Professional Documents
Culture Documents
List of Equipment & Instrument For Alhaj 30MMscfd EPF - Rev 2
List of Equipment & Instrument For Alhaj 30MMscfd EPF - Rev 2
Required / In-house
List of Equipment Not Required Avaialbility
Produced Water
Condensate
Condensate
Gas
PC 2103 Available
PI-2105 Available
PSV-2105 Available
PSV-2104 NA
Vessel
PI-2104 Available
PSH-2103 PAH-2103 Available
TI-2103 Available
Condensate Stripper
Not required
Metering station
PC 2205
Pressure control of SNGPL Line
PCV 2205
PC 2204 Pressure control of SNGPL Line to
PCV 2204 Flare Not available at NF
FR 2203
PI 2207
PI 2206
PI 2208
Kimray Pumps
PI 2212 avialable
PI 2213 avialable
PI 2214 avialable
Condensate StorageTank
LT
LI
PI
Not avaialble at NF
PI
PCV 10PSI
PCV 1" WC
TI
LSHH LAHH
LSH LAH
LSL LAL
VPSV 3"WC & 0.5 WC
PSV 4"WC
LG 2405
LG 2406
LG 2407
LG 2408
TI 2403
TI 2404
BR 2403
BR 2404
High Pressure Seperator
Required /
List of Equipment Not Required
LG 2106 Required
LC-2105 Required
Produced Water
LSH-2104 LAH-2104 Required
LG 2105
Condensate
LC 2104
Gas
PC 2103
Gas
PI-2105
PSV-2105
PSV-2104
Vessel
PI-2104
PSH-2103 PAH-2103
TI-2103
essure Seperator
In-house
Avaialbility Ordering Data
Inlet
TI 2206
PI 2211
Outlet
TI 2205
PI 2210
TI 2204 Vessel
PI 2209
LG 2204
Not required
LSH 2201 LAH 2201
Not required
LG 2203
LG 2204
PSV 2204
LG 2203
TI 2202
PI 2204
Pressure control of
Not required
Meyal Line
PC 2203
PCV 2203
Fuel Gas Scrubber V-2203
PCV 2206
PI 2215
TCV 2201
TC 2201
TI 2209
LG
PI 2216
PCV 2207
PI 2217
PCV 2208
Glycol Regenerator/Surge Tank E-2203
Other: 6" thick, 9# density, mist pad Inlet baffle, L.C. displacer box.
Ordering Data