CALCULATION FOR HVAC OF JETTY OPERATIONAL Doc No: SMJ-CCCC-HVA-SPN-0001

BUILDING Rev. 02

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY Date: 1-Sep-2022


FACILITY FOR SARAWAK METHANOL PROJECT IN
Total Pages: 8
BINTULU, SARAWAK

CALCULATION FOR HVAC OF JETTY OPERATIONAL BUILDING

CLASS: 2 (ISSUED FOR REVIEW & COMMENTS)

02 1-Sep-2022 Issued for Review WANG Y.Q LIU M XU W.H Yuseri M.Ali H.Putit N/A
01 10-Jun-2022 Issued for Review WANG Y.Q LIU M XU W.H Yuseri M.Ali H.Putit N/A
00 17-Dec-2021 Issued for Review WANG Y.Q LIU M XU W.H Yuseri M.Ali H.Putit N/A
Prepared Reviewed Approved Reviewed Approved
Rev Date Description
CCCC SPSB
CCCC JOB NO
CHINA COMMUNICATIONS CONSTRUCTION
COMPANY (MALAYSIA) SDN BHD 21S225-DD-JSS-NT-0001

No part of this document or the information it contains may be reproduced or transmitted in any form or by any means electronic or mechanical, including
photocopying, recording, or by any information storage and retrieval system, without permission in writing from SARAWAK PETCHEM or CCCC.

All Rights Reserved Page 1 of 8


OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

Revision Control Table

Rev. No. Rev. Date Rev. Section Rev. Description

00 17-DEC-21 / 1st issued for review & comments.

01 10-JUN-22 / Issued for review & comments.

All Rights Reserved Page 2 of 8


OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

On Hold Table

Ref No. Ref. Date Ref. Section Ref. On Hold Description

NOTE: “ON HOLD” means that the contents are provisional and they will be updated according to new
data.

All Rights Reserved Page 3 of 8


OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

Table of Contents
1 GENERAL....................................................................................................................................................................... 5
1.1 PROJECT INTRODUCTION AND PURPOSE..........................................................................................................................5
1.2 DEFINITIONS.............................................................................................................................................................. 5
2 REFERENCE DOCUMENTS............................................................................................................................................. 6
3 LIST OF HEAT-GENERATED EQUIPMENT.......................................................................................................................6
4 CALCULATION RESULTS.................................................................................................................................................8
5 CALCULATION SUMMARY............................................................................................................................................ 8

ANNEX 1: CALCULATION RESULTS

All Rights Reserved Page 4 of 8


OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

1 GENERAL

1.1 Project Introduction and Purpose


SARAWAK PETCHEM SDN. BHD. (hereinafter referred to as "OWNER") is undertaking the development of
Methanol Product Off-Take/Export Jetty Facility (hereinafter referred to as the "Methanol Jetty") to be
integrated and linked to the methanol plant which is located at Lot 3281, Block 20, Kemena Land District,
Tanjung Kidurong, Bintulu, Sarawak, Malaysia. The Methanol Jetty is designed to handle the export of the
total nameplate capacity of 5,000 MTPD methanol with simultaneous loading from multiple berths.

Figure 1- 1 Conceptual Sketch of Sarawak Methanol Jetty Project


The Methanol Jetty comprises of a methanol export piping, ship loading arms, metering facility, jetty
operation building, associated electrical and instrumentation system, safety systems, communications
systems, utilities and supporting systems, and a Jetty complete with barriers, berthing and mooring
dolphins, wave screen, access channel and turning and berthing basins.

1.2 Definitions
BEPCC OF PRODUCT OFFTAKE / EXPORT JETTY FACILITY FOR SARAWAK
PROJECT
METHANOL PROJECT
DESIGN STAGE Basic Design & Detailed Design
OWNER SARAWAK PETCHEM SDN. BHD.
CONTRACTOR CHINA COMMUNICATIONS CONSTRUCTION COMPANY (M) SDN.BHD.

All Rights Reserved Page 5 of 8


OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

2 REFERENCE DOCUMENTS
The following project documents are refenced to carry out the calculations.

DOCUMENT NUMBER DOCUMENT TITLE


SMJ-CCCC-HVA-SPN-0001 SPECIFICATION FOR HVAC EQUIPMENT
SMJ-CCCC-HVA-DWG-0101 JETTY OPERATIONAL BUILDING GENERAL NOTES
SMJ-CCCC-HVA-DWG-0102 JETTY OPERATIONAL BUILDING MAIN EQUIPMENT LIST
SMJ-CCCC-HVA-DWG-0103 JETTY OPERATIONAL BUILDING GROUND FLOOR HVAC PLAN
SMJ-CCCC-HVA-DWG-0104 JETTY OPERATIONAL BUILDING 1ST FLOOR HVAC PLAN
SMJ-CCCC-HVA-DWG-0105 JETTY OPERATIONAL BUILDING ROOF HVAC PLAN
SMJ-CCCC-HVA-DWG-0106 JETTY OPERATIONAL BUILDING HVAC SECTION PLAN
3 LIST OF HEAT-GENERATED EQUIPMENT
HEAT GENERATED
TAG NO. SERVICE DESCRIPTION LOCATION
(W)

JETTY AUXILIARY ROOM

JOB-PDB-001 POWER DISTRIBUTION CABINET JAR 100

JOB-NET-001 NETWORK CABINET JAR 300

JOB-DCS-001 DCS SYSTEM CABINET JAR 1000

JOB-MCD-001 DCS MARSHALLING CABINET JAR 1000

JOB-ESD-001 ESD SYSTEM CABINET JAR 1000

JOB-MCE-001 ESD MARSHALLING CABINET JAR 1000

JOB-FGS-001 FGS SYSTEM CABINET JAR 1000

JOB-MCF-001 FGS MARSHALLING CABINET JAR 1000

JOB-MCF-002 FGS MARSHALLING CABINET JAR 1000

CUSTODY METERING SYSTEM


JOB-CMS-001 JAR 1000
CABINET

JOB-CCTV-001 CCTV & TELECOM CABINET JAR 1200

All Rights Reserved Page 6 of 8


OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

MOORING LINE MONITORING SYSTEM


JOB-MLMS-001 JAR 1000
CABINET

JETTY OPERATOR ROOM

JOB-OWSL-001 LAS MONITORING WORK STATION JCR 500

JOB-OWSD-001 DCS OPERATOR WORK STATION JCR 500

JOB-OWSD-002 DCS OPERATOR WORK STATION JCR 500

JOB-OWSC-001 CCTV OPERATOR WORK STATION JCR 500

JOB-FAP-001 FIRE ALARM CONTROL PANEL JCR 1000

JOB-FMOC-001 FIRE MONITOR OPERATION CONSOLE JCR 200

JOB-FMOC-002 FIRE MONITOR OPERATION CONSOLE JCR 200

JOB-AUXF-001 FGS AUXILIARY CONSOLE JCR 200

JOB-AUXE-001 ESD AUXILIARY CONSOLE JCR 200

JOB-PRT-001 BLACK/WHITE PRINTER JCR 200

ENGINEERING ROOM

JOB-EWSE-001 EDS/FGS ENGINEER WORK STATION JER 500

JOB-EWSD-001 DCS ENGINEER WORK STATION JER 500

JOB-PRT-002 COLOR PRINTER JER 200

LV ROOM

SG-SS4-D-01 LV DISTRIBUTION SWITCHGEAR JER 6000

CABLE ROOM

CABLE JER 1000

UPS ROOM

All Rights Reserved Page 7 of 8


OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

UP-SS4-E-01 AC UPS. JER 8000

AC UPS BATTERY JER 1000

TRANFORMER ROOM 1

TR-SS4-C/D-01
02 DRY-TYPE TRANSFORMER
JER 3500
6.6/0.42kV ,Dyn11,Uk=4% 315KVA

TRANFORMER ROOM 2

DRY-TYPE TRANSFORMER
TR-SS4-C/D-02 JER 3500
6.6/0.42kV ,Dyn11,Uk=4% 315KVA

4 CALCULATION RESULTS
Refer to Annex 1 for the detailed calculation results.

5 CALCULATION SUMMARY
The calculation in this report provides the required capacity for each of the HVAC equipment.
All selected capacity of the HVAC equipment specified in the document of SMJ-CCCC-HVA-SPN-0001
SPECIFICATION FOR HVAC EQUIPMENT are higher than the required capacity.
Therefore, the selected capacity of the HVAC equipment specified in the above specification is
appropriate.

All Rights Reserved Page 8 of 8


OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ANNEX 1: CALCULATION RESULTS

1 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

1 Base Parameters
NO. ITEM CONTENT
1 MOISTURE LOAD UNITS kg/h
2 MOISTURE LOAD CORRECTION FACTOR 1
3 COOLING LOAD CORRECTION FACTOR 1
4 HEATING LOAD CORRECTION FACTOR 1

2 Meteorological Parameters

2.1 Base Parameters


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Tanjung Kidurong,
Country Malaysia Province City Bintulu
Kemena Land District

2.2 Parameters
ITEM CONTENT ITEM CONTENT ITEM CONTENT
Air-Conditioni
Air-Conditioning
ng Outdoor
Outdoor Average
ATM(Pa) 99860 36 Dry Bulb 33.2
Daily Temperature
Temperature
(℃)
(℃)
Air-Conditioning Atmospheric
Outdoor Average
Outdoor Wet Bulb 26.4 1.9 Transparency 4
Wind Speed(m/s)
Temperature (℃) Level

3 Project Load Summary (Cooling)


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Maximum Time Maximum Time Of
Area(㎡) 449 Of Cooling 17:00 Room Cooling 17:00
Load(h) Load(h)
Room Cooling
Cooling Load 141295 141295 Moisture load 4.787
Load
Outdoor Air
Outdoor Air Cooling
Room Moisture load 4.787 Volume 0 0
Load
Flow(m^3)
Outdoor Air Unit
Outdoor Air Unit Outdoor Air Unit
0 Sensible Cooling 0 0
Cooling Load Latent Cooling Load
Load
Cooling Load Moisture Load
314.7 0.011
Building Indicator Building
2 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Indicator

4 Building Information

4.1 Base Parameters (Building)


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Starting Starting Floor
Building Name Building 0 1
Elevation(m) Number
Ending Floor Building
1 Skip Floor Numbers 0
Number Volume(m^3)
Ground Floor Underground Floor
449 0 Covers Area(m^2) 0
Area(m^2) Area(m^2)
Surfaces Outside Surfaces Outside
Calculating Heat Transfer Heat Transfer
449 18.6 23
Area(m^2) Coefficient Coefficient
Summer(W/(㎡·K)) Winter(W/(㎡·K))
Surfaces Inside Heat
Transfer Coefficient 8.7
(W/(㎡·K))

4.2 Basement Parameters (Building)


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Deep Constant Around Thermal
Room Temperature
Depth Type Cover Temperature Conductivity 3.49
Type
Basement Basement (W/(m·℃))
Around Thermal
Around Average Deep Wall Lining
Diffusivity 13.53 21.3 0.4
Temperature (℃) Thickness(m)
(10^7·㎡/s)
Deep Wall Inside
Deep Wall Thermal Deep Wall Thermal
Heat Transfer
Conductivity 1.51 Diffusivity 8.33 8
Coefficient
(W/(m·℃)) (10^7·㎡/s)
(W/(㎡·℃))
Shallow Floor
Deep Wall Inside
Shallow Floor Thermal
Heat Transfer 1 — —
Thickness(m) Conductivity
Correction Factor
(W/(m·℃))
Shallow Sidewall
Shallow Floor
Shallow Sidewall Thermal
Thermal Diffusivity — — —
Thickness(m) Conductivity
(10^7·㎡/s)
(W/(m·℃))
Shallow Sidewall Surface Moisture
Thermal Diffusivity — Gain Unit 1
(10^7·㎡/s) Area(g/(㎡·h))
3 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

5 Surfaces Information

5.1 Building Surfaces Base Information


5.1.1 Outer Wall (Concrete Aerated Concrete 280(087001))

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Heat Transfer Winter Heat Transfer Heat Transfer
0.71 0.71 10.7
Coefficient(W/(㎡·K)) Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 0.3

5.1.2 Outer Window

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Heat Transfer Winter Heat Transfer Heat Transfer
2.01 2.05 0.4
Coefficient(W/(㎡·K)) Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 1

5.1.3 Inner Wall (003003)

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Heat Transfer Winter Heat Transfer Heat Transfer
2.38 2.38 5.4
Coefficient(W/(㎡·K)) Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 0.56

5.1.4 Inner Door

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Heat Transfer Winter Heat Transfer Heat Transfer
3.35 3.35 0.5
Coefficient(W/(㎡·K)) Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 0.99

5.1.5 Roof

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Heat Transfer Winter Heat Transfer Heat Transfer
2.43 2.49 4.3
Coefficient(W/(㎡·K)) Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 0.68

6 Building Load Summary

6.1 Cooling Load Summary


ITEM CONTENT ITEM CONTENT ITEM CONTENT

4 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Maximum Time Of
Maximum Time Of
Area(㎡) 449 17:00 Room Cooling 17:00
Cooling Load(h)
Load(h)
Cooling Load 141295 Room Cooling Load 141295 Moisture load 4.787
Room Moisture Outdoor Air Volume Outdoor Air Cooling
4.787 0 0
load Flow(m^3) Load
Outdoor Air Unit Outdoor Air Unit Outdoor Air Unit
0 0 0
Cooling Load Sensible Cooling Load Latent Cooling Load
Cooling Load Moisture Load
314.7 0.011
Building Indicator Building Indicator

7 Floor Information

7.1 Building Floor Information (Base Parameters -1 Floor)


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Window Height
Floor Number 1 Floor Height(m) 5.6 1.8
(m)
Elevation(m) 0 Building Area(m^2) 449 Hvac Area(m^2) 449
Caption Normal Floor Description
8 Floor Load Summary

8.1 Building Rooms Load Summary (Cooling Load -2 floor)


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Maximum Time Of
Maximum Time Of
Area(㎡) 449 17:00 Room Cooling 17:00
Cooling Load(h)
Load(h)
Cooling Load 141295 Room Cooling Load 141295 Moisture load 4.787
Room Moisture Outdoor Air Volume Outdoor Air Cooling
4.787 0 0
load Flow(m^3) Load
Outdoor Air Unit Outdoor Air Unit Outdoor Air Unit
0 0 0
Cooling Load Sensible Cooling Load Latent Cooling Load
Cooling Load Moisture Load
314.7 0.011
Building Indicator Building Indicator

9 Rooms Load Summary (Cooling Load)

9.1 1001[HV/LV ROOM]


ITEM CONTENT ITEM CONTENT ITEM CONTENT

5 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Maximum Time Of
Maximum Time Of
Area(㎡) 150 17:00 Room Cooling 17:00
Cooling Load(h)
Load(h)
Cooling Load 57037 Room Cooling Load 57037 Moisture load 3.371
Room Moisture Outdoor Air Volume Outdoor Air Cooling
3.371 0 0
load Flow(m^3) Load
Outdoor Air Unit Outdoor Air Unit Outdoor Air Unit
0 0 0
Cooling Load Sensible Cooling Load Latent Cooling Load
Variable
Cooling Load Moisture Load Room design
380.2 0.022 transformer
Building Indicator Building Indicator parameters
room

9.2 1002[BATTERY ROOM]


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Maximum Time Of
Maximum Time Of
Area(㎡) 63 17:00 Room Cooling 17:00
Cooling Load(h)
Load(h)
Cooling Load 11658 Room Cooling Load 11658 Moisture load 1.416
Room Moisture Outdoor Air Volume Outdoor Air Cooling
1.416 0 0
load Flow(m^3) Load
Outdoor Air Unit Outdoor Air Unit Outdoor Air Unit
0 0 0
Cooling Load Sensible Cooling Load Latent Cooling Load
Variable
Cooling Load Moisture Load Room design
185.1 0.022 transformer
Building Indicator Building Indicator parameters
room

9.3 1003[INSTRUMENT RACK ROOM]


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Maximum Time Of
Maximum Time Of
Area(㎡) 93 17:00 Room Cooling 17:00
Cooling Load(h)
Load(h)
Cooling Load 32577 Room Cooling Load 32577 Moisture load 0
Room Moisture Outdoor Air Volume Outdoor Air
0 0 0
load Flow(m^3) Cooling Load
Outdoor Air Unit
Outdoor Air Unit Outdoor Air Unit
0 0 Latent Cooling 0
Cooling Load Sensible Cooling Load
Load
Cooling Load Moisture Load Room design The control
350.3 0
Building Indicator Building Indicator parameters room

