Activity ID

Crown Plaza Hotel Project - Revised Program


procurement
Mechanical Work
Plumbing Work
Plate Heat Exchanger Plant
CP.P.D15.All.00031
CP.P.D15.All.00941
CP.P.D15.All.01028
CP.P.D15.All.01109
GRP water tanks
CP.P.D15.All.00032
CP.P.D15.All.00949
CP.P.D15.All.01036
CP.P.D15.All.01117
Gray Water Treatment Plant
CP.P.D15.All.00030
CP.P.D15.All.00950
CP.P.D15.All.01037
CP.P.D15.All.01118
External Drainage Manholes
CP.P.D15.All.00033
CP.P.D15.All.00958
CP.P.D15.All.01045
CP.P.D15.All.01126
Water Filtration System
CP.P.D15.All.00029
CP.P.D15.All.00967
CP.P.D15.All.01054
CP.P.D15.All.01135
lint strainer / Oil Interceptor
CP.P.D15.All.00035
CP.P.D15.All.00928
CP.P.D15.All.01015
CP.P.D15.All.01096
Drainage Pumps
CP.P.D15.All.00036
CP.P.D15.All.00929
CP.P.D15.All.01016
CP.P.D15.All.01097
Filtration Unit
CP.P.D15.All.00017
CP.P.D15.All.00955
CP.P.D15.All.01042
CP.P.D15.All.01123
Water Storage Calorifier
CP.P.D15.All.00028
CP.P.D15.All.00968
CP.P.D15.All.01055
CP.P.D15.All.01136
Water Supply Pumps
CP.P.D15.All.00027
CP.P.D15.All.00969
CP.P.D15.All.01056
CP.P.D15.All.01137
Ecology Unit / Electrostatic Filter And Carbon Filter
CP.P.D15.All.00026
CP.P.D15.All.00962
CP.P.D15.All.01049
CP.P.D15.All.01130
Grease Separator
CP.P.D15.All.00034
CP.P.D15.All.00927
CP.P.D15.All.01014
CP.P.D15.All.01095
Sanitary/Toilet & Bath Accessories
CP.P.D15.All.1153
CP.P.D15.All.1154
CP.P.D15.All.1155
CP.P.D15.All.1156
Fire Fighting Work
Fire Hydrant System
CP.P.EX.All.00061
CP.P.EX.All.00953
CP.P.EX.All.01040
CP.P.EX.All.01121
FM-200
CP.P.D15.All.00039
CP.P.D15.All.00932
CP.P.D15.All.01019
CP.P.D15.All.01100
Fire Fighting Pump
CP.P.D15.All.00037
CP.P.D15.All.00930
CP.P.D15.All.01017
CP.P.D15.All.01098
Fire Alarm Station
CP.P.D15.All.00038
CP.P.D15.All.00931
CP.P.D15.All.01018
CP.P.D15.All.01099
HVAC Work
Close Control Unit
CP.P.D15.All.00022
CP.P.D15.All.00980
CP.P.D15.All.01067
CP.P.D15.All.01148
Air and Dirt Separator
CP.P.D15.All.00015
CP.P.D15.All.00934
CP.P.D15.All.01021
CP.P.D15.All.01102
Cooling Tower
CP.P.D15.All.00012
CP.P.D15.All.00965
CP.P.D15.All.01052
CP.P.D15.All.01133
Chemical Dosing System
CP.P.D15.All.00018
CP.P.D15.All.00976
CP.P.D15.All.01063
CP.P.D15.All.01144
Air Handling Units
CP.P.D15.All.00021
CP.P.D15.All.00935
CP.P.D15.All.01022
CP.P.D15.All.01103
Smoke Control Fans
CP.P.D15.All.00024
CP.P.D15.All.00938
CP.P.D15.All.01025
CP.P.D15.All.01106
Refrigerant Leak Detection and Monitoring System
CP.P.D15.All.00016
CP.P.D15.All.00940
CP.P.D15.All.01027
CP.P.D15.All.01108
Fan Coil Unit
CP.P.D15.All.00023
CP.P.D15.All.00956
CP.P.D15.All.01043
CP.P.D15.All.01124
Extract Fans
CP.P.D15.All.00025
CP.P.D15.All.00957
CP.P.D15.All.01044
CP.P.D15.All.01125
Chilled Water Pressurization Unit
CP.P.D15.All.00014
CP.P.D15.All.00977
CP.P.D15.All.01064
CP.P.D15.All.01145
Fresh Air Handling Units
CP.P.D15.All.00020
CP.P.D15.All.00952
CP.P.D15.All.01039
CP.P.D15.All.01120
Chilled Water Pump
CP.P.D15.All.00013
CP.P.D15.All.00978
CP.P.D15.All.01065
CP.P.D15.All.01146
Chillers
CP.P.D15.All.00011
CP.P.D15.All.00979
CP.P.D15.All.01066
CP.P.D15.All.01147
LPG System
LPG Leak Detection System
CP.P.D15.All.00040
CP.P.D15.All.00945
CP.P.D15.All.01032
CP.P.D15.All.01113
LPG Tanks
CP.P.D15.All.00062
CP.P.D15.All.00983
CP.P.D15.All.01070
CP.P.D15.All.01151
LPG Electric Operated Vaporizers
CP.P.D15.All.00063
CP.P.D15.All.00984
CP.P.D15.All.01071
CP.P.D15.All.01152
LPG Pressure reducing and Distribution panel
CP.P.D15.All.00064
CP.P.D15.All.00985
CP.P.D15.All.01072
CP.P.D15.All.01153
Electrical Work
Power Distribution Work
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM
CP.P.D16.All.00049
CP.P.D16.All.00959
CP.P.D16.All.01046
CP.P.D16.All.01127
UPS System
CP.P.D16.All.00046
CP.P.D16.All.00966
CP.P.D16.All.01053
CP.P.D16.All.01134
Capacitor Bank
CP.P.D16.All.00044
CP.P.D16.All.00974
CP.P.D16.All.01061
CP.P.D16.All.01142
Main and Sub Distribution Boards
CP.P.D16.All.00043
CP.P.D16.All.00944
CP.P.D16.All.01031
CP.P.D16.All.01112
BTU Meter
CP.P.D15.All.00019
CP.P.D15.All.00973
CP.P.D15.All.01060
CP.P.D15.All.01141
GENERATOR
CP.P.D16.All.00042
CP.P.D16.All.00951
CP.P.D16.All.01038
CP.P.D16.All.01119
Motor Control Centers
CP.P.D16.All.00045
CP.P.D16.All.00943
CP.P.D16.All.01030
CP.P.D16.All.01111
Transformers
CP.P.D16.All.00041
CP.P.D16.All.00936
CP.P.D16.All.01023
CP.P.D16.All.01104
HV Switchear
CP.P.D16.All.1143
CP.P.D16.All.1144
CP.P.D16.All.1145
CP.P.D16.All.1146
Lighting Fixture
CP.P.D16.All.1147
CP.P.D16.All.1148
CP.P.D16.All.1149
CP.P.D16.All.1150
Facade/Landscape Lighting Fixture
CP.P.D16.All.1151
CP.P.D16.All.1152
CP.P.D16.All.1153
CP.P.D16.All.1154
Low Current Systems Work
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM
CP.P.D16.All.00048
CP.P.D16.All.00960
CP.P.D16.All.01047
CP.P.D16.All.01128
Guest Room Management System
CP.P.D16.All.00055
CP.P.D16.All.00948
CP.P.D16.All.01035
CP.P.D16.All.01116
CCTV/IPTV
CP.P.D16.All.00051
CP.P.D16.All.00975
CP.P.D16.All.01062
CP.P.D16.All.01143
Access Control System
CP.P.D16.All.00052
CP.P.D16.All.00933
CP.P.D16.All.01020
CP.P.D16.All.01101
Time Attendance System
CP.P.D16.All.00054
CP.P.D16.All.00937
CP.P.D16.All.01024
CP.P.D16.All.01105
Fire Alarm System / Smoke Detection
CP.P.D16.All.00047
CP.P.D16.All.00954
CP.P.D16.All.01041
CP.P.D16.All.01122
Digital Signage System
CP.P.D16.All.00058
CP.P.D16.All.00963
CP.P.D16.All.01050
CP.P.D16.All.01131
Data System
CP.P.D16.All.00050
CP.P.D16.All.00964
CP.P.D16.All.01051
CP.P.D16.All.01132
Audio Intercom System
CP.P.D16.All.00053
CP.P.D16.All.00970
CP.P.D16.All.01057
CP.P.D16.All.01138
Audio Visual System
CP.P.D16.All.00057
CP.P.D16.All.00971
CP.P.D16.All.01058
CP.P.D16.All.01139
BMS DDC's Panel and Devices
CP.P.D16.All.00059
CP.P.D16.All.00972
CP.P.D16.All.01059
CP.P.D16.All.01140
PAVA SYSTEM
CP.P.D16.All.00056
CP.P.D16.All.00942
CP.P.D16.All.01029
CP.P.D16.All.01110
Construction
Substructure
Basement 3 (Tanks)
Zone 2 B
Mechanical Work
Plumbing Work
CP.C.D15.B3.03140
CP.C.D15.B3.03288
Water Supply System
CP.C.D15.B3.03139
CP.C.D15.B3.03287
Fire Fighting Work
CP.C.D15.B3.03141
CP.C.D15.B3.03289
HVAC Work
Duct & Pipes Work
CP.C.D15.B3.02144
CP.C.D15.B3.02173
Equipment Work
CP.C.D15.B3.03138
CP.C.D15.B3.03286
Electrical Work
Power Distribution Work
CP.C.D16.B3.02145
CP.C.D16.B3.02174
CP.C.D16.B3.02227
CP.C.D16.B3.02315
CP.C.D16.B3.03142
CP.C.D16.B3.03378
CP.C.D16.B3.03504
CP.C.D16.B3.02146
CP.C.D16.B3.03503
Low Current Systems Work
PAVA System
CP.C.D16.B3.04200
CP.C.D16.B3.04201
CP.C.D16.B3.04641
CP.C.D16.B3.04422
CP.C.D16.B3.04870
CP.C.D16.B3.04743
BMS System
CP.C.D16.B3.04202
CP.C.D16.B3.04423
CP.C.D16.B3.04801
CP.C.D16.B3.04642
CP.C.D16.B3.04643
Basement 2
Zone 1 A
Mechanical Work
Plumbing Work
CP.C.D15.B2.02524
Drainage System
CP.C.D15.B2.02087
CP.C.D15.B2.02194
CP.C.D15.B2.02329
CP.C.D15.B2.02298
Water Supply System
CP.C.D15.B2.02414
CP.C.D15.B2.02193
CP.C.D15.B2.02243
CP.C.D15.B2.02353
CP.C.D15.B2.02487
Fire Fighting Work
CP.C.D15.B2.02244
CP.C.D15.B2.02306
CP.C.D15.B2.02430
CP.C.D15.B2.02541
CP.C.D15.B2.02488
CP.C.D15.B2.02615
CP.C.D15.B2.02088
CP.C.D15.B2.02195
CP.C.D15.B2.02661
HVAC Work
Duct & Pipes Work
CP.C.D15.B2.02336
CP.C.D15.B2.02084
CP.C.D15.B2.02200
CP.C.D15.B2.02338
CP.C.D15.B2.02337
CP.C.D15.B2.02536
CP.C.D15.B2.02402
CP.C.D15.B2.02339
CP.C.D15.B2.02466
CP.C.D15.B2.02595
Equipment Work
CP.C.D15.B2.03097
CP.C.D15.B2.03098
CP.C.D15.B2.03099
CP.C.D15.B2.03263
CP.C.D15.B2.03264
CP.C.D15.B2.03265
Electrical Work
Lighting System Work
CP.C.D16.B2.02092
CP.C.D16.B2.02380
CP.C.D16.B2.02509
CP.C.D16.B2.02648
CP.C.D16.B2.02676
CP.C.D16.B2.02588
Power Distribution Work
CP.C.D16.B2.00733
CP.C.D16.B2.02089
CP.C.D16.B2.01093
CP.C.D16.B2.02096
CP.C.D16.B2.02172
CP.C.D16.B2.02228
CP.C.D16.B2.02175
CP.C.D16.B2.02226
CP.C.D16.B2.02311
CP.C.D16.B2.03100
CP.C.D16.B2.02090
CP.C.D16.B2.02211
CP.C.D16.B2.03370
CP.C.D16.B2.02289
CP.C.D16.B2.03488
CP.C.D16.B2.03487
CP.C.D16.B2.02288
Power System Work
CP.C.D16.B2.02152
CP.C.D16.B2.02272
CP.C.D16.B2.02431
CP.C.D16.B2.02578
CP.C.D16.B2.02495
Low Current Systems Work
Data System Work
CP.C.D16.B2.02273
CP.C.D16.B2.02391
CP.C.D16.B2.00736
CP.C.D16.B2.00737
CP.C.D16.B2.02596
CP.C.D16.B2.02597
Fire Alarm System Work
CP.C.D16.B2.02093
CP.C.D16.B2.02258
CP.C.D16.B2.02390
CP.C.D16.B2.02447
CP.C.D16.B2.02448
CP.C.D16.B2.02525
CCTV
CP.C.D16.B2.02274
CP.C.D16.B2.02330
CP.C.D16.B2.02475
CP.C.D16.B2.02632
CP.C.D16.B2.02546
Access Control
CP.C.D16.B2.02275
CP.C.D16.B2.02392
CP.C.D16.B2.02526
CP.C.D16.B2.02652
CP.C.D16.B2.02598
Digital Signage System
CP.C.D16.B2.02277
CP.C.D16.B2.02394
CP.C.D16.B2.02528
CP.C.D16.B2.02600
CP.C.D16.B2.02601
PAVA System
CP.C.D16.B2.02276
CP.C.D16.B2.02393
CP.C.D16.B2.02527
CP.C.D16.B2.02653
CP.C.D16.B2.02599
BMS System
CP.C.D16.B2.02098
CP.C.D16.B2.02259
CP.C.D16.B2.02449
CP.C.D16.B2.02355
CP.C.D16.B2.02356
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B2.02095
CP.C.D16.B2.02214
CP.C.D16.B2.02312
CP.C.D16.B2.02419
CP.C.D16.B2.02354
Earthing and Lightning Protection System
CP.C.D16.B2.02510
External Work
MEP
CP.C.D15.B2.03101
CP.C.D15.B2.03301
Zone 1 B
Mechanical Work
Plumbing Work
CP.C.D15.B2.09107
Drainage System
CP.C.D15.B2.03875
CP.C.D15.B2.03924
CP.C.D15.B2.03874
CP.C.D15.B2.04018
CP.C.D15.B2.04082
Water Supply System
CP.C.D15.B2.03873
CP.C.D15.B2.03923
CP.C.D15.B2.03972
CP.C.D15.B2.04108
CP.C.D15.B2.04176
CP.C.D15.B2.04285
Fire Fighting Work
CP.C.D15.B2.03973
CP.C.D15.B2.04044
CP.C.D15.B2.04347
CP.C.D15.B2.04206
CP.C.D15.B2.04286
CP.C.D15.B2.04872
CP.C.D15.B2.05366
CP.C.D15.B2.05524
CP.C.D15.B2.05648
HVAC Work
Duct & Pipes Work
CP.C.D15.B2.04331
CP.C.D15.B2.04334
CP.C.D15.B2.04333
CP.C.D15.B2.04012
CP.C.D15.B2.04081
CP.C.D15.B2.04332
CP.C.D15.B2.04636
CP.C.D15.B2.04417
CP.C.D15.B2.04544
CP.C.D15.B2.05013
Equipment Work
CP.C.D15.B2.03267
CP.C.D15.B2.03102
CP.C.D15.B2.03103
CP.C.D15.B2.03266
Electrical Work
Lighting System Work
CP.C.D16.B2.03859
CP.C.D16.B2.04083
CP.C.D16.B2.03952
CP.C.D16.B2.04264
CP.C.D16.B2.04467
CP.C.D16.B2.05563
CP.C.D16.B2.04348
Power Distribution Work
CP.C.D16.B2.04263
CP.C.D16.B2.04339
CP.C.D16.B2.04451
CP.C.D16.B2.04601
CP.C.D16.B2.03104
CP.C.D16.B2.03371
CP.C.D16.B2.03490
CP.C.D16.B2.02101
CP.C.D16.B2.03489
Power System Work
CP.C.D16.B2.03869
CP.C.D16.B2.03876
CP.C.D16.B2.03962
CP.C.D16.B2.04154
CP.C.D16.B2.04340
CP.C.D16.B2.04234
Low Current Systems Work
Data System Work
CP.C.D16.B2.03963
CP.C.D16.B2.03879
CP.C.D16.B2.04097
CP.C.D16.B2.02102
CP.C.D16.B2.02103
CP.C.D16.B2.04369
CP.C.D16.B2.04370
Fire Alarm System Work
CP.C.D16.B2.03860
CP.C.D16.B2.03877
CP.C.D16.B2.03953
CP.C.D16.B2.04096
CP.C.D16.B2.04166
CP.C.D16.B2.04165
CP.C.D16.B2.04270
CCTV
CP.C.D16.B2.03964
CP.C.D16.B2.03880
CP.C.D16.B2.04046
CP.C.D16.B2.04221
CP.C.D16.B2.04418
CP.C.D16.B2.04309
Access Control
CP.C.D16.B2.03965
CP.C.D16.B2.03881
CP.C.D16.B2.04098
CP.C.D16.B2.04271
CP.C.D16.B2.04475
CP.C.D16.B2.04371
Digital Signage System
CP.C.D16.B2.03967
CP.C.D16.B2.03883
CP.C.D16.B2.04100
CP.C.D16.B2.04273
CP.C.D16.B2.04373
CP.C.D16.B2.04374
PAVA System
CP.C.D16.B2.03966
CP.C.D16.B2.03882
CP.C.D16.B2.04099
CP.C.D16.B2.04272
CP.C.D16.B2.04476
CP.C.D16.B2.04372
BMS System
CP.C.D16.B2.03862
CP.C.D16.B2.03954
CP.C.D16.B2.04072
CP.C.D16.B2.04168
CP.C.D16.B2.04073
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B2.03861
CP.C.D16.B2.03878
CP.C.D16.B2.03947
CP.C.D16.B2.04033
CP.C.D16.B2.04167
CP.C.D16.B2.04091
Earthing and Lightning Protection System
CP.C.D16.B2.02104
CP.C.D16.B2.04265
External Work
MEP
CP.C.D15.B2.03105
CP.C.D15.B2.03302
Zone 1 C
Mechanical Work
Plumbing Work
CP.C.D15.B2.09108
Drainage System
CP.C.D15.B2.03930
CP.C.D15.B2.03979
CP.C.D15.B2.03929
CP.C.D15.B2.04092
CP.C.D15.B2.04171
Water Supply System
CP.C.D15.B2.03928
CP.C.D15.B2.03978
CP.C.D15.B2.04047
CP.C.D15.B2.04207
CP.C.D15.B2.04296
CP.C.D15.B2.04400
Fire Fighting Work
CP.C.D15.B2.04048
CP.C.D15.B2.04116
CP.C.D15.B2.04477
CP.C.D15.B2.04321
CP.C.D15.B2.04401
CP.C.D15.B2.05025
CP.C.D15.B2.05368
CP.C.D15.B2.05525
CP.C.D15.B2.05649
HVAC Work
Duct & Pipes Work
CP.C.D15.B2.04452
CP.C.D15.B2.04084
CP.C.D15.B2.04170
CP.C.D15.B2.04453
CP.C.D15.B2.04774
CP.C.D15.B2.04545
CP.C.D15.B2.04454
CP.C.D15.B2.04455
CP.C.D15.B2.04682
CP.C.D15.B2.05181
Equipment Work
CP.C.D15.B2.03106
CP.C.D15.B2.03107
CP.C.D15.B2.03108
CP.C.D15.B2.03268
CP.C.D15.B2.03269
CP.C.D15.B2.03270
Electrical Work
Lighting System Work
CP.C.D16.B2.03899
CP.C.D16.B2.04019
CP.C.D16.B2.04172
CP.C.D16.B2.04382
CP.C.D16.B2.04595
CP.C.D16.B2.05564
CP.C.D16.B2.04478
Power Distribution Work
CP.C.D16.B2.03902
CP.C.D16.B2.04381
CP.C.D16.B2.03934
CP.C.D16.B2.04004
CP.C.D16.B2.04127
CP.C.D16.B2.04468
CP.C.D16.B2.04310
CP.C.D16.B2.04208
CP.C.D16.B2.04581
CP.C.D16.B2.04736
CP.C.D16.B2.03109
CP.C.D16.B2.05369
CP.C.D16.B2.05602
CP.C.D16.B2.05760
CP.C.D16.B2.03372
CP.C.D16.B2.05759
CP.C.D16.B2.03492
CP.C.D16.B2.03491
Power System Work
CP.C.D16.B2.03913
CP.C.D16.B2.03931
CP.C.D16.B2.04034
CP.C.D16.B2.04266
CP.C.D16.B2.04469
CP.C.D16.B2.04349
Low Current Systems Work
Data System Work
CP.C.D16.B2.04035
CP.C.D16.B2.03935
CP.C.D16.B2.04194
CP.C.D16.B2.02105
CP.C.D16.B2.02106
CP.C.D16.B2.04497
CP.C.D16.B2.04498
Fire Alarm System Work
CP.C.D16.B2.03900
CP.C.D16.B2.03932
CP.C.D16.B2.04020
CP.C.D16.B2.04193
CP.C.D16.B2.04288
CP.C.D16.B2.04287
CP.C.D16.B2.04394
CCTV
CP.C.D16.B2.04036
CP.C.D16.B2.03936
CP.C.D16.B2.04128
CP.C.D16.B2.04335
CP.C.D16.B2.04546
CP.C.D16.B2.04430
Access Control
CP.C.D16.B2.04037
CP.C.D16.B2.03937
CP.C.D16.B2.04195
CP.C.D16.B2.04395
CP.C.D16.B2.04602
CP.C.D16.B2.04499
Digital Signage System
CP.C.D16.B2.04039
CP.C.D16.B2.03939
CP.C.D16.B2.04197
CP.C.D16.B2.04397
CP.C.D16.B2.04501
CP.C.D16.B2.04502
PAVA System
CP.C.D16.B2.04038
CP.C.D16.B2.03938
CP.C.D16.B2.04396
CP.C.D16.B2.04196
CP.C.D16.B2.04603
CP.C.D16.B2.04500
BMS System
CP.C.D16.B2.03903
CP.C.D16.B2.04021
CP.C.D16.B2.04155
CP.C.D16.B2.04290
CP.C.D16.B2.04156
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B2.03901
CP.C.D16.B2.03933
CP.C.D16.B2.04003
CP.C.D16.B2.04109
CP.C.D16.B2.04289
CP.C.D16.B2.04177
Earthing and Lightning Protection System
CP.C.D16.B2.02107
CP.C.D16.B2.04383
External Work
MEP
CP.C.D15.B2.03110
CP.C.D15.B2.03303
Zone 2 A
Mechanical Work
Plumbing Work
CP.C.D15.B2.09109
Drainage System
CP.C.D15.B2.03891
CP.C.D15.B2.03858
CP.C.D15.B2.03857
CP.C.D15.B2.03969
CP.C.D15.B2.04040
Water Supply System
CP.C.D15.B2.03841
CP.C.D15.B2.03890
CP.C.D15.B2.03943
CP.C.D15.B2.04049
CP.C.D15.B2.04117
CP.C.D15.B2.04209
Fire Fighting Work
CP.C.D15.B2.03944
CP.C.D15.B2.03983
CP.C.D15.B2.04274
CP.C.D15.B2.04132
CP.C.D15.B2.04210
CP.C.D15.B2.04737
CP.C.D15.B2.05371
CP.C.D15.B2.05526
CP.C.D15.B2.05650
HVAC Work
Duct & Pipes Work
CP.C.D15.B2.04222
CP.C.D15.B2.04225
CP.C.D15.B2.04419
CP.C.D15.B2.03950
CP.C.D15.B2.04014
CP.C.D15.B2.04223
CP.C.D15.B2.04508
CP.C.D15.B2.04224
CP.C.D15.B2.04297
CP.C.D15.B2.04865
Equipment Work
CP.C.D15.B2.03111
CP.C.D15.B2.03112
CP.C.D15.B2.03113
CP.C.D15.B2.03271
CP.C.D15.B2.03272
CP.C.D15.B2.03273
Electrical Work
Lighting System Work
CP.C.D16.B2.03827
CP.C.D16.B2.03896
CP.C.D16.B2.04015
CP.C.D16.B2.04158
CP.C.D16.B2.04341
CP.C.D16.B2.05565
CP.C.D16.B2.04235
Power Distribution Work
CP.C.D16.B2.03830
CP.C.D16.B2.03845
CP.C.D16.B2.04157
CP.C.D16.B2.03893
CP.C.D16.B2.03974
CP.C.D16.B2.04229
CP.C.D16.B2.04336
CP.C.D16.B2.04479
CP.C.D16.B2.03114
CP.C.D16.B2.05372
CP.C.D16.B2.05603
CP.C.D16.B2.03373
CP.C.D16.B2.04101
CP.C.D16.B2.05762
CP.C.D16.B2.03494
CP.C.D16.B2.04041
CP.C.D16.B2.03493
CP.C.D16.B2.05761
Power System Work
CP.C.D16.B2.03834
CP.C.D16.B2.03842
CP.C.D16.B2.03907
CP.C.D16.B2.04074
CP.C.D16.B2.04230
CP.C.D16.B2.04133
Low Current Systems Work
Data System Work
CP.C.D16.B2.03908
CP.C.D16.B2.03846
CP.C.D16.B2.04025
CP.C.D16.B2.02108
CP.C.D16.B2.02109
CP.C.D16.B2.04254
CP.C.D16.B2.04255
Fire Alarm System Work
CP.C.D16.B2.03828
CP.C.D16.B2.03843
CP.C.D16.B2.03897
CP.C.D16.B2.04024
CP.C.D16.B2.04086
CP.C.D16.B2.04085
CP.C.D16.B2.04160
CCTV
CP.C.D16.B2.03909
CP.C.D16.B2.03847
CP.C.D16.B2.03975
CP.C.D16.B2.04118
CP.C.D16.B2.04298
CP.C.D16.B2.04198
Access Control
CP.C.D16.B2.03910
CP.C.D16.B2.03848
CP.C.D16.B2.04026
CP.C.D16.B2.04161
CP.C.D16.B2.04350
CP.C.D16.B2.04256
Digital Signage System
CP.C.D16.B2.03912
CP.C.D16.B2.03850
CP.C.D16.B2.04028
CP.C.D16.B2.04163
CP.C.D16.B2.04258
CP.C.D16.B2.04259
PAVA System
CP.C.D16.B2.03911
CP.C.D16.B2.03849
CP.C.D16.B2.04027
CP.C.D16.B2.04162
CP.C.D16.B2.04351
CP.C.D16.B2.04257
BMS System
CP.C.D16.B2.03831
CP.C.D16.B2.03898
CP.C.D16.B2.03999
CP.C.D16.B2.04088
CP.C.D16.B2.04000
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B2.03829
CP.C.D16.B2.03844
CP.C.D16.B2.03892
CP.C.D16.B2.03968
CP.C.D16.B2.04087
CP.C.D16.B2.04022
Earthing and Lightning Protection System
CP.C.D16.B2.02110
CP.C.D16.B2.04159
External Work
MEP
CP.C.D15.B2.03115
CP.C.D15.B2.03304
Zone 2 B
Mechanical Work
Plumbing Work
CP.C.D15.B2.09110
CP.C.D15.B2.03119
CP.C.D15.B2.03277
Drainage System
CP.C.D15.B2.02115
CP.C.D15.B2.02113
CP.C.D15.B2.02114
CP.C.D15.B2.02116
CP.C.D15.B2.03120
CP.C.D15.B2.03278
CP.C.D15.B2.02212
Water Supply System
CP.C.D15.B2.02112
CP.C.D15.B2.02196
CP.C.D15.B2.04275
CP.C.D15.B2.04139
CP.C.D15.B2.04376
CP.C.D15.B2.04480
Fire Fighting Work
CP.C.D15.B2.02197
CP.C.D15.B2.02245
CP.C.D15.B2.02460
CP.C.D15.B2.02364
CP.C.D15.B2.02415
CP.C.D15.B2.05567
CP.C.D15.B2.05374
CP.C.D15.B2.05527
CP.C.D15.B2.05711
HVAC Work
Duct & Pipes Work
CP.C.D15.B2.04402
CP.C.D15.B2.04529
CP.C.D15.B2.04851
CP.C.D15.B2.04957
CP.C.D15.B2.04852
CP.C.D15.B2.05259
CP.C.D15.B2.04854
CP.C.D15.B2.05123
CP.C.D15.B2.04853
CP.C.D15.B2.05710
Equipment Work
CP.C.D15.B2.03116
CP.C.D15.B2.03117
CP.C.D15.B2.03118
CP.C.D15.B2.03274
CP.C.D15.B2.03275
CP.C.D15.B2.03276
Electrical Work
Lighting System Work
CP.C.D16.B2.04102
CP.C.D16.B2.04299
CP.C.D16.B2.04530
CP.C.D16.B2.04776
CP.C.D16.B2.05015
CP.C.D16.B2.05767
CP.C.D16.B2.04873
Power Distribution Work
CP.C.D16.B2.04105
CP.C.D16.B2.04775
CP.C.D16.B2.04143
CP.C.D16.B2.04277
CP.C.D16.B2.04470
CP.C.D16.B2.04867
CP.C.D16.B2.05004
CP.C.D16.B2.05209
CP.C.D16.B2.03121
CP.C.D16.B2.05375
CP.C.D16.B2.05604
CP.C.D16.B2.03374
CP.C.D16.B2.04698
CP.C.D16.B2.05766
CP.C.D16.B2.03496
CP.C.D16.B2.04576
CP.C.D16.B2.03495
CP.C.D16.B2.05765
Power System Work
CP.C.D16.B2.04119
CP.C.D16.B2.04140
CP.C.D16.B2.04322
CP.C.D16.B2.04637
CP.C.D16.B2.04868
CP.C.D16.B2.04738
Low Current Systems Work
Data System Work
CP.C.D16.B2.04323
CP.C.D16.B2.04144
CP.C.D16.B2.04558
CP.C.D16.B2.02117
CP.C.D16.B2.02118
CP.C.D16.B2.04904
CP.C.D16.B2.04905
Fire Alarm System Work
CP.C.D16.B2.04103
CP.C.D16.B2.04141
CP.C.D16.B2.04300
CP.C.D16.B2.04557
CP.C.D16.B2.04670
CP.C.D16.B2.04669
CP.C.D16.B2.04782
CCTV
CP.C.D16.B2.04324
CP.C.D16.B2.04145
CP.C.D16.B2.04471
CP.C.D16.B2.04717
CP.C.D16.B2.04958
CP.C.D16.B2.04828
Access Control
CP.C.D16.B2.04325
CP.C.D16.B2.04146
CP.C.D16.B2.04559
CP.C.D16.B2.04783
CP.C.D16.B2.05026
CP.C.D16.B2.04906
Digital Signage System
CP.C.D16.B2.04327
CP.C.D16.B2.04148
CP.C.D16.B2.04561
CP.C.D16.B2.04785
CP.C.D16.B2.04908
CP.C.D16.B2.04909
PAVA System
CP.C.D16.B2.04326
CP.C.D16.B2.04147
CP.C.D16.B2.04784
CP.C.D16.B2.04560
CP.C.D16.B2.05027
CP.C.D16.B2.04907
BMS System
CP.C.D16.B2.04106
CP.C.D16.B2.04301
CP.C.D16.B2.04509
CP.C.D16.B2.04672
CP.C.D16.B2.04510
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B2.04104
CP.C.D16.B2.04142
CP.C.D16.B2.04276
CP.C.D16.B2.04444
CP.C.D16.B2.04671
CP.C.D16.B2.04547
Earthing and Lightning Protection System
CP.C.D16.B2.02119
CP.C.D16.B2.04777
External Work
MEP
CP.C.D15.B2.03123
CP.C.D15.B2.03174
CP.C.D15.B2.03305
CP.C.D15.B2.00828
Zone 3 A
Mechanical Work
Plumbing Work
CP.C.D15.B2.02529
Drainage System
CP.C.D15.B2.02199
CP.C.D15.B2.02122
CP.C.D15.B2.02299
CP.C.D15.B2.02331
Water Supply System
CP.C.D15.B2.02198
CP.C.D15.B2.02246
CP.C.D15.B2.02357
CP.C.D15.B2.02416
CP.C.D15.B2.03127
CP.C.D15.B2.02489
CP.C.D15.B2.03282
Fire Fighting Work
CP.C.D15.B2.02247
CP.C.D15.B2.02307
CP.C.D15.B2.02542
CP.C.D15.B2.02433
CP.C.D15.B2.02490
CP.C.D15.B2.02733
CP.C.D15.B2.05377
CP.C.D15.B2.05528
CP.C.D15.B2.05651
HVAC Work
Duct & Pipes Work
CP.C.D15.B2.02566
CP.C.D15.B2.02568
CP.C.D15.B2.02671
CP.C.D15.B2.02565
CP.C.D15.B2.02313
CP.C.D15.B2.02383
CP.C.D15.B2.02692
CP.C.D15.B2.02633
CP.C.D15.B2.02567
CP.C.D15.B2.02757
Equipment Work
CP.C.D15.B2.03124
CP.C.D15.B2.03125
CP.C.D15.B2.03126
CP.C.D15.B2.03279
CP.C.D15.B2.03280
CP.C.D15.B2.03281
Electrical Work
Lighting System Work
CP.C.D16.B2.02125
CP.C.D16.B2.02384
CP.C.D16.B2.02513
CP.C.D16.B2.02649
CP.C.D16.B2.05568
CP.C.D16.B2.02589
Power Distribution Work
CP.C.D16.B2.02512
CP.C.D16.B2.02579
CP.C.D16.B2.02642
CP.C.D16.B2.02684
CP.C.D16.B2.03128
CP.C.D16.B2.03375
CP.C.D16.B2.03498
CP.C.D16.B2.02124
CP.C.D16.B2.03497
Power System Work
CP.C.D16.B2.02153
CP.C.D16.B2.02278
CP.C.D16.B2.02434
CP.C.D16.B2.02580
CP.C.D16.B2.02496
Low Current Systems Work
Data System Work
CP.C.D16.B2.02279
CP.C.D16.B2.02396
CP.C.D16.B2.02131
CP.C.D16.B2.02132
CP.C.D16.B2.02603
CP.C.D16.B2.02604
Fire Alarm System Work
CP.C.D16.B2.02126
CP.C.D16.B2.02261
CP.C.D16.B2.02395
CP.C.D16.B2.02451
CP.C.D16.B2.02450
CP.C.D16.B2.02530
CCTV
CP.C.D16.B2.02280
CP.C.D16.B2.02332
CP.C.D16.B2.02476
CP.C.D16.B2.02634
CP.C.D16.B2.02548
Access Control
CP.C.D16.B2.02281
CP.C.D16.B2.02397
CP.C.D16.B2.02531
CP.C.D16.B2.02654
CP.C.D16.B2.02605
Digital Signage System
CP.C.D16.B2.02283
CP.C.D16.B2.02399
CP.C.D16.B2.02533
CP.C.D16.B2.02607
CP.C.D16.B2.02608
PAVA System
CP.C.D16.B2.02282
CP.C.D16.B2.02398
CP.C.D16.B2.02532
CP.C.D16.B2.02655
CP.C.D16.B2.02606
BMS System
CP.C.D16.B2.02136
CP.C.D16.B2.02262
CP.C.D16.B2.02359
CP.C.D16.B2.02452
CP.C.D16.B2.02360
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B2.02128
CP.C.D16.B2.02215
CP.C.D16.B2.02314
CP.C.D16.B2.02421
CP.C.D16.B2.02358
Earthing and Lightning Protection System
CP.C.D16.B2.02137
CP.C.D16.B2.02514
External Work
MEP
CP.C.D15.B2.03130
CP.C.D15.B2.03175
CP.C.D15.B2.03306
Zone 3 B
Mechanical Work
Plumbing Work
CP.C.D15.B2.09111
Drainage System
CP.C.D15.B2.04059
CP.C.D15.B2.04135
CP.C.D15.B2.04302
CP.C.D15.B2.04058
CP.C.D15.B2.04406
Water Supply System
CP.C.D15.B2.04134
CP.C.D15.B2.04231
CP.C.D15.B2.04445
CP.C.D15.B2.04057
CP.C.D15.B2.03132
CP.C.D15.B2.04548
CP.C.D15.B2.03284
CP.C.D15.B2.04673
Fire Fighting Work
CP.C.D15.B2.04232
CP.C.D15.B2.04337
CP.C.D15.B2.04739
CP.C.D15.B2.04578
CP.C.D15.B2.04674
CP.C.D15.B2.05397
CP.C.D15.B2.05378
CP.C.D15.B2.05529
CP.C.D15.B2.05652
HVAC Work
Duct & Pipes Work
CP.C.D15.B2.04718
CP.C.D15.B2.04291
CP.C.D15.B2.04810
CP.C.D15.B2.05070
CP.C.D15.B2.04405
CP.C.D15.B2.04719
CP.C.D15.B2.04721
CP.C.D15.B2.04720
CP.C.D15.B2.04959
CP.C.D15.B2.05541
Equipment Work
CP.C.D15.B2.03131
CP.C.D15.B2.03283
Electrical Work
Lighting System Work
CP.C.D16.B2.04029
CP.C.D16.B2.04180
CP.C.D16.B2.04407
CP.C.D16.B2.04639
CP.C.D16.B2.04869
CP.C.D16.B2.05607
CP.C.D16.B2.04740
Power Distribution Work
CP.C.D16.B2.04638
CP.C.D16.B2.04729
CP.C.D16.B2.04855
CP.C.D16.B2.05028
CP.C.D16.B2.03133
CP.C.D16.B2.03376
CP.C.D16.B2.03500
CP.C.D16.B2.02138
CP.C.D16.B2.03499
Power System Work
CP.C.D16.B2.04045
CP.C.D16.B2.04060
CP.C.D16.B2.04211
CP.C.D16.B2.04511
CP.C.D16.B2.04730
CP.C.D16.B2.04604
Low Current Systems Work
Data System Work
CP.C.D16.B2.04212
CP.C.D16.B2.04063
CP.C.D16.B2.04432
CP.C.D16.B2.02139
CP.C.D16.B2.02140
CP.C.D16.B2.04759
CP.C.D16.B2.04760
Fire Alarm System Work
CP.C.D16.B2.04030
CP.C.D16.B2.04061
CP.C.D16.B2.04181
CP.C.D16.B2.04431
CP.C.D16.B2.04532
CP.C.D16.B2.04531
CP.C.D16.B2.04648
CCTV
CP.C.D16.B2.04213
CP.C.D16.B2.04064
CP.C.D16.B2.04342
CP.C.D16.B2.04582
CP.C.D16.B2.04811
CP.C.D16.B2.04699
Access Control
CP.C.D16.B2.04214
CP.C.D16.B2.04065
CP.C.D16.B2.04433
CP.C.D16.B2.04649
CP.C.D16.B2.04874
CP.C.D16.B2.04761
Digital Signage System
CP.C.D16.B2.04216
CP.C.D16.B2.04067
CP.C.D16.B2.04435
CP.C.D16.B2.04651
CP.C.D16.B2.04763
CP.C.D16.B2.04764
PAVA System
CP.C.D16.B2.04215
CP.C.D16.B2.04066
CP.C.D16.B2.04434
CP.C.D16.B2.04650
CP.C.D16.B2.04875
CP.C.D16.B2.04762
BMS System
CP.C.D16.B2.04032
CP.C.D16.B2.04182
CP.C.D16.B2.04385
CP.C.D16.B2.04534
CP.C.D16.B2.04386
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B2.04031
CP.C.D16.B2.04062
CP.C.D16.B2.04164
CP.C.D16.B2.04328
CP.C.D16.B2.04533
CP.C.D16.B2.04420
Earthing and Lightning Protection System
CP.C.D16.B2.02141
CP.C.D16.B2.04640
External Work
MEP
CP.C.D15.B2.03134
CP.C.D15.B2.03176
CP.C.D15.B2.03307
Zone 3 C
Mechanical Work
Plumbing Work
CP.C.D15.B2.09112
Drainage System
CP.C.D15.B2.03987
CP.C.D15.B2.03988
CP.C.D15.B2.04051
CP.C.D15.B2.04183
CP.C.D15.B2.04294
Water Supply System
CP.C.D15.B2.04050
CP.C.D15.B2.04129
CP.C.D15.B2.03986
CP.C.D15.B2.04329
CP.C.D15.B2.04421
CP.C.D15.B2.04535
Fire Fighting Work
CP.C.D15.B2.04130
CP.C.D15.B2.04226
CP.C.D15.B2.04605
CP.C.D15.B2.04447
CP.C.D15.B2.04536
CP.C.D15.B2.05213
CP.C.D15.B2.05381
CP.C.D15.B2.05530
CP.C.D15.B2.05653
HVAC Work
Duct & Pipes Work
CP.C.D15.B2.04583
CP.C.D15.B2.04173
CP.C.D15.B2.04683
CP.C.D15.B2.04293
CP.C.D15.B2.04584
CP.C.D15.B2.04919
CP.C.D15.B2.04586
CP.C.D15.B2.04585
CP.C.D15.B2.04812
CP.C.D15.B2.05380
Equipment Work
CP.C.D15.B2.03135
CP.C.D15.B2.03285
Electrical Work
Lighting System Work
CP.C.D16.B2.03956
CP.C.D16.B2.04093
CP.C.D16.B2.04295
CP.C.D16.B2.04513
CP.C.D16.B2.04731
CP.C.D16.B2.05570
CP.C.D16.B2.04606
Power Distribution Work
CP.C.D16.B2.04512
CP.C.D16.B2.04597
CP.C.D16.B2.04722
CP.C.D16.B2.04876
CP.C.D16.B2.03136
CP.C.D16.B2.03377
CP.C.D16.B2.03502
CP.C.D16.B2.02142
CP.C.D16.B2.03501
Power System Work
CP.C.D16.B2.03970
CP.C.D16.B2.03989
CP.C.D16.B2.04110
CP.C.D16.B2.04387
CP.C.D16.B2.04598
CP.C.D16.B2.04481
Low Current Systems Work
Data System Work
CP.C.D16.B2.04111
CP.C.D16.B2.03992
CP.C.D16.B2.04313
CP.C.D16.B2.01907
CP.C.D16.B2.01908
CP.C.D16.B2.04623
CP.C.D16.B2.04624
Fire Alarm System Work
CP.C.D16.B2.03957
CP.C.D16.B2.03990
CP.C.D16.B2.04094
CP.C.D16.B2.04312
CP.C.D16.B2.04409
CP.C.D16.B2.04408
CP.C.D16.B2.04521
CCTV
CP.C.D16.B2.04112
CP.C.D16.B2.03993
CP.C.D16.B2.04233
CP.C.D16.B2.04456
CP.C.D16.B2.04684
CP.C.D16.B2.04562
Access Control
CP.C.D16.B2.04113
CP.C.D16.B2.03994
CP.C.D16.B2.04314
CP.C.D16.B2.04522
CP.C.D16.B2.04741
CP.C.D16.B2.04625
Digital Signage System
CP.C.D16.B2.04115
CP.C.D16.B2.03996
CP.C.D16.B2.04316
CP.C.D16.B2.04524
CP.C.D16.B2.04627
CP.C.D16.B2.04628
PAVA System
CP.C.D16.B2.04114
CP.C.D16.B2.03995
CP.C.D16.B2.04315
CP.C.D16.B2.04523
CP.C.D16.B2.04742
CP.C.D16.B2.04626
BMS System
CP.C.D16.B2.03959
CP.C.D16.B2.04095
CP.C.D16.B2.04267
CP.C.D16.B2.04411
CP.C.D16.B2.04268
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B2.03958
CP.C.D16.B2.03991
CP.C.D16.B2.04077
CP.C.D16.B2.04217
CP.C.D16.B2.04410
CP.C.D16.B2.04303
Earthing and Lightning Protection System
CP.C.D16.B2.02143
CP.C.D16.B2.04514
External Work
MEP
CP.C.D15.B2.03137
CP.C.D15.B2.03177
CP.C.D15.B2.03308
Basement 1
Zone 1 A
Mechanical Work
Plumbing Work
CP.C.D15.B1.02519
Drainage System
CP.C.D15.B1.02186
CP.C.D15.B1.02013
CP.C.D15.B1.02295
CP.C.D15.B1.02326
Water Supply System
CP.C.D15.B1.02185
CP.C.D15.B1.02236
CP.C.D15.B1.02344
CP.C.D15.B1.02410
CP.C.D15.B1.02481
Fire Fighting Work
CP.C.D15.B1.02237
CP.C.D15.B1.02303
CP.C.D15.B1.02424
CP.C.D15.B1.02538
CP.C.D15.B1.02482
CP.C.D15.B1.03036
CP.C.D15.B1.03387
CP.C.D15.B1.03433
CP.C.D15.B1.02891
CP.C.D15.B1.05352
CP.C.D15.B1.05512
CP.C.D15.B1.05644
HVAC Work
Duct & Pipes Work
CP.C.D15.B1.02553
CP.C.D15.B1.02629
CP.C.D15.B1.02308
CP.C.D15.B1.02371
CP.C.D15.B1.02555
CP.C.D15.B1.02556
CP.C.D15.B1.02668
CP.C.D15.B1.02554
CP.C.D15.B1.02688
CP.C.D15.B1.02936
Equipment Work
CP.C.D15.B1.03033
CP.C.D15.B1.03034
CP.C.D15.B1.03035
CP.C.D15.B1.03219
CP.C.D15.B1.03220
CP.C.D15.B1.03221
Electrical Work
Lighting System Work
CP.C.D16.B1.10013
CP.C.D16.B1.02015
CP.C.D16.B1.02372
CP.C.D16.B1.02500
CP.C.D16.B1.02645
CP.C.D16.B1.05552
CP.C.D16.B1.02585
Power Distribution Work
CP.C.D16.B1.10016
CP.C.D16.B1.02775
CP.C.D16.B1.02499
CP.C.D16.B1.02816
CP.C.D16.B1.02892
CP.C.D16.B1.02572
CP.C.D16.B1.02639
CP.C.D16.B1.02681
CP.C.D16.B1.03037
CP.C.D16.B1.05353
CP.C.D16.B1.05591
CP.C.D16.B1.05742
CP.C.D16.B1.05744
CP.C.D16.B1.03362
CP.C.D16.B1.05743
CP.C.D16.B1.03146
CP.C.D16.B1.03468
CP.C.D16.B1.02930
CP.C.D16.B1.03467
Power System Work
CP.C.D16.B1.10012
CP.C.D16.B1.02149
CP.C.D16.B1.02269
CP.C.D16.B1.02425
CP.C.D16.B1.02573
CP.C.D16.B1.02492
Low Current Systems Work
Data System Work
CP.C.D16.B1.10017
CP.C.D16.B1.02776
CP.C.D16.B1.02843
CP.C.D16.B1.02021
CP.C.D16.B1.02022
CP.C.D16.B1.02954
CP.C.D16.B1.02955
Fire Alarm System Work
CP.C.D16.B1.10014
CP.C.D16.B1.02016
CP.C.D16.B1.02249
CP.C.D16.B1.02387
CP.C.D16.B1.02439
CP.C.D16.B1.02438
CP.C.D16.B1.02520
CCTV
CP.C.D16.B1.10018
CP.C.D16.B1.02777
CP.C.D16.B1.02814
CP.C.D16.B1.02899
CP.C.D16.B1.03150
CP.C.D16.B1.02937
Access Control
CP.C.D16.B1.10019
CP.C.D16.B1.02778
CP.C.D16.B1.02844
CP.C.D16.B1.02920
CP.C.D16.B1.03222
CP.C.D16.B1.02956
Digital Signage System
CP.C.D16.B1.10022
CP.C.D16.B1.02781
CP.C.D16.B1.02846
CP.C.D16.B1.02922
CP.C.D16.B1.02959
CP.C.D16.B1.02960
PAVA System
CP.C.D16.B1.10021
CP.C.D16.B1.02780
CP.C.D16.B1.02845
CP.C.D16.B1.02921
CP.C.D16.B1.03223
CP.C.D16.B1.02958
BMS System
CP.C.D16.B1.10023
CP.C.D16.B1.02027
CP.C.D16.B1.02250
CP.C.D16.B1.02345
CP.C.D16.B1.02440
CP.C.D16.B1.02346
Guest Room Management System
CP.C.D16.B1.10020
CP.C.D16.B1.02779
CP.C.D16.B1.02806
CP.C.D16.B1.02882
CP.C.D16.B1.02957
CP.C.D16.B1.02915
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B1.10015
CP.C.D16.B1.02774
CP.C.D16.B1.02815
CP.C.D16.B1.02886
CP.C.D16.B1.02962
CP.C.D16.B1.02919
Earthing and Lightning Protection System
CP.C.D16.B1.02501
CP.C.D16.B1.02028
Zone 1 B
Mechanical Work
Plumbing Work
CP.C.D15.B1.09100
Drainage System
CP.C.D15.B1.04473
CP.C.D15.B1.04358
CP.C.D15.B1.04677
CP.C.D15.B1.04793
CP.C.D15.B1.04357
Water Supply System
CP.C.D15.B1.04472
CP.C.D15.B1.04591
CP.C.D15.B1.04831
CP.C.D15.B1.04950
CP.C.D15.B1.04356
CP.C.D15.B1.05089
Fire Fighting Work
CP.C.D15.B1.04592
CP.C.D15.B1.04714
CP.C.D15.B1.05196
CP.C.D15.B1.04982
CP.C.D15.B1.05090
CP.C.D15.B1.03040
CP.C.D15.B1.03388
CP.C.D15.B1.03434
CP.C.D15.B1.05878
CP.C.D15.B1.05354
CP.C.D15.B1.05513
CP.C.D15.B1.06040
HVAC Work
Duct & Pipes Work
CP.C.D15.B1.05163
CP.C.D15.B1.05289
CP.C.D15.B1.04662
CP.C.D15.B1.04792
CP.C.D15.B1.05614
CP.C.D15.B1.05165
CP.C.D15.B1.05166
CP.C.D15.B1.05472
CP.C.D15.B1.05164
CP.C.D15.B1.06039
Equipment Work
CP.C.D15.B1.03039
CP.C.D15.B1.03038
CP.C.D15.B1.03224
CP.C.D15.B1.03225
LPG System
Equipment Work
CP.C.D15.B1.03043
CP.C.D15.B1.03041
CP.C.D15.B1.03042
CP.C.D15.B1.03228
CP.C.D15.B1.03227
CP.C.D15.B1.03226
Electrical Work
Lighting System Work
CP.C.D16.B1.10025
CP.C.D16.B1.04305
CP.C.D16.B1.04539
CP.C.D16.B1.04794
CP.C.D16.B1.05064
CP.C.D16.B1.05355
CP.C.D16.B1.06101
CP.C.D16.B1.05197
Power Distribution Work
CP.C.D16.B1.05063
CP.C.D16.B1.05176
CP.C.D16.B1.05331
CP.C.D16.B1.05553
CP.C.D16.B1.05857
CP.C.D16.B1.03044
CP.C.D16.B1.03363
CP.C.D16.B1.03470
CP.C.D16.B1.02029
CP.C.D16.B1.03469
Power System Work
CP.C.D16.B1.10024
CP.C.D16.B1.04359
CP.C.D16.B1.04330
CP.C.D16.B1.04567
CP.C.D16.B1.04912
CP.C.D16.B1.05177
CP.C.D16.B1.05021
Low Current Systems Work
Data System Work
CP.C.D16.B1.10028
CP.C.D16.B1.04568
CP.C.D16.B1.04362
CP.C.D16.B1.04821
CP.C.D16.B1.02030
CP.C.D16.B1.02031
CP.C.D16.B1.05236
CP.C.D16.B1.05237
Fire Alarm System Work
CP.C.D16.B1.10026
CP.C.D16.B1.04306
CP.C.D16.B1.04360
CP.C.D16.B1.04540
CP.C.D16.B1.04820
CP.C.D16.B1.04935
CP.C.D16.B1.04934
CP.C.D16.B1.05073
CCTV
CP.C.D16.B1.10029
CP.C.D16.B1.04569
CP.C.D16.B1.04363
CP.C.D16.B1.04725
CP.C.D16.B1.04998
CP.C.D16.B1.05290
CP.C.D16.B1.05134
Access Control
CP.C.D16.B1.10030
CP.C.D16.B1.04570
CP.C.D16.B1.04364
CP.C.D16.B1.04822
CP.C.D16.B1.05074
CP.C.D16.B1.05390
CP.C.D16.B1.05238
Digital Signage System
CP.C.D16.B1.10033
CP.C.D16.B1.04573
CP.C.D16.B1.04367
CP.C.D16.B1.04824
CP.C.D16.B1.05076
CP.C.D16.B1.05241
CP.C.D16.B1.05242
PAVA System
CP.C.D16.B1.10032
CP.C.D16.B1.04366
CP.C.D16.B1.04572
CP.C.D16.B1.04823
CP.C.D16.B1.05075
CP.C.D16.B1.05391
CP.C.D16.B1.05240
BMS System
CP.C.D16.B1.10034
CP.C.D16.B1.04308
CP.C.D16.B1.04541
CP.C.D16.B1.04771
CP.C.D16.B1.04938
CP.C.D16.B1.04772
Guest Room Management System
CP.C.D16.B1.10031
CP.C.D16.B1.04365
CP.C.D16.B1.04571
CP.C.D16.B1.04703
CP.C.D16.B1.04937
CP.C.D16.B1.05239
CP.C.D16.B1.05065
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B1.10027
CP.C.D16.B1.04307
CP.C.D16.B1.04361
CP.C.D16.B1.04517
CP.C.D16.B1.04702
CP.C.D16.B1.04936
CP.C.D16.B1.04804
Earthing and Lightning Protection System
CP.C.D16.B1.02032
CP.C.D16.B1.05066
Zone 1 C
Mechanical Work
Plumbing Work
CP.C.D15.B1.02521
Drainage System
CP.C.D15.B1.02035
CP.C.D15.B1.02188
CP.C.D15.B1.02296
CP.C.D15.B1.02327
Water Supply System
CP.C.D15.B1.02187
CP.C.D15.B1.02238
CP.C.D15.B1.02347
CP.C.D15.B1.02411
CP.C.D15.B1.02483
Fire Fighting Work
CP.C.D15.B1.02239
CP.C.D15.B1.02304
CP.C.D15.B1.02426
CP.C.D15.B1.02539
CP.C.D15.B1.02484
CP.C.D15.B1.03048
CP.C.D15.B1.03389
CP.C.D15.B1.03435
CP.C.D15.B1.03419
CP.C.D15.B1.05357
CP.C.D15.B1.05514
CP.C.D15.B1.05645
HVAC Work
Duct & Pipes Work
CP.C.D15.B1.02557
CP.C.D15.B1.02630
CP.C.D15.B1.02309
CP.C.D15.B1.02374
CP.C.D15.B1.02689
CP.C.D15.B1.02560
CP.C.D15.B1.02558
CP.C.D15.B1.02559
CP.C.D15.B1.02669
CP.C.D15.B1.03512
Equipment Work
CP.C.D15.B1.03045
CP.C.D15.B1.03046
CP.C.D15.B1.03047
CP.C.D15.B1.03229
CP.C.D15.B1.03230
CP.C.D15.B1.03231
LPG System
Equipment Work
CP.C.D15.B1.03049
CP.C.D15.B1.03232
Electrical Work
Lighting System Work
CP.C.D16.B1.10051
CP.C.D16.B1.02037
CP.C.D16.B1.02375
CP.C.D16.B1.02503
CP.C.D16.B1.02646
CP.C.D16.B1.05554
CP.C.D16.B1.02586
Power Distribution Work
CP.C.D16.B1.10054
CP.C.D16.B1.02964
CP.C.D16.B1.02502
CP.C.D16.B1.03318
CP.C.D16.B1.03420
CP.C.D16.B1.02574
CP.C.D16.B1.03529
CP.C.D16.B1.03508
CP.C.D16.B1.02640
CP.C.D16.B1.02682
CP.C.D16.B1.03050
CP.C.D16.B1.05358
CP.C.D16.B1.05745
CP.C.D16.B1.05592
CP.C.D16.B1.05747
CP.C.D16.B1.03364
CP.C.D16.B1.05746
CP.C.D16.B1.03472
CP.C.D16.B1.03471
Power System Work
CP.C.D16.B1.10050
CP.C.D16.B1.02150
CP.C.D16.B1.02270
CP.C.D16.B1.02427
CP.C.D16.B1.02575
CP.C.D16.B1.02493
Low Current Systems Work
Data System Work
CP.C.D16.B1.10055
CP.C.D16.B1.02965
CP.C.D16.B1.03339
CP.C.D16.B1.02043
CP.C.D16.B1.02044
CP.C.D16.B1.03520
CP.C.D16.B1.03521
Fire Alarm System Work
CP.C.D16.B1.10052
CP.C.D16.B1.02038
CP.C.D16.B1.02252
CP.C.D16.B1.02388
CP.C.D16.B1.02442
CP.C.D16.B1.02441
CP.C.D16.B1.02522
CCTV
CP.C.D16.B1.10056
CP.C.D16.B1.02966
CP.C.D16.B1.03313
CP.C.D16.B1.03424
CP.C.D16.B1.03530
CP.C.D16.B1.03513
Access Control
CP.C.D16.B1.10057
CP.C.D16.B1.02967
CP.C.D16.B1.03340
CP.C.D16.B1.03474
CP.C.D16.B1.03539
CP.C.D16.B1.03522
Digital Signage System
CP.C.D16.B1.10060
CP.C.D16.B1.02970
CP.C.D16.B1.03342
CP.C.D16.B1.03476
CP.C.D16.B1.03525
CP.C.D16.B1.03526
PAVA System
CP.C.D16.B1.10059
CP.C.D16.B1.02969
CP.C.D16.B1.03341
CP.C.D16.B1.03475
CP.C.D16.B1.03540
CP.C.D16.B1.03524
BMS System
CP.C.D16.B1.10061
CP.C.D16.B1.02049
CP.C.D16.B1.02253
CP.C.D16.B1.02348
CP.C.D16.B1.02443
CP.C.D16.B1.02349
Guest Room Management System
CP.C.D16.B1.10058
CP.C.D16.B1.02968
CP.C.D16.B1.03296
CP.C.D16.B1.03415
CP.C.D16.B1.03523
CP.C.D16.B1.03442
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B1.10053
CP.C.D16.B1.02963
CP.C.D16.B1.03317
CP.C.D16.B1.03416
CP.C.D16.B1.03527
CP.C.D16.B1.03473
Earthing and Lightning Protection System
CP.C.D16.B1.02050
CP.C.D16.B1.02504
Zone 2 A
Mechanical Work
Plumbing Work
CP.C.D15.B1.03057
CP.C.D15.B1.09101
CP.C.D15.B1.03238
Drainage System
CP.C.D15.B1.04243
CP.C.D15.B1.04346
CP.C.D15.B1.04242
CP.C.D15.B1.04543
CP.C.D15.B1.04848
CP.C.D15.B1.02051
CP.C.D15.B1.04666
CP.C.D15.B1.04667
CP.C.D15.B1.06359
CP.C.D15.B1.06602
Water Supply System
CP.C.D15.B1.04241
CP.C.D15.B1.04345
CP.C.D15.B1.04465
CP.C.D15.B1.04704
CP.C.D15.B1.04805
CP.C.D15.B1.04939
Fire Fighting Work
CP.C.D15.B1.04579
CP.C.D15.B1.04466
CP.C.D15.B1.04833
CP.C.D15.B1.05022
CP.C.D15.B1.04940
CP.C.D15.B1.03058
CP.C.D15.B1.03390
CP.C.D15.B1.03436
CP.C.D15.B1.05868
CP.C.D15.B1.05359
CP.C.D15.B1.05515
CP.C.D15.B1.06013
HVAC Work
Duct & Pipes Work
CP.C.D15.B1.04999
CP.C.D15.B1.05118
CP.C.D15.B1.04527
CP.C.D15.B1.04665
CP.C.D15.B1.05001
CP.C.D15.B1.05432
CP.C.D15.B1.05002
CP.C.D15.B1.05291
CP.C.D15.B1.05000
CP.C.D15.B1.06012
Equipment Work
CP.C.D15.B1.03054
CP.C.D15.B1.03235
CP.C.D15.B1.03053
CP.C.D15.B1.03052
CP.C.D15.B1.03233
CP.C.D15.B1.03234
CP.C.D15.B1.03055
CP.C.D15.B1.03056
CP.C.D15.B1.03236
CP.C.D15.B1.03237
CP.C.D15.B1.05431
Electrical Work
Lighting System Work
CP.C.D16.B1.10001
CP.C.D16.B1.04188
CP.C.D16.B1.04414
CP.C.D16.B1.04668
CP.C.D16.B1.04914
CP.C.D16.B1.05178
CP.C.D16.B1.06052
CP.C.D16.B1.05023
Power Distribution Work
CP.C.D16.B1.10004
CP.C.D16.B1.04191
CP.C.D16.B1.04913
CP.C.D16.B1.04247
CP.C.D16.B1.04391
CP.C.D16.B1.04593
CP.C.D16.B1.05010
CP.C.D16.B1.05167
CP.C.D16.B1.05392
CP.C.D16.B1.03059
CP.C.D16.B1.05360
CP.C.D16.B1.05748
CP.C.D16.B1.05593
CP.C.D16.B1.03060
CP.C.D16.B1.05750
CP.C.D16.B1.03365
CP.C.D16.B1.03239
CP.C.D16.B1.05749
CP.C.D16.B1.03477
CP.C.D16.B1.03319
CP.C.D16.B1.04825
CP.C.D16.B1.03478
CP.C.D16.B1.04705
Power System Work
CP.C.D16.B1.10000
CP.C.D16.B1.04220
CP.C.D16.B1.04244
CP.C.D16.B1.04437
CP.C.D16.B1.04773
CP.C.D16.B1.05011
CP.C.D16.B1.04871
Low Current Systems Work
Data System Work
CP.C.D16.B1.10005
CP.C.D16.B1.04438
CP.C.D16.B1.04248
CP.C.D16.B1.04688
CP.C.D16.B1.02052
CP.C.D16.B1.02053
CP.C.D16.B1.05048
CP.C.D16.B1.05049
Fire Alarm System Work
CP.C.D16.B1.10002
CP.C.D16.B1.04189
CP.C.D16.B1.04245
CP.C.D16.B1.04415
CP.C.D16.B1.04687
CP.C.D16.B1.04796
CP.C.D16.B1.04795
CP.C.D16.B1.04920
CCTV
CP.C.D16.B1.10006
CP.C.D16.B1.04439
CP.C.D16.B1.04249
CP.C.D16.B1.04594
CP.C.D16.B1.04849
CP.C.D16.B1.05119
CP.C.D16.B1.04967
Access Control
CP.C.D16.B1.10007
CP.C.D16.B1.04440
CP.C.D16.B1.04250
CP.C.D16.B1.04689
CP.C.D16.B1.04921
CP.C.D16.B1.05200
CP.C.D16.B1.05050
Digital Signage System
CP.C.D16.B1.10010
CP.C.D16.B1.04443
CP.C.D16.B1.04253
CP.C.D16.B1.04691
CP.C.D16.B1.04923
CP.C.D16.B1.05053
CP.C.D16.B1.05054
PAVA System
CP.C.D16.B1.10009
CP.C.D16.B1.04442
CP.C.D16.B1.04252
CP.C.D16.B1.04690
CP.C.D16.B1.04922
CP.C.D16.B1.05201
CP.C.D16.B1.05052
BMS System
CP.C.D16.B1.10011
CP.C.D16.B1.04192
CP.C.D16.B1.04416
CP.C.D16.B1.04634
CP.C.D16.B1.04799
CP.C.D16.B1.04635
Guest Room Management System
CP.C.D16.B1.10008
CP.C.D16.B1.04251
CP.C.D16.B1.04441
CP.C.D16.B1.04575
CP.C.D16.B1.04798
CP.C.D16.B1.05051
CP.C.D16.B1.04915
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B1.10003
CP.C.D16.B1.04190
CP.C.D16.B1.04246
CP.C.D16.B1.04390
CP.C.D16.B1.04574
CP.C.D16.B1.04797
CP.C.D16.B1.04678
Earthing and Lightning Protection System
CP.C.D16.B1.02054
CP.C.D16.B1.04916
External Work
MEP
CP.C.D15.B1.00633
Zone 2 B
Mechanical Work
Plumbing Work
CP.C.D15.B1.09102
CP.C.D15.B1.03075
CP.C.D15.B1.03320
CP.C.D15.B1.03251
CP.C.D15.B1.03074
CP.C.D15.B1.03400
CP.C.D15.B1.03250
CP.C.D15.B1.09752
Water Supply System
CP.C.D15.B1.02055
CP.C.D15.B1.02189
CP.C.D15.B1.04924
CP.C.D15.B1.05056
CP.C.D15.B1.04748
CP.C.D15.B1.03073
CP.C.D15.B1.05202
CP.C.D15.B1.05057
CP.C.D15.B1.03249
Fire Fighting Work
CP.C.D15.B1.02240
CP.C.D15.B1.02190
CP.C.D15.B1.02363
CP.C.D15.B1.02412
CP.C.D15.B1.02459
CP.C.D15.B1.03076
CP.C.D15.B1.03391
CP.C.D15.B1.03437
CP.C.D15.B1.06590
CP.C.D15.B1.05844
CP.C.D15.B1.05977
CP.C.D15.B1.06735
HVAC Work
Duct & Pipes Work
CP.C.D15.B1.05093
CP.C.D15.B1.05699
CP.C.D15.B1.05697
CP.C.D15.B1.05276
CP.C.D15.B1.05815
CP.C.D15.B1.05698
CP.C.D15.B1.05700
CP.C.D15.B1.05960
CP.C.D15.B1.06113
CP.C.D15.B1.06734
Equipment Work
CP.C.D15.B1.03070
CP.C.D15.B1.03069
CP.C.D15.B1.03062
CP.C.D15.B1.03072
CP.C.D15.B1.03064
CP.C.D15.B1.03065
CP.C.D15.B1.03071
CP.C.D15.B1.03063
CP.C.D15.B1.03068
CP.C.D15.B1.03066
CP.C.D15.B1.03247
CP.C.D15.B1.03248
CP.C.D15.B1.03297
CP.C.D15.B1.03292
CP.C.D15.B1.03240
CP.C.D15.B1.03241
CP.C.D15.B1.03242
CP.C.D15.B1.03244
CP.C.D15.B1.03245
CP.C.D15.B1.03246
CP.C.D15.B1.06112
CP.C.D15.B1.03067
CP.C.D15.B1.03243
LPG System
Equipment Work
CP.C.D15.B1.03077
CP.C.D15.B1.03252
Pipes Work
CP.C.D15.B1.02056
CP.C.D15.B1.02170
CP.C.D15.B1.02294
CP.C.D15.B1.02171
CP.C.D15.B1.02324
Electrical Work
Lighting System Work
CP.C.D16.B1.10130
CP.C.D16.B1.04692
CP.C.D16.B1.04951
CP.C.D16.B1.05277
CP.C.D16.B1.05617
CP.C.D16.B1.05869
CP.C.D16.B1.06765
CP.C.D16.B1.05716
Power Distribution Work
CP.C.D16.B1.10133
CP.C.D16.B1.04695
CP.C.D16.B1.05616
CP.C.D16.B1.04752
CP.C.D16.B1.04926
CP.C.D16.B1.05179
CP.C.D16.B1.05707
CP.C.D16.B1.05858
CP.C.D16.B1.06053
CP.C.D16.B1.03078
CP.C.D16.B1.05845
CP.C.D16.B1.06383
CP.C.D16.B1.06042
CP.C.D16.B1.06228
CP.C.D16.B1.03366
CP.C.D16.B1.06227
CP.C.D16.B1.03479
CP.C.D16.B1.03480
CP.C.D16.B1.05488
CP.C.D16.B1.05322
Power System Work
CP.C.D16.B1.10129
CP.C.D16.B1.04716
CP.C.D16.B1.04749
CP.C.D16.B1.04983
CP.C.D16.B1.05433
CP.C.D16.B1.05708
CP.C.D16.B1.05555
Low Current Systems Work
Data System Work
CP.C.D16.B1.10134
CP.C.D16.B1.04984
CP.C.D16.B1.04753
CP.C.D16.B1.05305
CP.C.D16.B1.02057
CP.C.D16.B1.02058
CP.C.D16.B1.05751
CP.C.D16.B1.05752
Fire Alarm System Work
CP.C.D16.B1.10131
CP.C.D16.B1.04693
CP.C.D16.B1.04750
CP.C.D16.B1.04952
CP.C.D16.B1.05304
CP.C.D16.B1.05461
CP.C.D16.B1.05460
CP.C.D16.B1.05625
CCTV
CP.C.D16.B1.10135
CP.C.D16.B1.04985
CP.C.D16.B1.04754
CP.C.D16.B1.05180
CP.C.D16.B1.05516
CP.C.D16.B1.05816
CP.C.D16.B1.05672
Access Control
CP.C.D16.B1.10136
CP.C.D16.B1.04986
CP.C.D16.B1.04755
CP.C.D16.B1.05306
CP.C.D16.B1.05626
CP.C.D16.B1.05879
CP.C.D16.B1.05753
Digital Signage System
CP.C.D16.B1.10139
CP.C.D16.B1.04989
CP.C.D16.B1.04758
CP.C.D16.B1.05308
CP.C.D16.B1.05628
CP.C.D16.B1.05756
CP.C.D16.B1.05757
PAVA System
CP.C.D16.B1.10138
CP.C.D16.B1.04988
CP.C.D16.B1.04757
CP.C.D16.B1.05307
CP.C.D16.B1.05627
CP.C.D16.B1.05880
CP.C.D16.B1.05755
BMS System
CP.C.D16.B1.10140
CP.C.D16.B1.04696
CP.C.D16.B1.04953
CP.C.D16.B1.05250
CP.C.D16.B1.05464
CP.C.D16.B1.05251
Guest Room Management System
CP.C.D16.B1.10137
CP.C.D16.B1.04756
CP.C.D16.B1.04987
CP.C.D16.B1.05155
CP.C.D16.B1.05463
CP.C.D16.B1.05754
CP.C.D16.B1.05618
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B1.10132
CP.C.D16.B1.04694
CP.C.D16.B1.04751
CP.C.D16.B1.04925
CP.C.D16.B1.05154
CP.C.D16.B1.05462
CP.C.D16.B1.05292
Earthing and Lightning Protection System
CP.C.D16.B1.02059
CP.C.D16.B1.05619
External Work
MEP
CP.C.D15.B1.00661
Zone 3 A
Mechanical Work
Plumbing Work
CP.C.D15.B1.09104
CP.C.D15.B1.03082
CP.C.D15.B1.03256
Drainage System
CP.C.D15.B1.04612
CP.C.D15.B1.04735
CP.C.D15.B1.04611
CP.C.D15.B1.04955
CP.C.D15.B1.05097
Water Supply System
CP.C.D15.B1.04861
CP.C.D15.B1.04734
CP.C.D15.B1.05156
CP.C.D15.B1.04610
CP.C.D15.B1.05465
CP.C.D15.B1.05293
Fire Fighting Work
CP.C.D15.B1.05003
CP.C.D15.B1.05323
CP.C.D15.B1.04862
CP.C.D15.B1.05556
CP.C.D15.B1.05466
CP.C.D15.B1.03083
CP.C.D15.B1.03392
CP.C.D15.B1.03438
CP.C.D15.B1.06414
CP.C.D15.B1.05687
CP.C.D15.B1.05830
CP.C.D15.B1.06575
HVAC Work
Duct & Pipes Work
CP.C.D15.B1.05518
CP.C.D15.B1.04941
CP.C.D15.B1.05096
CP.C.D15.B1.05659
CP.C.D15.B1.05931
CP.C.D15.B1.05520
CP.C.D15.B1.05519
CP.C.D15.B1.05521
CP.C.D15.B1.05817
CP.C.D15.B1.06574
Equipment Work
CP.C.D15.B1.03079
CP.C.D15.B1.03080
CP.C.D15.B1.03081
