SLA Based OFC Route Maintenance under Tripura BA during the month of September 2022

Name of the Route/Section Sonamura Boxanagar ROUTE


Route Length KM
RID
1 2 3 4 5 6 7 8 9
Fault IN Fault OUT Store Utilised Location of Joint
Total Transnet
.

Description of fault MN
No

Date Time Date Time outage OFC SJC PLB Lat Long ID
S l.

1 19.09.2022 14.37 19.09.2022 17.33 02.26 Ant byte 1469962


2
3
4
5
6
7

Total no. of faults


MTTR
% of faults with MTTR<6
% of faults with MTTR<8
Number of joints with < 0.05 dbm splice loss
Number of joints with splice loss >0.05 dbm
have been rectified within 7 days as per SLA

Signature of Vendor Signature of Route Incharge JTO/SDE

Signature of Divisional Head

Note - Column No 1 to 7 will be filled up by vendor while column no 8 to 10 will be filled up by route Incharge.
10

Nature of
Fault

FIBRE BREAK

harge JTO/SDE
SLA Based OFC Route Maintenance under Tripura BA during the month of September 2022
Name of the Route/Section Mohanpur - Padmabil OFC Route
Route Length Km
RID
1 2 3 4 5 6 7 8 9
Fault IN Fault OUT Store Utilised Location of Joint
Total Transnet
.

Description of fault MN
No

Date Time Date Time outage OFC SJC PLB Lat Long ID
S l.

Small Joint Box Damage


1 23.09.2022 11.37 23.09.2022 16.02 04.25
during NH Work
01 1473183

Total no. of faults


MTTR
% of faults with MTTR<6 0%
% of faults with MTTR<8 50%
Number of joints with < 0.05 dbm splice loss
Number of joints with splice loss >0.05 dbm
have been rectified within 7 days as per SLA

Signature of Vendor Signature of Route Incharge JTO/SDE

Signature of Divisional Head


Note - Column No 1 to 7 will be filled up by vendor while column no 8 to 10 will be filled up by route Incharge.
10

Nature of
Fault

Fibre Break

harge JTO/SDE
SLA Based OFC Route Maintenance under Tripura BA during the month of September 20
Name of the Route/Section Khowai - Tulashikar OFC Route
Route Length Km
RID
1 2 3 4 5 6 7
Fault IN Fault OUT Store Utilised Location of Joint
Total
.

Description of fault
No

Date Time Date Time outage OFC SJC PLB Lat


S l.

Cabale Damage by PWD


1 05.09.2022 09.29 05.09.2022 14.06 04.37 Dainage work 02

Total no. of faults


MTTR
% of faults with MTTR<6 0%
% of faults with MTTR<8 50%
Number of joints with < 0.05 dbm splice loss
Number of joints with splice loss >0.05 dbm
have been rectified within 7 days as per SLA

Signature of Vendor

Signature of Divisional Head

Note - Column No 1 to 7 will be filled up by vendor while column no 8 to 10 will be filled up by route Incharge.
month of September 2022

7 8 9 10
Location of Joint
Transnet Nature of
MN
Long ID Fault

1463990 Cable Break

Signature of Route Incharge JTO/SDE

te Incharge.
SLA Based OFC Route Maintenance under Tripura BA during the month of September 202
Name of the Route/Section Bishalghar - Golaghati OFC Route
Route Length
RID
1 2 3 4 5 6 7
Fault IN Fault OUT Store Utilised Location of Joint
Total
.

Description of fault
No

Date Time Date Time outage OFC SJC PLB Lat


S l.

1 17.09.2022 09.08 17.09.2022 13.29 04.22 PWD Work 50 2

Total no. of faults 1


MTTR
% of faults with MTTR<6
% of faults with MTTR<8
Number of joints with < 0.05 dbm splice loss
Number of joints with splice loss >0.05 dbm
have been rectified within 7 days as per SLA

Signature of Vendor

Signature of Divisional Head

Note - Column No 1 to 7 will be filled up by vendor while column no 8 to 10 will be filled up by route Incharge.
e month of September 2022

7 8 9 10
Location of Joint
Transnet Nature of
MN
Long ID Fault

1469920 Cable Break

Signature of Route Incharge JTO/SDE

ute Incharge.
SLA Based OFC Route Maintenance under Tripura BA during the month of September 202
Name of the Route/Section Sonamura Kathalia OFC Route
Route Length Km
RID
1 2 3 4 5 6 7
Fault IN Fault OUT Store Utilised Location of Joint
Total
.

Description of fault
No

Date Time Date Time outage OFC SJC PLB Lat


S l.

1 26.09.2022 09.15 26.09.2022 16.14 0659 Ant Byte


2
3
4
5
6
7

Total no. of faults


MTTR
% of faults with MTTR<6
% of faults with MTTR<8
Number of joints with < 0.05 dbm splice loss
Number of joints with splice loss >0.05 dbm
have been rectified within 7 days as per SLA

Signature of Vendor

Signature of Divisional Head

Note - Column No 1 to 7 will be filled up by vendor while column no 8 to 10 will be filled up by route Incharge.
e month of September 2022

7 8 9 10
Location of Joint
Transnet Nature of
MN
Long ID Fault

1473750 FIBRE BREAK

Signature of Route Incharge JTO/SDE

ute Incharge.

You might also like