STEEL CONSUMPTION REPORT (JB)

Sr. # Detail 10mm 12mm 16mm 20mm 25mm Total

1 OHT 2.5 0.2 1.5


2 Masjid 7 3
3 Sr. Staff Hostle stair, shelves etc. 2 4.5 2.5 2
4 Jr. #1 & 2 stair, shleves, etc 4 9 3.5 3
5 Septic Tank 2.5 0.5
6 Weigh Bridge 5.25 0.75 0.5

Total Steel 23.25 17.95 6.5 6.5 0 54.2

Sr. No Description 10mm 12mm 16mm 20mm 25mm Total Remarks

Required Steel For JB 23.25 17.95 6.5 6.5 54.2


1 54.2
Available at Site 7.5 0.271 30.196 15 7.5 60.467
2a
Scrape 1 1
2b 61.467
Reuired Steel 15.75 17.679 (61.467-54.2) 7.267

Access Steel 23.7 8.5 7.5 39.7


STEEL CONSUMPTION REPORT (ICC)
a&a
Sr. # Detail 10mm 12mm 16mm 20mm 25mm Total

1 EB-4 55
2 AC # 7,6 40
3 AC # 5,4 10.5
4 AC # 3 7.5
5 AC # 2,1 18.5
10.5
Bale Press 3.5
Blow Room 47
OHT at Mill 35

Total Steel 227.5


STEEL REPORT (ICC)

Demand Available Required Steel


Sr. # Detail
ICC JB Site ICC Demand
1 10 mm 25 25
2 12 mm 3 3
3 16 mm 2 23.7 0
4 20 mm 5 8.5 0
5 25 mm 25 7.5 17.5

Total Steel 60 39.7 45.5