Download as xlsx, pdf, or txt
Download as xlsx, pdf, or txt
You are on page 1of 5

FORMULIR USG-I

SIMPANG TAK BERSINYAL Tanggal : 13 Juni 2024 Ditangani Oleh : Angga Dwi Sasmita
FORMULIR USIG-I : Kota : Bogor Provinsi : Jawa Barat
- GEOMETRI Jalan Utama : Jalan Raya Parung (B & D)
- ARUS LALU LINTAS Jalan Minor : Jalan Mad Nur (A)
Jalan Raya Bojong Gede - Kemang (C & E)
Soal : UAS Matkul Reklalin Periode : Jam Puncak Sore
Geometri Simpang Arus Lalu Lintas D
Jalan Raya Parung 98 151 102
U
D
14 M

Jalan Raya Bojong Gede -


10 M Kemang 8
C
15 C
6M
10 M 12
Jalan Mad Nur A
7M 20
10 M
E A 30
6M 15
10 M 10
B 10 M Jalan Raya Bojong Gede - 16 E
Kemang
7
14 M

Jalan Raya Parung 101 150 102


Median Jalan Utama L
B

1 KOMPOSISI LALU LINTAS LV%: HV%: MC%: Faktor-smp Faktor-k

Kend. Tak
ARUS LALU LINTAS Arah Kendaraan Ringan LV Kendaraan Berat HV Sepeda Motor MC Kendaraan bermotor total MV
bermotor UM
kend/jam
emp = 1,0 emp = 1,3 emp = 0,5 Rasio
Pendekat Kend/Jam Kend/Jam Kend/Jam Kend/Jam smp/jam
smp/jam smp/jam smp/jam Belok

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
2 Jl. Minor : A LT 20.00 20.00 5.00 6.50 450.00 225.00 475.00 251.50 0.363807 7
3 ST 30.00 30.00 0.00 0.00 420.00 210.00 450.00 240.00 15
4 RT 15.00 15.00 6.00 7.80 354.00 177.00 375.00 199.80 0.289021 14
5 Total 65.00 65.00 11.00 14.30 1,224.00 612.00 1,300.00 691.30 36
6 Jl. Minor : C LT 12.00 12.00 1.00 1.30 350.00 175.00 363.00 188.30 0.404338 5
7 ST 15.00 15.00 2.00 2.60 200.00 100.00 217.00 117.60 4
8 RT 8.00 8.00 1.00 1.30 301.00 150.50 310.00 159.80 0.343139 8
9 Total 35.00 35.00 4.00 5.20 851.00 425.50 890.00 465.70 17
10 Jl. Minor : E LT 7.00 7.00 3.00 3.90 300.00 150.00 310.00 160.90 0.373491 7
11 ST 16.00 16.00 2.00 2.60 190.00 95.00 208.00 113.60 2
12 RT 10.00 10.00 1.00 1.30 290.00 145.00 301.00 156.30 0.362813 5
13 Total 33.00 33.00 6.00 7.80 780.00 390.00 819.00 430.80 14
14 Jl. Minor total A+C+E 133.00 133.00 21.00 27.30 2,855.00 1,427.50 3,009.00 1,587.80 67
15 Jl. Utama : B LT 101.00 101.00 20.00 26.00 809.00 404.50 930.00 531.50 0.313847 15
16 ST 150.00 150.00 40.00 52.00 901.00 450.50 1,091.00 652.50 18
17 RT 102.00 102.00 10.00 13.00 789.00 394.50 901.00 509.50 0.300856 12
18 Total 353.00 353.00 70.00 91.00 2,499.00 1,249.50 2,922.00 1,693.50 45
19 Jl. Utama : D LT 102.00 102.00 8.00 10.40 872.00 436.00 982.00 548.40 0.305532 17
20 ST 151.00 151.00 50.00 65.00 974.00 487.00 1,175.00 703.00 19
21 RT 98.00 98.00 15.00 19.50 852.00 426.00 965.00 543.50 0.302802 13
22 Total 351.00 351.00 73.00 94.90 2,698.00 1,349.00 3,122.00 1,794.90 49
23 Jl. Utama total B+D 704.00 704.00 143.00 185.90 5,197.00 2,598.50 6,044.00 3,488.40 94
24 Utama + Minor LT 242.00 242.00 37.00 48.10 2,781.00 1,390.50 3,060.00 1,680.60 0.331074 51
25 ST 362.00 362.00 94.00 122.20 2,685.00 1,342.50 3,141.00 1,826.70 58
26 RT 233.00 233.00 33.00 42.90 2,586.00 1,293.00 2,852.00 1,568.90 0.30907 52
27 Utama + Minor Total 837.00 837.00 164.00 213.20 8,052.00 4,026.00 9,053.00 5,076.20 0.640144 161
28 Rasio Jl. Minor / (Jl. Utama + Minor) Total 0.31279303 UM/MV: 0.02
FORMULIR USG-I
SIMPANG TAK BERSINYAL Tanggal : 13 Juni 2024 Ditangani Oleh : Angga Dwi Sasmita
FORMULIR USIG-I : Kota : Bogor Provinsi : Jawa Barat
- GEOMETRI Jalan Utama : Jalan Raya Parung (B & D)
- ARUS LALU LINTAS Jalan Minor : Jalan Mad Nur (A)
Jalan Raya Bojong Gede - Kemang (C & E)
Soal : UAS Matkul Reklalin Periode : Jam Puncak Sore
Geometri Simpang Arus Lalu Lintas D
Jalan Raya Parung
98 151 102
U
D
14 M

