032 FSA Report Gardenia
032 FSA Report Gardenia
GAREDENIA
Beyara Baghbari, Tegoria, South Keranigonj, Dhaka.
Executive Summary
A survey of the existing fire safety condition was undertaken at Gardenia on January 31, 2021
by ICEL-GREEN JV. The survey was conducted as per Bangladesh National Building Code
(BNBC) and other relevant Guidelines for Fire Safety of Existing Plastic Factory Buildings in
Bangladesh. The purpose of this assessment was to identify significant fire safety concerns and
provide recommendation as per standards.
In the premises, there were two nos. single story production shed, four nos. single story godown
shed and one nos. single story utility RCC building, one nos. single story generator shed, one
nos. two story RCC office building. The full factory premises was used as factory purpose. The
shed building was constructed in 2017. The building was owned by Gardenia. Land of the
factory building was owned. The fire safety assessment was carried out for all buildings.
During the inspection, the fire safety system of the building was assessed for 67 checkpoints to
form an opinion regarding the level of compliance with respect to Guidelines for Fire Safety of
Existing Plastic Factory Buildings in Bangladesh.
Automatic fire detection & alarm system was not covered the full factory premises
Standard standpipe & hose system was not found in the factory.
Final evacuation route was not fire protected from adjacent transformer & sub-statin
room and generator room.
The factory has no building approval plan. Factory license were available at the factory. But the
trade license was expired. The as built architectural and structural drawings of the buildings
were not available.
Page 2 of 36
Fire Safety Assessment Report
Gardenia
Distribution of checkpoints
The checkpoints were categorized as below, based on the timeline of implementation and the
risk they possess. The following table and pie-chart show the distribution of checkpoints for the
factory.
5%
15%
36%
22%
7%
15%
The non-compliances have been prioritized based on the timeline in which the corrective action
can be implemented. As seen above, there are 5% non-compliances which need immediate
action. Corrective actions for 15% of non-compliances need to be implemented in Short term (1-
2 Week), whereas 22% of non- compliances need Mid-term (6 Weeks) for corrective action.
15% of checkpoints fall under Long term (6 months) category for corrective action. There are
7% of checkpoints which show general compliance with Guidelines for Fire Safety of Existing
Plastic Factory Buildings in Bangladesh.
Page 3 of 36
Fire Safety Assessment Report
Gardenia
Table of Contents
Page 4 of 36
Fire Safety Assessment Report
Gardenia
General Information
Gardenia
Factory Name & Address Beyara Baghbari, Tegoria, South Keranigonj,
Dhaka.
Date of Inspection January 31, 2021.
Name of the Factory Managing Director of
Md. Moniruzzaman
the Factory
Anik Mazumder
Name of Contact Person of The Factory
Sr. Officer (Comercial)
Phone No. of Contact Person 01716260624
Email Address of Contact Person anik.gardeniapet@gmail.com
Page 5 of 36
Fire Safety Assessment Report
Gardenia
Page 6 of 36
Fire Safety Assessment Report
Gardenia
Factory Information
2 No’s Single Story Shed Building (Production Shed)
1 No’s Single Story RCC Building (Utility Building)
Number of Building 4 No’s Single Story Shed Building (Godown)
1 No’s Single Story shed Building (Generator Building)
1 No’s two Story RCC Building (Office Building)
Which part of the building is Ground floor
occupied by the factory?
Name of other factories in the
None
building (if available)
Page 7 of 36
GF
Level
GF
Level
Gardenia
23
(Approximate)
Production
No. of Discharge Floor
1
Exit
N/A
Staircase
Gardenia
Work Activities on all floors
Fire Safety Assessment Report
1200
Approx. Floor Area (Sqm)
Total width of Discharge
1.03
Floor exit (m)
Required width of
5.9
1.0
Discharge Floor exit as per
minimum width 1.03 m
Page 8 of 36
No. of Occupants
23
(Approximate)
*Number of occupants confirmed by factory management.
0.092
formula (m)
1
Compliant
No. of Stair serving Floor
N/A
ICEL-GREEN JV
(m)
Fire Safety Assessment Report
Gardenia
Floor Layouts
The non-conformities have been categorized into following sections. Detailed observations of
non-conformities are listed in the relevant sections. Against each non-compliance, the timeline
for implementing corrective actions is mentioned on the top-right corner of every point. The
summary of the no. of checkpoints in every section against the non-compliances is given in the
table below.
