PTRI HSE Policy Monthly HSE Discussion: NUHS NUHs Yrs. HSE INDICATORS Jan Feb Mar Apr May Jun Jul Aug Sep Oct Nov Dec Yr-2023 Cum.
Total Accident Free Man Hours 5,960 18,880 1,703,160
Lost Time Injury 0 First Aid Case 0 Days Away From Work Case (DAFW) 0 Restricted Work Actvity Case (RWAC) 0 Near misses, Unsafe acts, Hazards 3 - NUHS Envrionment damage 0 Equipment Mobilization Failure 0 Personnel Mobilization Failure 2
Customer Service Quality
Questioner -CSQQ 8.5 Asset Failure Notification (AFN) 0 Health, Safety, And Environmental Policy 1. Promote a strong health, safety and environmental culture, workforce empowerment and individual HSE responsibility through the visible commitment of managers and active participation of all employees; 2. Adopt suitable for selection and assessment of employees to ensure that they are capable, competent and have a positive attitude towards HSE; 3. Provide employees with regular job related training, appropriate equipment and the responsibility to perform their duties in a safe working environment; 4. Complying with applicable health, safety and environmental laws and regulations; 5. Adopt a systematic approach to the identification, assessment and management of workplace hazards and to eliminate or control HSE risk in order to prevent accidents; 6. Encourage effective communication at all levels, keeping employees appropriately informed of all HSE measures in place to protect them; 7. Promote environmental awareness in all activities, particularly concerning the discharge of waste and the use of harmful substance; 8. Monitor the effectiveness of our efforts by regular inspections, reviews and audits, and ensure the continual improvement of HSE performance via innovation or correction action. NUHS February 2023 Cate Action by Date No. Name - Description & Hazards Remedy Status (close-out date) Submission gory M. I saw many catepillars at training room, the source was a tree Workshop 1 1 H I cut the tree Close Thamrin behind of the training building (Immediatelly) Workshop 2 1 Gindo VH H When I lifted sling to container, I found a spray paint tin I dispose the spray paint tin Close (Immediatelly) Some light lamp at fencing area behind of rutledge area was Workshop 3 4 Sakijo H Repair the lamp Close broken (Immediatelly) ADB regulator not equipped with release valve, It is an unsafe Workshop 4 4 Sakijo H Install a release valve on the ADB regulator Close condition, hose can be blow out. (Immediatelly) Workshop 5 5 Sakijo H There is no air exhaust in toilet Please install air exhaust Close (Immediatelly) I saw air regulator from cascade not released first, the cascade Workshop 6 5 Sakijo H Prepare all equipment before sent to outside Close will be taken out for load test (Immediatelly) Puguh When I did maintenance for ADB, I found some pressure gauge Workshop 7 5 H Replace the pressure gauge Close Widodo had crack. (Immediatelly) Workshop 8 7 Sakijo H Some container supported use rod of coconut tree Please replace the container support immediately Close (Immediatelly) Workshop 9 7 Sakijo H I saw a visitor not using PPE when visit workshop Use PPE at PPE area Close (Immediatelly) I have got a message from COPI drilling project that there is a Workshop 10 8 Sakijo H Prepare all equipment and sparepart well Close cable broke inside (Immediatelly) Workshop 11 8 Sakijo H Check motor burned because the bearing quality is not good Close (Immediatelly) I clean the leaked gliserine and close the opened Workshop 12 11 Gindo VH H I found leaked gliserine on manifold and rack manifold. Close manifold (Immediatelly) I have got a message that there are problem at site project. There Workshop 13 14 Sakijo H Ensure the connection is correct Close are cable misconnection for air compressor. (Immediatelly) When I working at HCML area, company man calls rutledge to check gas, when bleeding out pressure happen, I saw a Workshop 14 14 Kakung H personnel from other service company still near from the spot, I Always remind each other Close (Immediatelly) remind him to move to main deck, because rig position is above of platform. Workshop 15 11 Gindo VH H I found some spider nest inside of air manifold (6 man) Keep breathing apparatus equipment and tools clean Close (Immediatelly) Workshop 16 20 Gindo VH H I observe there are bug inside 6 man manifold I refill a new gliserine into the air manifold Close (Immediatelly) Workshop 17 20 Risnandi H There is a leak on outline of cascade (for training) I fix the leaked part. (Immediatelly) and…
The Winner Is…
NUHS WINNER February 2023 NUHS : ADB regulator not equipped with release valve, It is an unsafe condition, hose can be blow out.
Remedy : Install a release valve on the ADB regulator