MV Cable Sizing
MV Cable Sizing
30421007-3CL- SHEET i OF i
00013-P0B
4.16 kV MV CABLE
SIZING REPORT
DESIGN BASIS
FOR
4.16 kV MV CABLE SIZING
DOCUMENT NO : 30421007-3CL-00013-P0B
NOVEMBER 2004
ENGINEERING CONSULTANT
TCE CONSULTING ENGINEERS LIMITED
73/1, ST.MARK'S ROAD
BANGALORE 560001
INDIA
CONTRACTOR:
AL-TOUKHI COMPANY FOR INDUSTRY & TRADING
P.O.BOX 497, RIYADH 11411, KINGDOM OF SAUDI ARABIA
TEL.00966-1-4633660 : FAX.00966-1-4631150
P0B
MP SR
01.11.2004
P0A
MP SR
08.09.2004
275167996.xls
SHEET 1 OF 20
SECTION :cover sheeet
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
CONTENTS
SECTION DESCRIPTION
1.0 SCOPE
5.0 CONCLUSION
275167996.xls
SHEET 2 OF 20
SECTION :Index
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
275167996.xls
SHEET 3 OF 20
SECTION :Index
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
1.0 SCOPE
Scope of this report is to calculate the 4.16kV Cable sizes(3.6/6kV Grade) for the following 3 cases.
CASE-1
4.16 kV Cable size (3.6/6kV Grade) from 4.16kV Station Transformer T 401 orT 402 to 4.16kV Station
Switchgear incoming breakers.
CASE-2
4.16 kV Cable size (3.6/6kV Grade) from 4.16kV Station Switchgear to Station Aux Transformer T201 or T202.
CASE-3
4.16 kV Cable size (3.6/6kV Grade) from 4.16kV Station Switchgear to Starting Motors GT#7 or GT#8
2.2
IEC 60364-5-523 Selection and erection of electrical equipment-Current Carrying capacities in wiring system.
2.4 Key One Line Diagram for Arar Plant Drawing No: KA667481 REV-P0D
According to SES-P-104.03 Engineering standards Cl No:4.9.6 the minimum cable cross section may be
calculated with the formula:
142 x S
I =
t
Where,
I = Maximum Allowable conductor Short Circuit Current in Amps
t = Duration of Short circuits in seconds
S = Cross Sectional Area of Current Carrying conductor in Sqmm
K = Temperature co-efficient of conductor resistance. = 142 for copper XLPE
therefore,
Ix t
S =
275167996.xls
SHEET 4 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
FOR CASE-1
25000 x 3
S =
142
S = 304.930 Sqmm
Minimum nearest cable size is 400 Sqmm (Refer SAUDI CABLE COMPANY)
However,As per the Cl.No. 3.03-13 of PTS-1022, page 40 of 336, the size of cable from Station
Transformer to Station Switchgear is selected as 1C x 630 Sqmm/Phase Cu, XLPE Unarmoured.
FOR CASE-2
25000 x 1
S =
142
S = 176.056 Sqmm
Minimum nearest cable size 185 Sqmm (Refer SAUDI CABLE COMPANY)
However, as per the Cl.No. 3.03-13 of PTS-1022, page 40 of 336, the size of cable from Station
Switchgear to Station Aux Transformers T201or T202 is selected as 1C x 630 Sqmm/Phase Cu, XLPE
unarmoured.
FOR CASE-3
25000 x 1
S =
142
S = 176.056 Sqmm
Minimum nearest cable size 185 Sqmm (Refer SAUDI CABLE COMPANY)
However, as per the Cl.No. 3.03-14 of PTS-1022, page 40 of 336, the size of cable from Station
Switchgear to Starting Motor is selected as 3C x185 Sqmm, Cu, XLPE Unarmoured.
CASE-1 from 4.16kV Station Transformer T 401 orT 402 to 4.16kV Station Switchgear incoming
breakers.
CASE-2 from 4.16kV Station Switchgear to Station Aux Transformer T201 or T202.
275167996.xls
SHEET 5 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
According to SAUDI CABLE COMPANY Catalogues for Medium Voltage Cable System,the nominal
current carrying capacities are,
FOR CASE-1 & case 2
Current Carrying capacity
Laying Conditions(in duct) in Amps for 1C x 630
Sqmm
Laid directly in ground or duct ways, Ground
temp.in flat formation 30 DegC and Thermal
665
resistivity of soil = 1.2K m/W, depth of laying =
0.8m
Laid directly in ground or duct ways, Ground
temp.in trefoil formation 30 DegC and Thermal
720
resistivity of soil = 1.2K m/W, depth of laying =
0.8m
Derating factor Kd for 1C x 630 Sqmm Cable Laid in Duct ways :(for both Flat/trefoil formation)
Derating factor Ka for 1C x 630 Sqmm Cable installed in free air:(for both Flat/trefoil formation)
Derating Factor Ka = K5 x K6
Ka = 0.7654
According to the above, the maximum current carrying capacity of the selected 1C x 630Sqmm cable
as follows
Maximum current carrying capacity of 1C x 630Sqmm Cable Laid in Duct ways(after considering
derating factor)
275167996.xls
SHEET 6 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
As per above calculation, 2-Nos of 1C x 630 Sqmm/Phase cable can carry the required load current
of 1040.96Amps under all site conditions when cable laid in Air(Cable Tray)
The following Derating factors have been considered as per SAUDI CABLE COMPANY Catalogues
for the site conditions specified:
275167996.xls
SHEET 7 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
Derating Factor Ka = K5 x K6
Ka = 0.6230
According to the above, the maximum current carrying capacity of the selected 3C x 185 Sqmm cable
as follows
Maximum current carrying capacity of 3C x 185 sqmm Cable Laid in Duct ways(after considering
derating factor)
Maximum current carrying capacity of 3C x 185 Sqmm Cable Laid in Air(Cable Tray)
(after considering derating factor)
The Voltage Drop for CASE-1 from 4.16kV Station Transformer T 401 orT 402 to 4.16kV Station
Switchgear incoming breakers.
