Professional Documents
Culture Documents
01-DMM-120413-0001-Driving The Car at Night Time
01-DMM-120413-0001-Driving The Car at Night Time
DMM-180218-0001
Task: Driving the Car at Night Time Location: Dammam Head Office RA. No: Related Documentation / Legislation
Rev. 00
Brainerd Paraggua – Project Manager
Risk Assessment Team: Adnan Isani – Transportation Manager
Maximino Calinawan – Safety Officer
Switching on the car - Open electrical - Electric shock - Check for cuts and exposed wires and
When driving at
engine wires repair and replace damaged wires 2 2 4
night.
immediately.
- Faulty electrical - Burns - Check the wirings if connected properly
wiring and if there is available car circuit When driving at
2 2 4
diagram, then double check it to ensure night.
that it is properly connected.
Driving the car - Reckless - Vehicular - Driver must be well trained and must - Use of tracking device to
driving accident have valid driving license. monitor the speed, location of
- Driver must check the head lights and the driver and warn the driver When driving at
3 3 9 3 2 6
other components of truck if its 100% in if he is over speeding. night.
good condition. - Must have Standby or rescue
team in case of emergency.
- Fatality - Must be physically and mentally - Be a defensive driver.
When driving at
prepared anytime. 4 3 12 - Stop and take rest when you 4 1 4
night.
feel tired especially at night.
- Sand storm - Suffocation - Close all windows and bring extra
clothing to cover the face or wear dust
When driving at
mask. 2 2 4
night.
- Take extra precaution while driving.
- Fog - Vehicular - Always be alert when driving. 3 3 9 - If visibility is very low then 3 1 3 When driving at
IF THE RESIDUAL RISK RATING IS 8 OR ABOVE, then additional controls/ objectives need to be developed for the activity
Legend: S Severity and LLikelihood
Catastrophic (4) Critical (3) Serious (2) Marginal (1)
Frequent (4) 16 12 8 4 Prepared By: Maximino Calinawan Signature: Date: 18-02-2018
Probable (3) 12 9 6 3
Occasional (2) 8 6 4 2
Approved By: Arnold Densing Signature: Date: 18-02-2018
Remote (1) 4 3 2 1
ABDUL RAHMAN AL OTAISHAN GROUP FOR CONTRACTING
IF THE RESIDUAL RISK RATING IS 8 OR ABOVE, then additional controls/ objectives need to be developed for the activity
Legend: S Severity and LLikelihood
Catastrophic (4) Critical (3) Serious (2) Marginal (1)
Frequent (4) 16 12 8 4 Prepared By: Maximino Calinawan Signature: Date: 18-02-2018
Probable (3) 12 9 6 3
Occasional (2) 8 6 4 2
Approved By: Arnold Densing Signature: Date: 18-02-2018
Remote (1) 4 3 2 1