PERHITUNGAN VOLUME PEKERJAAN SALURAN

DAERAH IRIGASI : DALAM KOM


NAMA SALURAN : SALURAN PRIMER DALAM KOM RUAS 1
RUAS : INTAKE - BBM.1.Ka
PANJANG SALURAN : 1,399 meter

JARAK AREA VOLUME


ANTAR Timbun Timbun
Pembongkar Ps. Batu Plestera Timbun Pembon Ps. Batu
NO. PATOK Galian an Beton Galian Plesteran Timbunan an Beton
an Kali n an gkaran Kali
PATOK kembali kembali
(m) (m2) (m2) (m2) (m1) (m2) (m2) (m2) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
1 DM. 1 0.00 0.00 0.00 0.00 0.00 0.00 0.00
36.00 68.58 0.00 17.82 60.84 0.00 0.00 0.00
2 DM. 2 3.81 0.00 0.99 3.38 0.00 0.00 0.00
50.50 282.30 0.00 50.00 170.69 0.00 0.00 0.00
3 DM. 3 7.37 0.00 0.99 3.38 0.00 0.00 0.00
49.30 327.84 0.00 48.81 166.63 0.00 0.00 0.00
4 DM. 4 5.93 0.00 0.99 3.38 0.00 0.00 0.00
42.00 236.46 0.00 41.58 141.96 0.00 0.00 0.00
5 DM. 5 5.33 0.00 0.99 3.38 0.00 0.00 0.00
69.30 416.84 0.00 68.61 234.23 0.00 0.00 0.00
6 DM. 6 6.70 0.00 0.99 3.38 0.00 0.00 0.00
39.30 235.60 0.00 38.91 132.83 0.00 0.00 0.00
7 DM. 7 5.29 0.00 0.99 3.38 0.00 0.00 0.00
49.00 273.18 0.00 48.51 165.62 0.00 0.00 0.00
8 DM. 8 5.86 0.00 0.99 3.38 0.00 0.00 0.00
49.10 275.70 0.00 48.61 165.96 0.00 0.00 0.00
9 DM. 9 5.37 0.00 0.99 3.38 0.00 0.00 0.00
50.30 295.01 0.00 49.80 170.01 0.00 0.00 0.00
DM. 10 6.36 0.00 0.99 3.38 0.00 0.00 0.00
43.10 240.71 0.00 42.67 145.68 0.00 0.00 0.00
DM. 11 4.81 0.00 0.99 3.38 0.00 0.00 0.00
56.60 281.59 0.00 56.03 191.31 0.00 0.00 0.00
DM. 12 5.14 0.00 0.99 3.38 0.00 0.00 0.00
48.40 246.36 0.00 47.92 163.59 0.00 0.00 0.00
DM. 13 5.04 0.00 0.99 3.38 0.00 0.00 0.00
49.40 225.26 0.00 48.91 166.97 2.96 0.00 0.00
DM. 14 4.08 0.00 0.99 3.38 0.12 0.00 0.00
40.10 145.56 0.00 39.70 135.54 2.41 0.00 0.00
DM. 15 3.18 0.00 0.99 3.38 0.00 0.00 0.00
55.20 189.34 0.00 54.65 186.58 0.00 0.00 0.00
DM. 16 3.68 0.00 0.99 3.38 0.00 0.00 0.00
44.90 148.62 0.00 44.45 151.76 0.00 0.00 0.00
DM. 17 2.94 0.00 0.99 3.38 0.00 0.00 0.00
58.10 140.31 0.00 57.52 196.38 0.00 0.00 0.00
DM. 18 1.89 0.00 0.99 3.38 0.00 0.00 0.00
44.80 97.44 0.00 44.35 151.42 0.00 0.00 0.00
DM. 19 2.46 0.00 0.99 3.38 0.00 0.00 0.00
55.50 90.19 0.00 54.95 187.59 4.72 0.00 0.00
DM. 20 0.79 0.00 0.99 3.38 0.17 0.00 0.00
50.00 28.75 0.00 49.50 169.00 32.25 0.00 0.00
DM. 21 0.36 0.00 0.99 3.38 1.12 0.00 0.00
50.20 18.83 0.00 49.70 169.68 37.40 0.00 0.00
DM. 22 0.39 0.00 0.99 3.38 0.37 0.00 0.00
44.20 17.24 0.00 43.76 149.40 8.18 0.00 0.00
DM. 23 0.39 0.00 0.99 3.38 0.00 0.00 0.00
61.50 47.66 0.00 60.89 207.87 0.00 0.00 0.00
DM. 24 1.16 0.00 0.99 3.38 0.00 0.00 0.00
41.80 45.14 0.00 41.38 141.28 0.00 0.00 0.00
DM. 25 1.00 0.00 0.99 3.38 0.00 0.00 0.00
52.70 53.75 0.00 52.17 178.13 0.00 0.00 0.00
DM. 26 1.04 0.00 0.99 3.38 0.00 0.00 0.00
58.00 74.82 0.00 57.42 196.04 0.00 0.00 0.00
DM. 27 1.54 0.00 0.99 3.38 0.00 0.00 0.00
48.10 78.40 0.00 47.62 162.58 0.00 0.00 0.00
DM. 28 1.72 0.00 0.99 3.38 0.00 0.00 0.00
46.90 78.32 0.00 46.43 158.52 0.00 0.00 0.00
DM. 29 1.62 0.00 0.99 3.38 0.00 0.00 0.00
14.60 12.63 0.00 14.45 49.35 4.16 0.00 0.00
DM. 29 A 0.11 0.00 0.99 3.38 0.57 0.00 0.00
4,672.43 0.00 1,367.09 4,667.44 92.07 0.00 0.00
DAERAH IRIGASI : DALAM KOM
NAMA SALURAN : SALURAN SEKUNDER DALAM KOM RUAS 2
RUAS : BDK.1 - BKL.1
PANJANG SALURAN : 248.10 meter