9.4 1004[JETTY OPERATOR ROOM]


ITEM CONTENT ITEM CONTENT ITEM CONTENT

6 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Maximum Time
Maximum Time Of
Area(㎡) 120 17:00 Of Room Cooling 17:00
Cooling Load(h)
Load(h)
Cooling Load 34094 Room Cooling Load 34094 Moisture load 0
Room Moisture Outdoor Air Volume Outdoor Air
0 0 0
load Flow(m^3) Cooling Load
Outdoor Air Unit
Outdoor Air Unit Outdoor Air Unit
0 0 Latent Cooling 0
Cooling Load Sensible Cooling Load
Load
Cooling Load Moisture Load Room design The control
284.1 0
Building Indicator Building Indicator parameters room

9.5 1005[ENGINEER ROOM]


ITEM CONTENT ITEM CONTENT ITEM CONTENT
Maximum Time
Maximum Time Of
Area(㎡) 23 17:00 Of Room Cooling 17:00
Cooling Load(h)
Load(h)
Cooling Load 5927 Room Cooling Load 5927 Moisture load 0
Room Moisture Outdoor Air Volume Outdoor Air
0 0 0
load Flow(m^3) Cooling Load
Outdoor Air Unit
Outdoor Air Unit Outdoor Air Unit
0 0 Latent Cooling 0
Cooling Load Sensible Cooling Load
Load
Cooling Load Moisture Load Room design The control
257.7 0
Building Indicator Building Indicator parameters room

10 Rooms Detailed Calculation

10.1 1001[HV/LV ROOM] Rooms Information (Base Parameters)


ITEM CONTENT ITEM CONTENT ITEM CONTENT
HV/LV
Name Area(㎡) 150 Height(m) 5.6
ROOM
Lighting Watts
Calculated Equipment Watts Per
Calculated 397 Per Unit 11
Load Unit Area(W/㎡)
Area(W/㎡)
Outdoor Air
People Number Per Volume Flow Per
0.1 Number Of People 15 0
Unit Area(Person/㎡) Person(m^3/h-p
erson)
Winter Outdoor Air
Relative
Volume Flow Per 0 Temperature(℃) 28 60
Humidity(%)
Person(m^3/h-person)

7 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.2 1001[HV/LV ROOM] Detailed Parameters


10.2.1 The Human Body

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Seated Clustering
Number 15 Activity Level 0.89
Quiet Coefficient
Time Schedule Custom

10.2.2 Fresh Air [Cooling]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Volume Flow Calculation Calculated
0 Load Type Cooling Load
(m^3) Method Steady
Unit Processed Treatment To The Heat Recovery None Heat The default
Time Schedule
Status Status Of Room Type Recovery time
10.2.3 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 19.5 Time Schedule Custom
Equipment
10.2.4 The light

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Incandescent
Type Power(W) 1650 Time Schedule Custom
Lamp
10.2.5 Exterior Wall[North]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Concrete
Exterior aerated
Name Orientation North Construction
wall[North] concrete280
(087001)
Length(m) 16 Width(m) 5.6 Area(㎡) 89.6
Area Without Winter Heat Transfer
78.8 0.71
Window(㎡) Coefficient(W/(㎡·K))
10.2.6 Window [North]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Window[North] Orientation North Construction Window
Length(m) 1.5 Width(m) 1.8 Area(㎡) 2.7
Internal And Winter Heat Transfer Winter Gap
Shading Type 2.05 8.4
External Coefficient(W/(㎡·K)) Length(m)

8 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Shading

10.2.7 Window [North]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Window[North] Orientation North Construction Window
Length(m) 1.5 Width(m) 1.8 Area(㎡) 2.7
Internal And
Winter Heat Transfer Winter Gap
Shading Type External 2.05 8.4
Coefficient(W/(㎡·K)) Length(m)
Shading
10.2.8 Window [North]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Window[North] Orientation North Construction Window
Length(m) 1.5 Width(m) 1.8 Area(㎡) 2.7
Internal And
Winter Heat Transfer Winter Gap
Shading Type External 2.05 8.4
Coefficient(W/(㎡·K)) Length(m)
Shading
10.2.9 Window [North]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Window[North] Orientation North Construction Window
Length(m) 1.5 Width(m) 1.8 Area(㎡) 2.7
Internal And
Winter Heat Transfer Winter Gap
Shading Type External 2.05 8.4
Coefficient(W/(㎡·K)) Length(m)
Shading
10.2.10 Interior Wall

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Interior wall Construction Wall(003003) Length(m) 21
Winter Heat Transfer
Width(m) 5.6 Area(㎡) 117.6 2.38
Coefficient(W/(㎡·K))
10.2.11 The Inner

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name The inner Construction The door Length(m) 1.8
Winter Heat Transfer
Width(m) 2.1 Area(㎡) 3.78 3.35
Coefficient(W/(㎡·K))

9 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.2.12 Interior Wall

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Interior wall Construction Wall(003003) Length(m) 8
Winter Heat Transfer
Width(m) 5.6 Area(㎡) 44.8 2.38
Coefficient(W/(㎡·K))

10.2.13 The Inner

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name The inner Construction The door Length(m) 1.8
Winter Heat Transfer
Width(m) 2.1 Area(㎡) 3.78 3.35
Coefficient(W/(㎡·K))
10.2.14 The Inner

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name The inner Construction The door Length(m) 1.8
Winter Heat Transfer
Width(m) 2.1 Area(㎡) 3.78 3.35
Coefficient(W/(㎡·K))

10.2.15 The Air Permeability

ITEM CONTENT ITEM CONTENT


Volume Flow(m^3/h) 420 Time Schedule Custom

10.2.16 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 40 Time Schedule Custom
Equipment
10.2.17 Roof

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Roof Construction 01-1-35-1 Area(㎡) 150
Winter Heat Transfer
Sloping Roof Not 2.49
Coefficient(W/(㎡·K))

10.3 1001[HV/LV ROOM] Cooling Load Summary


10.3.1 The Human Body
10.3.1.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


10 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 1442 9:00 1442 10:00 1442
11:00 1442 12:00 1442 13:00 1442
14:00 1442 15:00 1442 16:00 1442
17:00 1442 18:00 1442 19:00 1442
20:00 1442

10.3.1.2 Sensible Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 53 9:00 53 10:00 53
11:00 53 12:00 53 13:00 53
14:00 53 15:00 53 16:00 53
17:00 53 18:00 53 19:00 53
20:00 53

10.3.1.3 Latent Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 55 9:00 55 10:00 55
11:00 55 12:00 55 13:00 55
14:00 55 15:00 55 16:00 55
17:00 55 18:00 55 19:00 55
20:00 55

10.3.1.4 Moisture Gain Per People(g/h)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 82 9:00 82 10:00 82
11:00 82 12:00 82 13:00 82
14:00 82 15:00 82 16:00 82
17:00 82 18:00 82 19:00 82
20:00 82

10.3.1.5 Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


11 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 708 9:00 708 10:00 708
11:00 708 12:00 708 13:00 708
14:00 708 15:00 708 16:00 708
17:00 708 18:00 708 19:00 708
20:00 708

10.3.1.6 Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 734 9:00 734 10:00 734
11:00 734 12:00 734 13:00 734
14:00 734 15:00 734 16:00 734
17:00 734 18:00 734 19:00 734
20:00 734

10.3.1.7 Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 1.095 9:00 1.095 10:00 1.095
11:00 1.095 12:00 1.095 13:00 1.095
14:00 1.095 15:00 1.095 16:00 1.095
17:00 1.095 18:00 1.095 19:00 1.095
20:00 1.095

10.3.2 Fresh Air[Cooling]


10.3.2.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

12 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.2.2 Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.2.3 Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.2.4 Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.2.5 Outdoor Air Take Away Room Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

13 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.2.6 Outdoor Air Take Away Room Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.2.7 Outdoor Air Take Away Room Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.2.8 Outdoor Air Take Away Room Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.2.9 Outdoor Air Unit Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

14 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.2.10Outdoor Air Unit Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.2.11Outdoor Air Unit Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.2.12Outdoor Air Unit Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.3 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 13650 9:00 13650 10:00 13650
11:00 13650 12:00 13650 13:00 13650
14:00 13650 15:00 13650 16:00 13650
17:00 13650 18:00 13650 19:00 13650
20:00 13650

15 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.4 The Light (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 1650 9:00 1650 10:00 1650
11:00 1650 12:00 1650 13:00 1650
14:00 1650 15:00 1650 16:00 1650
17:00 1650 18:00 1650 19:00 1650
20:00 1650

10.3.5 Exterior Wall[North]


10.3.5.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 346 9:00 311 10:00 278
11:00 251 12:00 233 13:00 228
14:00 235 15:00 254 16:00 283
17:00 321 18:00 365 19:00 410
20:00 455

10.3.5.2 Radiation Intensity(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 319 9:00 389 10:00 436
11:00 456 12:00 464 13:00 456
14:00 436 15:00 389 16:00 319
17:00 210 18:00 0 19:00 0
20:00 0

10.3.5.3 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 6.2 9:00 5.6 10:00 5
11:00 4.5 12:00 4.2 13:00 4.1
14:00 4.2 15:00 4.6 16:00 5.1
17:00 5.8 18:00 6.6 19:00 7.4

16 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


20:00 8.2

10.3.6 Window[North]
10.3.6.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 189 9:00 246 10:00 293
11:00 324 12:00 346 13:00 357
14:00 357 15:00 340 16:00 304
17:00 248 18:00 130 19:00 100
20:00 84

10.3.6.2 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -1 9:00 -0.1 10:00 0.7
11:00 1.6 12:00 2.4 13:00 3.1
14:00 3.5 15:00 3.7 16:00 3.5
17:00 3.4 18:00 3 19:00 2.2
20:00 1.4

10.3.6.3 Direct Radiation Area(㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 2.7 9:00 2.7 10:00 2.7
11:00 2.7 12:00 2.7 13:00 2.7
14:00 2.7 15:00 2.7 16:00 2.7
17:00 2.7 18:00 2.7 19:00 2.7
20:00 2.7

10.3.6.4 Scattering Radiation Area(㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


17:00 0 18:00 0 19:00 0
20:00 0

10.3.6.5 Direct Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 148 9:00 174 10:00 188
11:00 195 12:00 197 13:00 195
14:00 188 15:00 174 16:00 148
17:00 101 18:00 0 19:00 0
20:00 0

10.3.6.6 Scattering Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 75 9:00 100 10:00 120
11:00 128 12:00 132 13:00 128
14:00 120 15:00 100 16:00 75
17:00 45 18:00 0 19:00 0
20:00 0

10.3.6.7 Direct Radiation Load Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 148.9 9:00 190.2 10:00 224.2
11:00 245.3 12:00 259.8 13:00 266.1
14:00 264.9 15:00 251.5 16:00 224
17:00 181.3 18:00 91.9 19:00 70.3
20:00 60.6

10.3.6.8 Scattering Radiation Load Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 50.1 9:00 68.2 10:00 85.3
11:00 95.4 12:00 102.4 13:00 104.6

18 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 103.1 15:00 94 16:00 80.1
17:00 62.1 18:00 33.2 19:00 25.9
20:00 22.2

10.3.6.9 Direct Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 193 9:00 247 10:00 291
11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.3.6.10Scattering Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.6.11Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 193 9:00 247 10:00 291
11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.3.6.12Transfer Load By Temperature Difference

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -4 9:00 -0 10:00 3
11:00 6 12:00 9 13:00 12
19 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 13 15:00 14 16:00 13
17:00 13 18:00 11 19:00 8
20:00 5

10.3.7 Window[North]
10.3.7.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 189 9:00 246 10:00 293
11:00 324 12:00 346 13:00 357
14:00 357 15:00 340 16:00 304
17:00 248 18:00 130 19:00 100
20:00 84

10.3.7.2 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -1 9:00 -0.1 10:00 0.7
11:00 1.6 12:00 2.4 13:00 3.1
14:00 3.5 15:00 3.7 16:00 3.5
17:00 3.4 18:00 3 19:00 2.2
20:00 1.4

10.3.7.3 Direct Radiation Area(㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 2.7 9:00 2.7 10:00 2.7
11:00 2.7 12:00 2.7 13:00 2.7
14:00 2.7 15:00 2.7 16:00 2.7
17:00 2.7 18:00 2.7 19:00 2.7
20:00 2.7

10.3.7.4 Scattering Radiation Area(㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
20 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.7.5 Direct Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 148 9:00 174 10:00 188
11:00 195 12:00 197 13:00 195
14:00 188 15:00 174 16:00 148
17:00 101 18:00 0 19:00 0
20:00 0

10.3.7.6 Scattering Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 75 9:00 100 10:00 120
11:00 128 12:00 132 13:00 128
14:00 120 15:00 100 16:00 75
17:00 45 18:00 0 19:00 0
20:00 0

10.3.7.7 Direct Radiation Load Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 148.9 9:00 190.2 10:00 224.2
11:00 245.3 12:00 259.8 13:00 266.1
14:00 264.9 15:00 251.5 16:00 224
17:00 181.3 18:00 91.9 19:00 70.3
20:00 60.6

10.3.7.8 Scattering Radiation Load Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER

21 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 50.1 9:00 68.2 10:00 85.3
11:00 95.4 12:00 102.4 13:00 104.6
14:00 103.1 15:00 94 16:00 80.1
17:00 62.1 18:00 33.2 19:00 25.9
20:00 22.2

10.3.7.9 Direct Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 193 9:00 247 10:00 291
11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.3.7.10Scattering Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.7.11Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 193 9:00 247 10:00 291
11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.3.7.12Transfer Load By Temperature Difference

TIME NUMBER TIME NUMBER TIME NUMBER


22 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -4 9:00 -0 10:00 3
11:00 6 12:00 9 13:00 12
14:00 13 15:00 14 16:00 13
17:00 13 18:00 11 19:00 8
20:00 5

10.3.8 Window[North]
10.3.8.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 189 9:00 246 10:00 293
11:00 324 12:00 346 13:00 357
14:00 357 15:00 340 16:00 304
17:00 248 18:00 130 19:00 100
20:00 84

10.3.8.2 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -1 9:00 -0.1 10:00 0.7
11:00 1.6 12:00 2.4 13:00 3.1
14:00 3.5 15:00 3.7 16:00 3.5
17:00 3.4 18:00 3 19:00 2.2
20:00 1.4

10.3.8.3 Direct Radiation Area(㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 2.7 9:00 2.7 10:00 2.7
11:00 2.7 12:00 2.7 13:00 2.7
14:00 2.7 15:00 2.7 16:00 2.7
17:00 2.7 18:00 2.7 19:00 2.7
20:00 2.7

23 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.8.4 Scattering Radiation Area(㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.8.5 Direct Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 148 9:00 174 10:00 188
11:00 195 12:00 197 13:00 195
14:00 188 15:00 174 16:00 148
17:00 101 18:00 0 19:00 0
20:00 0

10.3.8.6 Scattering Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 75 9:00 100 10:00 120
11:00 128 12:00 132 13:00 128
14:00 120 15:00 100 16:00 75
17:00 45 18:00 0 19:00 0
20:00 0

10.3.8.7 Direct Radiation Load Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 148.9 9:00 190.2 10:00 224.2
11:00 245.3 12:00 259.8 13:00 266.1
14:00 264.9 15:00 251.5 16:00 224
17:00 181.3 18:00 91.9 19:00 70.3
20:00 60.6

24 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.8.8 Scattering Radiation Load Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 50.1 9:00 68.2 10:00 85.3
11:00 95.4 12:00 102.4 13:00 104.6
14:00 103.1 15:00 94 16:00 80.1
17:00 62.1 18:00 33.2 19:00 25.9
20:00 22.2

10.3.8.9 Direct Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 193 9:00 247 10:00 291
11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.3.8.10Scattering Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.8.11Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 193 9:00 247 10:00 291
11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

25 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.8.12Transfer Load By Temperature Difference

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -4 9:00 0 10:00 3
11:00 6 12:00 9 13:00 12
14:00 13 15:00 14 16:00 13
17:00 13 18:00 11 19:00 8
20:00 5

10.3.9 Window[North]
10.3.9.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 189 9:00 246 10:00 293
11:00 324 12:00 346 13:00 357
14:00 357 15:00 340 16:00 304
17:00 248 18:00 130 19:00 100
20:00 84

10.3.9.2 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -1 9:00 -0.1 10:00 0.7
11:00 1.6 12:00 2.4 13:00 3.1
14:00 3.5 15:00 3.7 16:00 3.5
17:00 3.4 18:00 3 19:00 2.2
20:00 1.4

