Download as pdf or txt
Download as pdf or txt
You are on page 1of 14

400KV TRANSMISSION DEVLOPMENT- 400KV LOOP CIRCUIT

CONTRACT: 4664/2014/3100
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL


SURVEY & PHOTOGRAPHICAL SURVEY
(DOC NO: 4664B2-CG-5500-M-601)

CONTRACTORS

MAIN CONTRACTOR : PRSYMIAN GROUP

SUB CONTRACTOR: : AL KOOHEJI ELECTRICAL


CIVIL WORKS & CONTRACTORS &
INSTALLATION CONSTRUCTION W.L.L.

______________________________________________________________________________

Page |1
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

METHOD STATEMENT
FOR TOpOgRApHicAl SuRvEy AND
pHOTOgRApHicAl SuRvEy

______________________________________________________________________________

Page |2
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

REVISION PAGE

REVISION DATE DESCRIPTION

0 07-01-2018 ISSUED FOR APPROVAL

______________________________________________________________________________

Page |3
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

CONTENTS

1.0 --- INTRODUCTION

2.0 --- SCOPE

3.0 --- TERMINOLOGY/ DEFINITIONS AND ABBREVIATIONS

4.0 --- REFERENCES

5.0 --- RESPONSIBILITIES AND RESOURCES

6.0 --- METHODOLOGY

7.0 --- QA/QC MANAGEMENT

8.0 --- HEALTH, SAFETY & ENVIRONMENTAL MANAGEMENT

9.0 --- APPENDICES

______________________________________________________________________________

Page |4
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

SECTION 1.0: INTRODUCTION

This General method statement provides the contractors with safe working procedure
for Topographical & Photographical survey. It outlines the activities to be performed, and
controls required for the completion of works.

SECTION 2.0: SCOPE

The purpose of Topographic survey to this Project is to gather survey data about the
natural and man-made features along the cable route and its surroundings of the land,
as well as its elevations. From this information a shop drawing will be prepared
incorporating all the field data. The work usually consists of the following;

1. Establishing horizontal and vertical control that will serve as the framework of the
survey by the GPS.
2. Determining enough horizontal location and elevation of ground points to provide
enough data for plotting when the drawings are prepared
3. Locating natural and man-made features that may be required by the purpose of
the survey
4. Computing distances, angles, and elevations
5. Photographing by shooting digital camera

SECTION 3.0: TERMINOLOGY / DEFINTIONS

ABBREVIATIONS

3.1 : ABBREVIATIONS:

IR Form: Inspection Request Form

______________________________________________________________________________

Page |5
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

ITP: Inspection and Test Plan

ER: Engineer’s Representative

EWA: Electricity and Water Authority

O/E: Owner/ Engineer

KECC: Al kooheji Electrical Contractors &


Constructions

S/C: Subcontractor

SECTION 4.0: REFERENCES

4.1 SPECIFICATIONS:

Contract Specifications Section 2.8-

4.2 DRAWINGS:

Contract Drawings and working / shop drawings issued for construction, as applicable.

4.3 QA/QC DOCUMENTATION:

Site Inspection and Test Plans, Inspection Requests and Survey Records as
applicable

Topographical survey

4.4 SHE DOCUMENTATION:

a) Health, Safety & Environmental Plan:

b) Risk Assessments

 Manual Handling
 Topographical Survey & Photographical Survey

______________________________________________________________________________

Page |6
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

SECTION 5.0: RESPONSIBILTIES & RESOURCES

5.1 RESPONSIBILITIES:

5.1.1 The various elements of the project will be supervised by experienced


personnel who reports to the Project Manager (Main Contractor-
Prysmian).

5.1.2 The Project Manager (KECC) reporting to the Project Manager of Main
Contractor(Prysmian), has overall responsibility for the co-ordination and
implementation of the construction activity, including manpower and plant
utilisation, engineering support, material scheduling and cost control.

5.1.3 Engineers reporting to the Project Manager (KECC), are responsible for
managing the activities on the site, in accordance with the specification
and requirements, and ensuring that the inspections and tests detailed in
the Site Inspection Test plan and checklists are maintained and recorded.

5.1.4 Approved Survey company shall be involved to provide necessary control


points and cross verify few centre line points of the cable route.

