Analysis Parameters:
Geotechnical investigation was conducted on the site. All the parameters used in the analysis are as
per Geotechnical investigation report.
Table 1. Parameters used in seepage analysis
U/S water
Section Foundation Material Permeability (m/sec)
Level (NCL)
Results:
SPILLWAY:
2,195.284
2,190.284
2,185.284
2,180.284
Elevation
2,175.284
Foundation
2,170.284
2,165.284
2,160.284
2,155.284
2,150.284
-24 -16 -8 0 8 16 24 32 40 48 56 64 72 80 88 96 104 112 120 128 136
Distance
Uplift Analysis
10
8
Water Pressure Head (m)
4
0 sec
-2
-4
0 20 40 60 80 100 120
Distance (m)