10.3.9.3 Direct Radiation Area(㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 2.7 9:00 2.7 10:00 2.7
11:00 2.7 12:00 2.7 13:00 2.7
14:00 2.7 15:00 2.7 16:00 2.7
17:00 2.7 18:00 2.7 19:00 2.7
20:00 2.7

26 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.9.4 Scattering Radiation Area(㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.9.5 Direct Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 148 9:00 174 10:00 188
11:00 195 12:00 197 13:00 195
14:00 188 15:00 174 16:00 148
17:00 101 18:00 0 19:00 0
20:00 0

10.3.9.6 Scattering Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 75 9:00 100 10:00 120
11:00 128 12:00 132 13:00 128
14:00 120 15:00 100 16:00 75
17:00 45 18:00 0 19:00 0
20:00 0

10.3.9.7 Direct Radiation Load Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 148.9 9:00 190.2 10:00 224.2
11:00 245.3 12:00 259.8 13:00 266.1
14:00 264.9 15:00 251.5 16:00 224
17:00 181.3 18:00 91.9 19:00 70.3
20:00 60.6

27 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.9.8 Scattering Radiation Load Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 50.1 9:00 68.2 10:00 85.3
11:00 95.4 12:00 102.4 13:00 104.6
14:00 103.1 15:00 94 16:00 80.1
17:00 62.1 18:00 33.2 19:00 25.9
20:00 22.2

10.3.9.9 Direct Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 193 9:00 247 10:00 291
11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.3.9.10Scattering Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.3.9.11Radiation Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 193 9:00 247 10:00 291
11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

28 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.9.12Transfer Load By Temperature Difference

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -4 9:00 -0 10:00 3
11:00 6 12:00 9 13:00 12
14:00 13 15:00 14 16:00 13
17:00 13 18:00 11 19:00 8
20:00 5

10.3.10 Interior Wall


10.3.10.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 975 9:00 975 10:00 975
11:00 975 12:00 975 13:00 975
14:00 975 15:00 975 16:00 975
17:00 975 18:00 975 19:00 975
20:00 975

10.3.10.2Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 3.6 9:00 3.6 10:00 3.6
11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6

10.3.11 The Inner


10.3.11.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 46 9:00 46 10:00 46
11:00 46 12:00 46 13:00 46
14:00 46 15:00 46 16:00 46

29 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


17:00 46 18:00 46 19:00 46
20:00 46

10.3.11.2Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 3.6 9:00 3.6 10:00 3.6
11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6

10.3.12 Interior Wall


10.3.12.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 319 9:00 319 10:00 319
11:00 319 12:00 319 13:00 319
14:00 319 15:00 319 16:00 319
17:00 319 18:00 319 19:00 319
20:00 319

10.3.12.2Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 3.6 9:00 3.6 10:00 3.6
11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6

10.3.13 The Inner


10.3.13.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 46 9:00 46 10:00 46
30 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


11:00 46 12:00 46 13:00 46
14:00 46 15:00 46 16:00 46
17:00 46 18:00 46 19:00 46
20:00 46

10.3.13.2Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 3.6 9:00 3.6 10:00 3.6
11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6

10.3.14 The Inner


10.3.14.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 46 9:00 46 10:00 46
11:00 46 12:00 46 13:00 46
14:00 46 15:00 46 16:00 46
17:00 46 18:00 46 19:00 46
20:00 46

10.3.14.2Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 3.6 9:00 3.6 10:00 3.6
11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6

31 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.15 The Air Permeability


10.3.15.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 2326 9:00 2326 10:00 2326
11:00 2326 12:00 2326 13:00 2326
14:00 2326 15:00 2326 16:00 2326
17:00 2326 18:00 2326 19:00 2326
20:00 2326

10.3.15.2Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 685 9:00 685 10:00 685
11:00 685 12:00 685 13:00 685
14:00 685 15:00 685 16:00 685
17:00 685 18:00 685 19:00 685
20:00 685

10.3.15.3Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 1642 9:00 1642 10:00 1642
11:00 1642 12:00 1642 13:00 1642
14:00 1642 15:00 1642 16:00 1642
17:00 1642 18:00 1642 19:00 1642
20:00 1642

10.3.15.4Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 2.277 9:00 2.277 10:00 2.277
11:00 2.277 12:00 2.277 13:00 2.277
14:00 2.277 15:00 2.277 16:00 2.277
17:00 2.277 18:00 2.277 19:00 2.277
20:00 2.277

32 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.3.16 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 28000 9:00 28000 10:00 28000
11:00 28000 12:00 28000 13:00 28000
14:00 28000 15:00 28000 16:00 28000
17:00 28000 18:00 28000 19:00 28000
20:00 28000

10.3.17 Roof
10.3.17.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -611 9:00 -390 10:00 238
11:00 1229 12:00 2462 13:00 3790
14:00 5062 15:00 6139 16:00 6896
17:00 7226 18:00 7103 19:00 6568
20:00 5792

10.3.17.2Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 404.5 9:00 622.2 10:00 799.9
11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

10.3.17.3Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -1.7 9:00 -1.1 10:00 0.7
11:00 3.4 12:00 6.8 13:00 10.4
14:00 13.9 15:00 16.9 16:00 18.9
17:00 19.9 18:00 19.5 19:00 18
20:00 15.9

33 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.4 1002[BATTERY ROOM]Rooms Information (Base Parameters)


ITEM CONTENT ITEM CONTENT ITEM CONTENT
BATTERY
Name Area(㎡) 63 Height(m) 5.6
ROOM
Lighting Watts
Calculated Equipment Watts Per
Calculated 130 Per Unit 11
Load Unit Area(W/㎡)
Area(W/㎡)
Outdoor Air
Volume Flow
People Number Per
0.1 Number Of People 6.3 Per 0
Unit Area(Person/㎡)
Person(m^3/h-p
erson)
Winter Outdoor Air
Relative
Volume Flow Per 0 Temperature(℃) 28 60
Humidity(%)
Person(m^3/h-person)

10.5 1002[BATTERY ROOM]Detailed Parameters


10.5.1 The Human Body

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Seated Clustering
Number 6.3 Activity Level 0.89
Quiet Coefficient
Time Schedule Custom

10.5.2 Fresh Air[Cooling]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Volume Flow Calculation Calculated
0 Load Type Cooling Load
(m^3) Method Steady
Unit Processed Treatment To The Heat Recovery None Heat The default
Time Schedule
Status Status Of Room Type Recovery time
10.5.3 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 8.19 Time Schedule Custom
Equipment
10.5.4 The Light

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Incandescent
Type Power(W) 693 Time Schedule Custom
Lamp
10.5.5 Interior Wall

ITEM CONTENT ITEM CONTENT ITEM CONTENT


34 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Interior wall Construction Wall(003003) Length(m) 15
Winter Heat Transfer
Width(m) 5.6 Area(㎡) 84 2.38
Coefficient(W/(㎡·K))
10.5.6 The Inner

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name The inner Construction The door Length(m) 1.8
Winter Heat Transfer
Width(m) 2.1 Area(㎡) 3.78 3.35
Coefficient(W/(㎡·K))
10.5.7 Roof

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Roof Construction 01-1-35-1 Area(㎡) 63
Winter Heat Transfer
Sloping Roof Not 2.49
Coefficient(W/(㎡·K))

10.5.8 The Air Permeability

ITEM CONTENT ITEM CONTENT


Volume Flow(m^3/h) 176.4 Time Schedule Custom

10.6 1002[BATTERY ROOM]Cooling Load Summary


10.6.1 The Human Body
10.6.1.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 606 9:00 606 10:00 606
11:00 606 12:00 606 13:00 606
14:00 606 15:00 606 16:00 606
17:00 606 18:00 606 19:00 606
20:00 606

10.6.1.2 Sensible Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 53 9:00 53 10:00 53
11:00 53 12:00 53 13:00 53

35 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 53 15:00 53 16:00 53
17:00 53 18:00 53 19:00 53
20:00 53

10.6.1.3 Latent Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 55 9:00 55 10:00 55
11:00 55 12:00 55 13:00 55
14:00 55 15:00 55 16:00 55
17:00 55 18:00 55 19:00 55
20:00 55

10.6.1.4 Moisture Gain Per People(g/h)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 82 9:00 82 10:00 82
11:00 82 12:00 82 13:00 82
14:00 82 15:00 82 16:00 82
17:00 82 18:00 82 19:00 82
20:00 82

10.6.1.5 Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 297 9:00 297 10:00 297
11:00 297 12:00 297 13:00 297
14:00 297 15:00 297 16:00 297
17:00 297 18:00 297 19:00 297
20:00 297

10.6.1.6 Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 308 9:00 308 10:00 308
11:00 308 12:00 308 13:00 308
36 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 308 15:00 308 16:00 308
17:00 308 18:00 308 19:00 308
20:00 308

10.6.1.7 Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0.46 9:00 0.46 10:00 0.46
11:00 0.46 12:00 0.46 13:00 0.46
14:00 0.46 15:00 0.46 16:00 0.46
17:00 0.46 18:00 0.46 19:00 0.46
20:00 0.46

10.6.2 Fresh Air[Cooling]


10.6.2.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.2 Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.3 Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
37 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.4 Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.5 Outdoor Air Take Away Room Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.6 Outdoor Air Take Away Room Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.7 Outdoor Air Take Away Room Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
38 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.8 Outdoor Air Take Away Room Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.9 Outdoor Air Unit Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.10Outdoor Air Unit Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.11Outdoor Air Unit Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
39 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.2.12Outdoor Air Unit Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.6.3 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 5733 9:00 5733 10:00 5733
11:00 5733 12:00 5733 13:00 5733
14:00 5733 15:00 5733 16:00 5733
17:00 5733 18:00 5733 19:00 5733
20:00 5733

10.6.4 The light (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 693 9:00 693 10:00 693
11:00 693 12:00 693 13:00 693
14:00 693 15:00 693 16:00 693
17:00 693 18:00 693 19:00 693
20:00 693

10.6.5 Interior Wall


10.6.5.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER

40 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 687 9:00 687 10:00 687
11:00 687 12:00 687 13:00 687
14:00 687 15:00 687 16:00 687
17:00 687 18:00 687 19:00 687
20:00 687

10.6.5.2 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 3.6 9:00 3.6 10:00 3.6
11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6

10.6.6 The Inner


10.6.6.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 46 9:00 46 10:00 46
11:00 46 12:00 46 13:00 46
14:00 46 15:00 46 16:00 46
17:00 46 18:00 46 19:00 46
20:00 46

10.6.6.2 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 3.6 9:00 3.6 10:00 3.6
11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6

41 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.6.7 Roof
10.6.7.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -212 9:00 -149 10:00 74
11:00 443 12:00 918 13:00 1442
14:00 1958 15:00 2409 16:00 2744
17:00 2917 18:00 2913 19:00 2742
20:00 2466

10.6.7.2 Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 404.5 9:00 622.2 10:00 799.9
11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

10.6.7.3 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 -1.4 9:00 -1 10:00 0.5
11:00 2.9 12:00 6 13:00 9.4
14:00 12.8 15:00 15.8 16:00 17.9
17:00 19.1 18:00 19.1 19:00 17.9
20:00 16.1

10.6.8 The Air Permeability


10.6.8.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 977 9:00 977 10:00 977
11:00 977 12:00 977 13:00 977
14:00 977 15:00 977 16:00 977
17:00 977 18:00 977 19:00 977

42 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


20:00 977

10.6.8.2 Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 288 9:00 288 10:00 288
11:00 288 12:00 288 13:00 288
14:00 288 15:00 288 16:00 288
17:00 288 18:00 288 19:00 288
20:00 288

10.6.8.3 Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 689 9:00 689 10:00 689
11:00 689 12:00 689 13:00 689
14:00 689 15:00 689 16:00 689
17:00 689 18:00 689 19:00 689
20:00 689

10.6.8.4 Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0.956 9:00 0.956 10:00 0.956
11:00 0.956 12:00 0.956 13:00 0.956
14:00 0.956 15:00 0.956 16:00 0.956
17:00 0.956 18:00 0.956 19:00 0.956
20:00 0.956

10.7 1003[INSTRUMENT RACK ROOM]Rooms Information (Base Parameters)


ITEM CONTENT ITEM CONTENT ITEM CONTENT
INSTRUMENT
Name Area(㎡) 93 Height(m) 5.6
RACK ROOM
Equipment Watts Lighting Watts
Calculated
Calculated Per Unit Area 388 Per Unit 11
Load
(W/㎡) Area(W/㎡)
People Number Per 0 Number Of People 0 Outdoor Air 0
43 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Unit Area(Person/㎡) Volume Flow Per
Person(m^3/h-p
erson)
Winter Outdoor Air
Relative
Volume Flow Per 0 Temperature(℃) 25 60
Humidity(%)
Person(m^3/h-person)

10.8 1003[INSTRUMENT RACK ROOM]Detailed Parameters


10.8.1 The Human Body

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Seated Clustering
Number 0 Activity Level 0.89
Quiet Coefficient
Time Schedule Custom

10.8.2 Fresh Air[Cooling]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Volume Flow Calculation Calculated
0 Load Type Cooling Load
(m^3) Method Steady
Unit Processed Treatment To The Heat Recovery None Heat The default
Time Schedule
Status Status Of Room Type Recovery time
10.8.3 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 12.09 Time Schedule Custom
Equipment
10.8.4 The Light

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Incandescent
Type Power(W) 1023 Time Schedule Custom
Lamp
10.8.5 Exterior Wall[North]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Concrete
Exterior aerated
Name Orientation North Construction
wall[North] concrete280
(087001)
Length(m) 17 Width(m) 5.6 Area(㎡) 95.2
Area Without Winter Heat Transfer
95.2 0.71
Window(㎡) Coefficient(W/(㎡·K))

44 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.8.6 Exterior Wall[East]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Exterior Orientation East Construction Concrete
wall[East] aerated
Name
concrete28
0(087001)
Length(m) 7 Width(m) 5.6 Area(㎡) 39.2
Area Without 39.2 Winter Heat Transfer 0.71
Window(㎡) Coefficient(W/(㎡·K))

10.8.7 Roof

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Roof Construction 01-1-35-1 Area(㎡) 93
Winter Heat Transfer
Sloping Roof Not 2.49
Coefficient(W/(㎡·K))
10.8.8 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 24 Time Schedule Custom
Equipment

10.9 1003[INSTRUMENT RACK ROOM]Cooling Load Summary


10.9.1 The Human Body
10.9.1.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.1.2 Sensible Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 67 9:00 67 10:00 67
11:00 67 12:00 67 13:00 67
14:00 67 15:00 67 16:00 67

45 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


17:00 67 18:00 67 19:00 67
20:00 67

10.9.1.3 Latent Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 41 9:00 41 10:00 41
11:00 41 12:00 41 13:00 41
14:00 41 15:00 41 16:00 41
17:00 41 18:00 41 19:00 41
20:00 41

10.9.1.4 Moisture Gain Per People(g/h)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 61 9:00 61 10:00 61
11:00 61 12:00 61 13:00 61
14:00 61 15:00 61 16:00 61
17:00 61 18:00 61 19:00 61
20:00 61

10.9.1.5 Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.1.6 Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
46 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


17:00 0 18:00 0 19:00 0
20:00 0

10.9.1.7 Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2 Fresh Air[Cooling]


10.9.2.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.2 Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.3 Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
47 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.4 Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.5 Outdoor Air Take Away Room Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.6 Outdoor Air Take Away Room Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.7 Outdoor Air Take Away Room Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
48 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.8 Outdoor Air Take Away Room Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.9 Outdoor Air Unit Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.10Outdoor Air Unit Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.11Outdoor Air Unit Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
49 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.2.12Outdoor Air Unit Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.9.3 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 8463 9:00 8463 10:00 8463
11:00 8463 12:00 8463 13:00 8463
14:00 8463 15:00 8463 16:00 8463
17:00 8463 18:00 8463 19:00 8463
20:00 8463

10.9.4 The light (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 1023 9:00 1023 10:00 1023
11:00 1023 12:00 1023 13:00 1023
14:00 1023 15:00 1023 16:00 1023
17:00 1023 18:00 1023 19:00 1023
20:00 1023

10.9.5 Exterior wall[North]


10.9.5.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 614 9:00 573 10:00 535

50 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


11:00 504 12:00 484 13:00 478
14:00 489 15:00 513 16:00 550
17:00 597 18:00 650 19:00 705
20:00 757

10.9.5.2 Radiation Intensity(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 319 9:00 389 10:00 436
11:00 456 12:00 464 13:00 456
14:00 436 15:00 389 16:00 319
17:00 210 18:00 0 19:00 0
20:00 0

10.9.5.3 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 9.1 9:00 8.5 10:00 8
11:00 7.5 12:00 7.2 13:00 7.1
14:00 7.3 15:00 7.6 16:00 8.2
17:00 8.9 18:00 9.7 19:00 10.5
20:00 11.3