No. of non-
Section No. of checkpoints
compliances
Evacuation Pathway 9 7
Stairways 11 0
Discharge Level 3 2
Fire Separation 9 4
Safety Systems 28 22
Management 7 3
Total 67 40
Page 9 of 36
Fire Safety Assessment Report
Gardenia
Evacuation Pathway
Have all evacuation pathways the minimum required width in
1 1-2 Weeks
accordance with the Guideline?
Section Evacuation Pathway
Location Factory premises
Aisles marking was not found. However the minimum aisle width was found 0.6
Description
meter.
The minimum clear width of the aisle shall be 0.9 meter. The required width shall
be obtained at the rate of 5 mm per person or 0.9 meter whichever is maximum.
Corrective
The minimum required clear width of corridor/passageway shall be 0.9 meter
Action
where serving an occupant load of 50 or less. If more than 50 occupants the
required minimum width shall be 1.1 meter.
References BNBC- 1.12.5, 3.7, 3.9
2 Are all evacuation pathways free of any permanent obstacles? 1-2 Weeks
Section Evacuation Pathway
Location Washing section
Description Evacuation pathways were obstructed by machines & workers.
Corrective
Rearrange the evacuation pathway to ensure the minimum width.
Action
References BNBC- 3.7, 3.4
Page 10 of 36
Fire Safety Assessment Report
Gardenia
3 Are all evacuation pathways free of any temporary stored items? 1-2 Weeks
Section Evacuation Pathway
Location Factory premises
Description All evacuation pathways were not free from any temporary stored items.
Corrective
Remove all temporary items from all escape routes, aisles and passageway.
Action
References BNBC- 3.7, 3.4
4 Do all evacuation ramps comply with the maximum allowable slope? N/A
Section Evacuation Pathway
Location Factory premises
Description No evacuation ramp was found.
Corrective
Action
References BNBC-3.11
Does the maximum travel distance from any location of the floor to
5 Compliant
nearest emergency exit meet the requirement of code?
Section Evacuation Pathway
Location Pet & washing section
Description The maximum travel distance was found 27m, which is as per the code.
Maximum travel distance 25 meter in case of 1 no. of exit,
2 or more than 2 exit - the travel distance shall not be exceed 45 meter.
Corrective
The factory equipped with an automated fire alarm, portable fire-fighting system
Action
and appropriate standpipe and hose system through the entire building the length
of travel shall not be exceeded 60 meter.
References BNBC-3.15.1, 4.3.5
Page 11 of 36
Fire Safety Assessment Report
Gardenia
Do all floor exit doors and final exit doors swing in the direction of
6 6 Weeks
travel?
Section Evacuation Pathway
Location Production and godown area
Steel sliding type doors were found at production, storage area and final
Description
evacuation pathway, which was not swing in the direction of travel.
Replace all existing doors on evacuation routes, exit doors, which are collapsible /
sliding / roll down gates and end shutters in egress route with side hinged type 1.5
Corrective
hr fire rated door, which swing outward of the room or in the direction of travel.
Action
Swinging of the door shall not be constrict the width of the corridor / passage
below 0.9 meter.
References BNBC-3.1.9.4
Page 12 of 36
Fire Safety Assessment Report
Gardenia
Does the sum of the width of all emergency exits meet the
9 6 Weeks
requirement in accordance with the number of occupants?
Section Evacuation Pathway
Location Production and godown area
Two nos. exits were found at pet section, washing section and godown-04, but
Description one of them was locked during the visit. However, one nos. exit was found at
godown-01 godown-2 and godown-03.
The minimum clear width of the exit door shall not be less than 0.9 meter. The
Corrective
required width of exit door shall be obtained at the rate of 4 mm per person or 0.9
Action
meter, whichever is maximum.
References BNBC-3.9
Page 13 of 36
Fire Safety Assessment Report
Gardenia
Stairways
Does the number of stairs is adequate based on No of occupants
10 N/A
per floor?
Section Stairways
Location Factory premises
Description The factory was a multiple single story shed.
Corrective
Action
References BNBC-3.14
11 Does the minimum width of stairs meet the requirement of code? N/A
Section Stairways
Location Factory premises
Description The factory was a multiple single story shed.
Corrective
Action
References BNBC-3.10.1, Table-4.3.4
Does the sum of the width of all staircases meet the requirement in
12 N/A
accordance with BNBC?
Section Stairways
Location Factory premises
Description The factory was a multiple single story shed.
