01-01-25
The content of this document is the property of Airbus. It is supplied in confidence and commercial security on its contents must
be maintained. It must not be used for any purpose other than that for which it is supplied, nor may information contained in it be
disclosed to unauthorized persons. It must not be reproduced in whole or in part without permission in writing from the owners of
the copyright.
© AIRBUS 2023. All rights reserved.
Prin1ed in Germany
Prin1ed in Germany
I TABLE OF CONTENTS
SUBJECT PAGE
1. GENERAL 1
3. PROCESS 2
3.1 Pickling 2
3.2 Rinsing 2
3.3 Repetition of pickling 2
Printed in Germany
Printed in Germany
3. PROCESS
3.1 Pickling
The components must be completely immersed in the bath. Refer to the data
sheets of this manufacturing instruction for bath preparation and bath
maintenance.
Tubes must be placed in the bath in such a way, that the bath liquid can
rise and expel all air. Tubes with sharp bends must be turned during
immersion, if necessary.
If turning cannot ensure that all air can escape, then the bath liquid must
be sucked or pumped throught the tubes.
3.2 Rinsing
Immersion spray rinsing
Rinsing time 3 - 5 minutes
Water Quality demineralized
3.3 Repetition of pickling
If heavy metal of heavy metal oxide deposits remain on the surface of the
component, the pickling process per PMS 01-01-15 must be repeated.
If deposits are still to be found on the surface of the component after
repeated pickling, the following measures must be taken: