BILL OF QUANTITIES

Construction Of New Dispencery


PSO Project Shikarpure Sindh
S.No Description No L (ft) B (ft) D (ft) Quantity Unit

1 Excavation work

Excavation in all type of mainstructure and wetland


soil/rock, dressed to designed section, grades and profiles,
excavated material disposed where required. lift up to 1ft

i Footing-F1 6.00 4.00 4.00 4.00 384.00


ii Footing-F2 13.00 4.00 5.00 4.00 1040.00
Sub Total 1424.00 Cft
1(a) Backfilling and Compaction work
i Footing-F1 6.00 4.00 4.00 2.50 240.00
ii Footing-F2 13.00 4.00 5.00 2.50 650.00
iii Sub-structure Dispencery (inside) 1.00 31.25 24.25 2.25 1705.08
vi Sub-structure P.W.D Toilet & Toilet Area (inside) 1.00 8.25 14.25 2.25 264.52
v Sub-structure Dispencery-Long side (External) 2.00 31.25 2.00 2.25 281.25
iv Sub-structure Dispencery-Short side (External) 2.00 24.25 2.00 2.25 218.25
iv Main Entrance Stair Case with P.W.D Ramp 2.00 8.00 6.00 1.75 168.00
iiv Main Entrance Stair Case with P.W.D Ramp Stop area 1.00 6.00 6.00 1.75 63.00
Sub Total 3590.09 Cft
Nos of Truck/Dumper-Size 400 Cft 8.98 Nos
2 Stone Soiling
Provision, laying and compaction of Stone 1"-1/2",
complete in all respect
i Footing-F1 6.00 4.00 4.00 0.50 48.00
ii Footing-F2 13.00 4.00 5.00 0.50 130.00
ii Ineternal Dispansry Flooring 1.00 24.25 31.25 0.50 378.91
iii Ineternal P.W.D Toilet & Toilet Flooring 1.00 15.59 9.75 0.50 76.00
vi Main Entrance Stair Case with P.W.D Ramp 2.00 8.00 6.00 0.50 48.00
v Main Entrance Stair Case with P.W.D Ramp Stop area 1.00 6.00 6.00 0.50 18.00
Sub Total 698.91 Cft
3 PCC 1:4:8
Plain cement concrete with 1:4:8 includig placing
compacting, finishing and curing, complete (including
screening and washing at stone aggregate with/without
shuttering. Complete in all respect
i Footing-F1 6.00 4.00 4.00 0.50 48.00
ii Footing-F2 13.00 4.00 5.00 0.50 130.00
iii Ineternal Dispansry Flooring 1.00 24.25 31.25 0.50 378.91
vi Ineternal P.W.D Toilet & Toilet Flooring 1.00 15.59 9.75 0.50 76.00
v Main Entrance Stair Case with P.W.D Ramp 2.00 8.00 6.00 0.50 48.00
iv Main Entrance Stair Case with P.W.D Ramp Stop area 1.00 6.00 6.00 0.50 18.00
Sub Total 698.91 Cft
4 RCC 1:2:4
Providing and laying Reinforced cement concrete using
graded screened bajri 3/8" and down gauge as fine
aggregate, OPC / SRC and crushed stone 3/4" down gauge
as coarse aggregate with 1:2:4 Concrete mix by machine at
site including the cost of fixing form work and scaffolding
and its removal, vibrating using mechanical vibrator, curing
and Cylinder testing etc. having min. cubicall strength of
4000 psi after 28 days curing but excluding the cost of
reinforcement bars complete as per drawing. For the
curing All structural items must be covered with Jute bags
cloth.The contractor is bound to sumbit the Sieve analysis
reports and results of cube test, cylinder tests on UTM
machine after the stregnth of 14 days and the result should
not be less than 90% of the specified strength.(Complete in
all respect)

Footings
Footing-F1 6.00 3.00 3.00 1.50 81.00
Footing-F2 13.00 4.00 4.00 1.50 312.00
Sub-Total 393.00 Cft