Corrective
Action
References BNBC-3.5
Page 14 of 36
Fire Safety Assessment Report
Gardenia
Are internal stairways linking more than two floors fire separated with
15 N/A
fire rated walls?
Section Stairways
Location Factory premises
Description The factory was a multiple single story shed.
Corrective
Action
References BNBC-3.13
For stairs that require fire separation, are they provided with fire
16 N/A
rated self-closing doors?
Section Stairways
Location Factory premises
Description The factory was a multiple single story shed.
Corrective
Action
References BNBC-3.1.9.4, 3.13
For stairs that require fire separation (such as high rise buildings,
17 >20m height or >6 floors), are they provided with fire rated entry N/A
lobby?
Section Stairways
Location Factory premises
Description The factory was a multiple single story shed.
Corrective
Action
References BNBC-3.13
Page 15 of 36
Fire Safety Assessment Report
Gardenia
Discharge Level
Is discharge floor exit/Premises exit widths based on the number of
21 6 Weeks
occupants and minimum allowable width?
Section Discharge Level
Location Ground Floor
The final exit width was 2.6m for 23 occupant. But the pocket door dimension was
Description
found below the standard.
Corrective Discharge floor exit/ Premises exits widths shall be based on occupants and
Action minimum allowable width.
References BNBC-Table 4.3.2
Page 16 of 36
Fire Safety Assessment Report
Gardenia
Are evacuation routes protected from production areas and high risk
23 6 Months
uses all the way to outside?
Section Discharge Level
Location Exit pathways
Final evacuation route was found besides transformer & sub-statin room and
Description
generator room which was not protected.
Corrective Evacuation routes shall be protected from production areas and high risk uses all
Action the way to outside.
References BNBC- 3.4 Page 10422
Page 17 of 36
Fire Safety Assessment Report
Gardenia
Fire Separation
Are any atria present linking more than two floors? If YES, are the
24 N/A
upper floors fire separated from the atria?
Section Fire Separation
Location Factory premises
Description Atria was not present in the factory.
Corrective
Upper floors shall be fire separated from atria.
Action
References BNBC- 3.1.17 Page 10390
Are any vertical service shafts passing through more than two
25 floors? If YES, are they provided with required fire resistance rating N/A
of walls/doors?
Section Fire Separation
Location Factory premises
Description The electrical cable entry point at the shed was not sealed.
Corrective
Action
References BNBC 2.5.5 Page 10411, D 9 Page 10484, D 13 Page 10486
Page 18 of 36
Fire Safety Assessment Report
Gardenia
Are all high risk rooms fire separated from the rest of the operational
30 6 Months
areas? Boiler Rm, Generator, Substation, ChemicalRm
Section Fire Separation
Location Transformer & sub-statin room and generator room
Final evacuation route was found besides Transformer & sub-statin room and
Description
generator room was found beside final evacuation, which was not protected.
All high risk room like generator, boiler & CNG meter room is required to enclose
Corrective
by 2 hr fire rated construction/barrier with 2 hr fire rated self-closing door for fire
Action
separated from the rest of the operational area.
References BNBC-3.13
Page 19 of 36
Fire Safety Assessment Report
Gardenia
31 Are any smoke & heat vents required at any atria or storage area? 6 Weeks
Section Fire Separation
Location Factory premises
DescriptionSmoke & heat vents was not found.
Provide smoke and heat vents on the roof / ceiling / wall at godown section,
Corrective
closure of natural draft, smoke & heat vent should be installed in such a way that
Action
fire service personnel can open it during a fire.
References BNBC- 2.6 Page 10411
Safety Systems
33 Are all evacuation pathways appropriately signed? 1-2 Weeks
Section Safety Systems
Location All exit
DescriptionNo exit sign was found during the visit.
Evacuation pathway shall be provided aisle marking with arrow guiding and exit
signage.
Corrective
Exit sign shall be posted above the exit door, it shall be clearly visible at all time,
Action
where necessary supplemented by directional signs. All exit doors shall be clearly
marked for easy identification.
References BNBC- 3.3 Page 10421, 3.6 Page 10423
Page 20 of 36
Fire Safety Assessment Report
Gardenia
Page 21 of 36
Fire Safety Assessment Report
Gardenia
Page 22 of 36
Fire Safety Assessment Report
Gardenia
Page 23 of 36
Fire Safety Assessment Report
Gardenia
Page 24 of 36
Fire Safety Assessment Report
Gardenia
Are the right number of portable fire extinguishers present & properly
43 Compliant
tagged?
