Professional Documents
Culture Documents
March 2024
March 2024
BACKGROUND
THE ASBUILT 1 STOREY RENTAL SPACE WITH STORAGE SHED OUTLAYS UNDER FY 2010
GENERAL APPROPRIATIONS ACT INTENDS TO APPLY THE SUM OF FOUR HUNDRED
SIXTEEN THOUSAND FOUR HUNDRED EIGHTY SIX AND SEVENTYSEVEN CENTS.
FOUR HUNDRED SIXTEEN THOUSAND FOUR HUNDRED EIGHTY SIX AND SEVENTYSEVEN
CENTS.(₱ 416,486.77) BEING THE APPROVED BUDGET FOR THE PROCUREMENT AND
IMPLEMENTATION OF THE PROJECT CONSTRUCTION OF RENTAL SPACE (TAKE OVER
CONTRACT) WITH THE PROJECT DURATION OF SIXTY (60) CALENDAR DAYS.
THE PROJECT WILL INVOLVE THEASBUILT 1 STOREY RENTAL SPACE WITH STORAGE
SHED- ST, PEDRO LAGAO GENERAL SANTOS CITY PURSUANT TO THE TECHNICAL
SPECIFICATIONS.
THE PROJECT WILL HAVE AN APPROVED BUDGET FOR THE CONTRACT (ABC) OF FOUR
HUNDRED SIXTEEN THOUSAND FOUR HUNDRED EIGHTY SIX AND SEVENTYSEVEN CENTS.
(₱ 416,486.77) INCLUDING ALL TAXES AND APPLICABLE PERMITS, LICENSES AND
CLEARANCES, FOR THE PROJECTS MENTIONED ABOVE.
THE CONSTRUCTION OFASBUILT 1 STOREY RENTAL SPACE WITH STORAGE SHED I (TAKE
OVER CONTRACT) IN WHICH THE APPROVED BUDGET CONTRACT SHALL BE ALLOCATED
FOR THE CIVIL, ELECTRICAL, AND PLUMBING WORKS.
GENERAL NOTES
ALL CIVIL WORKS HEREIN SHALL BE DONE IN ACCORDANCE WITH THESE PLANS AND
SPECIFICATION, THE APPLICABLE PROVISIONS OF THE LATEST EDITION OF NATIONAL
STRUCTURAL CODE OF THE PHILIPPINES PUBLISHED BY THE ASSOCIATION OF
STRUCTURAL ENGINEERS OF THE PHILIPPINES (ASEP), THE RULES AND REGULATIONS OF
THE LOCAL ENFORCING AUTHORITY. THE CIVIL WORKS SHALL BE DONE UNDER
IMMEDIATE SUPERVISION OF A DULY LICENSED CIVIL ENGINEER.
SCOPE OF WORKS
GENERAL CONDITION
STRUCTURAL
16MMǾ BARS AND LARGER SHALL BE HIGH GRADE WITH MINIMUM FY = 414MPA
(6000PSI).
Concrete Slabs
FOR TWO-WAY SLABS, BARS ALONG THE SHORTER SPAN SHALL BE PLACED
BELOW THE LONGER SPAN BARS AT CENTER AND ABOVE OF THE LONGER SPAN
BARS AT THE SUPPORTS. THE SPACING OF BARS AT THE COLUMN STRIP SHALL BE
1.5 TIMES THE SPACING IN THE MIDDLE STRIP BUT IN ANY CASE, GREATER THAN 2.5
THE SLAB THICKNESS OR 450MM.
ITEMS OF WORKS
A. PLASTERING
DESCRIPTION
MATERIAL REQUIREMENTS
FINISH COAT SHALL BE PURE PORTLAND CEMENT PROPERLY GRADED AND MIX WITH
WATER TO APPROVED CONSISTENCY.
CEMENT PLASTER FINISH SHALL BE 12.5OMM (1/2 INCH) THK. SMOOTH/ROUGH FINISH
OR ANY, DESIRED BY THE ARCHITECT.
B. TILE WORKS
DESCRIPTION
THIS ITEM SHALL CONSIST OF FURNISHING ALL CERAMIC TILES AND CEMENTITIOUS
MATERIALS, TOOLS AND EQUIPMENT INCLUDING LABOR REQUIRED IN UNDERTAKING THE
PROPER INSTALLATION OF FLOOR TILES AS SHOWN ON THE PLANS AND IN ACCORDANCE
WITH THIS SPECIFICATION.
MATERIAL REQUIREMENTS
USE CERAMIC/PORCELAIN TILES FOR FLOORING AND WALL FOR ALL TOILETS, TILES
NON-SKID TEXTURE FOR TERRACE, BALCONY OR LANAI AND TILES GLAZED FOR ALL
BEDROOMS.
