MA/PMC/HSE/SIC-17/Rev_01

MA CONSULTING SERVICES Pvt. Ltd.


CHECKLIST FOR CRADLE

Project:
Contractor: Date:
Location:

S.No Item Yes/No/NA Remarks


1 Are the operators authorised to use the Cradle?

2 Cradle Safe System of Work & Risk Assessment been carred out?
Are current test certificates acailable for winches, wire ropes, blocks
3
and so on?
4 Are ceadle installed and supervised by a competent person?

5 The roof deck can be accessed safely

6 Are ground floor barricaded with warning signboard (minimum 2 in no.)

7 Cradle can be accessed from roof deck surface (not edge)

8 All movements keys ate tested (from both packets & machine)

9 Limit switches are tested (ok)

10 Overload limit switch in the packet is tested manually


The Maximum Safe Working Load (MSWL) is clearly indicated on the
11
cradle
12 Sailing on tracks limit switch is tested manually (both directions)

13 Designated safety anchorage points are provided on the cradle

14 No physical signs of wear or damage

15 No exposed electrical wiring

16 All electrical connectors good and secure (not exposed to any damage)

17 No oil leak in all hydraulic connections & the oil level in the tank is OK

18 There are no dents or misalignment in any tracks or runways

19 The floor of the cradle isn’t damaged (view from up & down)

20 The ropes are not frayed, rusted, kinked or un-lubricated


Check that the ropes are rolled up and not caught or snagged on the
21
platform
There are no signs of extensive corrosion to the cradle, tracks or
22
runways
23 All guard-rails are in good condition

24 A tow full-body harness is available & in good condition

25 Means to secure tools inside the cradle are available


Check that any wires ropes do not have areas that are flattened, kinked
26
or have strands of wire protruding

Page 1 of 2
MA/PMC/HSE/SIC-17/Rev_01

S.No Item Yes/No/NA Remarks


27 Wind Speed is measured (less than 32 Km/h = 20 Mile/h)
Two mobile phones are available for communications between cradle
28
crew/roof deck operator

NOTE: If there is any NO, do not start the work & report the defect to Idama immediately

Operation Crew Names: (at least two phones are required one on cradle & one on roof deck)

1 Mobile # :

2 Mobile # :

Name Approval Signatures Date

Checked By: (Cont.)


Approver By:(Cont.
Safety):
Reviewed by (PMC):