Professional Documents
Culture Documents
MADA - Pedu - Existing - Layout
MADA - Pedu - Existing - Layout
DIESEL
GENSET 1
TANK
2'-9" PLINTH WITH
TNB METER
30kVA GENSET
DEWATERING PUMP
PANEL AMF BOARD
(2 Duty(1.5m3/s/pump)
+ 1 Standby 3m3/s)
MSB
To tunnel
GENSET 2 HPU for existing
BV(connected) &
PLINTH Previously removed
the HJV(not connected)
SEPTIC
TANK
VOLTAGE
REGULATOR
Part of SCADA
SSB/
Junction/Termination
MCC
Box (Under previous
TOILET
contract)
FROM
GF
CONTROL HOUSE
PLAN
PLANT HOUSE PLAN PLANT HOUSE PLAN
LOWER FLOOR GROUND FLOOR