BILL OF QUANTITY

LOCAL
NO. ITEMS QTY TOTAL AMOUNT
ITEMS
A PRELIMINARIES
Reposisi Kelistrikan ( saklar,lampu,stop ls
kontak baru ) 1.00
B INTERIOR WORK
1 Peredaman Dinding Kaca 1 sisi 19.84 m2
Main Frame 6,4 dan U runner
Frame Hollow 2 x 4 T 0,4 mm
Noise Armour 1750kg/m2
Absober D.80Kg/m³
Dry Wall 12 mm
Acoustic Woll 7 mm
Fleksible Membran
Kaca Film Hitam

2 Peredaman Dinding 3 sisi 56.96 m2


Main Frame 6,4 dan U runner
Frame Hollow 2 x 4 T 0,4 mm
Noise Armour 1750kg/m2
Absober D.80Kg/m³
Dry Wall 12 mm
Acoustic Woll 7 mm
Fleksible Membran
Fin Compound

4 Acoustic Panel 4 sisi 46.44 m2


Main Frame
Base Plate

5 Peredam Plafond 35.96 m2


Absorber D60 kg/m3

6 Panggung Drum 4.00 m


Triplek 18 mm
Absorber D80kg/m3
Holo Galvanis 4 x 4 t 1,2 mm

7 Pekerjaan Pintu Peredam 1.00 set


Kusen Pintu Fin HPL
Plywood 18 mm
MDF HMR 15 mm
Double Karet Balon
Vibrating Dumper 1750Kg/m³
Absober D100 kg/m3
HPL TACO
Accesories Pintu

TOTAL Rp0
Grand Total Rp0