Professional Documents
Culture Documents
Disposal of Spares
Disposal of Spares
"
Policy Department {. J
Head Office, Islamabad
kkkkk Mn+v r' s+
Fu eling the future
This is in continuation of our letters of even number dateo 03rd August 2022
and 04 April 2024. A variety of machinery & equipment supports different
departments across various locations. To ensure optimal functionality, these
departments maintain a sufficient inventory of spare parts and tools,
minimizing the risk of breakdowns and disruptions.
02. Upon reaching the end of their useful lift,. machinery & equipment are
subject to a condemnation process as outlined in the Materials Management
Manual, paving the way for their subsequent auction. However, a concern has
been identified regarding the stockpiling of spare parts for condemned
equipment, even when no similar equipment remains in use by the
departments. This results in excess inventory and unnecessary carrying costs.
03. Board of Directors also highlighted expediting the write-off of spare parts
when the corresponding main equipment is no longer in operation at OGDCL.
04. In order to streamline this process, following guidelines are circulated for
strict compliance:
ii) The department will finalize list of spares which cannot be further utilized
at any OGDCL location (after confirmation from other departments about
any possible utilization of these spares) as the main equipment becomes
unserviceable/obsolete and this equipment will not be utilized/purchased
by OGDCL in future being obsolete.
?
OIL & GAS DEVELOPMENT COMPANY LIMITED r r-
2
t:i
z Policy Department ( ·""
IQ (I
Head Office, Islamabad
[filli.o.g .J.l.l_U!J!JJJ:e k xkk k k «iv1w«r
iv) In case of availability of relevant spares in stock and the department has
retained the same for future use, HOD of the user department will
confirm in condemnation case that the spares are available but have
been retained as similar machinery/equipment is still in use.
vi) The department will initiate separate write-off case of not required
spares as per write-off procedure in Materials Management Manual in
parallel to condemnation case of main equipment.
vii) After approval of MD/CEO for auction of inventory under write-off (as per
Materials Management Manual), the department will forward the cases
of condemnation of main equipment and relevant Not Required spares
inventory to Materials Management Department (MMD).
viii) MMD will arrange auction of the main equipment and relevant Not
required spares as per procedure in vogue.
05. This issues with the approval of MD/CEO and forwarded for compliance by
all concerned. · ~ --•
c#.»