SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.

Rev. 2018.03.00 31-Mar-18


SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Storage, Handling and Preservation (Vessels & Tanks) SAIC-D-2005 14-May-18 MECH-
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR

EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.

LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.

SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?

SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL

ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
No.

A General Requirements (Vessels)

Equipment storage, handling and preservation procedure was submitted Sch Q, Att IV
A1
and approved by S.Aramco . Project Specific

Vessels that were not externally coated at the fabrication shop are
provided with a hard temporary preservative appropriate for the metallurgy 32-SAMSS-004
A2
of the vessel and can be easily removed at site prior to surface Par. 19.3.1 (a)
preparation & application of Saudi Aramco coating & paint system.

Stainless Steel vessels, which were shipped via ocean freight, are
32-SAMSS-004
A3 protected using a temporary protective system compatible with stainless
Par. 19.3.1(c)
steel & suitable outdoor exposure.

Vessels that are partially shop fabricated and/or likely to suffer from
distortion have the following protection:
a) Adequate* bracing 32-SAMSS-004
A4
b) All open ends are covered to prevent ingress of dirt and other Par. 19.1.4
foreign matters.

The internal of vessel is completely and thoroughly dried and cleaned 32-SAMSS-004
A5
from all loose scales, weld slag, dirt and debris. Par. 19.1.2

The interior surfaces of vessels, including internals, shall be protected


from corrosion by use of a nontoxic liquid or vapor phase corrosion
32-SAMSS-004
A6 inhibitor (VpCI) that is compatible with the metallurgy of all components in
Par. 19.2.2
the equipment being protected and is environmentally friendly for disposal
at sea.(Nitrites shall not be used)

Vessels internally protected by corrosion inhibitor are sealed vapor tight 32-SAMSS-004
A7
using metallic covers. Par. 19.2.2.6

For vessels made completely of stainless steels and vessels internally


cladded or weld-overlaid with these materials, in addition to vapor phase
corrosion inhibitors applied per par.19.2.2, nitrogen blanketing shall be 32-SAMSS-004
A8
used during shipment or periods of storage at the construction site. Par. 19.2.3
Note: The vessel shall be clearly marked with a warning: "Warning:
asphyxiation hazard--preserved with nitrogen"

Telltale holes in reinforcing pads shall be protected with wooden plugs or 32-SAMSS-004
A9
packed with rust preventative grease. Par. 19.3.2

Flanged connections and all other machined surfaces shall be protected


by a coating suitable for the metallurgy of the vessel and can be easily 32-SAMSS-004
A10
removed in the field. Connections shall be fitted with steel or wood cover, Par. 19.3.3
3mm thick and neoprene gaskets

Saudi Aramco: Company General Use


Covers shall be securely attached by a minimum of four bolts equally
32-SAMSS-004
A11 spaced. For ocean shipment, flanged connections shall also be covered
Par. 19.3.4
with heavy-duty plastic bags securely taped to the nozzles.

Flanges with permanent blind flanges or covers shall be secured with the 32-SAMSS-004
A12
gaskets and bolting specified for service. Par. 19.3.5

A General Requirements (Vessels) … Use the latest Revision of 32-SAMSS-004 along with this checklist

Prepare the surface and apply primer and final coatings as per the Saudi 32-SAMSS-004
A3
Aramco paint and coating system. Par. 19.3.1 (b)

B General Requirements (Small Tanks)

Apply requirements given in 32-SAMSS-030 Sec 12 32-SAMSS-030


B1
(Refer to Attachment 1) SEC -12

C General Requirements (API Tanks)

C1 To be determined from applicable API Standards API Stds

REMARKS:

Attachment 1 . 32-SAMSS-030 Small Metallic Atmospheric Storage Tank Protection and Preservation Reqmts

REFERENCE DOCUMENTS:
1- 32-SAMSS-004 -- Manufacture of Pressure Vessels, (1 February 2018)
2- 32-SAMSS-030, Manufacture of Small Metallic Atmospheric Storage Tank (31 December 2016)
Contractor / Third-Party Saudi Aramco
Construction Representative* PMT Representative
Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Inspector PID Representative


Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:

QC Supervisor Proponent and Others


Quality Record Approved: T&I Witnessed QC Record Reviewed Work Verified
Name, Organization,
Name, Sign and Date:
Initials and Date:

*Person Responsible for Completion of Quality Work / Test Y = YES N = NO F = FAILED

Saudi Aramco: Company General Use


SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
SAUDI ARAMCO INSPECTION CHECKLIST
Storage, Handling and Preservation (Vessels & Tanks) SAIC-D-2005 14-May-18 MECH-
ATTACHMENT 1-32-SAMSS-030 Small Metallic Atmospheric Storage Tank Reqmts

Saudi Aramco: Company General Use


Saudi Aramco: Company General Use
Saudi Aramco: Company General Use