10.9.6 Exterior Wall[East]


10.9.6.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 207 9:00 194 10:00 181
11:00 174 12:00 174 13:00 182
14:00 197 15:00 215 16:00 234
17:00 251 18:00 267 19:00 279
20:00 289

10.9.6.2 Radiation Intensity(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


51 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 615 9:00 625 10:00 532
11:00 362 12:00 160 13:00 156
14:00 146 15:00 121 16:00 91
17:00 55 18:00 0 19:00 0
20:00 0

10.9.6.3 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 7.5 9:00 7 10:00 6.6
11:00 6.3 12:00 6.3 13:00 6.6
14:00 7.1 15:00 7.8 16:00 8.4
17:00 9.1 18:00 9.6 19:00 10.1
20:00 10.4

10.9.7 Roof
10.9.7.1 Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 202 9:00 409 10:00 896
11:00 1621 12:00 2489 13:00 3391
14:00 4225 15:00 4895 16:00 5323
17:00 5443 18:00 5251 19:00 4786
20:00 4184

10.9.7.2 Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 404.5 9:00 622.2 10:00 799.9
11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

52 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.9.7.3 Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0.9 9:00 1.8 10:00 4
11:00 7.2 12:00 11 13:00 15
14:00 18.7 15:00 21.7 16:00 23.6
17:00 24.1 18:00 23.3 19:00 21.2
20:00 18.5

10.9.8 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 16800 9:00 16800 10:00 16800
11:00 16800 12:00 16800 13:00 16800
14:00 16800 15:00 16800 16:00 16800
17:00 16800 18:00 16800 19:00 16800
20:00 16800

10.10 1004[JETTY OPERATOR ROOM]Rooms Information


10.10.1 Base Parameters

ITEM CONTENT ITEM CONTENT ITEM CONTENT


JETTY
Name OPERATOR Area(㎡) 120 Height(m) 5.6
ROOM
Lighting Watts
Calculated Equipment Watts Per
Calculated 297 Per Unit 11
Load Unit Area(W/㎡)
Area(W/㎡)
Outdoor Air
People Number Per Volume Flow Per
0 Number Of People 0 0
Unit Area(Person/㎡) Person(m^3/h-p
erson)
Winter Outdoor Air
Relative
Volume Flow Per 0 Temperature(℃) 25 60
Humidity(%)
Person(m^3/h-person)

10.11 1004[JETTY OPERATOR ROOM]Detailed Parameters


10.11.1 The Human Body

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Seated Clustering
Number 0 Activity Level 0.89
Quiet Coefficient
53 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Time Schedule Custom

10.11.2 Fresh Air[Cooling]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Volume Flow Calculation Calculated
0 Load Type Cooling Load
(m^3) Method Steady
Unit Processed Treatment To The Heat Recovery None Heat The default
Time Schedule
Status Status Of Room Type Recovery time
10.11.3 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 15.6 Time Schedule Custom
Equipment
10.11.4 The Light

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Incandescent
Type Power(W) 1320 Time Schedule Custom
Lamp
10.11.5 Exterior Wall[North]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Concrete
Exterior aerated
Name Orientation North Construction
wall[North] concrete280
(087001)
Length(m) 17 Width(m) 5.6 Area(㎡) 95.2
Area Without Winter Heat Transfer
95.2 0.71
Window(㎡) Coefficient(W/(㎡·K))
10.11.6 Exterior Wall[East]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Concrete
Exterior aerated
Name Orientation East Construction
wall[East] concrete280
(087001)
Length(m) 7 Width(m) 5.6 Area(㎡) 39.2
Area Without Winter Heat Transfer
39.2 0.71
Window(㎡) Coefficient(W/(㎡·K))

54 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.11.7 Roof

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Roof Construction 01-1-35-1 Area(㎡) 120
Winter Heat Transfer
Sloping Roof Not 2.49
Coefficient(W/(㎡·K))

10.11.8 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 20 Time Schedule Custom
Equipment

10.12 1004[JETTY OPERATOR ROOM]Cooling Load Summary


10.12.1 The Human Body
10.12.1.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.1.2Sensible Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 67 9:00 67 10:00 67
11:00 67 12:00 67 13:00 67
14:00 67 15:00 67 16:00 67
17:00 67 18:00 67 19:00 67
20:00 67

10.12.1.3Latent Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 41 9:00 41 10:00 41
11:00 41 12:00 41 13:00 41
14:00 41 15:00 41 16:00 41

55 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


17:00 41 18:00 41 19:00 41
20:00 41

10.12.1.4Moisture Gain Per People(g/h)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 61 9:00 61 10:00 61
11:00 61 12:00 61 13:00 61
14:00 61 15:00 61 16:00 61
17:00 61 18:00 61 19:00 61
20:00 61

10.12.1.5Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.1.6Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.1.7Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
56 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


17:00 0 18:00 0 19:00 0
20:00 0

10.12.2 Fresh Air[Cooling]


10.12.2.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.2Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.3Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.4Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
57 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.5Outdoor Air Take Away Room Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.6Outdoor Air Take Away Room Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.7Outdoor Air Take Away Room Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.8Outdoor Air Take Away Room Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
58 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.9Outdoor Air Unit Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.10 Outdoor Air Unit Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.11 Outdoor Air Unit Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.2.12 Outdoor Air Unit Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
59 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.12.3 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 10920 9:00 10920 10:00 10920
11:00 10920 12:00 10920 13:00 10920
14:00 10920 15:00 10920 16:00 10920
17:00 10920 18:00 10920 19:00 10920
20:00 10920

10.12.4 The Light (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 1320 9:00 1320 10:00 1320
11:00 1320 12:00 1320 13:00 1320
14:00 1320 15:00 1320 16:00 1320
17:00 1320 18:00 1320 19:00 1320
20:00 1320

10.12.5 Exterior Wall[North]


10.12.5.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 614 9:00 573 10:00 535
11:00 504 12:00 484 13:00 478
14:00 489 15:00 513 16:00 550
17:00 597 18:00 650 19:00 705
20:00 757

10.12.5.2Radiation Intensity(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 319 9:00 389 10:00 436

60 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


11:00 456 12:00 464 13:00 456
14:00 436 15:00 389 16:00 319
17:00 210 18:00 0 19:00 0
20:00 0

10.12.5.3Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 9.1 9:00 8.5 10:00 8
11:00 7.5 12:00 7.2 13:00 7.1
14:00 7.3 15:00 7.6 16:00 8.2
17:00 8.9 18:00 9.7 19:00 10.5
20:00 11.3

10.12.6 Exterior Wall[East]


10.12.6.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 207 9:00 194 10:00 181
11:00 174 12:00 174 13:00 182
14:00 197 15:00 215 16:00 234
17:00 251 18:00 267 19:00 279
20:00 289

10.12.6.2Radiation Intensity(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 615 9:00 625 10:00 532
11:00 362 12:00 160 13:00 156
14:00 146 15:00 121 16:00 91
17:00 55 18:00 0 19:00 0
20:00 0

10.12.6.3Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


61 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 7.5 9:00 7 10:00 6.6
11:00 6.3 12:00 6.3 13:00 6.6
14:00 7.1 15:00 7.8 16:00 8.4
17:00 9.1 18:00 9.6 19:00 10.1
20:00 10.4

10.12.7 Roof
10.12.7.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 266 9:00 525 10:00 1143
11:00 2067 12:00 3178 13:00 4338
14:00 5412 15:00 6281 16:00 6840
17:00 7006 18:00 6771 19:00 6184
20:00 5417

10.12.7.2Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 404.5 9:00 622.2 10:00 799.9
11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

10.12.7.3Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0.9 9:00 1.8 10:00 3.9
11:00 7.1 12:00 10.9 13:00 14.9
14:00 18.6 15:00 21.6 16:00 23.5
17:00 24.1 18:00 23.3 19:00 21.2
20:00 18.6

62 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

10.12.8 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 14000 9:00 14000 10:00 14000
11:00 14000 12:00 14000 13:00 14000
14:00 14000 15:00 14000 16:00 14000
17:00 14000 18:00 14000 19:00 14000
20:00 14000

10.13 1005[ENGINEER ROOM]Rooms Information


10.13.1 Base Parameters

ITEM CONTENT ITEM CONTENT ITEM CONTENT


ENGINEER
Name Area(㎡) 23 Height(m) 5.6
ROOM
Lighting Watts
Calculated Equipment Watts Per
Calculated 260 Per Unit 11
Load Unit Area(W/㎡)
Area(W/㎡)
Outdoor Air
People Number Per Volume Flow Per
0 Number Of People 0 0
Unit Area(Person/㎡) Person(m^3/h-p
erson)
Winter Outdoor Air
Relative
Volume Flow Per 0 Temperature(℃) 25 60
Humidity(%)
Person(m^3/h-person)

10.14 1005[ENGINEER ROOM]Detailed Parameters


10.14.1 The Human Body

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Seated Clustering
Number 0 Activity Level 0.89
Quiet Coefficient
Time Schedule Custom

10.14.2 Fresh Air[Cooling]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Volume Flow Calculation Calculated
0 Load Type Cooling Load
(m^3) Method Steady
Unit Processed Treatment To The Heat Recovery None Heat The default
Time Schedule
Status Status Of Room Type Recovery time
10.14.3 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


63 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 2.99 Time Schedule Custom
Equipment
10.14.4 The Light

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Incandescent
Type Power(W) 253 Time Schedule Custom
Lamp
10.14.5 Exterior Wall[North]

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Concrete
Exterior aerated
Name Orientation North Construction
wall[North] concrete280
(087001)
Length(m) 4 Width(m) 5.6 Area(㎡) 22.4
Area Without Winter Heat Transfer
22.4 0.71
Window(㎡) Coefficient(W/(㎡·K))
10.14.6 Roof

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Name Roof Construction 01-1-35-1 Area(㎡) 23
Winter Heat Transfer
Sloping Roof Not 2.49
Coefficient(W/(㎡·K))

10.14.7 Equipment

ITEM CONTENT ITEM CONTENT ITEM CONTENT


Electronic
Type Power(KW) 3 Time Schedule Custom
Equipment

10.15 1005[ENGINEER ROOM]Cooling Load Summary


10.15.1 The Human Body
10.15.1.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0

64 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


20:00 0

10.15.1.2Sensible Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 67 9:00 67 10:00 67
11:00 67 12:00 67 13:00 67
14:00 67 15:00 67 16:00 67
17:00 67 18:00 67 19:00 67
20:00 67

10.15.1.3Latent Heat Gain Per People(W)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 41 9:00 41 10:00 41
11:00 41 12:00 41 13:00 41
14:00 41 15:00 41 16:00 41
17:00 41 18:00 41 19:00 41
20:00 41

10.15.1.4Moisture Gain Per People(g/h)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 61 9:00 61 10:00 61
11:00 61 12:00 61 13:00 61
14:00 61 15:00 61 16:00 61
17:00 61 18:00 61 19:00 61
20:00 61

10.15.1.5Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
65 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


20:00 0

10.15.1.6Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.1.7Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2 Fresh Air[Cooling]


10.15.2.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.2Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
66 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.3Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.4Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.5Outdoor Air Take Away Room Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.6Outdoor Air Take Away Room Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
67 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.7Outdoor Air Take Away Room Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.8Outdoor Air Take Away Room Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.9Outdoor Air Unit Sensible Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.10 Outdoor Air Unit Latent Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
68 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.11 Outdoor Air Unit Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.2.12 Outdoor Air Unit Moisture Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0 9:00 0 10:00 0
11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.15.3 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 2093 9:00 2093 10:00 2093
11:00 2093 12:00 2093 13:00 2093
14:00 2093 15:00 2093 16:00 2093
17:00 2093 18:00 2093 19:00 2093
20:00 2093

10.15.4 The Light (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 253 9:00 253 10:00 253
11:00 253 12:00 253 13:00 253

69 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


14:00 253 15:00 253 16:00 253
17:00 253 18:00 253 19:00 253
20:00 253

10.15.5 Exterior Wall[North]


10.15.5.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 145 9:00 135 10:00 126
11:00 119 12:00 114 13:00 113
14:00 115 15:00 121 16:00 129
17:00 140 18:00 153 19:00 166
20:00 178

10.15.5.2Radiation Intensity(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 319 9:00 389 10:00 436
11:00 456 12:00 464 13:00 456
14:00 436 15:00 389 16:00 319
17:00 210 18:00 0 19:00 0
20:00 0

10.15.5.3Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 9.1 9:00 8.5 10:00 8
11:00 7.5 12:00 7.2 13:00 7.1
14:00 7.3 15:00 7.6 16:00 8.2
17:00 8.9 18:00 9.7 19:00 10.5
20:00 11.3

10.15.6 Roof
10.15.6.1Cooling Load

TIME NUMBER TIME NUMBER TIME NUMBER


70 / 71
OWNER CONTRACTOR

ANNEX 1: CALCULATION RESULTS

DOCUMENT NO. 21S225-DD-JSS-NT-0001 DESIGN STAGE: DETAIL DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 02

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 52 9:00 100 10:00 218
11:00 393 12:00 606 13:00 827
14:00 1033 15:00 1200 16:00 1308
17:00 1341 18:00 1297 19:00 1186
20:00 1040

10.15.6.2Radiation Illumination Per Area(W/㎡)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 404.5 9:00 622.2 10:00 799.9
11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

10.15.6.3Temperature Difference(℃)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 0.9 9:00 1.8 10:00 3.9
11:00 7.1 12:00 10.9 13:00 14.8
14:00 18.5 15:00 21.5 16:00 23.4
17:00 24 18:00 23.2 19:00 21.3
20:00 18.6

10.15.7 Equipment (Cooling Load)

TIME NUMBER TIME NUMBER TIME NUMBER


8:00 2100 9:00 2100 10:00 2100
11:00 2100 12:00 2100 13:00 2100
14:00 2100 15:00 2100 16:00 2100
17:00 2100 18:00 2100 19:00 2100
20:00 2100

71 / 71
CALCULATION FOR HVAC OF JETTY OPERATIONAL DOC. NO.: SMJ‐CCCC‐HVA‐ERP‐0001
BUILDING REV.: 00
BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY DATE: 13‐Jan‐22
FACILITY FOR SARAWAK METHANOL PROJECT IN
BINTULU, SARAWAK TOTAL PAGES: 7

CALCULATION FOR HVAC OF


JETTY OPERATIONAL BUILDING

CLASS: 2 (ISSUED FOR REVIEW & COMMENTS)

00 13‐Jan 2022 Issued for Review WANG YQ LIU M XU WH C.Achong M.Ali H.Putit N/A
Prepared Reviewed Approved Reviewed App’d
Rev Date Description
CCCC SPSB

CCCC JOB NO
CHINA COMMUNICATIONS
CONSTRUCTION COMPANY (MALAYSIA)
21S225‐DD‐REP‐NT‐0001
SDN BHD
No part of this document or the information it contains may be reproduced or transmitted in any form or by any means electronic or mechanical, including
photocopying, recording, or by any information storage and retrieval system, without permission in writing from SARAWAK PETCHEM or CCCC.
BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY
FOR SARAWAK METHANOL PROJECT IN BINTULU,
SARAWAK
DOCUMENT NO. 21S225‐DD‐REP‐NT‐0001 DESIGN STAGE: DD
CLIENT NO. SMJ‐CCCC‐HVA‐ERP‐0001 REV.: 00

Revision Control Table

Rev. No. Rev. Date Rev. Section Rev. Description

All Rights Reserved Page 2 of 7


BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY
FOR SARAWAK METHANOL PROJECT IN BINTULU,
SARAWAK
DOCUMENT NO. 21S225‐DD‐REP‐NT‐0001 DESIGN STAGE: DD
CLIENT NO. SMJ‐CCCC‐HVA‐ERP‐0001 REV.: 00

On Hold Table

Ref No. Ref. Date Ref. Section Ref. On Hold Description

NOTE: “ON HOLD” means that the contents are provisional and they will be updated according to new
data.

All Rights Reserved Page 3 of 7


BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY
FOR SARAWAK METHANOL PROJECT IN BINTULU,
SARAWAK
DOCUMENT NO. 21S225‐DD‐REP‐NT‐0001 DESIGN STAGE: DD
CLIENT NO. SMJ‐CCCC‐HVA‐ERP‐0001 REV.: 00

Table of Contents

1. GENERAL ..................................................................................................................................................... 5

1.1 PROJECT INTRODUCTION AND PURPOSE ......................................................................................................................... 5


1.2 DEFINITIONS............................................................................................................................................................. 5

2. REFERENCE DOCUMENTS ............................................................................................................................. 6

3. CALCULATION RESULTS ................................................................................................................................ 6

ANNEX:

ANNEX 1: CALCULATION RESULTS

All Rights Reserved Page 4 of 7


BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY
FOR SARAWAK METHANOL PROJECT IN BINTULU,
SARAWAK
DOCUMENT NO. 21S225‐DD‐REP‐NT‐0001 DESIGN STAGE: DD
CLIENT NO. SMJ‐CCCC‐HVA‐ERP‐0001 REV.: 00

1. GENERAL

1.1 Project Introduction and Purpose


SARAWAK PETCHEM SDN. BHD. (hereinafter referred to as "OWNER") is undertaking the development of
Methanol Product Off‐Take/Export Jetty Facility (hereinafter referred to as the "Methanol Jetty") to be
integrated and linked to the methanol plant which is located at Lot 3281, Block 20, Kemena Land District,
Tanjung Kidurong, Bintulu, Sarawak, Malaysia. The Methanol Jetty is designed to handle the export of the
total nameplate capacity of 5,000 MTPD methanol with simultaneous loading from multiple berths.

Figure 1‐1 Conceptual Sketch of Sarawak Methanol Jetty Project

The Methanol Jetty comprises of a methanol export piping, ship loading arms, metering facility, jetty
operation building, associated electrical and instrumentation system, safety systems, communications
systems, utilities and supporting systems, and a Jetty complete with barriers, berthing and mooring
dolphins, wave screen, access channel and turning and berthing basins.

This report will carry out the HVAC calculation of the Jetty Operational Building for BEPCC OF PRODUCT
OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK METHANOL PROJECT IN BINTULU, SARAWAK.

1.2 Definitions
BEPCC OF PRODUCT OFFTAKE / EXPORT JETTY FACILITY FOR SARAWAK
PROJECT
METHANOL PROJECT

DESIGN STAGE Basic Design & Detailed Design


OWNER SARAWAK PETCHEM SDN. BHD.
CONTRACTOR CHINA COMMUNICATIONS CONSTRUCTION COMPANY (M) SDN.BHD.

All Rights Reserved Page 5 of 7


BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY
FOR SARAWAK METHANOL PROJECT IN BINTULU,
SARAWAK
DOCUMENT NO. 21S225‐DD‐REP‐NT‐0001 DESIGN STAGE: DD
CLIENT NO. SMJ‐CCCC‐HVA‐ERP‐0001 REV.: 00

2. REFERENCE DOCUMENTS

The following Project documents are referenced to carry out the calculation.

Document Number Document Title

SMJ‐CCCC‐HVA‐SPN‐0001 SPECIFICATION FOR HVAC EQUIPMENT


SMJ‐CCCC‐HVA‐DWG‐0101 JETTY OPERATIONAL BUILDING GENERAL NOTES
SMJ‐CCCC‐HVA‐DWG‐0102 JETTY OPERATIONAL BUILDING CHIEF EQUIPMENTS LIST
SMJ‐CCCC‐HVA‐DWG‐0103 JETTY OPERATIONAL BUILDING GROUND FLOOR HVAC PLAN
SMJ‐CCCC‐HVA‐DWG‐0104 JETTY OPERATIONAL BUILDING 1ST FLOOR HVAC PLAN
SMJ‐CCCC‐HVA‐DWG‐0105 JETTY OPERATIONAL BUILDING ROOF HVAC PLAN
SMJ‐CCCC‐HVA‐DWG‐0106 JETTY OPERATIONAL BUILDING HVAC SECTION PLAN

3. CALCULATION RESULTS

Refer to Annex 1 for the detailed calculation results.

All Rights Reserved Page 6 of 7


BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY
FOR SARAWAK METHANOL PROJECT IN BINTULU,
SARAWAK
DOCUMENT NO. 21S225‐DD‐REP‐NT‐0001 DESIGN STAGE: DD
CLIENT NO. SMJ‐CCCC‐HVA‐ERP‐0001 REV.: 00

ANNEX 1: CALCULATION RESULTS

All Rights Reserved Page 7 of 7


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

ANNEX 1: CALCULATION RESULTS

1 Project Information

1.1 Base Parameters


Calculating WANG Y.Q Validator XU W.H Reviewer LIU M
Person
Date 2021-12-16 Cooling Load W Heating Load W
Units Units
Moisture kg/h Cooling Load 1 Heating Load 1
Load Units Correction Correction
Factor Factor
Moisture 1
Load
Correction
Factor

2 Meteorological Parameters

2.1 Base Parameters


Country Malaysia Province Bintulu City Kidurong 、
Tanjung Kemena
Land Distric

2.2 Summer Parameters


Summer 99860 Summer Air- 28.6 Summer Air- 33.2
Atm(Pa) Conditioning Conditioning
Outdoor Outdoor Dry
Average Daily Bulb
Temperature(℃) Temperature(℃)
Summer Air- 26.4 Summer 1.9 Atmospheric 4
Conditioning Outdoor Transparency
Outdoor Wet Average Wind Level
Bulb Speed(m/s)
Temperature(℃)

3 Project Load Summary

3.1 Summer Cooling Load Summary


Area(㎡) 449 Maximum 17:00 Maximum 17:00
Time Of Time Of
Summer Summer
Cooling Room

All Rights Reserved Page 1 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

Load(h) Cooling
Load(h)
Summer 141295 Summer 141295 Summer 4.787
Cooling Load Room Moisture load
Cooling Load
Summer 4.787 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
Outdoor Air Outdoor Air Outdoor Air
Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 314.7 Summer 0.011
Cooling Load Moisture
Building Load Building
Indicator Indicator

4 Building Information

4.1 Base Parameters


4.1.1 Building
Building Name Building Starting 0 Starting Floor 1
Elevation(m) Number
Ending Floor 1 Skip Floor Building 0
Number Numbers Volume(m^3)
Ground Floor 449 Underground Floor 0 Covers 0
Area(m^2) Area(m^2) Area(m^2)
Calculating 449 Surfaces Outside 18.6 Surfaces 23
Area(m^2) Heat Transfer Outside Heat
Coefficient Transfer
Summer(W/(㎡·K)) Coefficient
Winter(W/(㎡·K))
Surfaces Inside Heat 8.7
Transfer
Coefficient(W/(㎡·K))

4.2 Basement Parameters


4.2.1 Building
Depth Type Deep Room Constant Around Thermal 3.4
Cover Temperature Temperatur Conductivity(W/(m· 9
Baseme Type e ℃))
nt Basement
Around Thermal 13.53 Around Average 14 Deep Wall Lining 0.4
Diffusivity(10^7·㎡/s) Temperature(℃) Thickness(m)
Deep Wall Thermal 1.51 Deep Wall 8.33 Deep Wall Inside 8
Conductivity(W/(m· Thermal Heat Transfer
℃)) Diffusivity(10^7· Coefficient(W/( ㎡ ·℃
㎡/s) ))
All Rights Reserved Page 2 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

Deep Wall Inside 1 Shallow Floor — Shallow Floor —


Heat Transfer Thickness(m) Thermal
Correction Factor Conductivity(W/(m·
℃))
Shallow Floor — Shallow — Shallow Sidewall —
Thermal Sidewall Thermal
Diffusivity(10^7·㎡/s) Thickness(m) Conductivity(W/(m·
℃))
Shallow Sidewall — Surface 1
Thermal Moisture Gain
Diffusivity(10^7·㎡/s) Unit
Area(g/(㎡·h))

5 Surfaces Information

5.1 Building Surfaces Base Information


5.1.1 Outer Wall
5.1.1.1 Concrete aerated concrete280(087001)

Summer Heat 0.71 Winter Heat Transfer 0.71 Heat 10.7


Transfer Coefficient(W/(㎡·K)) Transfer
Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 0.3
5.1.2 Outer Window
5.1.2.1 Window

Summer Heat 2.01 Winter Heat Transfer 2.05 Heat 0.4


Transfer Coefficient(W/(㎡·K)) Transfer
Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 1
5.1.3 Inner Wall
5.1.3.1 Wall(003003)

Summer Heat 2.38 Winter Heat Transfer 2.38 Heat 5.4


Transfer Coefficient(W/(㎡·K)) Transfer
Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 0.56
5.1.4 Inner Door
5.1.4.1 The door

Summer Heat 3.35 Winter Heat Transfer 3.35 Heat 0.5


Transfer Coefficient(W/(㎡·K)) Transfer
Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 0.99

All Rights Reserved Page 3 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

5.1.5 Roof
5.1.5.1 Roof

Summer Heat 2.43 Winter Heat Transfer 2.49 Heat 4.3


Transfer Coefficient(W/(㎡·K)) Transfer
Coefficient(W/(㎡·K)) Delay(h)
Heat Transfer Decay 0.68

6 Building Load Summary

6.1 Summer Cooling Load Summary


6.1.1 Building
Area(㎡) 449 Maximum 17:00 Maximum 17:00
Time Of Time Of
Summer Summer
Cooling Room
Load(h) Cooling
Load(h)
Summer 141295 Summer 141295 Summer 4.787
Cooling Load Room Moisture load
Cooling Load
Summer 4.787 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
Outdoor Air Outdoor Air Outdoor Air
Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 314.7 Summer 0.011
Cooling Load Moisture
Building Load Building
Indicator Indicator

7 Floor Information

7.1 Building Floor Information


7.1.1 Base Parameters
7.1.1.1 1 Floor

Floor Number 1 Floor 5.6 Window 1.8


Height(m) Height(m)
Elevation(m) 0 Building 449 Hvac 449
Area(m^2) Area(m^2)
Caption Normal Floor Description

All Rights Reserved Page 4 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

8 Floor Load Summary

8.1 BuildingRooms Load Summary


8.1.1 Summer Cooling Load Summary
8.1.1.1 2 floor

Area(㎡) 449 Maximum 17:00 Maximum 17:00


Time Of Time Of
Summer Summer
Cooling Room
Load(h) Cooling
Load(h)
Summer 141295 Summer 141295 Summer 4.787
Cooling Load Room Moisture load
Cooling Load
Summer 4.787 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
Outdoor Air Outdoor Air Outdoor Air
Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 314.7 Summer 0.011
Cooling Load Moisture
Building Load Building
Indicator Indicator

9 Rooms Load Summary

9.1 Building Rooms Load Summary


9.1.1 Summer Cooling Load Summary
9.1.1.1 1001[HV/LV ROOM]

Area(㎡) 150 Maximum 17:00 Maximum 17:00


Time Of Time Of
Summer Summer
Cooling Room
Load(h) Cooling
Load(h)
Summer 57037 Summer 57037 Summer 3.371
Cooling Load Room Moisture load
Cooling Load
Summer 3.371 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
All Rights Reserved Page 5 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

Outdoor Air Outdoor Air Outdoor Air


Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 380.2 Summer 0.022 Room design Variable
Cooling Load Moisture parameters transformer
Building Load Building room
Indicator Indicator
9.1.1.2 1002[BATTERY ROON]

Area(㎡) 63 Maximum 17:00 Maximum 17:00


Time Of Time Of
Summer Summer
Cooling Room
Load(h) Cooling
Load(h)
Summer 11658 Summer 11658 Summer 1.416
Cooling Load Room Moisture load
Cooling Load
Summer 1.416 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
Outdoor Air Outdoor Air Outdoor Air
Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 185.1 Summer 0.022 Room design Variable
Cooling Load Moisture parameters transformer
Building Load Building room
Indicator Indicator
9.1.1.3 1003[INSTRUMENT RACK ROOM]

Area(㎡) 93 Maximum 17:00 Maximum 17:00


Time Of Time Of
Summer Summer
Cooling Room
Load(h) Cooling
Load(h)
Summer 32577 Summer 32577 Summer 0
Cooling Load Room Moisture load
Cooling Load
Summer 0 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
Outdoor Air Outdoor Air Outdoor Air
Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 350.3 Summer 0 Room design The control
Cooling Load Moisture parameters room
All Rights Reserved Page 6 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

Building Load Building


Indicator Indicator
9.1.1.4 1004[JETTY OPERATOR ROOM]

Area(㎡) 120 Maximum 17:00 Maximum 17:00


Time Of Time Of
Summer Summer
Cooling Room
Load(h) Cooling
Load(h)
Summer 34094 Summer 34094 Summer 0
Cooling Load Room Moisture load
Cooling Load
Summer 0 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
Outdoor Air Outdoor Air Outdoor Air
Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 284.1 Summer 0 Room design The control
Cooling Load Moisture parameters room
Building Load Building
Indicator Indicator
9.1.1.5 1005[ENGINEER ROOM]

Area(㎡) 23 Maximum 17:00 Maximum 17:00


Time Of Time Of
Summer Summer
Cooling Room
Load(h) Cooling
Load(h)
Summer 5927 Summer 5927 Summer 0
Cooling Load Room Moisture load
Cooling Load
Summer 0 Summer 0 Summer 0
Room Outdoor Air Outdoor Air
Moisture load Volume Cooling Load
Flow(m^3)
Summer 0 Summer 0 Summer 0
Outdoor Air Outdoor Air Outdoor Air
Unit Cooling Unit Sensible Unit Latent
Load Cooling Load Cooling Load
Summer 257.7 Summer 0 Room design The control
Cooling Load Moisture parameters room
Building Load Building
Indicator Indicator

All Rights Reserved Page 7 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10 Rooms Detailed Calculation

10.1 Building Rooms Detailed Calculation


10.1.1 1001[HV/LV ROOM]Rooms Information
10.1.1.1 Base Parameters

Name HV/LV Area(㎡) 150 Height(m) 5.6


ROOM
Calculated Calculated Equipment Watts 397 Lighting Watts Per Unit 11
Load Per Unit Area(W/ Area(W/㎡)
㎡)
People Number Per 0.1 Number Of 15 Summer Outdoor Air 0
Unit Area(Person/㎡) People Volume Flow Per
Person(m^3/h-person)
Winter Outdoor Air 0 Temperature(℃) 28 Relative Humidity(%) 60
Volume Flow Per
Person(m^3/h-person)
10.1.2 1001[HV/LV ROOM]Detailed Parameters
10.1.2.1 The human body

Number 15 Activity Level Seated Quiet Clustering 0.89


Coefficient
Time Custom
Schedule
10.1.2.2 Fresh air[Cooling]

Volume 0 Load Type Cooling Load Calculation Calculated


Flow(m^3) Method Steady
Unit Treatment To Heat None Heat Time 默认时间
Processed The Status Of Recovery Recovery Schedule
Status Room Type
10.1.2.3 Equipment

Type Electronic Power(KW) 19.5 Time Custom


Equipment Schedule
10.1.2.4 The light

Type Incandescent Power(W) 1650 Time Custom


Lamp Schedule
10.1.2.5 Exterior wall[North]

Name Exterior Orientation North Construction Concrete aerated


wall[North] concrete280(087001)
Length(m) 16 Width(m) 5.6 Area(㎡) 89.6
Area 78.8 Winter Heat Transfer 0.71
Without Coefficient(W/(㎡·K))
Window(㎡)
All Rights Reserved Page 8 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.2.6 Window[North]

Name Window[North] Orientation North Construction Window


Length(m) 1.5 Width(m) 1.8 Area(㎡) 2.7
Shading Internal And Winter Heat Transfer 2.05 Winter Gap 8.4
Type External Coefficient(W/(㎡·K)) Length(m)
Shading
10.1.2.7 Window[North]

Name Window[North] Orientation North Construction Window


Length(m) 1.5 Width(m) 1.8 Area(㎡) 2.7
Shading Internal And Winter Heat Transfer 2.05 Winter Gap 8.4
Type External Coefficient(W/(㎡·K)) Length(m)
Shading
10.1.2.8 Window[North]

Name Window[North] Orientation North Construction Window


Length(m) 1.5 Width(m) 1.8 Area(㎡) 2.7
Shading Internal And Winter Heat Transfer 2.05 Winter Gap 8.4
Type External Coefficient(W/(㎡·K)) Length(m)
Shading
10.1.2.9 Window[North]

Name Window[North] Orientation North Construction Window


Length(m) 1.5 Width(m) 1.8 Area(㎡) 2.7
Shading Internal And Winter Heat Transfer 2.05 Winter Gap 8.4
Type External Coefficient(W/(㎡·K)) Length(m)
Shading
10.1.2.10 Interior wall

Name Interior wall Construction Wall(003003) Length(m) 21


Width(m) 5.6 Area(㎡) 117.6 Winter Heat Transfer 2.38
Coefficient(W/(㎡·K))
10.1.2.11 The inner

Name The inner Construction The door Length(m) 1.8


Width(m) 2.1 Area(㎡) 3.78 Winter Heat Transfer 3.35
Coefficient(W/(㎡·K))
10.1.2.12 Interior wall

