In response to the site instruction to construct a valve chamber for connection into the
existing sewer line, we are proposing the following rates:

DESCRIPTION QUANTITY RATE TOTAL


Grade 25 concrete total $100 $100 usd
Brick layig total $100 $100 usd
plumber total $100 $100 usd
Excavation&backfilling total $50 $50 usd
GRAND TOTAL $350---00 USD

Regards:

M. Goredema( for and on behalf of Tabernacle Construction)

………….