CP.C.D15.B1.03253
CP.C.D15.B1.03254
CP.C.D15.B1.03255
CP.C.D15.B1.05930
Electrical Work
Lighting System Work
CP.C.D16.B1.10142
CP.C.D16.B1.04553
CP.C.D16.B1.04806
CP.C.D16.B1.05098
CP.C.D16.B1.05437
CP.C.D16.B1.05709
CP.C.D16.B1.06603
CP.C.D16.B1.05557
Power Distribution Work
CP.C.D16.B1.05436
CP.C.D16.B1.05538
CP.C.D16.B1.05701
CP.C.D16.B1.03085
CP.C.D16.B1.03257
CP.C.D16.B1.05881
CP.C.D16.B1.03084
CP.C.D16.B1.06207
CP.C.D16.B1.03367
CP.C.D16.B1.03482
CP.C.D16.B1.02060
CP.C.D16.B1.03481
Power System Work
CP.C.D16.B1.10141
CP.C.D16.B1.04580
CP.C.D16.B1.04613
CP.C.D16.B1.04835
CP.C.D16.B1.05252
CP.C.D16.B1.05539
CP.C.D16.B1.05393
Low Current Systems Work
Data System Work
CP.C.D16.B1.10145
CP.C.D16.B1.04836
CP.C.D16.B1.04616
CP.C.D16.B1.05136
CP.C.D16.B1.02061
CP.C.D16.B1.06682
CP.C.D16.B1.06968
CP.C.D16.B1.05594
Fire Alarm System Work
CP.C.D16.B1.10143
CP.C.D16.B1.04554
CP.C.D16.B1.04614
CP.C.D16.B1.04807
CP.C.D16.B1.05135
CP.C.D16.B1.05279
CP.C.D16.B1.05278
CP.C.D16.B1.05443
CCTV
CP.C.D16.B1.10146
CP.C.D16.B1.04837
CP.C.D16.B1.04617
CP.C.D16.B1.05012
CP.C.D16.B1.05333
CP.C.D16.B1.05660
CP.C.D16.B1.05489
Access Control
CP.C.D16.B1.10147
CP.C.D16.B1.04838
CP.C.D16.B1.04618
CP.C.D16.B1.05137
CP.C.D16.B1.05444
CP.C.D16.B1.05717
CP.C.D16.B1.05595
Time Attendance System
CP.C.D16.B1.10148
CP.C.D16.B1.04619
CP.C.D16.B1.04839
CP.C.D16.B1.05138
CP.C.D16.B1.05445
CP.C.D16.B1.05718
CP.C.D16.B1.05596
Digital Signage System
CP.C.D16.B1.10151
CP.C.D16.B1.04842
CP.C.D16.B1.04622
CP.C.D16.B1.05140
CP.C.D16.B1.05447
CP.C.D16.B1.05599
CP.C.D16.B1.05600
PAVA System
CP.C.D16.B1.10150
CP.C.D16.B1.04841
CP.C.D16.B1.04621
CP.C.D16.B1.05139
CP.C.D16.B1.05446
CP.C.D16.B1.05719
CP.C.D16.B1.05598
BMS System
CP.C.D16.B1.10152
CP.C.D16.B1.04556
CP.C.D16.B1.04808
CP.C.D16.B1.05067
CP.C.D16.B1.05282
CP.C.D16.B1.05068
Guest Room Management System
CP.C.D16.B1.10149
CP.C.D16.B1.04620
CP.C.D16.B1.04840
CP.C.D16.B1.04991
CP.C.D16.B1.05281
CP.C.D16.B1.05597
CP.C.D16.B1.05438
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.B1.10144
CP.C.D16.B1.04555
CP.C.D16.B1.04615
CP.C.D16.B1.04781
CP.C.D16.B1.04990
CP.C.D16.B1.05280
CP.C.D16.B1.05121
Earthing and Lightning Protection System
CP.C.D16.B1.00664
CP.C.D16.B1.05439
Zone 3 B
Mechanical Work
Plumbing Work
CP.C.D15.B1.09105
Drainage System
CP.C.D15.B1.02064
CP.C.D15.B1.02192
CP.C.D15.B1.02297
CP.C.D15.B1.02328
CP.C.D15.B1.02065
Water Supply System
CP.C.D15.B1.02191
CP.C.D15.B1.02241
CP.C.D15.B1.02350
CP.C.D15.B1.02485
CP.C.D15.B1.02413
Fire Fighting Work
CP.C.D15.B1.02242
CP.C.D15.B1.02305
CP.C.D15.B1.02540
CP.C.D15.B1.02428
CP.C.D15.B1.02486
CP.C.D15.B1.03087
CP.C.D15.B1.03395
CP.C.D15.B1.03439
CP.C.D15.B1.03717
CP.C.D15.B1.05362
CP.C.D15.B1.05522
CP.C.D15.B1.05647
HVAC Work
Duct & Pipes Work
CP.C.D15.B1.02561
CP.C.D15.B1.02310
CP.C.D15.B1.02631
CP.C.D15.B1.02378
CP.C.D15.B1.02691
CP.C.D15.B1.02563
CP.C.D15.B1.02564
CP.C.D15.B1.02562
CP.C.D15.B1.02670
CP.C.D15.B1.03755
Equipment Work
CP.C.D15.B1.03086
CP.C.D15.B1.03258
CP.C.D15.B1.02690
LPG System
Equipment Work
CP.C.D15.B1.03088
CP.C.D15.B1.03259
Electrical Work
Lighting System Work
CP.C.D16.F.10119
CP.C.D16.B1.02068
CP.C.D16.B1.02379
CP.C.D16.B1.02507
CP.C.D16.B1.02647
CP.C.D16.B1.05559
CP.C.D16.B1.02587
Power Distribution Work
CP.C.D16.B1.02506
CP.C.D16.B1.02576
CP.C.D16.B1.02641
CP.C.D16.B1.02683
CP.C.D16.B1.03089
CP.C.D16.B1.02730
CP.C.D16.B1.03368
CP.C.D16.B1.03484
CP.C.D16.B1.02067
CP.C.D16.B1.03483
Power System Work
CP.C.D16.F.10118
CP.C.D16.B1.02151
CP.C.D16.B1.02271
CP.C.D16.B1.02429
CP.C.D16.B1.02577
CP.C.D16.B1.02494
Low Current Systems Work
Data System Work
CP.C.D16.F.10122
CP.C.D16.B1.03623
CP.C.D16.B1.03679
CP.C.D16.B1.02073
CP.C.D16.B1.03782
CP.C.D16.B1.03815
CP.C.D16.B1.03772
Fire Alarm System Work
CP.C.D16.F.10120
CP.C.D16.B1.02069
CP.C.D16.B1.02255
CP.C.D16.B1.02389
CP.C.D16.B1.02445
CP.C.D16.B1.02444
CP.C.D16.B1.02523
CCTV
CP.C.D16.F.10123
CP.C.D16.B1.03624
CP.C.D16.B1.03659
CP.C.D16.B1.03720
CP.C.D16.B1.03785
CP.C.D16.B1.03756
Access Control
CP.C.D16.F.10124
CP.C.D16.B1.03625
CP.C.D16.B1.03680
CP.C.D16.B1.03745
CP.C.D16.B1.03804
CP.C.D16.B1.03773
Digital Signage System
CP.C.D16.F.10127
CP.C.D16.B1.03628
CP.C.D16.B1.03682
CP.C.D16.B1.03747
CP.C.D16.B1.03776
CP.C.D16.B1.03777
PAVA System
CP.C.D16.F.10126
CP.C.D16.B1.03627
CP.C.D16.B1.03681
CP.C.D16.B1.03746
CP.C.D16.B1.03805
CP.C.D16.B1.03775
BMS System
CP.C.D16.F.10128
CP.C.D16.B1.02078
CP.C.D16.B1.02256
CP.C.D16.B1.02351
CP.C.D16.B1.02446
CP.C.D16.B1.02352
Guest Room Management System
CP.C.D16.F.10125
CP.C.D16.B1.03626
CP.C.D16.B1.03655
CP.C.D16.B1.03709
CP.C.D16.B1.03774
CP.C.D16.B1.03741
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F.10121
CP.C.D16.B1.03622
CP.C.D16.B1.03664
CP.C.D16.B1.03711
CP.C.D16.B1.03778
CP.C.D16.B1.03744
Earthing and Lightning Protection System
CP.C.D16.B1.02079
CP.C.D16.B1.02508
Zone 3 C
Mechanical Work
Plumbing Work
CP.C.D15.B1.09106
Drainage System
CP.C.D15.B1.04487
CP.C.D15.B1.04600
CP.C.D15.B1.04809
CP.C.D15.B1.04944
CP.C.D15.B1.04486
Water Supply System
CP.C.D15.B1.04599
CP.C.D15.B1.04726
CP.C.D15.B1.04992
CP.C.D15.B1.05283
CP.C.D15.B1.04485
CP.C.D15.B1.05122
Fire Fighting Work
CP.C.D15.B1.04727
CP.C.D15.B1.04850
CP.C.D15.B1.05157
CP.C.D15.B1.05394
CP.C.D15.B1.05284
CP.C.D15.B1.03092
CP.C.D15.B1.03396
CP.C.D15.B1.03440
CP.C.D15.B1.06230
CP.C.D15.B1.05506
CP.C.D15.B1.05673
CP.C.D15.B1.06385
HVAC Work
Duct & Pipes Work
CP.C.D15.B1.05335
CP.C.D15.B1.04800
CP.C.D15.B1.05473
CP.C.D15.B1.04943
CP.C.D15.B1.05337
CP.C.D15.B1.05336
CP.C.D15.B1.05785
CP.C.D15.B1.05338
CP.C.D15.B1.05661
CP.C.D15.B1.06384
Equipment Work
CP.C.D15.B1.03091
CP.C.D15.B1.03260
CP.C.D15.B1.05784
LPG System
Equipment Work
CP.C.D15.B1.03093
CP.C.D15.B1.03261
Pipes Work
CP.C.D15.B1.04945
CP.C.D15.B1.05058
CP.C.D15.B1.05324
CP.C.D15.B1.05059
CP.C.D15.B1.05490
Electrical Work
Lighting System Work
CP.C.D16.F.10108
CP.C.D16.B1.04426
CP.C.D16.B1.04679
CP.C.D16.B1.04946
CP.C.D16.B1.05256
CP.C.D16.B1.05540
CP.C.D16.B1.06430
CP.C.D16.B1.05395
Power Distribution Work
CP.C.D16.B1.05255
CP.C.D16.B1.05363
CP.C.D16.B1.05523
CP.C.D16.B1.03095
CP.C.D16.B1.03262
CP.C.D16.B1.05720
CP.C.D16.B1.03094
CP.C.D16.B1.06016
CP.C.D16.B1.03369
CP.C.D16.B1.03486
CP.C.D16.B1.02080
CP.C.D16.B1.03485
Power System Work
CP.C.D16.F.10107
CP.C.D16.B1.04450
CP.C.D16.B1.04488
CP.C.D16.B1.04707
CP.C.D16.B1.05069
CP.C.D16.B1.05364
CP.C.D16.B1.05204
Low Current Systems Work
Data System Work
CP.C.D16.F.10111
CP.C.D16.B1.04708
CP.C.D16.B1.04491
CP.C.D16.B1.04971
CP.C.D16.B1.02081
CP.C.D16.B1.02082
CP.C.D16.B1.05418
CP.C.D16.B1.05419
Fire Alarm System Work
CP.C.D16.F.10109
CP.C.D16.B1.04427
CP.C.D16.B1.04489
CP.C.D16.B1.04680
CP.C.D16.B1.04970
CP.C.D16.B1.05101
CP.C.D16.B1.05100
CP.C.D16.B1.05269
CCTV
CP.C.D16.F.10112
CP.C.D16.B1.04709
CP.C.D16.B1.04492
CP.C.D16.B1.04863
CP.C.D16.B1.05168
CP.C.D16.B1.05474
CP.C.D16.B1.05309
Access Control
CP.C.D16.F.10113
CP.C.D16.B1.04710
CP.C.D16.B1.04493
CP.C.D16.B1.04972
CP.C.D16.B1.05270
CP.C.D16.B1.05560
CP.C.D16.B1.05420
Digital Signage System
CP.C.D16.F.10116
CP.C.D16.B1.04713
CP.C.D16.B1.04496
CP.C.D16.B1.04974
CP.C.D16.B1.05272
CP.C.D16.B1.05423
CP.C.D16.B1.05424
PAVA System
CP.C.D16.F.10115
CP.C.D16.B1.04712
CP.C.D16.B1.04495
CP.C.D16.B1.04973
CP.C.D16.B1.05271
CP.C.D16.B1.05561
CP.C.D16.B1.05422
BMS System
CP.C.D16.F.10117
CP.C.D16.B1.04429
CP.C.D16.B1.04681
CP.C.D16.B1.04917
CP.C.D16.B1.05104
CP.C.D16.B1.04918
Guest Room Management System
CP.C.D16.F.10114
CP.C.D16.B1.04494
CP.C.D16.B1.04711
CP.C.D16.B1.04844
CP.C.D16.B1.05103
CP.C.D16.B1.05421
CP.C.D16.B1.05257
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F.10110
CP.C.D16.B1.04428
CP.C.D16.B1.04490
CP.C.D16.B1.04647
CP.C.D16.B1.04843
CP.C.D16.B1.05102
CP.C.D16.B1.04956
Earthing and Lightning Protection System
CP.C.D16.B1.02083
CP.C.D16.B1.05258
Superstructure
Ground Floor
Mechanical Work
Plumbing Work
CP.C.D15.GF.09056
Drainage System
CP.C.D15.GF.04883
CP.C.D15.GF.01973
CP.C.D15.GF.05285
CP.C.D15.GF.04884
CP.C.D15.GF.05454
CP.C.D15.GF.05020
Water Supply System
CP.C.D15.GF.05019
CP.C.D15.GF.05170
CP.C.D15.GF.05494
CP.C.D15.GF.04882
CP.C.D15.GF.05654
CP.C.D15.GF.05795
Fire Fighting Work
CP.C.D15.GF.05171
CP.C.D15.GF.05325
CP.C.D15.GF.05871
CP.C.D15.GF.02978
CP.C.D15.GF.02979
CP.C.D15.GF.05675
CP.C.D15.GF.05796
CP.C.D15.GF.03383
CP.C.D15.GF.03431
CP.C.D15.GF.03191
CP.C.D15.GF.06739
CP.C.D15.GF.05984
CP.C.D15.GF.06145
CP.C.D15.GF.06879
HVAC Work
Duct & Pipes Work
CP.C.D15.GF.05848
CP.C.D15.GF.05953
CP.C.D15.GF.05273
CP.C.D15.GF.05453
CP.C.D15.GF.05849
CP.C.D15.GF.05850
CP.C.D15.GF.05851
CP.C.D15.GF.06134
CP.C.D15.GF.06275
CP.C.D15.GF.06878
Equipment Work
CP.C.D15.GF.02975
CP.C.D15.GF.02976
CP.C.D15.GF.02977
CP.C.D15.GF.03188
CP.C.D15.GF.03189
CP.C.D15.GF.03190
CP.C.D15.GF.06274
CP.C.D15.GF.02974
CP.C.D15.GF.03187
LPG System
Equipment Work
CP.C.D15.GF.04885
CP.C.D15.GF.05185
CP.C.D15.GF.05427
CP.C.D15.GF.05543
CP.C.D15.GF.05544
Pipes Work
CP.C.D15.GF.05455
CP.C.D15.GF.05571
CP.C.D15.GF.05831
CP.C.D15.GF.05572
CP.C.D15.GF.05963
Electrical Work
Lighting System Work
CP.C.D16.GF.10036
CP.C.D16.GF.10078
CP.C.D16.GF.10093
CP.C.D16.GF.10154
CP.C.D16.GF.10184
CP.C.D16.GF.10169
CP.C.D16.GF.10199
CP.C.D16.GF.10063
CP.C.D16.GF.04813
CP.C.D16.GF.05112
CP.C.D16.GF.05456
CP.C.D16.GF.05885
CP.C.D16.GF.06185
CP.C.D16.GF.06912
CP.C.D16.GF.06018
Power Distribution Work
CP.C.D16.GF.10039
CP.C.D16.GF.10081
CP.C.D16.GF.10096
CP.C.D16.GF.10157
CP.C.D16.GF.10187
CP.C.D16.GF.10172
CP.C.D16.GF.10202
CP.C.D16.GF.10066
CP.C.D16.GF.02980
CP.C.D16.GF.04816
CP.C.D16.GF.05072
CP.C.D16.GF.05888
CP.C.D16.GF.04889
CP.C.D16.GF.05777
CP.C.D16.GF.03192
CP.C.D16.GF.05862
CP.C.D16.GF.10213
CP.C.D16.GF.02983
CP.C.D16.GF.06000
CP.C.D16.GF.10214
CP.C.D16.GF.03194
CP.C.D16.GF.06231
CP.C.D16.GF.02982
CP.C.D16.GF.05985
CP.C.D16.GF.06208
CP.C.D16.GF.03346
CP.C.D16.GF.02981
CP.C.D16.GF.06390
CP.C.D16.GF.03193
CP.C.D16.GF.06389
CP.C.D16.GF.03447
CP.C.D16.GF.03448
CP.C.D16.GF.06188
CP.C.D16.GF.06022
Power System Work
CP.C.D16.GF.10035
CP.C.D16.GF.10077
CP.C.D16.GF.10092
CP.C.D16.GF.10153
CP.C.D16.GF.10183
CP.C.D16.GF.10168
CP.C.D16.GF.10198
CP.C.D16.GF.10062
CP.C.D16.GF.04845
CP.C.D16.GF.04886
CP.C.D16.GF.05141
CP.C.D16.GF.05884
CP.C.D16.GF.06184
CP.C.D16.GF.06017
Low Current Systems Work
Data System Work
CP.C.D16.GF.10040
CP.C.D16.GF.10082
CP.C.D16.GF.10097
CP.C.D16.GF.10158
CP.C.D16.GF.10188
CP.C.D16.GF.10173
CP.C.D16.GF.10203
CP.C.D16.GF.10067
CP.C.D16.GF.05142
CP.C.D16.GF.04890
CP.C.D16.GF.05475
CP.C.D16.GF.05889
CP.C.D16.GF.01974
CP.C.D16.GF.05890
CP.C.D16.GF.05891
Fire Alarm System Work
CP.C.D16.GF.10037
CP.C.D16.GF.10079
CP.C.D16.GF.10094
CP.C.D16.GF.10155
CP.C.D16.GF.10185
CP.C.D16.GF.10170
CP.C.D16.GF.10200
CP.C.D16.GF.10064
CP.C.D16.GF.04814
CP.C.D16.GF.04887
CP.C.D16.GF.05113
CP.C.D16.GF.05886
CP.C.D16.GF.06019
CP.C.D16.GF.06020
CP.C.D16.GF.06186
CCTV
CP.C.D16.GF.10041
CP.C.D16.GF.10083
CP.C.D16.GF.10098
CP.C.D16.GF.10159
CP.C.D16.GF.10189
CP.C.D16.GF.10174
CP.C.D16.GF.10204
CP.C.D16.GF.10068
CP.C.D16.GF.05143
CP.C.D16.GF.04891
CP.C.D16.GF.05340
CP.C.D16.GF.05892
CP.C.D16.GF.06189
CP.C.D16.GF.06023
Access Control
CP.C.D16.GF.10042
CP.C.D16.GF.10084
CP.C.D16.GF.10099
CP.C.D16.GF.10160
CP.C.D16.GF.10190
CP.C.D16.GF.10175
CP.C.D16.GF.10205
CP.C.D16.GF.10069
CP.C.D16.GF.05144
CP.C.D16.GF.04892
CP.C.D16.GF.05476
CP.C.D16.GF.05893
CP.C.D16.GF.06190
CP.C.D16.GF.06024
Digital Signage System
CP.C.D16.GF.10047
CP.C.D16.GF.10089
CP.C.D16.GF.10104
CP.C.D16.GF.10165
CP.C.D16.GF.10195
CP.C.D16.GF.10180
CP.C.D16.GF.10210
CP.C.D16.GF.10074
CP.C.D16.GF.05149
CP.C.D16.GF.04897
CP.C.D16.GF.05480
CP.C.D16.GF.05898
CP.C.D16.GF.06030
CP.C.D16.GF.06031
Central Clock System
CP.C.D16.GF.10048
CP.C.D16.GF.10090
CP.C.D16.GF.10105
CP.C.D16.GF.10166
CP.C.D16.GF.10196
CP.C.D16.GF.10181
CP.C.D16.GF.10211
CP.C.D16.GF.10075
CP.C.D16.GF.04898
CP.C.D16.GF.05150
CP.C.D16.GF.05481
CP.C.D16.GF.05899
CP.C.D16.GF.06194
CP.C.D16.GF.06032
PAVA System
CP.C.D16.GF.10045
CP.C.D16.GF.10087
CP.C.D16.GF.10102
CP.C.D16.GF.10163
CP.C.D16.GF.10193
CP.C.D16.GF.10178
CP.C.D16.GF.10208
CP.C.D16.GF.10072
CP.C.D16.GF.05147
CP.C.D16.GF.04895
CP.C.D16.GF.05478
CP.C.D16.GF.05896
CP.C.D16.GF.06192
CP.C.D16.GF.06028
Audio Intercom System
CP.C.D16.GF.10043
CP.C.D16.GF.10085
CP.C.D16.GF.10100
CP.C.D16.GF.10161
CP.C.D16.GF.10191
CP.C.D16.GF.10176
CP.C.D16.GF.10206
CP.C.D16.GF.10070
CP.C.D16.GF.04893
CP.C.D16.GF.05145
CP.C.D16.GF.05477
CP.C.D16.GF.05894
CP.C.D16.GF.06025
CP.C.D16.GF.06026
Audio Visual System
CP.C.D16.GF.10046
CP.C.D16.GF.10088
CP.C.D16.GF.10103
CP.C.D16.GF.10164
CP.C.D16.GF.10194
CP.C.D16.GF.10179
CP.C.D16.GF.10209
CP.C.D16.GF.10073
CP.C.D16.GF.04896
CP.C.D16.GF.05148
CP.C.D16.GF.05479
CP.C.D16.GF.05897
CP.C.D16.GF.06193
CP.C.D16.GF.06029
BMS System
CP.C.D16.GF.10049
CP.C.D16.GF.10091
CP.C.D16.GF.10106
CP.C.D16.GF.10167
CP.C.D16.GF.10197
CP.C.D16.GF.10182
CP.C.D16.GF.10212
CP.C.D16.GF.10076
CP.C.D16.GF.04817
CP.C.D16.GF.05114
CP.C.D16.GF.05633
CP.C.D16.GF.05428
CP.C.D16.GF.05429
Guest Room Management System
CP.C.D16.GF.10044
CP.C.D16.GF.10086
CP.C.D16.GF.10101
CP.C.D16.GF.10162
CP.C.D16.GF.10192
CP.C.D16.GF.10177
CP.C.D16.GF.10207
CP.C.D16.GF.10071
CP.C.D16.GF.04894
CP.C.D16.GF.05146
CP.C.D16.GF.05310
CP.C.D16.GF.05895
CP.C.D16.GF.06191
CP.C.D16.GF.06027
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.GF.10038
CP.C.D16.GF.10080
CP.C.D16.GF.10095
CP.C.D16.GF.10156
CP.C.D16.GF.10186
CP.C.D16.GF.10171
CP.C.D16.GF.10201
CP.C.D16.GF.10065
CP.C.D16.GF.04888
CP.C.D16.GF.04815
CP.C.D16.GF.05071
CP.C.D16.GF.05887
CP.C.D16.GF.06187
CP.C.D16.GF.06021
Earthing and Lightning Protection System
CP.C.D16.GF.05778
External Work
MEP
CP.C.EX.GF.06058
CP.C.EX.GF.06069
CP.C.EX.GF.06063
CP.C.EX.GF.06059
CP.C.D16.GF.06057
CP.C.EX.GF.06060
CP.C.EX.GF.06061
CP.C.EX.GF.06062
First Floor
Mechanical Work
Plumbing Work
CP.C.D15.F1.09059
Drainage System
CP.C.D15.F1.05035
CP.C.D15.F1.05036
CP.C.D15.F1.05467
CP.C.D15.F1.05189
CP.C.D15.F1.05637
CP.C.D15.F1.00123
Water Supply System
CP.C.D15.F1.05034
CP.C.D15.F1.05677
CP.C.D15.F1.05188
CP.C.D15.F1.05341
CP.C.D15.F1.05808
CP.C.D15.F1.05940
Fire Fighting Work
CP.C.D15.F1.05342
CP.C.D15.F1.05508
CP.C.D15.F1.06047
CP.C.D15.F1.05833
CP.C.D15.F1.05941
CP.C.D15.F1.06898
CP.C.D15.F1.06165
CP.C.D15.F1.06324
CP.C.D15.F1.07040
HVAC Work
Duct & Pipes Work
CP.C.D15.F1.06003
CP.C.D15.F1.05457
CP.C.D15.F1.06136
CP.C.D15.F1.05636
CP.C.D15.F1.06004
CP.C.D15.F1.06005
CP.C.D15.F1.06006
CP.C.D15.F1.06312
CP.C.D15.F1.06461
CP.C.D15.F1.07039
Equipment Work
CP.C.D15.F1.02984
CP.C.D15.F1.03195
CP.C.D15.F1.02985
CP.C.D15.F1.02986
CP.C.D15.F1.03196
CP.C.D15.F1.03197
CP.C.D15.F1.06460
LPG System
Pipes Work
CP.C.D15.F1.05638
CP.C.D15.F1.05722
CP.C.D15.F1.05986
CP.C.D15.F1.05723
CP.C.D15.F1.06148
Electrical Work
Lighting System Work
CP.C.D16.F1.10001
CP.C.D16.F1.04960
CP.C.D16.F1.05286
CP.C.D16.F1.05639
CP.C.D16.F1.06071
CP.C.D16.F1.06363
CP.C.D16.F1.07078
CP.C.D16.F1.06211
Power Distribution Work
CP.C.D16.F1.10004
CP.C.D16.F1.05926
CP.C.D16.F1.04963
CP.C.D16.F1.05040
CP.C.D16.F1.05262
CP.C.D16.F1.06033
CP.C.D16.F1.06074
CP.C.D16.F1.06195
CP.C.D16.F1.06421
CP.C.D16.F1.06166
CP.C.D16.F1.02987
CP.C.D16.F1.06391
CP.C.D16.F1.06580
CP.C.D16.F1.03347
CP.C.D16.F1.06579
CP.C.D16.F1.03450
CP.C.D16.F1.03449
CP.C.D16.F1.06366
CP.C.D16.F1.06215
Power System Work
CP.C.D16.F1.10000
CP.C.D16.F1.04995
CP.C.D16.F1.05037
CP.C.D16.F1.05312
CP.C.D16.F1.06070
CP.C.D16.F1.06362
CP.C.D16.F1.06210
Low Current Systems Work
Data System Work
CP.C.D16.F1.10005
CP.C.D16.F1.05313
CP.C.D16.F1.05041
CP.C.D16.F1.05662
CP.C.D16.F1.06075
CP.C.D16.F1.01975
CP.C.D16.F1.06076
CP.C.D16.F1.06077
Fire Alarm System Work
CP.C.D16.F1.10002
CP.C.D16.F1.04961
CP.C.D16.F1.05038
CP.C.D16.F1.05287
CP.C.D16.F1.06072
CP.C.D16.F1.06212
CP.C.D16.F1.06213
CP.C.D16.F1.06364
CCTV
CP.C.D16.F1.10006
CP.C.D16.F1.05314
CP.C.D16.F1.05042
CP.C.D16.F1.05532
CP.C.D16.F1.06078
CP.C.D16.F1.06367
CP.C.D16.F1.06216
Access Control
CP.C.D16.F1.10007
CP.C.D16.F1.05315
CP.C.D16.F1.05043
CP.C.D16.F1.05663
CP.C.D16.F1.06079
CP.C.D16.F1.06368
CP.C.D16.F1.06217
Digital Signage System
CP.C.D16.F1.10010
CP.C.D16.F1.05318
CP.C.D16.F1.05046
CP.C.D16.F1.05665
CP.C.D16.F1.06082
CP.C.D16.F1.06220
CP.C.D16.F1.06221
PAVA System
CP.C.D16.F1.10009
CP.C.D16.F1.05317
CP.C.D16.F1.05045
CP.C.D16.F1.05664
CP.C.D16.F1.06081
CP.C.D16.F1.06370
CP.C.D16.F1.06219
BMS System
CP.C.D16.F1.10011
CP.C.D16.F1.04964
CP.C.D16.F1.05288
CP.C.D16.F1.05797
CP.C.D16.F1.05609
CP.C.D16.F1.05610
Guest Room Management System
CP.C.D16.F1.10008
CP.C.D16.F1.05044
CP.C.D16.F1.05316
CP.C.D16.F1.05496
CP.C.D16.F1.06080
CP.C.D16.F1.06369
CP.C.D16.F1.06218
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F1.10003
CP.C.D16.F1.04962
CP.C.D16.F1.05039
CP.C.D16.F1.05261
CP.C.D16.F1.06073
CP.C.D16.F1.06365
CP.C.D16.F1.06214
Earthing and Lightning Protection System
CP.C.D16.F1.05927
Second Floor
Mechanical Work
Plumbing Work
CP.C.D15.F2.09062
Drainage System
CP.C.D15.F2.05387
CP.C.D15.F2.05224
CP.C.D15.F2.05223
CP.C.D15.F2.05801
CP.C.D15.F2.05655
Water Supply System
CP.C.D15.F2.05386
CP.C.D15.F2.05533
CP.C.D15.F2.05834
CP.C.D15.F2.05222
CP.C.D15.F2.05954
CP.C.D15.F2.06120
Fire Fighting Work
CP.C.D15.F2.05534
CP.C.D15.F2.05689
CP.C.D15.F2.05988
CP.C.D15.F2.06234
CP.C.D15.F2.06121
CP.C.D15.F2.02994
CP.C.D15.F2.03384
CP.C.D15.F2.03432
CP.C.D15.F2.06915
CP.C.D15.F2.06342
CP.C.D15.F2.06516
CP.C.D15.F2.07060
HVAC Work
Duct & Pipes Work
CP.C.D15.F2.06198
CP.C.D15.F2.05640
CP.C.D15.F2.06314
CP.C.D15.F2.05800
CP.C.D15.F2.06500
CP.C.D15.F2.06200
CP.C.D15.F2.06201
CP.C.D15.F2.06199
CP.C.D15.F2.06633
CP.C.D15.F2.07059
Equipment Work
CP.C.D15.F2.02990
CP.C.D15.F2.02988
CP.C.D15.F2.02989
CP.C.D15.F2.03198
CP.C.D15.F2.03199
CP.C.D15.F2.03200
CP.C.D15.F2.02991
CP.C.D15.F2.02992
CP.C.D15.F2.02993
CP.C.D15.F2.03201
CP.C.D15.F2.03202
CP.C.D15.F2.03203
LPG System
Pipes Work
CP.C.D15.F2.05802
CP.C.D15.F2.05901
CP.C.D15.F2.06168
CP.C.D15.F2.05902
CP.C.D15.F2.06326
Electrical Work
Lighting System Work
CP.C.D16.F2.10001
CP.C.D16.F2.05468
CP.C.D16.F2.05126
CP.C.D16.F2.05803
CP.C.D16.F2.06242
CP.C.D16.F2.06551
CP.C.D16.F2.07095
CP.C.D16.F2.06393
Power Distribution Work
CP.C.D16.F2.10004
CP.C.D16.F2.06107
CP.C.D16.F2.05129
CP.C.D16.F2.05228
CP.C.D16.F2.05442
CP.C.D16.F2.06222
CP.C.D16.F2.06245
CP.C.D16.F2.06371
CP.C.D16.F2.02995
CP.C.D16.F2.06343
CP.C.D16.F2.06592
CP.C.D16.F2.06581
CP.C.D16.F2.03348
CP.C.D16.F2.06742
CP.C.D16.F2.06741
CP.C.D16.F2.03451
CP.C.D16.F2.03452
CP.C.D16.F2.06554
CP.C.D16.F2.06397
Power System Work
CP.C.D16.F2.10000
CP.C.D16.F2.05160
CP.C.D16.F2.05225
CP.C.D16.F2.05497
CP.C.D16.F2.06241
CP.C.D16.F2.06550
CP.C.D16.F2.06392
Low Current Systems Work
Data System Work
CP.C.D16.F2.10005
CP.C.D16.F2.05498
CP.C.D16.F2.05229
CP.C.D16.F2.05818
CP.C.D16.F2.06246
CP.C.D16.F2.01976
CP.C.D16.F2.06247
CP.C.D16.F2.06248
Fire Alarm System Work
CP.C.D16.F2.10002
CP.C.D16.F2.05127
CP.C.D16.F2.05469
CP.C.D16.F2.05226
CP.C.D16.F2.06243
CP.C.D16.F2.06394
CP.C.D16.F2.06395
CP.C.D16.F2.06552
CCTV
CP.C.D16.F2.10006
CP.C.D16.F2.05499
CP.C.D16.F2.05230
CP.C.D16.F2.05703
CP.C.D16.F2.06249
CP.C.D16.F2.06555
CP.C.D16.F2.06398
Access Control
CP.C.D16.F2.10007
CP.C.D16.F2.05500
CP.C.D16.F2.05231
CP.C.D16.F2.05819
CP.C.D16.F2.06250
CP.C.D16.F2.06556
CP.C.D16.F2.06399
Digital Signage System
CP.C.D16.F2.10010
CP.C.D16.F2.05503
CP.C.D16.F2.05234
CP.C.D16.F2.05821
CP.C.D16.F2.06253
CP.C.D16.F2.06402
CP.C.D16.F2.06403
PAVA System
CP.C.D16.F2.10009
CP.C.D16.F2.05502
CP.C.D16.F2.05233
CP.C.D16.F2.05820
CP.C.D16.F2.06252
CP.C.D16.F2.06558
CP.C.D16.F2.06401
BMS System
CP.C.D16.F2.10011
CP.C.D16.F2.05130
CP.C.D16.F2.05470
CP.C.D16.F2.05942
CP.C.D16.F2.05779
CP.C.D16.F2.05780
Guest Room Management System
CP.C.D16.F2.10008
CP.C.D16.F2.05232
CP.C.D16.F2.05501
CP.C.D16.F2.05678
CP.C.D16.F2.06251
CP.C.D16.F2.06557
CP.C.D16.F2.06400
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F2.10003
CP.C.D16.F2.05128
CP.C.D16.F2.05227
CP.C.D16.F2.05441
CP.C.D16.F2.06244
CP.C.D16.F2.06553
CP.C.D16.F2.06396
Earthing and Lightning Protection System
CP.C.D16.F2.06108
Third Floor
Mechanical Work
Plumbing Work
CP.C.D15.F3.09065
Drainage System
CP.C.D15.F3.05548
CP.C.D15.F3.05404
CP.C.D15.F3.05809
CP.C.D15.F3.05403
CP.C.D15.F3.05946
Water Supply System
CP.C.D15.F3.05547
CP.C.D15.F3.05704
CP.C.D15.F3.06138
CP.C.D15.F3.05989
CP.C.D15.F3.05402
CP.C.D15.F3.06298
Fire Fighting Work
CP.C.D15.F3.06299
CP.C.D15.F3.05853
CP.C.D15.F3.05705
CP.C.D15.F3.06171
CP.C.D15.F3.06423
CP.C.D15.F3.07080
CP.C.D15.F3.06533
CP.C.D15.F3.06685
CP.C.D15.F3.07216
HVAC Work
Duct & Pipes Work
CP.C.D15.F3.06377
CP.C.D15.F3.06672
CP.C.D15.F3.06375
CP.C.D15.F3.06374
CP.C.D15.F3.05804
CP.C.D15.F3.06501
CP.C.D15.F3.05945
CP.C.D15.F3.06376
CP.C.D15.F3.06795
CP.C.D15.F3.07215
Equipment Work
CP.C.D15.F3.02996
CP.C.D15.F3.03204
CP.C.D15.F3.02997
CP.C.D15.F3.02998
CP.C.D15.F3.03206
CP.C.D15.F3.03205
Electrical Work
Lighting System Work
CP.C.D16.F3.10011
CP.C.D16.F3.05295
CP.C.D16.F3.05656
CP.C.D16.F3.05947
CP.C.D16.F3.06280
CP.C.D16.F3.06582
CP.C.D16.F3.07247
CP.C.D16.F3.06424
Power Distribution Work
CP.C.D16.F3.10003
CP.C.D16.F3.06279
CP.C.D16.F3.05298
CP.C.D16.F3.05408
CP.C.D16.F3.06404
CP.C.D16.F3.05622
CP.C.D16.F3.05863
CP.C.D16.F3.06559
CP.C.D16.F3.06753
CP.C.D16.F3.02999
CP.C.D16.F3.06534
CP.C.D16.F3.06743
CP.C.D16.F3.03349
CP.C.D16.F3.03453
CP.C.D16.F3.06900
CP.C.D16.F3.06149
CP.C.D16.F3.05990
Power System Work
CP.C.D16.F3.10000
CP.C.D16.F3.05405
CP.C.D16.F3.05328
CP.C.D16.F3.05679
CP.C.D16.F3.06109
CP.C.D16.F3.06405
CP.C.D16.F3.06235
Low Current Systems Work
Data System Work
CP.C.D16.F3.10004
CP.C.D16.F3.05680
CP.C.D16.F3.05409
CP.C.D16.F3.05966
CP.C.D16.F3.01977
CP.C.D16.F3.01978
CP.C.D16.F3.06432
CP.C.D16.F3.06433
Fire Alarm System Work
CP.C.D16.F3.10001
CP.C.D16.F3.05296
CP.C.D16.F3.05406
CP.C.D16.F3.05657
CP.C.D16.F3.05965
CP.C.D16.F3.06122
CP.C.D16.F3.06123
CP.C.D16.F3.06288
CCTV
CP.C.D16.F3.10005
CP.C.D16.F3.05681
CP.C.D16.F3.05410
CP.C.D16.F3.05864
CP.C.D16.F3.06202
CP.C.D16.F3.06502
CP.C.D16.F3.06327
Access Control
CP.C.D16.F3.10006
CP.C.D16.F3.05682
CP.C.D16.F3.05411
CP.C.D16.F3.05967
CP.C.D16.F3.06289
CP.C.D16.F3.06594
CP.C.D16.F3.06434
Digital Signage System
CP.C.D16.F3.10009
CP.C.D16.F3.05685
CP.C.D16.F3.05414
CP.C.D16.F3.05969
CP.C.D16.F3.06291
CP.C.D16.F3.06437
CP.C.D16.F3.06438
PAVA System
CP.C.D16.F3.10008
CP.C.D16.F3.05684
CP.C.D16.F3.05413
CP.C.D16.F3.05968
CP.C.D16.F3.06290
CP.C.D16.F3.06595
CP.C.D16.F3.06436
BMS System
CP.C.D16.F3.10010
CP.C.D16.F3.05299
CP.C.D16.F3.05658
CP.C.D16.F3.06126
CP.C.D16.F3.05928
CP.C.D16.F3.05929
Guest Room Management System
CP.C.D16.F3.10007
CP.C.D16.F3.05412
CP.C.D16.F3.05683
CP.C.D16.F3.05836
CP.C.D16.F3.06125
CP.C.D16.F3.06435
CP.C.D16.F3.06281
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F3.10002
CP.C.D16.F3.05297
CP.C.D16.F3.05407
CP.C.D16.F3.05621
CP.C.D16.F3.05835
CP.C.D16.F3.06124
CP.C.D16.F3.05955
Earthing and Lightning Protection System
CP.C.D16.F3.06282
Fourth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F4.09068
Drainage System
CP.C.D15.F4.05577
CP.C.D15.F4.05715
CP.C.D15.F4.05956
CP.C.D15.F4.06130
CP.C.D15.F4.05576
Water Supply System
CP.C.D15.F4.05714
CP.C.D15.F4.05865
CP.C.D15.F4.06316
CP.C.D15.F4.06172
CP.C.D15.F4.05575
CP.C.D15.F4.06486
Fire Fighting Work
CP.C.D15.F4.06487
CP.C.D15.F4.05866
CP.C.D15.F4.06008
CP.C.D15.F4.06346
CP.C.D15.F4.06596
CP.C.D15.F4.07233
CP.C.D15.F4.06704
CP.C.D15.F4.06842
CP.C.D15.F4.07395
HVAC Work
Duct & Pipes Work
CP.C.D15.F4.06565
CP.C.D15.F4.06828
CP.C.D15.F4.05948
CP.C.D15.F4.06129
CP.C.D15.F4.06562
CP.C.D15.F4.06673
CP.C.D15.F4.06564
CP.C.D15.F4.06563
CP.C.D15.F4.06955
CP.C.D15.F4.07394
Equipment Work
CP.C.D15.F4.03000
CP.C.D15.F4.03207
Electrical Work
Lighting System Work
CP.C.D16.F4.10001
CP.C.D16.F4.05483
CP.C.D16.F4.05810
CP.C.D16.F4.06131
CP.C.D16.F4.06466
CP.C.D16.F4.06744
CP.C.D16.F4.07438
CP.C.D16.F4.06597
Power Distribution Work
CP.C.D16.F4.10004
CP.C.D16.F4.06465
CP.C.D16.F4.05486
CP.C.D16.F4.05581
CP.C.D16.F4.06583
CP.C.D16.F4.05788
CP.C.D16.F4.06034
CP.C.D16.F4.06722
CP.C.D16.F4.06916
CP.C.D16.F4.03001
CP.C.D16.F4.06705
CP.C.D16.F4.06901
CP.C.D16.F4.03350
CP.C.D16.F4.03454
CP.C.D16.F4.07066
CP.C.D16.F4.06328
CP.C.D16.F4.06173
Power System Work
CP.C.D16.F4.10000
CP.C.D16.F4.05511
CP.C.D16.F4.05578
CP.C.D16.F4.05837
CP.C.D16.F4.06283
CP.C.D16.F4.06584
CP.C.D16.F4.06425
Low Current Systems Work
Data System Work
CP.C.D16.F4.10005
CP.C.D16.F4.05582
CP.C.D16.F4.05838
CP.C.D16.F4.06151
CP.C.D16.F4.01979
CP.C.D16.F4.01980
CP.C.D16.F4.06605
CP.C.D16.F4.06606
Fire Alarm System Work
CP.C.D16.F4.10002
CP.C.D16.F4.05484
CP.C.D16.F4.05579
CP.C.D16.F4.05811
CP.C.D16.F4.06150
CP.C.D16.F4.06300
CP.C.D16.F4.06301
CP.C.D16.F4.06476
CCTV
CP.C.D16.F4.10006
CP.C.D16.F4.05839
CP.C.D16.F4.05583
CP.C.D16.F4.06035
CP.C.D16.F4.06378
CP.C.D16.F4.06674
CP.C.D16.F4.06518
Access Control
CP.C.D16.F4.10007
CP.C.D16.F4.05840
CP.C.D16.F4.05584
CP.C.D16.F4.06152
CP.C.D16.F4.06477
CP.C.D16.F4.06755
CP.C.D16.F4.06607
Digital Signage System
CP.C.D16.F4.10010
CP.C.D16.F4.05843
CP.C.D16.F4.05587
CP.C.D16.F4.06154
CP.C.D16.F4.06479
CP.C.D16.F4.06610
CP.C.D16.F4.06611
PAVA System
CP.C.D16.F4.10009
CP.C.D16.F4.05842
CP.C.D16.F4.05586
CP.C.D16.F4.06153
CP.C.D16.F4.06478
CP.C.D16.F4.06756
CP.C.D16.F4.06609
BMS System
CP.C.D16.F4.10011
CP.C.D16.F4.05487
CP.C.D16.F4.05812
CP.C.D16.F4.06304
CP.C.D16.F4.06110
CP.C.D16.F4.06111
Guest Room Management System
CP.C.D16.F4.10008
CP.C.D16.F4.05585
CP.C.D16.F4.05841
CP.C.D16.F4.05992
CP.C.D16.F4.06303
CP.C.D16.F4.06608
CP.C.D16.F4.06467
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F4.10003
CP.C.D16.F4.05485
CP.C.D16.F4.05580
CP.C.D16.F4.05787
CP.C.D16.F4.05991
CP.C.D16.F4.06302
CP.C.D16.F4.06139
Earthing and Lightning Protection System
CP.C.D16.F4.06468
Fifth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F5.09071
Drainage System
CP.C.D15.F5.05874
CP.C.D15.F5.05728
CP.C.D15.F5.06140
CP.C.D15.F5.06308
CP.C.D15.F5.05727
Water Supply System
CP.C.D15.F5.06347
CP.C.D15.F5.05873
CP.C.D15.F5.06036
CP.C.D15.F5.06504
CP.C.D15.F5.05726
CP.C.D15.F5.06654
Fire Fighting Work
CP.C.D15.F5.06655
CP.C.D15.F5.06037
CP.C.D15.F5.06204
CP.C.D15.F5.06537
CP.C.D15.F5.06757
CP.C.D15.F5.07423
CP.C.D15.F5.06859
CP.C.D15.F5.07003
CP.C.D15.F5.07575
HVAC Work
Duct & Pipes Work
CP.C.D15.F5.06728
CP.C.D15.F5.06990
CP.C.D15.F5.06725
CP.C.D15.F5.06829
CP.C.D15.F5.06132
CP.C.D15.F5.06307
CP.C.D15.F5.06727
CP.C.D15.F5.06726
CP.C.D15.F5.07122
CP.C.D15.F5.07574
Equipment Work
CP.C.D15.F5.03002
CP.C.D15.F5.03208
Electrical Work
Lighting System Work
CP.C.D16.F5.10001
CP.C.D16.F5.05957
CP.C.D16.F5.05667
CP.C.D16.F5.06309
CP.C.D16.F5.06638
CP.C.D16.F5.06902
CP.C.D16.F5.07614
CP.C.D16.F5.06758
Power Distribution Work
CP.C.D16.F5.10004
CP.C.D16.F5.06637
CP.C.D16.F5.05732
CP.C.D16.F5.05935
CP.C.D16.F5.06745
CP.C.D16.F5.05670
CP.C.D16.F5.06223
CP.C.D16.F5.06886
CP.C.D16.F5.07081
CP.C.D16.F5.06860
CP.C.D16.F5.07067
CP.C.D16.F5.03003
CP.C.D16.F5.07222
CP.C.D16.F5.03351
CP.C.D16.F5.03455
CP.C.D16.F5.06519
CP.C.D16.F5.06348
Power System Work
CP.C.D16.F5.10000
CP.C.D16.F5.05729
CP.C.D16.F5.05692
CP.C.D16.F5.05993
CP.C.D16.F5.06469
CP.C.D16.F5.06746
CP.C.D16.F5.06598
Low Current Systems Work
Data System Work
CP.C.D16.F5.10005
CP.C.D16.F5.05733
CP.C.D16.F5.05994
CP.C.D16.F5.06330
CP.C.D16.F5.01981
CP.C.D16.F5.01982
CP.C.D16.F5.06769
CP.C.D16.F5.06770
Fire Alarm System Work
CP.C.D16.F5.10002
CP.C.D16.F5.05730
CP.C.D16.F5.05958
CP.C.D16.F5.05668
CP.C.D16.F5.06329
CP.C.D16.F5.06488
CP.C.D16.F5.06489
CP.C.D16.F5.06646
CCTV
CP.C.D16.F5.10006
CP.C.D16.F5.05734
CP.C.D16.F5.05995
CP.C.D16.F5.06224
CP.C.D16.F5.06566
CP.C.D16.F5.06830
CP.C.D16.F5.06687
Access Control
CP.C.D16.F5.10007
CP.C.D16.F5.05735
CP.C.D16.F5.05996
CP.C.D16.F5.06331
CP.C.D16.F5.06647
CP.C.D16.F5.06918
CP.C.D16.F5.06771
Digital Signage System
CP.C.D16.F5.10010
CP.C.D16.F5.05738
CP.C.D16.F5.05999
CP.C.D16.F5.06333
CP.C.D16.F5.06649
CP.C.D16.F5.06774
CP.C.D16.F5.06775
PAVA System
CP.C.D16.F5.10009
CP.C.D16.F5.05737
CP.C.D16.F5.05998
CP.C.D16.F5.06332
CP.C.D16.F5.06648
CP.C.D16.F5.06919
CP.C.D16.F5.06773
BMS System
CP.C.D16.F5.10011
CP.C.D16.F5.05671
CP.C.D16.F5.05959
CP.C.D16.F5.06492
CP.C.D16.F5.06284
CP.C.D16.F5.06285
Guest Room Management System
CP.C.D16.F5.10008
CP.C.D16.F5.05736
CP.C.D16.F5.05997
CP.C.D16.F5.06175
CP.C.D16.F5.06491
CP.C.D16.F5.06772
CP.C.D16.F5.06639
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F5.10003
CP.C.D16.F5.05731
CP.C.D16.F5.05934
CP.C.D16.F5.05669
CP.C.D16.F5.06174
CP.C.D16.F5.06490
CP.C.D16.F5.06317
Earthing and Lightning Protection System
CP.C.D16.F5.06640
Sixth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F6.09074
Drainage System
CP.C.D15.F6.05907
CP.C.D15.F6.06050
CP.C.D15.F6.06318
CP.C.D15.F6.05906
CP.C.D15.F6.06496
Water Supply System
CP.C.D15.F6.06538
CP.C.D15.F6.06225
CP.C.D15.F6.06049
CP.C.D15.F6.06676
CP.C.D15.F6.05905
CP.C.D15.F6.06814
Fire Fighting Work
CP.C.D15.F6.06815
CP.C.D15.F6.06226
CP.C.D15.F6.06380
CP.C.D15.F6.06708
CP.C.D15.F6.06920
CP.C.D15.F6.07597
CP.C.D15.F6.07021
CP.C.D15.F6.07167
CP.C.D15.F6.07742
HVAC Work
Duct & Pipes Work
CP.C.D15.F6.06892
CP.C.D15.F6.07154
CP.C.D15.F6.06310
CP.C.D15.F6.06495
CP.C.D15.F6.06889
CP.C.D15.F6.06991
CP.C.D15.F6.06891
CP.C.D15.F6.06890
CP.C.D15.F6.07276
CP.C.D15.F6.07741
Equipment Work
CP.C.D15.F6.03004
CP.C.D15.F6.03209
Electrical Work
Lighting System Work
CP.C.D16.F6.10001
CP.C.D16.F6.06141
CP.C.D16.F6.05823
CP.C.D16.F6.06497
CP.C.D16.F6.06800
CP.C.D16.F6.07068
CP.C.D16.F6.07775
CP.C.D16.F6.06921
Power Distribution Work
CP.C.D16.F6.10004
CP.C.D16.F6.06799
CP.C.D16.F6.05911
CP.C.D16.F6.06903
CP.C.D16.F6.06115
CP.C.D16.F6.05826
CP.C.D16.F6.06406
CP.C.D16.F6.07045
CP.C.D16.F6.07022
CP.C.D16.F6.07223
CP.C.D16.F6.07234
CP.C.D16.F6.03005
CP.C.D16.F6.07401
CP.C.D16.F6.03352
CP.C.D16.F6.03456
CP.C.D16.F6.06688
CP.C.D16.F6.06539
Power System Work
CP.C.D16.F6.10000
CP.C.D16.F6.05908
CP.C.D16.F6.05854
CP.C.D16.F6.06176
CP.C.D16.F6.06641
CP.C.D16.F6.06904
CP.C.D16.F6.06759
Low Current Systems Work
Data System Work
CP.C.D16.F6.10005
CP.C.D16.F6.05912
CP.C.D16.F6.06177
CP.C.D16.F6.06521
CP.C.D16.F6.01314
CP.C.D16.F6.01315
CP.C.D16.F6.06930
CP.C.D16.F6.06931
Fire Alarm System Work
CP.C.D16.F6.10002
CP.C.D16.F6.05909
CP.C.D16.F6.06142
CP.C.D16.F6.05824
CP.C.D16.F6.06520
CP.C.D16.F6.06656
CP.C.D16.F6.06657
CP.C.D16.F6.06806
CCTV
CP.C.D16.F6.10006
CP.C.D16.F6.05913
CP.C.D16.F6.06178
CP.C.D16.F6.06407
CP.C.D16.F6.06729
CP.C.D16.F6.06992
CP.C.D16.F6.06844
Access Control
CP.C.D16.F6.10007
CP.C.D16.F6.05914
CP.C.D16.F6.06179
CP.C.D16.F6.06522
CP.C.D16.F6.06807
CP.C.D16.F6.07083
CP.C.D16.F6.06932
Digital Signage System
CP.C.D16.F6.10010
CP.C.D16.F6.05917
CP.C.D16.F6.06182
CP.C.D16.F6.06524
CP.C.D16.F6.06809
CP.C.D16.F6.06935
CP.C.D16.F6.06936
PAVA System
CP.C.D16.F6.10009
CP.C.D16.F6.05916
CP.C.D16.F6.06181
CP.C.D16.F6.06523
CP.C.D16.F6.06808
CP.C.D16.F6.07084
CP.C.D16.F6.06934
BMS System
CP.C.D16.F6.10011
CP.C.D16.F6.05827
CP.C.D16.F6.06143
CP.C.D16.F6.06660
CP.C.D16.F6.06470
CP.C.D16.F6.06471
Guest Room Management System
CP.C.D16.F6.10008
CP.C.D16.F6.05915
CP.C.D16.F6.06180
CP.C.D16.F6.06350
CP.C.D16.F6.06659
CP.C.D16.F6.06933
CP.C.D16.F6.06801
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F6.10003
CP.C.D16.F6.05910
CP.C.D16.F6.06114
CP.C.D16.F6.05825
CP.C.D16.F6.06349
CP.C.D16.F6.06658
CP.C.D16.F6.06505
Earthing and Lightning Protection System
CP.C.D16.F6.06802
Seventh Floor
Mechanical Work
Plumbing Work
CP.C.D15.F7.09077
Drainage System
CP.C.D15.F7.06506
CP.C.D15.F7.06238
CP.C.D15.F7.06088
CP.C.D15.F7.06087
CP.C.D15.F7.06664
Water Supply System
CP.C.D15.F7.06709
CP.C.D15.F7.06408
CP.C.D15.F7.06832
CP.C.D15.F7.06237
CP.C.D15.F7.06086
CP.C.D15.F7.06977
Fire Fighting Work
CP.C.D15.F7.06978
CP.C.D15.F7.06409
CP.C.D15.F7.06568
CP.C.D15.F7.06863
CP.C.D15.F7.07085
CP.C.D15.F7.07757
CP.C.D15.F7.07186
CP.C.D15.F7.07324
CP.C.D15.F7.07887
HVAC Work
Duct & Pipes Work
CP.C.D15.F7.07051
CP.C.D15.F7.07310
CP.C.D15.F7.07048
CP.C.D15.F7.06498
CP.C.D15.F7.07155
CP.C.D15.F7.06663
CP.C.D15.F7.07050
CP.C.D15.F7.07049
CP.C.D15.F7.07454
CP.C.D15.F7.07886
Equipment Work
CP.C.D15.F7.03006
CP.C.D15.F7.03210
Electrical Work
Lighting System Work
CP.C.D16.F7.10001
CP.C.D16.F7.06319
CP.C.D16.F7.05971
CP.C.D16.F7.06665
CP.C.D16.F7.06960
CP.C.D16.F7.07224
CP.C.D16.F7.07916
CP.C.D16.F7.07086
Power Distribution Work
CP.C.D16.F7.10004
CP.C.D16.F7.06959
CP.C.D16.F7.06092
CP.C.D16.F7.07069
CP.C.D16.F7.05974
CP.C.D16.F7.06293
CP.C.D16.F7.06585
CP.C.D16.F7.07187
CP.C.D16.F7.07402
CP.C.D16.F7.07203
CP.C.D16.F7.03007
CP.C.D16.F7.07581
CP.C.D16.F7.07424
CP.C.D16.F7.03353
CP.C.D16.F7.03457
CP.C.D16.F7.06845
CP.C.D16.F7.06710
Power System Work
CP.C.D16.F7.10000
CP.C.D16.F7.06089
CP.C.D16.F7.06009
CP.C.D16.F7.06351
CP.C.D16.F7.06803
CP.C.D16.F7.07070
CP.C.D16.F7.06922
Low Current Systems Work
Data System Work
CP.C.D16.F7.10005
CP.C.D16.F7.06093
CP.C.D16.F7.06352
CP.C.D16.F7.06690
CP.C.D16.F7.01983
CP.C.D16.F7.01984
CP.C.D16.F7.07096
CP.C.D16.F7.07097
Fire Alarm System Work
CP.C.D16.F7.10002
CP.C.D16.F7.06090
CP.C.D16.F7.06320
CP.C.D16.F7.05972
CP.C.D16.F7.06689
CP.C.D16.F7.06816
CP.C.D16.F7.06817
CP.C.D16.F7.06969
CCTV
CP.C.D16.F7.10006
CP.C.D16.F7.06094
CP.C.D16.F7.06353
CP.C.D16.F7.06586
CP.C.D16.F7.06893
CP.C.D16.F7.07156
CP.C.D16.F7.07005
Access Control
CP.C.D16.F7.10007
CP.C.D16.F7.06095
CP.C.D16.F7.06354
CP.C.D16.F7.06691
CP.C.D16.F7.06970
CP.C.D16.F7.07236
CP.C.D16.F7.07098
Digital Signage System
CP.C.D16.F7.10010
CP.C.D16.F7.06098
CP.C.D16.F7.06357
CP.C.D16.F7.06693
CP.C.D16.F7.06972
CP.C.D16.F7.07101
CP.C.D16.F7.07102
PAVA System
CP.C.D16.F7.10009
CP.C.D16.F7.06097
CP.C.D16.F7.06356
CP.C.D16.F7.06692
CP.C.D16.F7.06971
CP.C.D16.F7.07237
CP.C.D16.F7.07100
BMS System
CP.C.D16.F7.10011
CP.C.D16.F7.05975
CP.C.D16.F7.06321
CP.C.D16.F7.06820
CP.C.D16.F7.06642
CP.C.D16.F7.06643
Guest Room Management System
CP.C.D16.F7.10008
CP.C.D16.F7.06096
CP.C.D16.F7.06355
CP.C.D16.F7.06541
CP.C.D16.F7.06819
CP.C.D16.F7.07099
CP.C.D16.F7.06961
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F7.10003
CP.C.D16.F7.06091
CP.C.D16.F7.05973
CP.C.D16.F7.06292
CP.C.D16.F7.06540
CP.C.D16.F7.06818
CP.C.D16.F7.06677
Earthing and Lightning Protection System
CP.C.D16.F7.06962
Eighth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F8.09080
Drainage System
CP.C.D15.F8.06678
CP.C.D15.F8.06428
CP.C.D15.F8.06259
CP.C.D15.F8.06258
CP.C.D15.F8.06824
Water Supply System
CP.C.D15.F8.06864
CP.C.D15.F8.06427
CP.C.D15.F8.06587
CP.C.D15.F8.06994
CP.C.D15.F8.06257
CP.C.D15.F8.07141
Fire Fighting Work
CP.C.D15.F8.07142
CP.C.D15.F8.06588
CP.C.D15.F8.06731
CP.C.D15.F8.07025
CP.C.D15.F8.07238
CP.C.D15.F8.07905
CP.C.D15.F8.07362
CP.C.D15.F8.07515
CP.C.D15.F8.08038
HVAC Work
Duct & Pipes Work
CP.C.D15.F8.07206
CP.C.D15.F8.06666
CP.C.D15.F8.07311
CP.C.D15.F8.06823
CP.C.D15.F8.07208
CP.C.D15.F8.07209
CP.C.D15.F8.07498
CP.C.D15.F8.07207
CP.C.D15.F8.07627
CP.C.D15.F8.08037
Equipment Work
CP.C.D15.F8.03008
CP.C.D15.F8.03211
Electrical Work
Lighting System Work
CP.C.D16.F8.10001
CP.C.D16.F8.06507
CP.C.D16.F8.06156
CP.C.D16.F8.06825
CP.C.D16.F8.07127
CP.C.D16.F8.07403
CP.C.D16.F8.08063
CP.C.D16.F8.07239
Power Distribution Work
CP.C.D16.F8.10004
CP.C.D16.F8.07126
CP.C.D16.F8.06263
CP.C.D16.F8.06159
CP.C.D16.F8.07225
CP.C.D16.F8.06481
CP.C.D16.F8.06747
CP.C.D16.F8.07363
CP.C.D16.F8.07582
CP.C.D16.F8.03009
CP.C.D16.F8.07748
CP.C.D16.F8.07381
CP.C.D16.F8.07598
CP.C.D16.F8.03354
CP.C.D16.F8.03458
CP.C.D16.F8.07006
CP.C.D16.F8.06865
Power System Work
CP.C.D16.F8.10000
CP.C.D16.F8.06260
CP.C.D16.F8.06205
CP.C.D16.F8.06542
CP.C.D16.F8.06963
CP.C.D16.F8.07226
CP.C.D16.F8.07087
Low Current Systems Work
Data System Work
CP.C.D16.F8.10005
CP.C.D16.F8.06264
CP.C.D16.F8.06543
CP.C.D16.F8.06847
CP.C.D16.F8.01985
CP.C.D16.F8.01986
CP.C.D16.F8.07248
CP.C.D16.F8.07249
Fire Alarm System Work
CP.C.D16.F8.10002
CP.C.D16.F8.06261
CP.C.D16.F8.06508
CP.C.D16.F8.06157
CP.C.D16.F8.06846
CP.C.D16.F8.06979
CP.C.D16.F8.06980
CP.C.D16.F8.07133
CCTV
CP.C.D16.F8.10006
CP.C.D16.F8.06265
CP.C.D16.F8.06544
CP.C.D16.F8.06748
CP.C.D16.F8.07052
CP.C.D16.F8.07312
CP.C.D16.F8.07169
Access Control
CP.C.D16.F8.10007
CP.C.D16.F8.06266
CP.C.D16.F8.06545
CP.C.D16.F8.06848
CP.C.D16.F8.07134
CP.C.D16.F8.07426
CP.C.D16.F8.07250
Digital Signage System
CP.C.D16.F8.10010
CP.C.D16.F8.06269
CP.C.D16.F8.06548
CP.C.D16.F8.06850
CP.C.D16.F8.07136
CP.C.D16.F8.07253
CP.C.D16.F8.07254
PAVA System
CP.C.D16.F8.10009
CP.C.D16.F8.06268
CP.C.D16.F8.06547
CP.C.D16.F8.06849
CP.C.D16.F8.07135
CP.C.D16.F8.07427
CP.C.D16.F8.07252
BMS System
CP.C.D16.F8.10011
CP.C.D16.F8.06160
CP.C.D16.F8.06509
CP.C.D16.F8.06983
CP.C.D16.F8.06804
CP.C.D16.F8.06805
Guest Room Management System
CP.C.D16.F8.10008
CP.C.D16.F8.06267
CP.C.D16.F8.06546
CP.C.D16.F8.06712
CP.C.D16.F8.06982
CP.C.D16.F8.07251
CP.C.D16.F8.07128
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F8.10003
CP.C.D16.F8.06262
CP.C.D16.F8.06158
CP.C.D16.F8.06480
CP.C.D16.F8.06711
CP.C.D16.F8.06981
CP.C.D16.F8.06833
Earthing and Lightning Protection System
CP.C.D16.F8.07129
Nineth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F9.09083
Drainage System
CP.C.D15.F9.06444
CP.C.D15.F9.06834
CP.C.D15.F9.06601
CP.C.D15.F9.06443
CP.C.D15.F9.06987
Water Supply System
CP.C.D15.F9.06442
CP.C.D15.F9.06600
CP.C.D15.F9.06749
CP.C.D15.F9.07158
CP.C.D15.F9.07026
CP.C.D15.F9.07296
Fire Fighting Work
CP.C.D15.F9.07297
CP.C.D15.F9.06750
CP.C.D15.F9.06895
CP.C.D15.F9.07190
CP.C.D15.F9.07428
CP.C.D15.F9.08050
CP.C.D15.F9.07535
CP.C.D15.F9.07690
CP.C.D15.F9.08137
HVAC Work
Duct & Pipes Work
CP.C.D15.F9.07384
CP.C.D15.F9.07387
CP.C.D15.F9.06826
CP.C.D15.F9.06986
CP.C.D15.F9.07386
CP.C.D15.F9.07678
CP.C.D15.F9.07499
CP.C.D15.F9.07385
CP.C.D15.F9.07785
CP.C.D15.F9.08136
Equipment Work
CP.C.D15.F9.03010
CP.C.D15.F9.03212
Electrical Work
Lighting System Work
CP.C.D16.F9.10001
CP.C.D16.F9.06679
CP.C.D16.F9.06335
CP.C.D16.F9.06988
CP.C.D16.F9.07281
CP.C.D16.F9.07583
CP.C.D16.F9.08190
CP.C.D16.F9.07429
Power Distribution Work
CP.C.D16.F9.10004
CP.C.D16.F9.07280
CP.C.D16.F9.06448
CP.C.D16.F9.06338
CP.C.D16.F9.06651
CP.C.D16.F9.07404
CP.C.D16.F9.07558
CP.C.D16.F9.07758
CP.C.D16.F9.06905
CP.C.D16.F9.03011
CP.C.D16.F9.07536
CP.C.D16.F9.07749
CP.C.D16.F9.07893
CP.C.D16.F9.03355
CP.C.D16.F9.03459
CP.C.D16.F9.07170
CP.C.D16.F9.07027
Power System Work
CP.C.D16.F9.10000
CP.C.D16.F9.06445
CP.C.D16.F9.06381
CP.C.D16.F9.06713
CP.C.D16.F9.07130
CP.C.D16.F9.07405
CP.C.D16.F9.07240
Low Current Systems Work
Data System Work
CP.C.D16.F9.10005
CP.C.D16.F9.06449
CP.C.D16.F9.06714
CP.C.D16.F9.07008
CP.C.D16.F9.01987
CP.C.D16.F9.01988
CP.C.D16.F9.07439
CP.C.D16.F9.07440
Fire Alarm System Work
CP.C.D16.F9.10002
CP.C.D16.F9.06446
CP.C.D16.F9.06680
CP.C.D16.F9.06336
CP.C.D16.F9.07007
CP.C.D16.F9.07143
CP.C.D16.F9.07144
CP.C.D16.F9.07288
CCTV
CP.C.D16.F9.10006
CP.C.D16.F9.06450
CP.C.D16.F9.06715
CP.C.D16.F9.06906
CP.C.D16.F9.07210
CP.C.D16.F9.07500
CP.C.D16.F9.07326
Access Control
CP.C.D16.F9.10007
CP.C.D16.F9.06451
CP.C.D16.F9.06716
CP.C.D16.F9.07009
CP.C.D16.F9.07289
CP.C.D16.F9.07600
CP.C.D16.F9.07441
Digital Signage System
CP.C.D16.F9.10010
CP.C.D16.F9.06454
CP.C.D16.F9.06719
CP.C.D16.F9.07011
CP.C.D16.F9.07291
CP.C.D16.F9.07444
CP.C.D16.F9.07445
PAVA System
CP.C.D16.F9.10009
CP.C.D16.F9.06453
CP.C.D16.F9.06718
CP.C.D16.F9.07010
CP.C.D16.F9.07290
CP.C.D16.F9.07601
CP.C.D16.F9.07443
BMS System
CP.C.D16.F9.10011
CP.C.D16.F9.06339
CP.C.D16.F9.06681
CP.C.D16.F9.07147
CP.C.D16.F9.06964
CP.C.D16.F9.06965
Guest Room Management System
CP.C.D16.F9.10008
CP.C.D16.F9.06452
CP.C.D16.F9.06717
CP.C.D16.F9.06867
CP.C.D16.F9.07146
CP.C.D16.F9.07442
CP.C.D16.F9.07282
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F9.10003
CP.C.D16.F9.06447
CP.C.D16.F9.06337
CP.C.D16.F9.06650
CP.C.D16.F9.06866
CP.C.D16.F9.07145
CP.C.D16.F9.06995
Earthing and Lightning Protection System
CP.C.D16.F9.07283
Tenth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F10.09087
Drainage System
CP.C.D15.F10.06617
CP.C.D15.F10.06762
CP.C.D15.F10.06996
CP.C.D15.F10.06616
CP.C.D15.F10.07151
Water Supply System
CP.C.D15.F10.06761
CP.C.D15.F10.06907
CP.C.D15.F10.07191
CP.C.D15.F10.06615
CP.C.D15.F10.07314
CP.C.D15.F10.07480
Fire Fighting Work
CP.C.D15.F10.06908
CP.C.D15.F10.07054
CP.C.D15.F10.07366
CP.C.D15.F10.07602
CP.C.D15.F10.07481
CP.C.D15.F10.08162
CP.C.D15.F10.07705
CP.C.D15.F10.07844
CP.C.D15.F10.08251
HVAC Work
Duct & Pipes Work
CP.C.D15.F10.07561
CP.C.D15.F10.06989
CP.C.D15.F10.07150
CP.C.D15.F10.07564
CP.C.D15.F10.07835
CP.C.D15.F10.07563
CP.C.D15.F10.07679
CP.C.D15.F10.07562
CP.C.D15.F10.07926
CP.C.D15.F10.08250
Equipment Work
CP.C.D15.F10.03012
CP.C.D15.F10.03213
Electrical Work
Lighting System Work
CP.C.D16.F10.10001
CP.C.D16.F10.06835
CP.C.D16.F10.06526
CP.C.D16.F10.07152
CP.C.D16.F10.07459
CP.C.D16.F10.07750
CP.C.D16.F10.08275
CP.C.D16.F10.07603
Power Distribution Work
CP.C.D16.F10.10004
CP.C.D16.F10.07458
CP.C.D16.F10.06621
CP.C.D16.F10.06529
CP.C.D16.F10.06811
CP.C.D16.F10.07584
CP.C.D16.F10.07728
CP.C.D16.F10.07906
CP.C.D16.F10.07071
CP.C.D16.F10.03013
CP.C.D16.F10.07706
CP.C.D16.F10.07894
CP.C.D16.F10.08044
CP.C.D16.F10.03356
CP.C.D16.F10.03460
CP.C.D16.F10.07327
CP.C.D16.F10.07192
Power System Work
CP.C.D16.F10.10000
CP.C.D16.F10.06618
CP.C.D16.F10.06569
CP.C.D16.F10.06868
CP.C.D16.F10.07284
CP.C.D16.F10.07585
CP.C.D16.F10.07430
Low Current Systems Work
Data System Work
CP.C.D16.F10.10005
CP.C.D16.F10.06622
CP.C.D16.F10.06869
CP.C.D16.F10.07172
CP.C.D16.F10.01989
CP.C.D16.F10.01990
CP.C.D16.F10.07615
CP.C.D16.F10.07616
Fire Alarm System Work
CP.C.D16.F10.10002
CP.C.D16.F10.06836
CP.C.D16.F10.06619
CP.C.D16.F10.06527
CP.C.D16.F10.07171
CP.C.D16.F10.07298
CP.C.D16.F10.07299
CP.C.D16.F10.07471
CCTV
CP.C.D16.F10.10006
CP.C.D16.F10.06623
CP.C.D16.F10.06870
CP.C.D16.F10.07072
CP.C.D16.F10.07388
CP.C.D16.F10.07680
CP.C.D16.F10.07517
Access Control
CP.C.D16.F10.10007
CP.C.D16.F10.06624
CP.C.D16.F10.06871
CP.C.D16.F10.07173
CP.C.D16.F10.07472
CP.C.D16.F10.07760
CP.C.D16.F10.07617
Digital Signage System
CP.C.D16.F10.10010
CP.C.D16.F10.06627
CP.C.D16.F10.06874
CP.C.D16.F10.07175
CP.C.D16.F10.07474
CP.C.D16.F10.07620
CP.C.D16.F10.07621
PAVA System
CP.C.D16.F10.10009
CP.C.D16.F10.06626
CP.C.D16.F10.06873
CP.C.D16.F10.07174
CP.C.D16.F10.07473
CP.C.D16.F10.07761
CP.C.D16.F10.07619
BMS System
CP.C.D16.F10.10011
CP.C.D16.F10.06530
CP.C.D16.F10.06837
CP.C.D16.F10.07302
CP.C.D16.F10.07131
CP.C.D16.F10.07132
Guest Room Management System
CP.C.D16.F10.10008
CP.C.D16.F10.06625
CP.C.D16.F10.06872
CP.C.D16.F10.07029
CP.C.D16.F10.07301
CP.C.D16.F10.07618
CP.C.D16.F10.07460
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F10.10003
CP.C.D16.F10.06620
CP.C.D16.F10.06528
CP.C.D16.F10.06810
CP.C.D16.F10.07028
CP.C.D16.F10.07300
CP.C.D16.F10.07159
Earthing and Lightning Protection System
CP.C.D16.F10.07461
Eleventh Floor
Mechanical Work
Plumbing Work
CP.C.D15.F11.09091
Drainage System
CP.C.D15.F11.06781
CP.C.D15.F11.06925
CP.C.D15.F11.07160
CP.C.D15.F11.06780
CP.C.D15.F11.07306
Water Supply System
CP.C.D15.F11.06924