JARAK AREA VOLUME


ANTAR Timbun Timbun
Pembongkar Ps. Batu Plestera Timbun Pembon Ps. Batu
NO. PATOK Galian an Beton Galian Plesteran Timbunan an Beton
an Kali n an gkaran Kali
PATOK kembali kembali
(m) (m2) (m2) (m2) (m1) (m2) (m2) (m2) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
1 DM. 29A 1.87 0.00 1.79 2.74 0.41 0.73 0.00
63.80 95.38 0.00 114.20 174.81 57.74 35.73 0.00
2 B. 1 1.12 0.00 1.79 2.74 1.40 0.39 0.00
45.40 33.82 0.00 81.27 124.40 93.30 10.44 0.00
3 B. 2 0.37 0.00 1.79 2.74 2.71 0.07 0.00
55.60 20.85 0.00 99.52 152.34 162.63 4.73 0.00
4 B. 3 0.38 0.00 1.79 2.74 3.14 0.10 0.00
49.40 29.64 0.00 88.43 135.36 155.61 5.93 0.00
5 B. 4 0.82 0.00 1.79 2.74 3.16 0.14 0.00
33.90 34.92 0.00 51.53 82.72 91.02 5.93 0.00
6 B. 5 1.24 0.00 1.25 2.14 2.21 0.21 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

214.61 0.00 434.95 669.62 560.30 62.76 0.00


DAERAH IRIGASI : DALAM KOM
NAMA SALURAN : SALURAN SEKUNDER DALAM KOM RUAS 3
RUAS : BKL.1 - BKL.1M
PANJANG SALURAN : 959.20 meter