The Voltage Drop for CASE-2 from 4.16kV Station Switchgear to Station Aux
Transformer T201 or T202.
FOR CASE-3 from 4.16kV Station Switchgear to Starting Motor GT#7 or GT#8
275167996.xls
SHEET 8 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
During starting
V% = 3 (I1Z1L1 + I2Z2L2)x100/Un
Where,
Un = Voltage in V = 4160
I2 = 615.45 Amps
Z1 = 0.12
Z2 = 0.12
The Voltage drop in cable from secondary of station Transformer to 4.16kV Motor terminal during starting
condition of 4.16kV Motor
During Running
V% = 3 (I1Z1L1 + I2Z2L2)x100/Un
Where,
I1 is the current in Station Transformer
I1 = I2 + Base load on 4.16kV SWGR
Secondary side cable
275167996.xls
SHEET 9 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
I1 = 372.035
I2 = 102.575
Z1 = 0.09
Z2 = 0.16
5.0 CONCLUSION
CASE-1
From Station Transformers T 401 or T 402 to Station switchgear incoming breakers
3/6 kV Grade, XLPE insulated, Copper Conductor of size 3Nos-1C x 630 Sqmm/Phase,
Unarmoured cable has been selected based on the above calculations when cable laid in duct ways.
CASE-2
From Station Switchgear to Station Aux Transformers T 201 or T 202
3/6 kV Grade, XLPE insulated, Copper Conductor of size 1C x 630 Sqmm/Phase, Unarmoured
cable has been selected based on the above calculations.
CASE-3
From 4.16kV Station Switchgear to Starting motors GT#7 & GT#8
3.6/6 kV Grade, XLPE insulated, Copper Conductor of size 3C x 185 Sqmm, Unarmoured
cable has been selected based on the above calculations.
275167996.xls
SHEET 10 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
275167996.xls
SHEET 11 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
V-P0D
275167996.xls
SHEET 12 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
275167996.xls
SHEET 13 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
Amps
275167996.xls
SHEET 14 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
Amps
Amps
Amps
oming breakers)
can carry the required load current
275167996.xls
SHEET 15 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
Amps
Amps
r to Station Aux
or GT#7 or GT#8
275167996.xls
SHEET 16 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
n 4.16kV SWGR
n 4.16kV SWGR
urrent = 102.575amps
275167996.xls
SHEET 17 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
ncoming breakers
s-1C x 630 Sqmm/Phase,
lations when cable laid in duct ways.
ncoming breakers
s-1C x 630 Sqmm/Phase,
lations when cable laid in Air (Cable Tray).
275167996.xls
SHEET 18 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
275167996.xls
SHEET 19 OF 20
SECTION :Notes and Sizing Cal
GENERATION EXPANSION OF ARAR POWER PLANT
(CONTRACT NO : 30421007/00)
FULL
LENGTH
SL LOAD CURRENT CARRYING CAPACITY OF CABLE (SINGLE CURRENT CARRYING CAPACITY OF % VOLTAGE
FEEDER DESCRIPTION LOAD VOLTAGE CABLE SIZE SELECTED DERATING FACTOR OF
NO. CURRENT RUN) CABLE AFTER DERATING FACTOR (SINGLE RUN) DROP
CABLE
IFL
CABLE LAID IN DUCT CABLE LAID IN AIR(CABLE CABLE LAID IN DUCT CABLE LAID IN AIR- CABLE LAID IN DUCT CABLE LAID IN AIR(CABLE
kVA / kW VOLTS AMPS SQ.MM BANKS CABLE TRAYS KM %
BANKS TRAY) BANKS TRAY)
(IN BOTH (IN
FLAT/TREFOIL BOTH FLAT/TREFOIL
IN DUCT IN AIR IN FLAT IN TREFOIL IN FLAT IN TREFOIL IN FLAT IN TREFOIL IN FLAT IN TREFOIL
FORMATION) FORMATION)
BANKS FORMATION FORMATION FORMATION FORMATION FORMATION FORMATION FORMATION FORMATION
CASE-1
3 RUNS OF 2 RUNS OF
STATION TRANSFORMER T401 or
1C X 1C X
1 T402 TO STATION SWITCHGEAR 7500 4160 1040.93 665.00 720.00 980.00 960.00 0.6256 0.7654 416.02 450.43 750.09 734.78 0.05 0.109
630 sqmm / 630 sqmm /
INCOMING BREAKERS (Load in
phase phase
kVA)
CASE-3
for starting = 0.85
STATION SWITCHGEAR TO 1 RUN OF 1 RUN OF
3 596.8 4160 102.58 380.00 410.00 0.7364 0.6230 279.83 255.43 0.2 for running
STARTING MOTORS GT#7 or 3C X 185 3C X 185
= 0.21
GT#8 (Load in kW)
275167996.xls SHEET 20 OF 20
SECTION :Cable Sizing Report Summary