CP.C.D15.F11.07073
CP.C.D15.F11.07367
CP.C.D15.F11.07502
CP.C.D15.F11.06779
CP.C.D15.F11.07657
Fire Fighting Work
CP.C.D15.F11.07074
CP.C.D15.F11.07212
CP.C.D15.F11.07539
CP.C.D15.F11.07762
CP.C.D15.F11.07658
CP.C.D15.F11.08264
CP.C.D15.F11.07864
CP.C.D15.F11.07999
CP.C.D15.F11.08921
HVAC Work
Duct & Pipes Work
CP.C.D15.F11.07731
CP.C.D15.F11.07153
CP.C.D15.F11.07305
CP.C.D15.F11.07734
CP.C.D15.F11.07977
CP.C.D15.F11.07733
CP.C.D15.F11.07836
CP.C.D15.F11.07732
CP.C.D15.F11.08076
CP.C.D15.F11.08920
Equipment Work
CP.C.D15.F11.03014
CP.C.D15.F11.03214
Electrical Work
Lighting System Work
CP.C.D16.F11.10001
CP.C.D16.F11.06997
CP.C.D16.F11.06695
CP.C.D16.F11.07307
CP.C.D16.F11.07632
CP.C.D16.F11.07895
CP.C.D16.F11.08948
CP.C.D16.F11.07763
Power Distribution Work
CP.C.D16.F11.10004
CP.C.D16.F11.07631
CP.C.D16.F11.06785
CP.C.D16.F11.06698
CP.C.D16.F11.06974
CP.C.D16.F11.07751
CP.C.D16.F11.07874
CP.C.D16.F11.07227
CP.C.D16.F11.08051
CP.C.D16.F11.07865
CP.C.D16.F11.08045
CP.C.D16.F11.03015
CP.C.D16.F11.08143
CP.C.D16.F11.03357
CP.C.D16.F11.03461
CP.C.D16.F11.07518
CP.C.D16.F11.07368
Power System Work
CP.C.D16.F11.10000
CP.C.D16.F11.06782
CP.C.D16.F11.06732
CP.C.D16.F11.07030
CP.C.D16.F11.07462
CP.C.D16.F11.07752
CP.C.D16.F11.07604
Low Current Systems Work
Data System Work
CP.C.D16.F11.10005
CP.C.D16.F11.06786
CP.C.D16.F11.07031
CP.C.D16.F11.07329
CP.C.D16.F11.01991
CP.C.D16.F11.01992
CP.C.D16.F11.07776
CP.C.D16.F11.07777
Fire Alarm System Work
CP.C.D16.F11.10002
CP.C.D16.F11.06783
CP.C.D16.F11.06696
CP.C.D16.F11.06998
CP.C.D16.F11.07328
CP.C.D16.F11.07482
CP.C.D16.F11.07483
CP.C.D16.F11.07644
CCTV
CP.C.D16.F11.10006
CP.C.D16.F11.06787
CP.C.D16.F11.07032
CP.C.D16.F11.07228
CP.C.D16.F11.07565
CP.C.D16.F11.07837
CP.C.D16.F11.07692
Access Control
CP.C.D16.F11.10007
CP.C.D16.F11.06788
CP.C.D16.F11.07033
CP.C.D16.F11.07330
CP.C.D16.F11.07645
CP.C.D16.F11.07908
CP.C.D16.F11.07778
Digital Signage System
CP.C.D16.F11.10010
CP.C.D16.F11.06791
CP.C.D16.F11.07036
CP.C.D16.F11.07332
CP.C.D16.F11.07647
CP.C.D16.F11.07781
CP.C.D16.F11.07782
PAVA System
CP.C.D16.F11.10009
CP.C.D16.F11.06790
CP.C.D16.F11.07035
CP.C.D16.F11.07331
CP.C.D16.F11.07646
CP.C.D16.F11.07909
CP.C.D16.F11.07780
BMS System
CP.C.D16.F11.10011
CP.C.D16.F11.06699
CP.C.D16.F11.06999
CP.C.D16.F11.07486
CP.C.D16.F11.07285
CP.C.D16.F11.07286
Guest Room Management System
CP.C.D16.F11.10008
CP.C.D16.F11.06789
CP.C.D16.F11.07034
CP.C.D16.F11.07194
CP.C.D16.F11.07485
CP.C.D16.F11.07779
CP.C.D16.F11.07633
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F11.10003
CP.C.D16.F11.06784
CP.C.D16.F11.06697
CP.C.D16.F11.06973
CP.C.D16.F11.07193
CP.C.D16.F11.07484
CP.C.D16.F11.07315
Earthing and Lightning Protection System
CP.C.D16.F11.07634
Twelfth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F12.09094
Drainage System
CP.C.D15.F12.06942
CP.C.D15.F12.07090
CP.C.D15.F12.07316
CP.C.D15.F12.06941
CP.C.D15.F12.07490
Water Supply System
CP.C.D15.F12.07089
CP.C.D15.F12.07229
CP.C.D15.F12.07540
CP.C.D15.F12.06940
CP.C.D15.F12.07682
CP.C.D15.F12.07819
Fire Fighting Work
CP.C.D15.F12.07230
CP.C.D15.F12.07390
CP.C.D15.F12.07709
CP.C.D15.F12.07820
CP.C.D15.F12.07910
CP.C.D15.F12.08932
CP.C.D15.F12.08012
CP.C.D15.F12.08112
CP.C.D15.F12.08974
HVAC Work
Duct & Pipes Work
CP.C.D15.F12.07877
CP.C.D15.F12.07880
CP.C.D15.F12.08105
CP.C.D15.F12.07879
CP.C.D15.F12.07308
CP.C.D15.F12.07489
CP.C.D15.F12.07978
CP.C.D15.F12.07878
CP.C.D15.F12.08200
CP.C.D15.F12.08973
Equipment Work
CP.C.D15.F12.03016
CP.C.D15.F12.03215
Electrical Work
Lighting System Work
CP.C.D16.F12.10001
CP.C.D16.F12.07161
CP.C.D16.F12.06852
CP.C.D16.F12.07491
CP.C.D16.F12.07790
CP.C.D16.F12.08046
CP.C.D16.F12.08991
CP.C.D16.F12.07911
Power Distribution Work
CP.C.D16.F12.10004
CP.C.D16.F12.07789
CP.C.D16.F12.06946
CP.C.D16.F12.06855
CP.C.D16.F12.07138
CP.C.D16.F12.07896
CP.C.D16.F12.07406
CP.C.D16.F12.08020
CP.C.D16.F12.08165
CP.C.D16.F12.08013
CP.C.D16.F12.08144
CP.C.D16.F12.03017
CP.C.D16.F12.08257
CP.C.D16.F12.03358
CP.C.D16.F12.03462
CP.C.D16.F12.07693
CP.C.D16.F12.07541
Power System Work
CP.C.D16.F12.10000
CP.C.D16.F12.06943
CP.C.D16.F12.06896
CP.C.D16.F12.07195
CP.C.D16.F12.07635
CP.C.D16.F12.07897
CP.C.D16.F12.07764
Low Current Systems Work
Data System Work
CP.C.D16.F12.10005
CP.C.D16.F12.06947
CP.C.D16.F12.07196
CP.C.D16.F12.07520
CP.C.D16.F12.01993
CP.C.D16.F12.01994
CP.C.D16.F12.07917
CP.C.D16.F12.07918
Fire Alarm System Work
CP.C.D16.F12.10002
CP.C.D16.F12.06944
CP.C.D16.F12.07162
CP.C.D16.F12.06853
CP.C.D16.F12.07519
CP.C.D16.F12.07659
CP.C.D16.F12.07660
CP.C.D16.F12.07799
CCTV
CP.C.D16.F12.10006
CP.C.D16.F12.06948
CP.C.D16.F12.07197
CP.C.D16.F12.07407
CP.C.D16.F12.07735
CP.C.D16.F12.07979
CP.C.D16.F12.07846
Access Control
CP.C.D16.F12.10007
CP.C.D16.F12.06949
CP.C.D16.F12.07198
CP.C.D16.F12.07521
CP.C.D16.F12.07800
CP.C.D16.F12.08053
CP.C.D16.F12.07919
Digital Signage System
CP.C.D16.F12.10010
CP.C.D16.F12.06952
CP.C.D16.F12.07201
CP.C.D16.F12.07523
CP.C.D16.F12.07802
CP.C.D16.F12.07922
CP.C.D16.F12.07923
PAVA System
CP.C.D16.F12.10009
CP.C.D16.F12.06951
CP.C.D16.F12.07200
CP.C.D16.F12.07522
CP.C.D16.F12.07801
CP.C.D16.F12.08054
CP.C.D16.F12.07921
BMS System
CP.C.D16.F12.10011
CP.C.D16.F12.06856
CP.C.D16.F12.07163
CP.C.D16.F12.07663
CP.C.D16.F12.07463
CP.C.D16.F12.07464
Guest Room Management System
CP.C.D16.F12.10008
CP.C.D16.F12.06950
CP.C.D16.F12.07199
CP.C.D16.F12.07370
CP.C.D16.F12.07662
CP.C.D16.F12.07920
CP.C.D16.F12.07791
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F12.10003
CP.C.D16.F12.06945
CP.C.D16.F12.06854
CP.C.D16.F12.07137
CP.C.D16.F12.07369
CP.C.D16.F12.07661
CP.C.D16.F12.07503
Earthing and Lightning Protection System
CP.C.D16.F12.07792
Thirteenth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F13.09097
Drainage System
CP.C.D15.F13.07108
CP.C.D15.F13.07243
CP.C.D15.F13.07504
CP.C.D15.F13.07107
CP.C.D15.F13.07667
Water Supply System
CP.C.D15.F13.07242
CP.C.D15.F13.07408
CP.C.D15.F13.07710
CP.C.D15.F13.07106
CP.C.D15.F13.07839
CP.C.D15.F13.07963
Fire Fighting Work
CP.C.D15.F13.07409
CP.C.D15.F13.07567
CP.C.D15.F13.07868
CP.C.D15.F13.08055
CP.C.D15.F13.07964
CP.C.D15.F13.08984
CP.C.D15.F13.08119
CP.C.D15.F13.08227
CP.C.D15.F13.09036
HVAC Work
Duct & Pipes Work
CP.C.D15.F13.08023
CP.C.D15.F13.08106
CP.C.D15.F13.08219
CP.C.D15.F13.08026
CP.C.D15.F13.07492
CP.C.D15.F13.07666
CP.C.D15.F13.08024
CP.C.D15.F13.08025
CP.C.D15.F13.08283
CP.C.D15.F13.09035
Equipment Work
CP.C.D15.F13.03018
CP.C.D15.F13.03216
Electrical Work
Lighting System Work
CP.C.D16.F13.10001
CP.C.D16.F13.07317
CP.C.D16.F13.07013
CP.C.D16.F13.07668
CP.C.D16.F13.07931
CP.C.D16.F13.08145
CP.C.D16.F13.09052
CP.C.D16.F13.08056
Power Distribution Work
CP.C.D16.F13.10004
CP.C.D16.F13.07930
CP.C.D16.F13.07112
CP.C.D16.F13.07016
CP.C.D16.F13.07293
CP.C.D16.F13.08047
CP.C.D16.F13.07586
CP.C.D16.F13.08124
CP.C.D16.F13.08265
CP.C.D16.F13.08120
CP.C.D16.F13.08258
CP.C.D16.F13.03019
CP.C.D16.F13.08927
CP.C.D16.F13.03359
CP.C.D16.F13.03463
CP.C.D16.F13.07847
CP.C.D16.F13.07711
Power System Work
CP.C.D16.F13.10000
CP.C.D16.F13.07109
CP.C.D16.F13.07055
CP.C.D16.F13.07371
CP.C.D16.F13.07793
CP.C.D16.F13.08048
CP.C.D16.F13.07912
Low Current Systems Work
Data System Work
CP.C.D16.F13.10005
CP.C.D16.F13.07113
CP.C.D16.F13.07372
CP.C.D16.F13.07695
CP.C.D16.F13.01995
CP.C.D16.F13.01996
CP.C.D16.F13.08064
CP.C.D16.F13.08065
Fire Alarm System Work
CP.C.D16.F13.10002
CP.C.D16.F13.07110
CP.C.D16.F13.07318
CP.C.D16.F13.07014
CP.C.D16.F13.07694
CP.C.D16.F13.07821
CP.C.D16.F13.07822
CP.C.D16.F13.07954
CCTV
CP.C.D16.F13.10006
CP.C.D16.F13.07114
CP.C.D16.F13.07373
CP.C.D16.F13.07587
CP.C.D16.F13.07881
CP.C.D16.F13.08107
CP.C.D16.F13.08001
Access Control
CP.C.D16.F13.10007
CP.C.D16.F13.07115
CP.C.D16.F13.07374
CP.C.D16.F13.07696
CP.C.D16.F13.07955
CP.C.D16.F13.08168
CP.C.D16.F13.08066
Digital Signage System
CP.C.D16.F13.10010
CP.C.D16.F13.07118
CP.C.D16.F13.07377
CP.C.D16.F13.07698
CP.C.D16.F13.07957
CP.C.D16.F13.08069
CP.C.D16.F13.08070
PAVA System
CP.C.D16.F13.10009
CP.C.D16.F13.07117
CP.C.D16.F13.07376
CP.C.D16.F13.07697
CP.C.D16.F13.07956
CP.C.D16.F13.08169
CP.C.D16.F13.08068
BMS System
CP.C.D16.F13.10011
CP.C.D16.F13.07017
CP.C.D16.F13.07319
CP.C.D16.F13.07825
CP.C.D16.F13.07636
CP.C.D16.F13.07637
Guest Room Management System
CP.C.D16.F13.10008
CP.C.D16.F13.07116
CP.C.D16.F13.07375
CP.C.D16.F13.07543
CP.C.D16.F13.07824
CP.C.D16.F13.08067
CP.C.D16.F13.07932
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F13.10003
CP.C.D16.F13.07111
CP.C.D16.F13.07015
CP.C.D16.F13.07292
CP.C.D16.F13.07542
CP.C.D16.F13.07823
CP.C.D16.F13.07683
Earthing and Lightning Protection System
CP.C.D16.F13.07933
Fourteenth Floor
Mechanical Work
Plumbing Work
CP.C.D15.F14.09662
Drainage System
CP.C.D15.F14.07260
CP.C.D15.F14.07688
CP.C.D15.F14.07433
CP.C.D15.F14.07261
CP.C.D15.F14.07831
Water Supply System
CP.C.D15.F14.07432
CP.C.D15.F14.07259
CP.C.D15.F14.07592
CP.C.D15.F14.07870
CP.C.D15.F14.07995
CP.C.D15.F14.08103
Fire Fighting Work
CP.C.D15.F14.07593
CP.C.D15.F14.07737
CP.C.D15.F14.08016
CP.C.D15.F14.08172
CP.C.D15.F14.08104
CP.C.D15.F14.09047
CP.C.D15.F14.08236
CP.C.D15.F14.08878
CP.C.D15.F14.09648
HVAC Work
Duct & Pipes Work
CP.C.D15.F14.08131
CP.C.D15.F14.08575
CP.C.D15.F14.08128
CP.C.D15.F14.07673
CP.C.D15.F14.08221
CP.C.D15.F14.07830
CP.C.D15.F14.08129
CP.C.D15.F14.08130
CP.C.D15.F14.08950
CP.C.D15.F14.09647
Equipment Work
CP.C.D15.F14.03029
CP.C.D15.F14.03218
Electrical Work
Lighting System Work
CP.C.D16.F14.10001
CP.C.D16.F14.07511
CP.C.D16.F14.07177
CP.C.D16.F14.07832
CP.C.D16.F14.08085
CP.C.D16.F14.08262
CP.C.D16.F14.09664
CP.C.D16.F14.08173
Power Distribution Work
CP.C.D16.F14.10004
CP.C.D16.F14.08084
CP.C.D16.F14.07180
CP.C.D16.F14.07477
CP.C.D16.F14.07265
CP.C.D16.F14.08148
CP.C.D16.F14.07753
CP.C.D16.F14.08246
CP.C.D16.F14.08237
CP.C.D16.F14.08938
CP.C.D16.F14.08929
CP.C.D16.F14.03030
CP.C.D16.F14.08981
CP.C.D16.F14.03361
CP.C.D16.F14.03466
CP.C.D16.F14.08006
CP.C.D16.F14.07871
Power System Work
CP.C.D16.F14.10000
CP.C.D16.F14.07262
CP.C.D16.F14.07213
CP.C.D16.F14.07548
CP.C.D16.F14.07951
CP.C.D16.F14.08149
CP.C.D16.F14.08058
Low Current Systems Work
Data System Work
CP.C.D16.F14.10005
CP.C.D16.F14.07549
CP.C.D16.F14.07266
CP.C.D16.F14.07854
CP.C.D16.F14.01999
CP.C.D16.F14.02000
CP.C.D16.F14.08191
CP.C.D16.F14.08192
Fire Alarm System Work
CP.C.D16.F14.10002
CP.C.D16.F14.07512
CP.C.D16.F14.07178
CP.C.D16.F14.07263
CP.C.D16.F14.07853
CP.C.D16.F14.07971
CP.C.D16.F14.07972
CP.C.D16.F14.08091
CCTV
CP.C.D16.F14.10006
CP.C.D16.F14.07550
CP.C.D16.F14.07267
CP.C.D16.F14.07754
CP.C.D16.F14.08033
CP.C.D16.F14.08222
CP.C.D16.F14.08114
Access Control
CP.C.D16.F14.10007
CP.C.D16.F14.07551
CP.C.D16.F14.07268
CP.C.D16.F14.07855
CP.C.D16.F14.08092
CP.C.D16.F14.08270
CP.C.D16.F14.08193
Digital Signage System
CP.C.D16.F14.10010
CP.C.D16.F14.07554
CP.C.D16.F14.07271
CP.C.D16.F14.07857
CP.C.D16.F14.08094
CP.C.D16.F14.08196
CP.C.D16.F14.08197
PAVA System
CP.C.D16.F14.10009
CP.C.D16.F14.07553
CP.C.D16.F14.07270
CP.C.D16.F14.07856
CP.C.D16.F14.08093
CP.C.D16.F14.08271
CP.C.D16.F14.08195
BMS System
CP.C.D16.F14.10011
CP.C.D16.F14.07181
CP.C.D16.F14.07513
CP.C.D16.F14.07975
CP.C.D16.F14.07794
CP.C.D16.F14.07795
Guest Room Management System
CP.C.D16.F14.10008
CP.C.D16.F14.07552
CP.C.D16.F14.07269
CP.C.D16.F14.07722
CP.C.D16.F14.07974
CP.C.D16.F14.08194
CP.C.D16.F14.08086
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.F14.10003
CP.C.D16.F14.07179
CP.C.D16.F14.07264
CP.C.D16.F14.07476
CP.C.D16.F14.07721
CP.C.D16.F14.07973
CP.C.D16.F14.07840
Earthing and Lightning Protection System
CP.C.D16.F14.08087
Roof Floor
Mechanical Work
Plumbing Work
CP.C.D15.RF.09710
Drainage System
CP.C.D15.RF.07339
CP.C.D15.RF.07765
CP.C.D15.RF.07338
CP.C.D15.RF.07507
CP.C.D15.RF.07898
Water Supply System
CP.C.D15.RF.07669
CP.C.D15.RF.07506
CP.C.D15.RF.07337
CP.C.D15.RF.07934
CP.C.D15.RF.08057
CP.C.D15.RF.08146
Fire Fighting Work
CP.C.D15.RF.07803
CP.C.D15.RF.08079
CP.C.D15.RF.07670
CP.C.D15.RF.08147
CP.C.D15.RF.08220
CP.C.D15.RF.09655
CP.C.D15.RF.08886
CP.C.D15.RF.08965
CP.C.D15.RF.09699
HVAC Work
Duct & Pipes Work
CP.C.D15.RF.08242
CP.C.D15.RF.08550
CP.C.D15.RF.08958
CP.C.D15.RF.08245
CP.C.D15.RF.07826
CP.C.D15.RF.07968
CP.C.D15.RF.08243
CP.C.D15.RF.08244
CP.C.D15.RF.08992
CP.C.D15.RF.09698
Equipment Work
CP.C.D15.RF.03020
CP.C.D15.RF.03217
Electrical Work
Lighting System Work
CP.C.D16.RF.10001
CP.C.D16.RF.07341
CP.C.D16.RF.07685
CP.C.D16.RF.07969
CP.C.D16.RF.08205
CP.C.D16.RF.08928
CP.C.D16.RF.09712
CP.C.D16.RF.08267
Power Distribution Work
CP.C.D16.RF.10004
CP.C.D16.RF.08204
CP.C.D16.RF.07346
CP.C.D16.RF.08259
CP.C.D16.RF.07347
CP.C.D16.RF.08890
CP.C.D16.RF.07606
CP.C.D16.RF.08986
CP.C.D16.RF.07848
CP.C.D16.RF.03021
CP.C.D16.RF.08887
CP.C.D16.RF.08979
CP.C.D16.RF.09043
CP.C.D16.RF.09042
CP.C.D16.RF.03360
CP.C.D16.RF.03465
CP.C.D16.RF.08090
CP.C.D16.RF.03464
CP.C.D16.RF.07970
Power System Work
CP.C.D16.RF.10000
CP.C.D16.RF.07391
CP.C.D16.RF.07340
CP.C.D16.RF.07712
CP.C.D16.RF.08080
CP.C.D16.RF.08260
CP.C.D16.RF.08170
Low Current Systems Work
Fire Alarm System Work
CP.C.D16.RF.10002
CP.C.D16.RF.07342
CP.C.D16.RF.07343
CP.C.D16.RF.07686
CP.C.D16.RF.08002
CP.C.D16.RF.08099
CP.C.D16.RF.08100
CP.C.D16.RF.08210
CCTV
CP.C.D16.RF.10005
CP.C.D16.RF.07713
CP.C.D16.RF.07348
CP.C.D16.RF.07899
CP.C.D16.RF.08125
CP.C.D16.RF.08556
CP.C.D16.RF.08229
Access Control
CP.C.D16.RF.10006
CP.C.D16.RF.07714
CP.C.D16.RF.07349
CP.C.D16.RF.08003
CP.C.D16.RF.08211
CP.C.D16.RF.08934
CP.C.D16.RF.08276
Digital Signage System
CP.C.D16.RF.10009
CP.C.D16.RF.07717
CP.C.D16.RF.07352
CP.C.D16.RF.08005
CP.C.D16.RF.08213
CP.C.D16.RF.08279
CP.C.D16.RF.08280
PAVA System
CP.C.D16.RF.10008
CP.C.D16.RF.07716
CP.C.D16.RF.07351
CP.C.D16.RF.08004
CP.C.D16.RF.08212
CP.C.D16.RF.08935
CP.C.D16.RF.08278
BMS System
CP.C.D16.RF.10010
CP.C.D16.RF.07353
CP.C.D16.RF.07687
CP.C.D16.RF.08102
CP.C.D16.RF.07936
CP.C.D16.RF.07937
Guest Room Management System
CP.C.D16.RF.10007
CP.C.D16.RF.07715
CP.C.D16.RF.07350
CP.C.D16.RF.07869
CP.C.D16.RF.08101
CP.C.D16.RF.08277
CP.C.D16.RF.08206
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.RF.10003
CP.C.D16.RF.07344
CP.C.D16.RF.07345
CP.C.D16.RF.07605
CP.C.D16.RF.07827
CP.C.D16.RF.08072
CP.C.D16.RF.07935
Earthing and Lightning Protection System
CP.C.D16.RF.08207
External Work
CP.C.EX.RF.06118
CP.C.EX.RF.06209
CP.C.EX.RF.06295
Upper Roof Floor
Mechanical Work
Plumbing Work
CP.C.D15.URF.03027
CP.C.D15.URF.03160
CP.C.D15.URF.03180
CP.C.D15.URF.03295
CP.C.D15.URF.08261
Drainage System
CP.C.D15.URF.07413
CP.C.D15.URF.07414
CP.C.D15.URF.07467
CP.C.D15.URF.07509
CP.C.D15.URF.07569
Water Supply System
CP.C.D15.URF.07412
CP.C.D15.URF.07466
CP.C.D15.URF.07508
CP.C.D15.URF.07568
CP.C.D15.URF.07623
CP.C.D15.URF.07671
Fire Fighting Work
CP.C.D15.URF.07510
CP.C.D15.URF.03028
CP.C.D15.URF.07570
CP.C.D15.URF.03161
CP.C.D15.URF.07624
CP.C.D15.URF.03181
CP.C.D15.URF.07672
CP.C.D15.URF.07720
CP.C.D15.URF.07769
HVAC Work
Duct & Pipes Work
CP.C.D15.URF.07807
CP.C.D15.URF.07719
CP.C.D15.URF.07850
CP.C.D15.URF.07768
CP.C.D15.URF.07808
CP.C.D15.URF.07809
CP.C.D15.URF.07810
CP.C.D15.URF.07851
CP.C.D15.URF.07901
CP.C.D15.URF.07940
Equipment Work
CP.C.D15.URF.03024
CP.C.D15.URF.03022
CP.C.D15.URF.03025
CP.C.D15.URF.03026
CP.C.D15.URF.03023
CP.C.D15.URF.03155
CP.C.D15.URF.03156
CP.C.D15.URF.03157
CP.C.D15.URF.03158
CP.C.D15.URF.03159
Electrical Work
Lighting System Work
CP.C.D16.URF.10001
CP.C.D16.URF.07448
CP.C.D16.URF.07494
CP.C.D16.URF.07545
CP.C.D16.URF.07944
CP.C.D16.URF.08028
CP.C.D16.URF.08073
CP.C.D16.URF.07987
Power Distribution Work
CP.C.D16.URF.07811
CP.C.D16.URF.07852
CP.C.D16.URF.07902
CP.C.D16.URF.07941
CP.C.D16.URF.07903
CP.C.D16.URF.07942
CP.C.D16.URF.07986
CP.C.D16.URF.07984
Power System Work
CP.C.D16.URF.10000
CP.C.D16.URF.07475
CP.C.D16.URF.07415
CP.C.D16.URF.07525
CP.C.D16.URF.07943
CP.C.D16.URF.08027
CP.C.D16.URF.07985
Low Current Systems Work
Data System Work
CP.C.D16.URF.10004
CP.C.D16.URF.07526
CP.C.D16.URF.07418
CP.C.D16.URF.07588
CP.C.D16.URF.07947
CP.C.D16.URF.01998
CP.C.D16.URF.07638
CP.C.D16.URF.07639
Fire Alarm System Work
CP.C.D16.URF.10002
CP.C.D16.URF.07449
CP.C.D16.URF.07416
CP.C.D16.URF.07495
CP.C.D16.URF.07945
CP.C.D16.URF.07988
CP.C.D16.URF.07989
CP.C.D16.URF.08029
CCTV
CP.C.D16.URF.10005
CP.C.D16.URF.07527
CP.C.D16.URF.07419
CP.C.D16.URF.07589
CP.C.D16.URF.07948
CP.C.D16.URF.08031
CP.C.D16.URF.07991
Access Control
CP.C.D16.URF.10006
CP.C.D16.URF.07528
CP.C.D16.URF.07420
CP.C.D16.URF.07590
CP.C.D16.URF.07949
CP.C.D16.URF.08032
CP.C.D16.URF.07992
Digital Signage System
CP.C.D16.URF.10007
CP.C.D16.URF.07529
CP.C.D16.URF.07421
CP.C.D16.URF.07591
CP.C.D16.URF.07950
CP.C.D16.URF.07993
CP.C.D16.URF.07994
BMS System
CP.C.D16.URF.10008
CP.C.D16.URF.07451
CP.C.D16.URF.07497
CP.C.D16.URF.07546
CP.C.D16.URF.07608
CP.C.D16.URF.07547
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.URF.10003
CP.C.D16.URF.07450
CP.C.D16.URF.07417
CP.C.D16.URF.07496
CP.C.D16.URF.07946
CP.C.D16.URF.08030
CP.C.D16.URF.07990
Earthing and Lightning Protection System
CP.C.D16.URF.07609
Top Roof Floor
Mechanical Work
Plumbing Work
CP.C.D15.TRF.02231
Drainage System
CP.C.D15.TRF.02002
CP.C.D15.TRF.02003
CP.C.D15.TRF.02167
CP.C.D15.TRF.02157
CP.C.D15.TRF.02182
Water Supply System
CP.C.D15.TRF.02001
CP.C.D15.TRF.02156
CP.C.D15.TRF.02166
CP.C.D15.TRF.02181
CP.C.D15.TRF.02206
CP.C.D15.TRF.02217
Fire Fighting Work
CP.C.D15.TRF.02168
CP.C.D15.TRF.02183
CP.C.D15.TRF.02207
CP.C.D15.TRF.02218
CP.C.D15.TRF.02232
CP.C.D15.TRF.02268
HVAC Work
Duct & Pipes Work
CP.C.D15.TRF.02177
CP.C.D15.TRF.02155
CP.C.D15.TRF.02204
CP.C.D15.TRF.02165
CP.C.D15.TRF.02178
CP.C.D15.TRF.02179
CP.C.D15.TRF.02180
CP.C.D15.TRF.02205
CP.C.D15.TRF.02216
CP.C.D15.TRF.02230
Equipment Work
CP.C.D15.TRF.03032
CP.C.D15.TRF.03031
CP.C.D15.TRF.03162
CP.C.D15.TRF.03163
Electrical Work
Lighting System Work
CP.C.D16.TRF.10001
CP.C.D16.TRF.02005
CP.C.D16.TRF.02158
CP.C.D16.TRF.02169
CP.C.D16.TRF.02209
CP.C.D16.TRF.02234
CP.C.D16.TRF.05266
CP.C.D16.TRF.02220
Power Distribution Work
CP.C.D16.TRF.05193
CP.C.D16.TRF.05265
CP.C.D16.TRF.05303
Power System Work
CP.C.D16.TRF.10000
CP.C.D16.TRF.02148
CP.C.D16.TRF.02004
CP.C.D16.TRF.02161
CP.C.D16.TRF.02208
CP.C.D16.TRF.02233
CP.C.D16.TRF.02219
Low Current Systems Work
Fire Alarm System Work
CP.C.D16.TRF.10002
CP.C.D16.TRF.02006
CP.C.D16.TRF.02007
CP.C.D16.TRF.02159
CP.C.D16.TRF.02210
CP.C.D16.TRF.02221
CP.C.D16.TRF.02222
CP.C.D16.TRF.02235
CCTV
CP.C.D16.TRF.10004
CP.C.D16.TRF.06473
CP.C.D16.TRF.02009
CP.C.D16.TRF.06511
CP.C.D16.TRF.06571
CP.C.D16.TRF.06668
CP.C.D16.TRF.06630
Access Control
CP.C.D16.TRF.10005
CP.C.D16.TRF.06474
CP.C.D16.TRF.02010
CP.C.D16.TRF.06512
CP.C.D16.TRF.06572
CP.C.D16.TRF.06669
CP.C.D16.TRF.06631
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM System
CP.C.D16.TRF.10003
CP.C.D16.TRF.06472
CP.C.D16.TRF.02008
CP.C.D16.TRF.06510
CP.C.D16.TRF.06570
CP.C.D16.TRF.06667
CP.C.D16.TRF.06629
Earthing and Lightning Protection System
CP.C.D16.TRF.02184
CP.C.D16.TRF.02203
General Work Related to all Building
Electrical Work
Podium Part01
CP.C.EX.All.9049
CP.C.EX.All.9050
CP.C.EX.All.9052
CP.C.EX.All.9051
Podium Part02
CP.C.EX.All.9045
CP.C.EX.All.9046
CP.C.EX.All.9048
CP.C.EX.All.9047
Podium Part03
CP.C.EX.All.9033
CP.C.EX.All.9034
CP.C.EX.All.9036
CP.C.EX.All.9035
Podium Part04
CP.C.EX.All.9037
CP.C.EX.All.9038
CP.C.EX.All.9040
CP.C.EX.All.9039
Podium Atrium01
CP.C.EX.All.9041
CP.C.EX.All.9042
CP.C.EX.All.9044
CP.C.EX.All.9043
Podium Atrium02
CP.C.EX.All.9025
CP.C.EX.All.9026
CP.C.EX.All.9028
CP.C.EX.All.9027
Tower Part01
CP.C.EX.All.9053
CP.C.EX.All.9054
CP.C.EX.All.9056
CP.C.EX.All.9055
Tower Part02
CP.C.EX.All.9029
CP.C.EX.All.9030
CP.C.EX.All.9032
CP.C.EX.All.9031
Tower Part03
CP.C.EX.All.08930
CP.C.EX.All.08957
CP.C.EX.All.09025
CP.C.EX.All.08982
Testing and commissioning
Pre Functional Test
Basement 3 (Tanks)
Zone 2 B
CP.T.D16.B3.08872
CP.T.D15.B3.08868
CP.T.D15.B3.08869
CP.T.D15.B3.08870
CP.T.D15.B3.08871
CP.T.D16.B3.08873
CP.T.D16.B3.08874
Basement 2
Zone 1 A
CP.T.D16.B2.08752
CP.T.D16.B2.08753
CP.T.D16.B2.08754
CP.T.D15.B2.08749
CP.T.D15.B2.08750
CP.T.D15.B2.08751
CP.T.D16.B2.08755
CP.T.D16.B2.08756
CP.T.D16.B2.08757
CP.T.D16.B2.08758
CP.T.D16.B2.08759
CP.T.D16.B2.08760
CP.T.D16.B2.08761
CP.T.D16.B2.08762
CP.T.D16.B2.08763
CP.T.D16.B2.02602
CP.T.D16.B2.08764
Zone 1 B
CP.T.D16.B2.08767
CP.T.D16.B2.08768
CP.T.D15.B2.08765
CP.T.D15.B2.08766
CP.T.D16.B2.08769
CP.T.D16.B2.08770
CP.T.D16.B2.08771
CP.T.D16.B2.08772
CP.T.D16.B2.08773
CP.T.D16.B2.08774
CP.T.D16.B2.08775
CP.T.D16.B2.08776
CP.T.D16.B2.04375
CP.T.D16.B2.08777
Zone 1 C
CP.T.D16.B2.08781
CP.T.D16.B2.08782
CP.T.D16.B2.08783
CP.T.D15.B2.08778
CP.T.D15.B2.08779
CP.T.D15.B2.08780
CP.T.D16.B2.08784
CP.T.D16.B2.08785
CP.T.D16.B2.08786
CP.T.D16.B2.08787
CP.T.D16.B2.08788
CP.T.D16.B2.08789
CP.T.D16.B2.08790
CP.T.D16.B2.08791
CP.T.D16.B2.08792
CP.T.D16.B2.04503
CP.T.D16.B2.08793
Zone 2 A
CP.T.D16.B2.08797
CP.T.D16.B2.08798
CP.T.D16.B2.08799
CP.T.D15.B2.08794
CP.T.D15.B2.08795
CP.T.D15.B2.08796
CP.T.D16.B2.08800
CP.T.D16.B2.08801
CP.T.D16.B2.08802
CP.T.D16.B2.08803
CP.T.D16.B2.08804
CP.T.D16.B2.08805
CP.T.D16.B2.08806
CP.T.D16.B2.08807
CP.T.D16.B2.08808
CP.T.D16.B2.04260
CP.T.D16.B2.08809
Zone 2 B
CP.T.D16.B2.08815
CP.T.D16.B2.08816
CP.T.D16.B2.08817
CP.T.D15.B2.08810
CP.T.D15.B2.08811
CP.T.D15.B2.08812
CP.T.D15.B2.08813
CP.T.D15.B2.08814
CP.T.D16.B2.08818
CP.T.D16.B2.08819
CP.T.D16.B2.08820
CP.T.D16.B2.08821
CP.T.D16.B2.08822
CP.T.D16.B2.08823
CP.T.D16.B2.08824
CP.T.D16.B2.08825
CP.T.D16.B2.08826
CP.T.D16.B2.04910
CP.T.D16.B2.08827
Zone 3 A
CP.T.D16.B2.08832
CP.T.D16.B2.08833
CP.T.D15.B2.08828
CP.T.D15.B2.08829
CP.T.D15.B2.08830
CP.T.D15.B2.08831
CP.T.D16.B2.08834
CP.T.D16.B2.08835
CP.T.D16.B2.08836
CP.T.D16.B2.08837
CP.T.D16.B2.08838
CP.T.D16.B2.08839
CP.T.D16.B2.08840
CP.T.D16.B2.08841
CP.T.D16.B2.02609
CP.T.D16.B2.08842
Zone 3 B
CP.T.D16.B2.08845
CP.T.D16.B2.08846
CP.T.D15.B2.08843
CP.T.D15.B2.08844
CP.T.D16.B2.08847
CP.T.D16.B2.08848
CP.T.D16.B2.08849
CP.T.D16.B2.08850
CP.T.D16.B2.08851
CP.T.D16.B2.08852
CP.T.D16.B2.08853
CP.T.D16.B2.08854
CP.T.D16.B2.04765
CP.T.D16.B2.08855
Zone 3 C
CP.T.D16.B2.08857
CP.T.D16.B2.08858
CP.T.D15.B2.08856
CP.T.D16.B2.08859
CP.T.D16.B2.08860
CP.T.D16.B2.08861
CP.T.D16.B2.08862
CP.T.D16.B2.08863
CP.T.D16.B2.08864
CP.T.D16.B2.08865
CP.T.D16.B2.08866
CP.T.D16.B2.04629
CP.T.D16.B2.08867
Basement 1
Zone 1 A
CP.T.D16.B1.08598
CP.T.D16.B1.08599
CP.T.D16.B1.08600
CP.T.D15.B1.08594
CP.T.D15.B1.08595
CP.T.D15.B1.08596
CP.T.D15.B1.08597
CP.T.D16.B1.08601
CP.T.D16.B1.08602
CP.T.D16.B1.08603
CP.T.D16.B1.08604
CP.T.D16.B1.08605
CP.T.D16.B1.08606
CP.T.D16.B1.08607
CP.T.D16.B1.08608
CP.T.D16.B1.08609
CP.T.D16.B1.08610
CP.T.D16.B1.02592
CP.T.D16.B1.08611
Zone 1 B
CP.T.D16.B1.08618
CP.T.D16.B1.08619
CP.T.D15.B1.08612
CP.T.D15.B1.08613
CP.T.D15.B1.08614
CP.T.D15.B1.08615
CP.T.D15.B1.08616
CP.T.D15.B1.08617
CP.T.D16.B1.08620
CP.T.D16.B1.08621
CP.T.D16.B1.08622
CP.T.D16.B1.08623
CP.T.D16.B1.08624
CP.T.D16.B1.08625
CP.T.D16.B1.08626
CP.T.D16.B1.08627
CP.T.D16.B1.08628
CP.T.D16.B1.05243
CP.T.D16.B1.08629
Zone 1 C
CP.T.D16.B1.08635
CP.T.D16.B1.08636
CP.T.D16.B1.08637
CP.T.D15.B1.08630
CP.T.D15.B1.08631
CP.T.D15.B1.08632
CP.T.D15.B1.08633
CP.T.D15.B1.08634
CP.T.D16.B1.08638
CP.T.D16.B1.08639
CP.T.D16.B1.08640
CP.T.D16.B1.08641
CP.T.D16.B1.08642
CP.T.D16.B1.08643
CP.T.D16.B1.08644
CP.T.D16.B1.08645
CP.T.D16.B1.08646
CP.T.D16.B1.08647
CP.T.D16.B1.02593
CP.T.D16.B1.08648
Zone 2 A
CP.T.D16.B1.08657
CP.T.D16.B1.08656
CP.T.D15.B1.08649
CP.T.D15.B1.08650
CP.T.D16.B1.08658
CP.T.D16.B1.08659
CP.T.D15.B1.08651
CP.T.D15.B1.08652
CP.T.D15.B1.08653
CP.T.D15.B1.08654
CP.T.D15.B1.08655
CP.T.D16.B1.08660
CP.T.D16.B1.08661
CP.T.D16.B1.08662
CP.T.D16.B1.08663
CP.T.D16.B1.08664
CP.T.D16.B1.08665
CP.T.D16.B1.08666
CP.T.D16.B1.08667
CP.T.D16.B1.08668
CP.T.D16.B1.08669
CP.T.D16.B1.05055
CP.T.D16.B1.08670
Zone 2 B
CP.T.D16.B1.08686
CP.T.D15.B1.08671
CP.T.D15.B1.08672
CP.T.D15.B1.08673
CP.T.D15.B1.08678
CP.T.D16.B1.08687
CP.T.D16.B1.09782
CP.T.D15.B1.08674
CP.T.D15.B1.08675
CP.T.D15.B1.08676
CP.T.D15.B1.08677
CP.T.D15.B1.08679
CP.T.D15.B1.08680
CP.T.D15.B1.08681
CP.T.D15.B1.08682
CP.T.D15.B1.08683
CP.T.D15.B1.08684
CP.T.D15.B1.08685
CP.T.D16.B1.08688
CP.T.D16.B1.08689
CP.T.D16.B1.08690
CP.T.D16.B1.08691
CP.T.D16.B1.08692
CP.T.D16.B1.08693
CP.T.D16.B1.08694
CP.T.D16.B1.08695
CP.T.D16.B1.08696
CP.T.D16.B1.08697
CP.T.D16.B1.05758
CP.T.D16.B1.08698
Zone 3 A
CP.T.D16.B1.08704
CP.T.D16.B1.08706
CP.T.D15.B1.08699
CP.T.D15.B1.08700
CP.T.D15.B1.08701
CP.T.D15.B1.08702
CP.T.D15.B1.08703
CP.T.D16.B1.08705
CP.T.D16.B1.08707
CP.T.D16.B1.08708
CP.T.D16.B1.08709
CP.T.D16.B1.08710
CP.T.D16.B1.08711
CP.T.D16.B1.08712
CP.T.D16.B1.08713
CP.T.D16.B1.08714
CP.T.D16.B1.08715
CP.T.D16.B1.08716
CP.T.D16.B1.05601
CP.T.D16.B1.08717
Zone 3 B
CP.T.D16.B1.08721
CP.T.D16.B1.08722
CP.T.D15.B1.08718
CP.T.D15.B1.08719
CP.T.D15.B1.08720
CP.T.D16.B1.08723
CP.T.D16.B1.08724
CP.T.D16.B1.08725
CP.T.D16.B1.08726
CP.T.D16.B1.08727
CP.T.D16.B1.08728
CP.T.D16.B1.08729
CP.T.D16.B1.08730
CP.T.D16.B1.08731
CP.T.D16.B1.02594
CP.T.D16.B1.08732
Zone 3 C
CP.T.D16.B1.08736
CP.T.D16.B1.08738
CP.T.D15.B1.08733
CP.T.D15.B1.08734
CP.T.D15.B1.08735
CP.T.D16.B1.08737
CP.T.D16.B1.08739
CP.T.D16.B1.08740
CP.T.D16.B1.08741
CP.T.D16.B1.08742
CP.T.D16.B1.08743
CP.T.D16.B1.08744
CP.T.D16.B1.08745
CP.T.D16.B1.08746
CP.T.D16.B1.08747
CP.T.D16.B1.05425
CP.T.D16.B1.08748
Ground Floor
CP.T.D16.GF.08327
CP.T.D16.GF.9139
CP.T.D16.GF.08329
CP.T.D16.GF.08331
CP.T.D16.GF.08332
CP.T.D15.GF.08320
CP.T.D15.GF.08321
CP.T.D15.GF.08322
CP.T.D15.GF.08323
CP.T.D15.GF.08324
CP.T.D15.GF.08325
CP.T.D15.GF.08326
CP.T.D16.GF.08328
CP.T.D16.GF.08330
CP.T.D16.GF.08333
CP.T.D16.GF.08334
CP.T.D16.GF.08335
CP.T.D16.GF.08336
CP.T.D16.GF.08337
CP.T.D16.GF.08338
CP.T.D16.GF.08339
CP.T.D16.GF.08340
CP.T.D16.GF.08341
CP.T.D16.GF.08342
CP.T.D16.GF.08343
CP.T.D16.GF.08344
CP.T.D16.GF.08345
CP.T.D16.GF.05900
CP.T.EX.GF.08349
CP.T.EX.GF.08350
CP.T.EX.GF.08351
CP.T.D16.GF.08346
First Floor
CP.T.D16.F1.08355
CP.T.D16.F1.08356
CP.T.D16.F1.08357
CP.T.D15.F1.08352
CP.T.D15.F1.08353
CP.T.D15.F1.08354
CP.T.D16.F1.08358
CP.T.D16.F1.08359
CP.T.D16.F1.08360
CP.T.D16.F1.08361
CP.T.D16.F1.08362
CP.T.D16.F1.08363
CP.T.D16.F1.08364
CP.T.D16.F1.08365
CP.T.D16.F1.08366
CP.T.D16.F1.08367
CP.T.D16.F1.06083
CP.T.D16.F1.08368
Second Floor
CP.T.D16.F2.08376
CP.T.D15.F2.08369
CP.T.D15.F2.08370
CP.T.D16.F2.08377
CP.T.D16.F2.08378
CP.T.D15.F2.08371
CP.T.D15.F2.08372
CP.T.D15.F2.08373
CP.T.D15.F2.08374
CP.T.D15.F2.08375
CP.T.D16.F2.08379
CP.T.D16.F2.08380
CP.T.D16.F2.08381
CP.T.D16.F2.08382
CP.T.D16.F2.08383
CP.T.D16.F2.08384
CP.T.D16.F2.08385
CP.T.D16.F2.08386
CP.T.D16.F2.08387
CP.T.D16.F2.08388
CP.T.D16.F2.06254
CP.T.D16.F2.08389
Third Floor
CP.T.D16.F3.08393
CP.T.D16.F3.08394
CP.T.D15.F3.08390
CP.T.D16.F3.08395
CP.T.D15.F3.08391
CP.T.D15.F3.08392
CP.T.D16.F3.08396
CP.T.D16.F3.08397
CP.T.D16.F3.08398
CP.T.D16.F3.08399
CP.T.D16.F3.08400
CP.T.D16.F3.08401
CP.T.D16.F3.08402
CP.T.D16.F3.08403
CP.T.D16.F3.08404
CP.T.D16.F3.08405
CP.T.D16.F3.06439
CP.T.D16.F3.08406
Fourth Floor
CP.T.D16.F4.08408
CP.T.D16.F4.08409
CP.T.D15.F4.08407
CP.T.D16.F4.08410
CP.T.D16.F4.08411
CP.T.D16.F4.08412
CP.T.D16.F4.08413
CP.T.D16.F4.08414
CP.T.D16.F4.08415
CP.T.D16.F4.08416
CP.T.D16.F4.08417
CP.T.D16.F4.08418
CP.T.D16.F4.08419
CP.T.D16.F4.08420
CP.T.D16.F4.06612
CP.T.D16.F4.08421
Fifth Floor
CP.T.D16.F5.08423
CP.T.D16.F5.08424
CP.T.D15.F5.08422
CP.T.D16.F5.08425
CP.T.D16.F5.08426
CP.T.D16.F5.08427
CP.T.D16.F5.08428
CP.T.D16.F5.08429
CP.T.D16.F5.08430
CP.T.D16.F5.08431
CP.T.D16.F5.08432
CP.T.D16.F5.08433
CP.T.D16.F5.08434
CP.T.D16.F5.08435
CP.T.D16.F5.06776
CP.T.D16.F5.08436
Sixth Floor
CP.T.D16.F6.08438
CP.T.D16.F6.08439
CP.T.D15.F6.08437
CP.T.D16.F6.08440
CP.T.D16.F6.08441
CP.T.D16.F6.08442
CP.T.D16.F6.08443
CP.T.D16.F6.08444
CP.T.D16.F6.08445
CP.T.D16.F6.08446
CP.T.D16.F6.08447
CP.T.D16.F6.08448
CP.T.D16.F6.08449
CP.T.D16.F6.08450
CP.T.D16.F6.06937
CP.T.D16.F6.08451
Seventh Floor
CP.T.D16.F7.08453
CP.T.D16.F7.08454
CP.T.D15.F7.08452
CP.T.D16.F7.08455
CP.T.D16.F7.08456
CP.T.D16.F7.08457
CP.T.D16.F7.08458
CP.T.D16.F7.08459
CP.T.D16.F7.08460
CP.T.D16.F7.08461
CP.T.D16.F7.08462
CP.T.D16.F7.08463
CP.T.D16.F7.08464
CP.T.D16.F7.08465
CP.T.D16.F7.07103
CP.T.D16.F7.08466
Eighth Floor
CP.T.D16.F8.08468
CP.T.D16.F8.08469
CP.T.D15.F8.08467
CP.T.D16.F8.08470
CP.T.D16.F8.08471
CP.T.D16.F8.08472
CP.T.D16.F8.08473
CP.T.D16.F8.08474
CP.T.D16.F8.08475
CP.T.D16.F8.08476
CP.T.D16.F8.08477
CP.T.D16.F8.08478
CP.T.D16.F8.08479
CP.T.D16.F8.08480
CP.T.D16.F8.07255
CP.T.D16.F8.08481
Nineth Floor
CP.T.D16.F9.08483
CP.T.D16.F9.08484
CP.T.D15.F9.08482
CP.T.D16.F9.08485
CP.T.D16.F9.08944
CP.T.D16.F9.08486
CP.T.D16.F9.08487
CP.T.D16.F9.08488
CP.T.D16.F9.08489
CP.T.D16.F9.08490
CP.T.D16.F9.08491
CP.T.D16.F9.08492
CP.T.D16.F9.08493
CP.T.D16.F9.08494
CP.T.D16.F9.07446
CP.T.D16.F9.08495
Tenth Floor
CP.T.D16.F10.08497
CP.T.D16.F10.08498
CP.T.D15.F10.08496
CP.T.D16.F10.08499
CP.T.D16.F10.08987
CP.T.D16.F10.08500
CP.T.D16.F10.08501
CP.T.D16.F10.08502
CP.T.D16.F10.08503
CP.T.D16.F10.08504
CP.T.D16.F10.08505
CP.T.D16.F10.08506
CP.T.D16.F10.08507
CP.T.D16.F10.08508
CP.T.D16.F10.07622
CP.T.D16.F10.08509
Eleventh Floor
CP.T.D16.F11.08511
CP.T.D16.F11.08512
CP.T.D15.F11.08510
CP.T.D16.F11.08513
CP.T.D16.F11.09048
CP.T.D16.F11.08514
CP.T.D16.F11.08515
CP.T.D16.F11.08516
CP.T.D16.F11.08517
CP.T.D16.F11.08518
CP.T.D16.F11.08519
CP.T.D16.F11.08520
CP.T.D16.F11.08521
CP.T.D16.F11.08522
CP.T.D16.F11.07783
CP.T.D16.F11.08523
Twelfth Floor
CP.T.D16.F12.08525
CP.T.D16.F12.08955
CP.T.D15.F12.08524
CP.T.D16.F12.08526
CP.T.D16.F12.09657
CP.T.D16.F12.08527
CP.T.D16.F12.08528
CP.T.D16.F12.08529
CP.T.D16.F12.08530
CP.T.D16.F12.08531
CP.T.D16.F12.08532
CP.T.D16.F12.08533
CP.T.D16.F12.08534
CP.T.D16.F12.08535
CP.T.D16.F12.07924
CP.T.D16.F12.08536
Thirteenth Floor
CP.T.D16.F13.08538
CP.T.D16.F13.09024
CP.T.D15.F13.08537
CP.T.D16.F13.08539
CP.T.D16.F13.09705
CP.T.D16.F13.08540
CP.T.D16.F13.08541
CP.T.D16.F13.08542
CP.T.D16.F13.08543
CP.T.D16.F13.08544
CP.T.D16.F13.08545
CP.T.D16.F13.08546
CP.T.D16.F13.08547
CP.T.D16.F13.08548
CP.T.D16.F13.08071
CP.T.D16.F13.08549
Fourteenth Floor
CP.T.D16.F14.08576
CP.T.D16.F14.09099
CP.T.D15.F14.08574
CP.T.D16.F14.08577
CP.T.D16.F14.09754
CP.T.D16.F14.08578
CP.T.D16.F14.08579
CP.T.D16.F14.08580
CP.T.D16.F14.08879
CP.T.D16.F14.08581
CP.T.D16.F14.08961
CP.T.D16.F14.08582
CP.T.D16.F14.08888
CP.T.D16.F14.08583
CP.T.D16.F14.08198
CP.T.D16.F14.08584
Roof Floor
CP.T.D16.RF.08552
CP.T.D16.RF.09670
CP.T.D16.RF.08959
CP.T.EX.RF.08347
CP.T.D15.RF.08551
CP.T.D16.RF.09784
CP.T.D16.RF.08553
CP.T.D16.RF.08554
CP.T.D16.RF.08555
CP.T.D16.RF.08960
CP.T.D16.RF.09026
CP.T.D16.RF.08891
CP.T.D16.RF.08968
CP.T.D16.RF.08936
CP.T.D16.RF.08281
CP.T.D16.RF.08557
Upper Roof Floor
CP.T.D16.URF.08564
CP.T.D15.URF.08558
CP.T.D15.URF.08559
CP.T.D16.URF.08565
CP.T.D15.URF.08560
CP.T.D15.URF.08561
CP.T.D15.URF.08562
CP.T.D15.URF.08563
CP.T.D16.URF.08566
CP.T.D16.URF.08567
CP.T.D16.URF.08568
CP.T.D16.URF.08569
CP.T.D16.URF.08570
CP.T.D16.URF.08571
CP.T.D16.URF.08572
CP.T.D16.URF.07650
CP.T.D16.URF.08573
Top Roof Floor
CP.T.D16.TRF.08587
CP.T.D15.TRF.08585
CP.T.D16.TRF.08588
CP.T.D15.TRF.08586
CP.T.D16.TRF.08589
CP.T.D16.TRF.08590
CP.T.D16.TRF.08591
CP.T.D16.TRF.08592
CP.T.D16.TRF.08593
CP.T.D16.TRF.02223
General Work Related to all Building
CP.T.D14.All.08319
CP.T.EX.All.09044
General Site
CP.T.EX.All.08348
Final Stage
Basement 3 (Tanks)
Zone 2 B
CP.T.D16.B3.09633
CP.T.D15.B3.09629
CP.T.D15.B3.09630
CP.T.D15.B3.09631
CP.T.D15.B3.09632
CP.T.D16.B3.09634
CP.T.D16.B3.09635
Basement 2
Zone 1 A
CP.T.D16.B2.09513
CP.T.D16.B2.09514
CP.T.D16.B2.09515
CP.T.D15.B2.09510
CP.T.D15.B2.09511
CP.T.D15.B2.09512
CP.T.D16.B2.09516
CP.T.D16.B2.09517
CP.T.D16.B2.09518
CP.T.D16.B2.09519
CP.T.D16.B2.09520
CP.T.D16.B2.09521
CP.T.D16.B2.09522
CP.T.D16.B2.09523
CP.T.D16.B2.09524
CP.T.D16.B2.02613
CP.T.D16.B2.09525
Zone 1 B
CP.T.D16.B2.09528
CP.T.D16.B2.09529
CP.T.D15.B2.09526
CP.T.D15.B2.09527
CP.T.D16.B2.09530
CP.T.D16.B2.09531
CP.T.D16.B2.09532
CP.T.D16.B2.09533
CP.T.D16.B2.09534
CP.T.D16.B2.09535
CP.T.D16.B2.09536
CP.T.D16.B2.09537
CP.T.D16.B2.04378
CP.T.D16.B2.09538
Zone 1 C
CP.T.D16.B2.09542
CP.T.D16.B2.09543
CP.T.D16.B2.09544
CP.T.D15.B2.09539
CP.T.D15.B2.09540
CP.T.D15.B2.09541
CP.T.D16.B2.09545
CP.T.D16.B2.09546
CP.T.D16.B2.09547
CP.T.D16.B2.09548
CP.T.D16.B2.09549
CP.T.D16.B2.09550
CP.T.D16.B2.09551
CP.T.D16.B2.09552
CP.T.D16.B2.09553
CP.T.D16.B2.04504
CP.T.D16.B2.09554
Zone 2 A
CP.T.D16.B2.09558
CP.T.D16.B2.09559
CP.T.D16.B2.09560
CP.T.D15.B2.09555
CP.T.D15.B2.09556
CP.T.D15.B2.09557
CP.T.D16.B2.09561
CP.T.D16.B2.09562
CP.T.D16.B2.09563
CP.T.D16.B2.09564
CP.T.D16.B2.09565
CP.T.D16.B2.09566
CP.T.D16.B2.09567
CP.T.D16.B2.09568
CP.T.D16.B2.09569
CP.T.D16.B2.04262
CP.T.D16.B2.09570
Zone 2 B
CP.T.D16.B2.09576
CP.T.D16.B2.09577
CP.T.D16.B2.09578
CP.T.D15.B2.09571
CP.T.D15.B2.09572
CP.T.D15.B2.09573
CP.T.D15.B2.09574
CP.T.D15.B2.09575
CP.T.D16.B2.09579
CP.T.D16.B2.09580
CP.T.D16.B2.09581
CP.T.D16.B2.09582
CP.T.D16.B2.09583
CP.T.D16.B2.09584
CP.T.D16.B2.09585
CP.T.D16.B2.09586
CP.T.D16.B2.09587
CP.T.D16.B2.04911
CP.T.D16.B2.09588
Zone 3 A
CP.T.D16.B2.09593
CP.T.D16.B2.09594
CP.T.D15.B2.09589
CP.T.D15.B2.09590
CP.T.D15.B2.09591
CP.T.D15.B2.09592
CP.T.D16.B2.09595
CP.T.D16.B2.09596
CP.T.D16.B2.09597
CP.T.D16.B2.09598
CP.T.D16.B2.09599
CP.T.D16.B2.09600
CP.T.D16.B2.09601
CP.T.D16.B2.09602
CP.T.D16.B2.02614
CP.T.D16.B2.09603
Zone 3 B
CP.T.D16.B2.09606
CP.T.D16.B2.09607
CP.T.D15.B2.09604
CP.T.D15.B2.09605
CP.T.D16.B2.09608
CP.T.D16.B2.09609
CP.T.D16.B2.09610
CP.T.D16.B2.09611
CP.T.D16.B2.09612
CP.T.D16.B2.09613
CP.T.D16.B2.09614
CP.T.D16.B2.09615
CP.T.D16.B2.04770
CP.T.D16.B2.09616
Zone 3 C
CP.T.D16.B2.09618
CP.T.D16.B2.09619
CP.T.D15.B2.09617
CP.T.D16.B2.09620
CP.T.D16.B2.09621
CP.T.D16.B2.09622
CP.T.D16.B2.09623
CP.T.D16.B2.09624
CP.T.D16.B2.09625
CP.T.D16.B2.09626
CP.T.D16.B2.09627
CP.T.D16.B2.04630
CP.T.D16.B2.09628
Basement 1
Zone 1 A
CP.T.D16.B1.09359
CP.T.D16.B1.09360
CP.T.D16.B1.09361
CP.T.D15.B1.09355
CP.T.D15.B1.09356
CP.T.D15.B1.09357
CP.T.D15.B1.09358
CP.T.D16.B1.09362
CP.T.D16.B1.09363
CP.T.D16.B1.09364
CP.T.D16.B1.09365
CP.T.D16.B1.09366
CP.T.D16.B1.09367
CP.T.D16.B1.09368
CP.T.D16.B1.09369
CP.T.D16.B1.09370
CP.T.D16.B1.09371
CP.T.D16.B1.02610
CP.T.D16.B1.09372
Zone 1 B
CP.T.D16.B1.09379
CP.T.D16.B1.09380
CP.T.D15.B1.09373
CP.T.D15.B1.09374
CP.T.D15.B1.09375
CP.T.D15.B1.09376
CP.T.D15.B1.09377
CP.T.D15.B1.09378
CP.T.D16.B1.09381
CP.T.D16.B1.09382
CP.T.D16.B1.09383
CP.T.D16.B1.09384
CP.T.D16.B1.09385
CP.T.D16.B1.09386
CP.T.D16.B1.09387
CP.T.D16.B1.09388
CP.T.D16.B1.09389
CP.T.D16.B1.05248
CP.T.D16.B1.09390
Zone 1 C
CP.T.D16.B1.09396
CP.T.D16.B1.09397
CP.T.D16.B1.09398
CP.T.D15.B1.09391
CP.T.D15.B1.09392
CP.T.D15.B1.09393
CP.T.D15.B1.09394
CP.T.D15.B1.09395
CP.T.D16.B1.09399
CP.T.D16.B1.09400
CP.T.D16.B1.09401
CP.T.D16.B1.09402
CP.T.D16.B1.09403
CP.T.D16.B1.09404
CP.T.D16.B1.09405
CP.T.D16.B1.09406
CP.T.D16.B1.09407
CP.T.D16.B1.09408
CP.T.D16.B1.02611
CP.T.D16.B1.09409
Zone 2 A
CP.T.D16.B1.09417
CP.T.D16.B1.09418
CP.T.D16.B1.09419
CP.T.D16.B1.09420
CP.T.D15.B1.09410
CP.T.D15.B1.09411
CP.T.D15.B1.09412
CP.T.D15.B1.09413
CP.T.D15.B1.09414
CP.T.D15.B1.09415
CP.T.D15.B1.09416
CP.T.D16.B1.09421
CP.T.D16.B1.09422
CP.T.D16.B1.09423
CP.T.D16.B1.09424
CP.T.D16.B1.09425
CP.T.D16.B1.09426
CP.T.D16.B1.09427
CP.T.D16.B1.09428
CP.T.D16.B1.09429
CP.T.D16.B1.09430
CP.T.D16.B1.05060
CP.T.D16.B1.09431
Zone 2 B
CP.T.D16.B1.09447
CP.T.D16.B1.09448
CP.T.D16.B1.09811
CP.T.D15.B1.09432
CP.T.D15.B1.09433
CP.T.D15.B1.09434
CP.T.D15.B1.09435
CP.T.D15.B1.09436
CP.T.D15.B1.09437
CP.T.D15.B1.09438
CP.T.D15.B1.09439
CP.T.D15.B1.09440
CP.T.D15.B1.09441
CP.T.D15.B1.09442
CP.T.D15.B1.09443
CP.T.D15.B1.09444
CP.T.D15.B1.09445
CP.T.D15.B1.09446
CP.T.D16.B1.09449
CP.T.D16.B1.09450
CP.T.D16.B1.09451
CP.T.D16.B1.09452
CP.T.D16.B1.09453
CP.T.D16.B1.09454
CP.T.D16.B1.09455
CP.T.D16.B1.09456
CP.T.D16.B1.09457
CP.T.D16.B1.09458
CP.T.D16.B1.05772
CP.T.D16.B1.09459
Zone 3 A
CP.T.D16.B1.09465
CP.T.D16.B1.09467
CP.T.D15.B1.09460
CP.T.D15.B1.09461
CP.T.D15.B1.09462
CP.T.D15.B1.09463
CP.T.D15.B1.09464
CP.T.D16.B1.09466
CP.T.D16.B1.09468
CP.T.D16.B1.09469
CP.T.D16.B1.09470
CP.T.D16.B1.09471
CP.T.D16.B1.09472
CP.T.D16.B1.09473
CP.T.D16.B1.09474
CP.T.D16.B1.09475
CP.T.D16.B1.09476
CP.T.D16.B1.09477
CP.T.D16.B1.05608
CP.T.D16.B1.09478
Zone 3 B
CP.T.D16.B1.09482
CP.T.D16.B1.09483
CP.T.D15.B1.09479
CP.T.D15.B1.09480
CP.T.D15.B1.09481
CP.T.D16.B1.09484
CP.T.D16.B1.09485
CP.T.D16.B1.09486
CP.T.D16.B1.09487
CP.T.D16.B1.09488
CP.T.D16.B1.09489
CP.T.D16.B1.09490
CP.T.D16.B1.09491
CP.T.D16.B1.09492
CP.T.D16.B1.02612
CP.T.D16.B1.09493
Zone 3 C
CP.T.D16.B1.09497
CP.T.D16.B1.09499
CP.T.D15.B1.09494
CP.T.D15.B1.09495
CP.T.D15.B1.09496
CP.T.D16.B1.09498
CP.T.D16.B1.09500
CP.T.D16.B1.09501
CP.T.D16.B1.09502
CP.T.D16.B1.09503
CP.T.D16.B1.09504
CP.T.D16.B1.09505
CP.T.D16.B1.09506
CP.T.D16.B1.09507
CP.T.D16.B1.09508
CP.T.D16.B1.05426
CP.T.D16.B1.09509
Ground Floor
CP.T.D16.GF.09122
CP.T.D16.GF.09124
CP.T.D16.GF.09125
CP.T.D15.GF.09113
CP.T.D15.GF.09114
CP.T.D15.GF.09115
CP.T.D15.GF.09116
CP.T.D15.GF.09117
CP.T.D15.GF.09118
CP.T.D15.GF.09119
CP.T.D16.GF.09120
CP.T.D16.GF.09121
CP.T.D16.GF.09123
CP.T.D16.GF.09126
CP.T.D16.GF.09127
CP.T.D16.GF.09128
CP.T.D16.GF.09129
CP.T.D16.GF.09130
CP.T.D16.GF.09131
CP.T.D16.GF.09132
CP.T.D16.GF.09133
CP.T.D16.GF.09134
CP.T.D16.GF.09135
CP.T.D16.GF.09136
CP.T.D16.GF.09137
CP.T.D16.GF.09138
CP.T.D16.GF.05921
CP.T.EX.GF.08941
CP.T.EX.GF.08942
CP.T.EX.GF.08943
CP.T.D16.GF.9140
CP.T.D16.GF.09139
First Floor
CP.T.D16.F1.09144
CP.T.D16.F1.09145
CP.T.D16.F1.09146
CP.T.D15.F1.09141
CP.T.D15.F1.09142
CP.T.D15.F1.09143
CP.T.D16.F1.09147
CP.T.D16.F1.09148
CP.T.D16.F1.09149
CP.T.D16.F1.09150
CP.T.D16.F1.09151
CP.T.D16.F1.09152
CP.T.D16.F1.09153
CP.T.D16.F1.09154
CP.T.D16.F1.09155
CP.T.D16.F1.09156
CP.T.D16.F1.06102
CP.T.D16.F1.09157
Second Floor
CP.T.D16.F2.09165
CP.T.D16.F2.09166
CP.T.D16.F2.09167
CP.T.D15.F2.09158
CP.T.D15.F2.09159
CP.T.D15.F2.09160
CP.T.D15.F2.09161
CP.T.D15.F2.09162
CP.T.D15.F2.09163
CP.T.D15.F2.09164
CP.T.D16.F2.09168
CP.T.D16.F2.09169
CP.T.D16.F2.09170
CP.T.D16.F2.09171
CP.T.D16.F2.09172
CP.T.D16.F2.09173
CP.T.D16.F2.09174
CP.T.D16.F2.09175
CP.T.D16.F2.09176
CP.T.D16.F2.09177
CP.T.D16.F2.06273
CP.T.D16.F2.09178
Third Floor
CP.T.D16.F3.09182
CP.T.D16.F3.09183
CP.T.D16.F3.09184
CP.T.D15.F3.09179
CP.T.D15.F3.09180
CP.T.D15.F3.09181
CP.T.D16.F3.09185
CP.T.D16.F3.09186
CP.T.D16.F3.09187
CP.T.D16.F3.09188
CP.T.D16.F3.09189
CP.T.D16.F3.09190
CP.T.D16.F3.09191
CP.T.D16.F3.09192
CP.T.D16.F3.09193
CP.T.D16.F3.09194
CP.T.D16.F3.06459
CP.T.D16.F3.09195
Fourth Floor
CP.T.D16.F4.09197
CP.T.D16.F4.09198
CP.T.D16.F4.09199
CP.T.D15.F4.09196
CP.T.D16.F4.09200
CP.T.D16.F4.09201
CP.T.D16.F4.09202
CP.T.D16.F4.09203
CP.T.D16.F4.09204
CP.T.D16.F4.09205
CP.T.D16.F4.09206
CP.T.D16.F4.09207
CP.T.D16.F4.09208
CP.T.D16.F4.09209
CP.T.D16.F4.06632
CP.T.D16.F4.09210
Fifth Floor
CP.T.D16.F5.09212
CP.T.D16.F5.09213
CP.T.D16.F5.09214
CP.T.D15.F5.09211
CP.T.D16.F5.09215
CP.T.D16.F5.09216
CP.T.D16.F5.09217
CP.T.D16.F5.09218
CP.T.D16.F5.09219
CP.T.D16.F5.09220
CP.T.D16.F5.09221
CP.T.D16.F5.09222
CP.T.D16.F5.09223
CP.T.D16.F5.09224
CP.T.D16.F5.06793
CP.T.D16.F5.09225
Sixth Floor
CP.T.D16.F6.09227
CP.T.D16.F6.09228
CP.T.D16.F6.09229
CP.T.D15.F6.09226
CP.T.D16.F6.09230
CP.T.D16.F6.09231
CP.T.D16.F6.09232
CP.T.D16.F6.09233
CP.T.D16.F6.09234
CP.T.D16.F6.09235
CP.T.D16.F6.09236
CP.T.D16.F6.09237
CP.T.D16.F6.09238
CP.T.D16.F6.09239
CP.T.D16.F6.06954
CP.T.D16.F6.09240
Seventh Floor
CP.T.D16.F7.09242
CP.T.D16.F7.09243
CP.T.D16.F7.09244
CP.T.D15.F7.09241
CP.T.D16.F7.09245
CP.T.D16.F7.09246
CP.T.D16.F7.09247
CP.T.D16.F7.09248
CP.T.D16.F7.09249
CP.T.D16.F7.09250
CP.T.D16.F7.09251
CP.T.D16.F7.09252
CP.T.D16.F7.09253
CP.T.D16.F7.09254
CP.T.D16.F7.07120
CP.T.D16.F7.09255
Eighth Floor
CP.T.D16.F8.09257
CP.T.D16.F8.09258
CP.T.D16.F8.09259
CP.T.D15.F8.09256
CP.T.D16.F8.09260
CP.T.D16.F8.09261
CP.T.D16.F8.09262
CP.T.D16.F8.09263
CP.T.D16.F8.09264
CP.T.D16.F8.09265
CP.T.D16.F8.09266
CP.T.D16.F8.09267
CP.T.D16.F8.09268
CP.T.D16.F8.09269
CP.T.D16.F8.07273
CP.T.D16.F8.09270
Nineth Floor
CP.T.D16.F9.09272
CP.T.D16.F9.09273
CP.T.D16.F9.09274
CP.T.D15.F9.09271
CP.T.D16.F9.09665
CP.T.D16.F9.09275
CP.T.D16.F9.09276
CP.T.D16.F9.09277
CP.T.D16.F9.09278
CP.T.D16.F9.09279
CP.T.D16.F9.09280
CP.T.D16.F9.09281
CP.T.D16.F9.09282
CP.T.D16.F9.09283
CP.T.D16.F9.07452
CP.T.D16.F9.09284
Tenth Floor
CP.T.D16.F10.09286
CP.T.D16.F10.09287
CP.T.D16.F10.09288
CP.T.D15.F10.09285
CP.T.D16.F10.09713
CP.T.D16.F10.09289
CP.T.D16.F10.09290
CP.T.D16.F10.09291
CP.T.D16.F10.09292
CP.T.D16.F10.09293
CP.T.D16.F10.09294
CP.T.D16.F10.09295
CP.T.D16.F10.09296
CP.T.D16.F10.09297
CP.T.D16.F10.07626
CP.T.D16.F10.09298
Eleventh Floor
CP.T.D16.F11.09300
CP.T.D16.F11.09301
CP.T.D16.F11.09302
CP.T.D15.F11.09299
CP.T.D16.F11.09756
CP.T.D16.F11.09303
CP.T.D16.F11.09304
CP.T.D16.F11.09305
CP.T.D16.F11.09306
CP.T.D16.F11.09307
CP.T.D16.F11.09308
CP.T.D16.F11.09309
CP.T.D16.F11.09310
CP.T.D16.F11.09311
CP.T.D16.F11.07784
CP.T.D16.F11.09312
Twelfth Floor
CP.T.D16.F12.09314
CP.T.D16.F12.09671
CP.T.D16.F12.09315
CP.T.D15.F12.09313
CP.T.D16.F12.09786
CP.T.D16.F12.09316
CP.T.D16.F12.09317
CP.T.D16.F12.09318
CP.T.D16.F12.09319
CP.T.D16.F12.09320
CP.T.D16.F12.09321
CP.T.D16.F12.09322
CP.T.D16.F12.09323
CP.T.D16.F12.09324
CP.T.D16.F12.07925
CP.T.D16.F12.09325
Thirteenth Floor
CP.T.D16.F13.09327
CP.T.D16.F13.09743
CP.T.D16.F13.09328
CP.T.D15.F13.09326
CP.T.D16.F13.09796
CP.T.D16.F13.09329
CP.T.D16.F13.09330
CP.T.D16.F13.09331
CP.T.D16.F13.09332
CP.T.D16.F13.09333
CP.T.D16.F13.09334
CP.T.D16.F13.09335
CP.T.D16.F13.09336
CP.T.D16.F13.09337
CP.T.D16.F13.08075
CP.T.D16.F13.09338
Fourteenth Floor
CP.T.D16.F14.09346
CP.T.D16.F14.09761
CP.T.D16.F14.09347
CP.T.D15.F14.09345
CP.T.D16.F14.09807
CP.T.D16.F14.09348
CP.T.D16.F14.09349
CP.T.D16.F14.09350
CP.T.D16.F14.09638
CP.T.D16.F14.09351
CP.T.D16.F14.09674
CP.T.D16.F14.09352
CP.T.D16.F14.09641
CP.T.D16.F14.09353
CP.T.D16.F14.08199
CP.T.D16.F14.09354
Roof Floor
CP.T.D16.RF.09340
CP.T.D16.RF.09790
CP.T.D16.RF.09672
CP.T.EX.RF.08939
CP.T.D15.RF.09339
CP.T.D16.RF.09813
CP.T.D16.RF.09341
CP.T.D16.RF.09342
CP.T.D16.RF.09343
CP.T.D16.RF.09673
CP.T.D16.RF.09744
CP.T.D16.RF.09643
CP.T.D16.RF.09691
CP.T.D16.RF.09656
CP.T.D16.RF.08282
CP.T.D16.RF.09344
Upper Roof Floor
CP.T.D16.URF.08898
CP.T.D16.URF.08899
CP.T.D15.URF.08892
CP.T.D15.URF.08893
CP.T.D15.URF.08894
CP.T.D15.URF.08895
CP.T.D15.URF.08896
CP.T.D15.URF.08897
CP.T.D16.URF.08900
CP.T.D16.URF.08901
CP.T.D16.URF.08902
CP.T.D16.URF.08903
CP.T.D16.URF.08904
CP.T.D16.URF.08905
CP.T.D16.URF.08906
CP.T.D16.URF.07651
CP.T.D16.URF.08907
Top Roof Floor
CP.T.D16.TRF.08910
CP.T.D16.TRF.08911
CP.T.D15.TRF.08908
CP.T.D15.TRF.08909
CP.T.D16.TRF.08912
CP.T.D16.TRF.08913
CP.T.D16.TRF.08914
CP.T.D16.TRF.08915
CP.T.D16.TRF.08916
CP.T.D16.TRF.02225
General Work Related to all Building
CP.T.EX.All.09140
Activity Name

