PV Module Support (Standard A-Shaped

Support 2.0)

Quick Guide

Issue: 01
Part Number: 21540460 and
21540461
Date: 2020-11-30

HUAWEI TECHNOLOGIES CO., LTD.


Safety Precautions
PV module support (integrated
■ General Safety
To ensure safety of humans and the equipment, pay attention to the safety symbols on the equipment
pole)
and all the safety instructions in this document. The "NOTE", "CAUTION", “NOTICE” and "WARNING"
statements in this document do not represent all the safety instructions. They are only supplements to
the safety instructions. When operating Huawei products and devices, in addition to following the
general precautions in this document, follow the specific safety instructions given by Huawei. Huawei
will not be liable for any consequences that are caused by the violation of safety regulations and design,
production, and usage standards.
■ Local Safety Regulations
Comply with local laws and regulations when operating the equipment.
■ Personnel Requirements
Personnel who plan to install or maintain Huawei equipment must be qualified electricians who receive
thorough product training, understand all necessary safety precautions, and are able to correctly perform
all operations.
■ Symbol Conventions

Indicates a potentially hazardous situation, which if not avoided, could result in equipment
damage, data loss, performance degradation, or unexpected results.

Provides additional information to emphasize or supplement important points in the main text.

■ Personal Safety
To prevent electric shocks, use insulated tools and wear insulation gloves when connecting cables.
To prevent personal injury, wear protective shoes when moving heavy objects.

Tools

1
Installed Standard A-Shaped Support (Low Support)

PV module
middle
clamp PV
module
Longitudinal beam edge
Horizontal clamp
beam

Long raking strut

Short raking
strut

Column

Reinforced beam
Concrete
foundation
Ground

In the figures, the PV


module (445 W) tilt
angle is 15°.

2
Installed Standard A-Shaped Support (High Support)

PV module
middle clamp
PV
module
Horizontal edge
Longitudinal beam beam clamp

Long raking strut

Short raking
strut

High column
Reinforced
beam

Short
raking
strut

Low
column

Concrete foundation

Ground

3
In the figures, the PV module (445 W) tilt angle is 25°.

4
Standard A-Shaped Support (Low Support)
1 Installing a PV Module Support
1.1 Determining the Direction and Tilt Angle of PV Modules
Determine the direction of PV modules based on design requirements. In the northern
hemisphere, PV modules face south. In the southern hemisphere, PV modules face north. The
following table lists the tilt angle design specifications.
Site Latitude (Degree) 0–15 16–25 26–30 31–45
PV Module Tilt Angle (Degree) 15 25 35 45

1.2 Installing a PV Module Support

 PV module support can house 280 W, 300 W,


335 W, 375 W, 445 W, iPV375-M1A, and iPV400- Outer nut
M1A PV modules.
 When installing mechanical parts, use two nuts
to secure the bolts. Tighten the inner nut first
and then the outer nut. After the nuts are
tightened, ensure that the flats on the two nuts Inner nut
are not aligned. (Use a wrench to secure the
inner nut and use another wrench to tighten the
outer nut.)
 When installing a support, use a marker to mark
each bolt after tightening.

1. Install connecting plates on columns. (Partially tighten the bolts.)

5
2. Install a longitudinal beam. (Partially tighten the bolts.)

3. Install a long raking strut and a short raking strut. (Partially tighten the bolts.)

 The short raking strut needs to be installed on the lower side of a PV module
support, and the long raking strut needs to be installed on the higher side of the PV
module support.
 When installing raking struts, partially tighten them first. After anchor bolts are
installed, tighten them.
 The holes in the long and short raking struts are silkscreened. Determine the holes
for mounting based on the tilt angle of PV modules and support type. The
following uses the installation of raking struts for a low support for 45° PV
modules as an example. In this case, the raking struts need to be mounted through
the holes marked with 45L.

Raking strut mounting hole for a low


support for 45° PV modules

Raking strut mounting hole for a low Raking strut mounting hole for a low
support for 35° PV modules support for 15° PV modules

Raking strut mounting hole for a low Raking strut mounting hole for a low
support for 25° PV modules support for 25° PV modules
Raking strut mounting hole for a low
Raking strut mounting hole for a low support for 35° PV modules
support for 15° PV modules
Raking strut mounting hole for a low
support for 45° PV modules

Short raking strut Long raking strut

6
4. Install base anchors. (Partially tighten the bolts.)

7
5. Secure the support assemblies to the foundation and tighten all bolts that are
partially tightened.

 Ensure that lower edge of the longitudinal beam faces the equator.
 When installing anchor bolts, partially tighten the anchor bolts. After the PV
modules are installed, tighten all the anchor bolts. Secure each bolt with two nuts.