Jalan Raya Bojong Gede -


10 M Kemang
C 8
7M 15 C
10 M 12
Jalan Mad Nur A
8M 20
10 M
E A 30
6M
10 M 15 0
B 10 M Jalan Raya Bojong Gede -
0 E
Kemang

33
14 M

Jalan Raya Parung


101 150 102
Median Jalan Utama L
B

1 KOMPOSISI LALU LINTAS LV%: HV%: MC%: Faktor-smp Faktor-k

Kend. Tak
ARUS LALU LINTAS Arah Kendaraan Ringan LV Kendaraan Berat HV Sepeda Motor MC Kendaraan bermotor total MV
bermotor UM
kend/jam
emp = 1,0 emp = 1,3 emp = 0,5 Rasio
Pendekat Kend/Jam Kend/Jam Kend/Jam Kend/Jam smp/jam
smp/jam smp/jam smp/jam Belok

(1) (2) (3) (4) (5) (6) (7) (8) (9) (10) (11) (12)
2 Jl. Minor : A LT 20.00 20.00 5.00 6.50 450.00 225.00 475.00 251.50 0.363807 7
3 ST 30.00 30.00 0.00 0.00 420.00 210.00 450.00 240.00 15
4 RT 15.00 15.00 6.00 7.80 354.00 177.00 375.00 199.80 0.289021 14
5 Total 65.00 65.00 11.00 14.30 1,224.00 612.00 1,300.00 691.30 36
6 Jl. Minor : C LT 12.00 12.00 1.00 1.30 350.00 175.00 363.00 188.30 0.404338 5
7 ST 15.00 15.00 2.00 2.60 200.00 100.00 217.00 117.60 4
8 RT 8.00 8.00 1.00 1.30 301.00 150.50 310.00 159.80 0.343139 8
9 Total 35.00 35.00 4.00 5.20 851.00 425.50 890.00 465.70 17
10 Jl. Minor : E LT 33.00 33.00 6.00 7.80 780.00 390.00 819.00 430.80 1 7
11 ST 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 2
12 RT 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0.00 0 5
13 Total 33.00 33.00 6.00 7.80 780.00 390.00 819.00 430.80 14
14 Jl. Minor total A+C+E 133.00 133.00 21.00 27.30 2,855.00 1,427.50 3,009.00 1,587.80 67
15 Jl. Utama : B LT 101.00 101.00 20.00 26.00 809.00 404.50 930.00 531.50 0.313847 15
16 ST 150.00 150.00 40.00 52.00 901.00 450.50 1,091.00 652.50 18
17 RT 102.00 102.00 10.00 13.00 789.00 394.50 901.00 509.50 0.300856 12
18 Total 353.00 353.00 70.00 91.00 2,499.00 1,249.50 2,922.00 1,693.50 45
19 Jl. Utama : D LT 102.00 102.00 8.00 10.40 872.00 436.00 982.00 548.40 0.305532 17
20 ST 151.00 151.00 50.00 65.00 974.00 487.00 1,175.00 703.00 19
21 RT 98.00 98.00 15.00 19.50 852.00 426.00 965.00 543.50 0.302802 13
22 Total 351.00 351.00 73.00 94.90 2,698.00 1,349.00 3,122.00 1,794.90 49
23 Jl. Utama total B+D 704.00 704.00 143.00 185.90 5,197.00 2,598.50 6,044.00 3,488.40 94
24 Utama + Minor LT 268.00 268.00 40.00 52.00 3,261.00 1,630.50 3,569.00 1,950.50 0.384244 51
25 ST 346.00 346.00 92.00 119.60 2,495.00 1,247.50 2,933.00 1,713.10 58
26 RT 223.00 223.00 32.00 41.60 2,296.00 1,148.00 2,551.00 1,412.60 0.278279 52
27 Utama + Minor Total 837.00 837.00 164.00 213.20 8,052.00 4,026.00 9,053.00 5,076.20 0.662523 161
28 Rasio Jl. Minor / (Jl. Utama + Minor) Total 0.31279303 UM/MV: 0.02
FORMULIR USG-II
SIMPANG TAK BERSINYAL Tanggal : 13 Juni 2024 Ditangani Oleh : Angga Dwi Sasmita
FORMULIR USIG-II : Kota : Bogor Ukuran Kota : 5.965.410 JIWA (th. 2019)
- ANALISA Jalan Utama : Jalan Raya Parung (B & D) Lingkungan Jalan : Komersial
Jalan Minor : Jalan Mad Nur (A) Hambatan Samping : Sedang
Jalan Raya Bojong Gede - Kemang (C & E)
Soal : UAS Matkul Reklalin Periode : Jam Puncak Sore