Section Safety Systems
Location Factory premises
Description Sufficient number of portable extinguisher was found.
Corrective Approved type and adequate fire extinguisher shall be provided and tagged
Action properly.
References BNBC § 4.10 Page 10451
45 Does the factory have dedicated fire pump or hydrant system? 6 Months
Report No: ICEL-GREEN/FSA-032 ICEL-GREEN JV
Page 25 of 36
Fire Safety Assessment Report
Gardenia
48 Does the number of hose meet the requirement of code in all floors? 6 Months
Section Safety Systems
Location Factory premises
Description No standard standpipe & hose system was found.
Corrective The factory need to provide sufficient number of hose pipe with respect to area
Action and travel distance as per BNBC guideline.
References BNBC - 4.2.3 Page 10437 to 10344
49 Does the diameter of first aid hose and standpipe meet the 6 Weeks
Page 26 of 36
Fire Safety Assessment Report
Gardenia
requirement of code?
Section Safety Systems
Location Factory premises
Description No standard standpipe & hose system was found.
Corrective
The diameter of first aid hose and standpipe shall be as per requirement.
Action
References BNBC - 4.2.3 Page 10437 to 10344
Page 27 of 36
Fire Safety Assessment Report
Gardenia
Page 28 of 36
Fire Safety Assessment Report
Gardenia
Page 29 of 36
Fire Safety Assessment Report
Gardenia
60 Is the visual alarm placed and in working condition where required? 6 Weeks
Section Safety Systems
Location Generator room
Description No visual alarm was found during the visit.
Corrective
Visual alarm should be placed at the generator room.
Action
References BNBC- C 4 Page 10477
Management
61 Does the factory have the valid Fire License/ permit? Compliant
Section Management
Location Factory premises
Description Fire license was up-to-date during the visit.
Corrective The factory shall have valid fire license from Bangladesh fire service and civil
Action defense.
References Best Practices
Page 30 of 36
Fire Safety Assessment Report
Gardenia
Does the factory have single fire safety management system in case
64 N/A
of multi tenancy?
Section Management
Location Factory premises
Description A single tenancy was found.
Corrective In case of multi tenancy the factories shall have single fire safety management
Action system.
References Best Practices
Page 31 of 36
Fire Safety Assessment Report
Gardenia
Does the factory conduct fire drill regularly covering all shifts
67 Immediate
maintaining record properly?
Section Management
Location Factory premises
Description No fire drill record was found.
Corrective Fire drill shall be conducted quarterly (4 times a year) in existing buildings as
Action detailed under the Fire Safety Plan and record shall be kept properly.
References BNBC- A3 Page 10457
Page 32 of 36
Fire Safety Assessment Report
Gardenia
DIFE Summary
The minimum required clear width of corridor/passageway shall be 0.9 meter where
serving an occupant load of 50 or less. If more than 50 occupants the required minimum
width shall be 1.1 meter.
Rearrange the evacuation pathway to ensure the minimum width.
Remove all temporary items from all escape routes, aisles and passageway.
Evacuation pathway shall be provided aisle marking with arrow guiding and exit signage.
Exit sign shall be posted above the exit door, it shall be clearly visible at all time, where
necessary supplemented by directional signs. All exit doors shall be clearly marked for
easy identification.
Emergency lighting is needed to provide with back-up power supply with IPS or battery.
Fire alarm call point, alarm and detection system shall be checked periodically and
documented.
There shall be an arrangement of periodic checking of fire pump or hydrant system with
maintaining record properly.
The hose pipe performance shall be checked periodically and properly tagged.
The factory need to provide additional firefighting equipment like sand & water buckets
near to exit or easily accessible area for first phase firefighting.
Remove combustible/flammable material from near heat source/electrical source.
Page 33 of 36
Fire Safety Assessment Report
Gardenia
Replace all existing doors on evacuation routes, exit doors, which are collapsible /
sliding / roll down gates and end shutters in egress route with side hinged type 1.5 hr fire
rated door, which swing outward of the room or in the direction of travel.
Swinging of the door shall not be constrict the width of the corridor / passage below 0.9
meter.
Remove all locking device from all egress door. All exit doors shall be open-able from
the side they serve without the use of a key.
The minimum clear width of the exit door shall not be less than 0.9 meter. The required
width of exit door shall be obtained at the rate of 4 mm per person or 0.9 meter,
whichever is maximum.
