Professional Documents
Culture Documents
Georesistivity Validation Report
Georesistivity Validation Report
A. BACKGROUND
1 Requesting Recipent/Party
2 Contact Details of the Requesting Party
2.1 Name of Contact Person
2.2 Contact No./Email Address
4 Purpose of the Request
B. DATE OF THE ACTIVITY
C. SITE PROFILE
1 Location
2 Geo-coordinates
3 Crop Planted
4 Service Area
D. INITIAL HYDROLOGIC ASSESSMENT
Outcrop Location (e.g. River outcrop, road
1
outcrop, etc.)
General Geology (e.g. Sedimentary, Igneous,
2
etc.)
Geologic Structure (e.g. Bedded, Foliated,
3
Jointed, Faulted, etc.)
4 Topography (e.g. Flat, Rolling, Undulating, etc.)
5 Land Cover (e.g. Forests, Shrubs, Barren, etc.)
Static Water Level (meter below ground surface
6
[mbgs])
E. CONDITIONS FOR THE FEASIBILITY OF THE GEORESISTIVITY SURVEY
Is groundwater for irrigation purposes? Yes
b.
c.
G. RECOMMENDATION
Yes
Recommended for geo-resistivity survey?
No
H. PHOTO DOCUMENTATION
PLEASE SEE ATTACHED PHOTOS
NOTED BY:
RT
NT
SISTIVITY SURVEY
No
FALSE
FALSE
FALSE
NGS
FALSE
FALSE
EVIEWED BY:
Section Chief
Figure 3. Outcrop
Figure 4. Google Earth Image of Proposed Site
Y