5.2 RESOURCES:

5.2.1 Plant and Equipment

The following plant and equipment will be employed under this Method statement.

 All personnel – PPE’s


______________________________________________________________________________

Page |7
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

 Survey instruments, small tools and equipment for setting out and fixing purposes
with valid calibration certificates.
 GPD Leica CS-10
 Hand tools (Pick axe, Hand shovels etc)
 Warning Tape & Polyethene sheets
 Safety barriers
 Digital Camera
 All plant will have the appropriate certificates and the operators will have the
appropriate qualifications.

SECTION 6.0: METHODOLOGY

SECTION 6.1 :

This General method statement covers the general procedure for Topographical survey,
covers the following works:

1. Installation of Permanent and Temporary Benchmarks


2. Existing route for power and fiber optic cables.
3. Exact location of existing Electricity cable in relation to the route.
4. Existing location of above ground services markers, manholes etc. 5 meters on
both sides of the cable route.
All approved way leaves/planning permissions, permits shall be obtained and a hard
copy of all such shall be at the work sites.

6.2. GENERAL:

6.2.1 Permanent Benchmarks:

Existing permanent bench marks coordinates shall be taken from Survey Directorate and
submitted for approval. Protection of the approved Survey Directorate benchmarks on or
adjacent to the site prior to commence of the works, shall be with three no. 75mm diameter

______________________________________________________________________________

Page |8
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

steel hollow section pipe 1200mm long, driven 600mm deep into the ground. Pipe shall be
equidistant from each other and 600mm radius from the marker. Based on the approval the
survey shall commence.

6.2.2 Installation of Temporary Benchmarks (if required):

Temporary Bench Marks (TBM) will be installed and verified with Engineers representative
for accuracy before preceding the Topographic survey. The TBM’s will be installed on the
stable area, easily identified and reachable. All necessary precautions will be taken to
avoid damage to any of these PBM’s, TBM’s adjacent to the site. Shape and size of
TBM’s are planned to have dimensions of 30 cm x 30 cm x 45 cm for Temporary Bench
Mark. The stations and benchmarks will be clearly marked with item number, elevation and
/ or coordinate in shop drawing.

GPS

GPS surveying instruments offer measurements in 3D (X, Y, and Z planes) that make it easy
for the surveyor to take precise measurements for any point of the area. The GPS surveying
instruments receive signals from GPS satellites in terms of longitude, latitude, and elevation
(from sea level) along with some other information that helps the GPS surveying instrument
display exact measurements. With the GPS surveying instrument in hand, the surveyor will
take precise measurements without the requirement of line of sight. These devices will work
under any weather conditions. Thus, the process of surveying became fast, more precise.

Accuracy is dependent upon various factors including the number of satellites tracked,
constellation geometry, observation time, ephemeris accuracy, ionospheric disturbance,
multipath and resolved ambiguities.
______________________________________________________________________________

Page |9
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

The following accuracies, given as root mean square, are based on measurements
processed using LGO and on real-time measurements. The use of multiple GNSS systems
can increase accuracy by up to 30% relative to GPS only.

Differential code:

The baseline precision of a differential code solution for static and kinematic surveys
is 25 cm. The measurement of accuracy is complaint with ISO 17123-8.

Differential phase in post-processing:

Type Horizontal Vertical


Static and rapid static 5 mm + 0.5 ppm 10 mm + 0.5 ppm

Kinematic 10 mm + 1 ppm 20 mm + 1 ppm

Static with long 3 mm + 0.1 ppm 3.5 mm + 0.4 ppm


observations

Kinematic 10 mm + 1 ppm 20 mm + 1 ppm

Differential phase in real-time:

Type Horizontal Vertical

Static 5 mm +0.5 ppm 10mm+0.5 ppm

Kinematic 10 mm +1 ppm 20mm + 1ppm

______________________________________________________________________________

P a g e | 10
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

Survey Report

The following items will be included in the topographic survey report and in the shop drawing