Plate Heat Exchanger Plant Data Sheet / Supplier Suppmital


Plate Heat Exchanger Plant Data Sheet / Supplier Approval
Plate Heat Exchanger Plant P.O & Issue of Payment Certificate
Plate Heat Exchanger Plant Manufactures and Delivery

GRP water tanks Data Sheet / Supplier Suppmital


GRP water tanks Data Sheet / Supplier Approval
GRP water tanks P.O & Issue of Payment Certificate
GRP water tanks Manufactures and Delivery

Gray Water Treatment Plant Data Sheet / Supplier Suppmital


Gray Water Treatment Plant Data Sheet / Supplier Approval
Gray Water Treatment Plant P.O & Issue of Payment Certificate
Gray Water Treatment Plant Manufactures and Delivery

External Drainage Manholes Data Sheet / Supplier Suppmital


External Drainage Manholes Data Sheet / Supplier Approval
External Drainage Manholes P.O & Issue of Payment Certificate
External Drainage Manholes Manufactures and Delivery

Water Filtration System Data Sheet / Supplier Suppmital


Water Filtration System Data Sheet / Supplier Approval
Water Filtration System P.O & Issue of Payment Certificate
Water Filtration System Manufactures and Delivery

lint strainer / Oil Interceptor Data Sheet / Supplier Suppmital


lint strainer / Oil Interceptor Data Sheet / Supplier Approval
lint strainer / Oil Interceptor P.O & Issue of Payment Certificate
lint strainer / Oil Interceptor Manufactures and Delivery

Drainage Pumps Data Sheet / Supplier Suppmital


Drainage Pumps Data Sheet / Supplier Approval
Drainage Pumps P.O & Issue of Payment Certificate
Drainage Pumps Manufactures and Delivery

Filtration Unit Data Sheet / Supplier Suppmital


Filtration Unit Data Sheet / Supplier Approval
Filtration Unit P.O & Issue of Payment Certificate
Filtration Unit Manufactures and Delivery
Water Storage Calorifier Data Sheet / Supplier Suppmital
Water Storage Calorifier Data Sheet / Supplier Approval
Water Storage Calorifier P.O & Issue of Payment Certificate
Water Storage Calorifier Manufactures and Delivery

Water Supply Pumps Data Sheet / Supplier Suppmital


Water Supply Pumps Data Sheet / Supplier Approval
Water Supply Pumps P.O & Issue of Payment Certificate
Water Supply Pumps Manufactures and Delivery

Ecology Unit / Electrostatic Filter And Carbon Filter Data Sheet / Supplier Suppmital
Ecology Unit / Electrostatic Filter And Carbon Filter Data Sheet / Supplier Approval
Ecology Unit / Electrostatic Filter And Carbon Filter P.O & Issue of Payment Certificate
Ecology Unit / Electrostatic Filter And Carbon Filter Manufactures and Delivery

Grease Separator Data Sheet / Supplier Suppmital


Grease Separator Data Sheet / Supplier Approval
Grease Separator P.O & Issue of Payment Certificate
Grease Separator Manufactures and Delivery

Sanitary/Toilet & Bath Accessories Data Sheet / Supplier Suppmital


Sanitary/Toilet & Bath Accessories Data Sheet / Supplier Approval
Sanitary/Toilet & Bath Accessories P.O & Issue of Payment Certificate
Sanitary/Toilet & Bath Accessories Manufactures and Delivery

Fire Hydrant System Data Sheet / Supplier Suppmital


Fire Hydrant System Data Sheet / Supplier Approval
Fire Hydrant System P.O & Issue of Payment Certificate
Fire Hydrant System Manufactures and Delivery

FM-200 Data Sheet / Supplier Suppmital


FM-200 Data Sheet / Supplier Approval
FM-200 P.O & Issue of Payment Certificate
FM-200 Manufactures and Delivery

Fire Fighting Pump Data Sheet / Supplier Suppmital


Fire Fighting Pump Data Sheet / Supplier Approval
Fire Fighting Pump P.O & Issue of Payment Certificate
Fire Fighting Pump Manufactures and Delivery

Fire Alarm Station Data Sheet / Supplier Suppmital


Fire Alarm Station Data Sheet / Supplier Approval
Fire Alarm Station P.O & Issue of Payment Certificate
Fire Alarm Station Manufactures and Delivery

Close Control Unit Data Sheet / Supplier Suppmital


Close Control Unit Data Sheet / Supplier Approval
Close Control Unit P.O & Issue of Payment Certificate
Close Control Unit Manufactures and Delivery

Air and Dirt Separator Data Sheet / Supplier Suppmital


Air and Dirt Separator Data Sheet / Supplier Approval
Air and Dirt Separator P.O & Issue of Payment Certificate
Air and Dirt Separator Manufactures and Delivery

Cooling Tower Data Sheet / Supplier Suppmital


Cooling Tower Data Sheet / Supplier Approval
Cooling Tower P.O & Issue of Payment Certificate
Cooling Tower Manufactures and Delivery

Chemical Dosing System Data Sheet / Supplier Suppmital


Chemical Dosing System Data Sheet / Supplier Approval
Chemical Dosing System P.O & Issue of Payment Certificate
Chemical Dosing System Manufactures and Delivery

Air Handling Units Data Sheet / Supplier Suppmital


Air Handling Units Data Sheet / Supplier Approval
Air Handling Units P.O & Issue of Payment Certificate
Air Handling Units Manufactures and Delivery

Smoke Control Fans Data Sheet / Supplier Suppmital


Smoke Control Fans Data Sheet / Supplier Approval
Smoke Control Fans P.O & Issue of Payment Certificate
Smoke Control Fans Manufactures and Delivery

Refrigerant Leak Detection and Monitoring System Data Sheet / Supplier Suppmital
Refrigerant Leak Detection and Monitoring System Data Sheet / Supplier Approval
Refrigerant Leak Detection and Monitoring System P.O & Issue of Payment Certificate
Refrigerant Leak Detection and Monitoring System Manufactures and Delivery

Fan Coil Unit Data Sheet / Supplier Suppmital


Fan Coil Unit Data Sheet / Supplier Approval
Fan Coil Unit P.O & Issue of Payment Certificate
Fan Coil Unit Manufactures and Delivery

Extract Fans Data Sheet / Supplier Suppmital


Extract Fans Data Sheet / Supplier Approval
Extract Fans P.O & Issue of Payment Certificate
Extract Fans Manufactures and Delivery

Chilled Water Pressurization Unit Data Sheet / Supplier Suppmital


Chilled Water Pressurization Unit Data Sheet / Supplier Approval
Chilled Water Pressurization Unit P.O & Issue of Payment Certificate
Chilled Water Pressurization Unit Manufactures and Delivery

Fresh Air Handling Units Data Sheet / Supplier Suppmital


Fresh Air Handling Units Data Sheet / Supplier Approval
Fresh Air Handling Units P.O & Issue of Payment Certificate
Fresh Air Handling Units Manufactures and Delivery

Chilled Water Pump Data Sheet / Supplier Suppmital


Chilled Water Pump Data Sheet / Supplier Approval
Chilled Water Pump P.O & Issue of Payment Certificate
Chilled Water Pump Manufactures and Delivery

Chillers Data Sheet / Supplier Suppmital


Chillers Data Sheet / Supplier Approval
Chillers P.O & Issue of Payment Certificate
Chillers Manufactures and Delivery

LPG Leak Detection System Data Sheet / Supplier Suppmital


LPG Leak Detection System Data Sheet / Supplier Approval
LPG Leak Detection System P.O & Issue of Payment Certificate
LPG Leak Detection System Manufactures and Delivery

LPG Tanks Data Sheet / Supplier Suppmital


LPG Tanks Data Sheet / Supplier Approval
LPG Tanks P.O & Issue of Payment Certificate
LPG Tanks Manufactures and Delivery

LPG Electric Operated Vaporizers Data Sheet / Supplier Suppmital


LPG Electric Operated Vaporizers Data Sheet / Supplier Approval
LPG Electric Operated Vaporizers P.O & Issue of Payment Certificate
LPG Electric Operated Vaporizers Manufactures and Delivery

LPG Pressure reducing and Distribution panel Data Sheet / Supplier Suppmital
LPG Pressure reducing and Distribution panel Data Sheet / Supplier Approval
LPG Pressure reducing and Distribution panel P.O & Issue of Payment Certificate
LPG Pressure reducing and Distribution panel Manufactures and Delivery
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Data Sheet / Supplier Suppmital
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Data Sheet / Supplier Approval
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM P.O & Issue of Payment Certificate
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Manufactures and Delivery

UPS System Data Sheet / Supplier Suppmital


UPS System Data Sheet / Supplier Approval
UPS System P.O & Issue of Payment Certificate
UPS System Manufactures and Delivery

Capacitor Bank Data Sheet / Supplier Suppmital


Capacitor Bank Data Sheet / Supplier Approval
Capacitor Bank P.O & Issue of Payment Certificate
Capacitor Bank Manufactures and Delivery

Main and Sub Distribution Boards Data Sheet / Supplier Suppmital


Main and Sub Distribution Boards Data Sheet / Supplier Approval
Main and Sub Distribution Boards P.O & Issue of Payment Certificate
Main and Sub Distribution Boards Manufactures and Delivery

BTU Meter Data Sheet / Supplier Suppmital


BTU Meter Data Sheet / Supplier Approval
BTU Meter P.O & Issue of Payment Certificate
BTU Meter Manufactures and Delivery

GENERATOR Data Sheet / Supplier Suppmital


GENERATOR Data Sheet / Supplier Approval
GENERATOR P.O & Issue of Payment Certificate
GENERATOR Manufactures and Delivery

Motor Control Centers Data Sheet / Supplier Suppmital


Motor Control Centers Data Sheet / Supplier Approval
Motor Control Centers P.O & Issue of Payment Certificate
Motor Control Centers Manufactures and Delivery

Transformers Data Sheet / Supplier Suppmital


Transformers Data Sheet / Supplier Approval
Transformers P.O & Issue of Payment Certificate
Transformers Manufactures and Delivery

HV Switchear Data Sheet / Supplier Suppmital


HV Switchear Data Sheet / Supplier Approval
HV Switchear P.O & Issue of Payment Certificate
HV Switchear Manufactures and Delivery
Lighting Fixture Data Sheet / Supplier Suppmital
Lighting Fixture Data Sheet / Supplier Approval
Lighting Fixture P.O & Issue of Payment Certificate
Lighting Fixture Manufactures and Delivery

Fasade/Landscape Lighting Fixture Data Sheet / Supplier Suppmital


Fasade/Landscape Lighting Fixture Data Sheet / Supplier Approval
Facade/Landscape Lighting Fixture P.O & Issue of Payment Certificate
Facade/Landscape Lighting Fixture Manufactures and Delivery

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Data Sheet / Supplier Suppmital


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Data Sheet / Supplier Approval
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM P.O & Issue of Payment Certificate
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Manufactures and Delivery

Guest Room Management System Data Sheet / Supplier Suppmital


Guest Room Management System Data Sheet / Supplier Approval
Guest Room Management System P.O & Issue of Payment Certificate
Guest Room Management System Manufactures and Delivery

CCTV/IPTV System Data Sheet / Supplier Suppmital


CCTV/IPTV System Data Sheet / Supplier Approval
CCTV/IPTV System P.O & Issue of Payment Certificate
CCTV/IPTV System Manufactures and Delivery

Access Control System Data Sheet / Supplier Suppmital


Access Control System Data Sheet / Supplier Approval
Access Control System P.O & Issue of Payment Certificate
Access Control System Manufactures and Delivery

Time Attendance System Data Sheet / Supplier Suppmital


Time Attendance System Data Sheet / Supplier Approval
Time Attendance System P.O & Issue of Payment Certificate
Time Attendance System Manufactures and Delivery

Fire Alarm System Data Sheet / Supplier Suppmital


Fire Alarm System Data Sheet / Supplier Approval
Fire Alarm System P.O & Issue of Payment Certificate
Fire Alarm System Manufactures and Delivery

Digital Signage System Data Sheet / Supplier Suppmital


Digital Signage System Data Sheet / Supplier Approval
Digital Signage System P.O & Issue of Payment Certificate
Digital Signage System Manufactures and Delivery

Data System Data Sheet / Supplier Suppmital


Data System Data Sheet / Supplier Approval
Data System P.O & Issue of Payment Certificate
Data System Manufactures and Delivery

Audio Intercom System Data Sheet / Supplier Suppmital


Audio Intercom System Data Sheet / Supplier Approval
Audio Intercom System P.O & Issue of Payment Certificate
Audio Intercom System Manufactures and Delivery

Audio Visual System Data Sheet / Supplier Suppmital


Audio Visual System Data Sheet / Supplier Approval
Audio Visual System P.O & Issue of Payment Certificate
Audio Visual System Manufactures and Delivery

BMS DDC's Panel and Devices Data Sheet / Supplier Suppmital


BMS DDC's Panel and Devices Data Sheet / Supplier Approval
BMS DDC's Panel and Devices P.O & Issue of Payment Certificate
BMS DDC's Panel and Devices Manufactures and Delivery

PAVA SYSTEM Data Sheet / Supplier Suppmital


PAVA SYSTEM Data Sheet / Supplier Approval
PAVA SYSTEM P.O & Issue of Payment Certificate
PAVA SYSTEM Manufactures and Delivery

Gray Water Treatment Plant Installation at B3 Zone 2 B


Gray Water Treatment Plant Hock up and Connections at B3 Zone 2 B

Water Supply Pumps Installation at B3 Zone 2 B


Water Supply Pumps Hock up and Connections at B3 Zone 2 B

Fire Fighting Pump Installation at B3 Zone 2 B


Fire Fighting Pump Hock up and Connections at B3 Zone 2 B

Chilled Water Pipes Installation at B3 Zone 2 B


Chilled Water Testing at B3 Zone 2 B
Filtration Unit Installation at B3 Zone 2 B
Filtration Unit Hock up and Connections at B3 Zone 2 B

Cable Tray Installation at B3 Zone 2 B


LV Cables Over Cable Tray Placing at B3 Zone 2 B
Horizontal LV Busbar Installation at B3 Zone 2 B
Riser LV Busbar Installation at B3 Zone 2 B
Main and Sub Distribution Boards Frames Assembly and Installation at B3 Zone 2 B
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B3 Zone 2 B
Installation SPN / TPN Isolators for MDB and SMDB at B3 Zone 2 B
Installation SPN / TPN Isolators for DB at B3 Zone 2 B
Main and Sub Distribution Wiring and Termination at B3 Zone 2 B

PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B3 Zone 2 B
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B3 Zone 2 B
PAVA SYSTEM 2nd Fix Riser Cabling at B3 Zone 2 B
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B3 Zone 2 B
PAVA SYSTEM 3rd Fix Devices Installation at B3 Zone 2 B
PAVA SYSTEM Cable Termination at B3 Zone 2 B

BMS System 1st Fix (Conduits, Boxes, Flexible) at B3 Zone 2 B


BMS System 2nd Fix (Wiring, Cabling) at B3 Zone 2 B
BMS System 3rd Fix Devices Installation at B3 Zone 2 B
BMS System 3rd Fix Panels Installation at B3 Zone 2 B
BMS System Termination at B3 Zone 2 B

Installation of Sanitary Fixtures at B2 Zone 1 A

Installation of Drainage Pipes Support and Hangers at B2 Zone 1 A


Installation of Horizontal Drainage Pipes at B2 Zone 1 A
Testing of Drainage Pipes at B2 Zone 1 A
Installation of Riser Drainage Pipes at B2 Zone 1 A

Insulation of Hot Water Pipes at B2 Zone 1 A


Installation of Water Pipes Support and Hangers at B2 Zone 1 A
Installation of Horizontal Water Pipes at B2 Zone 1 A
Installation of Riser Water Pipes at B2 Zone 1 A
Testing of Water Pipes at B2 Zone 1 A

Installation of Fire Fighting Pipes Support and Hangers at B2 Zone 1 A


Installation of Fire Fighting Pipes at B2 Zone 1 A
Installation of Fire Fighting Riser Pipes at B2 Zone 1 A
Internal Fire Fighting Pipes Testing at B2 Zone 1 A
Installation of Fire Fighting Valves at B2 Zone 1 A
Installation of Sprinklers at B2 Zone 1 A
Installation of Fire Hose Cabinet at B2 Zone 1 A
Installation of hose and accessories at B2 Zone 1 A
Installation Fire Extinguisher at B2 Zone 1 A

Chilled Water Pipes Installation at B2 Zone 1 A


Installation of Duct Support and Hangers at B2 Zone 1 A
Installation of Horizontal Duct at B2 Zone 1 A
Insulation of Horizontal Duct at B2 Zone 1 A
Volume Damper and fire Damper Installation at B2 Zone 1 A
Smoke Test at B2 Zone 1 A
Chilled Water Testing at B2 Zone 1 A
Installation of Riser Duct at B2 Zone 1 A
Insulation of Riser Duct at B2 Zone 1 A
Installation of Air Outlets at B2 Zone 1 A

Fan Coil Unit Installation at B2 Zone 1 A


Smoke Control Fans Installation at B2 Zone 1 A
Extract Fans Installation at B2 Zone 1 A
Fan Coil Unit Hock up and Connections at B2 Zone 1 A
Smoke Control Fans Hock up and Connections at B2 Zone 1 A
Extract Fans Hock up and Connections at B2 Zone 1 A

Lighting System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 A


Lighting System 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
Lighting System 2nd Fix Riser Cabling at B2 Zone 1 A
Lighting System 3rd Fix Wiring Devices at B2 Zone 1 A
Installation of lighting Fixtures at B2 Zone 1 A
Lighting System Cable Termination at B2 Zone 1 A

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 A
Cable Tray Installation at B2 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at B2 Zone 1 A
LV Cables Over Cable Tray Placing at B2 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at B2 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at B2 Zone 1 A
Horizontal LV Busbar Installation at B2 Zone 1 A
Riser LV Busbar Installation at B2 Zone 1 A
Main and Sub Distribution Boards Frames Assembly and Installation at B2 Zone 1 A
Distribution Boards Frames Assembly and Installation at B2 Zone 1 A
Distribution Boards Circuit Breakers Installation at B2 Zone 1 A
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B2 Zone 1 A
Installation SPN / TPN Isolators for DB at B2 Zone 1 A
Installation SPN / TPN Isolators for MDB and SMDB at B2 Zone 1 A
Main and Sub Distribution Wiring and Termination at B2 Zone 1 A
Distribution Boards Wiring and Termination at B2 Zone 1 A

Power System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 A


Power System 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
Power System 2nd Fix Riser Cabling at B2 Zone 1 A
Power System 3rd Fix Wiring Devices Installation at B2 Zone 1 A
Power System Cable Termination at B2 Zone 1 A

Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 A
Data System 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
Data System 2nd Fix Riser Cabling at B2 Zone 1 A
Data System 2nd Fix Racks Installation at B2 Zone 1 A
Data System 3rd Fix Racks Component Installation at B2 Zone 1 A
Data System Cable Termination at B2 Zone 1 A

Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 A


Fire Alarm System 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
Fire Alarm System 2nd Fix Riser Cabling at B2 Zone 1 A
Fire Alarm System 3rd Fix Devices Installation at B2 Zone 1 A
Fire Alarm System 3rd Fix Panels Installation at B2 Zone 1 A
Fire Alarm System Cable Termination at B2 Zone 1 A

CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 A
CCTV System 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
CCTV System 2nd Fix Riser Cabling at B2 Zone 1 A
CCTV System 3rd Fix Cameras Installation at B2 Zone 1 A
CCTV System Cable Termination at B2 Zone 1 A

Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 A
Access Control System 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
Access Control System 2nd Fix Riser Cabling at B2 Zone 1 A
Access Control System 3rd Fix Devices Installation at B2 Zone 1 A
Access Control System Cable Termination at B2 Zone 1 A

Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 A
Digital Signage System 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
Digital Signage System 2nd Fix Riser Cabling at B2 Zone 1 A
Digital Signage System 3rd Fix Devices Installation at B2 Zone 1 A
Digital Signage System Cable Termination at B2 Zone 1 A

PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 A
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
PAVA SYSTEM 2nd Fix Riser Cabling at B2 Zone 1 A
PAVA SYSTEM 3rd Fix Devices Installation at B2 Zone 1 A
PAVA SYSTEM Cable Termination at B2 Zone 1 A

BMS System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 A


BMS System 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
BMS System 3rd Fix Devices Installation at B2 Zone 1 A
BMS System 3rd Fix Panels Installation at B2 Zone 1 A
BMS System Termination at B2 Zone 1 A

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B2 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B2 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B2 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B2 Zone 1 A

Lightning Protection System (Conduit, Wiring, Cabling) at B2 Zone 1 A

External Drainage Manholes Installation at B2 Zone 1 A


External Drainage Manholes Covers Installation at B2 Zone 1 A

Installation of Sanitary Fixtures at B2 Zone 1 B

Installation of Drainage Pipes Support and Hangers at B2 Zone 1 B


Installation of Horizontal Drainage Pipes at B2 Zone 1 B
Putting Drainage Pipes in Block Walls at B2 Zone 1 B
Installation of Riser Drainage Pipes at B2 Zone 1 B
Testing of Drainage Pipes at B2 Zone 1 B

Putting Water Pipes in Block Walls at B2 Zone 1 B


Installation of Water Pipes Support and Hangers at B2 Zone 1 B
Installation of Horizontal Water Pipes at B2 Zone 1 B
Installation of Riser Water Pipes at B2 Zone 1 B
Insulation of Hot Water Pipes at B2 Zone 1 B
Testing of Water Pipes at B2 Zone 1 B

Installation of Fire Fighting Pipes Support and Hangers at B2 Zone 1 B


Installation of Fire Fighting Pipes at B2 Zone 1 B
Internal Fire Fighting Pipes Testing at B2 Zone 1 B
Installation of Fire Fighting Riser Pipes at B2 Zone 1 B
Installation of Fire Fighting Valves at B2 Zone 1 B
Installation of Sprinklers at B2 Zone 1 B
Installation of Fire Hose Cabinet at B2 Zone 1 B
Installation of hose and accessories at B2 Zone 1 B
Installation Fire Extinguisher at B2 Zone 1 B

Chilled Water Pipes Installation at B2 Zone 1 B


Installation of Riser Duct at B2 Zone 1 B
Insulation of Horizontal Duct at B2 Zone 1 B
Installation of Duct Support and Hangers at B2 Zone 1 B
Installation of Horizontal Duct at B2 Zone 1 B
Volume Damper and fire Damper Installation at B2 Zone 1 B
Smoke Test at B2 Zone 1 B
Chilled Water Testing at B2 Zone 1 B
Insulation of Riser Duct at B2 Zone 1 B
Installation of Air Outlets at B2 Zone 1 B

Extract Fans Hock up and Connections at B2 Zone 1 B


Smoke Control Fans Installation at B2 Zone 1 B
Extract Fans Installation at B2 Zone 1 B
Smoke Control Fans Hock up and Connections at B2 Zone 1 B

Lighting System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 B


Lighting System 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
Lighting System 2nd Fix Riser Cabling at B2 Zone 1 B
Lighting System 3rd Fix Wiring Devices at B2 Zone 1 B
Installation of lighting Fixtures at B2 Zone 1 B
Lighting System Cable Termination at B2 Zone 1 B

Cable Tray Installation at B2 Zone 1 B


LV Cables Over Cable Tray Placing at B2 Zone 1 B
Horizontal LV Busbar Installation at B2 Zone 1 B
Riser LV Busbar Installation at B2 Zone 1 B
Main and Sub Distribution Boards Frames Assembly and Installation at B2 Zone 1 B
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B2 Zone 1 B
Installation SPN / TPN Isolators for MDB and SMDB at B2 Zone 1 B
Installation SPN / TPN Isolators for DB at B2 Zone 1 B
Main and Sub Distribution Wiring and Termination at B2 Zone 1 B
Power System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 B
Power System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
Power System 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
Power System 2nd Fix Riser Cabling at B2 Zone 1 B
Power System 3rd Fix Wiring Devices Installation at B2 Zone 1 B
Power System Cable Termination at B2 Zone 1 B

Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 B
Data System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
Data System 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
Data System 2nd Fix Riser Cabling at B2 Zone 1 B
Data System 2nd Fix Racks Installation at B2 Zone 1 B
Data System 3rd Fix Racks Component Installation at B2 Zone 1 B
Data System Cable Termination at B2 Zone 1 B

Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 B


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
Fire Alarm System 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
Fire Alarm System 2nd Fix Riser Cabling at B2 Zone 1 B
Fire Alarm System 3rd Fix Panels Installation at B2 Zone 1 B
Fire Alarm System 3rd Fix Devices Installation at B2 Zone 1 B
Fire Alarm System Cable Termination at B2 Zone 1 B

CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 B
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
CCTV System 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
CCTV System 2nd Fix Riser Cabling at B2 Zone 1 B
CCTV System 3rd Fix Cameras Installation at B2 Zone 1 B
CCTV System Cable Termination at B2 Zone 1 B

Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 B
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
Access Control System 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
Access Control System 2nd Fix Riser Cabling at B2 Zone 1 B
Access Control System 3rd Fix Devices Installation at B2 Zone 1 B
Access Control System Cable Termination at B2 Zone 1 B

Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 B
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
Digital Signage System 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
Digital Signage System 2nd Fix Riser Cabling at B2 Zone 1 B
Digital Signage System 3rd Fix Devices Installation at B2 Zone 1 B
Digital Signage System Cable Termination at B2 Zone 1 B
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 B
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
PAVA SYSTEM 2nd Fix Riser Cabling at B2 Zone 1 B
PAVA SYSTEM 3rd Fix Devices Installation at B2 Zone 1 B
PAVA SYSTEM Cable Termination at B2 Zone 1 B

BMS System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 B


BMS System 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
BMS System 3rd Fix Panels Installation at B2 Zone 1 B
BMS System 3rd Fix Devices Installation at B2 Zone 1 B
BMS System Termination at B2 Zone 1 B

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B2 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B2 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B2 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B2 Zone 1 B

Installation of Earthing Continuity inside Steel at B2 Zone 1 B


Lightning Protection System (Conduit, Wiring, Cabling) at B2 Zone 1 B

External Drainage Manholes Installation at B2 Zone 1 B


External Drainage Manholes Covers Installation at B2 Zone 1 B

Installation of Sanitary Fixtures at B2 Zone 1 C

Installation of Drainage Pipes Support and Hangers at B2 Zone 1 C


Installation of Horizontal Drainage Pipes at B2 Zone 1 C
Putting Drainage Pipes in Block Walls at B2 Zone 1 C
Installation of Riser Drainage Pipes at B2 Zone 1 C
Testing of Drainage Pipes at B2 Zone 1 C

Putting Water Pipes in Block Walls at B2 Zone 1 C


Installation of Water Pipes Support and Hangers at B2 Zone 1 C
Installation of Horizontal Water Pipes at B2 Zone 1 C
Installation of Riser Water Pipes at B2 Zone 1 C
Insulation of Hot Water Pipes at B2 Zone 1 C
Testing of Water Pipes at B2 Zone 1 C

Installation of Fire Fighting Pipes Support and Hangers at B2 Zone 1 C


Installation of Fire Fighting Pipes at B2 Zone 1 C
Internal Fire Fighting Pipes Testing at B2 Zone 1 C
Installation of Fire Fighting Riser Pipes at B2 Zone 1 C
Installation of Fire Fighting Valves at B2 Zone 1 C
Installation of Sprinklers at B2 Zone 1 C
Installation of Fire Hose Cabinet at B2 Zone 1 C
Installation of hose and accessories at B2 Zone 1 C
Installation Fire Extinguisher at B2 Zone 1 C

Chilled Water Pipes Installation at B2 Zone 1 C


Installation of Duct Support and Hangers at B2 Zone 1 C
Installation of Horizontal Duct at B2 Zone 1 C
Volume Damper and fire Damper Installation at B2 Zone 1 C
Smoke Test at B2 Zone 1 C
Chilled Water Testing at B2 Zone 1 C
Insulation of Horizontal Duct at B2 Zone 1 C
Installation of Riser Duct at B2 Zone 1 C
Insulation of Riser Duct at B2 Zone 1 C
Installation of Air Outlets at B2 Zone 1 C

Fan Coil Unit Installation at B2 Zone 1 C


Smoke Control Fans Installation at B2 Zone 1 C
Extract Fans Installation at B2 Zone 1 C
Fan Coil Unit Hock up and Connections at B2 Zone 1 C
Smoke Control Fans Hock up and Connections at B2 Zone 1 C
Extract Fans Hock up and Connections at B2 Zone 1 C

Lighting System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 C


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
Lighting System 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
Lighting System 2nd Fix Riser Cabling at B2 Zone 1 C
Lighting System 3rd Fix Wiring Devices at B2 Zone 1 C
Installation of lighting Fixtures at B2 Zone 1 C
Lighting System Cable Termination at B2 Zone 1 C

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 C
Cable Tray Installation at B2 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at B2 Zone 1 C
LV Cables Over Cable Tray Placing at B2 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at B2 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at B2 Zone 1 C
Horizontal LV Busbar Installation at B2 Zone 1 C
Riser LV Busbar Installation at B2 Zone 1 C
Main and Sub Distribution Boards Frames Assembly and Installation at B2 Zone 1 C
Distribution Boards Frames Assembly and Installation at B2 Zone 1 C
Distribution Boards Circuit Breakers Installation at B2 Zone 1 C
Installation SPN / TPN Isolators for DB at B2 Zone 1 C
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B2 Zone 1 C
Distribution Boards Wiring and Termination at B2 Zone 1 C
Installation SPN / TPN Isolators for MDB and SMDB at B2 Zone 1 C
Main and Sub Distribution Wiring and Termination at B2 Zone 1 C

Power System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 C


Power System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
Power System 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
Power System 2nd Fix Riser Cabling at B2 Zone 1 C
Power System 3rd Fix Wiring Devices Installation at B2 Zone 1 C
Power System Cable Termination at B2 Zone 1 C

Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 C
Data System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
Data System 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
Data System 2nd Fix Riser Cabling at B2 Zone 1 C
Data System 2nd Fix Racks Installation at B2 Zone 1 C
Data System 3rd Fix Racks Component Installation at B2 Zone 1 C
Data System Cable Termination at B2 Zone 1 C

Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 C


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
Fire Alarm System 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
Fire Alarm System 2nd Fix Riser Cabling at B2 Zone 1 C
Fire Alarm System 3rd Fix Panels Installation at B2 Zone 1 C
Fire Alarm System 3rd Fix Devices Installation at B2 Zone 1 C
Fire Alarm System Cable Termination at B2 Zone 1 C

CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 C
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
CCTV System 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
CCTV System 2nd Fix Riser Cabling at B2 Zone 1 C
CCTV System 3rd Fix Cameras Installation at B2 Zone 1 C
CCTV System Cable Termination at B2 Zone 1 C

Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 C
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
Access Control System 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
Access Control System 2nd Fix Riser Cabling at B2 Zone 1 C
Access Control System 3rd Fix Devices Installation at B2 Zone 1 C
Access Control System Cable Termination at B2 Zone 1 C

Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 C
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
Digital Signage System 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
Digital Signage System 2nd Fix Riser Cabling at B2 Zone 1 C
Digital Signage System 3rd Fix Devices Installation at B2 Zone 1 C
Digital Signage System Cable Termination at B2 Zone 1 C

PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 C
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
PAVA SYSTEM 2nd Fix Riser Cabling at B2 Zone 1 C
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
PAVA SYSTEM 3rd Fix Devices Installation at B2 Zone 1 C
PAVA SYSTEM Cable Termination at B2 Zone 1 C

BMS System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 1 C


BMS System 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
BMS System 3rd Fix Panels Installation at B2 Zone 1 C
BMS System 3rd Fix Devices Installation at B2 Zone 1 C
BMS System Termination at B2 Zone 1 C

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B2 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B2 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B2 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B2 Zone 1 C

Installation of Earthing Continuity inside Steel at B2 Zone 1 C


Lightning Protection System (Conduit, Wiring, Cabling) at B2 Zone 1 C

External Drainage Manholes Installation at B2 Zone 1 C


External Drainage Manholes Covers Installation at B2 Zone 1 C

Installation of Sanitary Fixtures at B2 Zone 2 A

Installation of Horizontal Drainage Pipes at B2 Zone 2 A


Installation of Drainage Pipes Support and Hangers at B2 Zone 2 A
Putting Drainage Pipes in Block Walls at B2 Zone 2 A
Installation of Riser Drainage Pipes at B2 Zone 2 A
Testing of Drainage Pipes at B2 Zone 2 A

Putting Water Pipes in Block Walls at B2 Zone 2 A


Installation of Water Pipes Support and Hangers at B2 Zone 2 A
Installation of Horizontal Water Pipes at B2 Zone 2 A
Installation of Riser Water Pipes at B2 Zone 2 A
Insulation of Hot Water Pipes at B2 Zone 2 A
Testing of Water Pipes at B2 Zone 2 A

Installation of Fire Fighting Pipes Support and Hangers at B2 Zone 2 A


Installation of Fire Fighting Pipes at B2 Zone 2 A
Internal Fire Fighting Pipes Testing at B2 Zone 2 A
Installation of Fire Fighting Riser Pipes at B2 Zone 2 A
Installation of Fire Fighting Valves at B2 Zone 2 A
Installation of Sprinklers at B2 Zone 2 A
Installation of Fire Hose Cabinet at B2 Zone 2 A
Installation of hose and accessories at B2 Zone 2 A
Installation Fire Extinguisher at B2 Zone 2 A

Chilled Water Pipes Installation at B2 Zone 2 A


Installation of Riser Duct at B2 Zone 2 A
Insulation of Riser Duct at B2 Zone 2 A
Installation of Duct Support and Hangers at B2 Zone 2 A
Installation of Horizontal Duct at B2 Zone 2 A
Volume Damper and fire Damper Installation at B2 Zone 2 A
Smoke Test at B2 Zone 2 A
Insulation of Horizontal Duct at B2 Zone 2 A
Chilled Water Testing at B2 Zone 2 A
Installation of Air Outlets at B2 Zone 2 A

Fan Coil Unit Installation at B2 Zone 2 A


Smoke Control Fans Installation at B2 Zone 2 A
Extract Fans Installation at B2 Zone 2 A
Fan Coil Unit Hock up and Connections at B2 Zone 2 A
Smoke Control Fans Hock up and Connections at B2 Zone 2 A
Extract Fans Hock up and Connections at B2 Zone 2 A

Lighting System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 2 A


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
Lighting System 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
Lighting System 2nd Fix Riser Cabling at B2 Zone 2 A
Lighting System 3rd Fix Wiring Devices at B2 Zone 2 A
Installation of lighting Fixtures at B2 Zone 2 A
Lighting System Cable Termination at B2 Zone 2 A

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
Cable Tray Installation at B2 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at B2 Zone 2 A
LV Cables Over Cable Tray Placing at B2 Zone 2 A
Horizontal LV Busbar Installation at B2 Zone 2 A
Riser LV Busbar Installation at B2 Zone 2 A
Main and Sub Distribution Boards Frames Assembly and Installation at B2 Zone 2 A
Distribution Boards Frames Assembly and Installation at B2 Zone 2 A
Distribution Boards Circuit Breakers Installation at B2 Zone 2 A
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B2 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at B2 Zone 2 A
Installation SPN / TPN Isolators for DB at B2 Zone 2 A
Installation SPN / TPN Isolators for MDB and SMDB at B2 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at B2 Zone 2 A
Main and Sub Distribution Wiring and Termination at B2 Zone 2 A
Distribution Boards Wiring and Termination at B2 Zone 2 A

Power System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 2 A


Power System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
Power System 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
Power System 2nd Fix Riser Cabling at B2 Zone 2 A
Power System 3rd Fix Wiring Devices Installation at B2 Zone 2 A
Power System Cable Termination at B2 Zone 2 A

Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 A
Data System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
Data System 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
Data System 2nd Fix Riser Cabling at B2 Zone 2 A
Data System 2nd Fix Racks Installation at B2 Zone 2 A
Data System 3rd Fix Racks Component Installation at B2 Zone 2 A
Data System Cable Termination at B2 Zone 2 A

Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 2 A


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
Fire Alarm System 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
Fire Alarm System 2nd Fix Riser Cabling at B2 Zone 2 A
Fire Alarm System 3rd Fix Panels Installation at B2 Zone 2 A
Fire Alarm System 3rd Fix Devices Installation at B2 Zone 2 A
Fire Alarm System Cable Termination at B2 Zone 2 A
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 A
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
CCTV System 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
CCTV System 2nd Fix Riser Cabling at B2 Zone 2 A
CCTV System 3rd Fix Cameras Installation at B2 Zone 2 A
CCTV System Cable Termination at B2 Zone 2 A

Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 A
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
Access Control System 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
Access Control System 2nd Fix Riser Cabling at B2 Zone 2 A
Access Control System 3rd Fix Devices Installation at B2 Zone 2 A
Access Control System Cable Termination at B2 Zone 2 A

Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 A
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
Digital Signage System 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
Digital Signage System 2nd Fix Riser Cabling at B2 Zone 2 A
Digital Signage System 3rd Fix Devices Installation at B2 Zone 2 A
Digital Signage System Cable Termination at B2 Zone 2 A

PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 A
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
PAVA SYSTEM 2nd Fix Riser Cabling at B2 Zone 2 A
PAVA SYSTEM 3rd Fix Devices Installation at B2 Zone 2 A
PAVA SYSTEM Cable Termination at B2 Zone 2 A

BMS System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 2 A


BMS System 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
BMS System 3rd Fix Panels Installation at B2 Zone 2 A
BMS System 3rd Fix Devices Installation at B2 Zone 2 A
BMS System Termination at B2 Zone 2 A

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B2 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B2 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B2 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B2 Zone 2 A

Installation of Earthing Continuity inside Steel at B2 Zone 2 A


Lightning Protection System (Conduit, Wiring, Cabling) at B2 Zone 2 A
External Drainage Manholes Installation at B2 Zone 2 A
External Drainage Manholes Covers Installation at B2 Zone 2 A

Installation of Sanitary Fixtures at B2 Zone 2 B


Grease Separator Installation at B2 Zone 2 B
Grease Separator Hock up and Connections at B2 Zone 2 B

Installation of Drainage Valves at B2 Zone 2 B


Floor Drain (Trap) Fixing at B2 Zone 2 B
Planter and flower Drain Fixing at B2 Zone 2 B
Installation of Ready Made Pressure Breaker for Riser at B2 Zone 2 B
Drainage Pumps Installation at B2 Zone 2 B
Drainage Pumps Hock up and Connections at B2 Zone 2 B
Installation of Drain Channel Grating at B2 Zone 2 B

Installation of Water Pipes Support and Hangers at B2 Zone 2 B


Installation of Horizontal Water Pipes at B2 Zone 2 B
Installation of Riser Water Pipes at B2 Zone 2 B
Putting Water Pipes in Block Walls at B2 Zone 2 B
Insulation of Hot Water Pipes at B2 Zone 2 B
Testing of Water Pipes at B2 Zone 2 B

Installation of Fire Fighting Pipes Support and Hangers at B2 Zone 2 B


Installation of Fire Fighting Pipes at B2 Zone 2 B
Internal Fire Fighting Pipes Testing at B2 Zone 2 B
Installation of Fire Fighting Riser Pipes at B2 Zone 2 B
Installation of Fire Fighting Valves at B2 Zone 2 B
Installation of Sprinklers at B2 Zone 2 B
Installation of Fire Hose Cabinet at B2 Zone 2 B
Installation of hose and accessories at B2 Zone 2 B
Installation Fire Extinguisher at B2 Zone 2 B

Installation of Duct Support and Hangers at B2 Zone 2 B


Installation of Horizontal Duct at B2 Zone 2 B
Chilled Water Pipes Installation at B2 Zone 2 B
Chilled Water Testing at B2 Zone 2 B
Volume Damper and fire Damper Installation at B2 Zone 2 B
Smoke Test at B2 Zone 2 B
Installation of Riser Duct at B2 Zone 2 B
Insulation of Riser Duct at B2 Zone 2 B
Insulation of Horizontal Duct at B2 Zone 2 B
Installation of Air Outlets at B2 Zone 2 B

Fan Coil Unit Installation at B2 Zone 2 B


Smoke Control Fans Installation at B2 Zone 2 B
Extract Fans Installation at B2 Zone 2 B
Fan Coil Unit Hock up and Connections at B2 Zone 2 B
Smoke Control Fans Hock up and Connections at B2 Zone 2 B
Extract Fans Hock up and Connections at B2 Zone 2 B

Lighting System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 2 B


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
Lighting System 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
Lighting System 2nd Fix Riser Cabling at B2 Zone 2 B
Lighting System 3rd Fix Wiring Devices at B2 Zone 2 B
Installation of lighting Fixtures at B2 Zone 2 B
Lighting System Cable Termination at B2 Zone 2 B

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 B
Cable Tray Installation at B2 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at B2 Zone 2 B
LV Cables Over Cable Tray Placing at B2 Zone 2 B
Horizontal LV Busbar Installation at B2 Zone 2 B
Riser LV Busbar Installation at B2 Zone 2 B
Main and Sub Distribution Boards Frames Assembly and Installation at B2 Zone 2 B
Distribution Boards Frames Assembly and Installation at B2 Zone 2 B
Distribution Boards Circuit Breakers Installation at B2 Zone 2 B
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B2 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at B2 Zone 2 B
Installation SPN / TPN Isolators for DB at B2 Zone 2 B
Installation SPN / TPN Isolators for MDB and SMDB at B2 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at B2 Zone 2 B
Main and Sub Distribution Wiring and Termination at B2 Zone 2 B
Distribution Boards Wiring and Termination at B2 Zone 2 B

Power System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 2 B


Power System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
Power System 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
Power System 2nd Fix Riser Cabling at B2 Zone 2 B
Power System 3rd Fix Wiring Devices Installation at B2 Zone 2 B
Power System Cable Termination at B2 Zone 2 B
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 B
Data System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
Data System 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
Data System 2nd Fix Riser Cabling at B2 Zone 2 B
Data System 2nd Fix Racks Installation at B2 Zone 2 B
Data System 3rd Fix Racks Component Installation at B2 Zone 2 B
Data System Cable Termination at B2 Zone 2 B

Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 2 B


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
Fire Alarm System 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
Fire Alarm System 2nd Fix Riser Cabling at B2 Zone 2 B
Fire Alarm System 3rd Fix Panels Installation at B2 Zone 2 B
Fire Alarm System 3rd Fix Devices Installation at B2 Zone 2 B
Fire Alarm System Cable Termination at B2 Zone 2 B

CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 B
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
CCTV System 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
CCTV System 2nd Fix Riser Cabling at B2 Zone 2 B
CCTV System 3rd Fix Cameras Installation at B2 Zone 2 B
CCTV System Cable Termination at B2 Zone 2 B

Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 B
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
Access Control System 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
Access Control System 2nd Fix Riser Cabling at B2 Zone 2 B
Access Control System 3rd Fix Devices Installation at B2 Zone 2 B
Access Control System Cable Termination at B2 Zone 2 B

Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 B
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
Digital Signage System 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
Digital Signage System 2nd Fix Riser Cabling at B2 Zone 2 B
Digital Signage System 3rd Fix Devices Installation at B2 Zone 2 B
Digital Signage System Cable Termination at B2 Zone 2 B

PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 B
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
PAVA SYSTEM 2nd Fix Riser Cabling at B2 Zone 2 B
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
PAVA SYSTEM 3rd Fix Devices Installation at B2 Zone 2 B
PAVA SYSTEM Cable Termination at B2 Zone 2 B

BMS System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 2 B


BMS System 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
BMS System 3rd Fix Panels Installation at B2 Zone 2 B
BMS System 3rd Fix Devices Installation at B2 Zone 2 B
BMS System Termination at B2 Zone 2 B

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B2 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B2 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B2 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B2 Zone 2 B

Installation of Earthing Continuity inside Steel at B2 Zone 2 B


Lightning Protection System (Conduit, Wiring, Cabling) at B2 Zone 2 B

External Drainage Manholes Installation at B2 Zone 2 B


External Drainage Manholes Epoxy Paints and Steps Installation at B2 Zone 2 B
External Drainage Manholes Covers Installation at B2 Zone 2 B
Installation of Rain Water Outlet at B2 Zone 2 B

Installation of Sanitary Fixtures at B2 Zone 3 A

Installation of Horizontal Drainage Pipes at B2 Zone 3 A


Installation of Drainage Pipes Support and Hangers at B2 Zone 3 A
Installation of Riser Drainage Pipes at B2 Zone 3 A
Testing of Drainage Pipes at B2 Zone 3 A

Installation of Water Pipes Support and Hangers at B2 Zone 3 A


Installation of Horizontal Water Pipes at B2 Zone 3 A
Installation of Riser Water Pipes at B2 Zone 3 A
Insulation of Hot Water Pipes at B2 Zone 3 A
Water Filtration System Installation at B2 Zone 3 A
Testing of Water Pipes at B2 Zone 3 A
Water Filtration System Hock up and Connections at B2 Zone 3 A

Installation of Fire Fighting Pipes Support and Hangers at B2 Zone 3 A


Installation of Fire Fighting Pipes at B2 Zone 3 A
Internal Fire Fighting Pipes Testing at B2 Zone 3 A
Installation of Fire Fighting Riser Pipes at B2 Zone 3 A
Installation of Fire Fighting Valves at B2 Zone 3 A
Installation of Sprinklers at B2 Zone 3 A
Installation of Fire Hose Cabinet at B2 Zone 3 A
Installation of hose and accessories at B2 Zone 3 A
Installation Fire Extinguisher at B2 Zone 3 A

Volume Damper and fire Damper Installation at B2 Zone 3 A


Installation of Riser Duct at B2 Zone 3 A
Insulation of Riser Duct at B2 Zone 3 A
Chilled Water Pipes Installation at B2 Zone 3 A
Installation of Duct Support and Hangers at B2 Zone 3 A
Installation of Horizontal Duct at B2 Zone 3 A
Smoke Test at B2 Zone 3 A
Chilled Water Testing at B2 Zone 3 A
Insulation of Horizontal Duct at B2 Zone 3 A
Installation of Air Outlets at B2 Zone 3 A

Fan Coil Unit Installation at B2 Zone 3 A


Smoke Control Fans Installation at B2 Zone 3 A
Extract Fans Installation at B2 Zone 3 A
Fan Coil Unit Hock up and Connections at B2 Zone 3 A
Smoke Control Fans Hock up and Connections at B2 Zone 3 A
Extract Fans Hock up and Connections at B2 Zone 3 A

Lighting System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 A


Lighting System 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
Lighting System 2nd Fix Riser Cabling at B2 Zone 3 A
Lighting System 3rd Fix Wiring Devices at B2 Zone 3 A
Installation of lighting Fixtures at B2 Zone 3 A
Lighting System Cable Termination at B2 Zone 3 A

Cable Tray Installation at B2 Zone 3 A


LV Cables Over Cable Tray Placing at B2 Zone 3 A
Horizontal LV Busbar Installation at B2 Zone 3 A
Riser LV Busbar Installation at B2 Zone 3 A
Main and Sub Distribution Boards Frames Assembly and Installation at B2 Zone 3 A
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B2 Zone 3 A
Installation SPN / TPN Isolators for MDB and SMDB at B2 Zone 3 A
Installation SPN / TPN Isolators for DB at B2 Zone 3 A
Main and Sub Distribution Wiring and Termination at B2 Zone 3 A

Power System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 A


Power System 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
Power System 2nd Fix Riser Cabling at B2 Zone 3 A
Power System 3rd Fix Wiring Devices Installation at B2 Zone 3 A
Power System Cable Termination at B2 Zone 3 A
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 A
Data System 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
Data System 2nd Fix Riser Cabling at B2 Zone 3 A
Data System 2nd Fix Racks Installation at B2 Zone 3 A
Data System 3rd Fix Racks Component Installation at B2 Zone 3 A
Data System Cable Termination at B2 Zone 3 A

Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 A


Fire Alarm System 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
Fire Alarm System 2nd Fix Riser Cabling at B2 Zone 3 A
Fire Alarm System 3rd Fix Panels Installation at B2 Zone 3 A
Fire Alarm System 3rd Fix Devices Installation at B2 Zone 3 A
Fire Alarm System Cable Termination at B2 Zone 3 A

CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 A
CCTV System 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
CCTV System 2nd Fix Riser Cabling at B2 Zone 3 A
CCTV System 3rd Fix Cameras Installation at B2 Zone 3 A
CCTV System Cable Termination at B2 Zone 3 A

Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 A
Access Control System 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
Access Control System 2nd Fix Riser Cabling at B2 Zone 3 A
Access Control System 3rd Fix Devices Installation at B2 Zone 3 A
Access Control System Cable Termination at B2 Zone 3 A

Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 A
Digital Signage System 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
Digital Signage System 2nd Fix Riser Cabling at B2 Zone 3 A
Digital Signage System 3rd Fix Devices Installation at B2 Zone 3 A
Digital Signage System Cable Termination at B2 Zone 3 A

PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 A
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
PAVA SYSTEM 2nd Fix Riser Cabling at B2 Zone 3 A
PAVA SYSTEM 3rd Fix Devices Installation at B2 Zone 3 A
PAVA SYSTEM Cable Termination at B2 Zone 3 A

BMS System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 A


BMS System 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
BMS System 3rd Fix Panels Installation at B2 Zone 3 A
BMS System 3rd Fix Devices Installation at B2 Zone 3 A
BMS System Termination at B2 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B2 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B2 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B2 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B2 Zone 3 A

Installation of Earthing Continuity inside Steel at B2 Zone 3 A


Lightning Protection System (Conduit, Wiring, Cabling) at B2 Zone 3 A

External Drainage Manholes Installation at B2 Zone 3 A


External Drainage Manholes Epoxy Paints and Steps Installation at B2 Zone 3 A
External Drainage Manholes Covers Installation at B2 Zone 3 A

Installation of Sanitary Fixtures at B2 Zone 3 B

Installation of Drainage Pipes Support and Hangers at B2 Zone 3 B


Installation of Horizontal Drainage Pipes at B2 Zone 3 B
Installation of Riser Drainage Pipes at B2 Zone 3 B
Putting Drainage Pipes in Block Walls at B2 Zone 3 B
Testing of Drainage Pipes at B2 Zone 3 B

Installation of Water Pipes Support and Hangers at B2 Zone 3 B


Installation of Horizontal Water Pipes at B2 Zone 3 B
Installation of Riser Water Pipes at B2 Zone 3 B
Putting Water Pipes in Block Walls at B2 Zone 3 B
Water Filtration System Installation at B2 Zone 3 B
Insulation of Hot Water Pipes at B2 Zone 3 B
Water Filtration System Hock up and Connections at B2 Zone 3 B
Testing of Water Pipes at B2 Zone 3 B

Installation of Fire Fighting Pipes Support and Hangers at B2 Zone 3 B


Installation of Fire Fighting Pipes at B2 Zone 3 B
Internal Fire Fighting Pipes Testing at B2 Zone 3 B
Installation of Fire Fighting Riser Pipes at B2 Zone 3 B
Installation of Fire Fighting Valves at B2 Zone 3 B
Installation of Sprinklers at B2 Zone 3 B
Installation of Fire Hose Cabinet at B2 Zone 3 B
Installation of hose and accessories at B2 Zone 3 B
Installation Fire Extinguisher at B2 Zone 3 B
Chilled Water Pipes Installation at B2 Zone 3 B
Installation of Duct Support and Hangers at B2 Zone 3 B
Chilled Water Testing at B2 Zone 3 B
Smoke Test at B2 Zone 3 B
Installation of Horizontal Duct at B2 Zone 3 B
Volume Damper and fire Damper Installation at B2 Zone 3 B
Installation of Riser Duct at B2 Zone 3 B
Insulation of Horizontal Duct at B2 Zone 3 B
Insulation of Riser Duct at B2 Zone 3 B
Installation of Air Outlets at B2 Zone 3 B

Fan Coil Unit Installation at B2 Zone 3 B


Fan Coil Unit Hock up and Connections at B2 Zone 3 B

Lighting System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 B


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
Lighting System 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
Lighting System 2nd Fix Riser Cabling at B2 Zone 3 B
Lighting System 3rd Fix Wiring Devices at B2 Zone 3 B
Installation of lighting Fixtures at B2 Zone 3 B
Lighting System Cable Termination at B2 Zone 3 B

Cable Tray Installation at B2 Zone 3 B


LV Cables Over Cable Tray Placing at B2 Zone 3 B
Horizontal LV Busbar Installation at B2 Zone 3 B
Riser LV Busbar Installation at B2 Zone 3 B
Main and Sub Distribution Boards Frames Assembly and Installation at B2 Zone 3 B
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B2 Zone 3 B
Installation SPN / TPN Isolators for MDB and SMDB at B2 Zone 3 B
Installation SPN / TPN Isolators for DB at B2 Zone 3 B
Main and Sub Distribution Wiring and Termination at B2 Zone 3 B

Power System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 B


Power System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
Power System 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
Power System 2nd Fix Riser Cabling at B2 Zone 3 B
Power System 3rd Fix Wiring Devices Installation at B2 Zone 3 B
Power System Cable Termination at B2 Zone 3 B

Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 B
Data System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
Data System 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
Data System 2nd Fix Riser Cabling at B2 Zone 3 B
Data System 2nd Fix Racks Installation at B2 Zone 3 B
Data System 3rd Fix Racks Component Installation at B2 Zone 3 B
Data System Cable Termination at B2 Zone 3 B

Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 B


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
Fire Alarm System 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
Fire Alarm System 2nd Fix Riser Cabling at B2 Zone 3 B
Fire Alarm System 3rd Fix Panels Installation at B2 Zone 3 B
Fire Alarm System 3rd Fix Devices Installation at B2 Zone 3 B
Fire Alarm System Cable Termination at B2 Zone 3 B

CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 B
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
CCTV System 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
CCTV System 2nd Fix Riser Cabling at B2 Zone 3 B
CCTV System 3rd Fix Cameras Installation at B2 Zone 3 B
CCTV System Cable Termination at B2 Zone 3 B

Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 B
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
Access Control System 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
Access Control System 2nd Fix Riser Cabling at B2 Zone 3 B
Access Control System 3rd Fix Devices Installation at B2 Zone 3 B
Access Control System Cable Termination at B2 Zone 3 B

Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 B
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
Digital Signage System 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
Digital Signage System 2nd Fix Riser Cabling at B2 Zone 3 B
Digital Signage System 3rd Fix Devices Installation at B2 Zone 3 B
Digital Signage System Cable Termination at B2 Zone 3 B

PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 B
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
PAVA SYSTEM 2nd Fix Riser Cabling at B2 Zone 3 B
PAVA SYSTEM 3rd Fix Devices Installation at B2 Zone 3 B
PAVA SYSTEM Cable Termination at B2 Zone 3 B

BMS System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 B


BMS System 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
BMS System 3rd Fix Panels Installation at B2 Zone 3 B
BMS System 3rd Fix Devices Installation at B2 Zone 3 B
BMS System Termination at B2 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B2 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B2 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B2 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B2 Zone 3 B

Installation of Earthing Continuity inside Steel at B2 Zone 3 B


Lightning Protection System (Conduit, Wiring, Cabling) at B2 Zone 3 B

External Drainage Manholes Installation at B2 Zone 3 B


External Drainage Manholes Epoxy Paints and Steps Installation at B2 Zone 3 B
External Drainage Manholes Covers Installation at B2 Zone 3 B

Installation of Sanitary Fixtures at B2 Zone 3 C

Putting Drainage Pipes in Block Walls at B2 Zone 3 C


Installation of Drainage Pipes Support and Hangers at B2 Zone 3 C
Installation of Horizontal Drainage Pipes at B2 Zone 3 C
Installation of Riser Drainage Pipes at B2 Zone 3 C
Testing of Drainage Pipes at B2 Zone 3 C

Installation of Water Pipes Support and Hangers at B2 Zone 3 C


Installation of Horizontal Water Pipes at B2 Zone 3 C
Putting Water Pipes in Block Walls at B2 Zone 3 C
Installation of Riser Water Pipes at B2 Zone 3 C
Insulation of Hot Water Pipes at B2 Zone 3 C
Testing of Water Pipes at B2 Zone 3 C

Installation of Fire Fighting Pipes Support and Hangers at B2 Zone 3 C


Installation of Fire Fighting Pipes at B2 Zone 3 C
Internal Fire Fighting Pipes Testing at B2 Zone 3 C
Installation of Fire Fighting Riser Pipes at B2 Zone 3 C
Installation of Fire Fighting Valves at B2 Zone 3 C
Installation of Sprinklers at B2 Zone 3 C
Installation of Fire Hose Cabinet at B2 Zone 3 C
Installation of hose and accessories at B2 Zone 3 C
Installation Fire Extinguisher at B2 Zone 3 C

Chilled Water Pipes Installation at B2 Zone 3 C


Installation of Duct Support and Hangers at B2 Zone 3 C
Chilled Water Testing at B2 Zone 3 C
Installation of Horizontal Duct at B2 Zone 3 C
Volume Damper and fire Damper Installation at B2 Zone 3 C
Smoke Test at B2 Zone 3 C
Installation of Riser Duct at B2 Zone 3 C
Insulation of Horizontal Duct at B2 Zone 3 C
Insulation of Riser Duct at B2 Zone 3 C
Installation of Air Outlets at B2 Zone 3 C

Fan Coil Unit Installation at B2 Zone 3 C


Fan Coil Unit Hock up and Connections at B2 Zone 3 C

Lighting System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 C


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
Lighting System 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
Lighting System 2nd Fix Riser Cabling at B2 Zone 3 C
Lighting System 3rd Fix Wiring Devices at B2 Zone 3 C
Installation of lighting Fixtures at B2 Zone 3 C
Lighting System Cable Termination at B2 Zone 3 C

Cable Tray Installation at B2 Zone 3 C


LV Cables Over Cable Tray Placing at B2 Zone 3 C
Horizontal LV Busbar Installation at B2 Zone 3 C
Riser LV Busbar Installation at B2 Zone 3 C
Main and Sub Distribution Boards Frames Assembly and Installation at B2 Zone 3 C
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B2 Zone 3 C
Installation SPN / TPN Isolators for MDB and SMDB at B2 Zone 3 C
Installation SPN / TPN Isolators for DB at B2 Zone 3 C
Main and Sub Distribution Wiring and Termination at B2 Zone 3 C

Power System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 C


Power System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
Power System 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
Power System 2nd Fix Riser Cabling at B2 Zone 3 C
Power System 3rd Fix Wiring Devices Installation at B2 Zone 3 C
Power System Cable Termination at B2 Zone 3 C

Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 C
Data System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
Data System 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
Data System 2nd Fix Riser Cabling at B2 Zone 3 C
Data System 2nd Fix Racks Installation at B2 Zone 3 C
Data System 3rd Fix Racks Component Installation at B2 Zone 3 C
Data System Cable Termination at B2 Zone 3 C

Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 C


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
Fire Alarm System 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
Fire Alarm System 2nd Fix Riser Cabling at B2 Zone 3 C
Fire Alarm System 3rd Fix Panels Installation at B2 Zone 3 C
Fire Alarm System 3rd Fix Devices Installation at B2 Zone 3 C
Fire Alarm System Cable Termination at B2 Zone 3 C

CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 C
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
CCTV System 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
CCTV System 2nd Fix Riser Cabling at B2 Zone 3 C
CCTV System 3rd Fix Cameras Installation at B2 Zone 3 C
CCTV System Cable Termination at B2 Zone 3 C

Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 C
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
Access Control System 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
Access Control System 2nd Fix Riser Cabling at B2 Zone 3 C
Access Control System 3rd Fix Devices Installation at B2 Zone 3 C
Access Control System Cable Termination at B2 Zone 3 C

Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 C
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
Digital Signage System 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
Digital Signage System 2nd Fix Riser Cabling at B2 Zone 3 C
Digital Signage System 3rd Fix Devices Installation at B2 Zone 3 C
Digital Signage System Cable Termination at B2 Zone 3 C

PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 C
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
PAVA SYSTEM 2nd Fix Riser Cabling at B2 Zone 3 C
PAVA SYSTEM 3rd Fix Devices Installation at B2 Zone 3 C
PAVA SYSTEM Cable Termination at B2 Zone 3 C

BMS System 1st Fix (Conduits, Boxes, Flexible) at B2 Zone 3 C


BMS System 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
BMS System 3rd Fix Panels Installation at B2 Zone 3 C
BMS System 3rd Fix Devices Installation at B2 Zone 3 C
BMS System Termination at B2 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B2 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B2 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B2 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B2 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B2 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B2 Zone 3 C

Installation of Earthing Continuity inside Steel at B2 Zone 3 C


Lightning Protection System (Conduit, Wiring, Cabling) at B2 Zone 3 C

External Drainage Manholes Installation at B2 Zone 3 C


External Drainage Manholes Epoxy Paints and Steps Installation at B2 Zone 3 C
External Drainage Manholes Covers Installation at B2 Zone 3 C

Installation of Sanitary Fixtures at B1 Zone 1 A

Installation of Horizontal Drainage Pipes at B1 Zone 1 A


Installation of Drainage Pipes Support and Hangers at B1 Zone 1 A
Installation of Riser Drainage Pipes at B1 Zone 1 A
Testing of Drainage Pipes at B1 Zone 1 A

Installation of Water Pipes Support and Hangers at B1 Zone 1 A


Installation of Horizontal Water Pipes at B1 Zone 1 A
Installation of Riser Water Pipes at B1 Zone 1 A
Insulation of Hot Water Pipes at B1 Zone 1 A
Testing of Water Pipes at B1 Zone 1 A

Installation of Fire Fighting Pipes Support and Hangers at B1 Zone 1 A


Installation of Fire Fighting Pipes at B1 Zone 1 A
Installation of Fire Fighting Riser Pipes at B1 Zone 1 A
Internal Fire Fighting Pipes Testing at B1 Zone 1 A
Installation of Fire Fighting Valves at B1 Zone 1 A
Installation of FM-200 Cylinders at B1 Zone 1 A
Installation of FM-200 Pipes including fittings at B1 Zone 1 A
Installation of FM-200 Nozzles at B1 Zone 1 A
Installation of Sprinklers at B1 Zone 1 A
Installation of Fire Hose Cabinet at B1 Zone 1 A
Installation of hose and accessories at B1 Zone 1 A
Installation Fire Extinguisher at B1 Zone 1 A
Chilled Water Pipes Installation at B1 Zone 1 A
Chilled Water Testing at B1 Zone 1 A
Installation of Duct Support and Hangers at B1 Zone 1 A
Installation of Horizontal Duct at B1 Zone 1 A
Insulation of Horizontal Duct at B1 Zone 1 A
Installation of Riser Duct at B1 Zone 1 A
Insulation of Riser Duct at B1 Zone 1 A
Volume Damper and fire Damper Installation at B1 Zone 1 A
Smoke Test at B1 Zone 1 A
Installation of Air Outlets at B1 Zone 1 A

Fan Coil Unit Installation at B1 Zone 1 A


Smoke Control Fans Installation at B1 Zone 1 A
Extract Fans Installation at B1 Zone 1 A
Fan Coil Unit Hock up and Connections at B1 Zone 1 A
Smoke Control Fans Hock up and Connections at B1 Zone 1 A
Extract Fans Hock up and Connections at B1 Zone 1 A

Lighting System 1st Fix Inside Concrete at B1 Zone 1 A


Lighting System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 A
Lighting System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
Lighting System 2nd Fix Riser Cabling at B1 Zone 1 A
Lighting System 3rd Fix Wiring Devices at B1 Zone 1 A
Installation of lighting Fixtures at B1 Zone 1 A
Lighting System Cable Termination at B1 Zone 1 A

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at B1 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 A
Cable Tray Installation at B1 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at B1 Zone 1 A
LV Cables Over Cable Tray Placing at B1 Zone 1 A
Horizontal LV Busbar Installation at B1 Zone 1 A
Riser LV Busbar Installation at B1 Zone 1 A
Main and Sub Distribution Boards Frames Assembly and Installation at B1 Zone 1 A
Distribution Boards Frames Assembly and Installation at B1 Zone 1 A
Distribution Boards Circuit Breakers Installation at B1 Zone 1 A
Installation of Meters at B1 Zone 1 A
Installation SPN / TPN Isolators for DB at B1 Zone 1 A
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B1 Zone 1 A
Distribution Boards Wiring and Termination at B1 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at B1 Zone 1 A
Installation SPN / TPN Isolators for MDB and SMDB at B1 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at B1 Zone 1 A
Main and Sub Distribution Wiring and Termination at B1 Zone 1 A

Power System 1st Fix Inside Concrete at B1 Zone 1 A


Power System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 A
Power System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
Power System 2nd Fix Riser Cabling at B1 Zone 1 A
Power System 3rd Fix Wiring Devices Installation at B1 Zone 1 A
Power System Cable Termination at B1 Zone 1 A

Data System 1st Fix Inside Concrete at B1 Zone 1 A


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 A
Data System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
Data System 2nd Fix Riser Cabling at B1 Zone 1 A
Data System 2nd Fix Racks Installation at B1 Zone 1 A
Data System 3rd Fix Racks Component Installation at B1 Zone 1 A
Data System Cable Termination at B1 Zone 1 A

Fire Alarm System 1st Fix Inside Concrete at B1 Zone 1 A


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 A
Fire Alarm System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
Fire Alarm System 2nd Fix Riser Cabling at B1 Zone 1 A
Fire Alarm System 3rd Fix Panels Installation at B1 Zone 1 A
Fire Alarm System 3rd Fix Devices Installation at B1 Zone 1 A
Fire Alarm System Cable Termination at B1 Zone 1 A

CCTV System 1st Fix Inside Concrete at B1 Zone 1 A


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 A
CCTV System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
CCTV System 2nd Fix Riser Cabling at B1 Zone 1 A
CCTV System 3rd Fix Cameras Installation at B1 Zone 1 A
CCTV System Cable Termination at B1 Zone 1 A

Access Control System 1st Fix Inside Concrete at B1 Zone 1 A


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 A
Access Control System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
Access Control System 2nd Fix Riser Cabling at B1 Zone 1 A
Access Control System 3rd Fix Devices Installation at B1 Zone 1 A
Access Control System Cable Termination at B1 Zone 1 A

Digital Signage System 1st Fix Inside Concrete at B1 Zone 1 A


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 A
Digital Signage System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
Digital Signage System 2nd Fix Riser Cabling at B1 Zone 1 A
Digital Signage System 3rd Fix Devices Installation at B1 Zone 1 A
Digital Signage System Cable Termination at B1 Zone 1 A

PAVA SYSTEM 1st Fix Inside Concrete at B1 Zone 1 A


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 A
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
PAVA SYSTEM 2nd Fix Riser Cabling at B1 Zone 1 A
PAVA SYSTEM 3rd Fix Devices Installation at B1 Zone 1 A
PAVA SYSTEM Cable Termination at B1 Zone 1 A

BMS System 1st Fix Inside Concrete at B1 Zone 1 A


BMS System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 A
BMS System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
BMS System 3rd Fix Panels Installation at B1 Zone 1 A
BMS System 3rd Fix Devices Installation at B1 Zone 1 A
BMS System Termination at B1 Zone 1 A

Guest Room Management System 1st Fix Inside Concrete at B1 Zone 1 A


Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 A
Guest Room Management System 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
Guest Room Management System 2nd Fix Riser Cabling at B1 Zone 1 A
Guest Room Management System 3rd Fix Devices Installation at B1 Zone 1 A
Guest Room Management System Cable Termination at B1 Zone 1 A

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at B1 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B1 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B1 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B1 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B1 Zone 1 A

Lightning Protection System (Conduit, Wiring, Cabling) at B1 Zone 1 A


Installation of Earthing Continuity inside Steel at B1 Zone 1 A

Installation of Sanitary Fixtures at B1 Zone 1 B

Installation of Horizontal Drainage Pipes at B1 Zone 1 B


Installation of Drainage Pipes Support and Hangers at B1 Zone 1 B
Installation of Riser Drainage Pipes at B1 Zone 1 B
Testing of Drainage Pipes at B1 Zone 1 B
Putting Drainage Pipes in Block Walls at B1 Zone 1 B

Installation of Water Pipes Support and Hangers at B1 Zone 1 B


Installation of Horizontal Water Pipes at B1 Zone 1 B
Installation of Riser Water Pipes at B1 Zone 1 B
Insulation of Hot Water Pipes at B1 Zone 1 B
Putting Water Pipes in Block Walls at B1 Zone 1 B
Testing of Water Pipes at B1 Zone 1 B

Installation of Fire Fighting Pipes Support and Hangers at B1 Zone 1 B


Installation of Fire Fighting Pipes at B1 Zone 1 B
Internal Fire Fighting Pipes Testing at B1 Zone 1 B
Installation of Fire Fighting Riser Pipes at B1 Zone 1 B
Installation of Fire Fighting Valves at B1 Zone 1 B
Installation of FM-200 Cylinders at B1 Zone 1 B
Installation of FM-200 Pipes including fittings at B1 Zone 1 B
Installation of FM-200 Nozzles at B1 Zone 1 B
Installation of Sprinklers at B1 Zone 1 B
Installation of Fire Hose Cabinet at B1 Zone 1 B
Installation of hose and accessories at B1 Zone 1 B
Installation Fire Extinguisher at B1 Zone 1 B

Chilled Water Pipes Installation at B1 Zone 1 B


Chilled Water Testing at B1 Zone 1 B
Installation of Duct Support and Hangers at B1 Zone 1 B
Installation of Horizontal Duct at B1 Zone 1 B
Smoke Test at B1 Zone 1 B
Insulation of Horizontal Duct at B1 Zone 1 B
Installation of Riser Duct at B1 Zone 1 B
Insulation of Riser Duct at B1 Zone 1 B
Volume Damper and fire Damper Installation at B1 Zone 1 B
Installation of Air Outlets at B1 Zone 1 B

Extract Fans Installation at B1 Zone 1 B


Smoke Control Fans Installation at B1 Zone 1 B
Smoke Control Fans Hock up and Connections at B1 Zone 1 B
Extract Fans Hock up and Connections at B1 Zone 1 B

LPG Pressure reducing and Distribution panel Installation at B1 Zone 1 B


LPG Tanks Installation at B1 Zone 1 B
LPG Electric Operated Vaporizers Installation at B1 Zone 1 B
LPG Pressure reducing and Distribution panel Hock up and Connections at B1 Zone 1 B
LPG Electric Operated Vaporizers Hock up and Connections at B1 Zone 1 B
LPG Tanks Hock up and Connections at B1 Zone 1 B

Lighting System 1st Fix Inside Concrete at B1 Zone 1 B


Lighting System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 B
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
Lighting System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
Lighting System 2nd Fix Riser Cabling at B1 Zone 1 B
Lighting System 3rd Fix Wiring Devices at B1 Zone 1 B
Installation of lighting Fixtures at B1 Zone 1 B
Lighting System Cable Termination at B1 Zone 1 B

Cable Tray Installation at B1 Zone 1 B


LV Cables Over Cable Tray Placing at B1 Zone 1 B
Horizontal LV Busbar Installation at B1 Zone 1 B
Riser LV Busbar Installation at B1 Zone 1 B
Installation of Meters at B1 Zone 1 B
Main and Sub Distribution Boards Frames Assembly and Installation at B1 Zone 1 B
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B1 Zone 1 B
Installation SPN / TPN Isolators for MDB and SMDB at B1 Zone 1 B
Installation SPN / TPN Isolators for DB at B1 Zone 1 B
Main and Sub Distribution Wiring and Termination at B1 Zone 1 B

Power System 1st Fix Inside Concrete at B1 Zone 1 B


Power System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
Power System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 B
Power System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
Power System 2nd Fix Riser Cabling at B1 Zone 1 B
Power System 3rd Fix Wiring Devices Installation at B1 Zone 1 B
Power System Cable Termination at B1 Zone 1 B

Data System 1st Fix Inside Concrete at B1 Zone 1 B


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 B
Data System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
Data System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
Data System 2nd Fix Riser Cabling at B1 Zone 1 B
Data System 2nd Fix Racks Installation at B1 Zone 1 B
Data System 3rd Fix Racks Component Installation at B1 Zone 1 B
Data System Cable Termination at B1 Zone 1 B

Fire Alarm System 1st Fix Inside Concrete at B1 Zone 1 B


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 B
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
Fire Alarm System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
Fire Alarm System 2nd Fix Riser Cabling at B1 Zone 1 B
Fire Alarm System 3rd Fix Panels Installation at B1 Zone 1 B
Fire Alarm System 3rd Fix Devices Installation at B1 Zone 1 B
Fire Alarm System Cable Termination at B1 Zone 1 B
CCTV System 1st Fix Inside Concrete at B1 Zone 1 B
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 B
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
CCTV System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
CCTV System 2nd Fix Riser Cabling at B1 Zone 1 B
CCTV System 3rd Fix Cameras Installation at B1 Zone 1 B
CCTV System Cable Termination at B1 Zone 1 B

Access Control System 1st Fix Inside Concrete at B1 Zone 1 B


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 B
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
Access Control System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
Access Control System 2nd Fix Riser Cabling at B1 Zone 1 B
Access Control System 3rd Fix Devices Installation at B1 Zone 1 B
Access Control System Cable Termination at B1 Zone 1 B

Digital Signage System 1st Fix Inside Concrete at B1 Zone 1 B


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 B
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
Digital Signage System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
Digital Signage System 2nd Fix Riser Cabling at B1 Zone 1 B
Digital Signage System 3rd Fix Devices Installation at B1 Zone 1 B
Digital Signage System Cable Termination at B1 Zone 1 B

PAVA SYSTEM 1st Fix Inside Concrete at B1 Zone 1 B


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 B
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
PAVA SYSTEM 2nd Fix Riser Cabling at B1 Zone 1 B
PAVA SYSTEM 3rd Fix Devices Installation at B1 Zone 1 B
PAVA SYSTEM Cable Termination at B1 Zone 1 B

BMS System 1st Fix Inside Concrete at B1 Zone 1 B


BMS System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 B
BMS System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
BMS System 3rd Fix Panels Installation at B1 Zone 1 B
BMS System 3rd Fix Devices Installation at B1 Zone 1 B
BMS System Termination at B1 Zone 1 B

Guest Room Management System 1st Fix Inside Concrete at B1 Zone 1 B


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 B
Guest Room Management System 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
Guest Room Management System 2nd Fix Riser Cabling at B1 Zone 1 B
Guest Room Management System 3rd Fix Devices Installation at B1 Zone 1 B
Guest Room Management System Cable Termination at B1 Zone 1 B

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at B1 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B1 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B1 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B1 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B1 Zone 1 B

Installation of Earthing Continuity inside Steel at B1 Zone 1 B


Lightning Protection System (Conduit, Wiring, Cabling) at B1 Zone 1 B

Installation of Sanitary Fixtures at B1 Zone 1 C

Installation of Drainage Pipes Support and Hangers at B1 Zone 1 C


Installation of Horizontal Drainage Pipes at B1 Zone 1 C
Installation of Riser Drainage Pipes at B1 Zone 1 C
Testing of Drainage Pipes at B1 Zone 1 C

Installation of Water Pipes Support and Hangers at B1 Zone 1 C


Installation of Horizontal Water Pipes at B1 Zone 1 C
Installation of Riser Water Pipes at B1 Zone 1 C
Insulation of Hot Water Pipes at B1 Zone 1 C
Testing of Water Pipes at B1 Zone 1 C

Installation of Fire Fighting Pipes Support and Hangers at B1 Zone 1 C


Installation of Fire Fighting Pipes at B1 Zone 1 C
Installation of Fire Fighting Riser Pipes at B1 Zone 1 C
Internal Fire Fighting Pipes Testing at B1 Zone 1 C
Installation of Fire Fighting Valves at B1 Zone 1 C
Installation of FM-200 Cylinders at B1 Zone 1 C
Installation of FM-200 Pipes including fittings at B1 Zone 1 C
Installation of FM-200 Nozzles at B1 Zone 1 C
Installation of Sprinklers at B1 Zone 1 C
Installation of Fire Hose Cabinet at B1 Zone 1 C
Installation of hose and accessories at B1 Zone 1 C
Installation Fire Extinguisher at B1 Zone 1 C

Chilled Water Pipes Installation at B1 Zone 1 C


Chilled Water Testing at B1 Zone 1 C
Installation of Duct Support and Hangers at B1 Zone 1 C
Installation of Horizontal Duct at B1 Zone 1 C
Smoke Test at B1 Zone 1 C
Installation of Riser Duct at B1 Zone 1 C
Volume Damper and fire Damper Installation at B1 Zone 1 C
Insulation of Horizontal Duct at B1 Zone 1 C
Insulation of Riser Duct at B1 Zone 1 C
Installation of Air Outlets at B1 Zone 1 C

Fan Coil Unit Installation at B1 Zone 1 C


Smoke Control Fans Installation at B1 Zone 1 C
Extract Fans Installation at B1 Zone 1 C
Fan Coil Unit Hock up and Connections at B1 Zone 1 C
Smoke Control Fans Hock up and Connections at B1 Zone 1 C
Extract Fans Hock up and Connections at B1 Zone 1 C

LPG Tanks Installation at B1 Zone 1 C


LPG Tanks Hock up and Connections at B1 Zone 1 C

Lighting System 1st Fix Inside Concrete at B1 Zone 1 C


Lighting System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 C
Lighting System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
Lighting System 2nd Fix Riser Cabling at B1 Zone 1 C
Lighting System 3rd Fix Wiring Devices at B1 Zone 1 C
Installation of lighting Fixtures at B1 Zone 1 C
Lighting System Cable Termination at B1 Zone 1 C

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at B1 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 C
Cable Tray Installation at B1 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at B1 Zone 1 C
LV Cables Over Cable Tray Placing at B1 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at B1 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at B1 Zone 1 C
Horizontal LV Busbar Installation at B1 Zone 1 C
Riser LV Busbar Installation at B1 Zone 1 C
Main and Sub Distribution Boards Frames Assembly and Installation at B1 Zone 1 C
Distribution Boards Frames Assembly and Installation at B1 Zone 1 C
Installation of Meters at B1 Zone 1 C
Distribution Boards Circuit Breakers Installation at B1 Zone 1 C
Installation SPN / TPN Isolators for DB at B1 Zone 1 C
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B1 Zone 1 C
Distribution Boards Wiring and Termination at B1 Zone 1 C
Installation SPN / TPN Isolators for MDB and SMDB at B1 Zone 1 C
Main and Sub Distribution Wiring and Termination at B1 Zone 1 C

Power System 1st Fix Inside Concrete at B1 Zone 1 C


Power System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 C
Power System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
Power System 2nd Fix Riser Cabling at B1 Zone 1 C
Power System 3rd Fix Wiring Devices Installation at B1 Zone 1 C
Power System Cable Termination at B1 Zone 1 C

Data System 1st Fix Inside Concrete at B1 Zone 1 C


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 C
Data System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
Data System 2nd Fix Riser Cabling at B1 Zone 1 C
Data System 2nd Fix Racks Installation at B1 Zone 1 C
Data System 3rd Fix Racks Component Installation at B1 Zone 1 C
Data System Cable Termination at B1 Zone 1 C

Fire Alarm System 1st Fix Inside Concrete at B1 Zone 1 C


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 C
Fire Alarm System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
Fire Alarm System 2nd Fix Riser Cabling at B1 Zone 1 C
Fire Alarm System 3rd Fix Panels Installation at B1 Zone 1 C
Fire Alarm System 3rd Fix Devices Installation at B1 Zone 1 C
Fire Alarm System Cable Termination at B1 Zone 1 C

CCTV System 1st Fix Inside Concrete at B1 Zone 1 C


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 C
CCTV System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
CCTV System 2nd Fix Riser Cabling at B1 Zone 1 C
CCTV System 3rd Fix Cameras Installation at B1 Zone 1 C
CCTV System Cable Termination at B1 Zone 1 C

Access Control System 1st Fix Inside Concrete at B1 Zone 1 C


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 C
Access Control System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
Access Control System 2nd Fix Riser Cabling at B1 Zone 1 C
Access Control System 3rd Fix Devices Installation at B1 Zone 1 C
Access Control System Cable Termination at B1 Zone 1 C

Digital Signage System 1st Fix Inside Concrete at B1 Zone 1 C


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 C
Digital Signage System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
Digital Signage System 2nd Fix Riser Cabling at B1 Zone 1 C
Digital Signage System 3rd Fix Devices Installation at B1 Zone 1 C
Digital Signage System Cable Termination at B1 Zone 1 C

PAVA SYSTEM 1st Fix Inside Concrete at B1 Zone 1 C


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 C
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
PAVA SYSTEM 2nd Fix Riser Cabling at B1 Zone 1 C
PAVA SYSTEM 3rd Fix Devices Installation at B1 Zone 1 C
PAVA SYSTEM Cable Termination at B1 Zone 1 C

BMS System 1st Fix Inside Concrete at B1 Zone 1 C


BMS System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 1 C
BMS System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
BMS System 3rd Fix Panels Installation at B1 Zone 1 C
BMS System 3rd Fix Devices Installation at B1 Zone 1 C
BMS System Termination at B1 Zone 1 C

Guest Room Management System 1st Fix Inside Concrete at B1 Zone 1 C


Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 C
Guest Room Management System 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
Guest Room Management System 2nd Fix Riser Cabling at B1 Zone 1 C
Guest Room Management System 3rd Fix Devices Installation at B1 Zone 1 C
Guest Room Management System Cable Termination at B1 Zone 1 C

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at B1 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B1 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B1 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B1 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B1 Zone 1 C

Installation of Earthing Continuity inside Steel at B1 Zone 1 C


Lightning Protection System (Conduit, Wiring, Cabling) at B1 Zone 1 C

Grease Separator Installation at B1 Zone 2 A


Installation of Sanitary Fixtures at B1 Zone 2 A
Grease Separator Hock up and Connections at B1 Zone 2 A

Installation of Drainage Pipes Support and Hangers at B1 Zone 2 A


Installation of Horizontal Drainage Pipes at B1 Zone 2 A
Putting Drainage Pipes in Block Walls at B1 Zone 2 A
Installation of Riser Drainage Pipes at B1 Zone 2 A
Testing of Drainage Pipes at B1 Zone 2 A
Planter and flower Drain Fixing at B1 Zone 2 A
Installation of Drainage Valves at B1 Zone 2 A
Installation of Ready Made Pressure Breaker for Riser at B1 Zone 2 A
Floor Drain (Trap) Fixing at B1 Zone 2 A
Installation of Drain Channel Grating at B1 Zone 2 A

Putting Water Pipes in Block Walls at B1 Zone 2 A


Installation of Water Pipes Support and Hangers at B1 Zone 2 A
Installation of Horizontal Water Pipes at B1 Zone 2 A
Installation of Riser Water Pipes at B1 Zone 2 A
Insulation of Hot Water Pipes at B1 Zone 2 A
Testing of Water Pipes at B1 Zone 2 A

Installation of Fire Fighting Pipes at B1 Zone 2 A


Installation of Fire Fighting Pipes Support and Hangers at B1 Zone 2 A
Installation of Fire Fighting Riser Pipes at B1 Zone 2 A
Internal Fire Fighting Pipes Testing at B1 Zone 2 A
Installation of Fire Fighting Valves at B1 Zone 2 A
Installation of FM-200 Cylinders at B1 Zone 2 A
Installation of FM-200 Pipes including fittings at B1 Zone 2 A
Installation of FM-200 Nozzles at B1 Zone 2 A
Installation of Sprinklers at B1 Zone 2 A
Installation of Fire Hose Cabinet at B1 Zone 2 A
Installation of hose and accessories at B1 Zone 2 A
Installation Fire Extinguisher at B1 Zone 2 A

Chilled Water Pipes Installation at B1 Zone 2 A


Chilled Water Testing at B1 Zone 2 A
Installation of Duct Support and Hangers at B1 Zone 2 A
Installation of Horizontal Duct at B1 Zone 2 A
Insulation of Horizontal Duct at B1 Zone 2 A
Smoke Test at B1 Zone 2 A
Installation of Riser Duct at B1 Zone 2 A
Insulation of Riser Duct at B1 Zone 2 A
Volume Damper and fire Damper Installation at B1 Zone 2 A
Installation of Air Outlets at B1 Zone 2 A

Fan Coil Unit Installation at B1 Zone 2 A


Fan Coil Unit Hock up and Connections at B1 Zone 2 A
Air Handling Units Installation at B1 Zone 2 A
Fresh Air Handling Units Installation at B1 Zone 2 A
Fresh Air Handling Units Hock up and Connections at B1 Zone 2 A
Air Handling Units Hock up and Connections at B1 Zone 2 A
Smoke Control Fans Installation at B1 Zone 2 A
Extract Fans Installation at B1 Zone 2 A
Smoke Control Fans Hock up and Connections at B1 Zone 2 A
Extract Fans Hock up and Connections at B1 Zone 2 A
Installation of VAV / CAV at B1 Zone 2 A

Lighting System 1st Fix Inside Concrete at B1 Zone 2 A


Lighting System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 2 A
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
Lighting System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
Lighting System 2nd Fix Riser Cabling at B1 Zone 2 A
Lighting System 3rd Fix Wiring Devices at B1 Zone 2 A
Installation of lighting Fixtures at B1 Zone 2 A
Lighting System Cable Termination at B1 Zone 2 A

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at B1 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 A
Cable Tray Installation at B1 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at B1 Zone 2 A
LV Cables Over Cable Tray Placing at B1 Zone 2 A
Horizontal LV Busbar Installation at B1 Zone 2 A
Riser LV Busbar Installation at B1 Zone 2 A
Main and Sub Distribution Boards Frames Assembly and Installation at B1 Zone 2 A
Distribution Boards Frames Assembly and Installation at B1 Zone 2 A
Installation of Meters at B1 Zone 2 A
Distribution Boards Circuit Breakers Installation at B1 Zone 2 A
Motor Control Centers Frames Assembly and Installation at B1 Zone 2 A
Installation SPN / TPN Isolators for DB at B1 Zone 2 A
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B1 Zone 2 A
Motor Control Centers components Installation at B1 Zone 2 A
Distribution Boards Wiring and Termination at B1 Zone 2 A
Main and Sub Distribution Wiring and Termination at B1 Zone 2 A
Motor Control Centers Wiring and Termination at B1 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at B1 Zone 2 A
Installation SPN / TPN Isolators for MDB and SMDB at B1 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at B1 Zone 2 A

Power System 1st Fix Inside Concrete at B1 Zone 2 A


Power System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 2 A
Power System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
Power System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
Power System 2nd Fix Riser Cabling at B1 Zone 2 A
Power System 3rd Fix Wiring Devices Installation at B1 Zone 2 A
Power System Cable Termination at B1 Zone 2 A

Data System 1st Fix Inside Concrete at B1 Zone 2 A


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 A
Data System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
Data System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
Data System 2nd Fix Riser Cabling at B1 Zone 2 A
Data System 2nd Fix Racks Installation at B1 Zone 2 A
Data System 3rd Fix Racks Component Installation at B1 Zone 2 A
Data System Cable Termination at B1 Zone 2 A

Fire Alarm System 1st Fix Inside Concrete at B1 Zone 2 A


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 2 A
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
Fire Alarm System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
Fire Alarm System 2nd Fix Riser Cabling at B1 Zone 2 A
Fire Alarm System 3rd Fix Panels Installation at B1 Zone 2 A
Fire Alarm System 3rd Fix Devices Installation at B1 Zone 2 A
Fire Alarm System Cable Termination at B1 Zone 2 A

CCTV System 1st Fix Inside Concrete at B1 Zone 2 A


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 A
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
CCTV System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
CCTV System 2nd Fix Riser Cabling at B1 Zone 2 A
CCTV System 3rd Fix Cameras Installation at B1 Zone 2 A
CCTV System Cable Termination at B1 Zone 2 A

Access Control System 1st Fix Inside Concrete at B1 Zone 2 A


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 A
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
Access Control System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
Access Control System 2nd Fix Riser Cabling at B1 Zone 2 A
Access Control System 3rd Fix Devices Installation at B1 Zone 2 A
Access Control System Cable Termination at B1 Zone 2 A

Digital Signage System 1st Fix Inside Concrete at B1 Zone 2 A


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 A
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
Digital Signage System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
Digital Signage System 2nd Fix Riser Cabling at B1 Zone 2 A
Digital Signage System 3rd Fix Devices Installation at B1 Zone 2 A
Digital Signage System Cable Termination at B1 Zone 2 A
PAVA SYSTEM 1st Fix Inside Concrete at B1 Zone 2 A
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 A
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
PAVA SYSTEM 2nd Fix Riser Cabling at B1 Zone 2 A
PAVA SYSTEM 3rd Fix Devices Installation at B1 Zone 2 A
PAVA SYSTEM Cable Termination at B1 Zone 2 A

BMS System 1st Fix Inside Concrete at B1 Zone 2 A


BMS System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 2 A
BMS System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
BMS System 3rd Fix Panels Installation at B1 Zone 2 A
BMS System 3rd Fix Devices Installation at B1 Zone 2 A
BMS System Termination at B1 Zone 2 A

Guest Room Management System 1st Fix Inside Concrete at B1 Zone 2 A


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 A
Guest Room Management System 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
Guest Room Management System 2nd Fix Riser Cabling at B1 Zone 2 A
Guest Room Management System 3rd Fix Devices Installation at B1 Zone 2 A
Guest Room Management System Cable Termination at B1 Zone 2 A

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at B1 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B1 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B1 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B1 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B1 Zone 2 A

Installation of Earthing Continuity inside Steel at B1 Zone 2 A


Lightning Protection System (Conduit, Wiring, Cabling) at B1 Zone 2 A

Installation of Rain Water Outlet at B1 Zone 2 A

Installation of Sanitary Fixtures at B1 Zone 2 B


GRP water tanks Installation at B1 Zone 2 B
GRP water tanks Covers Installation at B1 Zone 2 B
GRP water tanks Pumps Installation at B1 Zone 2 B
Plate Heat Exchanger Plant Installation at B1 Zone 2 B
GRP water tanks Testing at B1 Zone 2 B
Plate Heat Exchanger Hock up and Connections at B1 Zone 2 B
Installation of Electrical Water Heater at B1 Zone 2 B

Installation of Water Pipes Support and Hangers at B1 Zone 2 B


Installation of Horizontal Water Pipes at B1 Zone 2 B
Installation of Riser Water Pipes at B1 Zone 2 B
Insulation of Hot Water Pipes at B1 Zone 2 B
Putting Water Pipes in Block Walls at B1 Zone 2 B
Water Storage Calorifier Installation at B1 Zone 2 B
Testing of Water Pipes at B1 Zone 2 B
Installation of Water Monitoring Meter at B1 Zone 2 B
Water Storage Calorifier Hock up and Connections at B1 Zone 2 B

Installation of Fire Fighting Pipes at B1 Zone 2 B


Installation of Fire Fighting Pipes Support and Hangers at B1 Zone 2 B
Installation of Fire Fighting Riser Pipes at B1 Zone 2 B
Installation of Fire Fighting Valves at B1 Zone 2 B
Internal Fire Fighting Pipes Testing at B1 Zone 2 B
Installation of FM-200 Cylinders at B1 Zone 2 B
Installation of FM-200 Pipes including fittings at B1 Zone 2 B
Installation of FM-200 Nozzles at B1 Zone 2 B
Installation of Sprinklers at B1 Zone 2 B
Installation of Fire Hose Cabinet at B1 Zone 2 B
Installation of hose and accessories at B1 Zone 2 B
Installation Fire Extinguisher at B1 Zone 2 B

Installation of Duct Support and Hangers at B1 Zone 2 B


Insulation of Horizontal Duct at B1 Zone 2 B
Chilled Water Pipes Installation at B1 Zone 2 B
Installation of Horizontal Duct at B1 Zone 2 B
Chilled Water Testing at B1 Zone 2 B
Volume Damper and fire Damper Installation at B1 Zone 2 B
Installation of Riser Duct at B1 Zone 2 B
Insulation of Riser Duct at B1 Zone 2 B
Smoke Test at B1 Zone 2 B
Installation of Air Outlets at B1 Zone 2 B

Fan Coil Unit Installation at B1 Zone 2 B


Air Handling Units Installation at B1 Zone 2 B
Chillers Installation at B1 Zone 2 B
Extract Fans Installation at B1 Zone 2 B
Chilled Water Pressurization Unit Installation at B1 Zone 2 B
Air and Dirt Separator Installation at B1 Zone 2 B
Smoke Control Fans Installation at B1 Zone 2 B
Chilled Water Pump Installation at B1 Zone 2 B
BTU Meter Installation at B1 Zone 2 B
Refrigerant Leak Detection and Monitoring System Installation at B1 Zone 2 B
Smoke Control Fans Hock up and Connections at B1 Zone 2 B
Extract Fans Hock up and Connections at B1 Zone 2 B
Chillers Hock up and Connections at B1 Zone 2 B
Chilled Water Pump Hock up and Connections at B1 Zone 2 B
Chilled Water Pressurization Unit Hock up and Connections at B1 Zone 2 B
Air and Dirt Separator Hock up and Connections at B1 Zone 2 B
Refrigerant Leak Detection and Monitoring System Hock up and Connections at B1 Zone 2 B
BTU Meter Hock up and Connections at B1 Zone 2 B
Air Handling Units Hock up and Connections at B1 Zone 2 B
Fan Coil Unit Hock up and Connections at B1 Zone 2 B
Installation of VAV / CAV at B1 Zone 2 B
Chemical Dosing System Installation at B1 Zone 2 B
Chemical Dosing System Hock up and Connections at B1 Zone 2 B

LPG Pressure reducing and Distribution panel Installation at B1 Zone 2 B


LPG Pressure reducing and Distribution panel Hock up and Connections at B1 Zone 2 B

Installation of GAS Pipes Support and Hangers at B1 Zone 2 B


Installation of GAS Pipes at B1 Zone 2 B
installation of Gas Branch at B1 Zone 2 B
Testing of GAS Pipes at B1 Zone 2 B
Testing of Gas Branch at B1 Zone 2 B

Lighting System 1st Fix Inside Concrete at B1 Zone 2 B


Lighting System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 2 B
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
Lighting System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
Lighting System 2nd Fix Riser Cabling at B1 Zone 2 B
Lighting System 3rd Fix Wiring Devices at B1 Zone 2 B
Installation of lighting Fixtures at B1 Zone 2 B
Lighting System Cable Termination at B1 Zone 2 B

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at B1 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 B
Cable Tray Installation at B1 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at B1 Zone 2 B
LV Cables Over Cable Tray Placing at B1 Zone 2 B
Horizontal LV Busbar Installation at B1 Zone 2 B
Riser LV Busbar Installation at B1 Zone 2 B
Main and Sub Distribution Boards Frames Assembly and Installation at B1 Zone 2 B
Distribution Boards Frames Assembly and Installation at B1 Zone 2 B
Installation of Meters at B1 Zone 2 B
Distribution Boards Circuit Breakers Installation at B1 Zone 2 B
Installation SPN / TPN Isolators for DB at B1 Zone 2 B
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B1 Zone 2 B
Distribution Boards Wiring and Termination at B1 Zone 2 B
Main and Sub Distribution Wiring and Termination at B1 Zone 2 B
Installation SPN / TPN Isolators for MDB and SMDB at B1 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at B1 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at B1 Zone 2 B

Power System 1st Fix Inside Concrete at B1 Zone 2 B


Power System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 2 B
Power System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
Power System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
Power System 2nd Fix Riser Cabling at B1 Zone 2 B
Power System 3rd Fix Wiring Devices Installation at B1 Zone 2 B
Power System Cable Termination at B1 Zone 2 B

Data System 1st Fix Inside Concrete at B1 Zone 2 B


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 B
Data System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
Data System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
Data System 2nd Fix Riser Cabling at B1 Zone 2 B
Data System 2nd Fix Racks Installation at B1 Zone 2 B
Data System 3rd Fix Racks Component Installation at B1 Zone 2 B
Data System Cable Termination at B1 Zone 2 B

Fire Alarm System 1st Fix Inside Concrete at B1 Zone 2 B


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 2 B
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
Fire Alarm System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
Fire Alarm System 2nd Fix Riser Cabling at B1 Zone 2 B
Fire Alarm System 3rd Fix Panels Installation at B1 Zone 2 B
Fire Alarm System 3rd Fix Devices Installation at B1 Zone 2 B
Fire Alarm System Cable Termination at B1 Zone 2 B

CCTV System 1st Fix Inside Concrete at B1 Zone 2 B


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 B
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
CCTV System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
CCTV System 2nd Fix Riser Cabling at B1 Zone 2 B
CCTV System 3rd Fix Cameras Installation at B1 Zone 2 B
CCTV System Cable Termination at B1 Zone 2 B

Access Control System 1st Fix Inside Concrete at B1 Zone 2 B


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 B
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
Access Control System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
Access Control System 2nd Fix Riser Cabling at B1 Zone 2 B
Access Control System 3rd Fix Devices Installation at B1 Zone 2 B
Access Control System Cable Termination at B1 Zone 2 B

Digital Signage System 1st Fix Inside Concrete at B1 Zone 2 B


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 B
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
Digital Signage System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
Digital Signage System 2nd Fix Riser Cabling at B1 Zone 2 B
Digital Signage System 3rd Fix Devices Installation at B1 Zone 2 B
Digital Signage System Cable Termination at B1 Zone 2 B

PAVA SYSTEM 1st Fix Inside Concrete at B1 Zone 2 B


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 B
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
PAVA SYSTEM 2nd Fix Riser Cabling at B1 Zone 2 B
PAVA SYSTEM 3rd Fix Devices Installation at B1 Zone 2 B
PAVA SYSTEM Cable Termination at B1 Zone 2 B

BMS System 1st Fix Inside Concrete at B1 Zone 2 B


BMS System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 2 B
BMS System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
BMS System 3rd Fix Panels Installation at B1 Zone 2 B
BMS System 3rd Fix Devices Installation at B1 Zone 2 B
BMS System Termination at B1 Zone 2 B

Guest Room Management System 1st Fix Inside Concrete at B1 Zone 2 B


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 B
Guest Room Management System 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
Guest Room Management System 2nd Fix Riser Cabling at B1 Zone 2 B
Guest Room Management System 3rd Fix Devices Installation at B1 Zone 2 B
Guest Room Management System Cable Termination at B1 Zone 2 B

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at B1 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B1 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B1 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B1 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B1 Zone 2 B

Installation of Earthing Continuity inside Steel at B1 Zone 2 B


Lightning Protection System (Conduit, Wiring, Cabling) at B1 Zone 2 B

Installation of Main Water Meter Chamber at B1 Zone 2 B

Installation of Sanitary Fixtures at B1 Zone 3 A


lint strainer / Oil Interceptor Installation at B1 Zone 3 A
lint strainer / Oil Interceptor Hock up and Connections at B1 Zone 3 A

Installation of Drainage Pipes Support and Hangers at B1 Zone 3 A


Installation of Horizontal Drainage Pipes at B1 Zone 3 A
Putting Drainage Pipes in Block Walls at B1 Zone 3 A
Installation of Riser Drainage Pipes at B1 Zone 3 A
Testing of Drainage Pipes at B1 Zone 3 A

Installation of Horizontal Water Pipes at B1 Zone 3 A


Installation of Water Pipes Support and Hangers at B1 Zone 3 A
Installation of Riser Water Pipes at B1 Zone 3 A
Putting Water Pipes in Block Walls at B1 Zone 3 A
Testing of Water Pipes at B1 Zone 3 A
Insulation of Hot Water Pipes at B1 Zone 3 A

Installation of Fire Fighting Pipes at B1 Zone 3 A


Installation of Fire Fighting Riser Pipes at B1 Zone 3 A
Installation of Fire Fighting Pipes Support and Hangers at B1 Zone 3 A
Internal Fire Fighting Pipes Testing at B1 Zone 3 A
Installation of Fire Fighting Valves at B1 Zone 3 A
Installation of FM-200 Cylinders at B1 Zone 3 A
Installation of FM-200 Pipes including fittings at B1 Zone 3 A
Installation of FM-200 Nozzles at B1 Zone 3 A
Installation of Sprinklers at B1 Zone 3 A
Installation of Fire Hose Cabinet at B1 Zone 3 A
Installation of hose and accessories at B1 Zone 3 A
Installation Fire Extinguisher at B1 Zone 3 A
Chilled Water Pipes Installation at B1 Zone 3 A
Installation of Duct Support and Hangers at B1 Zone 3 A
Installation of Horizontal Duct at B1 Zone 3 A
Chilled Water Testing at B1 Zone 3 A
Smoke Test at B1 Zone 3 A
Insulation of Horizontal Duct at B1 Zone 3 A
Volume Damper and fire Damper Installation at B1 Zone 3 A
Installation of Riser Duct at B1 Zone 3 A
Insulation of Riser Duct at B1 Zone 3 A
Installation of Air Outlets at B1 Zone 3 A

Fan Coil Unit Installation at B1 Zone 3 A


Smoke Control Fans Installation at B1 Zone 3 A
Extract Fans Installation at B1 Zone 3 A
Fan Coil Unit Hock up and Connections at B1 Zone 3 A
Smoke Control Fans Hock up and Connections at B1 Zone 3 A
Extract Fans Hock up and Connections at B1 Zone 3 A
Installation of VAV / CAV at B1 Zone 3 A

Lighting System 1st Fix Inside Concrete at B1 Zone 3 A


Lighting System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 A
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
Lighting System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
Lighting System 2nd Fix Riser Cabling at B1 Zone 3 A
Lighting System 3rd Fix Wiring Devices at B1 Zone 3 A
Installation of lighting Fixtures at B1 Zone 3 A
Lighting System Cable Termination at B1 Zone 3 A

Cable Tray Installation at B1 Zone 3 A


LV Cables Over Cable Tray Placing at B1 Zone 3 A
Horizontal LV Busbar Installation at B1 Zone 3 A
UPS System Installation at B1 Zone 3 A
UPS System Hock up and Connections at B1 Zone 3 A
Riser LV Busbar Installation at B1 Zone 3 A
Main and Sub Distribution Boards Frames Assembly and Installation at B1 Zone 3 A
Installation of Meters at B1 Zone 3 A
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B1 Zone 3 A
Installation SPN / TPN Isolators for MDB and SMDB at B1 Zone 3 A
Installation SPN / TPN Isolators for DB at B1 Zone 3 A
Main and Sub Distribution Wiring and Termination at B1 Zone 3 A

Power System 1st Fix Inside Concrete at B1 Zone 3 A


Power System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 A
Power System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
Power System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
Power System 2nd Fix Riser Cabling at B1 Zone 3 A
Power System 3rd Fix Wiring Devices Installation at B1 Zone 3 A
Power System Cable Termination at B1 Zone 3 A

Data System 1st Fix Inside Concrete at B1 Zone 3 A


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 A
Data System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
Data System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
Data System 2nd Fix Riser Cabling at B1 Zone 3 A
Data System 2nd Fix Racks Installation at B1 Zone 3 A
Data System 3rd Fix Racks Component Installation at B1 Zone 3 A
Data System Cable Termination at B1 Zone 3 A

Fire Alarm System 1st Fix Inside Concrete at B1 Zone 3 A


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 A
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
Fire Alarm System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
Fire Alarm System 2nd Fix Riser Cabling at B1 Zone 3 A
Fire Alarm System 3rd Fix Panels Installation at B1 Zone 3 A
Fire Alarm System 3rd Fix Devices Installation at B1 Zone 3 A
Fire Alarm System Cable Termination at B1 Zone 3 A

CCTV System 1st Fix Inside Concrete at B1 Zone 3 A


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 A
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
CCTV System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
CCTV System 2nd Fix Riser Cabling at B1 Zone 3 A
CCTV System 3rd Fix Cameras Installation at B1 Zone 3 A
CCTV System Cable Termination at B1 Zone 3 A

Access Control System 1st Fix Inside Concrete at B1 Zone 3 A


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 A
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
Access Control System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
Access Control System 2nd Fix Riser Cabling at B1 Zone 3 A
Access Control System 3rd Fix Devices Installation at B1 Zone 3 A
Access Control System Cable Termination at B1 Zone 3 A

Time Attendance System 1st Fix Inside Concrete at B1 Zone 3 A


Time Attendance System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
Time Attendance System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 A
Time Attendance System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
Time Attendance System 2nd Fix Riser Cabling at B1 Zone 3 A
Time Attendance System 3rd Fix Devices Installation at B1 Zone 3 A
Time Attendance System Cable Termination at B1 Zone 3 A

Digital Signage System 1st Fix Inside Concrete at B1 Zone 3 A


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 A
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
Digital Signage System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
Digital Signage System 2nd Fix Riser Cabling at B1 Zone 3 A
Digital Signage System 3rd Fix Devices Installation at B1 Zone 3 A
Digital Signage System Cable Termination at B1 Zone 3 A

PAVA SYSTEM 1st Fix Inside Concrete at B1 Zone 3 A


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 A
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
PAVA SYSTEM 2nd Fix Riser Cabling at B1 Zone 3 A
PAVA SYSTEM 3rd Fix Devices Installation at B1 Zone 3 A
PAVA SYSTEM Cable Termination at B1 Zone 3 A

BMS System 1st Fix Inside Concrete at B1 Zone 3 A


BMS System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 A
BMS System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
BMS System 3rd Fix Panels Installation at B1 Zone 3 A
BMS System 3rd Fix Devices Installation at B1 Zone 3 A
BMS System Termination at B1 Zone 3 A

Guest Room Management System 1st Fix Inside Concrete at B1 Zone 3 A


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 A
Guest Room Management System 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
Guest Room Management System 2nd Fix Riser Cabling at B1 Zone 3 A
Guest Room Management System 3rd Fix Devices Installation at B1 Zone 3 A
Guest Room Management System Cable Termination at B1 Zone 3 A

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at B1 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B1 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B1 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B1 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B1 Zone 3 A

Installation of Earthing Continuity inside Steel at B1 Zone 3 A


Lightning Protection System (Conduit, Wiring, Cabling) at B1 Zone 3 A
Installation of Sanitary Fixtures at B1 Zone 3 B

Installation of Drainage Pipes Support and Hangers at B1 Zone 3 B


Installation of Horizontal Drainage Pipes at B1 Zone 3 B
Installation of Riser Drainage Pipes at B1 Zone 3 B
Testing of Drainage Pipes at B1 Zone 3 B
Installation of Drain Channel Grating at B1 Zone 3 B

Installation of Water Pipes Support and Hangers at B1 Zone 3 B


Installation of Horizontal Water Pipes at B1 Zone 3 B
Installation of Riser Water Pipes at B1 Zone 3 B
Testing of Water Pipes at B1 Zone 3 B
Insulation of Hot Water Pipes at B1 Zone 3 B

Installation of Fire Fighting Pipes Support and Hangers at B1 Zone 3 B


Installation of Fire Fighting Pipes at B1 Zone 3 B
Internal Fire Fighting Pipes Testing at B1 Zone 3 B
Installation of Fire Fighting Riser Pipes at B1 Zone 3 B
Installation of Fire Fighting Valves at B1 Zone 3 B
Installation of FM-200 Cylinders at B1 Zone 3 B
Installation of FM-200 Pipes including fittings at B1 Zone 3 B
Installation of FM-200 Nozzles at B1 Zone 3 B
Installation of Sprinklers at B1 Zone 3 B
Installation of Fire Hose Cabinet at B1 Zone 3 B
Installation of hose and accessories at B1 Zone 3 B
Installation Fire Extinguisher at B1 Zone 3 B

Chilled Water Pipes Installation at B1 Zone 3 B


Installation of Duct Support and Hangers at B1 Zone 3 B
Chilled Water Testing at B1 Zone 3 B
Installation of Horizontal Duct at B1 Zone 3 B
Smoke Test at B1 Zone 3 B
Insulation of Horizontal Duct at B1 Zone 3 B
Installation of Riser Duct at B1 Zone 3 B
Volume Damper and fire Damper Installation at B1 Zone 3 B
Insulation of Riser Duct at B1 Zone 3 B
Installation of Air Outlets at B1 Zone 3 B

Fan Coil Unit Installation at B1 Zone 3 B


Fan Coil Unit Hock up and Connections at B1 Zone 3 B
Installation of VAV / CAV at B1 Zone 3 B
LPG Pressure reducing and Distribution panel Installation at B1 Zone 3 B
LPG Pressure reducing and Distribution panel Hock up and Connections at B1 Zone 3 B

Lighting System 1st Fix Inside Concrete at B1 Zone 3 B


Lighting System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 B
Lighting System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
Lighting System 2nd Fix Riser Cabling at B1 Zone 3 B
Lighting System 3rd Fix Wiring Devices at B1 Zone 3 B
Installation of lighting Fixtures at B1 Zone 3 B
Lighting System Cable Termination at B1 Zone 3 B

Cable Tray Installation at B1 Zone 3 B


LV Cables Over Cable Tray Placing at B1 Zone 3 B
Horizontal LV Busbar Installation at B1 Zone 3 B
Riser LV Busbar Installation at B1 Zone 3 B
Main and Sub Distribution Boards Frames Assembly and Installation at B1 Zone 3 B
Installation of Meters at B1 Zone 3 B
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B1 Zone 3 B
Installation SPN / TPN Isolators for MDB and SMDB at B1 Zone 3 B
Installation SPN / TPN Isolators for DB at B1 Zone 3 B
Main and Sub Distribution Wiring and Termination at B1 Zone 3 B

Power System 1st Fix Inside Concrete at B1 Zone 3 B


Power System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 B
Power System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
Power System 2nd Fix Riser Cabling at B1 Zone 3 B
Power System 3rd Fix Wiring Devices Installation at B1 Zone 3 B
Power System Cable Termination at B1 Zone 3 B

Data System 1st Fix Inside Concrete at B1 Zone 3 B


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 B
Data System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
Data System 2nd Fix Riser Cabling at B1 Zone 3 B
Data System 2nd Fix Racks Installation at B1 Zone 3 B
Data System 3rd Fix Racks Component Installation at B1 Zone 3 B
Data System Cable Termination at B1 Zone 3 B

Fire Alarm System 1st Fix Inside Concrete at B1 Zone 3 B


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 B
Fire Alarm System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
Fire Alarm System 2nd Fix Riser Cabling at B1 Zone 3 B
Fire Alarm System 3rd Fix Panels Installation at B1 Zone 3 B
Fire Alarm System 3rd Fix Devices Installation at B1 Zone 3 B
Fire Alarm System Cable Termination at B1 Zone 3 B

CCTV System 1st Fix Inside Concrete at B1 Zone 3 B


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 B
CCTV System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
CCTV System 2nd Fix Riser Cabling at B1 Zone 3 B
CCTV System 3rd Fix Cameras Installation at B1 Zone 3 B
CCTV System Cable Termination at B1 Zone 3 B

Access Control System 1st Fix Inside Concrete at B1 Zone 3 B


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 B
Access Control System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
Access Control System 2nd Fix Riser Cabling at B1 Zone 3 B
Access Control System 3rd Fix Devices Installation at B1 Zone 3 B
Access Control System Cable Termination at B1 Zone 3 B

Digital Signage System 1st Fix Inside Concrete at B1 Zone 3 B


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 B
Digital Signage System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
Digital Signage System 2nd Fix Riser Cabling at B1 Zone 3 B
Digital Signage System 3rd Fix Devices Installation at B1 Zone 3 B
Digital Signage System Cable Termination at B1 Zone 3 B

PAVA SYSTEM 1st Fix Inside Concrete at B1 Zone 3 B


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 B
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
PAVA SYSTEM 2nd Fix Riser Cabling at B1 Zone 3 B
PAVA SYSTEM 3rd Fix Devices Installation at B1 Zone 3 B
PAVA SYSTEM Cable Termination at B1 Zone 3 B

BMS System 1st Fix Inside Concrete at B1 Zone 3 B


BMS System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 B
BMS System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
BMS System 3rd Fix Panels Installation at B1 Zone 3 B
BMS System 3rd Fix Devices Installation at B1 Zone 3 B
BMS System Termination at B1 Zone 3 B

Guest Room Management System 1st Fix Inside Concrete at B1 Zone 3 B


Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 B
Guest Room Management System 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
Guest Room Management System 2nd Fix Riser Cabling at B1 Zone 3 B
Guest Room Management System 3rd Fix Devices Installation at B1 Zone 3 B
Guest Room Management System Cable Termination at B1 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at B1 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B1 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B1 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B1 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B1 Zone 3 B

Installation of Earthing Continuity inside Steel at B1 Zone 3 B


Lightning Protection System (Conduit, Wiring, Cabling) at B1 Zone 3 B

Installation of Sanitary Fixtures at B1 Zone 3 C

Installation of Drainage Pipes Support and Hangers at B1 Zone 3 C


Installation of Horizontal Drainage Pipes at B1 Zone 3 C
Installation of Riser Drainage Pipes at B1 Zone 3 C
Testing of Drainage Pipes at B1 Zone 3 C
Putting Drainage Pipes in Block Walls at B1 Zone 3 C

Installation of Water Pipes Support and Hangers at B1 Zone 3 C


Installation of Horizontal Water Pipes at B1 Zone 3 C
Installation of Riser Water Pipes at B1 Zone 3 C
Testing of Water Pipes at B1 Zone 3 C
Putting Water Pipes in Block Walls at B1 Zone 3 C
Insulation of Hot Water Pipes at B1 Zone 3 C

Installation of Fire Fighting Pipes Support and Hangers at B1 Zone 3 C


Installation of Fire Fighting Pipes at B1 Zone 3 C
Installation of Fire Fighting Riser Pipes at B1 Zone 3 C
Internal Fire Fighting Pipes Testing at B1 Zone 3 C
Installation of Fire Fighting Valves at B1 Zone 3 C
Installation of FM-200 Cylinders at B1 Zone 3 C
Installation of FM-200 Pipes including fittings at B1 Zone 3 C
Installation of FM-200 Nozzles at B1 Zone 3 C
Installation of Sprinklers at B1 Zone 3 C
Installation of Fire Hose Cabinet at B1 Zone 3 C
Installation of hose and accessories at B1 Zone 3 C
Installation Fire Extinguisher at B1 Zone 3 C

Chilled Water Pipes Installation at B1 Zone 3 C


Installation of Duct Support and Hangers at B1 Zone 3 C
Chilled Water Testing at B1 Zone 3 C
Installation of Horizontal Duct at B1 Zone 3 C
Insulation of Horizontal Duct at B1 Zone 3 C
Volume Damper and fire Damper Installation at B1 Zone 3 C
Smoke Test at B1 Zone 3 C
Installation of Riser Duct at B1 Zone 3 C
Insulation of Riser Duct at B1 Zone 3 C
Installation of Air Outlets at B1 Zone 3 C

Fan Coil Unit Installation at B1 Zone 3 C


Fan Coil Unit Hock up and Connections at B1 Zone 3 C
Installation of VAV / CAV at B1 Zone 3 C

LPG Pressure reducing and Distribution panel Installation at B1 Zone 3 C


LPG Pressure reducing and Distribution panel Hock up and Connections at B1 Zone 3 C

Installation of GAS Pipes Support and Hangers at B1 Zone 3 C


Installation of GAS Pipes at B1 Zone 3 C
installation of Gas Branch at B1 Zone 3 C
Testing of GAS Pipes at B1 Zone 3 C
Testing of Gas Branch at B1 Zone 3 C

Lighting System 1st Fix Inside Concrete at B1 Zone 3 C


Lighting System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 C
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
Lighting System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
Lighting System 2nd Fix Riser Cabling at B1 Zone 3 C
Lighting System 3rd Fix Wiring Devices at B1 Zone 3 C
Installation of lighting Fixtures at B1 Zone 3 C
Lighting System Cable Termination at B1 Zone 3 C

Cable Tray Installation at B1 Zone 3 C


LV Cables Over Cable Tray Placing at B1 Zone 3 C
Horizontal LV Busbar Installation at B1 Zone 3 C
UPS System Installation at B1 Zone 3 C
UPS System Hock up and Connections at B1 Zone 3 C
Riser LV Busbar Installation at B1 Zone 3 C
Main and Sub Distribution Boards Frames Assembly and Installation at B1 Zone 3 C
Installation of Meters at B1 Zone 3 C
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at B1 Zone 3 C
Installation SPN / TPN Isolators for MDB and SMDB at B1 Zone 3 C
Installation SPN / TPN Isolators for DB at B1 Zone 3 C
Main and Sub Distribution Wiring and Termination at B1 Zone 3 C

Power System 1st Fix Inside Concrete at B1 Zone 3 C


Power System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 C
Power System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
Power System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
Power System 2nd Fix Riser Cabling at B1 Zone 3 C
Power System 3rd Fix Wiring Devices Installation at B1 Zone 3 C
Power System Cable Termination at B1 Zone 3 C

Data System 1st Fix Inside Concrete at B1 Zone 3 C


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 C
Data System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
Data System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
Data System 2nd Fix Riser Cabling at B1 Zone 3 C
Data System 2nd Fix Racks Installation at B1 Zone 3 C
Data System 3rd Fix Racks Component Installation at B1 Zone 3 C
Data System Cable Termination at B1 Zone 3 C

Fire Alarm System 1st Fix Inside Concrete at B1 Zone 3 C


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 C
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
Fire Alarm System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
Fire Alarm System 2nd Fix Riser Cabling at B1 Zone 3 C
Fire Alarm System 3rd Fix Panels Installation at B1 Zone 3 C
Fire Alarm System 3rd Fix Devices Installation at B1 Zone 3 C
Fire Alarm System Cable Termination at B1 Zone 3 C

CCTV System 1st Fix Inside Concrete at B1 Zone 3 C


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 C
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
CCTV System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
CCTV System 2nd Fix Riser Cabling at B1 Zone 3 C
CCTV System 3rd Fix Cameras Installation at B1 Zone 3 C
CCTV System Cable Termination at B1 Zone 3 C

Access Control System 1st Fix Inside Concrete at B1 Zone 3 C


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 C
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
Access Control System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
Access Control System 2nd Fix Riser Cabling at B1 Zone 3 C
Access Control System 3rd Fix Devices Installation at B1 Zone 3 C
Access Control System Cable Termination at B1 Zone 3 C

Digital Signage System 1st Fix Inside Concrete at B1 Zone 3 C


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 C
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
Digital Signage System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
Digital Signage System 2nd Fix Riser Cabling at B1 Zone 3 C
Digital Signage System 3rd Fix Devices Installation at B1 Zone 3 C
Digital Signage System Cable Termination at B1 Zone 3 C

PAVA SYSTEM 1st Fix Inside Concrete at B1 Zone 3 C


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 C
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
PAVA SYSTEM 2nd Fix Riser Cabling at B1 Zone 3 C
PAVA SYSTEM 3rd Fix Devices Installation at B1 Zone 3 C
PAVA SYSTEM Cable Termination at B1 Zone 3 C

BMS System 1st Fix Inside Concrete at B1 Zone 3 C


BMS System 1st Fix (Conduits, Boxes, Flexible) at B1 Zone 3 C
BMS System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
BMS System 3rd Fix Panels Installation at B1 Zone 3 C
BMS System 3rd Fix Devices Installation at B1 Zone 3 C
BMS System Termination at B1 Zone 3 C

Guest Room Management System 1st Fix Inside Concrete at B1 Zone 3 C


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 C
Guest Room Management System 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
Guest Room Management System 2nd Fix Riser Cabling at B1 Zone 3 C
Guest Room Management System 3rd Fix Devices Installation at B1 Zone 3 C
Guest Room Management System Cable Termination at B1 Zone 3 C

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at B1 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at B1 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at B1 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at B1 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at B1 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at B1 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at B1 Zone 3 C

Installation of Earthing Continuity inside Steel at B1 Zone 3 C


Lightning Protection System (Conduit, Wiring, Cabling) at B1 Zone 3 C

Installation of Sanitary Fixtures at GF

Putting Drainage Pipes in Block Walls at GF


Installation of Drain Channel Grating at GF
Installation of Riser Drainage Pipes at GF
Installation of Drainage Pipes Support and Hangers at GF
Testing of Drainage Pipes at GF
Installation of Horizontal Drainage Pipes at GF

Installation of Water Pipes Support and Hangers at GF


Installation of Horizontal Water Pipes at GF
Installation of Riser Water Pipes at GF
Putting Water Pipes in Block Walls at GF
Insulation of Hot Water Pipes at GF
Testing of Water Pipes at GF

Installation of Fire Fighting Pipes Support and Hangers at GF


Installation of Fire Fighting Pipes at GF
Internal Fire Fighting Pipes Testing at GF
Fire Alarm Station Installation at GF
Installation of FM-200 Cylinders at GF
Installation of Fire Fighting Riser Pipes at GF
Installation of Fire Fighting Valves at GF
Installation of FM-200 Pipes including fittings at GF
Installation of FM-200 Nozzles at GF
Fire Alarm Station Hock up and Connections at GF
Installation of Sprinklers at GF
Installation of Fire Hose Cabinet at GF
Installation of hose and accessories at GF
Installation Fire Extinguisher at GF

Chilled Water Pipes Installation at GF


Chilled Water Testing at GF
Installation of Duct Support and Hangers at GF
Installation of Horizontal Duct at GF
Volume Damper and fire Damper Installation at GF
Insulation of Horizontal Duct at GF
Installation of Riser Duct at GF
Insulation of Riser Duct at GF
Smoke Test at GF
Installation of Air Outlets at GF

Fan Coil Unit Installation at GF


Smoke Control Fans Installation at GF
Extract Fans Installation at GF
Fan Coil Unit Hock up and Connections at GF
Smoke Control Fans Hock up and Connections at GF
Extract Fans Hock up and Connections at GF
Installation of VAV / CAV at GF
Close Control Unit Installation at GF
Close Control Unit Hock up and Connections at GF

LPG Leak Detection System 1st Fix (Conduits, Boxes, Flexible) at GF


LPG Leak Detection System 2nd Fix (Wiring, Cabling) at GF
LPG Leak Detection System 2nd Fix Riser Cabling at GF
LPG Leak Detection System 3rd Fix Devices Installation at GF
LPG Leak Detection System Cable Termination at GF

Installation of GAS Pipes Support and Hangers at GF


Installation of GAS Pipes at GF
installation of Gas Branch at GF
Testing of GAS Pipes at GF
Testing of Gas Branch at GF