Name Interior wall Construction Wall(003003) Length(m) 8


Width(m) 5.6 Area(㎡) 44.8 Winter Heat Transfer 2.38
Coefficient(W/(㎡·K))
10.1.2.13 The inner

Name The inner Construction The door Length(m) 1.8


Width(m) 2.1 Area(㎡) 3.78 Winter Heat Transfer 3.35

All Rights Reserved Page 9 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

Coefficient(W/(㎡·K))
10.1.2.14 The inner

Name The inner Construction The door Length(m) 1.8


Width(m) 2.1 Area(㎡) 3.78 Winter Heat Transfer 3.35
Coefficient(W/(㎡·K))
10.1.2.15 The air permeability

Volume Flow(m^3/h) 420 Time Schedule Custom


10.1.2.16 Equipment

Type Electronic Power(KW) 40 Time Custom


Equipment Schedule
10.1.2.17 Roof

Name Roof Construction 01-1-35-1 Area(㎡) 150


Sloping Not Winter Heat Transfer 2.49
Roof Coefficient(W/(㎡·K))
10.1.3 1001[HV/LV ROOM]Summer Cooling Load Summary
10.1.3.1 The human body

10.1.3.1.1 Cooling Load

8:00 1442 9:00 1442 10:00 1442


11:00 1442 12:00 1442 13:00 1442
14:00 1442 15:00 1442 16:00 1442
17:00 1442 18:00 1442 19:00 1442
20:00 1442

10.1.3.1.2 Sensible Heat Gain Per People(W)

8:00 53 9:00 53 10:00 53


11:00 53 12:00 53 13:00 53
14:00 53 15:00 53 16:00 53
17:00 53 18:00 53 19:00 53
20:00 53

10.1.3.1.3 Latent Heat Gain Per People(W)

8:00 55 9:00 55 10:00 55


11:00 55 12:00 55 13:00 55
14:00 55 15:00 55 16:00 55
17:00 55 18:00 55 19:00 55
20:00 55
All Rights Reserved Page 10 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.1.4 Moisture Gain Per People(g/h)

8:00 82 9:00 82 10:00 82


11:00 82 12:00 82 13:00 82
14:00 82 15:00 82 16:00 82
17:00 82 18:00 82 19:00 82
20:00 82

10.1.3.1.5 Sensible Cooling Load

8:00 708 9:00 708 10:00 708


11:00 708 12:00 708 13:00 708
14:00 708 15:00 708 16:00 708
17:00 708 18:00 708 19:00 708
20:00 708

10.1.3.1.6 Latent Cooling Load

8:00 734 9:00 734 10:00 734


11:00 734 12:00 734 13:00 734
14:00 734 15:00 734 16:00 734
17:00 734 18:00 734 19:00 734
20:00 734

10.1.3.1.7 Moisture Load

8:00 1.095 9:00 1.095 10:00 1.095


11:00 1.095 12:00 1.095 13:00 1.095
14:00 1.095 15:00 1.095 16:00 1.095
17:00 1.095 18:00 1.095 19:00 1.095
20:00 1.095
10.1.3.2 Fresh air[Cooling]

10.1.3.2.1 Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 11 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.2.2 Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.3 Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.4 Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.5 Outdoor Air Take Away Room Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.6 Outdoor Air Take Away Room Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.7 Outdoor Air Take Away Room Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
All Rights Reserved Page 12 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

14:00 0 15:00 0 16:00 0


17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.8 Outdoor Air Take Away Room Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.9 Outdoor Air Unit Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.10 Outdoor Air Unit Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.11 Outdoor Air Unit Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.2.12 Outdoor Air Unit Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 13 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.3 Equipment

10.1.3.3.1 Cooling Load

8:00 13650 9:00 13650 10:00 13650


11:00 13650 12:00 13650 13:00 13650
14:00 13650 15:00 13650 16:00 13650
17:00 13650 18:00 13650 19:00 13650
20:00 13650
10.1.3.4 The light

10.1.3.4.1 Cooling Load

8:00 1650 9:00 1650 10:00 1650


11:00 1650 12:00 1650 13:00 1650
14:00 1650 15:00 1650 16:00 1650
17:00 1650 18:00 1650 19:00 1650
20:00 1650
10.1.3.5 Exterior wall[North]

10.1.3.5.1 Cooling Load

8:00 346 9:00 311 10:00 278


11:00 251 12:00 233 13:00 228
14:00 235 15:00 254 16:00 283
17:00 321 18:00 365 19:00 410
20:00 455

10.1.3.5.2 Radiation Intensity(W/㎡)

8:00 319 9:00 389 10:00 436


11:00 456 12:00 464 13:00 456
14:00 436 15:00 389 16:00 319
17:00 210 18:00 0 19:00 0
20:00 0

10.1.3.5.3 Temperature Difference(℃)

8:00 6.2 9:00 5.6 10:00 5


11:00 4.5 12:00 4.2 13:00 4.1
14:00 4.2 15:00 4.6 16:00 5.1
17:00 5.8 18:00 6.6 19:00 7.4
All Rights Reserved Page 14 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

20:00 8.2
10.1.3.6 Window[North]

10.1.3.6.1 Cooling Load

8:00 189 9:00 246 10:00 293


11:00 324 12:00 346 13:00 357
14:00 357 15:00 340 16:00 304
17:00 248 18:00 130 19:00 100
20:00 84

10.1.3.6.2 Temperature Difference(℃)

8:00 -1 9:00 -0.1 10:00 0.7


11:00 1.6 12:00 2.4 13:00 3.1
14:00 3.5 15:00 3.7 16:00 3.5
17:00 3.4 18:00 3 19:00 2.2
20:00 1.4

10.1.3.6.3 Direct Radiation Area(㎡)

8:00 2.7 9:00 2.7 10:00 2.7


11:00 2.7 12:00 2.7 13:00 2.7
14:00 2.7 15:00 2.7 16:00 2.7
17:00 2.7 18:00 2.7 19:00 2.7
20:00 2.7

10.1.3.6.4 Scattering Radiation Area(㎡)

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.6.5 Direct Radiation Illumination Per Area(W/㎡)

8:00 148 9:00 174 10:00 188


11:00 195 12:00 197 13:00 195
14:00 188 15:00 174 16:00 148
17:00 101 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 15 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.6.6 Scattering Radiation Illumination Per Area(W/㎡)

8:00 75 9:00 100 10:00 120


11:00 128 12:00 132 13:00 128
14:00 120 15:00 100 16:00 75
17:00 45 18:00 0 19:00 0
20:00 0

10.1.3.6.7 Direct Radiation Load Per Area(W/㎡)

8:00 148.9 9:00 190.2 10:00 224.2


11:00 245.3 12:00 259.8 13:00 266.1
14:00 264.9 15:00 251.5 16:00 224
17:00 181.3 18:00 91.9 19:00 70.3
20:00 60.6

10.1.3.6.8 Scattering Radiation Load Per Area(W/㎡)

8:00 50.1 9:00 68.2 10:00 85.3


11:00 95.4 12:00 102.4 13:00 104.6
14:00 103.1 15:00 94 16:00 80.1
17:00 62.1 18:00 33.2 19:00 25.9
20:00 22.2

10.1.3.6.9 Direct Radiation Load

8:00 193 9:00 247 10:00 291


11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.1.3.6.10 Scattering Radiation Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.6.11 Radiation Load

8:00 193 9:00 247 10:00 291


All Rights Reserved Page 16 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

11:00 318 12:00 337 13:00 345


14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.1.3.6.12 Transfer Load By Temperature Difference

8:00 -4 9:00 -0 10:00 3


11:00 6 12:00 9 13:00 12
14:00 13 15:00 14 16:00 13
17:00 13 18:00 11 19:00 8
20:00 5
10.1.3.7 Window[North]

10.1.3.7.1 Cooling Load

8:00 189 9:00 246 10:00 293


11:00 324 12:00 346 13:00 357
14:00 357 15:00 340 16:00 304
17:00 248 18:00 130 19:00 100
20:00 84

10.1.3.7.2 Temperature Difference(℃)

8:00 -1 9:00 -0.1 10:00 0.7


11:00 1.6 12:00 2.4 13:00 3.1
14:00 3.5 15:00 3.7 16:00 3.5
17:00 3.4 18:00 3 19:00 2.2
20:00 1.4

10.1.3.7.3 Direct Radiation Area(㎡)

8:00 2.7 9:00 2.7 10:00 2.7


11:00 2.7 12:00 2.7 13:00 2.7
14:00 2.7 15:00 2.7 16:00 2.7
17:00 2.7 18:00 2.7 19:00 2.7
20:00 2.7

10.1.3.7.4 Scattering Radiation Area(㎡)

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
All Rights Reserved Page 17 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

17:00 0 18:00 0 19:00 0


20:00 0

10.1.3.7.5 Direct Radiation Illumination Per Area(W/㎡)

8:00 148 9:00 174 10:00 188


11:00 195 12:00 197 13:00 195
14:00 188 15:00 174 16:00 148
17:00 101 18:00 0 19:00 0
20:00 0

10.1.3.7.6 Scattering Radiation Illumination Per Area(W/㎡)

8:00 75 9:00 100 10:00 120


11:00 128 12:00 132 13:00 128
14:00 120 15:00 100 16:00 75
17:00 45 18:00 0 19:00 0
20:00 0

10.1.3.7.7 Direct Radiation Load Per Area(W/㎡)

8:00 148.9 9:00 190.2 10:00 224.2


11:00 245.3 12:00 259.8 13:00 266.1
14:00 264.9 15:00 251.5 16:00 224
17:00 181.3 18:00 91.9 19:00 70.3
20:00 60.6

10.1.3.7.8 Scattering Radiation Load Per Area(W/㎡)

8:00 50.1 9:00 68.2 10:00 85.3


11:00 95.4 12:00 102.4 13:00 104.6
14:00 103.1 15:00 94 16:00 80.1
17:00 62.1 18:00 33.2 19:00 25.9
20:00 22.2

10.1.3.7.9 Direct Radiation Load

8:00 193 9:00 247 10:00 291


11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

All Rights Reserved Page 18 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.7.10 Scattering Radiation Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.7.11 Radiation Load

8:00 193 9:00 247 10:00 291


11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.1.3.7.12 Transfer Load By Temperature Difference

8:00 -4 9:00 -0 10:00 3


11:00 6 12:00 9 13:00 12
14:00 13 15:00 14 16:00 13
17:00 13 18:00 11 19:00 8
20:00 5
10.1.3.8 Window[North]

10.1.3.8.1 Cooling Load

8:00 189 9:00 246 10:00 293


11:00 324 12:00 346 13:00 357
14:00 357 15:00 340 16:00 304
17:00 248 18:00 130 19:00 100
20:00 84

10.1.3.8.2 Temperature Difference(℃)

8:00 -1 9:00 -0.1 10:00 0.7


11:00 1.6 12:00 2.4 13:00 3.1
14:00 3.5 15:00 3.7 16:00 3.5
17:00 3.4 18:00 3 19:00 2.2
20:00 1.4

All Rights Reserved Page 19 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.8.3 Direct Radiation Area(㎡)

8:00 2.7 9:00 2.7 10:00 2.7


11:00 2.7 12:00 2.7 13:00 2.7
14:00 2.7 15:00 2.7 16:00 2.7
17:00 2.7 18:00 2.7 19:00 2.7
20:00 2.7

10.1.3.8.4 Scattering Radiation Area(㎡)

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.8.5 Direct Radiation Illumination Per Area(W/㎡)

8:00 148 9:00 174 10:00 188


11:00 195 12:00 197 13:00 195
14:00 188 15:00 174 16:00 148
17:00 101 18:00 0 19:00 0
20:00 0

10.1.3.8.6 Scattering Radiation Illumination Per Area(W/㎡)

8:00 75 9:00 100 10:00 120


11:00 128 12:00 132 13:00 128
14:00 120 15:00 100 16:00 75
17:00 45 18:00 0 19:00 0
20:00 0

10.1.3.8.7 Direct Radiation Load Per Area(W/㎡)

8:00 148.9 9:00 190.2 10:00 224.2


11:00 245.3 12:00 259.8 13:00 266.1
14:00 264.9 15:00 251.5 16:00 224
17:00 181.3 18:00 91.9 19:00 70.3
20:00 60.6

All Rights Reserved Page 20 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.8.8 Scattering Radiation Load Per Area(W/㎡)

8:00 50.1 9:00 68.2 10:00 85.3


11:00 95.4 12:00 102.4 13:00 104.6
14:00 103.1 15:00 94 16:00 80.1
17:00 62.1 18:00 33.2 19:00 25.9
20:00 22.2

10.1.3.8.9 Direct Radiation Load

8:00 193 9:00 247 10:00 291


11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.1.3.8.10 Scattering Radiation Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.8.11 Radiation Load

8:00 193 9:00 247 10:00 291


11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.1.3.8.12 Transfer Load By Temperature Difference

8:00 -4 9:00 -0 10:00 3


11:00 6 12:00 9 13:00 12
14:00 13 15:00 14 16:00 13
17:00 13 18:00 11 19:00 8
20:00 5

All Rights Reserved Page 21 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.9 Window[North]

10.1.3.9.1 Cooling Load

8:00 189 9:00 246 10:00 293


11:00 324 12:00 346 13:00 357
14:00 357 15:00 340 16:00 304
17:00 248 18:00 130 19:00 100
20:00 84

10.1.3.9.2 Temperature Difference(℃)

8:00 -1 9:00 -0.1 10:00 0.7


11:00 1.6 12:00 2.4 13:00 3.1
14:00 3.5 15:00 3.7 16:00 3.5
17:00 3.4 18:00 3 19:00 2.2
20:00 1.4

10.1.3.9.3 Direct Radiation Area(㎡)

8:00 2.7 9:00 2.7 10:00 2.7


11:00 2.7 12:00 2.7 13:00 2.7
14:00 2.7 15:00 2.7 16:00 2.7
17:00 2.7 18:00 2.7 19:00 2.7
20:00 2.7

10.1.3.9.4 Scattering Radiation Area(㎡)

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.9.5 Direct Radiation Illumination Per Area(W/㎡)

8:00 148 9:00 174 10:00 188


11:00 195 12:00 197 13:00 195
14:00 188 15:00 174 16:00 148
17:00 101 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 22 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.9.6 Scattering Radiation Illumination Per Area(W/㎡)

8:00 75 9:00 100 10:00 120


11:00 128 12:00 132 13:00 128
14:00 120 15:00 100 16:00 75
17:00 45 18:00 0 19:00 0
20:00 0

10.1.3.9.7 Direct Radiation Load Per Area(W/㎡)

8:00 148.9 9:00 190.2 10:00 224.2


11:00 245.3 12:00 259.8 13:00 266.1
14:00 264.9 15:00 251.5 16:00 224
17:00 181.3 18:00 91.9 19:00 70.3
20:00 60.6

10.1.3.9.8 Scattering Radiation Load Per Area(W/㎡)

8:00 50.1 9:00 68.2 10:00 85.3


11:00 95.4 12:00 102.4 13:00 104.6
14:00 103.1 15:00 94 16:00 80.1
17:00 62.1 18:00 33.2 19:00 25.9
20:00 22.2

10.1.3.9.9 Direct Radiation Load

8:00 193 9:00 247 10:00 291


11:00 318 12:00 337 13:00 345
14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.1.3.9.10 Scattering Radiation Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.3.9.11 Radiation Load

8:00 193 9:00 247 10:00 291


All Rights Reserved Page 23 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

11:00 318 12:00 337 13:00 345


14:00 343 15:00 326 16:00 290
17:00 235 18:00 119 19:00 91
20:00 78

10.1.3.9.12 Transfer Load By Temperature Difference

8:00 -4 9:00 -0 10:00 3


11:00 6 12:00 9 13:00 12
14:00 13 15:00 14 16:00 13
17:00 13 18:00 11 19:00 8
20:00 5
10.1.3.10 Interior wall

10.1.3.10.1 Cooling Load

8:00 975 9:00 975 10:00 975


11:00 975 12:00 975 13:00 975
14:00 975 15:00 975 16:00 975
17:00 975 18:00 975 19:00 975
20:00 975

10.1.3.10.2 Temperature Difference(℃)

8:00 3.6 9:00 3.6 10:00 3.6


11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6
10.1.3.11 The inner

10.1.3.11.1 Cooling Load

8:00 46 9:00 46 10:00 46


11:00 46 12:00 46 13:00 46
14:00 46 15:00 46 16:00 46
17:00 46 18:00 46 19:00 46
20:00 46