JARAK AREA VOLUME


ANTAR Timbun Timbun
Pembongkar Ps. Batu Plestera Timbun Pembon Ps. Batu
NO. PATOK Galian an Beton Galian Plesteran Timbunan an Beton
an Kali n an gkaran Kali
PATOK kembali kembali
(m) (m2) (m2) (m2) (m1) (m2) (m2) (m2) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
1 B. 5 1.24 0.00 1.25 2.14 2.21 0.21 0.00
52.70 80.89 0.00 65.88 112.78 67.98 18.71 0.00
2 B. 6 1.83 0.00 1.25 2.14 0.37 0.50 0.00
56.10 114.72 0.00 70.13 120.05 12.62 30.86 0.00
3 B. 7 2.26 0.00 1.25 2.14 0.08 0.60 0.00
52.40 89.34 0.00 65.50 112.14 28.30 22.79 0.00
4 B. 8 1.15 0.00 1.25 2.14 1.00 0.27 0.00
87.50 104.56 0.00 109.38 187.25 83.56 24.94 0.00
5 B. 9 1.24 0.00 1.25 2.14 0.91 0.30 0.00
56.30 153.42 0.00 70.38 120.48 25.62 26.18 0.00
6 B. 10 4.21 0.00 1.25 2.14 0.00 0.63 0.00
62.20 207.44 0.00 77.75 133.11 0.00 39.19 0.00
7 B. 11 2.46 0.00 1.25 2.14 0.00 0.63 0.00
46.20 133.98 0.00 57.75 98.87 0.00 29.11 0.00
8 B. 12 3.34 0.00 1.25 2.14 0.00 0.63 0.00
58.10 122.01 0.00 72.63 124.33 43.28 23.82 0.00
9 B. 13 0.86 0.00 1.25 2.14 1.49 0.19 0.00
52.90 89.93 0.00 66.13 113.21 39.41 21.69 0.00
10 B. 14 2.54 0.00 1.25 2.14 0.00 0.63 0.00
50.10 97.70 0.00 62.63 107.21 24.05 23.80 0.00
11 B. 15 1.36 0.00 1.25 2.14 0.96 0.32 0.00
51.50 71.59 0.00 64.38 110.21 48.41 17.25 0.00
12 B. 16 1.42 0.00 1.25 2.14 0.92 0.35 0.00
43.50 49.37 0.00 54.38 93.09 55.25 11.75 0.00
13 B. 17 0.85 0.00 1.25 2.14 1.62 0.19 0.00
52.30 50.47 0.00 65.38 111.92 69.56 11.77 0.00
14 B. 18 1.08 0.00 1.25 2.14 1.04 0.26 0.00
67.10 115.08 0.00 83.88 143.59 36.57 29.86 0.00
15 B. 19 2.35 0.00 1.25 2.14 0.05 0.63 0.00
64.40 103.04 0.00 80.50 137.82 50.23 26.40 0.00
16 B. 20 0.85 0.00 1.25 2.14 1.51 0.19 0.00
49.50 23.02 0.00 61.88 105.93 107.66 5.20 0.00
17 B. 21 0.08 0.00 1.25 2.14 2.84 0.02 0.00
56.40 7.33 0.00 70.50 120.70 151.43 1.97 0.00
18 B. 22 0.18 0.00 1.25 2.14 2.53 0.05 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00
1,583.54 0.00 1,066.63 1,826.06 584.84 358.10 0.00
DAERAH IRIGASI : DALAM KOM
NAMA SALURAN : SALURAN SEKUNDER DALAM KOM RUAS 1
RUAS : BDK.1 - BDK.2
PANJANG SALURAN : 761.70 meter