Lighting System 1st Fix Inside Concrete at GF Zone 2 A


Lighting System 1st Fix Inside Concrete at GF Zone 1 B
Lighting System 1st Fix Inside Concrete at GF Zone 1 C
Lighting System 1st Fix Inside Concrete at GF Zone 3 C
Lighting System 1st Fix Inside Concrete at GF Zone 2 B
Lighting System 1st Fix Inside Concrete at GF Zone 3 B
Lighting System 1st Fix Inside Concrete at GF Zone 3 A
Lighting System 1st Fix Inside Concrete at GF Zone 1 A
Lighting System 1st Fix (Conduits, Boxes, Flexible) at GF
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at GF
Lighting System 2nd Fix (Wiring, Cabling) at GF
Lighting System 2nd Fix Riser Cabling at GF
Lighting System 3rd Fix Wiring Devices at GF
Installation of lighting Fixtures at GF
Lighting System Cable Termination at GF

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at GF Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at GF Zone 1 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at GF Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at GF Zone 3 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at GF Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at GF Zone 3 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at GF Zone 3 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at GF Zone 1 A
Transformers Installation at GF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at GF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at GF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at GF
Cable Tray Installation at GF
Transformers Hock up and Connections at GF
LV Cables Over Cable Tray Placing at GF
HV Swichgear Installation at GF
Capacitor Bank Installation at GF
Horizontal LV Busbar Installation at GF
HV Swichgaer Hock up and Connections at GF
Capacitor Bank Hock up and Connections at GF
Riser LV Busbar Installation at GF
Main and Sub Distribution Boards Frames Assembly and Installation at GF
Distribution Boards Frames Assembly and Installation at GF
Distribution Boards Circuit Breakers Installation at GF
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at GF
GENERATOR Installation at GF
Installation SPN / TPN Isolators for DB at GF
GENERATOR Hock up and Connections at GF
Distribution Boards Wiring and Termination at GF
Main and Sub Distribution Wiring and Termination at GF
Installation SPN / TPN Isolators for MDB and SMDB at GF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at GF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at GF

Power System 1st Fix Inside Concrete at GF Zone 2 A


Power System 1st Fix Inside Concrete at GF Zone 1 B
Power System 1st Fix Inside Concrete at GF Zone 1 C
Power System 1st Fix Inside Concrete at GF Zone 3 C
Power System 1st Fix Inside Concrete at GF Zone 2 B
Power System 1st Fix Inside Concrete at GF Zone 3 B
Power System 1st Fix Inside Concrete at GF Zone 3 A
Power System 1st Fix Inside Concrete at GF Zone 1 A
Power System 1st Fix (Conduits, Boxes, Flexible) at GF
Power System 1st Fix (Conduits, Boxes,) Inside Block at GF
Power System 2nd Fix (Wiring, Cabling) at GF
Power System 2nd Fix Riser Cabling at GF
Power System 3rd Fix Wiring Devices Installation at GF
Power System Cable Termination at GF

Data System 1st Fix Inside Concrete at GF Zone 2 A


Data System 1st Fix Inside Concrete at GF Zone 1 B
Data System 1st Fix Inside Concrete at GF Zone 1 C
Data System 1st Fix Inside Concrete at GF Zone 3 C
Data System 1st Fix Inside Concrete at GF Zone 2 B
Data System 1st Fix Inside Concrete at GF Zone 3 B
Data System 1st Fix Inside Concrete at GF Zone 3 A
Data System 1st Fix Inside Concrete at GF Zone 1 A
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
Data System 1st Fix (Conduits, Boxes,) Inside Block at GF
Data System 2nd Fix (Wiring, Cabling) at GF
Data System 2nd Fix Riser Cabling at GF
Data System 2nd Fix Racks Installation at GF
Data System 3rd Fix Racks Component Installation at GF
Data System Cable Termination at GF

Fire Alarm System 1st Fix Inside Concrete at GF Zone 2 A


Fire Alarm System 1st Fix Inside Concrete at GF Zone 1 B
Fire Alarm System 1st Fix Inside Concrete at GF Zone 1 C
Fire Alarm System 1st Fix Inside Concrete at GF Zone 3 C
Fire Alarm System 1st Fix Inside Concrete at GF Zone 2 B
Fire Alarm System 1st Fix Inside Concrete at GF Zone 3 B
Fire Alarm System 1st Fix Inside Concrete at GF Zone 3 A
Fire Alarm System 1st Fix Inside Concrete at GF Zone 1 A
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at GF
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at GF
Fire Alarm System 2nd Fix (Wiring, Cabling) at GF
Fire Alarm System 2nd Fix Riser Cabling at GF
Fire Alarm System 3rd Fix Devices Installation at GF
Fire Alarm System 3rd Fix Panels Installation at GF
Fire Alarm System Cable Termination at GF

CCTV System 1st Fix Inside Concrete at GF Zone 2 A


CCTV System 1st Fix Inside Concrete at GF Zone 1 B
CCTV System 1st Fix Inside Concrete at GF Zone 1 C
CCTV System 1st Fix Inside Concrete at GF Zone 3 C
CCTV System 1st Fix Inside Concrete at GF Zone 2 B
CCTV System 1st Fix Inside Concrete at GF Zone 3 B
CCTV System 1st Fix Inside Concrete at GF Zone 3 A
CCTV System 1st Fix Inside Concrete at GF Zone 1 A
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at GF
CCTV System 2nd Fix (Wiring, Cabling) at GF
CCTV System 2nd Fix Riser Cabling at GF
CCTV System 3rd Fix Cameras Installation at GF
CCTV System Cable Termination at GF

Access Control System 1st Fix Inside Concrete at GF Zone 2 A


Access Control System 1st Fix Inside Concrete at GF Zone 1 B
Access Control System 1st Fix Inside Concrete at GF Zone 1 C
Access Control System 1st Fix Inside Concrete at GF Zone 3 C
Access Control System 1st Fix Inside Concrete at GF Zone 2 B
Access Control System 1st Fix Inside Concrete at GF Zone 3 B
Access Control System 1st Fix Inside Concrete at GF Zone 3 A
Access Control System 1st Fix Inside Concrete at GF Zone 1 A
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at GF
Access Control System 2nd Fix (Wiring, Cabling) at GF
Access Control System 2nd Fix Riser Cabling at GF
Access Control System 3rd Fix Devices Installation at GF
Access Control System Cable Termination at GF

Digital Signage System 1st Fix Inside Concrete at GF Zone 2 A


Digital Signage System 1st Fix Inside Concrete at GF Zone 1 B
Digital Signage System 1st Fix Inside Concrete at GF Zone 1 C
Digital Signage System 1st Fix Inside Concrete at GF Zone 3 C
Digital Signage System 1st Fix Inside Concrete at GF Zone 2 B
Digital Signage System 1st Fix Inside Concrete at GF Zone 3 B
Digital Signage System 1st Fix Inside Concrete at GF Zone 3 A
Digital Signage System 1st Fix Inside Concrete at GF Zone 1 A
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at GF
Digital Signage System 2nd Fix (Wiring, Cabling) at GF
Digital Signage System 2nd Fix Riser Cabling at GF
Digital Signage System 3rd Fix Devices Installation at GF
Digital Signage System Cable Termination at GF

Central Clock System 1st Fix Inside Concrete at GF Zone 2 A


Central Clock System 1st Fix Inside Concrete at GF Zone 1 B
Central Clock System 1st Fix Inside Concrete at GF Zone 1 C
Central Clock System 1st Fix Inside Concrete at GF Zone 3 C
Central Clock System 1st Fix Inside Concrete at GF Zone 2 B
Central Clock System 1st Fix Inside Concrete at GF Zone 3 B
Central Clock System 1st Fix Inside Concrete at GF Zone 3 A
Central Clock System 1st Fix Inside Concrete at GF Zone 1 A
Central Clock System 1st Fix (Conduits, Boxes,) Inside Block at GF
Central Clock System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
Central Clock System 2nd Fix (Wiring, Cabling) at GF
Central Clock System 2nd Fix Riser Cabling at GF
Central Clock System 3rd Fix Devices Installation at GF
Central Clock System Cable Termination at GF

PAVA SYSTEM 1st Fix Inside Concrete at GF Zone 2 A


PAVA SYSTEM 1st Fix Inside Concrete at GF Zone 1 B
PAVA SYSTEM 1st Fix Inside Concrete at GF Zone 1 C
PAVA SYSTEM 1st Fix Inside Concrete at GF Zone 3 C
PAVA SYSTEM 1st Fix Inside Concrete at GF Zone 2 B
PAVA SYSTEM 1st Fix Inside Concrete at GF Zone 3 B
PAVA SYSTEM 1st Fix Inside Concrete at GF Zone 3 A
PAVA SYSTEM 1st Fix Inside Concrete at GF Zone 1 A
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at GF
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at GF
PAVA SYSTEM 2nd Fix Riser Cabling at GF
PAVA SYSTEM 3rd Fix Devices Installation at GF
PAVA SYSTEM Cable Termination at GF

Audio Intercom System 1st Fix Inside Concrete at GF Zone 2 A


Audio Intercom System 1st Fix Inside Concrete at GF Zone 1 B
Audio Intercom System 1st Fix Inside Concrete at GF Zone 1 C
Audio Intercom System 1st Fix Inside Concrete at GF Zone 3 C
Audio Intercom System 1st Fix Inside Concrete at GF Zone 2 B
Audio Intercom System 1st Fix Inside Concrete at GF Zone 3 B
Audio Intercom System 1st Fix Inside Concrete at GF Zone 3 A
Audio Intercom System 1st Fix Inside Concrete at GF Zone 1 A
Audio Intercom System 1st Fix (Conduits, Boxes,) Inside Block at GF
Audio Intercom System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
Audio Intercom System 2nd Fix (Wiring, Cabling) at GF
Audio Intercom System 2nd Fix Riser Cabling at GF
Audio Intercom System 3rd Fix Devices Installation at GF
Audio Intercom System Cable Termination at GF

Audio Visual System 1st Fix Inside Concrete at GF Zone 2 A


Audio Visual System 1st Fix Inside Concrete at GF Zone 1 B
Audio Visual System 1st Fix Inside Concrete at GF Zone 1 C
Audio Visual System 1st Fix Inside Concrete at GF Zone 3 C
Audio Visual System 1st Fix Inside Concrete at GF Zone 2 B
Audio Visual System 1st Fix Inside Concrete at GF Zone 3 B
Audio Visual System 1st Fix Inside Concrete at GF Zone 3 A
Audio Visual System 1st Fix Inside Concrete at GF Zone 1 A
Audio Visual System 1st Fix (Conduits, Boxes,) Inside Block at GF
Audio Visual System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
Audio Visual System 2nd Fix (Wiring, Cabling) at GF
Audio Visual System 2nd Fix Riser Cabling at GF
Audio Visual System 3rd Fix Devices Installation at GF
Audio Visual System Cable Termination at GF

BMS System 1st Fix Inside Concrete at GF Zone 2 A


BMS System 1st Fix Inside Concrete at GF Zone 1 B
BMS System 1st Fix Inside Concrete at GF Zone 1 C
BMS System 1st Fix Inside Concrete at GF Zone 3 C
BMS System 1st Fix Inside Concrete at GF Zone 2 B
BMS System 1st Fix Inside Concrete at GF Zone 3 B
BMS System 1st Fix Inside Concrete at GF Zone 3 A
BMS System 1st Fix Inside Concrete at GF Zone 1 A
BMS System 1st Fix (Conduits, Boxes, Flexible) at GF
BMS System 2nd Fix (Wiring, Cabling) at GF
BMS System 3rd Fix Devices Installation at GF
BMS System 3rd Fix Panels Installation at GF
BMS System Termination at GF

Guest Room Management System 1st Fix Inside Concrete at GF Zone 2 A


Guest Room Management System 1st Fix Inside Concrete at GF Zone 1 B
Guest Room Management System 1st Fix Inside Concrete at GF Zone 1 C
Guest Room Management System 1st Fix Inside Concrete at GF Zone 3 C
Guest Room Management System 1st Fix Inside Concrete at GF Zone 2 B
Guest Room Management System 1st Fix Inside Concrete at GF Zone 3 B
Guest Room Management System 1st Fix Inside Concrete at GF Zone 3 A
Guest Room Management System 1st Fix Inside Concrete at GF Zone 1 A
Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at GF
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
Guest Room Management System 2nd Fix (Wiring, Cabling) at GF
Guest Room Management System 2nd Fix Riser Cabling at GF
Guest Room Management System 3rd Fix Devices Installation at GF
Guest Room Management System Cable Termination at GF

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at GF Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at GF Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at GF Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at GF Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at GF Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at GF Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at GF Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at GF Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at GF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at GF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at GF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at GF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at GF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at GF

Lightning Protection System (Conduit, Wiring, Cabling) at GF


Fountains Electrical Conduit at GF
Fire Hydrant System Installation at GF
External Irrigation Pipes Excavation at GF
Fountains Mechanical Sleeves at GF
General Site MV Cables Placing at GF
Fountains Electrical Wiring at GF
Fountains Mechanical Valves at GF
Fountains Mechanical Pump at GF

Installation of Sanitary Fixtures at F1

Putting Drainage Pipes in Block Walls at F1


Installation of Drainage Pipes Support and Hangers at F1
Installation of Riser Drainage Pipes at F1
Installation of Horizontal Drainage Pipes at F1
Testing of Drainage Pipes at F1
Installation of Drain Channel Grating at F1

Putting Water Pipes in Block Walls at F1


Installation of Riser Water Pipes at F1
Installation of Water Pipes Support and Hangers at F1
Installation of Horizontal Water Pipes at F1
Insulation of Hot Water Pipes at F1
Testing of Water Pipes at F1

Installation of Fire Fighting Pipes Support and Hangers at F1


Installation of Fire Fighting Pipes at F1
Internal Fire Fighting Pipes Testing at F1
Installation of Fire Fighting Riser Pipes at F1
Installation of Fire Fighting Valves at F1
Installation of Sprinklers at F1
Installation of Fire Hose Cabinet at F1
Installation of hose and accessories at F1
Installation Fire Extinguisher at F1

Chilled Water Pipes Installation at F1


Installation of Duct Support and Hangers at F1
Chilled Water Testing at F1
Installation of Horizontal Duct at F1
Volume Damper and fire Damper Installation at F1
Insulation of Horizontal Duct at F1
Installation of Riser Duct at F1
Insulation of Riser Duct at F1
Smoke Test at F1
Installation of Air Outlets at F1

Fan Coil Unit Installation at F1


Fan Coil Unit Hock up and Connections at F1
Smoke Control Fans Installation at F1
Extract Fans Installation at F1
Smoke Control Fans Hock up and Connections at F1
Extract Fans Hock up and Connections at F1
Installation of VAV / CAV at F1

Installation of GAS Pipes Support and Hangers at F1


Installation of GAS Pipes at F1
installation of Gas Branch at F1
Testing of GAS Pipes at F1
Testing of Gas Branch at F1

Lighting System 1st Fix Inside Concrete at F1


Lighting System 1st Fix (Conduits, Boxes, Flexible) at F1
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F1
Lighting System 2nd Fix (Wiring, Cabling) at F1
Lighting System 2nd Fix Riser Cabling at F1
Lighting System 3rd Fix Wiring Devices at F1
Installation of lighting Fixtures at F1
Lighting System Cable Termination at F1

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F1


Cable Tray Installation at F1
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F1
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F1
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F1
LV Cables Over Cable Tray Placing at F1
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F1
Horizontal LV Busbar Installation at F1
Riser LV Busbar Installation at F1
Distribution Boards Frames Assembly and Installation at F1
Main and Sub Distribution Boards Frames Assembly and Installation at F1
Distribution Boards Circuit Breakers Installation at F1
Installation SPN / TPN Isolators for DB at F1
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F1
Distribution Boards Wiring and Termination at F1
Installation SPN / TPN Isolators for MDB and SMDB at F1
Main and Sub Distribution Wiring and Termination at F1
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F1
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F1

Power System 1st Fix Inside Concrete at F1


Power System 1st Fix (Conduits, Boxes, Flexible) at F1
Power System 1st Fix (Conduits, Boxes,) Inside Block at F1
Power System 2nd Fix (Wiring, Cabling) at F1
Power System 2nd Fix Riser Cabling at F1
Power System 3rd Fix Wiring Devices Installation at F1
Power System Cable Termination at F1

Data System 1st Fix Inside Concrete at F1


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F1
Data System 1st Fix (Conduits, Boxes,) Inside Block at F1
Data System 2nd Fix (Wiring, Cabling) at F1
Data System 2nd Fix Riser Cabling at F1
Data System 2nd Fix Racks Installation at F1
Data System 3rd Fix Racks Component Installation at F1
Data System Cable Termination at F1

Fire Alarm System 1st Fix Inside Concrete at F1


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F1
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F1
Fire Alarm System 2nd Fix (Wiring, Cabling) at F1
Fire Alarm System 2nd Fix Riser Cabling at F1
Fire Alarm System 3rd Fix Devices Installation at F1
Fire Alarm System 3rd Fix Panels Installation at F1
Fire Alarm System Cable Termination at F1

CCTV System 1st Fix Inside Concrete at F1


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F1
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F1
CCTV System 2nd Fix (Wiring, Cabling) at F1
CCTV System 2nd Fix Riser Cabling at F1
CCTV System 3rd Fix Cameras Installation at F1
CCTV System Cable Termination at F1

Access Control System 1st Fix Inside Concrete at F1


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F1
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F1
Access Control System 2nd Fix (Wiring, Cabling) at F1
Access Control System 2nd Fix Riser Cabling at F1
Access Control System 3rd Fix Devices Installation at F1
Access Control System Cable Termination at F1

Digital Signage System 1st Fix Inside Concrete at F1


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F1
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F1
Digital Signage System 2nd Fix (Wiring, Cabling) at F1
Digital Signage System 2nd Fix Riser Cabling at F1
Digital Signage System 3rd Fix Devices Installation at F1
Digital Signage System Cable Termination at F1

PAVA SYSTEM 1st Fix Inside Concrete at F1


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F1
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F1
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F1
PAVA SYSTEM 2nd Fix Riser Cabling at F1
PAVA SYSTEM 3rd Fix Devices Installation at F1
PAVA SYSTEM Cable Termination at F1

BMS System 1st Fix Inside Concrete at F1


BMS System 1st Fix (Conduits, Boxes, Flexible) at F1
BMS System 2nd Fix (Wiring, Cabling) at F1
BMS System 3rd Fix Devices Installation at F1
BMS System 3rd Fix Panels Installation at F1
BMS System Termination at F1

Guest Room Management System 1st Fix Inside Concrete at F1


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F1
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F1
Guest Room Management System 2nd Fix (Wiring, Cabling) at F1
Guest Room Management System 2nd Fix Riser Cabling at F1
Guest Room Management System 3rd Fix Devices Installation at F1
Guest Room Management System Cable Termination at F1

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F1


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F1
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F1
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F1
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F1
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F1
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F1

Lightning Protection System (Conduit, Wiring, Cabling) at F1


Installation of Sanitary Fixtures at F2

Installation of Horizontal Drainage Pipes at F2


Installation of Drainage Pipes Support and Hangers at F2
Putting Drainage Pipes in Block Walls at F2
Testing of Drainage Pipes at F2
Installation of Riser Drainage Pipes at F2

Installation of Water Pipes Support and Hangers at F2


Installation of Horizontal Water Pipes at F2
Installation of Riser Water Pipes at F2
Putting Water Pipes in Block Walls at F2
Insulation of Hot Water Pipes at F2
Testing of Water Pipes at F2

Installation of Fire Fighting Pipes Support and Hangers at F2


Installation of Fire Fighting Pipes at F2
Installation of Fire Fighting Riser Pipes at F2
Internal Fire Fighting Pipes Testing at F2
Installation of Fire Fighting Valves at F2
Installation of FM-200 Cylinders at F2
Installation of FM-200 Pipes including fittings at F2
Installation of FM-200 Nozzles at F2
Installation of Sprinklers at F2
Installation of Fire Hose Cabinet at F2
Installation of hose and accessories at F2
Installation Fire Extinguisher at F2

Chilled Water Pipes Installation at F2


Installation of Duct Support and Hangers at F2
Chilled Water Testing at F2
Installation of Horizontal Duct at F2
Insulation of Riser Duct at F2
Insulation of Horizontal Duct at F2
Installation of Riser Duct at F2
Volume Damper and fire Damper Installation at F2
Smoke Test at F2
Installation of Air Outlets at F2

Fan Coil Unit Installation at F2


Fresh Air Handling Units Installation at F2
Air Handling Units Installation at F2
Fresh Air Handling Units Hock up and Connections at F2
Air Handling Units Hock up and Connections at F2
Fan Coil Unit Hock up and Connections at F2
Smoke Control Fans Installation at F2
Extract Fans Installation at F2
Ecology Unit / Electrostatic Filter And Carbon Filter Installation at F2
Smoke Control Fans Hock up and Connections at F2
Extract Fans Hock up and Connections at F2
Ecology Unit / Electrostatic Filter And Carbon Filter Hock up and Connections at F2

Installation of GAS Pipes Support and Hangers at F2


Installation of GAS Pipes at F2
installation of Gas Branch at F2
Testing of GAS Pipes at F2
Testing of Gas Branch at F2

Lighting System 1st Fix Inside Concrete at F2


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F2
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F2
Lighting System 2nd Fix (Wiring, Cabling) at F2
Lighting System 2nd Fix Riser Cabling at F2
Lighting System 3rd Fix Wiring Devices at F2
Installation of lighting Fixtures at F2
Lighting System Cable Termination at F2

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F2


Cable Tray Installation at F2
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F2
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F2
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F2
LV Cables Over Cable Tray Placing at F2
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F2
Horizontal LV Busbar Installation at F2
Main and Sub Distribution Boards Frames Assembly and Installation at F2
Distribution Boards Frames Assembly and Installation at F2
Riser LV Busbar Installation at F2
Distribution Boards Circuit Breakers Installation at F2
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F2
Installation SPN / TPN Isolators for DB at F2
Distribution Boards Wiring and Termination at F2
Main and Sub Distribution Wiring and Termination at F2
Installation SPN / TPN Isolators for MDB and SMDB at F2
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F2
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F2
Power System 1st Fix Inside Concrete at F2
Power System 1st Fix (Conduits, Boxes, Flexible) at F2
Power System 1st Fix (Conduits, Boxes,) Inside Block at F2
Power System 2nd Fix (Wiring, Cabling) at F2
Power System 2nd Fix Riser Cabling at F2
Power System 3rd Fix Wiring Devices Installation at F2
Power System Cable Termination at F2

Data System 1st Fix Inside Concrete at F2


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F2
Data System 1st Fix (Conduits, Boxes,) Inside Block at F2
Data System 2nd Fix (Wiring, Cabling) at F2
Data System 2nd Fix Riser Cabling at F2
Data System 2nd Fix Racks Installation at F2
Data System 3rd Fix Racks Component Installation at F2
Data System Cable Termination at F2

Fire Alarm System 1st Fix Inside Concrete at F2


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F2
Fire Alarm System 2nd Fix (Wiring, Cabling) at F2
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F2
Fire Alarm System 2nd Fix Riser Cabling at F2
Fire Alarm System 3rd Fix Devices Installation at F2
Fire Alarm System 3rd Fix Panels Installation at F2
Fire Alarm System Cable Termination at F2

CCTV System 1st Fix Inside Concrete at F2


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F2
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F2
CCTV System 2nd Fix (Wiring, Cabling) at F2
CCTV System 2nd Fix Riser Cabling at F2
CCTV System 3rd Fix Cameras Installation at F2
CCTV System Cable Termination at F2

Access Control System 1st Fix Inside Concrete at F2


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F2
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F2
Access Control System 2nd Fix (Wiring, Cabling) at F2
Access Control System 2nd Fix Riser Cabling at F2
Access Control System 3rd Fix Devices Installation at F2
Access Control System Cable Termination at F2

Digital Signage System 1st Fix Inside Concrete at F2


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F2
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F2
Digital Signage System 2nd Fix (Wiring, Cabling) at F2
Digital Signage System 2nd Fix Riser Cabling at F2
Digital Signage System 3rd Fix Devices Installation at F2
Digital Signage System Cable Termination at F2

PAVA SYSTEM 1st Fix Inside Concrete at F2


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F2
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F2
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F2
PAVA SYSTEM 2nd Fix Riser Cabling at F2
PAVA SYSTEM 3rd Fix Devices Installation at F2
PAVA SYSTEM Cable Termination at F2

BMS System 1st Fix Inside Concrete at F2


BMS System 1st Fix (Conduits, Boxes, Flexible) at F2
BMS System 2nd Fix (Wiring, Cabling) at F2
BMS System 3rd Fix Devices Installation at F2
BMS System 3rd Fix Panels Installation at F2
BMS System Termination at F2

Guest Room Management System 1st Fix Inside Concrete at F2


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F2
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F2
Guest Room Management System 2nd Fix (Wiring, Cabling) at F2
Guest Room Management System 2nd Fix Riser Cabling at F2
Guest Room Management System 3rd Fix Devices Installation at F2
Guest Room Management System Cable Termination at F2

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F2


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F2
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F2
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F2
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F2
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F2
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F2

Lightning Protection System (Conduit, Wiring, Cabling) at F2

Installation of Sanitary Fixtures at F3

Installation of Horizontal Drainage Pipes at F3


Installation of Drainage Pipes Support and Hangers at F3
Installation of Riser Drainage Pipes at F3
Putting Drainage Pipes in Block Walls at F3
Testing of Drainage Pipes at F3

Installation of Water Pipes Support and Hangers at F3


Installation of Horizontal Water Pipes at F3
Insulation of Hot Water Pipes at F3
Installation of Riser Water Pipes at F3
Putting Water Pipes in Block Walls at F3
Testing of Water Pipes at F3

Installation of Fire Fighting Valves at F3


Installation of Fire Fighting Pipes at F3
Installation of Fire Fighting Pipes Support and Hangers at F3
Installation of Fire Fighting Riser Pipes at F3
Internal Fire Fighting Pipes Testing at F3
Installation of Sprinklers at F3
Installation of Fire Hose Cabinet at F3
Installation of hose and accessories at F3
Installation Fire Extinguisher at F3

Installation of Riser Duct at F3


Insulation of Riser Duct at F3
Volume Damper and fire Damper Installation at F3
Chilled Water Pipes Installation at F3
Installation of Duct Support and Hangers at F3
Chilled Water Testing at F3
Installation of Horizontal Duct at F3
Insulation of Horizontal Duct at F3
Smoke Test at F3
Installation of Air Outlets at F3

Fan Coil Unit Installation at F3


Fan Coil Unit Hock up and Connections at F3
Smoke Control Fans Installation at F3
Extract Fans Installation at F3
Extract Fans Hock up and Connections at F3
Smoke Control Fans Hock up and Connections at F3

Lighting System 1st Fix Inside Concrete at F3


Lighting System 1st Fix (Conduits, Boxes, Flexible) at F3
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F3
Lighting System 2nd Fix (Wiring, Cabling) at F3
Lighting System 2nd Fix Riser Cabling at F3
Lighting System 3rd Fix Wiring Devices at F3
Installation of lighting Fixtures at F3
Lighting System Cable Termination at F3

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F3


Cable Tray Installation at F3
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F3
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F3
LV Cables Over Cable Tray Placing at F3
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F3
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F3
Horizontal LV Busbar Installation at F3
Riser LV Busbar Installation at F3
Main and Sub Distribution Boards Frames Assembly and Installation at F3
Distribution Boards Frames Assembly and Installation at F3
Distribution Boards Circuit Breakers Installation at F3
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F3
Main and Sub Distribution Wiring and Termination at F3
Distribution Boards Wiring and Termination at F3
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F3
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F3

Power System 1st Fix Inside Concrete at F3


Power System 1st Fix (Conduits, Boxes,) Inside Block at F3
Power System 1st Fix (Conduits, Boxes, Flexible) at F3
Power System 2nd Fix (Wiring, Cabling) at F3
Power System 2nd Fix Riser Cabling at F3
Power System 3rd Fix Wiring Devices Installation at F3
Power System Cable Termination at F3

Data System 1st Fix Inside Concrete at F3


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F3
Data System 1st Fix (Conduits, Boxes,) Inside Block at F3
Data System 2nd Fix (Wiring, Cabling) at F3
Data System 2nd Fix Riser Cabling at F3
Data System 2nd Fix Racks Installation at F3
Data System 3rd Fix Racks Component Installation at F3
Data System Cable Termination at F3

Fire Alarm System 1st Fix Inside Concrete at F3


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F3
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F3
Fire Alarm System 2nd Fix (Wiring, Cabling) at F3
Fire Alarm System 2nd Fix Riser Cabling at F3
Fire Alarm System 3rd Fix Devices Installation at F3
Fire Alarm System 3rd Fix Panels Installation at F3
Fire Alarm System Cable Termination at F3

CCTV System 1st Fix Inside Concrete at F3


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F3
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F3
CCTV System 2nd Fix (Wiring, Cabling) at F3
CCTV System 2nd Fix Riser Cabling at F3
CCTV System 3rd Fix Cameras Installation at F3
CCTV System Cable Termination at F3

Access Control System 1st Fix Inside Concrete at F3


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F3
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F3
Access Control System 2nd Fix (Wiring, Cabling) at F3
Access Control System 2nd Fix Riser Cabling at F3
Access Control System 3rd Fix Devices Installation at F3
Access Control System Cable Termination at F3

Digital Signage System 1st Fix Inside Concrete at F3


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F3
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F3
Digital Signage System 2nd Fix (Wiring, Cabling) at F3
Digital Signage System 2nd Fix Riser Cabling at F3
Digital Signage System 3rd Fix Devices Installation at F3
Digital Signage System Cable Termination at F3

PAVA SYSTEM 1st Fix Inside Concrete at F3


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F3
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F3
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F3
PAVA SYSTEM 2nd Fix Riser Cabling at F3
PAVA SYSTEM 3rd Fix Devices Installation at F3
PAVA SYSTEM Cable Termination at F3

BMS System 1st Fix Inside Concrete at F3


BMS System 1st Fix (Conduits, Boxes, Flexible) at F3
BMS System 2nd Fix (Wiring, Cabling) at F3
BMS System 3rd Fix Devices Installation at F3
BMS System 3rd Fix Panels Installation at F3
BMS System Termination at F3

Guest Room Management System 1st Fix Inside Concrete at F3


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F3
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F3
Guest Room Management System 2nd Fix (Wiring, Cabling) at F3
Guest Room Management System 2nd Fix Riser Cabling at F3
Guest Room Management System 3rd Fix Devices Installation at F3
Guest Room Management System Cable Termination at F3

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F3


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F3
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F3
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F3
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F3
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F3
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F3

Lightning Protection System (Conduit, Wiring, Cabling) at F3

Installation of Sanitary Fixtures at F4

Installation of Drainage Pipes Support and Hangers at F4


Installation of Horizontal Drainage Pipes at F4
Installation of Riser Drainage Pipes at F4
Testing of Drainage Pipes at F4
Putting Drainage Pipes in Block Walls at F4

Installation of Water Pipes Support and Hangers at F4


Installation of Horizontal Water Pipes at F4
Insulation of Hot Water Pipes at F4
Installation of Riser Water Pipes at F4
Putting Water Pipes in Block Walls at F4
Testing of Water Pipes at F4

Installation of Fire Fighting Valves at F4


Installation of Fire Fighting Pipes Support and Hangers at F4
Installation of Fire Fighting Pipes at F4
Installation of Fire Fighting Riser Pipes at F4
Internal Fire Fighting Pipes Testing at F4
Installation of Sprinklers at F4
Installation of Fire Hose Cabinet at F4
Installation of hose and accessories at F4
Installation Fire Extinguisher at F4
Installation of Riser Duct at F4
Insulation of Riser Duct at F4
Installation of Duct Support and Hangers at F4
Installation of Horizontal Duct at F4
Chilled Water Pipes Installation at F4
Chilled Water Testing at F4
Insulation of Horizontal Duct at F4
Volume Damper and fire Damper Installation at F4
Smoke Test at F4
Installation of Air Outlets at F4

Fan Coil Unit Installation at F4


Fan Coil Unit Hock up and Connections at F4

Lighting System 1st Fix Inside Concrete at F4


Lighting System 1st Fix (Conduits, Boxes, Flexible) at F4
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F4
Lighting System 2nd Fix (Wiring, Cabling) at F4
Lighting System 2nd Fix Riser Cabling at F4
Lighting System 3rd Fix Wiring Devices at F4
Installation of lighting Fixtures at F4
Lighting System Cable Termination at F4

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F4


Cable Tray Installation at F4
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F4
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F4
LV Cables Over Cable Tray Placing at F4
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F4
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F4
Horizontal LV Busbar Installation at F4
Riser LV Busbar Installation at F4
Main and Sub Distribution Boards Frames Assembly and Installation at F4
Distribution Boards Frames Assembly and Installation at F4
Distribution Boards Circuit Breakers Installation at F4
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F4
Main and Sub Distribution Wiring and Termination at F4
Distribution Boards Wiring and Termination at F4
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F4
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F4

Power System 1st Fix Inside Concrete at F4


Power System 1st Fix (Conduits, Boxes, Flexible) at F4
Power System 1st Fix (Conduits, Boxes,) Inside Block at F4
Power System 2nd Fix (Wiring, Cabling) at F4
Power System 2nd Fix Riser Cabling at F4
Power System 3rd Fix Wiring Devices Installation at F4
Power System Cable Termination at F4

Data System 1st Fix Inside Concrete at F4


Data System 1st Fix (Conduits, Boxes,) Inside Block at F4
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F4
Data System 2nd Fix (Wiring, Cabling) at F4
Data System 2nd Fix Riser Cabling at F4
Data System 2nd Fix Racks Installation at F4
Data System 3rd Fix Racks Component Installation at F4
Data System Cable Termination at F4

Fire Alarm System 1st Fix Inside Concrete at F4


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F4
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F4
Fire Alarm System 2nd Fix (Wiring, Cabling) at F4
Fire Alarm System 2nd Fix Riser Cabling at F4
Fire Alarm System 3rd Fix Devices Installation at F4
Fire Alarm System 3rd Fix Panels Installation at F4
Fire Alarm System Cable Termination at F4

CCTV System 1st Fix Inside Concrete at F4


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F4
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F4
CCTV System 2nd Fix (Wiring, Cabling) at F4
CCTV System 2nd Fix Riser Cabling at F4
CCTV System 3rd Fix Cameras Installation at F4
CCTV System Cable Termination at F4

Access Control System 1st Fix Inside Concrete at F4


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F4
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F4
Access Control System 2nd Fix (Wiring, Cabling) at F4
Access Control System 2nd Fix Riser Cabling at F4
Access Control System 3rd Fix Devices Installation at F4
Access Control System Cable Termination at F4

Digital Signage System 1st Fix Inside Concrete at F4


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F4
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F4
Digital Signage System 2nd Fix (Wiring, Cabling) at F4
Digital Signage System 2nd Fix Riser Cabling at F4
Digital Signage System 3rd Fix Devices Installation at F4
Digital Signage System Cable Termination at F4

PAVA SYSTEM 1st Fix Inside Concrete at F4


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F4
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F4
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F4
PAVA SYSTEM 2nd Fix Riser Cabling at F4
PAVA SYSTEM 3rd Fix Devices Installation at F4
PAVA SYSTEM Cable Termination at F4

BMS System 1st Fix Inside Concrete at F4


BMS System 1st Fix (Conduits, Boxes, Flexible) at F4
BMS System 2nd Fix (Wiring, Cabling) at F4
BMS System 3rd Fix Devices Installation at F4
BMS System 3rd Fix Panels Installation at F4
BMS System Termination at F4

Guest Room Management System 1st Fix Inside Concrete at F4


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F4
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F4
Guest Room Management System 2nd Fix (Wiring, Cabling) at F4
Guest Room Management System 2nd Fix Riser Cabling at F4
Guest Room Management System 3rd Fix Devices Installation at F4
Guest Room Management System Cable Termination at F4

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F4


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F4
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F4
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F4
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F4
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F4
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F4

Lightning Protection System (Conduit, Wiring, Cabling) at F4

Installation of Sanitary Fixtures at F5

Installation of Horizontal Drainage Pipes at F5


Installation of Drainage Pipes Support and Hangers at F5
Installation of Riser Drainage Pipes at F5
Testing of Drainage Pipes at F5
Putting Drainage Pipes in Block Walls at F5
Installation of Riser Water Pipes at F5
Installation of Water Pipes Support and Hangers at F5
Installation of Horizontal Water Pipes at F5
Insulation of Hot Water Pipes at F5
Putting Water Pipes in Block Walls at F5
Testing of Water Pipes at F5

Installation of Fire Fighting Valves at F5


Installation of Fire Fighting Pipes Support and Hangers at F5
Installation of Fire Fighting Pipes at F5
Installation of Fire Fighting Riser Pipes at F5
Internal Fire Fighting Pipes Testing at F5
Installation of Sprinklers at F5
Installation of Fire Hose Cabinet at F5
Installation of hose and accessories at F5
Installation Fire Extinguisher at F5

Installation of Riser Duct at F5


Insulation of Riser Duct at F5
Chilled Water Pipes Installation at F5
Chilled Water Testing at F5
Installation of Duct Support and Hangers at F5
Installation of Horizontal Duct at F5
Insulation of Horizontal Duct at F5
Volume Damper and fire Damper Installation at F5
Smoke Test at F5
Installation of Air Outlets at F5

Fan Coil Unit Installation at F5


Fan Coil Unit Hock up and Connections at F5

Lighting System 1st Fix Inside Concrete at F5


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F5
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F5
Lighting System 2nd Fix (Wiring, Cabling) at F5
Lighting System 2nd Fix Riser Cabling at F5
Lighting System 3rd Fix Wiring Devices at F5
Installation of lighting Fixtures at F5
Lighting System Cable Termination at F5

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F5


Cable Tray Installation at F5
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F5
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F5
LV Cables Over Cable Tray Placing at F5
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F5
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F5
Horizontal LV Busbar Installation at F5
Riser LV Busbar Installation at F5
Distribution Boards Frames Assembly and Installation at F5
Distribution Boards Circuit Breakers Installation at F5
Main and Sub Distribution Boards Frames Assembly and Installation at F5
Distribution Boards Wiring and Termination at F5
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F5
Main and Sub Distribution Wiring and Termination at F5
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F5
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F5

Power System 1st Fix Inside Concrete at F5


Power System 1st Fix (Conduits, Boxes,) Inside Block at F5
Power System 1st Fix (Conduits, Boxes, Flexible) at F5
Power System 2nd Fix (Wiring, Cabling) at F5
Power System 2nd Fix Riser Cabling at F5
Power System 3rd Fix Wiring Devices Installation at F5
Power System Cable Termination at F5

Data System 1st Fix Inside Concrete at F5


Data System 1st Fix (Conduits, Boxes,) Inside Block at F5
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F5
Data System 2nd Fix (Wiring, Cabling) at F5
Data System 2nd Fix Riser Cabling at F5
Data System 2nd Fix Racks Installation at F5
Data System 3rd Fix Racks Component Installation at F5
Data System Cable Termination at F5

Fire Alarm System 1st Fix Inside Concrete at F5


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F5
Fire Alarm System 2nd Fix (Wiring, Cabling) at F5
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F5
Fire Alarm System 2nd Fix Riser Cabling at F5
Fire Alarm System 3rd Fix Devices Installation at F5
Fire Alarm System 3rd Fix Panels Installation at F5
Fire Alarm System Cable Termination at F5

CCTV System 1st Fix Inside Concrete at F5


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F5
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F5
CCTV System 2nd Fix (Wiring, Cabling) at F5
CCTV System 2nd Fix Riser Cabling at F5
CCTV System 3rd Fix Cameras Installation at F5
CCTV System Cable Termination at F5

Access Control System 1st Fix Inside Concrete at F5


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F5
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F5
Access Control System 2nd Fix (Wiring, Cabling) at F5
Access Control System 2nd Fix Riser Cabling at F5
Access Control System 3rd Fix Devices Installation at F5
Access Control System Cable Termination at F5

Digital Signage System 1st Fix Inside Concrete at F5


Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F5
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F5
Digital Signage System 2nd Fix (Wiring, Cabling) at F5
Digital Signage System 2nd Fix Riser Cabling at F5
Digital Signage System 3rd Fix Devices Installation at F5
Digital Signage System Cable Termination at F5

PAVA SYSTEM 1st Fix Inside Concrete at F5


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F5
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F5
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F5
PAVA SYSTEM 2nd Fix Riser Cabling at F5
PAVA SYSTEM 3rd Fix Devices Installation at F5
PAVA SYSTEM Cable Termination at F5

BMS System 1st Fix Inside Concrete at F5


BMS System 1st Fix (Conduits, Boxes, Flexible) at F5
BMS System 2nd Fix (Wiring, Cabling) at F5
BMS System 3rd Fix Devices Installation at F5
BMS System 3rd Fix Panels Installation at F5
BMS System Termination at F5

Guest Room Management System 1st Fix Inside Concrete at F5


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F5
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F5
Guest Room Management System 2nd Fix (Wiring, Cabling) at F5
Guest Room Management System 2nd Fix Riser Cabling at F5
Guest Room Management System 3rd Fix Devices Installation at F5
Guest Room Management System Cable Termination at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F5

Lightning Protection System (Conduit, Wiring, Cabling) at F5

Installation of Sanitary Fixtures at F6

Installation of Drainage Pipes Support and Hangers at F6


Installation of Horizontal Drainage Pipes at F6
Installation of Riser Drainage Pipes at F6
Putting Drainage Pipes in Block Walls at F6
Testing of Drainage Pipes at F6

Installation of Riser Water Pipes at F6


Installation of Horizontal Water Pipes at F6
Installation of Water Pipes Support and Hangers at F6
Insulation of Hot Water Pipes at F6
Putting Water Pipes in Block Walls at F6
Testing of Water Pipes at F6

Installation of Fire Fighting Valves at F6


Installation of Fire Fighting Pipes Support and Hangers at F6
Installation of Fire Fighting Pipes at F6
Installation of Fire Fighting Riser Pipes at F6
Internal Fire Fighting Pipes Testing at F6
Installation of Sprinklers at F6
Installation of Fire Hose Cabinet at F6
Installation of hose and accessories at F6
Installation Fire Extinguisher at F6

Installation of Riser Duct at F6


Insulation of Riser Duct at F6
Installation of Duct Support and Hangers at F6
Installation of Horizontal Duct at F6
Chilled Water Pipes Installation at F6
Chilled Water Testing at F6
Insulation of Horizontal Duct at F6
Volume Damper and fire Damper Installation at F6
Smoke Test at F6
Installation of Air Outlets at F6

Fan Coil Unit Installation at F6


Fan Coil Unit Hock up and Connections at F6

Lighting System 1st Fix Inside Concrete at F6


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F6
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F6
Lighting System 2nd Fix (Wiring, Cabling) at F6
Lighting System 2nd Fix Riser Cabling at F6
Lighting System 3rd Fix Wiring Devices at F6
Installation of lighting Fixtures at F6
Lighting System Cable Termination at F6

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F6


Cable Tray Installation at F6
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F6
LV Cables Over Cable Tray Placing at F6
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F6
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F6
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F6
Horizontal LV Busbar Installation at F6
Distribution Boards Frames Assembly and Installation at F6
Distribution Boards Circuit Breakers Installation at F6
Riser LV Busbar Installation at F6
Main and Sub Distribution Boards Frames Assembly and Installation at F6
Distribution Boards Wiring and Termination at F6
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F6
Main and Sub Distribution Wiring and Termination at F6
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F6
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F6

Power System 1st Fix Inside Concrete at F6


Power System 1st Fix (Conduits, Boxes,) Inside Block at F6
Power System 1st Fix (Conduits, Boxes, Flexible) at F6
Power System 2nd Fix (Wiring, Cabling) at F6
Power System 2nd Fix Riser Cabling at F6
Power System 3rd Fix Wiring Devices Installation at F6
Power System Cable Termination at F6

Data System 1st Fix Inside Concrete at F6


Data System 1st Fix (Conduits, Boxes,) Inside Block at F6
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F6
Data System 2nd Fix (Wiring, Cabling) at F6
Data System 2nd Fix Riser Cabling at F6
Data System 2nd Fix Racks Installation at F6
Data System 3rd Fix Racks Component Installation at F6
Data System Cable Termination at F6

Fire Alarm System 1st Fix Inside Concrete at F6


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F6
Fire Alarm System 2nd Fix (Wiring, Cabling) at F6
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F6
Fire Alarm System 2nd Fix Riser Cabling at F6
Fire Alarm System 3rd Fix Devices Installation at F6
Fire Alarm System 3rd Fix Panels Installation at F6
Fire Alarm System Cable Termination at F6

CCTV System 1st Fix Inside Concrete at F6


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F6
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F6
CCTV System 2nd Fix (Wiring, Cabling) at F6
CCTV System 2nd Fix Riser Cabling at F6
CCTV System 3rd Fix Cameras Installation at F6
CCTV System Cable Termination at F6

Access Control System 1st Fix Inside Concrete at F6


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F6
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F6
Access Control System 2nd Fix (Wiring, Cabling) at F6
Access Control System 2nd Fix Riser Cabling at F6
Access Control System 3rd Fix Devices Installation at F6
Access Control System Cable Termination at F6

Digital Signage System 1st Fix Inside Concrete at F6


Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F6
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F6
Digital Signage System 2nd Fix (Wiring, Cabling) at F6
Digital Signage System 2nd Fix Riser Cabling at F6
Digital Signage System 3rd Fix Devices Installation at F6
Digital Signage System Cable Termination at F6

PAVA SYSTEM 1st Fix Inside Concrete at F6


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F6
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F6
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F6
PAVA SYSTEM 2nd Fix Riser Cabling at F6
PAVA SYSTEM 3rd Fix Devices Installation at F6
PAVA SYSTEM Cable Termination at F6

BMS System 1st Fix Inside Concrete at F6


BMS System 1st Fix (Conduits, Boxes, Flexible) at F6
BMS System 2nd Fix (Wiring, Cabling) at F6
BMS System 3rd Fix Devices Installation at F6
BMS System 3rd Fix Panels Installation at F6
BMS System Termination at F6

Guest Room Management System 1st Fix Inside Concrete at F6


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F6
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F6
Guest Room Management System 2nd Fix (Wiring, Cabling) at F6
Guest Room Management System 2nd Fix Riser Cabling at F6
Guest Room Management System 3rd Fix Devices Installation at F6
Guest Room Management System Cable Termination at F6

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F6


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F6
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F6
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F6
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F6
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F6
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F6

Lightning Protection System (Conduit, Wiring, Cabling) at F6

Installation of Sanitary Fixtures at F7

Installation of Riser Drainage Pipes at F7


Installation of Horizontal Drainage Pipes at F7
Installation of Drainage Pipes Support and Hangers at F7
Putting Drainage Pipes in Block Walls at F7
Testing of Drainage Pipes at F7

Installation of Riser Water Pipes at F7


Installation of Horizontal Water Pipes at F7
Insulation of Hot Water Pipes at F7
Installation of Water Pipes Support and Hangers at F7
Putting Water Pipes in Block Walls at F7
Testing of Water Pipes at F7
Installation of Fire Fighting Valves at F7
Installation of Fire Fighting Pipes Support and Hangers at F7
Installation of Fire Fighting Pipes at F7
Installation of Fire Fighting Riser Pipes at F7
Internal Fire Fighting Pipes Testing at F7
Installation of Sprinklers at F7
Installation of Fire Hose Cabinet at F7
Installation of hose and accessories at F7
Installation Fire Extinguisher at F7

Installation of Riser Duct at F7


Insulation of Riser Duct at F7
Chilled Water Pipes Installation at F7
Installation of Duct Support and Hangers at F7
Chilled Water Testing at F7
Installation of Horizontal Duct at F7
Insulation of Horizontal Duct at F7
Volume Damper and fire Damper Installation at F7
Smoke Test at F7
Installation of Air Outlets at F7

Fan Coil Unit Installation at F7


Fan Coil Unit Hock up and Connections at F7

Lighting System 1st Fix Inside Concrete at F7


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F7
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F7
Lighting System 2nd Fix (Wiring, Cabling) at F7
Lighting System 2nd Fix Riser Cabling at F7
Lighting System 3rd Fix Wiring Devices at F7
Installation of lighting Fixtures at F7
Lighting System Cable Termination at F7

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F7


Cable Tray Installation at F7
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F7
LV Cables Over Cable Tray Placing at F7
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F7
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F7
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F7
Distribution Boards Frames Assembly and Installation at F7
Distribution Boards Circuit Breakers Installation at F7
Horizontal LV Busbar Installation at F7
Main and Sub Distribution Boards Frames Assembly and Installation at F7
Distribution Boards Wiring and Termination at F7
Riser LV Busbar Installation at F7
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F7
Main and Sub Distribution Wiring and Termination at F7
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F7
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F7

Power System 1st Fix Inside Concrete at F7


Power System 1st Fix (Conduits, Boxes,) Inside Block at F7
Power System 1st Fix (Conduits, Boxes, Flexible) at F7
Power System 2nd Fix (Wiring, Cabling) at F7
Power System 2nd Fix Riser Cabling at F7
Power System 3rd Fix Wiring Devices Installation at F7
Power System Cable Termination at F7

Data System 1st Fix Inside Concrete at F7


Data System 1st Fix (Conduits, Boxes,) Inside Block at F7
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F7
Data System 2nd Fix (Wiring, Cabling) at F7
Data System 2nd Fix Riser Cabling at F7
Data System 2nd Fix Racks Installation at F7
Data System 3rd Fix Racks Component Installation at F7
Data System Cable Termination at F7

Fire Alarm System 1st Fix Inside Concrete at F7


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F7
Fire Alarm System 2nd Fix (Wiring, Cabling) at F7
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F7
Fire Alarm System 2nd Fix Riser Cabling at F7
Fire Alarm System 3rd Fix Devices Installation at F7
Fire Alarm System 3rd Fix Panels Installation at F7
Fire Alarm System Cable Termination at F7

CCTV System 1st Fix Inside Concrete at F7


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F7
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F7
CCTV System 2nd Fix (Wiring, Cabling) at F7
CCTV System 2nd Fix Riser Cabling at F7
CCTV System 3rd Fix Cameras Installation at F7
CCTV System Cable Termination at F7

Access Control System 1st Fix Inside Concrete at F7


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F7
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F7
Access Control System 2nd Fix (Wiring, Cabling) at F7
Access Control System 2nd Fix Riser Cabling at F7
Access Control System 3rd Fix Devices Installation at F7
Access Control System Cable Termination at F7

Digital Signage System 1st Fix Inside Concrete at F7


Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F7
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F7
Digital Signage System 2nd Fix (Wiring, Cabling) at F7
Digital Signage System 2nd Fix Riser Cabling at F7
Digital Signage System 3rd Fix Devices Installation at F7
Digital Signage System Cable Termination at F7

PAVA SYSTEM 1st Fix Inside Concrete at F7


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F7
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F7
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F7
PAVA SYSTEM 2nd Fix Riser Cabling at F7
PAVA SYSTEM 3rd Fix Devices Installation at F7
PAVA SYSTEM Cable Termination at F7

BMS System 1st Fix Inside Concrete at F7


BMS System 1st Fix (Conduits, Boxes, Flexible) at F7
BMS System 2nd Fix (Wiring, Cabling) at F7
BMS System 3rd Fix Devices Installation at F7
BMS System 3rd Fix Panels Installation at F7
BMS System Termination at F7

Guest Room Management System 1st Fix Inside Concrete at F7


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F7
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F7
Guest Room Management System 2nd Fix (Wiring, Cabling) at F7
Guest Room Management System 2nd Fix Riser Cabling at F7
Guest Room Management System 3rd Fix Devices Installation at F7
Guest Room Management System Cable Termination at F7

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F7


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F7
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F7
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F7
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F7
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F7
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F7
Lightning Protection System (Conduit, Wiring, Cabling) at F7

Installation of Sanitary Fixtures at F8

Installation of Riser Drainage Pipes at F8


Installation of Horizontal Drainage Pipes at F8
Installation of Drainage Pipes Support and Hangers at F8
Putting Drainage Pipes in Block Walls at F8
Testing of Drainage Pipes at F8

Installation of Riser Water Pipes at F8


Installation of Water Pipes Support and Hangers at F8
Installation of Horizontal Water Pipes at F8
Insulation of Hot Water Pipes at F8
Putting Water Pipes in Block Walls at F8
Testing of Water Pipes at F8

Installation of Fire Fighting Valves at F8


Installation of Fire Fighting Pipes Support and Hangers at F8
Installation of Fire Fighting Pipes at F8
Installation of Fire Fighting Riser Pipes at F8
Internal Fire Fighting Pipes Testing at F8
Installation of Sprinklers at F8
Installation of Fire Hose Cabinet at F8
Installation of hose and accessories at F8
Installation Fire Extinguisher at F8

Chilled Water Pipes Installation at F8


Installation of Duct Support and Hangers at F8
Chilled Water Testing at F8
Installation of Horizontal Duct at F8
Insulation of Horizontal Duct at F8
Installation of Riser Duct at F8
Insulation of Riser Duct at F8
Volume Damper and fire Damper Installation at F8
Smoke Test at F8
Installation of Air Outlets at F8

Fan Coil Unit Installation at F8


Fan Coil Unit Hock up and Connections at F8
Lighting System 1st Fix Inside Concrete at F8
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F8
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F8
Lighting System 2nd Fix (Wiring, Cabling) at F8
Lighting System 2nd Fix Riser Cabling at F8
Lighting System 3rd Fix Wiring Devices at F8
Installation of lighting Fixtures at F8
Lighting System Cable Termination at F8

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F8


Cable Tray Installation at F8
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F8
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F8
LV Cables Over Cable Tray Placing at F8
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F8
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F8
Distribution Boards Frames Assembly and Installation at F8
Distribution Boards Circuit Breakers Installation at F8
Main and Sub Distribution Boards Frames Assembly and Installation at F8
Distribution Boards Wiring and Termination at F8
Horizontal LV Busbar Installation at F8
Riser LV Busbar Installation at F8
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F8
Main and Sub Distribution Wiring and Termination at F8
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F8
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F8

Power System 1st Fix Inside Concrete at F8


Power System 1st Fix (Conduits, Boxes,) Inside Block at F8
Power System 1st Fix (Conduits, Boxes, Flexible) at F8
Power System 2nd Fix (Wiring, Cabling) at F8
Power System 2nd Fix Riser Cabling at F8
Power System 3rd Fix Wiring Devices Installation at F8
Power System Cable Termination at F8

Data System 1st Fix Inside Concrete at F8


Data System 1st Fix (Conduits, Boxes,) Inside Block at F8
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F8
Data System 2nd Fix (Wiring, Cabling) at F8
Data System 2nd Fix Riser Cabling at F8
Data System 2nd Fix Racks Installation at F8
Data System 3rd Fix Racks Component Installation at F8
Data System Cable Termination at F8
Fire Alarm System 1st Fix Inside Concrete at F8
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F8
Fire Alarm System 2nd Fix (Wiring, Cabling) at F8
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F8
Fire Alarm System 2nd Fix Riser Cabling at F8
Fire Alarm System 3rd Fix Devices Installation at F8
Fire Alarm System 3rd Fix Panels Installation at F8
Fire Alarm System Cable Termination at F8

CCTV System 1st Fix Inside Concrete at F8


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F8
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F8
CCTV System 2nd Fix (Wiring, Cabling) at F8
CCTV System 2nd Fix Riser Cabling at F8
CCTV System 3rd Fix Cameras Installation at F8
CCTV System Cable Termination at F8

Access Control System 1st Fix Inside Concrete at F8


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F8
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F8
Access Control System 2nd Fix (Wiring, Cabling) at F8
Access Control System 2nd Fix Riser Cabling at F8
Access Control System 3rd Fix Devices Installation at F8
Access Control System Cable Termination at F8

Digital Signage System 1st Fix Inside Concrete at F8


Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F8
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F8
Digital Signage System 2nd Fix (Wiring, Cabling) at F8
Digital Signage System 2nd Fix Riser Cabling at F8
Digital Signage System 3rd Fix Devices Installation at F8
Digital Signage System Cable Termination at F8

PAVA SYSTEM 1st Fix Inside Concrete at F8


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F8
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F8
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F8
PAVA SYSTEM 2nd Fix Riser Cabling at F8
PAVA SYSTEM 3rd Fix Devices Installation at F8
PAVA SYSTEM Cable Termination at F8

BMS System 1st Fix Inside Concrete at F8


BMS System 1st Fix (Conduits, Boxes, Flexible) at F8
BMS System 2nd Fix (Wiring, Cabling) at F8
BMS System 3rd Fix Devices Installation at F8
BMS System 3rd Fix Panels Installation at F8
BMS System Termination at F8

Guest Room Management System 1st Fix Inside Concrete at F8


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F8
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F8
Guest Room Management System 2nd Fix (Wiring, Cabling) at F8
Guest Room Management System 2nd Fix Riser Cabling at F8
Guest Room Management System 3rd Fix Devices Installation at F8
Guest Room Management System Cable Termination at F8

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F8


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F8
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F8
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F8
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F8
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F8
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F8

Lightning Protection System (Conduit, Wiring, Cabling) at F8

Installation of Sanitary Fixtures at F9

Installation of Drainage Pipes Support and Hangers at F9


Installation of Riser Drainage Pipes at F9
Installation of Horizontal Drainage Pipes at F9
Putting Drainage Pipes in Block Walls at F9
Testing of Drainage Pipes at F9

Putting Water Pipes in Block Walls at F9


Installation of Water Pipes Support and Hangers at F9
Installation of Horizontal Water Pipes at F9
Insulation of Hot Water Pipes at F9
Installation of Riser Water Pipes at F9
Testing of Water Pipes at F9

Installation of Fire Fighting Valves at F9


Installation of Fire Fighting Pipes Support and Hangers at F9
Installation of Fire Fighting Pipes at F9
Installation of Fire Fighting Riser Pipes at F9
Internal Fire Fighting Pipes Testing at F9
Installation of Sprinklers at F9
Installation of Fire Hose Cabinet at F9
Installation of hose and accessories at F9
Installation Fire Extinguisher at F9

Chilled Water Pipes Installation at F9


Installation of Riser Duct at F9
Installation of Duct Support and Hangers at F9
Installation of Horizontal Duct at F9
Insulation of Horizontal Duct at F9
Insulation of Riser Duct at F9
Chilled Water Testing at F9
Volume Damper and fire Damper Installation at F9
Smoke Test at F9
Installation of Air Outlets at F9

Fan Coil Unit Installation at F9


Fan Coil Unit Hock up and Connections at F9

Lighting System 1st Fix Inside Concrete at F9


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F9
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F9
Lighting System 2nd Fix (Wiring, Cabling) at F9
Lighting System 2nd Fix Riser Cabling at F9
Lighting System 3rd Fix Wiring Devices at F9
Installation of lighting Fixtures at F9
Lighting System Cable Termination at F9

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F9


Cable Tray Installation at F9
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F9
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F9
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F9
LV Cables Over Cable Tray Placing at F9
Horizontal LV Busbar Installation at F9
Riser LV Busbar Installation at F9
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F9
Main and Sub Distribution Boards Frames Assembly and Installation at F9
Distribution Boards Frames Assembly and Installation at F9
Distribution Boards Circuit Breakers Installation at F9
Distribution Boards Wiring and Termination at F9
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F9
Main and Sub Distribution Wiring and Termination at F9
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F9
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F9

Power System 1st Fix Inside Concrete at F9


Power System 1st Fix (Conduits, Boxes,) Inside Block at F9
Power System 1st Fix (Conduits, Boxes, Flexible) at F9
Power System 2nd Fix (Wiring, Cabling) at F9
Power System 2nd Fix Riser Cabling at F9
Power System 3rd Fix Wiring Devices Installation at F9
Power System Cable Termination at F9

Data System 1st Fix Inside Concrete at F9


Data System 1st Fix (Conduits, Boxes,) Inside Block at F9
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F9
Data System 2nd Fix (Wiring, Cabling) at F9
Data System 2nd Fix Riser Cabling at F9
Data System 2nd Fix Racks Installation at F9
Data System 3rd Fix Racks Component Installation at F9
Data System Cable Termination at F9

Fire Alarm System 1st Fix Inside Concrete at F9


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F9
Fire Alarm System 2nd Fix (Wiring, Cabling) at F9
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F9
Fire Alarm System 2nd Fix Riser Cabling at F9
Fire Alarm System 3rd Fix Devices Installation at F9
Fire Alarm System 3rd Fix Panels Installation at F9
Fire Alarm System Cable Termination at F9

CCTV System 1st Fix Inside Concrete at F9


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F9
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F9
CCTV System 2nd Fix (Wiring, Cabling) at F9
CCTV System 2nd Fix Riser Cabling at F9
CCTV System 3rd Fix Cameras Installation at F9
CCTV System Cable Termination at F9

Access Control System 1st Fix Inside Concrete at F9


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F9
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F9
Access Control System 2nd Fix (Wiring, Cabling) at F9
Access Control System 2nd Fix Riser Cabling at F9
Access Control System 3rd Fix Devices Installation at F9
Access Control System Cable Termination at F9
Digital Signage System 1st Fix Inside Concrete at F9
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F9
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F9
Digital Signage System 2nd Fix (Wiring, Cabling) at F9
Digital Signage System 2nd Fix Riser Cabling at F9
Digital Signage System 3rd Fix Devices Installation at F9
Digital Signage System Cable Termination at F9

PAVA SYSTEM 1st Fix Inside Concrete at F9


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F9
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F9
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F9
PAVA SYSTEM 2nd Fix Riser Cabling at F9
PAVA SYSTEM 3rd Fix Devices Installation at F9
PAVA SYSTEM Cable Termination at F9

BMS System 1st Fix Inside Concrete at F9


BMS System 1st Fix (Conduits, Boxes, Flexible) at F9
BMS System 2nd Fix (Wiring, Cabling) at F9
BMS System 3rd Fix Devices Installation at F9
BMS System 3rd Fix Panels Installation at F9
BMS System Termination at F9

Guest Room Management System 1st Fix Inside Concrete at F9


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F9
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F9
Guest Room Management System 2nd Fix (Wiring, Cabling) at F9
Guest Room Management System 2nd Fix Riser Cabling at F9
Guest Room Management System 3rd Fix Devices Installation at F9
Guest Room Management System Cable Termination at F9

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F9


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F9
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F9
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F9
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F9
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F9
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F9

Lightning Protection System (Conduit, Wiring, Cabling) at F9

Installation of Sanitary Fixtures at F10


Installation of Drainage Pipes Support and Hangers at F10
Installation of Horizontal Drainage Pipes at F10
Installation of Riser Drainage Pipes at F10
Putting Drainage Pipes in Block Walls at F10
Testing of Drainage Pipes at F10

Installation of Water Pipes Support and Hangers at F10


Installation of Horizontal Water Pipes at F10
Installation of Riser Water Pipes at F10
Putting Water Pipes in Block Walls at F10
Insulation of Hot Water Pipes at F10
Testing of Water Pipes at F10

Installation of Fire Fighting Pipes Support and Hangers at F10


Installation of Fire Fighting Pipes at F10
Installation of Fire Fighting Riser Pipes at F10
Internal Fire Fighting Pipes Testing at F10
Installation of Fire Fighting Valves at F10
Installation of Sprinklers at F10
Installation of Fire Hose Cabinet at F10
Installation of hose and accessories at F10
Installation Fire Extinguisher at F10

Chilled Water Pipes Installation at F10


Installation of Duct Support and Hangers at F10
Installation of Horizontal Duct at F10
Installation of Riser Duct at F10
Insulation of Riser Duct at F10
Insulation of Horizontal Duct at F10
Chilled Water Testing at F10
Volume Damper and fire Damper Installation at F10
Smoke Test at F10
Installation of Air Outlets at F10

Fan Coil Unit Installation at F10


Fan Coil Unit Hock up and Connections at F10

Lighting System 1st Fix Inside Concrete at F10


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F10
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F10
Lighting System 2nd Fix (Wiring, Cabling) at F10
Lighting System 2nd Fix Riser Cabling at F10
Lighting System 3rd Fix Wiring Devices at F10
Installation of lighting Fixtures at F10
Lighting System Cable Termination at F10

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F10
Cable Tray Installation at F10
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F10
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F10
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F10
LV Cables Over Cable Tray Placing at F10
Horizontal LV Busbar Installation at F10
Riser LV Busbar Installation at F10
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F10
Main and Sub Distribution Boards Frames Assembly and Installation at F10
Distribution Boards Frames Assembly and Installation at F10
Distribution Boards Circuit Breakers Installation at F10
Distribution Boards Wiring and Termination at F10
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F10
Main and Sub Distribution Wiring and Termination at F10
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F10
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F10

Power System 1st Fix Inside Concrete at F10


Power System 1st Fix (Conduits, Boxes,) Inside Block at F10
Power System 1st Fix (Conduits, Boxes, Flexible) at F10
Power System 2nd Fix (Wiring, Cabling) at F10
Power System 2nd Fix Riser Cabling at F10
Power System 3rd Fix Wiring Devices Installation at F10
Power System Cable Termination at F10

Data System 1st Fix Inside Concrete at F10


Data System 1st Fix (Conduits, Boxes,) Inside Block at F10
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F10
Data System 2nd Fix (Wiring, Cabling) at F10
Data System 2nd Fix Riser Cabling at F10
Data System 2nd Fix Racks Installation at F10
Data System 3rd Fix Racks Component Installation at F10
Data System Cable Termination at F10

Fire Alarm System 1st Fix Inside Concrete at F10


Fire Alarm System 2nd Fix (Wiring, Cabling) at F10
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F10
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F10
Fire Alarm System 2nd Fix Riser Cabling at F10
Fire Alarm System 3rd Fix Devices Installation at F10
Fire Alarm System 3rd Fix Panels Installation at F10
Fire Alarm System Cable Termination at F10

CCTV System 1st Fix Inside Concrete at F10


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F10
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F10
CCTV System 2nd Fix (Wiring, Cabling) at F10
CCTV System 2nd Fix Riser Cabling at F10
CCTV System 3rd Fix Cameras Installation at F10
CCTV System Cable Termination at F10

Access Control System 1st Fix Inside Concrete at F10


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F10
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F10
Access Control System 2nd Fix (Wiring, Cabling) at F10
Access Control System 2nd Fix Riser Cabling at F10
Access Control System 3rd Fix Devices Installation at F10
Access Control System Cable Termination at F10

Digital Signage System 1st Fix Inside Concrete at F10


Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F10
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F10
Digital Signage System 2nd Fix (Wiring, Cabling) at F10
Digital Signage System 2nd Fix Riser Cabling at F10
Digital Signage System 3rd Fix Devices Installation at F10
Digital Signage System Cable Termination at F10

PAVA SYSTEM 1st Fix Inside Concrete at F10


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F10
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F10
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F10
PAVA SYSTEM 2nd Fix Riser Cabling at F10
PAVA SYSTEM 3rd Fix Devices Installation at F10
PAVA SYSTEM Cable Termination at F10

BMS System 1st Fix Inside Concrete at F10


BMS System 1st Fix (Conduits, Boxes, Flexible) at F10
BMS System 2nd Fix (Wiring, Cabling) at F10
BMS System 3rd Fix Devices Installation at F10
BMS System 3rd Fix Panels Installation at F10
BMS System Termination at F10

Guest Room Management System 1st Fix Inside Concrete at F10


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F10
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F10
Guest Room Management System 2nd Fix (Wiring, Cabling) at F10
Guest Room Management System 2nd Fix Riser Cabling at F10
Guest Room Management System 3rd Fix Devices Installation at F10
Guest Room Management System Cable Termination at F10

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F10
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F10
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F10
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F10
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F10
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F10
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F10

Lightning Protection System (Conduit, Wiring, Cabling) at F10

Installation of Sanitary Fixtures at F11

Installation of Drainage Pipes Support and Hangers at F11


Installation of Horizontal Drainage Pipes at F11
Installation of Riser Drainage Pipes at F11
Putting Drainage Pipes in Block Walls at F11
Testing of Drainage Pipes at F11

Installation of Water Pipes Support and Hangers at F11


Installation of Horizontal Water Pipes at F11
Installation of Riser Water Pipes at F11
Insulation of Hot Water Pipes at F11
Putting Water Pipes in Block Walls at F11
Testing of Water Pipes at F11

Installation of Fire Fighting Pipes Support and Hangers at F11


Installation of Fire Fighting Pipes at F11
Installation of Fire Fighting Riser Pipes at F11
Internal Fire Fighting Pipes Testing at F11
Installation of Fire Fighting Valves at F11
Installation of Sprinklers at F11
Installation of Fire Hose Cabinet at F11
Installation of hose and accessories at F11
Installation Fire Extinguisher at F11

Chilled Water Pipes Installation at F11


Installation of Duct Support and Hangers at F11
Installation of Horizontal Duct at F11
Installation of Riser Duct at F11
Insulation of Riser Duct at F11
Insulation of Horizontal Duct at F11
Chilled Water Testing at F11
Volume Damper and fire Damper Installation at F11
Smoke Test at F11
Installation of Air Outlets at F11

