Raw water intake pumps

readiness
Resrvoir dosing
system ( Chlorine
Dioxide)

RAW WATER RAW WATER


RESERVOIR - 1 RESERVOIR -2
(Cap - 2300000 (Cap - 2300000
m3/hr) m3/hr)

RW Pump -1 RW Pump -3
RW Pump -2
erection erection
erection completion
completion completion

RW Pump -1 RW Pump -3 motor


RW Pump -2 motor
motor erection erection
erection completion
completion along completion along
along with Elecrical
with Elecrical with Elecrical
readiness
readiness readiness

RW Pump -1
RW Pump -2 motor RW Pump -3 motor
motor DCS
DCS readiness DCS readiness
readiness

RW Pump -1 RW Pump -2 motor RW Pump -3 motor Raw water pump out let
motor NO-Load NO-Load trail NO-Load trail line arrangement for
trail completion completion completion open/closed loop flushing

RW PUMP -1 Load RW PUMP -2 Load RW PUMP -3 Load


trail readiness trail readiness trail readiness

Rapid gravity sand filters (12 No's 9 W & 3 S)


Rapid gravity sand filters (12 No's 9 W & 3 S)

Filtered water reservoir (12000 M3)


1 Raw water reservoir readiness either compartment -1 or 2 & Bay area
2 Reservior compartments each through cleaning
3 Raw water intake pumps readiness
4 Resrvoir dosing system ( Chlorine Dioxide) readiness
5 RW pump -1 or pump -2 or pump -3 erection completion
6 RW Pump motor erection completion and cabling completion
7 RW Pump motor DCS rediness with all protections for motor No - Load trial
8 Motor NO- Load trial completion of each (Either 1 or 2 or 3)
9 Raw water pump out let line arrangement for open/closed loop flushing as per the cl
10 RW pump -1 or pump -2 or pump -3 Load trail readiness
11 Rapid gravity sand filters preparedness
12 Filtered water reservoir preparedness

water pump out let


arrangement for
closed loop flushing
1 or 2 & Bay area

or motor No - Load trial

closed loop flushing as per the clients requirements