JARAK AREA VOLUME


ANTAR Timbun Timbun
Pembongkar Ps. Batu Plestera Timbun Pembon Ps. Batu
NO. PATOK Galian an Beton Galian Plesteran Timbunan an Beton
an Kali n an gkaran Kali
PATOK kembali kembali
(m) (m2) (m2) (m2) (m1) (m2) (m2) (m2) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
1 DM. 29 A 0.11 0.00 0.99 3.38 0.57 0.00 0.00
27.80 39.06 0.00 40.03 90.07 10.01 10.56 0.00
2 DM. 30 2.70 0.00 1.89 3.10 0.15 0.76 0.00
30.50 69.39 0.00 57.64 94.55 24.40 16.62 0.00
3 DM. 31 1.85 0.00 1.89 3.10 1.45 0.33 0.00
81.70 171.57 0.00 154.41 253.27 82.93 37.58 0.00
4 DM. 32 2.35 0.00 1.89 3.10 0.58 0.59 0.00
48.00 109.92 0.00 90.72 148.80 24.24 27.36 0.00
5 DM. 33 2.23 0.00 1.89 3.10 0.43 0.55 0.00
51.10 124.94 0.00 96.58 158.41 16.10 32.96 0.00
6 DM. 34 2.66 0.00 1.89 3.10 0.20 0.74 0.00
70.30 149.04 0.00 132.87 217.93 22.14 45.70 0.00
7 DM. 36 1.58 0.00 1.89 3.10 0.43 0.56 0.00
49.10 80.52 0.00 92.80 152.21 22.10 27.74 0.00
8 DM. 37 1.70 0.00 1.89 3.10 0.47 0.57 0.00
52.80 101.64 0.00 99.79 163.68 23.23 31.15 0.00
9 DM. 38 2.15 0.00 1.89 3.10 0.41 0.61 0.00
47.00 89.77 0.00 88.83 145.70 22.56 28.91 0.00
DM. 39 1.67 0.00 1.89 3.10 0.55 0.62 0.00
53.40 85.44 0.00 100.93 165.54 45.92 26.70 0.00
DM. 40 1.53 0.00 1.89 3.10 1.17 0.38 0.00
49.60 71.92 0.00 93.74 153.76 66.96 16.86 0.00
DM. 41 1.37 0.00 1.89 3.10 1.53 0.30 0.00
50.30 59.86 0.00 95.07 155.93 91.55 13.58 0.00
DM. 42 1.01 0.00 1.89 3.10 2.11 0.24 0.00
50.10 36.32 0.00 94.69 155.31 118.49 9.27 0.00
DM. 43 0.44 0.00 1.89 3.10 2.62 0.13 0.00
51.40 35.47 0.00 97.15 159.34 119.76 9.77 0.00
DM. 44 0.94 0.00 1.89 3.10 2.04 0.25 0.00
48.60 41.80 0.00 91.85 150.66 104.49 8.99 0.00
DM. 45 0.78 0.00 1.89 3.10 2.26 0.12 0.00

1,266.65 0.00 1,427.10 2,365.16 794.87 343.75 0.00


DAERAH IRIGASI : DALAM KOM
NAMA SALURAN : SALURAN SEKUNDER DALAM KOM RUAS 1
RUAS : BDK.2 - BDK.3
PANJANG SALURAN : 255.50 meter

JARAK AREA VOLUME


ANTAR Timbun Timbun
Pembongkar Ps. Batu Plestera Timbun Pembon Ps. Batu
NO. PATOK Galian an Beton Galian Plesteran Timbunan an Beton
an Kali n an gkaran Kali
PATOK kembali kembali
(m) (m2) (m2) (m2) (m1) (m2) (m2) (m2) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
1 DM. 45A 2.02 0.00 1.89 3.10 1.52 0.33 0.00
28.10 126.03 0.00 53.11 87.11 21.36 16.72 0.00
2 DM. 46 6.95 0.00 1.89 3.10 0.00 0.86 0.00
44.70 271.33 0.00 84.48 138.57 0.00 38.44 0.00
3 DM. 47 5.19 0.00 1.89 3.10 0.00 0.86 0.00
55.90 210.74 0.00 105.65 173.29 19.84 39.97 0.00
4 DM. 48 2.35 0.00 1.89 3.10 0.71 0.57 0.00
50.60 79.70 0.00 96.14 157.87 154.84 18.47 0.00
5 CM. 19 0.80 0.00 1.91 3.14 5.41 0.16 0.00
54.30 44.80 0.00 103.71 170.50 209.60 9.23 0.00
6 CM. 20 0.85 0.00 1.91 3.14 2.31 0.18 0.00
21.90 111.14 0.00 41.17 67.45 25.29 10.84 0.00
7 E. 1 9.30 0.00 1.85 3.02 0.00 0.81 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

843.74 0.00 484.27 794.80 430.93 133.67 0.00


DAERAH IRIGASI : DALAM KOM
NAMA SALURAN : SALURAN SEKUNDER DALAM KOM RUAS 1
RUAS : BDK.3 - BDK.4
PANJANG SALURAN : 943.60 meter

