AMBF PSO
TLA - SETBACK AMBF / TLA (100%)
AMBF
FROM ACQUIRED AMBF
AMBF VOLUME OF FROM ACQUIRED
CONCRETE & AMBF OR GIVEN
BAGS OF CEMENT AREA OF ROOM
IS ASKED NUMBER OF
PLYWOOD IS ASKED
SETBACK SETBACK
RROW RROW
ESTIMATES AND DEVELOPMENT CONTROLS
USA ISA
FRONT SETBACK TLA - USA
ISA
AMBF AMBF
USA
FROM ACQUIRED
FRONT
USA VOLUME OF
CONCRETE & SETBACK
BAGS OF CEMENT IS
RROW RROW
ASKED
ESTIMATES AND DEVELOPMENT CONTROLS
AMVB TGFA
AMBF X TOTAL HEIGHT AMBF X NUMBER OF FLOORS
HEIGHT NUMBER
OF OF
BLDG FLOORS
AMBF AMBF
ESTIMATES AND DEVELOPMENT CONTROLS
PARKING PARKING
PARKING AT FRONT
PARKING AT SIDE
SETBACK
SETBACK
AMBF
AMBF
FRONT
SETBACK SIDE
FROM ACQUIRED SETBACK
FRONT SETBACK
PARKING IS ASKED
RROW RROW
ESTIMATES AND DEVELOPMENT CONTROLS
10M
RROW SECTION A
ESTIMATES
TRUCKLOAD OF SAND KG. OF REBARS
& GRAVEL VOLUME OF BASED FROM COMPUTED VOLUME OF
CONCRETE CONCRETE, FACTOR OF KILOGRAM OF
REBARS IS GIVEN.
BASED FROM AMBF THICKNESS
OF SLAB IS GIVEN Example: 1 CUM OF CONC.= 15 KGS OF REBARS
THICKNESS
OF SLAB IS
GIVEN
AMBF
CEILING
CEILING FOR EAVES
FROM ACQUIRED AREA
FOR EAVES NUMBER
INTERIORS PLYWOOD OR
FROM ACQUIRED AMBF PAINTS IS ASKED
OR GIVEN AREA OF
ROOM/SPACE NUMBER
PLYWOOD OR
PAINTS IS ASKED
RROW RROW
ESTIMATES
PERIMETER OF GUTTER
BASED FROM AMBF AND GIVEN EAVE
DIMENSIONS
C
GUTTER AT
PERIMETER
RROW
ESTIMATES
VOLUME OF CONCRETE OF BEAM &
LINEAR METER OF STEEL BEAM
C
STEEL BEAM/
REINF. CONCRETE
BEAM
B AMBF D
LINEAR METER = A + B + C + D
FROM ACQUIRED AMBF OR GIVEN
A DIMENSION OF SPACE LINEAR
METER OF STEEL BEAM IS ASKED
RROW
CUBIC METER= A + B + C + D (AREA OF BEAM)
FROM ACQUIRED AMBF OR GIVEN
DIMENSION OF SPACE LINEAR
METER OF STEEL BEAM IS ASKED
ESTIMATES
PERIMETER OF EXTERIOR WALLS & CHB
BASED FROM AMBF AND CONSIDERING THE
GIVEN SIZE OF RC BEAM AT THE PERIMETER OF
EXTERIOR WALLS
PERIMETER
OF EXTERIOR
B AMBF D
WALL
PERIMETER= A + B + C + D
A
WITH THE AREA OF WALLS,
NUMBER OF CHB OR LINEAR METER
RROW OF WALLS IS ASKED
ESTIMATES
LINEAR METER OF FENCE & CHB
BASED FROM GIVEN LOT SIZE COMPUTE THE PERIMETER OF FENCE
AND CONSIDERING GIVEN SIZE OF GATE.
PERIMETER
OF FENCE
B AMBF D
A + B + C + D) – E
WITH THE AREA OF WALLS FOR FENCE,
E NUMBER OF CHB OR LINEAR METER OF
GATE
WALLS IS ASKED
A RROW
IMORTANT: DONT
FORGET TO SUBTRACT
AREA OF GATE
.
Example:
Volume = L x W x Thickness
= 10m x 30m x .15 m
= 45 cum
Example:
Volume = L x W x Thickness
= 30m x 60m x .15 m
= 270 cum
8 METERS
Example:
Example:
Commercial Sizes
Factor:
Area of surface= L x W
= 6mx 12m = 72sqm
Example: Important:
• Subtract area of opening (doors,
Area of wall = L x W windows)
= 6mx 12m = 72sqm • For ground floor, the chb below
natural
No. of CHB = Area of surface x 12.5 grade line for wall footing
No. of CHB = 72 x 12.5
No. of CHB = 900 + add 10% contingency
.