LOCATION NO: 557/08 557/09 557/10A 557/10 557/11A 557/11 557/12 557/13 557/14 557/15 558/01 558/02 558/03

557/11A 557/11 557/12 557/13 557/14 557/15 558/01 558/02 558/03 558/04 558/05 558/06 558/07 558/08 558/09 558/10 558/11A 558/11 558/12A 558/12 558/13 558/14 558/15 559/01 559/02 559/03 559/04 559/05 559/06 559/07 559/08 559/09 559/10 559/11 559/12 559/13 559/14 560/01 560/02 560/03 560/04 560/05 560/06 560/07 560/08 560/09 560/10 560/11 560/12 560/13 560/14 561/01 561/02 SECTION: VIRUDHUNAGAR-TENKASI

CHAINAGE: 557/506.65 557/578.65 557/632.65 557/637.15 557/691.15 557/695.65 557/754.15 557/812.65 557/871.15 557/938.65 558/16.95 558/88.95 558/160.95 558/232.95 558/304.95 558/376.95 558/448.95 558/520.95 558/588.45 558/660.45 558/718.95 558/727.95 558/786.45 558/790.95 558/853.95 558/916.95 558/979.95 559/41.35 559/113.35 559/185.35 559/248.35 559/311.35 559/383.35 559/455.35 559/527.35 559/599.35 559/671.35 559/743.35 559/810.85 559/882.85 559/954.85 559/20.95 560/92.95 560/160.45 560/232.45 560/304.45 560/376.45 560/443.95 560/515.95 560/587.95 560/659.95 560/731.95 560/799.45 560/871.45 560/938.95 561/10.65 561/78.15 PROJECT- PROVISION OF INTERLOCKING ARRANGEMENTS DRG NO: MDU/VPT-TSI/557-561/LC423
TYPE OF MAST: B-175 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-175 B-150 B-150 B-175 B-175 B-150 B-150 B-175 B-150 B-150 B-175 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-175 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-150 B-175 B-150 B-150 B-175 (3 NOS) AT MANNED LC'S BETWEEN VPT-TSI SEC. (LC 423)
STAGGER: 150 150 150 150 150 150 150 150 150 150 150 150 150 150 100 0 100 150 200 200 100 100 0 0 100 350 350 150 150 150 150 150 150 150 150 200 150 150 150 150 150 200 200 150 150 150 150 150 150 150 100 0 100 150 200 200 150 DATE: 23-05-2024

KM: 561
KM: 558 KM: 559 KM: 560

558/73.40
558/70.00
NOTES:-
TL: 1399.50

GATE DISTANT
TO LOC: 557/05 PROPOSED INTERLOCKING ARRANGEMENTS
UIOL FOR MAIN LINE CH: 313.15 IOL FOR MAIN LINE UIOL FOR MAIN LINE

560/1000.30
GATE HOME

561/000.00
HT LINE START

HT LINE END
DISMANTLING ARRANGEMENTS

558/1001.60

559/1001.40
CH TL: 1408.50 CH CH TL: 1309.50

557/993.70
558/000.00

559/000.00

560/000.00
TL: 522.00 TL: 1165.50 TL: 1125.00

557/744.15
TO LOC: 559/01 558/624.45 TO LOC: 557/05 TO LOC: 560/01 558/948.45 TO LOC: 561/02 560/56.95 TO LOC: 558/13

558/843.95
CH: 41.35 CH: 313.15 CH: 16.45 CH: 78.15 CH: 853.95
UIOL FOR MAIN LINE
ACC
675.00 634.50
10 09
10.00 10.00
ACC TL: 522.00 ACC CH
BRIDGE NO:35 TL: 1044.00 TL: 1125.00
697.50 TO LOC: 558/08 562.50
10 10 711.00 562.50 TO LOC: 561/15 560/974.95 TO LOC: 559/14
53.00 57.50 CH: 520.95 INTERLOCKED LC NO:423 INTERLOCKED LC NO:424 8 8 LC NO:425
CH: 915.15 CH: 954.85
BRIDGE NO:38
SM 50503
BWA
ACA ACA BWA BWA
ACA ACA
BWA BWA 63.00 ACA ACA BWA BWA BWA BWA
i=3.00
72.00 i=3.15 72.00 72.00 i=3.55 72.00 i=3.85 72.00 i=4.05 72.00 67.50 63.00 63.00 i=2.90 63.00 i=3.00 72.00 i=4.60 72.00 72.00 i=4.75 72.00 i=3.00 72.00 i=2.90 67.50 i=3.50 72.00 i=3.50 72.00 i=3.50 67.50 72.00 67.50 72.00 i=3.50 72.00 i=3.50 72.00 i=3.50 67.50 i=3.50 72.00 i=3.60 72.00 i=3.75 72.00 i=3.80 72.00 i=3.95 67.50 i=2.90 72.00 67.50 72.00 67.50
VIRUDHUNAGAR i=3.31 i=3.32 54.00 58.50 i=3.45 i=3.00 58.50 58.50 i=3.59 i=3.00 63.00 58.50 i=2.70 i=2.90
58.50 i=2.90 58.50 i=2.90 67.50 i=3.00 72.00 i=3.00 72.00 i=3.30
i=3.00 i=3.00 72.00 i=3.08 58.50 67.50 i=3.02
67.50 63.00 i=3.50 i=3.00
67.50 63.00 i=2.70 i=3.00 i=3.00 63.00 i=3.00
i=3.00
58.50 i=2.90 72.00 i=2.90 i=4.75 i=3.00 72.00 i=3.50 i=3.50 i=3.50 i=3.00 i=3.00 i=3.00 i=3.00 TENKASI APPROVED IN PRINCIPLE
i=3.30

H G G H G
F F H
I=2.60 I=2.70
i=4.10

TTL DSTE/GS/MDU DEE/TRD/MDU


STATION
BUILDING CHECKED & VERIFIED BY

M/S.J.HUSSAIN FARID
SSE/TRD/RJPM ADEE/TRD/TEN Proprietor

558/102.00

558/108.50
OHE PART LAYOUT PLAN

GATE DISTANT
GATE HOME

GATE HOME
559/172.50

559/173.70

559/192.10

559/553.50

559/579.30

559/741.00
FOR LC NO.423

559/766.00

559/774.00

560/811.20

560/815.00
559/77.30

559/81.70
(KM 557 TO 561)

PLATFORM START

PLATFORM START

PLATFORM START
BR END

PLATFORM END
559/267.70

559/983.00
SOUTHERN RAILWAY - MADURAI DIVISION

BR ST

561/4.100
LC STARTS

LC STARTS
LC STARTS

BR END
DATE REV NO. NATURE OF MOD SIGN

BR ST

LC ENDS

LC ENDS
LC ENDS
NAME / SIGN

DRN

LOCATION NO: (P.B.PARTHIBAN) SCALE : N.T.S


CHAINAGE:
TYPE OF MAST: DESIGNATION DESIGN ENGINEER
SUB-SCALE : N.T.S IR