Fan Coil Unit Installation at F11


Fan Coil Unit Hock up and Connections at F11

Lighting System 1st Fix Inside Concrete at F11


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F11
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F11
Lighting System 2nd Fix (Wiring, Cabling) at F11
Lighting System 2nd Fix Riser Cabling at F11
Lighting System 3rd Fix Wiring Devices at F11
Installation of lighting Fixtures at F11
Lighting System Cable Termination at F11

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F11
Cable Tray Installation at F11
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F11
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F11
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F11
LV Cables Over Cable Tray Placing at F11
Horizontal LV Busbar Installation at F11
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F11
Riser LV Busbar Installation at F11
Distribution Boards Frames Assembly and Installation at F11
Distribution Boards Circuit Breakers Installation at F11
Main and Sub Distribution Boards Frames Assembly and Installation at F11
Distribution Boards Wiring and Termination at F11
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F11
Main and Sub Distribution Wiring and Termination at F11
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F11
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F11

Power System 1st Fix Inside Concrete at F11


Power System 1st Fix (Conduits, Boxes,) Inside Block at F11
Power System 1st Fix (Conduits, Boxes, Flexible) at F11
Power System 2nd Fix (Wiring, Cabling) at F11
Power System 2nd Fix Riser Cabling at F11
Power System 3rd Fix Wiring Devices Installation at F11
Power System Cable Termination at F11

Data System 1st Fix Inside Concrete at F11


Data System 1st Fix (Conduits, Boxes,) Inside Block at F11
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F11
Data System 2nd Fix (Wiring, Cabling) at F11
Data System 2nd Fix Riser Cabling at F11
Data System 2nd Fix Racks Installation at F11
Data System 3rd Fix Racks Component Installation at F11
Data System Cable Termination at F11

Fire Alarm System 1st Fix Inside Concrete at F11


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F11
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F11
Fire Alarm System 2nd Fix (Wiring, Cabling) at F11
Fire Alarm System 2nd Fix Riser Cabling at F11
Fire Alarm System 3rd Fix Devices Installation at F11
Fire Alarm System 3rd Fix Panels Installation at F11
Fire Alarm System Cable Termination at F11

CCTV System 1st Fix Inside Concrete at F11


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F11
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F11
CCTV System 2nd Fix (Wiring, Cabling) at F11
CCTV System 2nd Fix Riser Cabling at F11
CCTV System 3rd Fix Cameras Installation at F11
CCTV System Cable Termination at F11

Access Control System 1st Fix Inside Concrete at F11


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F11
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F11
Access Control System 2nd Fix (Wiring, Cabling) at F11
Access Control System 2nd Fix Riser Cabling at F11
Access Control System 3rd Fix Devices Installation at F11
Access Control System Cable Termination at F11

Digital Signage System 1st Fix Inside Concrete at F11


Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F11
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F11
Digital Signage System 2nd Fix (Wiring, Cabling) at F11
Digital Signage System 2nd Fix Riser Cabling at F11
Digital Signage System 3rd Fix Devices Installation at F11
Digital Signage System Cable Termination at F11
PAVA SYSTEM 1st Fix Inside Concrete at F11
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F11
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F11
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F11
PAVA SYSTEM 2nd Fix Riser Cabling at F11
PAVA SYSTEM 3rd Fix Devices Installation at F11
PAVA SYSTEM Cable Termination at F11

BMS System 1st Fix Inside Concrete at F11


BMS System 1st Fix (Conduits, Boxes, Flexible) at F11
BMS System 2nd Fix (Wiring, Cabling) at F11
BMS System 3rd Fix Devices Installation at F11
BMS System 3rd Fix Panels Installation at F11
BMS System Termination at F11

Guest Room Management System 1st Fix Inside Concrete at F11


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F11
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F11
Guest Room Management System 2nd Fix (Wiring, Cabling) at F11
Guest Room Management System 2nd Fix Riser Cabling at F11
Guest Room Management System 3rd Fix Devices Installation at F11
Guest Room Management System Cable Termination at F11

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F11
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F11
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F11
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F11
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F11
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F11
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F11

Lightning Protection System (Conduit, Wiring, Cabling) at F11

Installation of Sanitary Fixtures at F12

Installation of Drainage Pipes Support and Hangers at F12


Installation of Horizontal Drainage Pipes at F12
Installation of Riser Drainage Pipes at F12
Putting Drainage Pipes in Block Walls at F12
Testing of Drainage Pipes at F12

Installation of Water Pipes Support and Hangers at F12


Installation of Horizontal Water Pipes at F12
Installation of Riser Water Pipes at F12
Putting Water Pipes in Block Walls at F12
Insulation of Hot Water Pipes at F12
Testing of Water Pipes at F12

Installation of Fire Fighting Pipes Support and Hangers at F12


Installation of Fire Fighting Pipes at F12
Installation of Fire Fighting Riser Pipes at F12
Installation of Fire Fighting Valves at F12
Internal Fire Fighting Pipes Testing at F12
Installation of Sprinklers at F12
Installation of Fire Hose Cabinet at F12
Installation of hose and accessories at F12
Installation Fire Extinguisher at F12

Chilled Water Pipes Installation at F12


Installation of Riser Duct at F12
Insulation of Riser Duct at F12
Insulation of Horizontal Duct at F12
Installation of Duct Support and Hangers at F12
Installation of Horizontal Duct at F12
Chilled Water Testing at F12
Volume Damper and fire Damper Installation at F12
Smoke Test at F12
Installation of Air Outlets at F12

Fan Coil Unit Installation at F12


Fan Coil Unit Hock up and Connections at F12

Lighting System 1st Fix Inside Concrete at F12


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F12
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F12
Lighting System 2nd Fix (Wiring, Cabling) at F12
Lighting System 2nd Fix Riser Cabling at F12
Lighting System 3rd Fix Wiring Devices at F12
Installation of lighting Fixtures at F12
Lighting System Cable Termination at F12

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F12
Cable Tray Installation at F12
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F12
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F12
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F12
LV Cables Over Cable Tray Placing at F12
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F12
Horizontal LV Busbar Installation at F12
Riser LV Busbar Installation at F12
Distribution Boards Frames Assembly and Installation at F12
Distribution Boards Circuit Breakers Installation at F12
Main and Sub Distribution Boards Frames Assembly and Installation at F12
Distribution Boards Wiring and Termination at F12
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F12
Main and Sub Distribution Wiring and Termination at F12
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F12
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F12

Power System 1st Fix Inside Concrete at F12


Power System 1st Fix (Conduits, Boxes,) Inside Block at F12
Power System 1st Fix (Conduits, Boxes, Flexible) at F12
Power System 2nd Fix (Wiring, Cabling) at F12
Power System 2nd Fix Riser Cabling at F12
Power System 3rd Fix Wiring Devices Installation at F12
Power System Cable Termination at F12

Data System 1st Fix Inside Concrete at F12


Data System 1st Fix (Conduits, Boxes,) Inside Block at F12
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F12
Data System 2nd Fix (Wiring, Cabling) at F12
Data System 2nd Fix Riser Cabling at F12
Data System 2nd Fix Racks Installation at F12
Data System 3rd Fix Racks Component Installation at F12
Data System Cable Termination at F12

Fire Alarm System 1st Fix Inside Concrete at F12


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F12
Fire Alarm System 2nd Fix (Wiring, Cabling) at F12
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F12
Fire Alarm System 2nd Fix Riser Cabling at F12
Fire Alarm System 3rd Fix Devices Installation at F12
Fire Alarm System 3rd Fix Panels Installation at F12
Fire Alarm System Cable Termination at F12

CCTV System 1st Fix Inside Concrete at F12


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F12
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F12
CCTV System 2nd Fix (Wiring, Cabling) at F12
CCTV System 2nd Fix Riser Cabling at F12
CCTV System 3rd Fix Cameras Installation at F12
CCTV System Cable Termination at F12

Access Control System 1st Fix Inside Concrete at F12


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F12
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F12
Access Control System 2nd Fix (Wiring, Cabling) at F12
Access Control System 2nd Fix Riser Cabling at F12
Access Control System 3rd Fix Devices Installation at F12
Access Control System Cable Termination at F12

Digital Signage System 1st Fix Inside Concrete at F12


Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F12
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F12
Digital Signage System 2nd Fix (Wiring, Cabling) at F12
Digital Signage System 2nd Fix Riser Cabling at F12
Digital Signage System 3rd Fix Devices Installation at F12
Digital Signage System Cable Termination at F12

PAVA SYSTEM 1st Fix Inside Concrete at F12


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F12
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F12
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F12
PAVA SYSTEM 2nd Fix Riser Cabling at F12
PAVA SYSTEM 3rd Fix Devices Installation at F12
PAVA SYSTEM Cable Termination at F12

BMS System 1st Fix Inside Concrete at F12


BMS System 1st Fix (Conduits, Boxes, Flexible) at F12
BMS System 2nd Fix (Wiring, Cabling) at F12
BMS System 3rd Fix Devices Installation at F12
BMS System 3rd Fix Panels Installation at F12
BMS System Termination at F12

Guest Room Management System 1st Fix Inside Concrete at F12


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F12
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F12
Guest Room Management System 2nd Fix (Wiring, Cabling) at F12
Guest Room Management System 2nd Fix Riser Cabling at F12
Guest Room Management System 3rd Fix Devices Installation at F12
Guest Room Management System Cable Termination at F12

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F12
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F12
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F12
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F12
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F12
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F12
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F12

Lightning Protection System (Conduit, Wiring, Cabling) at F12

Installation of Sanitary Fixtures at F13

Installation of Drainage Pipes Support and Hangers at F13


Installation of Horizontal Drainage Pipes at F13
Installation of Riser Drainage Pipes at F13
Putting Drainage Pipes in Block Walls at F13
Testing of Drainage Pipes at F13

Installation of Water Pipes Support and Hangers at F13


Installation of Horizontal Water Pipes at F13
Installation of Riser Water Pipes at F13
Putting Water Pipes in Block Walls at F13
Insulation of Hot Water Pipes at F13
Testing of Water Pipes at F13

Installation of Fire Fighting Pipes Support and Hangers at F13


Installation of Fire Fighting Pipes at F13
Installation of Fire Fighting Riser Pipes at F13
Internal Fire Fighting Pipes Testing at F13
Installation of Fire Fighting Valves at F13
Installation of Sprinklers at F13
Installation of Fire Hose Cabinet at F13
Installation of hose and accessories at F13
Installation Fire Extinguisher at F13

Chilled Water Pipes Installation at F13


Chilled Water Testing at F13
Insulation of Riser Duct at F13
Installation of Riser Duct at F13
Installation of Duct Support and Hangers at F13
Installation of Horizontal Duct at F13
Volume Damper and fire Damper Installation at F13
Insulation of Horizontal Duct at F13
Smoke Test at F13
Installation of Air Outlets at F13

Fan Coil Unit Installation at F13


Fan Coil Unit Hock up and Connections at F13

Lighting System 1st Fix Inside Concrete at F13


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F13
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F13
Lighting System 2nd Fix (Wiring, Cabling) at F13
Lighting System 2nd Fix Riser Cabling at F13
Lighting System 3rd Fix Wiring Devices at F13
Installation of lighting Fixtures at F13
Lighting System Cable Termination at F13

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F13
Cable Tray Installation at F13
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F13
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F13
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F13
LV Cables Over Cable Tray Placing at F13
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F13
Horizontal LV Busbar Installation at F13
Riser LV Busbar Installation at F13
Distribution Boards Frames Assembly and Installation at F13
Distribution Boards Circuit Breakers Installation at F13
Main and Sub Distribution Boards Frames Assembly and Installation at F13
Distribution Boards Wiring and Termination at F13
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F13
Main and Sub Distribution Wiring and Termination at F13
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F13
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F13

Power System 1st Fix Inside Concrete at F13


Power System 1st Fix (Conduits, Boxes,) Inside Block at F13
Power System 1st Fix (Conduits, Boxes, Flexible) at F13
Power System 2nd Fix (Wiring, Cabling) at F13
Power System 2nd Fix Riser Cabling at F13
Power System 3rd Fix Wiring Devices Installation at F13
Power System Cable Termination at F13

Data System 1st Fix Inside Concrete at F13


Data System 1st Fix (Conduits, Boxes,) Inside Block at F13
Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F13
Data System 2nd Fix (Wiring, Cabling) at F13
Data System 2nd Fix Riser Cabling at F13
Data System 2nd Fix Racks Installation at F13
Data System 3rd Fix Racks Component Installation at F13
Data System Cable Termination at F13

Fire Alarm System 1st Fix Inside Concrete at F13


Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F13
Fire Alarm System 2nd Fix (Wiring, Cabling) at F13
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F13
Fire Alarm System 2nd Fix Riser Cabling at F13
Fire Alarm System 3rd Fix Devices Installation at F13
Fire Alarm System 3rd Fix Panels Installation at F13
Fire Alarm System Cable Termination at F13

CCTV System 1st Fix Inside Concrete at F13


CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F13
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F13
CCTV System 2nd Fix (Wiring, Cabling) at F13
CCTV System 2nd Fix Riser Cabling at F13
CCTV System 3rd Fix Cameras Installation at F13
CCTV System Cable Termination at F13

Access Control System 1st Fix Inside Concrete at F13


Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F13
Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F13
Access Control System 2nd Fix (Wiring, Cabling) at F13
Access Control System 2nd Fix Riser Cabling at F13
Access Control System 3rd Fix Devices Installation at F13
Access Control System Cable Termination at F13

Digital Signage System 1st Fix Inside Concrete at F13


Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F13
Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F13
Digital Signage System 2nd Fix (Wiring, Cabling) at F13
Digital Signage System 2nd Fix Riser Cabling at F13
Digital Signage System 3rd Fix Devices Installation at F13
Digital Signage System Cable Termination at F13

PAVA SYSTEM 1st Fix Inside Concrete at F13


PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F13
PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F13
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F13
PAVA SYSTEM 2nd Fix Riser Cabling at F13
PAVA SYSTEM 3rd Fix Devices Installation at F13
PAVA SYSTEM Cable Termination at F13

BMS System 1st Fix Inside Concrete at F13


BMS System 1st Fix (Conduits, Boxes, Flexible) at F13
BMS System 2nd Fix (Wiring, Cabling) at F13
BMS System 3rd Fix Devices Installation at F13
BMS System 3rd Fix Panels Installation at F13
BMS System Termination at F13

Guest Room Management System 1st Fix Inside Concrete at F13


Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F13
Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F13
Guest Room Management System 2nd Fix (Wiring, Cabling) at F13
Guest Room Management System 2nd Fix Riser Cabling at F13
Guest Room Management System 3rd Fix Devices Installation at F13
Guest Room Management System Cable Termination at F13

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F13
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F13
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F13
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F13
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F13
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F13
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F13

Lightning Protection System (Conduit, Wiring, Cabling) at F13

Installation of Sanitary Fixtures at F14

Putting Drainage Pipes in Block Walls at F14


Installation of Riser Drainage Pipes at F14
Installation of Horizontal Drainage Pipes at F14
Installation of Drainage Pipes Support and Hangers at F14
Testing of Drainage Pipes at F14

Installation of Water Pipes Support and Hangers at F14


Putting Water Pipes in Block Walls at F14
Installation of Horizontal Water Pipes at F14
Installation of Riser Water Pipes at F14
Insulation of Hot Water Pipes at F14
Testing of Water Pipes at F14

Installation of Fire Fighting Pipes Support and Hangers at F14


Installation of Fire Fighting Pipes at F14
Installation of Fire Fighting Riser Pipes at F14
Internal Fire Fighting Pipes Testing at F14
Installation of Fire Fighting Valves at F14
Installation of Sprinklers at F14
Installation of Fire Hose Cabinet at F14
Installation of hose and accessories at F14
Installation Fire Extinguisher at F14

Installation of Riser Duct at F14


Insulation of Riser Duct at F14
Chilled Water Pipes Installation at F14
Installation of Duct Support and Hangers at F14
Chilled Water Testing at F14
Installation of Horizontal Duct at F14
Volume Damper and fire Damper Installation at F14
Insulation of Horizontal Duct at F14
Smoke Test at F14
Installation of Air Outlets at F14

Fan Coil Unit Installation at F14


Fan Coil Unit Hock up and Connections at F14

Lighting System 1st Fix Inside Concrete at F14


Lighting System 1st Fix (Conduits, Boxes,) Inside Block at F14
Lighting System 1st Fix (Conduits, Boxes, Flexible) at F14
Lighting System 2nd Fix (Wiring, Cabling) at F14
Lighting System 2nd Fix Riser Cabling at F14
Lighting System 3rd Fix Wiring Devices at F14
Installation of lighting Fixtures at F14
Lighting System Cable Termination at F14

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at F14
Cable Tray Installation at F14
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F14
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at F14
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F14
LV Cables Over Cable Tray Placing at F14
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at F14
Horizontal LV Busbar Installation at F14
Distribution Boards Frames Assembly and Installation at F14
Riser LV Busbar Installation at F14
Distribution Boards Circuit Breakers Installation at F14
Main and Sub Distribution Boards Frames Assembly and Installation at F14
Distribution Boards Wiring and Termination at F14
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at F14
Main and Sub Distribution Wiring and Termination at F14
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at F14
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at F14

Power System 1st Fix Inside Concrete at F14


Power System 1st Fix (Conduits, Boxes,) Inside Block at F14
Power System 1st Fix (Conduits, Boxes, Flexible) at F14
Power System 2nd Fix (Wiring, Cabling) at F14
Power System 2nd Fix Riser Cabling at F14
Power System 3rd Fix Wiring Devices Installation at F14
Power System Cable Termination at F14

Data System 1st Fix Inside Concrete at F14


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F14
Data System 1st Fix (Conduits, Boxes,) Inside Block at F14
Data System 2nd Fix (Wiring, Cabling) at F14
Data System 2nd Fix Riser Cabling at F14
Data System 2nd Fix Racks Installation at F14
Data System 3rd Fix Racks Component Installation at F14
Data System Cable Termination at F14

Fire Alarm System 1st Fix Inside Concrete at F14


Fire Alarm System 2nd Fix (Wiring, Cabling) at F14
Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at F14
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at F14
Fire Alarm System 2nd Fix Riser Cabling at F14
Fire Alarm System 3rd Fix Devices Installation at F14
Fire Alarm System 3rd Fix Panels Installation at F14
Fire Alarm System Cable Termination at F14

CCTV System 1st Fix Inside Concrete at F14


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F14
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at F14
CCTV System 2nd Fix (Wiring, Cabling) at F14
CCTV System 2nd Fix Riser Cabling at F14
CCTV System 3rd Fix Cameras Installation at F14
CCTV System Cable Termination at F14

Access Control System 1st Fix Inside Concrete at F14


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F14
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at F14
Access Control System 2nd Fix (Wiring, Cabling) at F14
Access Control System 2nd Fix Riser Cabling at F14
Access Control System 3rd Fix Devices Installation at F14
Access Control System Cable Termination at F14

Digital Signage System 1st Fix Inside Concrete at F14


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F14
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at F14
Digital Signage System 2nd Fix (Wiring, Cabling) at F14
Digital Signage System 2nd Fix Riser Cabling at F14
Digital Signage System 3rd Fix Devices Installation at F14
Digital Signage System Cable Termination at F14

PAVA SYSTEM 1st Fix Inside Concrete at F14


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F14
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at F14
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at F14
PAVA SYSTEM 2nd Fix Riser Cabling at F14
PAVA SYSTEM 3rd Fix Devices Installation at F14
PAVA SYSTEM Cable Termination at F14

BMS System 1st Fix Inside Concrete at F14


BMS System 1st Fix (Conduits, Boxes, Flexible) at F14
BMS System 2nd Fix (Wiring, Cabling) at F14
BMS System 3rd Fix Devices Installation at F14
BMS System 3rd Fix Panels Installation at F14
BMS System Termination at F14

Guest Room Management System 1st Fix Inside Concrete at F14


Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F14
Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at F14
Guest Room Management System 2nd Fix (Wiring, Cabling) at F14
Guest Room Management System 2nd Fix Riser Cabling at F14
Guest Room Management System 3rd Fix Devices Installation at F14
Guest Room Management System Cable Termination at F14

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at F14
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at F14
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at F14
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at F14
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at F14
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at F14
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at F14

Lightning Protection System (Conduit, Wiring, Cabling) at F14


Installation of Sanitary Fixtures at RF

Installation of Drainage Pipes Support and Hangers at RF


Installation of Riser Drainage Pipes at RF
Putting Drainage Pipes in Block Walls at RF
Installation of Horizontal Drainage Pipes at RF
Testing of Drainage Pipes at RF

Installation of Horizontal Water Pipes at RF


Installation of Water Pipes Support and Hangers at RF
Putting Water Pipes in Block Walls at RF
Installation of Riser Water Pipes at RF
Insulation of Hot Water Pipes at RF
Testing of Water Pipes at RF

Installation of Fire Fighting Pipes at RF


Installation of Fire Fighting Riser Pipes at RF
Installation of Fire Fighting Pipes Support and Hangers at RF
Installation of Fire Fighting Valves at RF
Internal Fire Fighting Pipes Testing at RF
Installation of Sprinklers at RF
Installation of Fire Hose Cabinet at RF
Installation of hose and accessories at RF
Installation Fire Extinguisher at RF

Chilled Water Pipes Installation at RF


Chilled Water Testing at RF
Insulation of Riser Duct at RF
Installation of Riser Duct at RF
Installation of Duct Support and Hangers at RF
Installation of Horizontal Duct at RF
Volume Damper and fire Damper Installation at RF
Insulation of Horizontal Duct at RF
Smoke Test at RF
Installation of Air Outlets at RF

Fan Coil Unit Installation at RF


Fan Coil Unit Hock up and Connections at RF

Lighting System 1st Fix Inside Concrete at RF


Lighting System 1st Fix (Conduits, Boxes, Flexible) at RF
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at RF
Lighting System 2nd Fix (Wiring, Cabling) at RF
Lighting System 2nd Fix Riser Cabling at RF
Lighting System 3rd Fix Wiring Devices at RF
Installation of lighting Fixtures at RF
Lighting System Cable Termination at RF

EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix Inside Concrete at RF


Cable Tray Installation at RF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at RF
LV Cables Over Cable Tray Placing at RF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at RF
Horizontal LV Busbar Installation at RF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix (Wiring, Cabling) at RF
Riser LV Busbar Installation at RF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 2nd Fix Riser Cabling at RF
Main and Sub Distribution Boards Frames Assembly and Installation at RF
Distribution Boards Frames Assembly and Installation at RF
Distribution Boards Circuit Breakers Installation at RF
Installation SPN / TPN Isolators for DB at RF
Distribution Boards Wiring and Termination at RF
Main and Sub Distribution Boards Circuit Breakers, Fuses and Main Switch Installation at RF
Installation SPN / TPN Isolators for MDB and SMDB at RF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM 3rd Fix Devices Installation at RF
Main and Sub Distribution Wiring and Termination at RF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Cable Termination at RF

Power System 1st Fix Inside Concrete at RF


Power System 1st Fix (Conduits, Boxes, Flexible) at RF
Power System 1st Fix (Conduits, Boxes,) Inside Block at RF
Power System 2nd Fix (Wiring, Cabling) at RF
Power System 2nd Fix Riser Cabling at RF
Power System 3rd Fix Wiring Devices Installation at RF
Power System Cable Termination at RF

Fire Alarm System 1st Fix Inside Concrete at RF


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at RF
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at RF
Fire Alarm System 2nd Fix (Wiring, Cabling) at RF
Fire Alarm System 2nd Fix Riser Cabling at RF
Fire Alarm System 3rd Fix Devices Installation at RF
Fire Alarm System 3rd Fix Panels Installation at RF
Fire Alarm System Cable Termination at RF
CCTV System 1st Fix Inside Concrete at RF
CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at RF
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at RF
CCTV System 2nd Fix (Wiring, Cabling) at RF
CCTV System 2nd Fix Riser Cabling at RF
CCTV System 3rd Fix Cameras Installation at RF
CCTV System Cable Termination at RF

Access Control System 1st Fix Inside Concrete at RF


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at RF
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at RF
Access Control System 2nd Fix (Wiring, Cabling) at RF
Access Control System 2nd Fix Riser Cabling at RF
Access Control System 3rd Fix Devices Installation at RF
Access Control System Cable Termination at RF

Digital Signage System 1st Fix Inside Concrete at RF


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at RF
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at RF
Digital Signage System 2nd Fix (Wiring, Cabling) at RF
Digital Signage System 2nd Fix Riser Cabling at RF
Digital Signage System 3rd Fix Devices Installation at RF
Digital Signage System Cable Termination at RF

PAVA SYSTEM 1st Fix Inside Concrete at RF


PAVA SYSTEM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at RF
PAVA SYSTEM 1st Fix (Conduits, Boxes,) Inside Block at RF
PAVA SYSTEM 2nd Fix (Wiring, Cabling) at RF
PAVA SYSTEM 2nd Fix Riser Cabling at RF
PAVA SYSTEM 3rd Fix Devices Installation at RF
PAVA SYSTEM Cable Termination at RF

BMS System 1st Fix Inside Concrete at RF


BMS System 1st Fix (Conduits, Boxes, Flexible) at RF
BMS System 2nd Fix (Wiring, Cabling) at RF
BMS System 3rd Fix Devices Installation at RF
BMS System 3rd Fix Panels Installation at RF
BMS System Termination at RF

Guest Room Management System 1st Fix Inside Concrete at RF


Guest Room Management System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at RF
Guest Room Management System 1st Fix (Conduits, Boxes,) Inside Block at RF
Guest Room Management System 2nd Fix (Wiring, Cabling) at RF
Guest Room Management System 2nd Fix Riser Cabling at RF
Guest Room Management System 3rd Fix Devices Installation at RF
Guest Room Management System Cable Termination at RF

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at RF


EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at RF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at RF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at RF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at RF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at RF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at RF

Lightning Protection System (Conduit, Wiring, Cabling) at RF

Swimming and Shower Pool MEP First Fix at RF


Swimming and Shower Pool MEP Second Fix at RF
Swimming and Shower Pool MEP Third Fix at RF

GRP water tanks Installation at URF


GRP water tanks Pumps Installation at URF
GRP water tanks Covers Installation at URF
GRP water tanks Testing at URF
Installation of Sanitary Fixtures at URF

Putting Drainage Pipes in Block Walls at URF


Installation of Drainage Pipes Support and Hangers at URF
Installation of Horizontal Drainage Pipes at URF
Installation of Riser Drainage Pipes at URF
Testing of Drainage Pipes at URF

Putting Water Pipes in Block Walls at URF


Installation of Water Pipes Support and Hangers at URF
Installation of Horizontal Water Pipes at URF
Installation of Riser Water Pipes at URF
Insulation of Hot Water Pipes at URF
Testing of Water Pipes at URF

Installation of Fire Fighting Pipes Support and Hangers at URF


Installation of FM-200 Cylinders at URF
Installation of Fire Fighting Pipes at URF
Installation of FM-200 Pipes including fittings at URF
Installation of Fire Fighting Riser Pipes at URF
Installation of FM-200 Nozzles at URF
Installation of Fire Fighting Valves at URF
Internal Fire Fighting Pipes Testing at URF
Installation of Sprinklers at URF

Chilled Water Pipes Installation at URF


Installation of Duct Support and Hangers at URF
Chilled Water Testing at URF
Installation of Horizontal Duct at URF
Volume Damper and fire Damper Installation at URF
Insulation of Horizontal Duct at URF
Installation of Riser Duct at URF
Insulation of Riser Duct at URF
Smoke Test at URF
Installation of Air Outlets at URF

Fan Coil Unit Installation at URF


Cooling Tower Installation at URF
Smoke Control Fans Installation at URF
Extract Fans Installation at URF
Fresh Air Handling Units Installation at URF
Cooling Tower Hock up and Connections at URF
Fresh Air Handling Units Hock up and Connections at URF
Fan Coil Unit Hock up and Connections at URF
Smoke Control Fans Hock up and Connections at URF
Extract Fans Hock up and Connections at URF

Lighting System 1st Fix Inside Concrete at URF


Lighting System 1st Fix (Conduits, Boxes, Flexible) at URF
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at URF
Lighting System 2nd Fix (Wiring, Cabling) at URF
Lighting System 2nd Fix Riser Cabling at URF
Lighting System 3rd Fix Wiring Devices at URF
Installation of lighting Fixtures at URF
Lighting System Cable Termination at URF

Cable Tray Installation at URF


LV Cables Over Cable Tray Placing at URF
Horizontal LV Busbar Installation at URF
Riser LV Busbar Installation at URF
Distribution Boards Frames Assembly and Installation at URF
Distribution Boards Circuit Breakers Installation at URF
Installation SPN / TPN Isolators for DB at URF
Distribution Boards Wiring and Termination at URF
Power System 1st Fix Inside Concrete at URF
Power System 1st Fix (Conduits, Boxes, Flexible) at URF
Power System 1st Fix (Conduits, Boxes,) Inside Block at URF
Power System 2nd Fix (Wiring, Cabling) at URF
Power System 2nd Fix Riser Cabling at URF
Power System 3rd Fix Wiring Devices Installation at URF
Power System Cable Termination at URF

Data System 1st Fix Inside Concrete at URF


Data System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at URF
Data System 1st Fix (Conduits, Boxes,) Inside Block at URF
Data System 2nd Fix (Wiring, Cabling) at URF
Data System 2nd Fix Riser Cabling at URF
Data System 2nd Fix Racks Installation at URF
Data System 3rd Fix Racks Component Installation at URF
Data System Cable Termination at URF

Fire Alarm System 1st Fix Inside Concrete at URF


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at URF
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at URF
Fire Alarm System 2nd Fix (Wiring, Cabling) at URF
Fire Alarm System 2nd Fix Riser Cabling at URF
Fire Alarm System 3rd Fix Devices Installation at URF
Fire Alarm System 3rd Fix Panels Installation at URF
Fire Alarm System Cable Termination at URF

CCTV System 1st Fix Inside Concrete at URF


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at URF
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at URF
CCTV System 2nd Fix (Wiring, Cabling) at URF
CCTV System 2nd Fix Riser Cabling at URF
CCTV System 3rd Fix Cameras Installation at URF
CCTV System Cable Termination at URF

Access Control System 1st Fix Inside Concrete at URF


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at URF
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at URF
Access Control System 2nd Fix (Wiring, Cabling) at URF
Access Control System 2nd Fix Riser Cabling at URF
Access Control System 3rd Fix Devices Installation at URF
Access Control System Cable Termination at URF

Digital Signage System 1st Fix Inside Concrete at URF


Digital Signage System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at URF
Digital Signage System 1st Fix (Conduits, Boxes,) Inside Block at URF
Digital Signage System 2nd Fix (Wiring, Cabling) at URF
Digital Signage System 2nd Fix Riser Cabling at URF
Digital Signage System 3rd Fix Devices Installation at URF
Digital Signage System Cable Termination at URF

BMS System 1st Fix Inside Concrete at URF


BMS System 1st Fix (Conduits, Boxes, Flexible) at URF
BMS System 2nd Fix (Wiring, Cabling) at URF
BMS System 3rd Fix Panels Installation at URF
BMS System 3rd Fix Devices Installation at URF
BMS System Termination at URF

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at URF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at URF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at URF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at URF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at URF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at URF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at URF

Lightning Protection System (Conduit, Wiring, Cabling) at URF

Installation of Sanitary Fixtures at TRF

Putting Drainage Pipes in Block Walls at TRF


Installation of Drainage Pipes Support and Hangers at TRF
Installation of Riser Drainage Pipes at TRF
Installation of Horizontal Drainage Pipes at TRF
Testing of Drainage Pipes at TRF

Putting Water Pipes in Block Walls at TRF


Installation of Water Pipes Support and Hangers at TRF
Installation of Horizontal Water Pipes at TRF
Installation of Riser Water Pipes at TRF
Insulation of Hot Water Pipes at TRF
Testing of Water Pipes at TRF

Installation of Fire Fighting Pipes Support and Hangers at TRF


Installation of Fire Fighting Pipes at TRF
Installation of Fire Fighting Riser Pipes at TRF
Installation of Fire Fighting Valves at TRF
Internal Fire Fighting Pipes Testing at TRF
Installation of Sprinklers at TRF

Chilled Water Pipes Installation at TRF


Installation of Duct Support and Hangers at TRF
Chilled Water Testing at TRF
Installation of Horizontal Duct at TRF
Volume Damper and fire Damper Installation at TRF
Insulation of Horizontal Duct at TRF
Installation of Riser Duct at TRF
Insulation of Riser Duct at TRF
Smoke Test at TRF
Installation of Air Outlets at TRF

Fan Coil Unit Installation at TRF


Fresh Air Handling Units Installation at TRF
Fresh Air Handling Units Hock up and Connections at TRF
Fan Coil Unit Hock up and Connections at TRF

Lighting System 1st Fix Inside Concrete at TRF


Lighting System 1st Fix (Conduits, Boxes, Flexible) at TRF
Lighting System 1st Fix (Conduits, Boxes,) Inside Block at TRF
Lighting System 2nd Fix (Wiring, Cabling) at TRF
Lighting System 2nd Fix Riser Cabling at TRF
Lighting System 3rd Fix Wiring Devices at TRF
Installation of lighting Fixtures at TRF
Lighting System Cable Termination at TRF

Distribution Boards Frames Assembly and Installation at TRF


Distribution Boards Circuit Breakers Installation at TRF
Distribution Boards Wiring and Termination at TRF

Power System 1st Fix Inside Concrete at TRF


Power System 1st Fix (Conduits, Boxes, Flexible) at TRF
Power System 1st Fix (Conduits, Boxes,) Inside Block at TRF
Power System 2nd Fix (Wiring, Cabling) at TRF
Power System 2nd Fix Riser Cabling at TRF
Power System 3rd Fix Wiring Devices Installation at TRF
Power System Cable Termination at TRF

Fire Alarm System 1st Fix Inside Concrete at TRF


Fire Alarm System 1st Fix (Conduits, Boxes, Flexible) at TRF
Fire Alarm System 1st Fix (Conduits, Boxes,) Inside Block at TRF
Fire Alarm System 2nd Fix (Wiring, Cabling) at TRF
Fire Alarm System 2nd Fix Riser Cabling at TRF
Fire Alarm System 3rd Fix Devices Installation at TRF
Fire Alarm System 3rd Fix Panels Installation at TRF
Fire Alarm System Cable Termination at TRF

CCTV System 1st Fix Inside Concrete at TRF


CCTV System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at TRF
CCTV System 1st Fix (Conduits, Boxes,) Inside Block at TRF
CCTV System 2nd Fix (Wiring, Cabling) at TRF
CCTV System 2nd Fix Riser Cabling at TRF
CCTV System 3rd Fix Cameras Installation at TRF
CCTV System Cable Termination at TRF

Access Control System 1st Fix Inside Concrete at TRF


Access Control System 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at TRF
Access Control System 1st Fix (Conduits, Boxes,) Inside Block at TRF
Access Control System 2nd Fix (Wiring, Cabling) at TRF
Access Control System 2nd Fix Riser Cabling at TRF
Access Control System 3rd Fix Devices Installation at TRF
Access Control System Cable Termination at TRF

EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix Inside Concrete at TRF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes, Flexible) Above False Ceiling at TRF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 1st Fix (Conduits, Boxes,) Inside Block at TRF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix (Wiring, Cabling) at TRF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 2nd Fix Riser Cabling at TRF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM 3rd Fix Devices Installation at TRF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Cable Termination at TRF

Lightning Protection System (Conduit, Wiring, Cabling) at TRF


Installation of Lightning Protection Rod at TRF

Facade Lighting Conduit & Boxes Installation at Podium Part01


Facade Lighting Wiring at Podium Part01
Facade Lighting Light Fixture Installation at Podium Part01
Facade Lighting Wiring Termination at Podium Part01

Facade Lighting Conduit & Boxes Installation at Podium Part02


Facade Lighting Wiring at Podium Part02
Facade Lighting Light Fixture Installation at Podium Part02
Facade Lighting Wiring Termination at Podium Part02
Facade Lighting Conduit & Boxes Installation at Podium Part03
Facade Lighting Wiring at Podium Part03
Facade Lighting Light Fixture Installation at Podium Part03
Facade Lighting Wiring Termination at Podium Part03

Facade Lighting Conduit & Boxes Installation at Podium Part04


Facade Lighting Wiring at Podium Part04
Facade Lighting Light Fixture Installation at Podium Part04
Facade Lighting Wiring Termination at Podium Part04

Facade Lighting Conduit & Boxes Installation at Podium Atrium01


Facade Lighting Wiring at Podium Atrium01
Facade Lighting Light Fixture Installation at Podium Atrium01
Facade Lighting Wiring Termination at Podium Atrium01

Facade Lighting Conduit & Boxes Installation at Podium Atrium02


Facade Lighting Wiring at Podium Atrium02
Facade Lighting Light Fixture Installation at Podium Atrium02
Facade Lighting Wiring Termination at Podium Atrium02

Facade Lighting Conduit & Boxes Installation at Tower Part01


Facade Lighting Wiring at Tower Part01
Facade Lighting Light Fixture Installation at Tower Part01
Facade Lighting Wiring Termination at Tower Part01

Facade Lighting Conduit & Boxes Installation at Tower Part02


Facade Lighting Wiring at Tower Part02
Facade Lighting Light Fixture Installation at Tower Part02
Facade Lighting Wiring Termination at Tower Part02

Facade Lighting Conduit & Boxes Installation at Tower Part03


Facade Lighting Wiring at Tower Part03
Facade Lighting Light Fixture Installation at Tower Part03
Facade Lighting Wiring Termination at Tower Part03

Main and Sub Distribution Boards Pre-Functional Test at B3 Zone 2 B


Filtration Unit Pre-Functional Test at B3 Zone 2 B
Water Supply Pumps Pre-Functional Test at B3 Zone 2 B
Gray Water Treatment Plant Pre-Functional Test at B3 Zone 2 B
Fire Fighting Pump Pre-Functional Test at B3 Zone 2 B
PAVA SYSTEM Pre-Functional Test at B3 Zone 2 B
BMS Pre-Functional Test at B3 Zone 2 B
Main and Sub Distribution Boards Pre-Functional Test at B2 Zone 1 A
Distribution Boards Pre-Functional Test at B2 Zone 1 A
Power System Pre-Functional Test at B2 Zone 1 A
Fan Coil Unit Pre-Functional Test at B2 Zone 1 A
Smoke Control Fans Pre-Functional Test at B2 Zone 1 A
Extract Fans Pre-Functional Test at B2 Zone 1 A
Lighting System Pre-Functional Test at B2 Zone 1 A
Fire Alarm System Pre-Functional Test at B2 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B2 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at B2 Zone 1 A
Data System Pre-Functional Test at B2 Zone 1 A
CCTV System Pre-Functional Test at B2 Zone 1 A
Access Control System Pre-Functional Test at B2 Zone 1 A
PAVA SYSTEM Pre-Functional Test at B2 Zone 1 A
Digital Signage System Pre-Functional Test at B2 Zone 1 A
Pre-Functional Test of Lightning Protection System at B2 Zone 1 A
BMS Pre-Functional Test at B2 Zone 1 A

Main and Sub Distribution Boards Pre-Functional Test at B2 Zone 1 B


Power System Pre-Functional Test at B2 Zone 1 B
Smoke Control Fans Pre-Functional Test at B2 Zone 1 B
Extract Fans Pre-Functional Test at B2 Zone 1 B
Lighting System Pre-Functional Test at B2 Zone 1 B
Fire Alarm System Pre-Functional Test at B2 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B2 Zone 1 B
Data System Pre-Functional Test at B2 Zone 1 B
CCTV System Pre-Functional Test at B2 Zone 1 B
Access Control System Pre-Functional Test at B2 Zone 1 B
PAVA SYSTEM Pre-Functional Test at B2 Zone 1 B
Digital Signage System Pre-Functional Test at B2 Zone 1 B
Pre-Functional Test of Lightning Protection System at B2 Zone 1 B
BMS Pre-Functional Test at B2 Zone 1 B

Main and Sub Distribution Boards Pre-Functional Test at B2 Zone 1 C


Distribution Boards Pre-Functional Test at B2 Zone 1 C
Power System Pre-Functional Test at B2 Zone 1 C
Fan Coil Unit Pre-Functional Test at B2 Zone 1 C
Smoke Control Fans Pre-Functional Test at B2 Zone 1 C
Extract Fans Pre-Functional Test at B2 Zone 1 C
Lighting System Pre-Functional Test at B2 Zone 1 C
Fire Alarm System Pre-Functional Test at B2 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B2 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at B2 Zone 1 C
Data System Pre-Functional Test at B2 Zone 1 C
CCTV System Pre-Functional Test at B2 Zone 1 C
Access Control System Pre-Functional Test at B2 Zone 1 C
PAVA SYSTEM Pre-Functional Test at B2 Zone 1 C
Digital Signage System Pre-Functional Test at B2 Zone 1 C
Pre-Functional Test of Lightning Protection System at B2 Zone 1 C
BMS Pre-Functional Test at B2 Zone 1 C

Main and Sub Distribution Boards Pre-Functional Test at B2 Zone 2 A


Distribution Boards Pre-Functional Test at B2 Zone 2 A
Power System Pre-Functional Test at B2 Zone 2 A
Fan Coil Unit Pre-Functional Test at B2 Zone 2 A
Smoke Control Fans Pre-Functional Test at B2 Zone 2 A
Extract Fans Pre-Functional Test at B2 Zone 2 A
Lighting System Pre-Functional Test at B2 Zone 2 A
Fire Alarm System Pre-Functional Test at B2 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B2 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at B2 Zone 2 A
Data System Pre-Functional Test at B2 Zone 2 A
CCTV System Pre-Functional Test at B2 Zone 2 A
Access Control System Pre-Functional Test at B2 Zone 2 A
PAVA SYSTEM Pre-Functional Test at B2 Zone 2 A
Digital Signage System Pre-Functional Test at B2 Zone 2 A
Pre-Functional Test of Lightning Protection System at B2 Zone 2 A
BMS Pre-Functional Test at B2 Zone 2 A

Main and Sub Distribution Boards Pre-Functional Test at B2 Zone 2 B


Distribution Boards Pre-Functional Test at B2 Zone 2 B
Power System Pre-Functional Test at B2 Zone 2 B
Fan Coil Unit Pre-Functional Test at B2 Zone 2 B
Smoke Control Fans Pre-Functional Test at B2 Zone 2 B
Extract Fans Pre-Functional Test at B2 Zone 2 B
Grease Separator Pre-Functional Test at B2 Zone 2 B
Drainage Pumps Pre-Functional Test at B2 Zone 2 B
Lighting System Pre-Functional Test at B2 Zone 2 B
Fire Alarm System Pre-Functional Test at B2 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B2 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at B2 Zone 2 B
Data System Pre-Functional Test at B2 Zone 2 B
CCTV System Pre-Functional Test at B2 Zone 2 B
Access Control System Pre-Functional Test at B2 Zone 2 B
PAVA SYSTEM Pre-Functional Test at B2 Zone 2 B
Digital Signage System Pre-Functional Test at B2 Zone 2 B
Pre-Functional Test of Lightning Protection System at B2 Zone 2 B
BMS Pre-Functional Test at B2 Zone 2 B
Main and Sub Distribution Boards Pre-Functional Test at B2 Zone 3 A
Power System Pre-Functional Test at B2 Zone 3 A
Fan Coil Unit Pre-Functional Test at B2 Zone 3 A
Smoke Control Fans Pre-Functional Test at B2 Zone 3 A
Extract Fans Pre-Functional Test at B2 Zone 3 A
Water Filtration System Pre-Functional Test at B2 Zone 3 A
Lighting System Pre-Functional Test at B2 Zone 3 A
Fire Alarm System Pre-Functional Test at B2 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B2 Zone 3 A
Data System Pre-Functional Test at B2 Zone 3 A
CCTV System Pre-Functional Test at B2 Zone 3 A
Access Control System Pre-Functional Test at B2 Zone 3 A
PAVA SYSTEM Pre-Functional Test at B2 Zone 3 A
Digital Signage System Pre-Functional Test at B2 Zone 3 A
Pre-Functional Test of Lightning Protection System at B2 Zone 3 A
BMS Pre-Functional Test at B2 Zone 3 A

Main and Sub Distribution Boards Pre-Functional Test at B2 Zone 3 B


Power System Pre-Functional Test at B2 Zone 3 B
Fan Coil Unit Pre-Functional Test at B2 Zone 3 B
Water Filtration System Pre-Functional Test at B2 Zone 3 B
Lighting System Pre-Functional Test at B2 Zone 3 B
Fire Alarm System Pre-Functional Test at B2 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B2 Zone 3 B
Data System Pre-Functional Test at B2 Zone 3 B
CCTV System Pre-Functional Test at B2 Zone 3 B
Access Control System Pre-Functional Test at B2 Zone 3 B
PAVA SYSTEM Pre-Functional Test at B2 Zone 3 B
Digital Signage System Pre-Functional Test at B2 Zone 3 B
Pre-Functional Test of Lightning Protection System at B2 Zone 3 B
BMS Pre-Functional Test at B2 Zone 3 B

Main and Sub Distribution Boards Pre-Functional Test at B2 Zone 3 C


Power System Pre-Functional Test at B2 Zone 3 C
Fan Coil Unit Pre-Functional Test at B2 Zone 3 C
Lighting System Pre-Functional Test at B2 Zone 3 C
Fire Alarm System Pre-Functional Test at B2 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B2 Zone 3 C
Data System Pre-Functional Test at B2 Zone 3 C
CCTV System Pre-Functional Test at B2 Zone 3 C
Access Control System Pre-Functional Test at B2 Zone 3 C
PAVA SYSTEM Pre-Functional Test at B2 Zone 3 C
Digital Signage System Pre-Functional Test at B2 Zone 3 C
Pre-Functional Test of Lightning Protection System at B2 Zone 3 C
BMS Pre-Functional Test at B2 Zone 3 C

Main and Sub Distribution Boards Pre-Functional Test at B1 Zone 1 A


Distribution Boards Pre-Functional Test at B1 Zone 1 A
Power System Pre-Functional Test at B1 Zone 1 A
Fan Coil Unit Pre-Functional Test at B1 Zone 1 A
Smoke Control Fans Pre-Functional Test at B1 Zone 1 A
Extract Fans Pre-Functional Test at B1 Zone 1 A
Pre-Functional Test of FM-200 at B1 Zone 1 A
Lighting System Pre-Functional Test at B1 Zone 1 A
Fire Alarm System Pre-Functional Test at B1 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B1 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at B1 Zone 1 A
Data System Pre-Functional Test at B1 Zone 1 A
CCTV System Pre-Functional Test at B1 Zone 1 A
Access Control System Pre-Functional Test at B1 Zone 1 A
Guest Room Management System Pre-Functional Test at B1 Zone 1 A
PAVA SYSTEM Pre-Functional Test at B1 Zone 1 A
Digital Signage System Pre-Functional Test at B1 Zone 1 A
Pre-Functional Test of Lightning Protection System at B1 Zone 1 A
BMS Pre-Functional Test at B1 Zone 1 A

Main and Sub Distribution Boards Pre-Functional Test at B1 Zone 1 B


Power System Pre-Functional Test at B1 Zone 1 B
Smoke Control Fans Pre-Functional Test at B1 Zone 1 B
Extract Fans Pre-Functional Test at B1 Zone 1 B
Pre-Functional Test of FM-200 at B1 Zone 1 B
LPG Tanks Pre-Functional Test at B1 Zone 1 B
LPG Electric Operated Vaporizers Pre-Functional Test at B1 Zone 1 B
LPG Pressure reducing and Distribution panel Pre-Functional Test at B1 Zone 1 B
Lighting System Pre-Functional Test at B1 Zone 1 B
Fire Alarm System Pre-Functional Test at B1 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B1 Zone 1 B
Data System Pre-Functional Test at B1 Zone 1 B
CCTV System Pre-Functional Test at B1 Zone 1 B
Access Control System Pre-Functional Test at B1 Zone 1 B
Guest Room Management System Pre-Functional Test at B1 Zone 1 B
PAVA SYSTEM Pre-Functional Test at B1 Zone 1 B
Digital Signage System Pre-Functional Test at B1 Zone 1 B
Pre-Functional Test of Lightning Protection System at B1 Zone 1 B
BMS Pre-Functional Test at B1 Zone 1 B

Main and Sub Distribution Boards Pre-Functional Test at B1 Zone 1 C


Distribution Boards Pre-Functional Test at B1 Zone 1 C
Power System Pre-Functional Test at B1 Zone 1 C
Fan Coil Unit Pre-Functional Test at B1 Zone 1 C
Smoke Control Fans Pre-Functional Test at B1 Zone 1 C
Extract Fans Pre-Functional Test at B1 Zone 1 C
Pre-Functional Test of FM-200 at B1 Zone 1 C
LPG Tanks Pre-Functional Test at B1 Zone 1 C
Lighting System Pre-Functional Test at B1 Zone 1 C
Fire Alarm System Pre-Functional Test at B1 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B1 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at B1 Zone 1 C
Data System Pre-Functional Test at B1 Zone 1 C
CCTV System Pre-Functional Test at B1 Zone 1 C
Access Control System Pre-Functional Test at B1 Zone 1 C
Guest Room Management System Pre-Functional Test at B1 Zone 1 C
PAVA SYSTEM Pre-Functional Test at B1 Zone 1 C
Digital Signage System Pre-Functional Test at B1 Zone 1 C
Pre-Functional Test of Lightning Protection System at B1 Zone 1 C
BMS Pre-Functional Test at B1 Zone 1 C

Motor Control Centers Boards Pre-Functional Test at B1 Zone 2 A


Main and Sub Distribution Boards Pre-Functional Test at B1 Zone 2 A
Fresh Air Handling Units Pre-Functional Test at B1 Zone 2 A
Air Handling Units Pre-Functional Test at B1 Zone 2 A
Distribution Boards Pre-Functional Test at B1 Zone 2 A
Power System Pre-Functional Test at B1 Zone 2 A
Fan Coil Unit Pre-Functional Test at B1 Zone 2 A
Smoke Control Fans Pre-Functional Test at B1 Zone 2 A
Extract Fans Pre-Functional Test at B1 Zone 2 A
Grease Separator Pre-Functional Test at B1 Zone 2 A
Pre-Functional Test of FM-200 at B1 Zone 2 A
Lighting System Pre-Functional Test at B1 Zone 2 A
Fire Alarm System Pre-Functional Test at B1 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B1 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at B1 Zone 2 A
Data System Pre-Functional Test at B1 Zone 2 A
CCTV System Pre-Functional Test at B1 Zone 2 A
Access Control System Pre-Functional Test at B1 Zone 2 A
Guest Room Management System Pre-Functional Test at B1 Zone 2 A
PAVA SYSTEM Pre-Functional Test at B1 Zone 2 A
Digital Signage System Pre-Functional Test at B1 Zone 2 A
Pre-Functional Test of Lightning Protection System at B1 Zone 2 A
BMS Pre-Functional Test at B1 Zone 2 A

Main and Sub Distribution Boards Pre-Functional Test at B1 Zone 2 B


Chillers Pre-Functional Test at B1 Zone 2 B
Chilled Water Pump Pre-Functional Test at B1 Zone 2 B
Chilled Water Pressurization Unit Pre-Functional Test at B1 Zone 2 B
Air Handling Units Pre-Functional Test at B1 Zone 2 B
Distribution Boards Pre-Functional Test at B1 Zone 2 B
Power System Pre-Functional Test at B1 Zone 2 B
Air and Dirt Separator Pre-Functional Test at B1 Zone 2 B
Refrigerant Leak Detection and Monitoring System Pre-Functional Test at B1 Zone 2 B
Chemical Dosing System Pre-Functional Test at B1 Zone 2 B
BTU Meter Pre-Functional Test at B1 Zone 2 B
Fan Coil Unit Pre-Functional Test at B1 Zone 2 B
Smoke Control Fans Pre-Functional Test at B1 Zone 2 B
Extract Fans Pre-Functional Test at B1 Zone 2 B
Water Storage Calorifier Pre-Functional Test at B1 Zone 2 B
Plate Heat Exchanger Pre-Functional Test at B1 Zone 2 B
Pre-Functional Test of FM-200 at B1 Zone 2 B
LPG Pressure reducing and Distribution panel Pre-Functional Test at B1 Zone 2 B
Lighting System Pre-Functional Test at B1 Zone 2 B
Fire Alarm System Pre-Functional Test at B1 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B1 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at B1 Zone 2 B
Data System Pre-Functional Test at B1 Zone 2 B
CCTV System Pre-Functional Test at B1 Zone 2 B
Access Control System Pre-Functional Test at B1 Zone 2 B
Guest Room Management System Pre-Functional Test at B1 Zone 2 B
PAVA SYSTEM Pre-Functional Test at B1 Zone 2 B
Digital Signage System Pre-Functional Test at B1 Zone 2 B
Pre-Functional Test of Lightning Protection System at B1 Zone 2 B
BMS Pre-Functional Test at B1 Zone 2 B

Main and Sub Distribution Boards Pre-Functional Test at B1 Zone 3 A


Power System Pre-Functional Test at B1 Zone 3 A
Fan Coil Unit Pre-Functional Test at B1 Zone 3 A
Smoke Control Fans Pre-Functional Test at B1 Zone 3 A
Extract Fans Pre-Functional Test at B1 Zone 3 A
lint strainer / Oil Interceptor Pre-Functional Test at B1 Zone 3 A
Pre-Functional Test of FM-200 at B1 Zone 3 A
UPS System Pre-Functional Test at B1 Zone 3 A
Lighting System Pre-Functional Test at B1 Zone 3 A
Fire Alarm System Pre-Functional Test at B1 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B1 Zone 3 A
Data System Pre-Functional Test at B1 Zone 3 A
CCTV System Pre-Functional Test at B1 Zone 3 A
Access Control System Pre-Functional Test at B1 Zone 3 A
Time Attendance System Pre-Functional Test at B1 Zone 3 A
Guest Room Management System Pre-Functional Test at B1 Zone 3 A
PAVA SYSTEM Pre-Functional Test at B1 Zone 3 A
Digital Signage System Pre-Functional Test at B1 Zone 3 A
Pre-Functional Test of Lightning Protection System at B1 Zone 3 A
BMS Pre-Functional Test at B1 Zone 3 A

Main and Sub Distribution Boards Pre-Functional Test at B1 Zone 3 B


Power System Pre-Functional Test at B1 Zone 3 B
Fan Coil Unit Pre-Functional Test at B1 Zone 3 B
Pre-Functional Test of FM-200 at B1 Zone 3 B
LPG Pressure reducing and Distribution panel Pre-Functional Test at B1 Zone 3 B
Lighting System Pre-Functional Test at B1 Zone 3 B
Fire Alarm System Pre-Functional Test at B1 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B1 Zone 3 B
Data System Pre-Functional Test at B1 Zone 3 B
CCTV System Pre-Functional Test at B1 Zone 3 B
Access Control System Pre-Functional Test at B1 Zone 3 B
Guest Room Management System Pre-Functional Test at B1 Zone 3 B
PAVA SYSTEM Pre-Functional Test at B1 Zone 3 B
Digital Signage System Pre-Functional Test at B1 Zone 3 B
Pre-Functional Test of Lightning Protection System at B1 Zone 3 B
BMS Pre-Functional Test at B1 Zone 3 B

Main and Sub Distribution Boards Pre-Functional Test at B1 Zone 3 C


Power System Pre-Functional Test at B1 Zone 3 C
Fan Coil Unit Pre-Functional Test at B1 Zone 3 C
Pre-Functional Test of FM-200 at B1 Zone 3 C
LPG Pressure reducing and Distribution panel Pre-Functional Test at B1 Zone 3 C
UPS System Pre-Functional Test at B1 Zone 3 C
Lighting System Pre-Functional Test at B1 Zone 3 C
Fire Alarm System Pre-Functional Test at B1 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at B1 Zone 3 C
Data System Pre-Functional Test at B1 Zone 3 C
CCTV System Pre-Functional Test at B1 Zone 3 C
Access Control System Pre-Functional Test at B1 Zone 3 C
Guest Room Management System Pre-Functional Test at B1 Zone 3 C
PAVA SYSTEM Pre-Functional Test at B1 Zone 3 C
Digital Signage System Pre-Functional Test at B1 Zone 3 C
Pre-Functional Test of Lightning Protection System at B1 Zone 3 C
BMS Pre-Functional Test at B1 Zone 3 C

Transformers Pre-Functional Test at GF


HV Swichgear Pre-Functional Test at GF
Main and Sub Distribution Boards Pre-Functional Test at GF
Distribution Boards Pre-Functional Test at GF
Power System Pre-Functional Test at GF
Close Control Unit Pre-Functional Test at GF
Fan Coil Unit Pre-Functional Test at GF
Smoke Control Fans Pre-Functional Test at GF
Extract Fans Pre-Functional Test at GF
Fire Alarm Station Pre-Functional Test at GF
Pre-Functional Test of FM-200 at GF
LPG Leak Detection System Pre-Functional Test at GF
GENERATOR Pre-Functional Test at GF
Capacitor Bank Pre-Functional Test at GF
Lighting System Pre-Functional Test at GF
Fire Alarm System Pre-Functional Test at GF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at GF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at GF
Data System Pre-Functional Test at GF
CCTV System Pre-Functional Test at GF
Access Control System Pre-Functional Test at GF
Audio Intercom System Pre-Functional Test at GF
Guest Room Management System Pre-Functional Test at GF
PAVA SYSTEM Pre-Functional Test at GF
Audio Visual System Pre-Functional Test at GF
Digital Signage System Pre-Functional Test at GF
Central Clock System Pre-Functional Test at GF
Pre-Functional Test of Lightning Protection System at GF
External Irrigation Pipes Pre-Functional Test at GF
Irrigation Water Pumps Pre-Functional Test at GF
Fire Hydrant System Pre-Functional Test at GF
BMS Pre-Functional Test at GF

Main and Sub Distribution Boards Pre-Functional Test at F1


Distribution Boards Pre-Functional Test at F1
Power System Pre-Functional Test at F1
Fan Coil Unit Pre-Functional Test at F1
Smoke Control Fans Pre-Functional Test at F1
Extract Fans Pre-Functional Test at F1
Lighting System Pre-Functional Test at F1
Fire Alarm System Pre-Functional Test at F1
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F1
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F1
Data System Pre-Functional Test at F1
CCTV System Pre-Functional Test at F1
Access Control System Pre-Functional Test at F1
Guest Room Management System Pre-Functional Test at F1
PAVA SYSTEM Pre-Functional Test at F1
Digital Signage System Pre-Functional Test at F1
Pre-Functional Test of Lightning Protection System at F1
BMS Pre-Functional Test at F1

Main and Sub Distribution Boards Pre-Functional Test at F2


Fresh Air Handling Units Pre-Functional Test at F2
Air Handling Units Pre-Functional Test at F2
Distribution Boards Pre-Functional Test at F2
Power System Pre-Functional Test at F2
Fan Coil Unit Pre-Functional Test at F2
Smoke Control Fans Pre-Functional Test at F2
Extract Fans Pre-Functional Test at F2
Ecology Unit / Electrostatic Filter And Carbon Filter Pre-Functional Test at F2
Pre-Functional Test of FM-200 at F2
Lighting System Pre-Functional Test at F2
Fire Alarm System Pre-Functional Test at F2
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F2
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F2
Data System Pre-Functional Test at F2
CCTV System Pre-Functional Test at F2
Access Control System Pre-Functional Test at F2
Guest Room Management System Pre-Functional Test at F2
PAVA SYSTEM Pre-Functional Test at F2
Digital Signage System Pre-Functional Test at F2
Pre-Functional Test of Lightning Protection System at F2
BMS Pre-Functional Test at F2

Main and Sub Distribution Boards Pre-Functional Test at F3


Distribution Boards Pre-Functional Test at F3
Fan Coil Unit Pre-Functional Test at F3
Power System Pre-Functional Test at F3
Smoke Control Fans Pre-Functional Test at F3
Extract Fans Pre-Functional Test at F3
Lighting System Pre-Functional Test at F3
Fire Alarm System Pre-Functional Test at F3
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F3
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F3
Data System Pre-Functional Test at F3
CCTV System Pre-Functional Test at F3
Access Control System Pre-Functional Test at F3
Guest Room Management System Pre-Functional Test at F3
PAVA SYSTEM Pre-Functional Test at F3
Digital Signage System Pre-Functional Test at F3
Pre-Functional Test of Lightning Protection System at F3
BMS Pre-Functional Test at F3

Main and Sub Distribution Boards Pre-Functional Test at F4


Distribution Boards Pre-Functional Test at F4
Fan Coil Unit Pre-Functional Test at F4
Power System Pre-Functional Test at F4
Lighting System Pre-Functional Test at F4
Fire Alarm System Pre-Functional Test at F4
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F4
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F4
Data System Pre-Functional Test at F4
CCTV System Pre-Functional Test at F4
Access Control System Pre-Functional Test at F4
Guest Room Management System Pre-Functional Test at F4
PAVA SYSTEM Pre-Functional Test at F4
Digital Signage System Pre-Functional Test at F4
Pre-Functional Test of Lightning Protection System at F4
BMS Pre-Functional Test at F4

Main and Sub Distribution Boards Pre-Functional Test at F5


Distribution Boards Pre-Functional Test at F5
Fan Coil Unit Pre-Functional Test at F5
Power System Pre-Functional Test at F5
Lighting System Pre-Functional Test at F5
Fire Alarm System Pre-Functional Test at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F5
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F5
Data System Pre-Functional Test at F5
CCTV System Pre-Functional Test at F5
Access Control System Pre-Functional Test at F5
Guest Room Management System Pre-Functional Test at F5
PAVA SYSTEM Pre-Functional Test at F5
Digital Signage System Pre-Functional Test at F5
Pre-Functional Test of Lightning Protection System at F5
BMS Pre-Functional Test at F5

Main and Sub Distribution Boards Pre-Functional Test at F6


Distribution Boards Pre-Functional Test at F6
Fan Coil Unit Pre-Functional Test at F6
Power System Pre-Functional Test at F6
Lighting System Pre-Functional Test at F6
Fire Alarm System Pre-Functional Test at F6
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F6
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F6
Data System Pre-Functional Test at F6
CCTV System Pre-Functional Test at F6
Access Control System Pre-Functional Test at F6
Guest Room Management System Pre-Functional Test at F6
PAVA SYSTEM Pre-Functional Test at F6
Digital Signage System Pre-Functional Test at F6
Pre-Functional Test of Lightning Protection System at F6
BMS Pre-Functional Test at F6

Main and Sub Distribution Boards Pre-Functional Test at F7


Distribution Boards Pre-Functional Test at F7
Fan Coil Unit Pre-Functional Test at F7
Power System Pre-Functional Test at F7
Lighting System Pre-Functional Test at F7
Fire Alarm System Pre-Functional Test at F7
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F7
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F7
Data System Pre-Functional Test at F7
CCTV System Pre-Functional Test at F7
Access Control System Pre-Functional Test at F7
Guest Room Management System Pre-Functional Test at F7
PAVA SYSTEM Pre-Functional Test at F7
Digital Signage System Pre-Functional Test at F7
Pre-Functional Test of Lightning Protection System at F7
BMS Pre-Functional Test at F7

Main and Sub Distribution Boards Pre-Functional Test at F8


Distribution Boards Pre-Functional Test at F8
Fan Coil Unit Pre-Functional Test at F8
Power System Pre-Functional Test at F8
Lighting System Pre-Functional Test at F8
Fire Alarm System Pre-Functional Test at F8
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F8
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F8
Data System Pre-Functional Test at F8
CCTV System Pre-Functional Test at F8
Access Control System Pre-Functional Test at F8
Guest Room Management System Pre-Functional Test at F8
PAVA SYSTEM Pre-Functional Test at F8
Digital Signage System Pre-Functional Test at F8
Pre-Functional Test of Lightning Protection System at F8
BMS Pre-Functional Test at F8

Main and Sub Distribution Boards Pre-Functional Test at F9


Distribution Boards Pre-Functional Test at F9
Fan Coil Unit Pre-Functional Test at F9
Power System Pre-Functional Test at F9
Lighting System Pre-Functional Test at F9
Fire Alarm System Pre-Functional Test at F9
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F9
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F9
Data System Pre-Functional Test at F9
CCTV System Pre-Functional Test at F9
Access Control System Pre-Functional Test at F9
Guest Room Management System Pre-Functional Test at F9
PAVA SYSTEM Pre-Functional Test at F9
Digital Signage System Pre-Functional Test at F9
Pre-Functional Test of Lightning Protection System at F9
BMS Pre-Functional Test at F9

Main and Sub Distribution Boards Pre-Functional Test at F10


Distribution Boards Pre-Functional Test at F10
Fan Coil Unit Pre-Functional Test at F10
Power System Pre-Functional Test at F10
Lighting System Pre-Functional Test at F10
Fire Alarm System Pre-Functional Test at F10
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F10
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F10
Data System Pre-Functional Test at F10
CCTV System Pre-Functional Test at F10
Access Control System Pre-Functional Test at F10
Guest Room Management System Pre-Functional Test at F10
PAVA SYSTEM Pre-Functional Test at F10
Digital Signage System Pre-Functional Test at F10
Pre-Functional Test of Lightning Protection System at F10
BMS Pre-Functional Test at F10

Main and Sub Distribution Boards Pre-Functional Test at F11


Distribution Boards Pre-Functional Test at F11
Fan Coil Unit Pre-Functional Test at F11
Power System Pre-Functional Test at F11
Lighting System Pre-Functional Test at F11
Fire Alarm System Pre-Functional Test at F11
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F11
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F11
Data System Pre-Functional Test at F11
CCTV System Pre-Functional Test at F11
Access Control System Pre-Functional Test at F11
Guest Room Management System Pre-Functional Test at F11
PAVA SYSTEM Pre-Functional Test at F11
Digital Signage System Pre-Functional Test at F11
Pre-Functional Test of Lightning Protection System at F11
BMS Pre-Functional Test at F11
Main and Sub Distribution Boards Pre-Functional Test at F12
Distribution Boards Pre-Functional Test at F12
Fan Coil Unit Pre-Functional Test at F12
Power System Pre-Functional Test at F12
Lighting System Pre-Functional Test at F12
Fire Alarm System Pre-Functional Test at F12
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F12
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F12
Data System Pre-Functional Test at F12
CCTV System Pre-Functional Test at F12
Access Control System Pre-Functional Test at F12
Guest Room Management System Pre-Functional Test at F12
PAVA SYSTEM Pre-Functional Test at F12
Digital Signage System Pre-Functional Test at F12
Pre-Functional Test of Lightning Protection System at F12
BMS Pre-Functional Test at F12

Main and Sub Distribution Boards Pre-Functional Test at F13


Distribution Boards Pre-Functional Test at F13
Fan Coil Unit Pre-Functional Test at F13
Power System Pre-Functional Test at F13
Lighting System Pre-Functional Test at F13
Fire Alarm System Pre-Functional Test at F13
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F13
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F13
Data System Pre-Functional Test at F13
CCTV System Pre-Functional Test at F13
Access Control System Pre-Functional Test at F13
Guest Room Management System Pre-Functional Test at F13
PAVA SYSTEM Pre-Functional Test at F13
Digital Signage System Pre-Functional Test at F13
Pre-Functional Test of Lightning Protection System at F13
BMS Pre-Functional Test at F13

Main and Sub Distribution Boards Pre-Functional Test at F14


Distribution Boards Pre-Functional Test at F14
Fan Coil Unit Pre-Functional Test at F14
Power System Pre-Functional Test at F14
Lighting System Pre-Functional Test at F14
Fire Alarm System Pre-Functional Test at F14
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at F14
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at F14
Data System Pre-Functional Test at F14
CCTV System Pre-Functional Test at F14
Access Control System Pre-Functional Test at F14
Guest Room Management System Pre-Functional Test at F14
PAVA SYSTEM Pre-Functional Test at F14
Digital Signage System Pre-Functional Test at F14
Pre-Functional Test of Lightning Protection System at F14
BMS Pre-Functional Test at F14

Main and Sub Distribution Boards Pre-Functional Test at RF


Distribution Boards Pre-Functional Test at RF
Power System Pre-Functional Test at RF
Swimming and Shower Pool Pre-Functional Test at RF
Fan Coil Unit Pre-Functional Test at RF
Lighting System Pre-Functional Test at RF
Fire Alarm System Pre-Functional Test at RF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at RF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Pre-Functional Test at RF
CCTV System Pre-Functional Test at RF
Access Control System Pre-Functional Test at RF
Guest Room Management System Pre-Functional Test at RF
PAVA SYSTEM Pre-Functional Test at RF
Digital Signage System Pre-Functional Test at RF
Pre-Functional Test of Lightning Protection System at RF
BMS Pre-Functional Test at RF

