Brose Lo Problem-Solving Scheme 100
Brose Lo Problem-Solving Scheme 100
Affected Brose Plant(s): (Brose Plant Name(s)) Failure Cause: (What was the root cause for the issue?)
Repeated Issue: Yes No
Team (int/ext):
(Supplier Lead Contact) (Job Function, Contact Information)
(Name) (Job Function, Contact Information)
(Name) (Job Function, Contact Information)
Problem description (Is/Target): (What is reported as NOK?) Corrective Actions: (Continuous prevention/detection actions)
Due Date
Task Responsible Status
mm/dd/yy
Completion:
Complaint
Yes No
accepted:
Initial Backlog
Notification #: (Notification #) Part #: 2000
Actual Shipped
Date (mm/dd/yy) ETA @ Brose Plan to Ship Status by plan Releases Brose Actual Backlog
17-Feb 2000 2000
18-Feb 2000 2000
19-Feb 2000 2000
20-Feb 2000 2000
21-Feb 2000 2000
22-Feb 2000 2000
23-Feb 2000 2000
24-Feb 2000 2000
25-Feb 2000 2000
26-Feb 2000 2000
27-Feb 2000 2000
28-Feb 2000 2000
29-Feb 2000 2000
1-Mar 2000 2000
2-Mar 2000 2000
3-Mar 2000 2000
4-Mar 2000 2000
5-Mar 2000 2000
6-Mar 2000 2000
7-Mar 2000 2000
8-Mar 2000 2000
9-Mar 2000 2000
10-Mar 2000 2000
11-Mar 2000 2000
12-Mar 2000 2000
13-Mar 2000 2000
14-Mar 2000 2000
15-Mar 2000 2000
16-Mar 2000 2000
17-Mar 2000 2000
18-Mar 2000 2000
19-Mar 2000 2000
20-Mar 2000 2000
21-Mar 2000 2000
22-Mar 2000 2000
23-Mar 2000 2000
24-Mar 2000 2000
25-Mar 2000 2000
26-Mar 2000 2000
27-Mar 2000 2000
28-Mar 2000 2000
29-Mar 2000 2000
30-Mar 2000 2000
31-Mar 2000 2000
1-Apr 2000 2000
2-Apr 2000 2000
3-Apr 2000 2000
4-Apr 2000 2000
5-Apr 2000 2000
6-Apr 2000 2000
7-Apr 2000 2000
8-Apr 2000 2000
9-Apr 2000 2000
10-Apr 2000 2000
Affected Brose Plant(s): (Brose Plant Name(s)) Failure Cause: (What was the root cause for the issue?)
Repeated Issue: Yes ✘ No Service center came and repaired the press. The sensor wire was replaced and rerouted at the same
time to prevent a re-occurrence (timing was delayed as the sensor wire needed to be specially made)
Team (int/ext):
James Hunt Material Planner (Intec Tools)
Mary Jones Logistics Supervisor (Intec Tools)
Steven Wilson Materal Planner (Brose)
Problem description (Is/Target): (What is reported as NOK?) Corrective Actions: (Continuous prevention/detection actions)
Part number 123456-100 is reported as being in Backlog by 40000 pieces. Due Date
Task Responsible Status
mm/dd/yy
Responsible: NA/EK-LE/Hall, Andrew; ZLO/Kuhn, Verena Page: 4/4 Status: 07. Feb. 2020
Source: 767857656.xlsx Index: 100
Copyright by Brose. Alle Rechte vorbehalten