Professional Documents
Culture Documents
N648703001p06-Motor Control Center #3 (Front)
N648703001p06-Motor Control Center #3 (Front)
THIS DRAWING AND THE INFORMATION CONTAINED HEREIN ARE THE SOLE PROPERTY OF SAUDI ARAMCO. NO REPRODUCTION IN FULL, OR IN PART, SHALL BE OBTAINED FROM THIS DRAWING WITHOUT THE WRITTEN CONSENT OF SAUDI ARAMCO.
a) To operate in a desert areaambiant temperature up to 35 ^C
L Space d) All surface to be provided with a tropical finish resistance to a highly corrosive Copper Aluminum
atmosphere and high humidity.
M Unit 1FM 2FM 4FM 4FM Ground bus yes/no Neutral bus yes/no
NONE
Arrangement of starting units, future space units, incoming line devices,and feeder
1FM REACTOR
2FD COOLING WATER PUMP-GM-208C 100 3 125 381 4 3/C #4/0 4/C #12 FVNR 4 2NO / 2NC 400 200 1200-4000 1880 22,000
2FH COOLING WATER PUMP-GM-211M 50 3 60 363 3 3/C #1 4/C #12 FVNR 4 2NO / 2NC 100 100 480-1000 792 22,000
2FM COOLING WATER PUMP-GM-211N 50 3 60 363 3 3/C #1 4/C #12 FVNR 4 2NO / 2NC 100 100 480-1000 792 22,000
SCALE:
REVISION VALIDATION
3FD REFRIDGE COND. EM-211P 50 3 60 363 3 3/C #1 4/C #12 FVNR 4 2NO / 2NC 100 100 480-1000 792 22,000
3FH 60 363 3/C #1 THIS REVISION NO. 06 IS COVERED, FOR ALL APPROVAL AND CERTIFICATION
REFRIDGE COND. EM-211Q 50 3 3 4/C #12 FVNR 4 2NO / 2NC 100 100 480-1000 792 22,000
REQUIREMENTS, PER SAEP-334, UNDER DRAWING COMPLETION CERTIFICATE NO:
3FM REFRIDGE COND. EM-211R 50 3 60 363 3 3/C #1 4/C #12 FVNR 4 2NO / 2NC 100 100 480-1000 792 22,000
532220-0811-004
4RM INTERSTAGE COOLER EM-201B-L 50 3 60 363 3 3/C #1 4/C #12 FVNR 4 2NO / 2NC 100 100 480-1000 792 22,000 REV.NO. DATE REVISION DESCRIPTION