Project: MOZOON TOWERS

Compliance Statement for FAN COIL UNITS

No.
PART 2 - EQUIPMENTS
2.03
A
B

PART 3 - EXECUTION
3.01
A

B
3.02
A
3.03
A

3.04
A

3.05
A

B
C

3.06
A

1
2

END OF SECTION 15710


Project: MOZOON TOWERS
Compliance Statement for FAN COIL UNITS

Project Specifications
PART 2 - EQUIPMENTS
FAN COIL UNITS
General
Fan coil units consist of centrifugal fans, cooling coil, electric heating coil, (where
specified) and drain pan assembly, filter, insulated cabinet, discharge grille,
motorized valve kit, dynamic pressure compensating valve return air grille, motor
and drive all factory assembled.
Units shall be horizontal arrangement as scheduled or drawn.
Motorized valve shall be of the high pressure rating to withstand the maximum
system pressure and operate at the selected pump pressure at no additional cost.

Fans shall be centrifugal double inlet drive coupled to permanent split capacitor,
totally enclosed 3-speed motor suitable for 240V, 1-phase, 50 Hz supply.

Filters shall be of the cleanable aluminum type.


Cooling coils shall be of copper tube mechanically bonded to aluminum plate fins,
with brass header. The connection side shall be field changeable. Coils shall have
manual air vent and 15 mm FPT connections.
Unit casing shall be fabricated from galvanized sheet steel internally insulated. Unit
cabinet shall be fabricated from pre-painted sheet steel with a baked enamel finish.
Cabinet shall have doors for easy access to the fan switch and the connections on
the coil.
Units shall include speed control switch ( 3-speed/4 position) which shall select any
of the three available fan speeds and also switch off the fan. When the switch is in
the “ OFF “ position the unit shall be completely isolated from the mains.

Fan coil units shall be of the quite type with maximum noise level as specified in
various rooms.
Unit shall be selected on medium speed, 35dbA and specified static pressure.

Fan coil units shall be concealed type with plenum box and filter or exposed type
with cabinet decorative as shown on drawings
Fan coil units shall be complete with 2 way modulating motorized valves (3-way
valves in specific locations), gate valves, self balancing valves, double regulating
valves, strainers, di-electric fittings, unions and all other accessories as detailed on
drawings.
Digital type thermostat shall include speed control switch ( 3-speed/4 position)
which shall select any of the three available fan speeds and also switch off the fan.
When the switch is in the “ OFF “ position the unit shall be completely isolated from
the mains. Thermostat shall have cooling mode to control the 2-way or 3-way
motorized valve thermostat in summer, or heating mode to control the electric
heater (when specified) in winter. Refer to section 15900 for thermostat
specifications.
Microprocessor based with BMS Integration Capability

FCU electric heaters


Electric heaters shall be of the type installed in the horizontal type fan coil units or
duct mounted as instructed by the Engineer (type international) multi stage of 2kW
each, open wire type suitable for 240V/1PH/50Hz consisting of coils of high grade
resistance wire which are insulated by incorporating ceramic insulators in plated
steel brackets. These heat elements shall be suspended directly in front of the fan
outlet nozzle or installed in duct as instructed by the Engineer.

PART 3 - EXECUTION
EXAMINATION
Examine areas for compliance with requirements for installation tolerances and for
structural rigidity, strength, anchors, and other conditions affecting performance of
heat exchangers.
Proceed with installation only after unsatisfactory conditions have been corrected.
HEAT EXCHANGER INSTALLATION
Install heat exchangers according to manufacturer's written instructions.
CONNECTIONS
Piping installation requirements are specified in other Division 15 Sections.
Drawings indicate general arrangement of piping, fittings, and specialties.
Maintain manufacturer's recommended clearances for service and maintenance.
Install piping connections to allow service and maintenance of heat exchangers.

Install piping with threaded or flanged connections at heat exchangers.

Install shutoff valves at heat exchanger inlet and outlet connections.

Install relief valves on heat exchanger heated-fluid connection.

CLEANING
After completing system installation, including outlet fitting and devices, inspect
exposed finish. Remove burrs, dirt, and construction debris and repair damaged
finishes.
COMMISSIONING
Verify that heat exchangers are installed and connected according to the Contract
Documents.
Adjust flows and controls to deliver specified performance.
Test and adjust controls and safeties. Replace damaged and malfunctioning
controls and equipment.
DEMONSTRATION
Engage a factory-authorized service representative to train Owner's maintenance
personnel to adjust, operate, and maintain heat exchangers as specified below:

Train Owner's maintenance personnel on procedures and schedules for starting


and stopping, troubleshooting, servicing, and maintaining heat exchangers.
Review data in maintenance manuals. Refer to Division 1 Section "Operation and
Maintenance Data".

Schedule training with Owner, through Engineer, with at least seven days' advance
notice.

For approved Manufacturers refer to section 15999.


END OF SECTION 15710
Compliance Remarks

Comply. Controls and valve packages by


Contractor.

Comply.
Noted. Controls and valve packages by
Contractor.

Comply.

Comply
Comply.

Comply

Comply All units shall be with 3 speeds


& Units are selected at Medium
speed. Controlers shall be
contractors scope
Noted. Please refer to data sheets for
noise levels.
Comply with medium speed selection. Please refer to data sheets for
noise levels.
Comply.

Noted. Controls and valve packages by


Contractor.

Noted. Thermostat, controls and valve


packages by Contractor.
Noted. Thermostat, controls and valve
packages by Contractor.

Comply as remarks Electric heaters shall be


provided as per the capacity
wherever specified in
theequipment schedule.

Noted. Installation by Contractor.

Noted. Installation by Contractor.

Comply.

Noted. Piping installation by Contractor.

Noted. Piping installation by Contractor.

Noted. Piping installation by Contractor.

Noted. Piping installation by Contractor.

Noted. Piping installation by Contractor.

Noted. Housekeeping by Contactor.

Comply.

Comply.
Noted. Controls and accessories by
Contractor.

Comply. Euroclima Engineer / Supervisor


will conduct the IOM training for the End
user.
Comply. Euroclima Engineer / Supervisor
will conduct the IOM training for the End
user.
Comply. Euroclima Engineer / Supervisor
will conduct the IOM training for the End
user.
Comply. Euroclima Engineer / Supervisor
will conduct the IOM training for the End
user.

CTION 15710