Distribution Boards Pre-Functional Test at URF


Cooling Tower Pre-Functional Test at URF
Fresh Air Handling Units Pre-Functional Test at URF
Power System Pre-Functional Test at URF
Fan Coil Unit Pre-Functional Test at URF
Smoke Control Fans Pre-Functional Test at URF
Extract Fans Pre-Functional Test at URF
Pre-Functional Test of FM-200 at URF
Lighting System Pre-Functional Test at URF
Fire Alarm System Pre-Functional Test at URF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at URF
Data System Pre-Functional Test at URF
CCTV System Pre-Functional Test at URF
Access Control System Pre-Functional Test at URF
Digital Signage System Pre-Functional Test at URF
Pre-Functional Test of Lightning Protection System at URF
BMS Pre-Functional Test at URF

Distribution Boards Pre-Functional Test at TRF


Fresh Air Handling Units Pre-Functional Test at TRF
Power System Pre-Functional Test at TRF
Fan Coil Unit Pre-Functional Test at TRF
Lighting System Pre-Functional Test at TRF
Fire Alarm System Pre-Functional Test at TRF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Pre-Functional Test at TRF
CCTV System Pre-Functional Test at TRF
Access Control System Pre-Functional Test at TRF
Pre-Functional Test of Lightning Protection System at TRF

Elevator Pre-Functional Test


Facade Lighting Pre-Functional Test

Landscape Lighting Pre-Functional Test

Main and Sub Distribution Boards Testing and Commissioning at B3 Zone 2 B


Filtration Unit Testing and Commissioning at B3 Zone 2 B
Water Supply Pumps Testing and Commissioning at B3 Zone 2 B
Gray Water Treatment Plant Testing and Commissioning at B3 Zone 2 B
Fire Fighting Pump Testing and Commissioning at B3 Zone 2 B
PAVA SYSTEM Testing and Commissioning at B3 Zone 2 B
BMS Testing and Commissioning at B3 Zone 2 B

Main and Sub Distribution Boards Testing and Commissioning at B2 Zone 1 A


Distribution Boards Testing and Commissioning at B2 Zone 1 A
Power System Testing and Commissioning at B2 Zone 1 A
Fan Coil Unit Testing and Commissioning at B2 Zone 1 A
Smoke Control Fans Testing and Commissioning at B2 Zone 1 A
Extract Fans Testing and Commissioning at B2 Zone 1 A
Lighting System Testing and Commissioning at B2 Zone 1 A
Fire Alarm System Testing and Commissioning at B2 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B2 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at B2 Zone 1 A
Data System Testing and Commissioning at B2 Zone 1 A
CCTV System Testing and Commissioning at B2 Zone 1 A
Access Control System Testing and Commissioning at B2 Zone 1 A
PAVA SYSTEM Testing and Commissioning at B2 Zone 1 A
Digital Signage System Testing and Commissioning at B2 Zone 1 A
Testing & Commissioning of Lightning Protection System at B2 Zone 1 A
BMS Testing and Commissioning at B2 Zone 1 A

Main and Sub Distribution Boards Testing and Commissioning at B2 Zone 1 B


Power System Testing and Commissioning at B2 Zone 1 B
Smoke Control Fans Testing and Commissioning at B2 Zone 1 B
Extract Fans Testing and Commissioning at B2 Zone 1 B
Lighting System Testing and Commissioning at B2 Zone 1 B
Fire Alarm System Testing and Commissioning at B2 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B2 Zone 1 B
Data System Testing and Commissioning at B2 Zone 1 B
CCTV System Testing and Commissioning at B2 Zone 1 B
Access Control System Testing and Commissioning at B2 Zone 1 B
PAVA SYSTEM Testing and Commissioning at B2 Zone 1 B
Digital Signage System Testing and Commissioning at B2 Zone 1 B
Testing & Commissioning of Lightning Protection System at B2 Zone 1 B
BMS Testing and Commissioning at B2 Zone 1 B

Main and Sub Distribution Boards Testing and Commissioning at B2 Zone 1 C


Distribution Boards Testing and Commissioning at B2 Zone 1 C
Power System Testing and Commissioning at B2 Zone 1 C
Fan Coil Unit Testing and Commissioning at B2 Zone 1 C
Smoke Control Fans Testing and Commissioning at B2 Zone 1 C
Extract Fans Testing and Commissioning at B2 Zone 1 C
Lighting System Testing and Commissioning at B2 Zone 1 C
Fire Alarm System Testing and Commissioning at B2 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B2 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at B2 Zone 1 C
Data System Testing and Commissioning at B2 Zone 1 C
CCTV System Testing and Commissioning at B2 Zone 1 C
Access Control System Testing and Commissioning at B2 Zone 1 C
PAVA SYSTEM Testing and Commissioning at B2 Zone 1 C
Digital Signage System Testing and Commissioning at B2 Zone 1 C
Testing & Commissioning of Lightning Protection System at B2 Zone 1 C
BMS Testing and Commissioning at B2 Zone 1 C

Main and Sub Distribution Boards Testing and Commissioning at B2 Zone 2 A


Distribution Boards Testing and Commissioning at B2 Zone 2 A
Power System Testing and Commissioning at B2 Zone 2 A
Fan Coil Unit Testing and Commissioning at B2 Zone 2 A
Smoke Control Fans Testing and Commissioning at B2 Zone 2 A
Extract Fans Testing and Commissioning at B2 Zone 2 A
Lighting System Testing and Commissioning at B2 Zone 2 A
Fire Alarm System Testing and Commissioning at B2 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B2 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at B2 Zone 2 A
Data System Testing and Commissioning at B2 Zone 2 A
CCTV System Testing and Commissioning at B2 Zone 2 A
Access Control System Testing and Commissioning at B2 Zone 2 A
PAVA SYSTEM Testing and Commissioning at B2 Zone 2 A
Digital Signage System Testing and Commissioning at B2 Zone 2 A
Testing & Commissioning of Lightning Protection System at B2 Zone 2 A
BMS Testing and Commissioning at B2 Zone 2 A

Main and Sub Distribution Boards Testing and Commissioning at B2 Zone 2 B


Distribution Boards Testing and Commissioning at B2 Zone 2 B
Power System Testing and Commissioning at B2 Zone 2 B
Fan Coil Unit Testing and Commissioning at B2 Zone 2 B
Smoke Control Fans Testing and Commissioning at B2 Zone 2 B
Extract Fans Testing and Commissioning at B2 Zone 2 B
Grease Separator Testing and Commissioning at B2 Zone 2 B
Drainage Pumps Testing and Commissioning at B2 Zone 2 B
Lighting System Testing and Commissioning at B2 Zone 2 B
Fire Alarm System Testing and Commissioning at B2 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B2 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at B2 Zone 2 B
Data System Testing and Commissioning at B2 Zone 2 B
CCTV System Testing and Commissioning at B2 Zone 2 B
Access Control System Testing and Commissioning at B2 Zone 2 B
PAVA SYSTEM Testing and Commissioning at B2 Zone 2 B
Digital Signage System Testing and Commissioning at B2 Zone 2 B
Testing & Commissioning of Lightning Protection System at B2 Zone 2 B
BMS Testing and Commissioning at B2 Zone 2 B

Main and Sub Distribution Boards Testing and Commissioning at B2 Zone 3 A


Power System Testing and Commissioning at B2 Zone 3 A
Fan Coil Unit Testing and Commissioning at B2 Zone 3 A
Smoke Control Fans Testing and Commissioning at B2 Zone 3 A
Extract Fans Testing and Commissioning at B2 Zone 3 A
Water Filtration System Testing and Commissioning at B2 Zone 3 A
Lighting System Testing and Commissioning at B2 Zone 3 A
Fire Alarm System Testing and Commissioning at B2 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B2 Zone 3 A
Data System Testing and Commissioning at B2 Zone 3 A
CCTV System Testing and Commissioning at B2 Zone 3 A
Access Control System Testing and Commissioning at B2 Zone 3 A
PAVA SYSTEM Testing and Commissioning at B2 Zone 3 A
Digital Signage System Testing and Commissioning at B2 Zone 3 A
Testing & Commissioning of Lightning Protection System at B2 Zone 3 A
BMS Testing and Commissioning at B2 Zone 3 A

Main and Sub Distribution Boards Testing and Commissioning at B2 Zone 3 B


Power System Testing and Commissioning at B2 Zone 3 B
Fan Coil Unit Testing and Commissioning at B2 Zone 3 B
Water Filtration System Testing and Commissioning at B2 Zone 3 B
Lighting System Testing and Commissioning at B2 Zone 3 B
Fire Alarm System Testing and Commissioning at B2 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B2 Zone 3 B
Data System Testing and Commissioning at B2 Zone 3 B
CCTV System Testing and Commissioning at B2 Zone 3 B
Access Control System Testing and Commissioning at B2 Zone 3 B
PAVA SYSTEM Testing and Commissioning at B2 Zone 3 B
Digital Signage System Testing and Commissioning at B2 Zone 3 B
Testing & Commissioning of Lightning Protection System at B2 Zone 3 B
BMS Testing and Commissioning at B2 Zone 3 B

Main and Sub Distribution Boards Testing and Commissioning at B2 Zone 3 C


Power System Testing and Commissioning at B2 Zone 3 C
Fan Coil Unit Testing and Commissioning at B2 Zone 3 C
Lighting System Testing and Commissioning at B2 Zone 3 C
Fire Alarm System Testing and Commissioning at B2 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B2 Zone 3 C
Data System Testing and Commissioning at B2 Zone 3 C
CCTV System Testing and Commissioning at B2 Zone 3 C
Access Control System Testing and Commissioning at B2 Zone 3 C
PAVA SYSTEM Testing and Commissioning at B2 Zone 3 C
Digital Signage System Testing and Commissioning at B2 Zone 3 C
Testing & Commissioning of Lightning Protection System at B2 Zone 3 C
BMS Testing and Commissioning at B2 Zone 3 C

Main and Sub Distribution Boards Testing and Commissioning at B1 Zone 1 A


Distribution Boards Testing and Commissioning at B1 Zone 1 A
Power System Testing and Commissioning at B1 Zone 1 A
Fan Coil Unit Testing and Commissioning at B1 Zone 1 A
Smoke Control Fans Testing and Commissioning at B1 Zone 1 A
Extract Fans Testing and Commissioning at B1 Zone 1 A
Testing and Commissioning of FM-200 at B1 Zone 1 A
Lighting System Testing and Commissioning at B1 Zone 1 A
Fire Alarm System Testing and Commissioning at B1 Zone 1 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B1 Zone 1 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at B1 Zone 1 A
Data System Testing and Commissioning at B1 Zone 1 A
CCTV System Testing and Commissioning at B1 Zone 1 A
Access Control System Testing and Commissioning at B1 Zone 1 A
Guest Room Management System Testing and Commissioning at B1 Zone 1 A
PAVA SYSTEM Testing and Commissioning at B1 Zone 1 A
Digital Signage System Testing and Commissioning at B1 Zone 1 A
Testing & Commissioning of Lightning Protection System at B1 Zone 1 A
BMS Testing and Commissioning at B1 Zone 1 A

Main and Sub Distribution Boards Testing and Commissioning at B1 Zone 1 B


Power System Testing and Commissioning at B1 Zone 1 B
Smoke Control Fans Testing and Commissioning at B1 Zone 1 B
Extract Fans Testing and Commissioning at B1 Zone 1 B
Testing and Commissioning of FM-200 at B1 Zone 1 B
LPG Tanks Testing and Commissioning at B1 Zone 1 B
LPG Electric Operated Vaporizers Testing and Commissioning at B1 Zone 1 B
LPG Pressure reducing and Distribution panel Testing and Commissioning at B1 Zone 1 B
Lighting System Testing and Commissioning at B1 Zone 1 B
Fire Alarm System Testing and Commissioning at B1 Zone 1 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B1 Zone 1 B
Data System Testing and Commissioning at B1 Zone 1 B
CCTV System Testing and Commissioning at B1 Zone 1 B
Access Control System Testing and Commissioning at B1 Zone 1 B
Guest Room Management System Testing and Commissioning at B1 Zone 1 B
PAVA SYSTEM Testing and Commissioning at B1 Zone 1 B
Digital Signage System Testing and Commissioning at B1 Zone 1 B
Testing & Commissioning of Lightning Protection System at B1 Zone 1 B
BMS Testing and Commissioning at B1 Zone 1 B

Main and Sub Distribution Boards Testing and Commissioning at B1 Zone 1 C


Distribution Boards Testing and Commissioning at B1 Zone 1 C
Power System Testing and Commissioning at B1 Zone 1 C
Fan Coil Unit Testing and Commissioning at B1 Zone 1 C
Smoke Control Fans Testing and Commissioning at B1 Zone 1 C
Extract Fans Testing and Commissioning at B1 Zone 1 C
Testing and Commissioning of FM-200 at B1 Zone 1 C
LPG Tanks Testing and Commissioning at B1 Zone 1 C
Lighting System Testing and Commissioning at B1 Zone 1 C
Fire Alarm System Testing and Commissioning at B1 Zone 1 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B1 Zone 1 C
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at B1 Zone 1 C
Data System Testing and Commissioning at B1 Zone 1 C
CCTV System Testing and Commissioning at B1 Zone 1 C
Access Control System Testing and Commissioning at B1 Zone 1 C
Guest Room Management System Testing and Commissioning at B1 Zone 1 C
PAVA SYSTEM Testing and Commissioning at B1 Zone 1 C
Digital Signage System Testing and Commissioning at B1 Zone 1 C
Testing & Commissioning of Lightning Protection System at B1 Zone 1 C
BMS Testing and Commissioning at B1 Zone 1 C

Main and Sub Distribution Boards Testing and Commissioning at B1 Zone 2 A


Motor Control Centers Boards Testing and Commissioning at B1 Zone 2 A
Distribution Boards Testing and Commissioning at B1 Zone 2 A
Power System Testing and Commissioning at B1 Zone 2 A
Fresh Air Handling Units Testing and Commissioning at B1 Zone 2 A
Air Handling Units Testing and Commissioning at B1 Zone 2 A
Fan Coil Unit Testing and Commissioning at B1 Zone 2 A
Smoke Control Fans Testing and Commissioning at B1 Zone 2 A
Extract Fans Testing and Commissioning at B1 Zone 2 A
Grease Separator Testing and Commissioning at B1 Zone 2 A
Testing and Commissioning of FM-200 at B1 Zone 2 A
Lighting System Testing and Commissioning at B1 Zone 2 A
Fire Alarm System Testing and Commissioning at B1 Zone 2 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B1 Zone 2 A
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at B1 Zone 2 A
Data System Testing and Commissioning at B1 Zone 2 A
CCTV System Testing and Commissioning at B1 Zone 2 A
Access Control System Testing and Commissioning at B1 Zone 2 A
Guest Room Management System Testing and Commissioning at B1 Zone 2 A
PAVA SYSTEM Testing and Commissioning at B1 Zone 2 A
Digital Signage System Testing and Commissioning at B1 Zone 2 A
Testing & Commissioning of Lightning Protection System at B1 Zone 2 A
BMS Testing and Commissioning at B1 Zone 2 A

Main and Sub Distribution Boards Testing and Commissioning at B1 Zone 2 B


Distribution Boards Testing and Commissioning at B1 Zone 2 B
Power System Testing and Commissioning at B1 Zone 2 B
Chillers Testing and Commissioning at B1 Zone 2 B
Chilled Water Pump Testing and Commissioning at B1 Zone 2 B
Chilled Water Pressurization Unit Testing and Commissioning at B1 Zone 2 B
Air and Dirt Separator Testing and Commissioning at B1 Zone 2 B
Refrigerant Leak Detection and Monitoring System Testing and Commissioning at B1 Zone 2 B
Chemical Dosing System Testing and Commissioning at B1 Zone 2 B
BTU Meter Testing and Commissioning at B1 Zone 2 B
Air Handling Units Testing and Commissioning at B1 Zone 2 B
Fan Coil Unit Testing and Commissioning at B1 Zone 2 B
Smoke Control Fans Testing and Commissioning at B1 Zone 2 B
Extract Fans Testing and Commissioning at B1 Zone 2 B
Water Storage Calorifier Testing and Commissioning at B1 Zone 2 B
Plate Heat Exchanger Testing and Commissioning at B1 Zone 2 B
Testing and Commissioning of FM-200 at B1 Zone 2 B
LPG Pressure reducing and Distribution panel Testing and Commissioning at B1 Zone 2 B
Lighting System Testing and Commissioning at B1 Zone 2 B
Fire Alarm System Testing and Commissioning at B1 Zone 2 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B1 Zone 2 B
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at B1 Zone 2 B
Data System Testing and Commissioning at B1 Zone 2 B
CCTV System Testing and Commissioning at B1 Zone 2 B
Access Control System Testing and Commissioning at B1 Zone 2 B
Guest Room Management System Testing and Commissioning at B1 Zone 2 B
PAVA SYSTEM Testing and Commissioning at B1 Zone 2 B
Digital Signage System Testing and Commissioning at B1 Zone 2 B
Testing & Commissioning of Lightning Protection System at B1 Zone 2 B
BMS Testing and Commissioning at B1 Zone 2 B

Main and Sub Distribution Boards Testing and Commissioning at B1 Zone 3 A


Power System Testing and Commissioning at B1 Zone 3 A
Fan Coil Unit Testing and Commissioning at B1 Zone 3 A
Smoke Control Fans Testing and Commissioning at B1 Zone 3 A
Extract Fans Testing and Commissioning at B1 Zone 3 A
lint strainer / Oil Interceptor Testing and Commissioning at B1 Zone 3 A
Testing and Commissioning of FM-200 at B1 Zone 3 A
UPS System Testing and Commissioning at B1 Zone 3 A
Lighting System Testing and Commissioning at B1 Zone 3 A
Fire Alarm System Testing and Commissioning at B1 Zone 3 A
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B1 Zone 3 A
Data System Testing and Commissioning at B1 Zone 3 A
CCTV System Testing and Commissioning at B1 Zone 3 A
Access Control System Testing and Commissioning at B1 Zone 3 A
Time Attendance System Testing and Commissioning at B1 Zone 3 A
Guest Room Management System Testing and Commissioning at B1 Zone 3 A
PAVA SYSTEM Testing and Commissioning at B1 Zone 3 A
Digital Signage System Testing and Commissioning at B1 Zone 3 A
Testing & Commissioning of Lightning Protection System at B1 Zone 3 A
BMS Testing and Commissioning at B1 Zone 3 A

Main and Sub Distribution Boards Testing and Commissioning at B1 Zone 3 B


Power System Testing and Commissioning at B1 Zone 3 B
Fan Coil Unit Testing and Commissioning at B1 Zone 3 B
Testing and Commissioning of FM-200 at B1 Zone 3 B
LPG Pressure reducing and Distribution panel Testing and Commissioning at B1 Zone 3 B
Lighting System Testing and Commissioning at B1 Zone 3 B
Fire Alarm System Testing and Commissioning at B1 Zone 3 B
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B1 Zone 3 B
Data System Testing and Commissioning at B1 Zone 3 B
CCTV System Testing and Commissioning at B1 Zone 3 B
Access Control System Testing and Commissioning at B1 Zone 3 B
Guest Room Management System Testing and Commissioning at B1 Zone 3 B
PAVA SYSTEM Testing and Commissioning at B1 Zone 3 B
Digital Signage System Testing and Commissioning at B1 Zone 3 B
Testing & Commissioning of Lightning Protection System at B1 Zone 3 B
BMS Testing and Commissioning at B1 Zone 3 B

Main and Sub Distribution Boards Testing and Commissioning at B1 Zone 3 C


Power System Testing and Commissioning at B1 Zone 3 C
Fan Coil Unit Testing and Commissioning at B1 Zone 3 C
Testing and Commissioning of FM-200 at B1 Zone 3 C
LPG Pressure reducing and Distribution panel Testing and Commissioning at B1 Zone 3 C
UPS System Testing and Commissioning at B1 Zone 3 C
Lighting System Testing and Commissioning at B1 Zone 3 C
Fire Alarm System Testing and Commissioning at B1 Zone 3 C
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at B1 Zone 3 C
Data System Testing and Commissioning at B1 Zone 3 C
CCTV System Testing and Commissioning at B1 Zone 3 C
Access Control System Testing and Commissioning at B1 Zone 3 C
Guest Room Management System Testing and Commissioning at B1 Zone 3 C
PAVA SYSTEM Testing and Commissioning at B1 Zone 3 C
Digital Signage System Testing and Commissioning at B1 Zone 3 C
Testing & Commissioning of Lightning Protection System at B1 Zone 3 C
BMS Testing and Commissioning at B1 Zone 3 C

Main and Sub Distribution Boards Testing and Commissioning at GF


Distribution Boards Testing and Commissioning at GF
Power System Testing and Commissioning at GF
Close Control Unit Testing and Commissioning at GF
Fan Coil Unit Testing and Commissioning at GF
Smoke Control Fans Testing and Commissioning at GF
Extract Fans Testing and Commissioning at GF
Fire Alarm Station Testing and Commissioning at GF
Testing and Commissioning of FM-200 at GF
LPG Leak Detection System Testing and Commissioning at GF
Transformers Testing and Commissioning at GF
GENERATOR Testing and Commissioning at GF
Capacitor Bank Testing and Commissioning at GF
Lighting System Testing and Commissioning at GF
Fire Alarm System Testing and Commissioning at GF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at GF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at GF
Data System Testing and Commissioning at GF
CCTV System Testing and Commissioning at GF
Access Control System Testing and Commissioning at GF
Audio Intercom System Testing and Commissioning at GF
Guest Room Management System Testing and Commissioning at GF
PAVA SYSTEM Testing and Commissioning at GF
Audio Visual System Testing and Commissioning at GF
Digital Signage System Testing and Commissioning at GF
Central Clock System Testing and Commissioning at GF
Testing & Commissioning of Lightning Protection System at GF
External Irrigation Pipes Testing and Commissioning at GF
Irrigation Water Pumps Testing and Commissioning at GF
Fire Hydrant System Testing and Commissioning at GF
HV Swichgear Testing and Commissioning at GF
BMS Testing and Commissioning at GF

Main and Sub Distribution Boards Testing and Commissioning at F1


Distribution Boards Testing and Commissioning at F1
Power System Testing and Commissioning at F1
Fan Coil Unit Testing and Commissioning at F1
Smoke Control Fans Testing and Commissioning at F1
Extract Fans Testing and Commissioning at F1
Lighting System Testing and Commissioning at F1
Fire Alarm System Testing and Commissioning at F1
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F1
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F1
Data System Testing and Commissioning at F1
CCTV System Testing and Commissioning at F1
Access Control System Testing and Commissioning at F1
Guest Room Management System Testing and Commissioning at F1
PAVA SYSTEM Testing and Commissioning at F1
Digital Signage System Testing and Commissioning at F1
Testing & Commissioning of Lightning Protection System at F1
BMS Testing and Commissioning at F1

Main and Sub Distribution Boards Testing and Commissioning at F2


Distribution Boards Testing and Commissioning at F2
Power System Testing and Commissioning at F2
Fresh Air Handling Units Testing and Commissioning at F2
Air Handling Units Testing and Commissioning at F2
Fan Coil Unit Testing and Commissioning at F2
Smoke Control Fans Testing and Commissioning at F2
Extract Fans Testing and Commissioning at F2
Ecology Unit / Electrostatic Filter And Carbon Filter Testing and Commissioning at F2
Testing and Commissioning of FM-200 at F2
Lighting System Testing and Commissioning at F2
Fire Alarm System Testing and Commissioning at F2
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F2
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F2
Data System Testing and Commissioning at F2
CCTV System Testing and Commissioning at F2
Access Control System Testing and Commissioning at F2
Guest Room Management System Testing and Commissioning at F2
PAVA SYSTEM Testing and Commissioning at F2
Digital Signage System Testing and Commissioning at F2
Testing & Commissioning of Lightning Protection System at F2
BMS Testing and Commissioning at F2
Main and Sub Distribution Boards Testing and Commissioning at F3
Distribution Boards Testing and Commissioning at F3
Power System Testing and Commissioning at F3
Fan Coil Unit Testing and Commissioning at F3
Smoke Control Fans Testing and Commissioning at F3
Extract Fans Testing and Commissioning at F3
Lighting System Testing and Commissioning at F3
Fire Alarm System Testing and Commissioning at F3
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F3
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F3
Data System Testing and Commissioning at F3
CCTV System Testing and Commissioning at F3
Access Control System Testing and Commissioning at F3
Guest Room Management System Testing and Commissioning at F3
PAVA SYSTEM Testing and Commissioning at F3
Digital Signage System Testing and Commissioning at F3
Testing & Commissioning of Lightning Protection System at F3
BMS Testing and Commissioning at F3

Main and Sub Distribution Boards Testing and Commissioning at F4


Distribution Boards Testing and Commissioning at F4
Power System Testing and Commissioning at F4
Fan Coil Unit Testing and Commissioning at F4
Lighting System Testing and Commissioning at F4
Fire Alarm System Testing and Commissioning at F4
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F4
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F4
Data System Testing and Commissioning at F4
CCTV System Testing and Commissioning at F4
Access Control System Testing and Commissioning at F4
Guest Room Management System Testing and Commissioning at F4
PAVA SYSTEM Testing and Commissioning at F4
Digital Signage System Testing and Commissioning at F4
Testing & Commissioning of Lightning Protection System at F4
BMS Testing and Commissioning at F4

Main and Sub Distribution Boards Testing and Commissioning at F5


Distribution Boards Testing and Commissioning at F5
Power System Testing and Commissioning at F5
Fan Coil Unit Testing and Commissioning at F5
Lighting System Testing and Commissioning at F5
Fire Alarm System Testing and Commissioning at F5
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F5
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F5
Data System Testing and Commissioning at F5
CCTV System Testing and Commissioning at F5
Access Control System Testing and Commissioning at F5
Guest Room Management System Testing and Commissioning at F5
PAVA SYSTEM Testing and Commissioning at F5
Digital Signage System Testing and Commissioning at F5
Testing & Commissioning of Lightning Protection System at F5
BMS Testing and Commissioning at F5

Main and Sub Distribution Boards Testing and Commissioning at F6


Distribution Boards Testing and Commissioning at F6
Power System Testing and Commissioning at F6
Fan Coil Unit Testing and Commissioning at F6
Lighting System Testing and Commissioning at F6
Fire Alarm System Testing and Commissioning at F6
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F6
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F6
Data System Testing and Commissioning at F6
CCTV System Testing and Commissioning at F6
Access Control System Testing and Commissioning at F6
Guest Room Management System Testing and Commissioning at F6
PAVA SYSTEM Testing and Commissioning at F6
Digital Signage System Testing and Commissioning at F6
Testing & Commissioning of Lightning Protection System at F6
BMS Testing and Commissioning at F6

Main and Sub Distribution Boards Testing and Commissioning at F7


Distribution Boards Testing and Commissioning at F7
Power System Testing and Commissioning at F7
Fan Coil Unit Testing and Commissioning at F7
Lighting System Testing and Commissioning at F7
Fire Alarm System Testing and Commissioning at F7
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F7
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F7
Data System Testing and Commissioning at F7
CCTV System Testing and Commissioning at F7
Access Control System Testing and Commissioning at F7
Guest Room Management System Testing and Commissioning at F7
PAVA SYSTEM Testing and Commissioning at F7
Digital Signage System Testing and Commissioning at F7
Testing & Commissioning of Lightning Protection System at F7
BMS Testing and Commissioning at F7

Main and Sub Distribution Boards Testing and Commissioning at F8


Distribution Boards Testing and Commissioning at F8
Power System Testing and Commissioning at F8
Fan Coil Unit Testing and Commissioning at F8
Lighting System Testing and Commissioning at F8
Fire Alarm System Testing and Commissioning at F8
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F8
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F8
Data System Testing and Commissioning at F8
CCTV System Testing and Commissioning at F8
Access Control System Testing and Commissioning at F8
Guest Room Management System Testing and Commissioning at F8
PAVA SYSTEM Testing and Commissioning at F8
Digital Signage System Testing and Commissioning at F8
Testing & Commissioning of Lightning Protection System at F8
BMS Testing and Commissioning at F8

Main and Sub Distribution Boards Testing and Commissioning at F9


Distribution Boards Testing and Commissioning at F9
Power System Testing and Commissioning at F9
Fan Coil Unit Testing and Commissioning at F9
Lighting System Testing and Commissioning at F9
Fire Alarm System Testing and Commissioning at F9
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F9
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F9
Data System Testing and Commissioning at F9
CCTV System Testing and Commissioning at F9
Access Control System Testing and Commissioning at F9
Guest Room Management System Testing and Commissioning at F9
PAVA SYSTEM Testing and Commissioning at F9
Digital Signage System Testing and Commissioning at F9
Testing & Commissioning of Lightning Protection System at F9
BMS Testing and Commissioning at F9

Main and Sub Distribution Boards Testing and Commissioning at F10


Distribution Boards Testing and Commissioning at F10
Power System Testing and Commissioning at F10
Fan Coil Unit Testing and Commissioning at F10
Lighting System Testing and Commissioning at F10
Fire Alarm System Testing and Commissioning at F10
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F10
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F10
Data System Testing and Commissioning at F10
CCTV System Testing and Commissioning at F10
Access Control System Testing and Commissioning at F10
Guest Room Management System Testing and Commissioning at F10
PAVA SYSTEM Testing and Commissioning at F10
Digital Signage System Testing and Commissioning at F10
Testing & Commissioning of Lightning Protection System at F10
BMS Testing and Commissioning at F10

Main and Sub Distribution Boards Testing and Commissioning at F11


Distribution Boards Testing and Commissioning at F11
Power System Testing and Commissioning at F11
Fan Coil Unit Testing and Commissioning at F11
Lighting System Testing and Commissioning at F11
Fire Alarm System Testing and Commissioning at F11
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F11
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F11
Data System Testing and Commissioning at F11
CCTV System Testing and Commissioning at F11
Access Control System Testing and Commissioning at F11
Guest Room Management System Testing and Commissioning at F11
PAVA SYSTEM Testing and Commissioning at F11
Digital Signage System Testing and Commissioning at F11
Testing & Commissioning of Lightning Protection System at F11
BMS Testing and Commissioning at F11

Main and Sub Distribution Boards Testing and Commissioning at F12


Distribution Boards Testing and Commissioning at F12
Power System Testing and Commissioning at F12
Fan Coil Unit Testing and Commissioning at F12
Lighting System Testing and Commissioning at F12
Fire Alarm System Testing and Commissioning at F12
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F12
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F12
Data System Testing and Commissioning at F12
CCTV System Testing and Commissioning at F12
Access Control System Testing and Commissioning at F12
Guest Room Management System Testing and Commissioning at F12
PAVA SYSTEM Testing and Commissioning at F12
Digital Signage System Testing and Commissioning at F12
Testing & Commissioning of Lightning Protection System at F12
BMS Testing and Commissioning at F12

Main and Sub Distribution Boards Testing and Commissioning at F13


Distribution Boards Testing and Commissioning at F13
Power System Testing and Commissioning at F13
Fan Coil Unit Testing and Commissioning at F13
Lighting System Testing and Commissioning at F13
Fire Alarm System Testing and Commissioning at F13
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F13
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F13
Data System Testing and Commissioning at F13
CCTV System Testing and Commissioning at F13
Access Control System Testing and Commissioning at F13
Guest Room Management System Testing and Commissioning at F13
PAVA SYSTEM Testing and Commissioning at F13
Digital Signage System Testing and Commissioning at F13
Testing & Commissioning of Lightning Protection System at F13
BMS Testing and Commissioning at F13

Main and Sub Distribution Boards Testing and Commissioning at F14


Distribution Boards Testing and Commissioning at F14
Power System Testing and Commissioning at F14
Fan Coil Unit Testing and Commissioning at F14
Lighting System Testing and Commissioning at F14
Fire Alarm System Testing and Commissioning at F14
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at F14
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at F14
Data System Testing and Commissioning at F14
CCTV System Testing and Commissioning at F14
Access Control System Testing and Commissioning at F14
Guest Room Management System Testing and Commissioning at F14
PAVA SYSTEM Testing and Commissioning at F14
Digital Signage System Testing and Commissioning at F14
Testing & Commissioning of Lightning Protection System at F14
BMS Testing and Commissioning at F14

Main and Sub Distribution Boards Testing and Commissioning at RF


Distribution Boards Testing and Commissioning at RF
Power System Testing and Commissioning at RF
Swimming and Shower Pool Testing and Commissioning at RF
Fan Coil Unit Testing and Commissioning at RF
Lighting System Testing and Commissioning at RF
Fire Alarm System Testing and Commissioning at RF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at RF
EMERGENCY LIGHTING / CENTRAL BATTERY SYSTEM Testing and Commissioning at RF
CCTV System Testing and Commissioning at RF
Access Control System Testing and Commissioning at RF
Guest Room Management System Testing and Commissioning at RF
PAVA SYSTEM Testing and Commissioning at RF
Digital Signage System Testing and Commissioning at RF
Testing & Commissioning of Lightning Protection System at RF
BMS Testing and Commissioning at RF

Distribution Boards Testing and Commissioning at URF


Power System Testing and Commissioning at URF
Cooling Tower Testing and Commissioning at URF
Fresh Air Handling Units Testing and Commissioning at URF
Fan Coil Unit Testing and Commissioning at URF
Smoke Control Fans Testing and Commissioning at URF
Extract Fans Testing and Commissioning at URF
Testing and Commissioning of FM-200 at URF
Lighting System Testing and Commissioning at URF
Fire Alarm System Testing and Commissioning at URF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at URF
Data System Testing and Commissioning at URF
CCTV System Testing and Commissioning at URF
Access Control System Testing and Commissioning at URF
Digital Signage System Testing and Commissioning at URF
Testing & Commissioning of Lightning Protection System at URF
BMS Testing and Commissioning at URF

Distribution Boards Testing and Commissioning at TRF


Power System Testing and Commissioning at TRF
Fresh Air Handling Units Testing and Commissioning at TRF
Fan Coil Unit Testing and Commissioning at TRF
Lighting System Testing and Commissioning at TRF
Fire Alarm System Testing and Commissioning at TRF
EMERGENCY ASSISTANCE / MEDICAL ALERT ALARM Testing and Commissioning at TRF
CCTV System Testing and Commissioning at TRF
Access Control System Testing and Commissioning at TRF
Testing & Commissioning of Lightning Protection System at TRF

Facade Lighting Testing and Commissioning


Activity % Complete

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
0%

0%
0%
0%
0%

100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
0%
100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
0%

100%
100%
100%
100%

100%
100%
100%
100%

100%
0%
0%
0%

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
0%

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
100%

100%
100%
100%
0%

100%
100%
100%
100%

100%
100%
100%
0%

100%
100%
100%
0%
100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
0.00%

100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
0%

100%
100%
100%
100%

100%
100%
100%
0%
100%
0%
0%
0%

100%
100%
100%
0%

100%
0%
0%
0%

100%
100%
100%
0%

100%
0%
0%
0%

100%
100%
100%
0%

100%
0%
0%
0%

100%
100%
100%
0%

100%
100%
100%
80%

100%
0%
0%
0%

100%
0%
0%
0%

100%
100%
100%
0%

100%
100%
100%
0%

100%
0%
0%
0%

100%
20%

0%
0%

100%
100%

100%
0%
0%
0%

100%
20%
100% NO BUSBAR IN B3
100% NO BUSBAR IN B3
0%
0%
0%
0%
0%

85%
85%
70%
70%
0%
0%

0%
0%
0%
0%
0%

100% NO RISER DUCT AVAILABLE IN ZONE-1A

100%
100%
100%
100%

100%
100%
100%
100%
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
100%
90%
85%
65%
90%
0%
100% NO RISER DUCT AVAILABLE IN ZONE-1A
100% NO RISER DUCT AVAILABLE IN ZONE-1A
0%

100%
100%
100%
100%
30%
30%

90%
92%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
0%
0%
100% NO BUSBAR IN B2
100% NO BUSBAR IN B2
0%
0%
0%
0%
0%
0%
0%
0%

100%
75%
100% NO RISER AVAILABLE IN ZONE-1A
0%
0%

100%
0%
100% NO RISER AVAILABLE IN ZONE-1A
0%
0%
0%

100%
96%
100% NO RISER AVAILABLE IN ZONE-1A
0%
100% NO PANELS AVAILABLE IN ZONE-1A
0%

100%
0%
100% NO RISER AVAILABLE IN ZONE-1A
0%
0%

100%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2

100%
60% COMPLETED
0%
0%
0%

60%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2

100%

0%
0%

100% NOT AVAILABLE IN B2 zone 1B

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 zone 1B
0%
0%
0%
0%

100%
100%
100%
100%
90%
65%
90%
100% NO CHW PIPE IN ZONE-1B
100% NO RISER DUCT AVAILABLE IN ZONE-1B
0%

100%
100%
100%
30%

100%
100%
90%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
0%
100% NO BUSBAR IN B2
100% NO BUSBAR IN B2
0%
0%
0%
0%
0%
100%
100%
75%
100% NO RISER AVAILABLE IN ZONE-1B
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-1B
100% NO RACKS AVAILABLE IN ZONE-1B
0%
0%

100%
100%
100%
100% NO RISER AVAILABLE IN ZONE-1B
0%
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-1B
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%
100%
100%
60% COMPLETED
0%
0%
0%

70%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
100%

0%
0%

100% NOT AVAILABLE IN B2 zone 1C

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 zone 2A
0%
0%
0%
0%

100%
90%
90%
65%
90%
100%
90%
100% NO RISER DUCT AVAILABLE IN ZONE-1C
100% NO RISER DUCT AVAILABLE IN ZONE-1C
0%

100%
100%
100%
100%
30%
30%

100%
100%
92%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
90%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
0%
0%
100% NO BUSBAR IN B2
100% NO BUSBAR IN B2
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
75%
100% NO RISER AVAILABLE IN ZONE-1C
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-1C
100% NO RACKS AVAILABLE IN ZONE-1C
0%
0%

100%
100%
96%
100% NO RISER AVAILABLE IN ZONE-1C
0%
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-1C
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
100%
0%
60% COMPLETED
0%
0%

50%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
100%

0%
0%

100% NOT AVAILABLE IN B2 zone 2A

100%
100%
100%
100%
100%

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 zone 2A
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 zone 2A
0%
0%
0%
0%

100%
100%
100%
100%
90%
65%
90%
90%
0%
0%

100%
100%
100%
100%
0%
0%

100%
100%
92%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
90%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
100% NO BUSBAR IN B2
100% NO BUSBAR IN B2
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
75%
100% NO RISER AVAILABLE IN ZONE-2A
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-2A
100% NO RACKS AVAILABLE IN ZONE-2A
0%
0%

100%
100%
80%
100% NO RISER AVAILABLE IN ZONE-2A
0%
0%
0%
100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-2A
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
100%
60% COMPLETED
0%
0%
0%

50%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
100%
0%
0%

100%
100%
10%

70%
30%
50%
100% NOT AVAILABLE IN B2 ZONE 2B
100% NOT AVAILABLE IN B2 ZONE 2B
0%
0% Al saad Scope

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 ZONE 2B
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
95%
100%
90%
65%
90%
100% NOT AVAILABLE IN B2 ZONE 2B
100% NOT AVAILABLE IN B2 ZONE 2B
100% NOT AVAILABLE IN B2 ZONE 2B
0%

100%
100%
100%
100%
30%
30%

100%
100%
92%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
90%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
100% NO BUSBAR IN B2
100% NO BUSBAR IN B2
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
75%
0%
0%
0%
100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-2B
100% NO RACKS AVAILABLE IN ZONE-2B
0%
0%

100%
100%
75%
100% NO RISER AVAILABLE IN ZONE-2B
0%
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-2B
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
0%
60% COMPLETED
0%
0%

50%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
100%

100% NOT AVAILABLE IN B2


100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2

100% NOT AVAILABLE IN B2 ZONE-3A

100%
100%
100%
100%

100%
100%
100%
100% NOT AVAILABLE IN B2 ZONE-3A
0%
0%
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 ZONE-3A
0%
0%
0%
0%

90%
100% NOT AVAILABLE IN B2 ZONE-3A
100% NOT AVAILABLE IN B2 ZONE-3A
100% NOT AVAILABLE IN B2 ZONE-3A
100%
90%
90%
100% NOT AVAILABLE IN B2 ZONE-3A
100% NOT AVAILABLE IN B2 ZONE-3A
0%

100%
100%
100%
100%
30%
30%

100%
92%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
0%
100% NO BUSBAR IN B2
100% NO BUSBAR IN B2
0%
0%
0%
0%
0%

100%
75%
100% NO RISER AVAILABLE IN ZONE-3A
0%
0%
100%
0%
100% NO RISER AVAILABLE IN ZONE-3A
100% NO RACKS AVAILABLE IN ZONE-3A
0%
0%

100%
90%
100% NO RISER AVAILABLE IN ZONE-2C
0%
0%
0%

100%
0%
100% NO RISER AVAILABLE IN ZONE-3A
0%
0%

100%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
60% COMPLETED
0%
0%
0%

50%
0%
0%
0%
0%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
95%

0%
0%
0%

100% NOT AVAILABLE IN B2 ZONE 3B

100%
100%
100%
100%
95%

100%
100%
100%
100% NOT AVAILABLE IN B2 ZONE 3B
0%
100% NOT AVAILABLE IN B2 ZONE 3B
0%
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%
100%
100%
90%
50%
90%
85%
80%
90%
80%
0%

100%
100%

100%
100%
91%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
0%
100% NO BUSBAR IN B2
100% NO BUSBAR IN B2
0%
0%
0%
0%
0%

100%
100%
75%
100% NO RISER AVAILABLE IN ZONE-3A
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-3B
100% NO RACKS AVAILABLE IN ZONE-3B
0%
0%

100%
100%
80%
100% NO RISER AVAILABLE IN ZONE-3A
0%
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-3B
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
100%
60% COMPLETED
0%
0%
0%

50%
0%
0%
0%
0%
100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
95%

0%
0%
0%

100% NOT AVAILABLE IN B2 ZONE 3C

100%
100%
100%
100%
100%

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 ZONE 3C
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 ZONE 3C
0%
0%
0%
0%

100%
100%
90%
90%
75%
50%
100% NOT AVAILABLE IN B2 ZONE 3C
100% NOT AVAILABLE IN B2 ZONE 3C
100% NOT AVAILABLE IN B2 ZONE 3C
0%

100%
100%

100%
100%
91%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
0%
100% NO BUSBAR IN B2
100% NO BUSBAR IN B2
0%
0%
0%
0%
0%

100%
100%
75%
100% NO RISER AVAILABLE IN ZONE-3A
0%
0%

100%
100%
0%
0%
0%
0%
0%

100%
100%
90%
100% NO RISER AVAILABLE IN ZONE-3B
0%
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
100%
60% COMPLETED
0%
0%
0%

100%
0%
0%
0%
0%
100%
100%
100% NOT AVAILABLE IN B2
100% NOT AVAILABLE IN B2
0%
0%

100%
95%

0%
0%
0%

100% NOT AVAILABLE IN B2 ZONE 1A

100%
100%
100%
100%

100%
100%
100%
100% NOT AVAILABLE IN B2 ZONE 1A
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN B2 ZONE 1A
100% NOT AVAILABLE IN B2 ZONE 1A
100% NOT AVAILABLE IN B2 ZONE 1A
100% NOT AVAILABLE IN B2 ZONE 1A
0%
0%
0%
0%
100%
90%
100%
90%
60%
100% NOT AVAILABLE IN B2 ZONE 1A
100% NOT AVAILABLE IN B2 ZONE 1A
65%
50%
0%

100%
100%
100%
100%
20%
20%

100%
100%
91%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
100%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
100% NO HORIZONTAL BUSBAR IN ZONE-1A
100% NO BUSBAR IN ZONE-1A
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
55%
100% NO RISER AVAILABLE IN ZONE-1A
0%
0%

100%
100%
0%
0%
0%
0%
0%

100%
100%
90%
100% NO RISER AVAILABLE IN ZONE-1A
0%
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-1A
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%
55% COMPLETED
0%
0%
0%

100%
30%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN ZONE-1A
100% NOT AVAILABLE IN ZONE-1A
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%

100% NOT AVAILABLE IN B1 ZONE 1B

95%
100%
100%
75%
100% NOT AVAILABLE IN B1 ZONE 1B

100%
100%
100%
100% NOT AVAILABLE IN B1 ZONE 1B
100% NOT AVAILABLE IN B1 ZONE 1B
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN B1 ZONE 1B
100% NOT AVAILABLE IN B1 ZONE 1B
100% NOT AVAILABLE IN B1 ZONE 1B
100% NOT AVAILABLE IN B1 ZONE 1B
0%
0%
0%
0%

100% NOT AVAILABLE IN B1 ZONE 1B


100% NOT AVAILABLE IN B1 ZONE 1B
100%
90%
50%
100% NOT AVAILABLE IN B1 ZONE 1B
100% NOT AVAILABLE IN B1 ZONE 1B
100% NOT AVAILABLE IN B1 ZONE 1B
60%
0%

100%
100%
20%
20%

0%
0%
0%
0%
0%
0%

100%
100%
100%
90%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
0%
100% NO HORIZONTAL BUSBAR IN ZONE-1B
100% NO BUSBAR IN ZONE-1B
0%
0%
0%
0%
0%
0%

100%
100%
100%
55%
100% NO RISER AVAILABLE IN ZONE-1B
0%
0%

100%
100%
80%
0%
0%
0%
0%
0%

100%
100%
100%
90%
0%
0%
0%
0%
100%
100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-1B
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%
100%
55% COMPLETED
0%
0%
0%

100%
30%
0%
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN ZONE-1B
100% NOT AVAILABLE IN ZONE-1B
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%

100% NOT AVAILABLE IN B1 ZONE 1C

100%
100%
100%
100%

100%
100%
100%
100% NOT AVAILABLE IN B1 ZONE 1C
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN B1 ZONE 1C
0%
0%
0%
0%
0%
0%
0%

100%
90%
100%
90%
75%
100% NOT AVAILABLE IN B1 ZONE 1C
60%
50%
100% NOT AVAILABLE IN B1 ZONE 1C
0%

100%
100%
100%
100%
20%
20%

0%
0%

100%
100%
90%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
70%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
0%
0%
100% NO HORIZONTAL BUSBAR IN ZONE-1C
100% NO BUSBAR IN ZONE-1C
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
55%
100% NO RISER AVAILABLE IN ZONE-1C
0%
0%

100%
100%
0%
0%
0%
0%
0%

100%
100%
100% NO RISER AVAILABLE IN ZONE-1C
0%
0%
0%
0%

100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-1C
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%
55% COMPLETED
0%
0%
0%

100%
30%
40%
0%
0%
0%

100%
100% NOT AVAILABLE IN ZONE-1C
100% NOT AVAILABLE IN ZONE-1C
100% NOT AVAILABLE IN ZONE-1C
0%
0%

100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%

100%
100%
0%

100%
90%
100%
100%
85%
100%
100% NOT AVAILABLE IN ZONE-2A
100% NOT AVAILABLE IN ZONE-2A
0%
0%

100%
100%
100%
100%
100% NOT AVAILABLE IN ZONE-2A
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%

100%
100%
95%
85%
85%
50%
100% NOT AVAILABLE IN ZONE-2A
100% NOT AVAILABLE IN ZONE-2A
65%
0%

100%
100%
100%
100%
0%
0%
100%
50%
0%
0%
65%

100%
100%
100%
90%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
100%
70%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
100%
55%
100% NO RISER AVAILABLE IN ZONE-2A
0%
0%

100%
100%
100%
0%
0%
0%
0%
0%

100%
100%
100%
90%
100% NO RISER AVAILABLE IN ZONE-2A
0%
0%
0%

100%
100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-2A
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%
100%
100%
100%
55% COMPLETED
0%
0%
0%

100%
30%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN ZONE-2A
100% NOT AVAILABLE IN ZONE-2A
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
90%

0%

100%
100%
100%
20%
100%
85%
0%
0%

100%
100%
100%
80%
100%
0%
0%
0%
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%
0%
0%
0%

95%
85%
70%
85%
25%
65%
100% NOT AVAILABLE IN B1 ZONE 2B
100% NOT AVAILABLE IN B1 ZONE 2B
0%
0%

100%
100%
100%
60%
0%
0%
20%
100%
0%
0%
20%
20%
50%
40%
0%
0%
0%
0%
20%
65%
35%
0%
0%

0%
0%

0%
0%
0%
0%
0%

100%
100%
100%
90%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
100%
70%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
100% NO HORIZONTAL BUSBAR IN ZONE-2B
100% NO BUSBAR IN ZONE-2B
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
100%
55%
100% NO RISER AVAILABLE IN ZONE-2B
0%
0%

100%
100%
100%
0%
0%
0%
0%
0%

100%
100%
100%
90%
100% NO RISER AVAILABLE IN ZONE-2B
0%
0%
0%

100%
100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-2B
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%
100%
55% COMPLETED
0%
0%
0%

100%
30%
30%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN ZONE-2B
100% NOT AVAILABLE IN ZONE-2B
100% NOT AVAILABLE IN ZONE-2B
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%

0%

100%
0%
0%

100%
100%
100%
100%
90%

100%
100%
100%
100%
15%
100%

100%
100%
100%
100%
100% NOT AVAILABLE IN ZONE-3A
100% NOT AVAILABLE IN ZONE-3A
100% NOT AVAILABLE IN ZONE-3A
100% NOT AVAILABLE IN ZONE-3A
0%
0%
0%
0%
95%
95%
85%
90%
50%
85%
65%
100% NOT AVAILABLE IN ZONE-3A
100% NOT AVAILABLE IN ZONE-3A
0%

100%
100%
30%
85%
0%
0%
25%

100%
100%
100%
90%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
0%
5%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
100%
55%
0%
0%
0%

100%
100%
100%
0%
0%
0%
0%
0%

100%
100%
100%
90%
100% NO RISER AVAILABLE IN ZONE-3A
100% NO RISER AVAILABLE IN ZONE-2B
0%
0%

100%
100%
100%
0%
100% NO RISER AVAILABLE IN ZONE-3A
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%
100%
55% COMPLETED
0%
0%
0%

100%
30%
0%
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN ZONE-3A
100% NOT AVAILABLE IN ZONE-3A
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%
0%

100%
100%
100%
85%
0% Alsaad Scope

100%
100%
100%
75%
80%

100%
100%
100%
100%
50%
0%
0%
0%
0%
0%
0%
0%

100%
90%
85%
85%
40%
80%
95%
65%
95%
0%

100%
85%
25%
0%
0%

100%
100%
90%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
0%
5%
0%
0%
0%
0%
0%
0%
0%

100%
100%
55%
0%
0%
0%

100%
100%
0%
0%
0%
0%
0%

100%
100%
90%
0%
0%
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%
55% COMPLETED
0%
0%
0%

100%
30%
0%
0%
0%
0%

100%
100%
0%
0%
0%
0%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%

0%

100%
95%
100%
85%
100%

100%
100%
100%
35%
100%
100% NOT AVAILABLE IN B1 ZONE 3C

100%
100%
100%
100%
30%
0%
0%
0%
0%
0%
0%
0%

90%
90%
90%
80%
40%
50%
45%
100% NOT AVAILABLE IN B1 ZONE 3C
100% NOT AVAILABLE IN B1 ZONE 3C
0%

100%
85%
0%

0%
0%

0%
0%
0%
0%
0%

100%
100%
100%
85%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
0%
100% NO HORIZONTAL BUSBAR IN ZONE-3C
0%
0%
100% NO BUSBAR IN ZONE-3C
0%
0%
0%
0%
0%
0%

100%
100%
100%
55%
0%
0%
0%

100%
100%
100%
0%
0%
0%
0%
0%

100%
100%
100%
90%
100% NO RISER AVAILABLE IN ZONE-3C
0%
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%
100%
55% COMPLETED
0%
0%
0%

100%
30%
0%
0%
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN ZONE-3C
100% NOT AVAILABLE IN ZONE-3C
0%
0%

100%
100%
100%
100% NOT AVAILABLE IN B1
100% NOT AVAILABLE IN B1
0%
0%

100%
100%

0%

90%
0% Alsaad Scope
85%
95%
25%
85%

85%
75%
75%
90%
55%
0%

90%
90%
90%
0%
0%
100%
50%
0%
0%
0%
0%
0%
0%
0%

95%
85%
80%
25%
0%
25%
60%
60%
0%
0%

95%
20%
20%
10%
20%
20%
0%
0%
0%

0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
90%
50%
35%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
90%
90%
50%
100% NO RISER FOR EMRG.LIGHT SYSTEM
55%
75%
90%
60%
0%
0%
100% NO HORIZONTAL BUSBAR IN GF
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
90%
55%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
70%
55%
0%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
75%
55%
40%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
75%
55%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
75%
55%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
75% ID CHANGE
55% ID CHANGE
0% ID CHANGE
0% ID CHANGE
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
100% SYSTEM CANCELLED
100% SYSTEM CANCELLED
100% SYSTEM CANCELLED
100% SYSTEM CANCELLED
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
75%
55%
50% COMPLETED & ID CHANGES
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
100% NOT AVAILABLE IN GF
100% NOT AVAILABLE IN GF
100% NOT AVAILABLE IN GF
100% NOT AVAILABLE IN GF
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
100% NOT AVAILABLE IN GF
100% NOT AVAILABLE IN GF
100% NOT AVAILABLE IN GF
100% NOT AVAILABLE IN GF
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
0%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
100% NOT AVAILABLE GF
100% NOT AVAILABLE GF
100% NOT AVAILABLE GF
100% NOT AVAILABLE F1
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
55%
90%
0%
0%
0%
0%

100%
80%
0%
0%
0%
0%
0%
0%
0%

25%

90%
90%
85%
85%
40%
0% Alsaad scope

100%
85%
90%
85%
45%
0%

90%
90%
25%
90%
0%
0%
0%
0%
0%

100%
65%
0%
50%
30%
50%
60%
60%
0%
0%

100%
90%
25%
25%
0%
0%
0%

0%
0%
0%
0%
0%

100%
90%
40%
30%
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
65%
75%
65%
45%
0%
100% NO RISER FOR EMRG.LIGHT SYSTEM
100% NO HORIZONTAL BUSBAR IN F1
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%

100%
75%
40%
0%
0%
0%
0%
0%

100%
70%
40%
35%
0%
0%
0%
0%

100%
75%
40%
0%
0%
0%
0%

100%
75%
40%
0%
0%
0%
0%

100%
75% ID CHANGE
40% ID CHANGE
0% ID CHANGE
0%
0%
0%

100%
75%
40%
10% COMPLETED & ID CHANGES
0%
0%
0%

100%
0%
0%
0%
0%
0%

100%
100% NOT AVAILABLE F1
100% NOT AVAILABLE F1
100% NOT AVAILABLE F1
100% NOT AVAILABLE F1
0%
0%

100%
75%
35%
0%
0%
0%
0%

100%
25%

100%
100%
100%
95%
100%

100%
100%
100%
100%
90%
0%

95%
95%
100%
90%
100%
0%
0%
0%
0%
0%
0%
0%

90%
90%
90%
85%
80%
80%
80%
0%
0%
0%

90%
40%
40%
0%
0%
15%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%

100%
90%
50%
0%
0%
0%
0%
0%

100%
80%
90%
50%
55%
0%
100% NO RISER FOR EMRG.LIGHT SYSTEM
100% NO HORIZONTAL BUSBAR IN F2
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
100%
90%
50%
0%
0%
0%
0%

100%
90%
50%
0%
0%
0%
0%
0%

100%
90%
60%
50%
0%
0%
0%
0%

100%
90%
50%
0%
0%
0%
0%

100%
90%
50%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN F2
0%
0%
0%
0%

100%
90%
50%
40%
0%
0%
0%

100%
10%
0%
0%
0%
0%

100%
50%
50%
0%
0%
0%
0%

100%
75%
50%
0%
0%
0%
0%

100%

20%

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
85%
0%

100%
100%
50%
50%
0%
0%

100%
100%
100%
75%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100% NO RISER FOR EMRG.LIGHT SYSTEM
100% NO HORIZONTAL BUSBAR IN F3
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
100%
70%
0%
0%
0%

100%
100%
100%
70%
0%
0%
0%
0%

100%
100%
100%
95%
0%
0%
0%
0%

100%
100%
100%
10%
0%
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN F3
100% NOT AVAILABLE IN F3
100% NOT AVAILABLE IN F3
0%
0%

100%
100%
100%
75%
0%
0%
0%

100%
75%
0%
0%
0%
0%

100%
100%
100%
30%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN 3F
100% NOT AVAILABLE IN 3F
100% NOT AVAILABLE IN 3F
0%
0%

100%

20%

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
0%
0%
0%
0%
100%
100%
100%
100%
100%
100%
100%
100%
50%
0%

100%
100%

100%
100%
100%
50%
0%
0%
0%
0%

100%
90%
100%
100%
90%
90%
100% NO RISER FOR EMRG.LIGHT SYSTEM
100% NO HORIZONTAL BUSBAR IN F4
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
100%
70%
0%
0%
0%

100%
100%
100%
40%
0%
0%
0%
0%

100%
100%
100%
95%
0%
0%
0%
0%

100%
100%
100%
10%
0%
0%
0%

100%
100%
100%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN F4
100% NOT AVAILABLE IN F4
0%
0%
0%

100%
100%
100%
70%
0%
0%
0%

100%
75%
0%
0%
0%
0%

100%
100%
100%
10%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN 4F
100% NOT AVAILABLE IN 4F
0%
0%
0%

100%

20%

100%
100%
100%
100%
100%
100%
100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
50%
0%

100%
100%

100%
95%
95%
35%
0%
0%
0%
0%

100%
100%
100%
80%
100%
95%
0%
100% NO HORIZONTAL BUSBAR IN F5
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
100%
95%
50%
0%
0%
0%

100%
95%
95%
35%
0%
0%
0%
0%

100%
95%
80%
95%
0%
0%
0%
0%

100%
95%
95%
0%
0%
0%
0%

100%
95%
95%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F5
100%
0%
0%
0%
0%

100%
95%
95%
70%
0%
0%
0%

100%
50%
0%
0%
0%
0%

100%
95%
95%
0%
0%
0%
0%
100%
100% NOT AVAILABLE IN 5F
100% NOT AVAILABLE IN 5F
100%
0%
0%
0%

60%

20%

100%
100%
100%
100%
100%

100%
100%
100%
100%
100%
85%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100%
100%
100%
100%
100%
45%
0%

100%
100%

100%
95%
100%
30%
0%
0%
0%
0%

100%
90%
95%
85%
80%
100%
0%
100% NO HORIZONTAL BUSBAR IN F6
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
95%
95%
30%
0%
0%
0%

100%
95%
95%
20%
0%
0%
0%
0%

100%
95%
90%
95%
0%
0%
0%
0%

100%
95%
95%
0%
0%
0%
0%

100%
95%
95%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F6
100%
0%
0%
0%
0%

100%
95%
95%
70%
0%
0%
0%

100%
45%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN 6F
10%
100%
0%
0%
0%

100%

20%

100%
100%
100%
100%
50%

100%
100%
100%
100%
100%
85%
100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
100%
100%
95%
95%
100%
0%
0%

100%
100%

100%
90%
100%
15%
0%
0%
0%
0%

100%
85%
100%
80%
90%
65%
0%
0%
0%
100% NO HORIZONTAL BUSBAR IN F7
0%
0%
0%
0%
0%
0%
0%

100%
90%
90%
25%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%
0%

100%
90%
80%
90%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F7
100%
0%
0%
0%
0%

100%
90%
90%
65%
0%
0%
0%

100%
45%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN 7F
100%
0%
0%
0%
0%
100%

20%

100%
100%
100%
100%
20%

100%
100%
100%
100%
100%
65%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
95%
100%
90%
90%
100%
100%
100%
0%
0%

95%
95%
100%
85%
85%
10%
0%
0%
0%
0%

100%
85%
85%
85%
75%
65%
0%
0%
0%
0%
0%
100% NO HORIZONTAL BUSBAR IN F8
0%
0%
0%
0%
0%

100%
85%
85%
10%
0%
0%
0%

100%
85%
85%
0%
0%
0%
0%
0%
100%
85%
75%
85%
0%
0%
0%
0%

100%
85%
85%
0%
0%
0%
0%

100%
85%
85%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F8
100%
0%
0%
0%
0%

100%
85%
85%
65%
0%
0%
0%

100%
35%
0%
0%
0%
0%

100%
85%
85%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN 8F
100%
0%
0%
0%
0%

100%

20%

100%
100%
100%
100%
60%

100%
100%
100%
100%
100%
50%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
100%
100%
85%
85%
100%
100%
50%
0%
0%

100%
100%

100%
90%
90%
15%
0%
0%
0%
0%

100%
100%
90%
90%
45%
80%
100% NO HORIZONTAL BUSBAR IN F9
0%
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
0%
0%
0%
0%
0%
0%
0%

100%
90%
90%
5%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%
0%

100%
90%
75%
90%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%
100%
100% NOT AVAILABLE IN F9
100%
100% NOT AVAILABLE IN F9
0%
0%
0%

100%
90%
90%
40%
0%
0%
0%

100%
60%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%

100%
90%
90%
0%
0%
0%
0%

100%

20%
100%
100%
100%
100%
20%

100%
100%
100%
100%
90%
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
95%
85%
100%
100%
85%
100%
65%
0%
0%

100%
95%

100%
80%
80%
0%
0%
0%
0%
0%

100%
80%
80%
80%
45%
0%
100% NO HORIZONTAL BUSBAR IN F10
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
80%
80%
0%
0%
0%
0%

100%
80%
80%
0%
0%
0%
0%
0%

100%
70%
80%
80%
0%
0%
0%
0%

100%
80%
80%
0%
0%
0%
0%

100%
80%
80%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F10
100%
0%
0%
0%
0%

100%
90%
80%
40%
0%
0%
0%

100%
70%
0%
0%
0%
0%

100%
65%
70%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN 10F
100%
0%
0%
0%
0%

60%

20%

100%
100%
100%
100%
100%

100%
100%
100%
85%
100%
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
90%
90%
100%
100%
80%
0%
50%
0%
0%

100%
80%

100%
65%
65%
0%
0%
0%
0%
0%

100%
70%
65%
65%
45%
0%
100% NO HORIZONTAL BUSBAR IN F11
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%
0%

100%
65%
65%
60%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F11
100%
0%
0%
0%
0%
100%
65%
65%
35%
0%
0%
0%

100%
45%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN 11F
100%
0%
0%
0%
0%

100%

20%

100%
100%
100%
100%
30%

100%
100%
100%
100%
70%
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
80%
85%
85%
60%
60%
0%
60%
0%
0%

100%
90%

100%
65%
65%
0%
0%
0%
0%
0%

100%
60%
65%
65%
45%
0%
0%
100% NO HORIZONTAL BUSBAR IN F12
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%
0%

100%
70%
60%
65%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%

100%
65%
65%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F12
100%
0%
0%
0%
0%

100%
65%
65%
35%
0%
0%
0%

100%
40%
0%
0%
0%
0%

100%
65%
50%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F12
100%
0%
0%
0%
0%

100%

10%

100%
100%
100%
75%
30%

90%
90%
100%
80%
50%
0%

100%
100%
100%
100%
100%
0%
0%
0%
0%

100%
70%
95%
95%
85%
45%
45%
45%
0%
0%

95%
50%

100%
60%
60%
0%
0%
0%
0%
0%

100%
60%
60%
60%
45%
0%
0%
100% NO HORIZONTAL BUSBAR IN F13
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
60%
60%
0%
0%
0%
0%

100%
60%
60%
0%
0%
0%
0%
0%

100%
60%
50%
60%
0%
0%
0%
0%

100%
60%
60%
0%
0%
0%
0%

100%
60%
60%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN F13
100%
0%
0%
0%
0%

100%
60%
60%
20%
0%
0%
0%

100%
35%
0%
0%
0%
0%

100%
60%
60%
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN 13F
100%
0%
0%
0%
0%

100%

10%

50%
100%
100%
100%
30%

75%
50%
40%
100%
40%
0%

90%
90%
90%
90%
0%
0%
0%
0%
0%

90%
90%
100%
50%
0%
20%
20%
20%
0%
0%

90%
0%

100%
35%
35%
0%
0%
0%
0%
0%

100%
40%
35%
25%
35%
0%
0%
100% NO HORIZONTAL BUSBAR IN F14
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
35%
35%
0%
0%
0%
0%

100%
35%
35%
0%
0%
0%
0%
0%

100%
30%
35%
35%
0%
0%
0%
0%

100%
35%
35%
0%
0%
0%
0%

100%
35%
35%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN 14F
0%
0%
0%
0%

100%
35%
35%
10%
0%
0%
0%

100%
30%
0%
0%
0%
0%

100%
35%
35%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN 14F
0%
0%
0%
0%

100%
0%

95%
100%
0%
95%
0%

20%
20%
0%
0%
0%
0%

80%
100%
80%
0%
0%
0%
0%
0%
0%

70%
70%
30%
30%
0%
0%
0%
0%
0%
0%

90%
0%

100%
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
100% NO RISER FOR LIGHTING SYSTEM
0%
0%
0%

100%
35%
5% ID CHANGES & BLOCK WALL NOT READY
0%
0% ID CHANGES & BLOCK WALL NOT READY
100% NO BUSBAR RISER IN RF
0%
100% NO BUSBAR RISER IN RF
100% NO RISER FOR EMRG.LIGHT SYSTEM
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

100%
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0%
0%

100%
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0%
0%
0%
100%
50% ID CHANGES
0% ID CHANGES
0% ID CHANGES
0% ID CHANGES
0%
0%

100%
50% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0%
0%
0%

100%
100% NOT AVAILABLE IN RF
100% NOT AVAILABLE IN RF
100% NOT AVAILABLE IN RF
100% NOT AVAILABLE IN RF
0%
0%

100%
50% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0%
0%

100%
0%
0%
0%
0%
0%

100%
100% NOT AVAILABLE RF
100% NOT AVAILABLE RF
100% NOT AVAILABLE RF
100% NOT AVAILABLE RF
0%
0%

100%
0% ID CHANGES & BLOCK WALL NOT READY
0% ID CHANGES & BLOCK WALL NOT READY
0%
0%
0%
0%

90%

100%
100%
0%

100% NOT AVAILABLE URF


100% NOT AVAILABLE URF
100% NOT AVAILABLE URF
100% NOT AVAILABLE URF
100% NOT AVAILABLE URF

100% NOT AVAILABLE URF


0%
0%
50%
0%

100% NOT AVAILABLE URF


0%
0%
0%
100% NOT AVAILABLE URF
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
30%
30%
0%
0%

95%
100%
0%
0%
20%
0%
0%
0%
0%
0%

100%
0% BLOCK WALL NOT READY
0% BLOCK WALL NOT READY
0%
0%
0%
0%
0%

0%
0%
100%
100%
0%
0%
0%
0%
100%
50% BLOCK WALL NOT READY
50% BLOCK WALL NOT READY
0%
0%
0%
0%

100%
50% BLOCK WALL NOT READY
50% BLOCK WALL NOT READY
0%
0%
0%
0%
0%

100%
50% BLOCK WALL NOT READY
50% BLOCK WALL NOT READY
0%
0%
0%
0%
0%

100%
50% BLOCK WALL NOT READY
50% BLOCK WALL NOT READY
0%
0%
0%
0%

100%
50% BLOCK WALL NOT READY
25% BLOCK WALL NOT READY
0%
0%
0%
0%

100%
100% NOT AVAILABLE IN URF
100% NOT AVAILABLE IN URF
100% NOT AVAILABLE IN URF
0%
0%
0%

100%
0%
0%
0%
0%
0%

100%
100%
100% NOT AVAILABLE IN URF
100% NOT AVAILABLE IN URF
0%
0%
0%

10%

100% NOT AVAILABLE IN TR

100% NOT AVAILABLE IN TR


0
0
0
0

100% NOT AVAILABLE IN TR


0
0
0
100% NOT AVAILABLE IN TR
0

0
0
0
0
0
0

0
0
0
0
0
0
0
0
0
0

0
0
0
0

100
0
0
0
0
0
0
0

0
0
0

100
0
0
0
0
0
0

100
0
0
0
0
0
0
0

100
0
0
0
0
0
0

100
0
0
0
0
0
0

100
100
0
0
0
0
0

0
0

100%
15%
0%
0%

100%
15%
0%
0%
100%
15%
0%
0%

100%
15%
0%
0%

100%
15%
0%
0%

100%
15%
0%
0%

100%
15%
0%
0%

100%
15%
0%
0%

100%
15%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%

0%

0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%
0%
0%
0%
0%
0%
0%
0%
0%
0%

0%