Discharge floor exit/ Premises exits widths shall be based on occupants and minimum
allowable width.
Provide smoke and heat vents on the roof / ceiling / wall at godown section, closure of
natural draft, smoke & heat vent should be installed in such a way that fire service
personnel can open it during a fire.
Seal all openings with fire separating slab and floors should not exceed the approved
limit to maintain fire separation.
The egress paths shall be illuminated with emergency lighting with power back-up
supply & illumination should be a minimum of 10 lux for all corridors & exit doors. Aisles
shall be provided with a minimum 2 lux.
Install additional nos. of manual activation call point at all exit route of the building.
An automatic alarm systems must be provided throughout the factory; the alarm must be
automatically triggered on detection of a fire.
Provide adequate nos. of smoke detectors to cover the whole factory building.
Dedicated fire pump shall have alternative power backup.
The diameter of first aid hose and standpipe shall be as per requirement.
A suitable public address system shall be provided for communicating to all floors as
well as facilities to receive messages from all floors.
Power backup supply shall be provided for fire alarm system.
Visual alarm should be placed at the generator room.
The minimum clear width of the exit door shall not be less than 0.9 meter. The required
width of exit door shall be obtained at the rate of 4 mm per person or 0.9 meter,
whichever is maximum.
Evacuation routes shall be protected from production areas and high risk uses all the
way to outside.
Storage area shall be fire separated from other occupancy.
All high risk room like generator, boiler & CNG meter room is required to enclose by 2 hr
fire rated construction/barrier with 2 hr fire rated self-closing door for fire separated from
the rest of the operational area.
Provide automatic detection system with addressable fire alarm.
Provide automatic detection and alarm system as per guidelines.
The fire pump shall be so designed that it shall satisfy the required pressures and flow
for firefighting equipment’s at the highest and most remote part of the protected
premises during their peak demand hour or for roof storage tank. The pump shall be
housed in a readily accessible position in a building of non-combustible construction.
The pump shall be adequately protected against mechanical damage. A manually
Page 34 of 36
Fire Safety Assessment Report
Gardenia
controlled pump may be used to feed water into gravity overhead tank with fire reserve.
There shall be provision for standby fire pump driven by a compression ignition (diesel)
engine or electric pump with own generator.
The factory need to provide sufficient number of hose pipe with respect to area and
travel distance as per BNBC guideline.
The minimum pressure for standpipes supplying a 50mm or larger hose shall be at least
300 kPa. For standpipe supplying first aid hose (38mm nominal) may have a minimum
pressure of 200 kPa.
Provide dedicated water stored in storage tank for firefighting operation comply with the
requirement of BNBC table 4.4.1 and not to be used for other purposes.
Page 35 of 36
Fire Safety Assessment Report
Gardenia
Disclaimer
This report is intended to serve the Company in helping to understand the current safety
conditions under the prevailing system and proposed changes that will help improve the safety
and reliability of the systems installed at the Company’s facility. At the time of the audit/ survey,
all the systems were working as intended, as produced by the Company to the auditors. The
above result reflects ICEL-GREEN’s findings at the time and place of inspection.
This report does not release the Company or any other entity dealing with it from their
contractual responsibilities nor does it prejudice any one’s right of claim for compensation for
any apparent and/ or hidden defects not detected during inspection or occurring anytime
thereafter. This report indicates the measures advised to be installed at the facility to improve
safety performance, provided that the compliance to the national standards and all legal and
statutory requirements are adhered to by the Company. ICEL-GREEN doesn’t hold the
accountability or responsibility, directly or indirectly of any mishap/disaster happening in the
facility audited as it doesn’t have any control over the Company’s process and practices. This
report is made solely to the management of the Company for which this report is produced, as a
body, in accordance with agreed scope of work and for no other purpose. ICEL-GREEN does
not assume any responsibility to any other person or body for the content of this report.
In so far as audit reports are prepared in the course of processing the order and which are
subject to the protection of copyright, ICEL-GREEN shall grant the Company a simple, non-
transferable right to use the audit report, insofar as this is necessary and in accordance with the
contractually presupposed purpose. Other rights shall not be transferred; in particular, the
Company shall not be entitled to modify (edit) audit/ survey reports or to make use of such
reports outside of its business premises.
ICEL-GREEN, its staff and any experts that may be called in shall not disclose and use trade
and business matters of the Company about which they have gained knowledge of during the
performance of their work, without proper authorization.
Page 36 of 36