Download as pdf or txt
Download as pdf or txt
You are on page 1of 5

1. What are the reservoir engineering Branches?

2. What are the Formation Evaluation Branches?

3. Reserve Estimation is related to …………….

4. Artificial Lift is related to …………….

 Drilling Engineering
 Reservoir Engineering
 Formation Evaluation
 Production Engineering

5. What are the Kinds of Traps?

6. What are the types of Structural Oil traps?


Define the Type of Trap:
Fill the following empty boxes

(Impermeable
)

1. The Pressure Dimension is ……….

 M/L3
 M/LT
 (M/T2)/L

2. Viscosity Filed Unit is ………

 Cp
 Atm
 G

3. 1.25 acre equals ……….

 54450 ft2
 34848 ft2
 298.65 cm
‫جدول التحويالت يجب حفظه و يتم التحويل كما هو موضح بالصورة التالية‪:‬‬

You might also like