20 KW ONGRID PROPOSAL

Date 22-May-24
Customer Mr. Farooq Ahmad (402-D3, Wapda Town)
Ref # TTQ-SLR-241-24

w w w . t e c h n o t r e n d s . c o m . p k
Date 22-May-24
Customer Mr. Farooq Ahmad (402-D3, Wapda Town) Ref # TTQ-SLR-241-24

Dear Respected Customer,

SUBJECT: TECHNICAL AND FINANCIAL PROPOSAL FOR 20KW(ONGRID) SOLAR-


PV GRID TIED POWER PLANT

Dear Respected Customer,

Thank you for showing interest in our products and services. We would like to share the technical
and financial feasibility based on your requirement and the subsequent design of the system.

All aspects including technical information, commercial value and financials have been covered in
this document. Ref. to subject, we TECHNO TRENDS will proceed with the Delivery, Installation and
commissioning and proceed for approval for Net-Metering from NEPRA or respective DISCO of Solar
PV Power Plant for your premises. We offer our best quality services with all standards to maintain
100% satisfaction of our valued clients, which makes us the preferred choice. We offer One year
free of cost after sales services as well as equipment warranty will be claimed as per manufacturer
warranty policy, and other components will be charged as per actual afterwards.

Director Message:

We, at TECHNO TRENDS take great pleasure in introducing ourselves as a rapidly growing solar
systems provider. Established in 2004 with a vision of offering technology-driven solutions to both
residential and commercial customers, our enterprise is steadily advancing towards its goals. This
progress is evident through continuous expansions in our product and service lines. Notably, we
have gained the trust of leading Technology brands and have been honored with the LETTER OF
DISTRIBUTORSHIP for their products in the Pakistan market.

Our commitment to competitive pricing and unparalleled after-sales support sets us apart. Allow us
to cater to your energy needs with state-of-the-art solar systems from globally renowned brands.
Join us in embracing sustainable energy solutions and bring enhanced comfort to your life!”

Muhammad Usman Younas


Director Operations
Techno Trends
DETAILED PRICE SCHEDULE
20 KW ONGRID Solar System with Net-Metering
Sr# Description Qty Unit Price Amount

Solar Panels: Jinko N-Type 580 - 585W Mono-Facial


1 34 0 0
Single Glass A-Grade Tier 1 Solar Panels.

Inverter: Solis 20 KW On-Grid Inverter With Wifi Data


2 Logger Max PV Capacity 20000+ Max Output Efficiency 1 0 0
80%.

3 Elevated Structure: H-Beam including Nut Bolt etc 1 0 0

4 Civil Work Included 1-1FT Concrete Blocks. 1 0 0

Cable, Wiring and Electrical’s:


Original Branded(ABB,Chint,Tomzn) AC/DC Breakers
and Surge Protection Devices(SPD’s),
5 1 0 0
Branded(GM/Popular Cables) 6mm Double PVC/PVC
600V/1000V & AC Branded Cable 6mm, MCCB 100A AC
Breaker.

Net Metering: Complete Net Metering Process Three


6 1 0 0
Phase Green Meter Wapda Fee Installation of Meter.

AC/DC Earthing & Protection:


DC Earthing upto 50 feet bores AC, DC & Lightening
7 2 0 0
Arrester with Bare Copper Wire 16mm Copper Rod,
Branded 4mm Earthing Wire(Popular) including Chemical

Other Accessories: Cable Tray, PVC Pipe and Duct


8 (Popular Pipes) , flexible Pipe and all Other accessories 1 0 0
including Rawal Bolts Thimbles, Ties, solution Tapes etc.

Installation & Transportation:


Loading – Unloading, Lifting of Panels upto Roof.
9 Installation, Testing & Commissioning & Configuration. 1 0 0
Cloud Monitoring, After Sales Services, 1 Time Panels
Washing.
TOTAL 2,050,000
DISCOUNT 0
GRAND TOTAL 2,050,000

Total with Elevated Structure = Rs. 2050000


Note: Incase of Multiple Meters DB inter connections should be on customer end.
ACKNOWLEDGEMENT LETTER

I / We, acknowledge and represent that I / we have read the terms and conditions

of this proposal and I / we fully understand what is stated herein. I / we expressly

agree to all the terms and conditions set out herein and shall abide by them and to

all payment obligations and other ancillary obligations in signing this proposal. I /

We are not relying on any other representation made by the company to me and

are willing to proceed with the execution of this project with TECHNO TRENDS.

Client Signature For & Behalf of Techno Trends

Name: Name:

Date: Date:

CNIC # : Designation:

Designation:

Mobile #:

Address
WARRANTIES AND PLANS

Product & Workmanship Warranty:

PRODUCT WARRANTY
5 Years material & workmanship and 12 Years 80% Efficiency Confirm with
PV Modules PV Standards: IEC 61215:2005, IEC 61730:2004, UL 1703 / ISO9001,
OHSAS18001, ISO14001
Intelligent Inverter 5 Years ( Solis )
Protection System 1 Year Warranty on Breakers and SPD’s. Brands (ABB , Chint , Tomzn)

Installation Plans:

Material Delivery Time: 10 Working Days Upon Advance Payment.


Installation and Load Testing 25 Working Days After Equipment Delivery.

Net Meter Installation As Per Respective DISCO’s Processing Time. (Around 60-65 Working Days)

Return on Investment (ROI):


Average daily units generated by 1 Panel 2.5-3 Units (In Summers)
Average daily units generated by 34 Panels (Daily Saving) 34 x 2.5 - 3 = 85 - 102 Units
Average Annual units generated by 20 KW (Yearly Saving) 102 x 300 = 30600 Units

Annual Saving of electricity bill @Unit= 45 RS 30600 x 45 = Rs. 1377000/-


Payback Period of Investment 1.5-2 Years

Payment Terms:

System Booking
Advance Payment
After Delivery
Final Payment After Net metering

Acceptable Payment Methods:

Cross-Cheque / Pay-Order In favor of:


COMMIX TRADING CONCERN
Title: Commix Trading Concern
Bank: MEEZAN BANK LIMITED
TERMS & CONDITIONS
The contract is being signed between TECHNO TRENDS and the consumer as per following terms and conditions.
The Term of this Agreement shall commence upon the execution of this Agreement and remain in force until the
Project is completed whereby the installation process comes to an end and the operational charge is handed over to
the customer for use of any applicable terms agreed.
1 Specifications and system terms are as follows:

a TECHNO TRENDS Tier 1(Grade A) Solar Panels will be installed.


b TECHNO TRENDS smart inverter of tier 1 brand will be used.
c DC/AC Cabling shall be used as per IEC and TECHNO TRENDS Standards.
d Protection and Grounding system will be installed as per NEPRA and TECHNO TRENDS
Standards.
e
Standard Structure used would be 14 Gauge with SS Nut Bolts. (Stability = 100km / hr wind speed)

f The customer shall permit TECHNO TREND Steam to work 24/7 (day and night working) in order
to meet the proposed Project completion / commissioning state.
g The designated technical staff of customer shall be trained for monitoring & operation of the
Project on site while 24/7 online monitoring shall be conducted by TECHNO TRENDS.
h Panels should be cleaned properly after regular intervals by consumer to maintain efficiency of the
system.
i Other Preventive maintenance that is required includes; Physical inspection and cleaning of
inverters for which training shall be provided by TECHNO TRENDS.
j Separate Agreement for regular inspection and cleaning of solar panels can be signed upon
customer request on a yearly basis.
k DC Earthing & AC Earthing bores would be separate and All Earthing SOPs will be followed,
providing the ohmic value < 05 Ohm (Earthing report shall be provided by TECHNO TRENDS).

TECHNO TRENDS reserves the right to remove all equipment installed at site in case if Payment is not
2
delivered by consumer as per agreed Payment terms.
3 This document is not valid for court.

The Agreement shall be kept confidential with no definitive period of time. The customer shall incur a
4 material breach that may give rise for a legal cause of action against it, should it disclose any technical
or commercial information to any third party without the prior written permit of TECHNO TRENDS.

Net Metering Time would be as per respective DISCO’s and customer shall cooperate in case of any
5
delay from respective DISCO.
Bill Adjustment time will be as per respective DISCO and not under TECHNO TRENDS Scope of
6
Work.
7 Meter Type (1 phase to 3-phase) is at client end.
8 Electrician must be provided from the client at the time of Inverter Commissioning and Load Testing.
Load Segregation and AC wiring from one DB Box to another DB Box for individual load connection is
9
at client end.

10 Sanction Load/Transformer is at Customer End.


11 Equipment delivered at site is customer’s Liability.
Material & Workmanship warranty for the solar panels will be 12 years while linear power output
12
warranty is 25 Years. (Warranty will not be covered under the following conditions).
a Scratches on Panels.
b Mechanical Damage on Panels.
c Mishandling of any equipment.
d External Faults will not be covered just like WAPDA Surge, Lightening on the Panels etc.
e Equipment Damage due to fire, water or natural disaster.
13 The Warranty of Inverter would be as per Manufacturer’s warranty period.

Company will cover these warranties on rectification of faults occurred during warranty period.
PCB Electrical Parts. Warranty will not be covered in the following circumstances:
a Damaged by Accidents.
b Electricity short circuit.
c Electricity Fluctuation from WAPDA.
d High/Low Voltage from GRID.
e Overloading of Appliances beyond Inverter capacity.
f Misuse/Mishandling of Equipment.
g Equipment Damaged due to fire, water or unavoidable natural circumstances.

14 Following Reports would be Provided at the time of handing over the Project to client.
a Duly Signed Completion Certificate would be Provided.
b All test Reports for Panels like Flash Test, COC and PSI report would be Provided.
c Inverter Warranty upon company Letter Head Would be Provided.
d Structure Stability Report upon company Letter Head would be Provided.

For and on behalf of For and on behalf of


TECHNO TRENDS Mr. Farooq Ahmad (402-D3, Wapda Town)