Professional Documents
Culture Documents
Propose New AP Savoury
Propose New AP Savoury
29
26
28
27
30 53 52 51 50 49
26
21
16 31 E
35
28 35 42 17
I 32 33
24 29 33 38 43 47
25
24
26 31 36 40 45
palett
palett
palett
palett
palett
palett
palett
palett
palett
palett
12
19 21 25 30 34 39 44 48 34 13
23
6 22 34
46 G
D 27 32 37 41
20 G
22 D
13 23
14 15 16
12
19
20
20 21
5
17 18
4
19
B 4
7 14
8 7
3
2
3
6
11 9 Lantai 2 (Changing Room) 5
10
5 25
10 C
5
6
1 18 17
4
2 23
7 24 11
22
18 9 A 1
H
4
A 15
3 8
1 : Kantin
2 : Coriander Room (Meeting Room)
2
3 : Nusery Room & Moh Clinic
Second and Third Floor 9
4 : Server Room
5 : Engineering Room
6 : Coldstore
1 7 : Control Room (Utiliti)
8 : Office Lt1
11 9 : Security Office & Induction Room
10 : Female Locker Room
37
Lt.2 Produksi DRY (BBS) 11 : Male Locker Room
10
12 : RMS Area (Warehouse)
13 : Substore (Paletizer)
14 : SBU (Small Business Unit)
15 : Parkiran
16 : RMS Office
17 : Tank Farm
18 : Substation Building (Cable Room)
16
19 : Production Wet
20 : Production Dry
1
7 21 : Big Bag Discharge Station
Lt. 2 Office
11 22 : Electrical
23 : Substore 2 (User dedicated 3
Stairs 6 dengan PC 3 bisa sampai 8 untuk user
Lt. 2 Substation biasanya saat kerja)
24 : Engineering Room
25 : Transformer Room
12 13 26 : Pos Jembatan
8 15
10
14 9 Lokasi Rack Switch
1 : Server
2 : Pantry Lt.2
3 : RMS Office
4 : Warehouse
5 : Utility
6 : Production Hall (Big Bag Discharge area)
7 : Security Gate
8 : Rack Tank Farm
13
46
48
14 50
12
47 49
40 41 44
38 43
Control
Room
39 42 45
F F