Installing PV Module Supports (Concrete Foundation)

Installing PV Module Supports (Screw Pile Foundation)


1) Install screw piles.

 The diameter of the holes is 60 mm and the depth of the holes is 750 mm. Ensure
that all the four screw piles are 100 mm high.
 For details about how to install screw piles, watch the related instruction video
Installing Screw Piles at Support website.
 Before the installation, you need to test the tensile strength of the screw piles. For
details, see the video Testing the Tensile Strength of Screw Piles at Support website.
 Support website:
 https://support.huawei.com (Carrier)
 https://support.huawei.com/enterprise (Enterprise)

8
2) Install the support assemblies.

Screw pile foundation


6. Install horizontal beams.

 The PV module support installation method on the screw pile foundation is similar
to that on the concrete foundation. This document shows how to install PV module
support assemblies on the concrete foundation.
 Ensure that the bolts are inserted from the above side of the beam.

9
7. Install a reinforced beam.

8. Install edge clamps and middle clamps for PV modules.

 Partially tighten all the clamps.


 When installing the rubber pad, ensure that the
adhesive side faces upwards. Remove the adhesive
sticker and press the rubber pad to ensure that it is
firmly attached.
 The nuts for securing PV modules are classified into
common nuts and antitheft nuts. Secure nuts based
on the actual configuration.
 Use an antitheft nut wrench to partially tighten
antitheft nuts.

Antitheft nut

U-type bolt Clamp Flat Nut Triangle Common U-type bolt Clamp Flat Nut Triangle Common
washer cover nut nut washer cover nut nut

Common nut

U-type bolt Clamp Flat Nut U-type bolt Clamp Flat Nut
washer washer

10
Common
nut

Antitheft nut Common nut

Antitheft
nut

Antitheft Common
nut nut

9. Install PV modules.

 When installing PV modules, ensure that the distances between the PV module edges
and the two ends of the support horizontal beam are the same.
 When installing PV modules, ensure that the control boxes behind PV modules face
the same direction.
 The following table lists the PV module dimensions that are applicable to the support.

Dimensions (mm)
PV module specifications
Length Width Thickness
280 W/300 W 1640-1675 990-992 35
335 W/375 W/iPV375-M1A 1956-1960 990-992 40
445 W/iPV400-M1A 1956-2132 992-1052 35/40

Applicable to 280 W/300 W/335 Applicable to iPV375-M1A/iPV400-M1A


W/375 W/445 W PV Modules

11
10. Adjust the positions of clamps to secure the PV modules and tighten the screws.

When securing PV modules, ensure that the edge clamps are closely attached to
the inner wall of the PV module and the middle clamps are closely attached to
the outer wall of the PV module.

PV module PV module

PV module PV module
middle clamp edge clamp

12
2 Installing Cables for PV Modules
1. Install ground screws and a ground cable for PV modules.

Install ground screws near the ground bar.

Solar junction box (SJB)

Site ground bar

13
2. Install DC power cables for PV modules.

If the DC power cables to PV modules are not long enough, extension cables can be
configured.

Installing 280 W/300 W/335 W/375 W/445 W PV Modules


When installing PV string cables, you should connect three PV modules in series as a route
and connect the route to an SJB.

To the SJB To the SJB


positive terminal negative terminal

To the SJB To the SJB


positive terminal negative terminal

(Optional) Extension cables for


To the SJB DC power cables to PV modules
positive terminal

To the SJB
negative terminal

14
Installing iPV375-M1A/iPV400-M1A

• If the number of PV modules is a multiple of 2, every two PV modules are


connected in series to form a route and connect to an SJB.
• If the number of PV modules is not a multiple of 2, the remaining one PV module is
connected to an SJB as a route.
• The following figure uses 6, 5 PV modules as an example.

To the To the To the To the To the To the To the To the To the To the
SJB SJB SJB SJB SJB SJB SJB SJB SJB SJB
negative positive negative positive negative positive negative positive negative positive To the To the
terminal terminal terminal terminal terminal terminal terminal terminal terminal terminal SJB SJB
positive negative
terminal terminal

(Optional) Extension cables for


DC power cables to PV modules
To the SJB
positive terminal

To the SJB
negative terminal

15
Standard A-Shaped Support (High Support)
1 Installing a PV Module Support
1.1 Determining the Direction and Tilt Angle of PV Modules
Determine the direction of PV modules based on design requirements. In the northern
hemisphere, PV modules face south. In the southern hemisphere, PV modules face north.
The following table lists the tilt angle design specifications.
Site Latitude (Degree) 0–15 16–25 26–30 31–45
PV Module Tilt Angle (Degree) 15 25 35 45

1.2 Installing a PV Module Support

 PV module support can house 280 W, 300 W, 335


W, 375 W, 445 W, iPV375-M1A, and iPV400-M1A
PV modules. Outer nut
 When installing mechanical parts, use two nuts to
secure the bolts. Tighten the inner nut first and
then the outer nut. After the nuts are tightened,
ensure that the flats on the two nuts are not
aligned. (Use a wrench to secure the inner nut
Inner nut
and use another wrench to tighten the outer
nut.)
 When installing a support, use a marker to mark
each bolt after tightening.