10.1.3.11.2 Temperature Difference(℃)

8:00 3.6 9:00 3.6 10:00 3.6

All Rights Reserved Page 24 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

11:00 3.6 12:00 3.6 13:00 3.6


14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6
10.1.3.12 Interior wall

10.1.3.12.1 Cooling Load

8:00 319 9:00 319 10:00 319


11:00 319 12:00 319 13:00 319
14:00 319 15:00 319 16:00 319
17:00 319 18:00 319 19:00 319
20:00 319

10.1.3.12.2 Temperature Difference(℃)

8:00 3.6 9:00 3.6 10:00 3.6


11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6
10.1.3.13 The inner

10.1.3.13.1 Cooling Load

8:00 46 9:00 46 10:00 46


11:00 46 12:00 46 13:00 46
14:00 46 15:00 46 16:00 46
17:00 46 18:00 46 19:00 46
20:00 46

10.1.3.13.2 Temperature Difference(℃)

8:00 3.6 9:00 3.6 10:00 3.6


11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6

All Rights Reserved Page 25 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.14 The inner

10.1.3.14.1 Cooling Load

8:00 46 9:00 46 10:00 46


11:00 46 12:00 46 13:00 46
14:00 46 15:00 46 16:00 46
17:00 46 18:00 46 19:00 46
20:00 46

10.1.3.14.2 Temperature Difference(℃)

8:00 3.6 9:00 3.6 10:00 3.6


11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6
10.1.3.15 The air permeability

10.1.3.15.1 Cooling Load

8:00 2326 9:00 2326 10:00 2326


11:00 2326 12:00 2326 13:00 2326
14:00 2326 15:00 2326 16:00 2326
17:00 2326 18:00 2326 19:00 2326
20:00 2326

10.1.3.15.2 Sensible Cooling Load

8:00 685 9:00 685 10:00 685


11:00 685 12:00 685 13:00 685
14:00 685 15:00 685 16:00 685
17:00 685 18:00 685 19:00 685
20:00 685

10.1.3.15.3 Latent Cooling Load

8:00 1642 9:00 1642 10:00 1642


11:00 1642 12:00 1642 13:00 1642
14:00 1642 15:00 1642 16:00 1642
17:00 1642 18:00 1642 19:00 1642
20:00 1642

All Rights Reserved Page 26 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.3.15.4 Moisture Load

8:00 2.277 9:00 2.277 10:00 2.277


11:00 2.277 12:00 2.277 13:00 2.277
14:00 2.277 15:00 2.277 16:00 2.277
17:00 2.277 18:00 2.277 19:00 2.277
20:00 2.277
10.1.3.16 Equipment

10.1.3.16.1 Cooling Load

8:00 28000 9:00 28000 10:00 28000


11:00 28000 12:00 28000 13:00 28000
14:00 28000 15:00 28000 16:00 28000
17:00 28000 18:00 28000 19:00 28000
20:00 28000
10.1.3.17 Roof

10.1.3.17.1 Cooling Load

8:00 -611 9:00 -390 10:00 238


11:00 1229 12:00 2462 13:00 3790
14:00 5062 15:00 6139 16:00 6896
17:00 7226 18:00 7103 19:00 6568
20:00 5792

10.1.3.17.2 Radiation Illumination Per Area(W/㎡)

8:00 404.5 9:00 622.2 10:00 799.9


11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

10.1.3.17.3 Temperature Difference(℃)

8:00 -1.7 9:00 -1.1 10:00 0.7


11:00 3.4 12:00 6.8 13:00 10.4
14:00 13.9 15:00 16.9 16:00 18.9
17:00 19.9 18:00 19.5 19:00 18
20:00 15.9

All Rights Reserved Page 27 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.4 1002[BATTERY ROON]Rooms Information


10.1.4.1 Base Parameters

Name BATTERY Area(㎡) 63 Height(m) 5.6


ROON
Calculated Calculated Equipment 130 Lighting Watts 11
Load Watts Per Unit Per Unit
Area(W/㎡) Area(W/㎡)
People 0.1 Number Of 6.3 Summer 0
Number Per People Outdoor Air
Unit Volume Flow
Area(Person/ Per
㎡) Person(m^3/h-
person)
Winter 0 Temperature(℃) 28 Relative 60
Outdoor Air Humidity(%)
Volume Flow
Per
Person(m^3/h-
person)
10.1.5 1002[BATTERY ROON]Detailed Parameters
10.1.5.1 The human body

Number 6.3 Activity Level Seated Quiet Clustering 0.89


Coefficient
Time Custom
Schedule
10.1.5.2 Fresh air[Cooling]

Volume 0 Load Type Cooling Load Calculation Calculated


Flow(m^3) Method Steady
Unit Treatment To Heat None Heat Time 默认时间
Processed The Status Of Recovery Recovery Schedule
Status Room Type
10.1.5.3 Equipment

Type Electronic Power(KW) 8.19 Time Custom


Equipment Schedule
10.1.5.4 The light

Type Incandescent Power(W) 693 Time Custom


Lamp Schedule
10.1.5.5 Interior wall

Name Interior wall Construction Wall(003003) Length(m) 15


Width(m) 5.6 Area(㎡) 84 Winter Heat Transfer 2.38
Coefficient(W/(㎡·K))

All Rights Reserved Page 28 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.5.6 The inner

Name The inner Construction The door Length(m) 1.8


Width(m) 2.1 Area(㎡) 3.78 Winter Heat Transfer 3.35
Coefficient(W/(㎡·K))
10.1.5.7 Roof

Name Roof Construction 01-1-35-1 Area(㎡) 63


Sloping Not Winter Heat Transfer 2.49
Roof Coefficient(W/(㎡·K))
10.1.5.8 The air permeability

Volume Flow(m^3/h) 176.4 Time Schedule Custom


10.1.6 1002[BATTERY ROON]Summer Cooling Load Summary
10.1.6.1 The human body

10.1.6.1.1 Cooling Load

8:00 606 9:00 606 10:00 606


11:00 606 12:00 606 13:00 606
14:00 606 15:00 606 16:00 606
17:00 606 18:00 606 19:00 606
20:00 606

10.1.6.1.2 Sensible Heat Gain Per People(W)

8:00 53 9:00 53 10:00 53


11:00 53 12:00 53 13:00 53
14:00 53 15:00 53 16:00 53
17:00 53 18:00 53 19:00 53
20:00 53

10.1.6.1.3 Latent Heat Gain Per People(W)

8:00 55 9:00 55 10:00 55


11:00 55 12:00 55 13:00 55
14:00 55 15:00 55 16:00 55
17:00 55 18:00 55 19:00 55
20:00 55

10.1.6.1.4 Moisture Gain Per People(g/h)

8:00 82 9:00 82 10:00 82


11:00 82 12:00 82 13:00 82
All Rights Reserved Page 29 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

14:00 82 15:00 82 16:00 82


17:00 82 18:00 82 19:00 82
20:00 82

10.1.6.1.5 Sensible Cooling Load

8:00 297 9:00 297 10:00 297


11:00 297 12:00 297 13:00 297
14:00 297 15:00 297 16:00 297
17:00 297 18:00 297 19:00 297
20:00 297

10.1.6.1.6 Latent Cooling Load

8:00 308 9:00 308 10:00 308


11:00 308 12:00 308 13:00 308
14:00 308 15:00 308 16:00 308
17:00 308 18:00 308 19:00 308
20:00 308

10.1.6.1.7 Moisture Load

8:00 0.46 9:00 0.46 10:00 0.46


11:00 0.46 12:00 0.46 13:00 0.46
14:00 0.46 15:00 0.46 16:00 0.46
17:00 0.46 18:00 0.46 19:00 0.46
20:00 0.46
10.1.6.2 Fresh air[Cooling]

10.1.6.2.1 Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.2 Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0
All Rights Reserved Page 30 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.6.2.3 Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.4 Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.5 Outdoor Air Take Away Room Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.6 Outdoor Air Take Away Room Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.7 Outdoor Air Take Away Room Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.8 Outdoor Air Take Away Room Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
All Rights Reserved Page 31 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

14:00 0 15:00 0 16:00 0


17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.9 Outdoor Air Unit Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.10 Outdoor Air Unit Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.11 Outdoor Air Unit Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.6.2.12 Outdoor Air Unit Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0
10.1.6.3 Equipment

10.1.6.3.1 Cooling Load

8:00 5733 9:00 5733 10:00 5733


11:00 5733 12:00 5733 13:00 5733
14:00 5733 15:00 5733 16:00 5733
17:00 5733 18:00 5733 19:00 5733
20:00 5733
All Rights Reserved Page 32 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.6.4 The light

10.1.6.4.1 Cooling Load

8:00 693 9:00 693 10:00 693


11:00 693 12:00 693 13:00 693
14:00 693 15:00 693 16:00 693
17:00 693 18:00 693 19:00 693
20:00 693
10.1.6.5 Interior wall

10.1.6.5.1 Cooling Load

8:00 687 9:00 687 10:00 687


11:00 687 12:00 687 13:00 687
14:00 687 15:00 687 16:00 687
17:00 687 18:00 687 19:00 687
20:00 687

10.1.6.5.2 Temperature Difference(℃)

8:00 3.6 9:00 3.6 10:00 3.6


11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
20:00 3.6
10.1.6.6 The inner

10.1.6.6.1 Cooling Load

8:00 46 9:00 46 10:00 46


11:00 46 12:00 46 13:00 46
14:00 46 15:00 46 16:00 46
17:00 46 18:00 46 19:00 46
20:00 46

10.1.6.6.2 Temperature Difference(℃)

8:00 3.6 9:00 3.6 10:00 3.6


11:00 3.6 12:00 3.6 13:00 3.6
14:00 3.6 15:00 3.6 16:00 3.6
17:00 3.6 18:00 3.6 19:00 3.6
All Rights Reserved Page 33 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

20:00 3.6
10.1.6.7 Roof

10.1.6.7.1 Cooling Load

8:00 -212 9:00 -149 10:00 74


11:00 443 12:00 918 13:00 1442
14:00 1958 15:00 2409 16:00 2744
17:00 2917 18:00 2913 19:00 2742
20:00 2466

10.1.6.7.2 Radiation Illumination Per Area(W/㎡)

8:00 404.5 9:00 622.2 10:00 799.9


11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

10.1.6.7.3 Temperature Difference(℃)

8:00 -1.4 9:00 -1 10:00 0.5


11:00 2.9 12:00 6 13:00 9.4
14:00 12.8 15:00 15.8 16:00 17.9
17:00 19.1 18:00 19.1 19:00 17.9
20:00 16.1
10.1.6.8 The air permeability

10.1.6.8.1 Cooling Load

8:00 977 9:00 977 10:00 977


11:00 977 12:00 977 13:00 977
14:00 977 15:00 977 16:00 977
17:00 977 18:00 977 19:00 977
20:00 977

10.1.6.8.2 Sensible Cooling Load

8:00 288 9:00 288 10:00 288


11:00 288 12:00 288 13:00 288
14:00 288 15:00 288 16:00 288
17:00 288 18:00 288 19:00 288

All Rights Reserved Page 34 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

20:00 288

10.1.6.8.3 Latent Cooling Load

8:00 689 9:00 689 10:00 689


11:00 689 12:00 689 13:00 689
14:00 689 15:00 689 16:00 689
17:00 689 18:00 689 19:00 689
20:00 689

10.1.6.8.4 Moisture Load

8:00 0.956 9:00 0.956 10:00 0.956


11:00 0.956 12:00 0.956 13:00 0.956
14:00 0.956 15:00 0.956 16:00 0.956
17:00 0.956 18:00 0.956 19:00 0.956
20:00 0.956
10.1.7 1003[INSTRUMENT RACK ROOM]Rooms Information
10.1.7.1 Base Parameters

Name INSTRUMENT Area(㎡) 93 Height(m) 5.6


RACK ROOM
Calculated Calculated Equipment 388 Lighting Watts 11
Load Watts Per Unit Per Unit
Area(W/㎡) Area(W/㎡)
People 0 Number Of 0 Summer 0
Number Per People Outdoor Air
Unit Volume Flow
Area(Person/ Per
㎡) Person(m^3/h-
person)
Winter 0 Temperature(℃) 25 Relative 60
Outdoor Air Humidity(%)
Volume Flow
Per
Person(m^3/h-
person)
10.1.8 1003[INSTRUMENT RACK ROOM]Detailed Parameters
10.1.8.1 The human body

Number 0 Activity Level Seated Quiet Clustering 0.89


Coefficient
Time Custom
Schedule
10.1.8.2 Fresh air[Cooling]

Volume 0 Load Type Cooling Load Calculation Calculated


All Rights Reserved Page 35 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

Flow(m^3) Method Steady


Unit Treatment To Heat None Heat Time 默认时间
Processed The Status Of Recovery Recovery Schedule
Status Room Type
10.1.8.3 Equipment

Type Electronic Power(KW) 12.09 Time Custom


Equipment Schedule
10.1.8.4 The light

Type Incandescent Power(W) 1023 Time Custom


Lamp Schedule
10.1.8.5 Exterior wall[North]

Name Exterior Orientation North Construction Concrete aerated


wall[North] concrete280(087001)
Length(m) 17 Width(m) 5.6 Area(㎡) 95.2
Area 95.2 Winter Heat Transfer 0.71
Without Coefficient(W/(㎡·K))
Window(㎡)
10.1.8.6 Exterior wall[East]

Name Exterior Orientation East Construction Concrete aerated


wall[East] concrete280(087001)
Length(m) 7 Width(m) 5.6 Area(㎡) 39.2
Area 39.2 Winter Heat Transfer 0.71
Without Coefficient(W/(㎡·K))
Window(㎡)
10.1.8.7 Roof

Name Roof Construction 预 制 01-1- Area(㎡) 93


35-1
Sloping Not Winter Heat Transfer 2.49
Roof Coefficient(W/(㎡·K))
10.1.8.8 Equipment

Type Electronic Power(KW) 24 Time Custom


Equipment Schedule
10.1.9 1003[INSTRUMENT RACK ROOM]Summer Cooling Load Summary
10.1.9.1 The human body

10.1.9.1.1 Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0

All Rights Reserved Page 36 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

14:00 0 15:00 0 16:00 0


17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.1.2 Sensible Heat Gain Per People(W)

8:00 67 9:00 67 10:00 67


11:00 67 12:00 67 13:00 67
14:00 67 15:00 67 16:00 67
17:00 67 18:00 67 19:00 67
20:00 67

10.1.9.1.3 Latent Heat Gain Per People(W)

8:00 41 9:00 41 10:00 41


11:00 41 12:00 41 13:00 41
14:00 41 15:00 41 16:00 41
17:00 41 18:00 41 19:00 41
20:00 41

10.1.9.1.4 Moisture Gain Per People(g/h)

8:00 61 9:00 61 10:00 61


11:00 61 12:00 61 13:00 61
14:00 61 15:00 61 16:00 61
17:00 61 18:00 61 19:00 61
20:00 61

10.1.9.1.5 Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.1.6 Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 37 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.9.1.7 Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0
10.1.9.2 Fresh air[Cooling]

10.1.9.2.1 Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.2 Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.3 Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.4 Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 38 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.9.2.5 Outdoor Air Take Away Room Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.6 Outdoor Air Take Away Room Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.7 Outdoor Air Take Away Room Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.8 Outdoor Air Take Away Room Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.9 Outdoor Air Unit Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.10 Outdoor Air Unit Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
All Rights Reserved Page 39 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

14:00 0 15:00 0 16:00 0


17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.11 Outdoor Air Unit Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.9.2.12 Outdoor Air Unit Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0
10.1.9.3 Equipment

10.1.9.3.1 Cooling Load

8:00 8463 9:00 8463 10:00 8463


11:00 8463 12:00 8463 13:00 8463
14:00 8463 15:00 8463 16:00 8463
17:00 8463 18:00 8463 19:00 8463
20:00 8463
10.1.9.4 The light

10.1.9.4.1 Cooling Load

8:00 1023 9:00 1023 10:00 1023


11:00 1023 12:00 1023 13:00 1023
14:00 1023 15:00 1023 16:00 1023
17:00 1023 18:00 1023 19:00 1023
20:00 1023
10.1.9.5 Exterior wall[North]

10.1.9.5.1 Cooling Load

8:00 614 9:00 573 10:00 535


All Rights Reserved Page 40 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

11:00 504 12:00 484 13:00 478


14:00 489 15:00 513 16:00 550
17:00 597 18:00 650 19:00 705
20:00 757

10.1.9.5.2 Radiation Intensity(W/㎡)

8:00 319 9:00 389 10:00 436


11:00 456 12:00 464 13:00 456
14:00 436 15:00 389 16:00 319
17:00 210 18:00 0 19:00 0
20:00 0