USE 2.44M (B FT.) TILE TRIM MATCHED WITH THE WALL TILE COLOR AND CONSISTENT
WITH ITS DIMENSIONS, NECESSARY FOR EDGING OR MAKING A TRANSITION BETWEEN
INTERSECTING PLANES.
USE TILE ADHESIVE FOR BONDING AND APPLY TILE GROUT FOR ALL TILE JOINTS.
INSTALLATION
IF THE USE OF TILE TRIM IS NOT EQUIRED, ALL TILES ON EDGES MUST BE GRINDED
45" TO FIT WITH EACH OTHER.
CARPENTRY WORKS
DESCRIPTION
MATERIAL REQUIREMENTS
CABINETS
DESCRIPTION
MATERIALS REQUIREMENTS
USE 5MM X 37мм х 37MM X 6M ANGLE BAR HANGER CLIP USE 10Mм х 75мM
EXPANSION BOLT W/ NUT & WASHER
USE12.50MM LENGTH FLAT HEAD SCREW (POWER LOAD AND DRIVE PIN)
PAINTINGS
DESCRIPTION
THIS ITEM SHALL CONSIST OF FURNISHING ALL PAINT MATERIALS, LABOR, AND
TOOLS. EQUIPMENT AND PLANT REQUIRED IN UNDERTAKING THE PROPER APPLICATION
USING PROPER PAINTING STANDARD PROCEDURE AND METHODS OF PAINTING AND
MUST BE EXECUTED BY A PROFESSIONAL BUILDING PAINTER INDICATED AS TO TYPE
SIZE AND SHAPE AS SHOWN ON PLANS AND SPECIFICATIONS.
MATERIAL REQUIREMENTS
USE ANY BRAND OF PAINT, BUT PREFERABLY DAVIES OR BOYSEN PAINTS.( VERIFY
ARCHITECT FOR DETAILS)
PLUMBING WORKS
GENERAL CONDITION
THE WORK , INDLUDED THIS PROJECT COMPRISED THE FURNISHING ALL MATERIALS
LABOR, TOOLS, EQUIPMENT AND OTHER FACILITIES AND THE SATISFACTORY
PERFORMANCE OF ALL WORK NECESSARY TO COMPLETE THIS PROJECT AS SHOWN
ON PLANS AND DETAIL DRAWINGS. ALL ITEMS OF WORK SPECIFIED HEREIN BUT NOT
INCLUDED IN BID SCHEDULE SHALL BE OMITTED AS IF NOT SHOWN IN THIS
SPECIFICATION.
DESCRIPTION
THIS ITEM SHALL CONSIST OF FURNISHING AND PLACING ALL PLUMBING MATERIALS
SUCH AS SANITARY & WATERLINE PIPES, TOILET & SHOWER FIXTURES, FITTINGS AND
OTHERS AS TO TYPE, SIZE AND SHAPE AS SHOWN IN PLANS..
MATERIAL REQUIREMENTE
USE 4" PVC PIPES FOR WATER CLOSETS, FLOOR DRAINS, CLEAN DUTS, SOIL STACKS
AND DOWNSPOUTS.
USE 6" PVC PIPES FOR MAIN SEWER LINE AND STORM DRAINS,
INSTALLATION
ELECTRICAL WORKS
GENERAL CONDITION
A. SERVICE ENTRANCE
DESCRIPTION
MATERIAL REQUIREMENT
ALL MATERIALS SHALL BE BRAND NEW AND OF APPROVED TYPE SUBJECT TO
INSPECTION OF PROFESSIONAL ELECTRICAL ENGINEER HARDWARE OF RACEWAYS
SHALL BE SO FITTED THAT WATERS NEVER ENTER INTO THE PIPE AND CONDUITS.
INSTALLATION
B. PANEL BOARD
DESCRIPTION
INSTALLATION
DIMENSIONING
PANEL LOCATED AT THE AVERAGE EYE LEVEL CENTER. MOLDED CIRCUIT BREAKERS
WHEN MOUNTED IS ON HIGHER RATING FROM THE LEFT AND LOWER RATING RUNNING
TO THE RIGHT IF IN HORIZONTAL ARRANGEMENT FOR VERTICAL HIERARCHY, HIGHER
RATING IS ON TOP OF THE LOWER RATING.
INSTALLATION
THE TAPPED/SPLICED WIRES SHALL BE INSULATED WITH RUBBER TAPE FIRST AND
FINISHED WITH ELECTRICAL TAPE.
APPROVED BY
PREPARED BY:
PRC NO.