Professional Documents
Culture Documents
Offshore Gas and Liquid Sampling: Due Date Countdown Date Sample Taken Date Report Received Date Sample Taken
Offshore Gas and Liquid Sampling: Due Date Countdown Date Sample Taken Date Report Received Date Sample Taken
Gas Liquid
Note: If possible, frequency for gas sampling is 6M and for liquid sampling is 3M.
Starting April, all water sampling offshore will need to include full water analysis as required by GSR including chloride.
Liquid
Date Remarks
Due Date Countdown
Report received
Platform Well Last valid sample No. of days to next Last valid sample
Next sampling
taken sampling taken
Note: If possible, frequency for gas sampling is 6M and for liquid sampling is 3M.
Starting April, all water sampling offshore will need to include full water analysis as required by GSR including chloride.
Liquid