1. Install connecting plates on high columns. (Partially tighten the bolts.)

16
2. Install a longitudinal beam. (Partially tighten the bolts.)

3. Install a long raking strut and a short raking strut. (Partially tighten the bolts.)

 The short raking strut needs to be installed on the lower side of a PV module
support, and the long raking strut needs to be installed on the higher side of the PV
module support.
 When installing raking struts, partially tighten them first. After anchor bolts are
installed, tighten them.
 The holes in the long and short raking struts are silkscreened. Determine the holes
for mounting based on the tilt angle of PV modules and support type. The
following uses the installation of raking struts for a high support for 45° PV
modules as an example. In this case, the raking struts need to be mounted through
the holes marked with 45H.

Raking strut mounting hole for a high


support for 45° PV modules

Raking strut mounting hole for a high Raking strut mounting hole for a high
support for 35° PV modules support for 15° PV modules
Raking strut mounting hole for a high
Raking strut mounting hole for a high support for 25° PV modules
support for 25° PV modules Raking strut mounting hole for a high
support for 35° PV modules
Raking strut mounting hole for a high
Raking strut mounting hole for a high
support for 15° PV modules
support for 45° PV modules
Short raking Long raking
strut strut

17
4. Install low columns. (Partially tighten the bolts.)

18
5. Install a short raking strut. (Partially tighten the bolts.)

6. Install base anchors. (Partially tighten the bolts.)

19
7. Secure the support assemblies to the foundation and tighten all bolts that are
partially tightened.

• Ensure that lower edge of the longitudinal beam faces the equator.
• When installing anchor bolts, partially tighten the anchor bolts. After the PV
modules are installed, tighten all the anchor bolts. Secure each bolt with two nuts.

Installing PV Module Supports (Concrete Foundation)

Installing PV Module Supports (Screw Pile Foundation)


1) Install screw piles.

 The diameter of the holes is 60 mm and the depth of the holes is 750 mm. Ensure
that all the four screw piles are 100 mm high.
 For details about how to install screw piles, watch the related instruction video
Installing Screw Piles at Support website.
 Before the installation, you need to test the tensile strength of the screw piles. For
details, see the video Testing the Tensile Strength of Screw Piles at Support website.
 Support website:
 https://support.huawei.com (Carrier)
 https://support.huawei.com/enterprise (Enterprise)

20
2) Install the support assemblies.

Screw pile foundation


8. Install horizontal beams.

• The PV module support installation method on the screw pile foundation is similar
to that on the concrete foundation. This document shows how to install PV module
support assemblies on the concrete foundation.
• Ensure that the bolts are inserted from the above side of the beam.

21
9. Install a reinforced beam.

10. Install edge clamps and middle clamps for PV modules.

 Partially tighten all the clamps.


 When installing the rubber pad, ensure
that the adhesive side faces upwards.
Remove the adhesive sticker and press the
rubber pad to ensure that it is firmly
attached.
 The nuts for securing PV modules are
classified into common nuts and antitheft
nuts. Secure nuts based on the actual
configuration.
 Use an antitheft nut wrench to partially
tighten antitheft nuts.

Antitheft nut

U-type bolt Clamp Flat Nut Triangle Common U-type bolt Clamp Flat Nut Triangle Common
washer cover nut nut washer cover nut nut

Common nut

U-type bolt Clamp Flat Nut U-type bolt Clamp Flat Nut
washer washer

22
Antitheft nut
Antitheft nut

Common nut

Common nut
Antitheft nut

Common nut

11. Install PV modules.

 When installing PV modules, ensure that the distances between the PV module edges
and the two ends of the support horizontal beam are the same.
 When installing PV modules, ensure that the control boxes behind PV modules face
the same direction.
 The following table lists the PV module dimensions that are applicable to the support.

Dimensions (mm)
PV module specifications
Length Width Thickness
280 W/300 W 1640-1675 990-992 35
335 W/375 W/iPV375-M1A 1956-1960 990-992 40
445 W/iPV400-M1A 1956-2132 992-1052 35/40

Applicable to 280 W/300 W/335 Applicable to iPV375-M1A/iPV400-M1A


W/375 W/445 W PV Modules

23
12. Adjust the positions of clamps to secure the PV modules and tighten the screws.