JARAK AREA VOLUME


ANTAR Timbun Timbun
Pembongkar Ps. Batu Plestera Timbun Pembon Ps. Batu
NO. PATOK Galian an Beton Galian Plesteran Timbunan an Beton
an Kali n an gkaran Kali
PATOK kembali kembali
(m) (m2) (m2) (m2) (m1) (m2) (m2) (m2) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
1 E. 1 9.30 0.00 1.85 3.02 0.00 0.81 0.00
36.60 215.57 0.00 67.71 110.53 3.48 26.90 0.00
2 CM. 22 2.48 0.00 1.85 3.02 0.19 0.66 0.00
50.40 130.28 0.00 93.24 152.21 7.31 35.28 0.00
3 CM. 23 2.69 0.00 1.85 3.02 0.10 0.74 0.00
49.00 134.26 0.00 90.65 147.98 11.27 35.28 0.00
4 CM. 23A 2.79 0.00 1.85 3.02 0.36 0.70 0.00
53.10 114.96 0.00 98.24 160.36 35.84 28.67 0.00
5 CM. 24 1.54 0.00 1.85 3.02 0.99 0.38 0.00
51.70 82.98 0.00 95.65 156.13 45.50 21.46 0.00
6 CM. 25 1.67 0.00 1.85 3.02 0.77 0.45 0.00
48.40 61.95 0.00 89.54 146.17 59.53 15.97 0.00
7 CM. 26 0.89 0.00 1.85 3.02 1.69 0.21 0.00
51.90 52.42 0.00 96.02 156.74 70.32 13.49 0.00
8 CM. 27 1.13 0.00 1.85 3.02 1.02 0.31 0.00
49.40 64.96 0.00 91.39 149.19 45.70 18.28 0.00
9 CM. 28 1.50 0.00 1.85 3.02 0.83 0.43 0.00
49.40 71.63 0.00 91.39 149.19 45.45 19.76 0.00
CM. 29 1.40 0.00 1.85 3.02 1.01 0.37 0.00
50.30 55.33 0.00 93.05 151.91 45.77 17.35 0.00
CM. 30 0.80 0.00 1.85 3.02 0.81 0.32 0.00
51.30 51.56 0.00 94.91 154.93 47.71 19.49 0.00
CM. 31 1.21 0.00 1.85 3.02 1.05 0.44 0.00
49.10 44.93 0.00 90.84 148.28 53.27 17.92 0.00
CM. 32 0.62 0.00 1.85 3.02 1.12 0.29 0.00
47.30 26.49 0.00 87.51 142.85 90.58 9.70 0.00
CM. 33 0.50 0.00 1.85 3.02 2.71 0.12 0.00
52.00 22.36 0.00 96.20 157.04 113.62 5.46 0.00
CM. 34 0.36 0.00 1.85 3.02 1.66 0.09 0.00
50.60 26.06 0.00 93.61 152.81 74.89 7.59 0.00
CM. 35 0.67 0.00 1.85 3.02 1.30 0.21 0.00
25.40 23.50 0.00 46.99 76.71 34.29 5.71 0.00
CM. 35A 1.18 0.00 1.85 3.02 1.40 0.24 0.00
22.60 13.33 0.00 41.81 68.25 40.23 2.71 0.00
CM. 36 0.00 0.00 1.85 3.02 2.16 0.00 0.00
51.80 19.17 0.00 95.83 156.44 83.92 6.73 0.00
CM. 37 0.74 0.00 1.85 3.02 1.08 0.26 0.00
50.70 54.50 0.00 93.80 153.11 50.45 18.51 0.00
CM. 38 1.41 0.00 1.85 3.02 0.91 0.47 0.00
52.60 82.58 0.00 97.31 158.85 49.44 22.88 0.00
CM. 39 1.73 0.00 1.85 3.02 0.97 0.40 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

1,348.82 0.00 1,745.66 2,849.67 1,008.56 349.16 0.00


DAERAH IRIGASI : DALAM KOM
NAMA SALURAN : SALURAN SEKUNDER DALAM KOM RUAS 1
RUAS : BDK.4 - BDK.4M
PANJANG SALURAN : 163.20 meter

