Preventive Maintenance
AHU/FCU Checklist
A. Amperage Reading
B. Cleaning
✔ Cooling Coil ✔ Blower Wheel Housing ✔ Sump ✔ Chilled Pipe Insulation
✔ Canvas Connection N/A Chain Coupling N/A Blower Shafts Alignment ✔ Induction Motor
✔ Pillow Block Bearing ✔ Pulley Alignment ✔ Vibration Isolation Spring ✔ Air Duct
✔ Drain Pipe P-Trap Plug ✔ Blower Wheel Set Screws ✔ Feederline Flexible Conduit
D. Lubrication
✔ Pillow Block Bearing N/A Chain Coupling
1 of 2
AHU-SMSF-020
E. Remarks
Done pm
F. Attachments
No attachments.
G. Technicians
merwin hallarsis
H. Duty Engineer
Received By