Revision: 01
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 1 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Site survey -Un-authored -security breach, 5 4 20 H • All Personnel and CVMPE to have -Security 5 2 10 L
access -minor or major injury valid NEOM QR Code -Managers
-Site vehicle -Risk of getting hit by vehicles • Obtain Permission from relevant -Supervisor
movement authorities
• Site induction to be given to all
-falling objects Human error resulting into injury and personnel which will include
-slip trip and damage emergency exit route, assembly point
fall and emergency services etc.
Slip /Trip/ Fall • Demark designated access point /
New walk ways.
employees & • Adequate PPE should be worn at all-
Young Bites or stings time includes hard hat, reflective
employees jacket, safety goggles, safety
boots/shoes & face mask.
Poor Lighting / • Personnel should be adequately
Excessive trained for the task and aware of
lighting onsite hazard present and
appropriate controls to be
Presence of implemented.
Fauna & Flora • Adequate lighting as per the
NEOM SOP requirements (Section 3.8
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-001-OCT-2022 - ABG Form 01 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 2 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
N E O M - N P R - S O P - 00 8 ) shall
be provided.
• Lux levels at the working area
especially during night shall be
monitored and recorded.
• Maintenance and replacement of
faulty lighting fixtures to be provided.
• Pest Control to be done at all
areas of the site, as rodents attracts
Snakes.
• Food Waste to be disposes on
time as open food waste attracts
rodents.
• Remove unwanted bushes and
close all visible burrows inorder to
reduce the hiding places for
venomous Reptiles and Scorpions.
• Consider that snakes & scorpions
may be at site.
• Wear gloves during manual
handling
• Do not place hands etc. under
rocks without checking first
• Report and highlight visibility of
any of the above
• Conduct awareness TBT and do
not touch or engage any of the
above.
• Should a bite or sting – provide
immediate first aid and seek medical
help.
• Try to take a photograph of
animal for hospital reference – DO
NOT attempt to catch the animal.
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 3 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 4 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 6 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Scaffold Erection Falling of Severe Personal injuries/ Fatality 5 5 25 H • A competent temporary works Temporary 5 2 10 L
materials Property Damage coordinator is to be appointed. work
Falling of • All temporary works must have a coordinator
personnel design and load calculation Supervisor,
prepared by competent structural Operator,
engineer Project
• All access equipment must be manager,
stable with sound footings, wheels Engineer
locked (where fitted) and tied into
the structure where specification
or design requires.
• General and emergency access
routes must be clearly defined,
signed, barricaded, and lit paying
particular attention to emergency
routes.
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 7 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 9 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 10 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Use of Skin burns, Exposure to chemical 5 4 20 H • Store the chemical in a cool, dry, Temporary 5 2 10 L
chemical/hazardous and well-ventilated area away works
material eye irritation, Improper handling and storage from direct sunlight and ignition coordinator
Supervisor,
sources.
Inhalation of fumes released during the Operator,
respiratory • Ensure containers are tightly
mixing and application. Project
issues due to sealed and clearly labelled manager,
contact with Splashing of chemical • Have spill containment kits Engineer
or inhalation
readily available on-site
of chemicals. Accidental ingestion • Follow the manufacturer’s
Chemical Working in poor ventilated areas.
instructions for handling, mixing,
spill, leaks or
and applying the chemicals.
other
environmental • Use dispensing tools designed for
contamination the chemical to minimize direct
contact.
Respiratory • Ensure adequate ventilation in
irritation.
the work area to dissipate fumes.
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 11 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Allergic
reactions
Use of MEWP Operating Personal serious Injuries 5 4 20 H • All MEWP must be undergone for Manager 5 2 10 L
whilst Falling /suspension injury NEOM inspection and certified by Site Engineer
travelling Personnel Injury NEOM/AECOM team. Supervisor
Property Damage HSE Officer
Operative Fall • All operators required to be use
from height PFAS.
Drop Objects
(Tools and • Training to all operators on use of
materials) MEWP
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 12 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 13 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Working in Extreme Heat, Rain, Personnel Injury 4 4 16 M • Weather to be monitored on Site Engineer 4 2 8 L
weather condition Strong wind Ill-health daily basis. Supervisor
and other • During summer or extreme heat, HSSE Officer
inclement frequent breaks to be
weather implemented.
• Provide cool shaded rest area.
• Provide continuous supply of cool
drinking water,
• Heat stress training to be given to
all.
• Rehydration drink to be provided.
• Work schedule and timings to
adopt the condition.
• Heavy and tiring activity to be
done on early part of the day.
• Implement work rotation, if
necessary, during hot condition.
• Follow mid-day break work rules.
• No external works to be done
during rain and strong winds.
• Make sure all materials and
structure are secured properly to
prevent being blown away.
• All FOD and waste to be
controlled and removed on daily
basis.
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 14 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Exposure to dust / Dust Ill-health 3 4 12 M • Daily dust and noise monitoring Site Engineer 3 2 6 L
noise Noise NIHL (Noise induced Hearing loss) to be implemented. Supervisor
Asthma • Appropriate dust control HSSE Officer
Lung disorders measures to be implemented
(e.g. dust suppression by making
the work area dampened down
with water)
• Appropriate noise protection to
be implemented.
• Provide appropriate PPE e.g. dust
mask & hearing protection/ear
plugs.
• All sources of noise and dust to
be contained at its source..
• Replace all noisy equipment with
less noise producing
equipment/tools.
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 15 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
Mediu
High Medium Low High Low
m
Mediu
High Medium Low High Low
m
Total Number of Initial Risks per level Total Number Final Risks per level recorded
Risk Assessment Level Summary: 9 6 0 0 0 15
recorded before controls - after controls -
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.
HSSEF-018-REV-007-OCT-2021 - ABG Form 061 - Risk Assessment
Assessment Number: ABG-HSE-RA-061 Assessment Date: 19-05-2024 Revision Date: 20-05-2024 Page Number: 16 of 16
RISK INITIAL RISK FINAL
TASK STEP HAZARDS RISKS RATING RISK CONTROL MEASURES CONTROLLER RATING RISK
S L RR LEVEL S L RR LEVEL
RR3 = 15-18 = further assessment may be necessary to establish more precisely the
3 6 9 12 15 18 SUBSTANTIAL
Substantial likelihood of harm as a basis for determining the need for improved control
MEDIUM measures. A permit to work may have to be applied to achieve this.
Efforts should be made to reduce the risk, but the cost of prevention should
RR4 = 12 =
4 8 12 16 20 24 MODERATE be carefully measured and limited. Risk reduction measures should be
Moderate
implemented within a defined time period.
No additional control required. Consideration may be given to a more cost-
RR5 = 8-10 =
5 10 15 20 25 30 TOLERABLE effective solution or improvement that imposes no additional cost burden.
Tolerable
LOW Monitoring is required to ensure that the controls are maintained.
RR6 = 1-6 =
6 12 18 24 30 36 TRIVIAL No action is required and no documentary records needs to be kept.
Trivial
Notes : S=Severity of injury L= Likelihood of occurrence Risk Rating score (RR) = S x L RISK LEVEL = Resultant Risk Level being either High, Medium or Low.