JARAK AREA VOLUME


ANTAR Timbun Timbun
Pembongkar Ps. Batu Plestera Timbun Pembon Ps. Batu
NO. PATOK Galian an Beton Galian Plesteran Timbunan an Beton
an Kali n an gkaran Kali
PATOK kembali kembali
(m) (m2) (m2) (m2) (m1) (m2) (m2) (m2) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
1 CM. 39 1.73 0.00 1.85 3.02 0.97 0.40 0.00
55.50 90.74 0.00 87.69 149.57 48.01 21.37 0.00
2 C. 1 1.54 0.00 1.31 2.37 0.76 0.37 0.00
55.70 79.65 0.00 72.97 132.01 38.71 21.72 0.00
3 C. 2 1.32 0.00 1.31 2.37 0.63 0.41 0.00
52.00 73.58 0.00 68.12 123.24 23.92 24.18 0.00
4 C. 3 1.51 0.00 1.31 2.37 0.29 0.52 0.00
0.00 0.00 0.00 0.00 0.00 0.00 0.00

243.97 0.00 228.78 404.82 110.64 67.27 0.00

DAERAH IRIGASI : DALAM KOM


NAMA SALURAN : SALURAN SEKUNDER DALAM KOM RUAS 1
RUAS : BDK.1 - BDK.1M Ki
PANJANG SALURAN : 793.20 meter

JARAK AREA VOLUME


ANTAR Timbun Timbun
Pembongkar Ps. Batu Plestera Timbun Pembon Ps. Batu
NO. PATOK Galian an Beton Galian Plesteran Timbunan an Beton
an Kali n an gkaran Kali
PATOK kembali kembali
(m) (m2) (m2) (m2) (m1) (m2) (m2) (m2) (m3) (m3) (m3) (m3) (m3) (m3) (m3)
1 DM. 29A 1.87 0.00 1.14 1.90 0.00 0.53 0.00
73.90 168.49 0.00 84.25 140.41 3.70 39.91 0.00
2 DM. 50 2.69 0.00 1.14 1.90 0.10 0.55 0.00
49.50 151.47 0.00 56.43 94.05 2.48 27.23 0.00
3 DM. 51 3.43 0.00 1.14 1.90 0.00 0.55 0.00
51.80 179.75 0.00 59.05 98.42 0.00 28.49 0.00
4 DM. 52 3.51 0.00 1.14 1.90 0.00 0.55 0.00
50.10 173.85 0.00 57.11 95.19 0.00 27.56 0.00
5 DM. 53 3.43 0.00 1.14 1.90 0.00 0.55 0.00
43.20 151.20 0.00 49.25 82.08 0.00 23.76 0.00
6 DM. 54 3.57 0.00 1.14 1.90 0.00 0.55 0.00
49.20 144.65 0.00 56.09 93.48 0.00 27.06 0.00
7 DM. 55 2.31 0.00 1.14 1.90 0.00 0.55 0.00
51.40 107.68 0.00 58.60 97.66 4.11 28.27 0.00
8 DM. 56 1.88 0.00 1.14 1.90 0.16 0.55 0.00
47.40 79.63 0.00 54.04 90.06 12.56 23.70 0.00
9 DM. 57 1.48 0.00 1.14 1.90 0.37 0.45 0.00
50.80 73.66 0.00 57.91 96.52 17.27 24.38 0.00
10 DM. 58 1.42 0.00 1.14 1.90 0.31 0.51 0.00
48.60 74.12 0.00 55.40 92.34 12.88 24.30 0.00
11 DM. 59 1.63 0.00 1.14 1.90 0.22 0.49 0.00
52.80 87.12 0.00 60.19 100.32 12.41 25.87 0.00
12 DM. 60 1.67 0.00 1.14 1.90 0.25 0.49 0.00
52.10 69.29 0.00 59.39 98.99 29.44 21.88 0.00
13 DM. 61 0.99 0.00 1.14 1.90 0.88 0.35 0.00
50.00 51.25 0.00 57.00 95.00 44.00 14.75 0.00
14 DM. 61A 1.06 0.00 1.14 1.90 0.88 0.24 0.00
60.00 78.90 0.00 68.40 114.00 36.60 19.50 0.00
15 DM. 61B 1.57 0.00 1.14 1.90 0.34 0.41 0.00
62.40 59.28 0.00 71.14 118.56 68.95 15.29 0.00
16 DM. 61C 0.33 0.00 1.14 1.90 1.87 0.08 0.00

1,650.34 0.00 904.25 1,507.08 244.39 371.94 0.00