Vedanta cairn oil & Gas Limited

2/18/2021

Rawa Terminal

Smit Chavan
Executive Summary

2
Table of Contents

Introduction....................................................................................................................................4
Scope of Work.............................................................................................................................4
Inspection Summary......................................................................................................................5
Line 2'' Line..................................................................................................................................6
Location TL 01 1.5'' Line-3 Cul-9............................................................................................6
Axisymmetric Analyses.......................................................................................................7
ANLYS 22 KHz..............................................................................................................7

3
Introduction

Scope of Work

4
Inspection Summary

A summary of the pipes examined at the test site are as follows:

Pipe ID Diameter Comments Photograph


Location TL 01 1.5'' Carbon
Line-3 Cul-9 Line 2'' Steel
Line

5
Line 2'' Line

Parameter Value
Tool Piezoelectric Standard
Pipe Material Carbon Steel
Pipe Size 5.08 cm
Pipe Schedule 40.00
Coating Material None
Coating Thickness 0.00 mm

Location TL 01 1.5'' Line-3 Cul-9

[Insert Image]

[Insert Caption]

Parameter Value
Datum Location At Tool
Distance to Datum 0.00 m
Tool Orientation Horizontal
Acquisition Length 15.00 m
Datum Notes

# Classification Distance (m) Notes


1 Flange -2.70
2 Weld 3.66
3 Pipe Support 5.01
4 Cat 1. 5.43
5 Cat 1. 5.75
6 Cat 1. 7.12

6
7 Weld 7.48
8 Cat 1. 7.94
9 Pipe Support 8.69
10 Bend Weld 9.71
11 Bend Weld 10.09
12 Bend Weld 10.46
13 Bend Weld 10.92

Axisymmetric Analyses

ANLYS 22 KHz