10.1.9.5.3 Temperature Difference(℃)

8:00 9.1 9:00 8.5 10:00 8


11:00 7.5 12:00 7.2 13:00 7.1
14:00 7.3 15:00 7.6 16:00 8.2
17:00 8.9 18:00 9.7 19:00 10.5
20:00 11.3
10.1.9.6 Exterior wall[East]

10.1.9.6.1 Cooling Load

8:00 207 9:00 194 10:00 181


11:00 174 12:00 174 13:00 182
14:00 197 15:00 215 16:00 234
17:00 251 18:00 267 19:00 279
20:00 289

10.1.9.6.2 Radiation Intensity(W/㎡)

8:00 615 9:00 625 10:00 532


11:00 362 12:00 160 13:00 156
14:00 146 15:00 121 16:00 91
17:00 55 18:00 0 19:00 0
20:00 0

10.1.9.6.3 Temperature Difference(℃)

8:00 7.5 9:00 7 10:00 6.6


11:00 6.3 12:00 6.3 13:00 6.6
14:00 7.1 15:00 7.8 16:00 8.4
All Rights Reserved Page 41 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

17:00 9.1 18:00 9.6 19:00 10.1


20:00 10.4
10.1.9.7 Roof

10.1.9.7.1 Cooling Load

8:00 202 9:00 409 10:00 896


11:00 1621 12:00 2489 13:00 3391
14:00 4225 15:00 4895 16:00 5323
17:00 5443 18:00 5251 19:00 4786
20:00 4184

10.1.9.7.2 Radiation Illumination Per Area(W/㎡)

8:00 404.5 9:00 622.2 10:00 799.9


11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

10.1.9.7.3 Temperature Difference(℃)

8:00 0.9 9:00 1.8 10:00 4


11:00 7.2 12:00 11 13:00 15
14:00 18.7 15:00 21.7 16:00 23.6
17:00 24.1 18:00 23.3 19:00 21.2
20:00 18.5
10.1.9.8 Equipment

10.1.9.8.1 Cooling Load

8:00 16800 9:00 16800 10:00 16800


11:00 16800 12:00 16800 13:00 16800
14:00 16800 15:00 16800 16:00 16800
17:00 16800 18:00 16800 19:00 16800
20:00 16800
10.1.10 1004[JETTY OPERATOR ROOM]Rooms Information
10.1.10.1 Base Parameters

Name JETTY Area(㎡) 120 Height(m) 5.6


OPERATOR
ROOM
Calculated Calculated Equipment 297 Lighting Watts 11
All Rights Reserved Page 42 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

Load Watts Per Unit Per Unit


Area(W/㎡) Area(W/㎡)
People 0 Number Of 0 Summer 0
Number Per People Outdoor Air
Unit Volume Flow
Area(Person/ Per
㎡) Person(m^3/h-
person)
Winter 0 Temperature(℃) 25 Relative 60
Outdoor Air Humidity(%)
Volume Flow
Per
Person(m^3/h-
person)
10.1.11 1004[JETTY OPERATOR ROOM]Detailed Parameters
10.1.11.1 The human body

Number 0 Activity Level Seated Quiet Clustering 0.89


Coefficient
Time Custom
Schedule
10.1.11.2 Fresh air[Cooling]

Volume 0 Load Type Cooling Load Calculation Calculated


Flow(m^3) Method Steady
Unit Treatment To Heat None Heat Time 默认时间
Processed The Status Of Recovery Recovery Schedule
Status Room Type
10.1.11.3 Equipment

Type Electronic Power(KW) 15.6 Time Custom


Equipment Schedule
10.1.11.4 The light

Type Incandescent Power(W) 1320 Time Custom


Lamp Schedule
10.1.11.5 Exterior wall[North]

Name Exterior Orientation North Construction Concrete aerated


wall[North] concrete280(087001)
Length(m) 17 Width(m) 5.6 Area(㎡) 95.2
Area 95.2 Winter Heat Transfer 0.71
Without Coefficient(W/(㎡·K))
Window(㎡)
10.1.11.6 Exterior wall[East]

Name Exterior Orientation East Construction Concrete aerated


wall[East] concrete280(087001)

All Rights Reserved Page 43 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

Length(m) 7 Width(m) 5.6 Area(㎡) 39.2


Area 39.2 Winter Heat Transfer 0.71
Without Coefficient(W/(㎡·K))
Window(㎡)
10.1.11.7 Roof

Name Roof Construction 预 制 01-1- Area(㎡) 120


35-1
Sloping Not Winter Heat Transfer 2.49
Roof Coefficient(W/(㎡·K))
10.1.11.8 Equipment

Type Electronic Power(KW) 20 Time Custom


Equipment Schedule
10.1.12 1004[JETTY OPERATOR ROOM]Summer Cooling Load Summary
10.1.12.1 The human body

10.1.12.1.1 Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.1.2 Sensible Heat Gain Per People(W)

8:00 67 9:00 67 10:00 67


11:00 67 12:00 67 13:00 67
14:00 67 15:00 67 16:00 67
17:00 67 18:00 67 19:00 67
20:00 67

10.1.12.1.3 Latent Heat Gain Per People(W)

8:00 41 9:00 41 10:00 41


11:00 41 12:00 41 13:00 41
14:00 41 15:00 41 16:00 41
17:00 41 18:00 41 19:00 41
20:00 41

All Rights Reserved Page 44 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.12.1.4 Moisture Gain Per People(g/h)

8:00 61 9:00 61 10:00 61


11:00 61 12:00 61 13:00 61
14:00 61 15:00 61 16:00 61
17:00 61 18:00 61 19:00 61
20:00 61

10.1.12.1.5 Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.1.6 Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.1.7 Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0
10.1.12.2 Fresh air[Cooling]

10.1.12.2.1 Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 45 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.12.2.2 Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.3 Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.4 Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.5 Outdoor Air Take Away Room Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.6 Outdoor Air Take Away Room Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.7 Outdoor Air Take Away Room Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
All Rights Reserved Page 46 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

14:00 0 15:00 0 16:00 0


17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.8 Outdoor Air Take Away Room Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.9 Outdoor Air Unit Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.10 Outdoor Air Unit Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.11 Outdoor Air Unit Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.12.2.12 Outdoor Air Unit Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 47 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.12.3 Equipment

10.1.12.3.1 Cooling Load

8:00 10920 9:00 10920 10:00 10920


11:00 10920 12:00 10920 13:00 10920
14:00 10920 15:00 10920 16:00 10920
17:00 10920 18:00 10920 19:00 10920
20:00 10920
10.1.12.4 The light

10.1.12.4.1 Cooling Load

8:00 1320 9:00 1320 10:00 1320


11:00 1320 12:00 1320 13:00 1320
14:00 1320 15:00 1320 16:00 1320
17:00 1320 18:00 1320 19:00 1320
20:00 1320
10.1.12.5 Exterior wall[North]

10.1.12.5.1 Cooling Load

8:00 614 9:00 573 10:00 535


11:00 504 12:00 484 13:00 478
14:00 489 15:00 513 16:00 550
17:00 597 18:00 650 19:00 705
20:00 757

10.1.12.5.2 Radiation Intensity(W/㎡)

8:00 319 9:00 389 10:00 436


11:00 456 12:00 464 13:00 456
14:00 436 15:00 389 16:00 319
17:00 210 18:00 0 19:00 0
20:00 0

10.1.12.5.3 Temperature Difference(℃)

8:00 9.1 9:00 8.5 10:00 8


11:00 7.5 12:00 7.2 13:00 7.1
14:00 7.3 15:00 7.6 16:00 8.2
17:00 8.9 18:00 9.7 19:00 10.5
All Rights Reserved Page 48 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

20:00 11.3
10.1.12.6 Exterior wall[East]

10.1.12.6.1 Cooling Load

8:00 207 9:00 194 10:00 181


11:00 174 12:00 174 13:00 182
14:00 197 15:00 215 16:00 234
17:00 251 18:00 267 19:00 279
20:00 289

10.1.12.6.2 Radiation Intensity(W/㎡)

8:00 615 9:00 625 10:00 532


11:00 362 12:00 160 13:00 156
14:00 146 15:00 121 16:00 91
17:00 55 18:00 0 19:00 0
20:00 0

10.1.12.6.3 Temperature Difference(℃)

8:00 7.5 9:00 7 10:00 6.6


11:00 6.3 12:00 6.3 13:00 6.6
14:00 7.1 15:00 7.8 16:00 8.4
17:00 9.1 18:00 9.6 19:00 10.1
20:00 10.4
10.1.12.7 Roof

10.1.12.7.1 Cooling Load

8:00 266 9:00 525 10:00 1143


11:00 2067 12:00 3178 13:00 4338
14:00 5412 15:00 6281 16:00 6840
17:00 7006 18:00 6771 19:00 6184
20:00 5417

10.1.12.7.2 Radiation Illumination Per Area(W/㎡)

8:00 404.5 9:00 622.2 10:00 799.9


11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
All Rights Reserved Page 49 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

20:00 0

10.1.12.7.3 Temperature Difference(℃)

8:00 0.9 9:00 1.8 10:00 3.9


11:00 7.1 12:00 10.9 13:00 14.9
14:00 18.6 15:00 21.6 16:00 23.5
17:00 24.1 18:00 23.3 19:00 21.2
20:00 18.6
10.1.12.8 Equipment

10.1.12.8.1 Cooling Load

8:00 14000 9:00 14000 10:00 14000


11:00 14000 12:00 14000 13:00 14000
14:00 14000 15:00 14000 16:00 14000
17:00 14000 18:00 14000 19:00 14000
20:00 14000
10.1.13 1005[ENGINEER ROOM]Rooms Information
10.1.13.1 Base Parameters

Name ENGINEER Area(㎡) 23 Height(m) 5.6


ROOM
Calculated Calculated Equipment 260 Lighting Watts 11
Load Watts Per Unit Per Unit
Area(W/㎡) Area(W/㎡)
People 0 Number Of 0 Summer 0
Number Per People Outdoor Air
Unit Volume Flow
Area(Person/ Per
㎡) Person(m^3/h-
person)
Winter 0 Temperature(℃) 25 Relative 60
Outdoor Air Humidity(%)
Volume Flow
Per
Person(m^3/h-
person)
10.1.14 1005[ENGINEER ROOM]Detailed Parameters
10.1.14.1 The human body

Number 0 Activity Level Seated Quiet Clustering 0.89


Coefficient
Time Custom
Schedule

All Rights Reserved Page 50 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.14.2 Fresh air[Cooling]

Volume 0 Load Type Cooling Load Calculation Calculated


Flow(m^3) Method Steady
Unit Treatment To Heat None Heat Time 默认时间
Processed The Status Of Recovery Recovery Schedule
Status Room Type
10.1.14.3 Equipment

Type Electronic Power(KW) 2.99 Time Custom


Equipment Schedule
10.1.14.4 The light

Type Incandescent Power(W) 253 Time Custom


Lamp Schedule
10.1.14.5 Exterior wall[North]

Name Exterior Orientation North Construction Concrete aerated


wall[North] concrete280(087001)
Length(m) 4 Width(m) 5.6 Area(㎡) 22.4
Area 22.4 Winter Heat Transfer 0.71
Without Coefficient(W/(㎡·K))
Window(㎡)
10.1.14.6 Roof

Name Roof Construction 预 制 01-1- Area(㎡) 23


35-1
Sloping Not Winter Heat Transfer 2.49
Roof Coefficient(W/(㎡·K))
10.1.14.7 Equipment

Type Electronic Power(KW) 3 Time Custom


Equipment Schedule
10.1.15 1005[ENGINEER ROOM]Summer Cooling Load Summary
10.1.15.1 The human body

10.1.15.1.1 Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

All Rights Reserved Page 51 of 57


OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.15.1.2 Sensible Heat Gain Per People(W)

8:00 67 9:00 67 10:00 67


11:00 67 12:00 67 13:00 67
14:00 67 15:00 67 16:00 67
17:00 67 18:00 67 19:00 67
20:00 67

10.1.15.1.3 Latent Heat Gain Per People(W)

8:00 41 9:00 41 10:00 41


11:00 41 12:00 41 13:00 41
14:00 41 15:00 41 16:00 41
17:00 41 18:00 41 19:00 41
20:00 41

10.1.15.1.4 Moisture Gain Per People(g/h)

8:00 61 9:00 61 10:00 61


11:00 61 12:00 61 13:00 61
14:00 61 15:00 61 16:00 61
17:00 61 18:00 61 19:00 61
20:00 61

10.1.15.1.5 Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.1.6 Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.1.7 Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
All Rights Reserved Page 52 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

14:00 0 15:00 0 16:00 0


17:00 0 18:00 0 19:00 0
20:00 0
10.1.15.2 Fresh air[Cooling]

10.1.15.2.1 Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.2 Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.3 Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.4 Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.5 Outdoor Air Take Away Room Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0
All Rights Reserved Page 53 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

10.1.15.2.6 Outdoor Air Take Away Room Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.7 Outdoor Air Take Away Room Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.8 Outdoor Air Take Away Room Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.9 Outdoor Air Unit Sensible Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.10 Outdoor Air Unit Latent Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.11 Outdoor Air Unit Cooling Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
All Rights Reserved Page 54 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

14:00 0 15:00 0 16:00 0


17:00 0 18:00 0 19:00 0
20:00 0

10.1.15.2.12 Outdoor Air Unit Moisture Load

8:00 0 9:00 0 10:00 0


11:00 0 12:00 0 13:00 0
14:00 0 15:00 0 16:00 0
17:00 0 18:00 0 19:00 0
20:00 0
10.1.15.3 Equipment

10.1.15.3.1 Cooling Load

8:00 2093 9:00 2093 10:00 2093


11:00 2093 12:00 2093 13:00 2093
14:00 2093 15:00 2093 16:00 2093
17:00 2093 18:00 2093 19:00 2093
20:00 2093
10.1.15.4 The light

10.1.15.4.1 Cooling Load

8:00 253 9:00 253 10:00 253


11:00 253 12:00 253 13:00 253
14:00 253 15:00 253 16:00 253
17:00 253 18:00 253 19:00 253
20:00 253
10.1.15.5 Exterior wall[North]

10.1.15.5.1 Cooling Load

8:00 145 9:00 135 10:00 126


11:00 119 12:00 114 13:00 113
14:00 115 15:00 121 16:00 129
17:00 140 18:00 153 19:00 166
20:00 178

10.1.15.5.2 Radiation Intensity(W/㎡)

8:00 319 9:00 389 10:00 436


All Rights Reserved Page 55 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

11:00 456 12:00 464 13:00 456


14:00 436 15:00 389 16:00 319
17:00 210 18:00 0 19:00 0
20:00 0

10.1.15.5.3 Temperature Difference(℃)

8:00 9.1 9:00 8.5 10:00 8


11:00 7.5 12:00 7.2 13:00 7.1
14:00 7.3 15:00 7.6 16:00 8.2
17:00 8.9 18:00 9.7 19:00 10.5
20:00 11.3
10.1.15.6 Roof

10.1.15.6.1 Cooling Load

8:00 52 9:00 100 10:00 218


11:00 393 12:00 606 13:00 827
14:00 1033 15:00 1200 16:00 1308
17:00 1341 18:00 1297 19:00 1186
20:00 1040

10.1.15.6.2 Radiation Illumination Per Area(W/㎡)

8:00 404.5 9:00 622.2 10:00 799.9


11:00 902.4 12:00 939.4 13:00 902.4
14:00 799.9 15:00 622.2 16:00 404.5
17:00 180.3 18:00 0 19:00 0
20:00 0

10.1.15.6.3 Temperature Difference(℃)

8:00 0.9 9:00 1.8 10:00 3.9


11:00 7.1 12:00 10.9 13:00 14.8
14:00 18.5 15:00 21.5 16:00 23.4
17:00 24 18:00 23.2 19:00 21.3
20:00 18.6
10.1.15.7 Equipment

10.1.15.7.1 Cooling Load

8:00 2100 9:00 2100 10:00 2100


All Rights Reserved Page 56 of 57
OWNER CONTRACTOR

BEPCC OF PRODUCT OFFTAKE/ EXPORT JETTY FACILITY FOR SARAWAK


METHANOL PROJECT IN BINTULU, SARAWAK

DOCUMENT NAME: ANNEX 1: CALCULATION RESULTS DESIGN STAGE: DETAILED DESIGN


CLIENT NO. SMJ-CCCC-HVA-SPN-0001 REV. 00

11:00 2100 12:00 2100 13:00 2100


14:00 2100 15:00 2100 16:00 2100
17:00 2100 18:00 2100 19:00 2100
20:00 2100