1 SAUDI ARAMCO ID/PIEU - 14- May 2018 - REV. 2018.03.00 (Standards Cutoff -March 31, 2018) Rev. 2018.03.00 31-Mar-18
SAIC NUMBER DATE APPROVED QR NUMBER
2 SAUDI ARAMCO INSPECTION CHECKLIST
Inspection of Above Ground Small MetallicTank
3 SAIC-D-2019 14-May-18 MECH-
Installation
PROJECT TITLE WBS / BI / JO NUMBER CONTRACTOR / SUBCONTRACTOR
4
EQUIPMENT ID NUMBER(S) EQUIPMENT DESCRIPTION EQPT CODE SYSTEM ID. PLANT NO.
7
LAYOUT DRAWING NUMBER REV. NO. PURCHASE ORDER NUMBER EC / PMCC / MCC NO.
9
SCHEDULED INSPECTION DATE & TIME ACTUAL INSPECTION DATE & TIME QUANTITY INSP. MH's SPENT TRAVEL TIME
11
12 SAUDI ARAMCO USE ONLY
SAUDI ARAMCO TIP NUMBER SAUDI ARAMCO ACTIVITY NUMBER WORK PERMIT REQUIRED?
13
SAUDI ARAMCO INSPECTION LEVEL CONTRACTOR INSPECTION LEVEL
15
18 ITEM
ACCEPTANCE CRITERIA REFERENCE PASS FAIL N/A RE-INSP DATE
19 No.

SAES-Q-005,
20 A1 Top of concrete is of 150 mm above finished grade.
Par. 4.3.2 (a)

Top elevation of leveling shims conformed to construction drawing


21 A2
elevation plans.
IFC Drawings

Location of vessel and foundation were verified to conform with the


22 A3
coordinates in the construction plan drawings.
IFC Drawings

SAES-Q-005,
23 A4 Precast concrete foundations have not been used.
Par. 4.4.1

The minimum anchor bolt diameter is 20 mm (¾"), except when SAES-Q-005,


24 A5
specified otherwise by the vendor for small equipment Par. 4.8.5

Anchor bolts subject to uplift or vibration are equipped with an SAES-Q-005,


25 A6
additional nut to serve as a lock nut, to ensure against loosening. Par. 4.8.7

Post-installed anchor bolts were not used for new construction


without prior written approval from the Supervisor, Civil Engineering SAES-Q-005,
26 A7
Unit, Mechanical & Civil Engineering Division, Consulting Services Par. 4.8.9
Department

Anchor bolts are in compliance with drawing AA-036322-001. SAES-Q-005,


27 A8
(attached). Par. 4.8.1

Supports provided with thru holes for tie down are slotted or open
SAES-D-109,
28 A9 ended to allow for thermal expansion & contraction.
Reference 3.2
(UL 142 Para 30.1.3)
REMARKS:
30

32 REFERENCE DOCUMENTS:
33 1. SAES-D-109, Design of Small Metallic StorageTanks, 25 December 2016
34 2- SAES-Q-005, Concrete Foundations, 01 Jan 2018.
35 3- UL 142, Standard for Steel Aboveground Tanks for Flammable and Combustible Liquids, October 2, 2009
37 Contractor / Third-Party Saudi Aramco
38 Construction Representative* PMT Representative
39 Work is Complete and Ready for Inspection: T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
40
41 QC Inspector PID Representative
42 Performed Inspection Work / Rework May Proceed T&I Witnessed QC Record Reviewed Work Verified
Name, Initials and Date: Name, Initials and Date:
43
44 QC Supervisor Proponent and Others
45 Quality Record Approved:
Name, Organization,
T&I Witnessed QC Record Reviewed Work Verified
Name, Sign and Date:
46 Initials and Date:

Saudi Aramco: Company General Use