1. Lebar pendekat dan tipe simpang

Lebar Pendekat (m) Jumlah lajur Gambar


Jalan Minor Jalan Utama B-1:2
Jumlah Lengan Tipe Simpang Tbl B-
Pilihan Lebar Pendekat
Simpang 1:1
rata - rata WI Jalan Jalan
WA WC WE WACE WB WD WBD
Minor Utama

(1) (2) (3) (4) (4) (5) (6) (7) (8) (9) (10) (11)
1 5 7.00 6.00 6.00 6.33 14.00 14.00 14.00 9.40 3 2 424

2 5 8.00 7.00 6.00 7.00 14.00 14.00 14.00 9.80 3 2 424

2. Kapasitas
Faktor Penyesuaian Kapasitas (F)
Kapasitas Dasar
Lebar Pendekat Median Jalan Hambatan Kapasitas
CO smp/jam Ukuran Kota Belok Kiri Belok Kanan Rasio Minor / Total
Pilihan rata - rata Utama Samping

FW FM FCS FRSU FLT FRT FMI (C)


Tbl. B-2:1 Gbr. B-3:1 Tbl. B-4:1 Tbl. B-5:1 Tbl. B-6:1 Gbr. B-7:1 Gbr. B-8:1 Gbr. B-9:1 smp/jam
(20) (21) (22) (23) (24) (25) (26) (27) (28)

1 3,400 1.31 1.20 1.05 0.94 1.373 1 0.875 6,338.69

2 3,400 1.34 1.20 1.05 0.94 1.459 1 0.875 6,888.09

3. Perilaku Lalu Lintas

Arus Lalu Lintas Tundaan lalu-


Derajat Tundaan lalu- Tundaan lalu- Tundaan geometrik
(Q) lintas Jl. Tundaan simpang Peluang antrian Sasaran
Kejenuhan lintas simpang lintas Jl. Minor simpang
smp/jam Utama
Pilihan
USIG-I (DS) DTI DMA DMI (DG) (D) (QP %)

Brs. 27-Kol 10 (30)/(28) Gbr. C-2:1 Gbr. C-2:2 (32)+(35) Gbr. C-3:1

(30) (31) (32) (33) (34) (35) (36) (37) (38)


1 5,076.20 0.801 9.093 6.691 14.370 4.183 13.276 25,86 - 56,84 DS > 0,75

2 5,076.20 0.737 7.964 5.903 12.492 4.260 12.224 22,07 - 50,75 DS < 0,75

Catatan mengenai perbandingan dengan sasaran (39)

PLH-1 Pada Kondisi yang ada, DS lebih dari 0,75 maka masuk klasifikasi tinggi

PLH-2 Pelarangan Belok Kanan dan Jalan Lurus pada jalan Minor E serta penambahan lebar Jalan pada Minor A dan Minor C sebesar 1 meter

Penyelesaian:

a.) Formulir USIG-I dan USIG II menunjukkan hasil perhitungan. Ringkasannya sebagai berikut:

- Kapasitas 6,338.69 smp/jam

- Derajat kejenuhan 0.801

- Tundaan Lalu-lintas simpang 9.093 det/smp

- Tundaan Lalu-lintas Jalan Utama 6.691 det/smp

- Tundaan Lalu-lintas Jalan Minor 14.370 det/smp

- Tundaan Geometrik simpang 4.183 det/smp

- Tundaan Simpang 13.276 dt/smp

- Peluang antrian 25,86 - 56,84 %

b.) Dengan anggapan bahwa Pelarangan Belok Kanan dan Jalan Lurus pada jalan Minor E serta penambahan lebar Jalan pada Minor A dan Minor C sebesar 1 meter

maka kapasitas simpang menjadi 6,888.09 smp/jam,

dan derajat kejenuhan (DS) 0.737 (lihat formulir USIG-II).

You might also like