When securing PV modules, ensure that the edge clamps are closely attached to
the inner wall of the PV module and the middle clamps are closely attached to
the outer wall of the PV module.

PV module PV module

PV module
PV module
middle clamp
edge clamp

24
2 Installing Cables for PV Modules
1. Install ground screws and a ground cable for PV modules.

Install ground screws near the ground bar.

SJB

Site ground bar

25
2. Install DC power cables for PV modules.

If the DC power cables to PV modules are not long enough, extension cables can be
configured.

Installing 280 W/300 W/335 W/375 W/445 W PV Modules


When installing PV string cables, you should connect three PV modules in series as a route
and connect the route to an SJB.

To the SJB To the SJB


positive terminal negative terminal

To the SJB To the SJB


positive terminal negative terminal

(Optional) Extension cables for


To the SJB DC power cables to PV modules
positive terminal

To the SJB
negative terminal

26
Installing iPV375-M1A/iPV400-M1A

• If the number of PV modules is a multiple of 2, every two PV modules are


connected in series to form a route and connect to an SJB.
• If the number of PV modules is not a multiple of 2, the remaining one PV module is
connected to an SJB as a route.
• The following figure uses 6, 5 PV modules as an example.

To the To the To the To the To the To the To the To the To the To the
SJB SJB SJB SJB SJB SJB SJB SJB SJB SJB
negative positive negative positive negative positive negative positive negative positive To the To the
terminal terminal terminal terminal terminal terminal terminal terminal terminal terminal SJB SJB
positive negative
terminal terminal

(Optional) Extension cables for


DC power cables to PV modules
To the SJB
positive terminal

To the SJB
negative terminal

27
Appendix
1 (Optional) Installing a Standard SJB
1. Install an SJB.

Mounting ear

Mounting ear
Hose clamp

2. Install cables between PV modules and the SJB.

PV Module Type Installation Mode Maximum Routes


Connected to the SJB
280 W/300 W PV module Every three PV modules 4
connected in series to
335 W/375 W/445 W PV module form a route 3

The figure shows how to connect one route to the SJB.

PV modules

28
2 (Optional) Installing an SJB-0601A
2. (Optional) Installing an SJB-0601A
1. Install a metal base.

Securing with Screws

1) Mark mounting holes in an appropriate 2) Drill holes in the marked positions.


area on the wall.

(1) Expansion anchor bolt (2) M6 nut (3) Spring


3) Secure the base. washer (4) Flat washer
(5) Expansion sleeve (6) Wall (7) Rubber mallet
(8) Socket wrench

Securing with Rivets


1) Mark mounting holes 2) Drill holes in the 3) Secure the base.
in an appropriate marked positions.
area on the wall.

29
Securing with Hose Clamps
1) Secure the base to an appropriate
position on the pole.

Hose clamps support a


pole with a diameter of
48–114 mm.

2. Install the SJB.

Wall Mounting Pole Mounting

3. Install an SJB ground cable.

Ground screw on the support


or site ground bar

30
4. Install cables between PV modules and the SJB.
SJB-0601A with the Surge Protection Function (02312VQH)
PV Module Type Installation Mode Maximum Routes
Connected to the SJB

iPV375-M1A/iPV400-M1A Every two PV modules connected in


series to form a route
PV module

If the number of PV modules is not 5


a multiple of 2, the remaining one
PV module is connected to an SJB as
a route.

The figure shows how to connect one route to the SJB.

PV modules

SJB-0601A without the Surge Protection Function (21204202-001)


PV Module Type Installation Mode Maximum Routes
Connected to the SJB
280 W/300 W PV module Every three PV modules 4

335 W/375 W/445 W PV connected in series to form a


route 3
module

The figure shows how to connect one route to the SJB.

PV modules

31
(Optional) Installing a Signal Cable for Reporting PV
3 Module Thefts
1. Route the cable through the holes on the rear of PV modules in sequence and bind the
cable using cable ties.
2. Connect the cable to the DIN port on the user interface module (UIM). The following
figure uses the DIN2 port as an example.

 If the cable is connected to a dry contact that reports an alarm when closed, set the
dry contact to report an alarm when open.
 If the cable is connected to a multiplexing dry contact and is an ALM dry contact
output port, set it to a DIN input port.

HUAWEI TECHNOLOGIES CO., LTD.


Huawei Industrial Base, Bantian, Longgang
District, Shenzhen, Guangdong Province
Shenzhen 518129 People's Republic of China
www.huawei.com

32