 Location and elevation of bench mark within the limits of the survey.
 Spot elevations at any abrupt changes.
 Location, width and elevation at both ends of all existing sidewalks. Include a
description of the kind and general condition of the sidewalk.
 Location of trees with in the cable route and
 Electric utilities – the location of power poles, route markers, etc.,
 Storm, and sewer lines – the location of all observable manholes and other structures
such as outfalls, headwalls. Include elevations of the top of manholes and head
walls.
 Existing location of manholes, route markers, etc.; that are visible on the section.
 Gas – the existing location of all manholes and gas line markers that are visible on
the parcel. Show elevation on top of any manholes.
 Telephone – the existing location of cables, manholes, boxes, etc. that are visible on
the parcel.
 Street lighting – the location of all lamp poles, boxes etc.
 Location and dimensions of any existing buildings, tanks, fences, miscellaneous
structures, driveways, or other obstructions on the parcel.
 Cross sections will be provided those locations where trail holes are taken.
 Over all route map draft drawing of scale 1:10000 on A3 by A1 sheet and individual
route maps to scale of 1:1000 on A3 by A1 sheets shall be submitted.
 All survey coordinates shall be referenced to WGS84 UTM Zone 39 and levels to
Bahrain National Level Datum 1976.

After collecting the above applicable information a Topographical survey report in the
form of drawings will be submitted to the Engineer for review. Based on these information
exact route of the proposed cable line, joint bay, draw pits will be finalised.

______________________________________________________________________________

P a g e | 11
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

Photographical & Video graphical Survey:

 Videos & Photos will be taken starting from HIDD 400KV Grid station along Drydock
highway to Submarine crossing location and from Sitra Power station going towards
Riffa 400KV Grid station. Photo and Videos will be taken from chainage CHN-0 every
20 meters or where there is a change in direction.
 A white board shall state the following information and shall be held at the place of
the photo:
Board content:

 Project Name:
 Date:
 Chainage:
 All HDD, NDRC Open cut sections will be identified and a separate photo with the
related shall be submitted.
 All trees, manholes, buildings in an area of 5 m on each side of the cable route will
be recorded.
 Photos of in build-up overview looking at the cable route will be presented along
with the Topographical survey report.
Special permission shall be obtained for videography and photography in areas where
private properties are identified.

SECTION 7.0: QA/QC DOCUMENTATION

7.1 All work activities and processes shall be inspected and tested by
Prysmian (Main contractor) as appropriate, responsible for supervising
the works of their sub-contractors to ensure that the standards required
are achieved.

______________________________________________________________________________

P a g e | 12
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

7.2 Prysmian (Main contractor) shall verify all necessary checks as required
by Project Quality Plan. These inspection checks carried out shall be
attached along with the inspection request to O/E.

7.3 KECC shall carry out their internal checks on the works and inspection
request shall be forwarded to Prysmian (Main contractor).

7.4 KECC has an integrated management system which is in accordance


with ISO 9001:2008. A HSE Plan has been drawn up for this project

7.5 This method statement and associative documents shall be distributed


or made available as applicable to all personnel and subcontractors (if
any) involved in this activity. Issuing, change and document control
requirements shall be in accordance with the Project quality
management system.

SECTION 8.0: SAFETY HEALTH & MANAGEMENT

8.1 All work shall be carried out in a safe manner as described in the HSE
Plan, prepared by KECC/ Prysmian and approved by O/E.
8.2 Activity pre-start and tool box / safety meetings, inspections and
monitoring will be carried out by KECC as described in HSE Plan.
8.3 Activity specific risk assessments shall be carried out by KECC (internal)
and shall include control measures required to eliminate or minimise the
risk of injury or accident.
8.4 Minimum Personal Protective Equipment (PPE) for KECC site workers
shall consist of safety helmet/ hardhat, safety boots or shoes with steel
toecap, safety glasses and high visibility reflective vests.
8.5 Special access or egress arrangements will be determined for the
specific item or area wherever required.
8.6 The Safety officer or his designee will carry out inspections and reports
to the Project Manager.

______________________________________________________________________________

P a g e | 13
PROJECT TITLE: 400KV TRANSMISSION DEVLOPMENT- 400KV LOOP DOC REF 4664B2-CG-5500-M-601
CIRCUIT NO:
DATE: 07/01/2017
CLIENT: ELECTRICITY & WATER AUTHORITY (EWA)

METHOD STATEMENT FOR TOPOGRAPHICAL & PHOTOGRAPHICAL REV 0


SURVEY

APPENDIX A

TOPOGRAPHICAL &PHOTOGRAPHIC SURVEY RISK ASSESSMENT

______________________________________________________________________________

P a g e | 14

You might also like