Download as docx, pdf, or txt
Download as docx, pdf, or txt
You are on page 1of 10

DEFENCEHOUSINGAUTHORITY

Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

Civil Infra Work Sector-F Ext


MONTHLY PROGRESS REPORT NO.10
PERIOD: 01 February 2024 to 29 February 2024

SUBMITTED BY:
BRIXEN ASSOCIATES AK COMMUNICATION (JV)

CONTENTS

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

 Sector Plan (Sketch)

 Contract Detail

 Executive Summary/Overview

 Weather Report

 Payment Status (IPC Detail)

 Monthly Civil Works Summary

 Lab Test Report

 S-Curve

 Manpower Detail

 Equipment Detail

 Progress Plan

 Progress Pictures

Key Plan

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

Contract Detail

Name of Project Civil Infra Works of Sec-F Ext


Location Bahawalpur

Client DHAB

Design /Consultant Al-Imam JV FAHHM

Consultants

Commencement Date 05 Jan 2023

Actual Completion Date 04 Jan 2024

After EOT Completion Date 04 May 2024

Duration 16 Months

Project Cost Sector-F Ext 637.144 Mn

Executive Summary/Overview

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

Date of Commencement: 05 Jan 2023


Date of Completion: 04 May 2024

This Monthly Report covers progress up to 29 February 2024.

1. Road work
Earth Work, Sub Grade Preparation, Sub Base, Aggregate Base Course Work in Progress.

2. Sewerage work
Excavation of Trenches Work in Progress
Sand Bedding and RCC Pipe Installation work in progress.
Construction of manholes work in progress.
Backfill Work in Progress.
House Chamber & Crossing Work in Progress.

3. Drain Work
Excavation, Lean, Steel Fixing and Concrete for Bed, Walls Top Slab & Backfill
Works Completed. Grating Works in Progress
4. Rising Main
Excavation and Pipe Installation Works in Progress.
RCC Sleeve works Completed.

5. Water Supply Networks


Excavation and RCC Pipe Installation for Sleeves and Road Crossing works in Progress.
Excavation & Installation of Main Pipeline and HDPE Pipe Installation in Progress.

6. OHWT
Excavation Sand Bed, Lean, Steel Fixing, Concrete & Bitumen Coating for Raft Completed.
Backfilling, Shaft Steel & Concrete Pouring Works Completed.
Bowl Concrete Pouring is completed. Stair Concrete Pouring Work in Progress.

7. Electrical Sleeves Works


Excavation, Pipe Installation, Sand Cushion & Backfilling Work in Progress.

Weather Report
BRIXEN ASSOCIATES AK COMMUNICATION (JV)
Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

Payment Status (IPC & EPC)

Se IPC No Submission Date Vetted Work Remarks


r Done (Mn)

1 IPC-01 24 May 2023 43.585 Paid

2 IPC-02 19 June 2023 64.941 Paid

3 IPC-03 24 Aug 2023 67.61 Paid

4 IPC-04 16 Oct 2023 50.66 Paid

5 EPC-01 (IPC- 11 Dec 2023 11.79 Paid


05)

6 IPC-06 26 Dec 2023 37.30 Paid

7 IPC-07 15-Feb 2024 19.41 In Progress

Grand Total 295.32

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

Progress Monthly Accumulative


Achieved Plan Lag (-) Achieved Plan Lag (-)
Sr Month Year
Progress % Progress /Lead+) Progress % Progress Lead+)
1 Dec 2022 - - - - - -
2 Jan 2023 - - - - - -
3 Feb 2023 - - - - - -
4 Mar 2023 - 1.000 -1.000 - 1.000 -1.000
5 Apr 2023 - 4.000 -4.000 - 4.000 -4.000
6 May 2023 9.336 8.000 1.336 9.336 8.000 1.336
7 Jun 2023 17.399 15.000 2.399 17.399 15.000 2.399
8 Jul 2023 19.965 24.600 -4.635 19.965 24.600 -4.635
9 Aug 2023 35.823 37.490 -1.667 35.823 37.490 -1.667
10 Sep 2023 39.873 42.630 -2.757 39.873 42.630 -2.757
11 Oct 2023 50.404 52.630 -2.226 50.404 52.630 -2.226
12 Nov 2023 56.405 58.630 -2.225 56.405 58.630 -2.225
13 Dec 2023 47.230 64.630 -17.400 47.230 64.630 -17.400
14 Jan 2024 50.412 73.630 -23.218 50.412 73.630 -23.218
15 Feb 2024 52.561 81.630 -31.069 52.561 81.63 -31.069

Monthly Civil Works Progress Summary

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

Monthly Lab Report


CIVIL INFRASTRUCTURE DEVELOPMENT WORKS Sector F- Extension DHA BAHAWALPUR
Progress Sheet Month of February,2024
FDT
Sieve Sand Unit C/ Los Cylinder
Description Fai PI MDD CBR Sp.gr Calibratio Penitr Extra GMM GMB Stabiltiy
Total Pass Analysis Equivalent wt Lumps Ang 28 days
l Soundness
Earth.work 33 27 6 1 1 1 1
Cone Calibration
Granular Sub Base 18 15 3 1 1 1 1 1 1 1
Agg/Base Corse 17 12 5 1 1 1 1 1 1 1
C/Agg For Concrete
F/Agg For Concrete
Compressive Strength 27
Comp/ Stre Of Bricks
Comp/Stre Kerb
3
Stone
Asphalt Binder Cource
Core Compaction
Bitumen
cement
C/Agg For DST
This Month 68 54 14 3 3 3 3 2 0 2 0 0 0 0 0 0 0 0 2 30
Previous
301 242 63 38 24 24 20 13 1 10 2 2 0 0 0 0 0 0 6 261
Accumulative
Total Accomulative 369 296 77 41 27 27 23 15 1 12 2 2 0 0 0 0 0 0 8 291

Cotractor Rep: Consltant Rep:

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur
DEFENCEHOUSINGAUTHORITY
Civil Infra Works Sec-E DHA, Bahawalpur

Doc.#: BA/MPR/10 Submission Date 04 Mar 2024

S CURVE OF Sec-F Ext.

110.00

90.00

70.00

50.00

30.00

10.00

Dec- Jan- Feb- Mar- Apr- May- Jun- Jul- Aug- Sep- Oct- Nov- Dec- Jan- Feb- Mar- Apr- May-
22 23 23 23 23 23 23 23 23 23 23 23 23 24 24 24 24 24
P 0 0 0 1 4 8 15 24.6 37.4 42.6 52.6 58.6 64.6 73.6 81.6 90.6 96.6 100
l 9 3 3 3 3 3 3 3 3
a
n
n
e
d
A 0 0 0 0 0 9.33 17.3 19.9 35.8 39.8 50.4 56.4 47.2 50.4 52.5 NaN NaN NaN
c 6 99 65 23 73 04 05 3 12 61
h
i
e
v
e
d

BRIXEN ASSOCIATES AK COMMUNICATION (JV)


Defence Housing Authority Civil Infra Work Sector-F Ext,Bahawalpur

You might also like