Columns-C1 19.00 1.50 0.75 11.00 235.13 Cft

i Plinth Beam
Vertical direction-Beam
PB1 (9''X18'') on Grid 01,02,04 B/W Grid A to D 3.00 25.75 0.75 1.50 86.91
PB1 (9''X18'') on Grid 03 B/W Grid A to D 1.00 9.67 0.75 1.50 10.88
PB1 (9''X18'') on Grid 05 B/W Grid A to C 1.00 15.58 0.75 1.50 17.53
Horizonal direction-Beam
PB1 (9''X18'') on Grid-A B/W Grid 01 to 05 1.00 39.50 0.75 1.50 44.44
PB1 (9''X18'') on Grid-B B/W Grid 01 to 02 1.00 11.92 0.75 1.50 13.41
PB1 (9''X18'') on Grid-B B/W Grid 04 to 05 1.00 9.00 0.75 1.50 10.13
PB1 (9''X18'') on Grid-C B/W Grid 01 to 04 1.00 29.75 0.75 1.50 33.47
PB1 (9''X18'') on Grid-C B/W Grid 04 to 05 1.00 9.00 0.75 1.50 10.13
PB1 (9''X18'') on Grid-D B/W Grid 01 to 04 1.00 29.75 0.75 1.50 33.47
Sub-Total 260.34 Cft
ii First Floor Beam/Top Beams
Horizonal direction-Beam
FB-01 (9''X18'') on Grid-A B/W Grid 01 to 05 1.00 39.00 0.75 1.50 43.88
FB-04 (9''X18'') on Grid-B B/W Grid 01 to 04 1.00 29.75 0.75 1.50 33.47
FB-03 (9''X18'') on Grid-B B/W Grid 04 to 05 1.00 8.25 0.75 1.50 9.28
FB-02 (9''X18'') on Grid-C B/W Grid 01 to 04 1.00 29.75 0.75 1.50 33.47
FB-03 (9''X18'') on Grid-C B/W Grid 04 to 05 1.00 8.25 0.75 1.50 9.28
FB-01 (9''X18'') on Grid-D B/W Grid 01 to 04 1.00 29.00 0.75 1.50 32.63
Vertical direction-Beam
FB-01 (9''X18'') on Grid-01 B/W Grid A to D 1.00 25.75 0.75 1.50 28.97
FB-02 (9''X18'') on Grid-02 B/W Grid A to D 1.00 25.75 0.75 1.50 28.97
FB-04 & FB2 (9''X18'') on Grid-03 B/W Grid A to D 1.00 25.75 0.75 1.50 28.97
FB-02 (9''X18'') on Grid-04 B/W Grid A to D 1.00 25.75 0.75 1.50 28.97
FB-01 (9''X18'') on Grid-05 B/W Grid A to C 1.00 15.58 0.75 1.50 17.53
Sub-Total 295.40 Cft
Slab-Dispansry 1.00 34.25 25.75 0.50 440.97
Slab-P.W.D Toilet & Toilet 1.00 24.75 15.59 0.50 192.93
Sub-Total 633.90 Cft
Total Concrete 1817.77 Cft
5 Steel

Providing, straightening, cutting, bending, fabrication,


hoisting and placing in position high yield strength Steel
Reinforcement 60,000 psi Amreeli Steeli conforming to
ASTM A-615 (Deformed bar), tying with binding wire 18
gauge together with its cost in all kinds of reinforced
concrete sections in any position or elevation or at any
height, providing and fixing steel chairs or approved plastic
chairs, or precast concrete chairs of mix richer than the
concrete mix in section, tying with binding wire, pins,
spacer bars etc. as per drawings, specifications and
instructions of the Architect/Engineer.(Complete in all
respect)

Total Steel for building already 7% wastage steel add in


this Qty 1.00 11,402 1,000.00 11.40 Tons
Footing F1 6.00 124.49 kg 0.12 Tons
Footing F2 13.00 300.88 kg 0.30 Tons
Column-C1 19.00 3471.23 kg 3.47 Tons
Plinth Beam -Steel 1.00 1254.553 kg 1.25 Tons
First Floor Beam -Steel 1.00 1254.553 kg 1.25 Tons
Slab -Steel 1.00 4995.90 kg 4.996 Tons

4 Brick Masonry with 1:4 C/S Mortars


Provision and construction of Brick Masonry with 1:4
cement sand mortars including maintaining of horizontal
and vertical levels and proper curing after construction
work for desirable timing to have proper strength,
complete in all respect.
Building Long walls 2.00 42.50 0.75 10.50 669.38
Building Short walls 2.00 24.25 0.75 10.50 381.94
LHV room long wall 1.00 12.00 0.50 10.50 63.00
LHV room short wall 1.00 8.00 0.50 10.50 42.00
Doctor room (8'x10') long wall 1.00 10.00 0.50 10.50 52.50
Doctor room (8'x10') short wall 1.00 8.00 0.50 10.50 42.00
Waiting room Partition wall 1.00 15.00 0.50 10.50 78.75
Toilet partition wall 01 1.00 9.00 0.50 10.50 47.25
Toilet partition wall 02 1.00 4.00 0.50 10.50 21.00
E.R Room Short wall 1.00 8.00 0.50 10.50 42.00
E.R Room Long wall 1.00 12.00 0.50 10.50 63.00
Pharmecy room 1.00 7.00 0.50 10.50 36.75
Recieption counter 1.00 5.00 1.00 5.00 25.00
Main Entrance Stair Case with P.W.D Ramp 2.00 8.00 6.00 1.50 144.00
Main Entrance Stair Case with P.W.D Ramp Stop area 1.00 6.00 6.00 2.00 72.00
Partition wall
Step-01 1.00 17.00 2.00 1.00 34.00
Step-02 1.00 17.00 1.50 1.00 25.50
Step-03 1.00 17.00 13.50 1.50 344.25
Step-04 1.00 17.00 0.75 9.50 121.13
Brick Masonry below PB-Beams 1.00 188.00 1.00 1.00 188.00
Total 2493.44 Cft
Deductions
i D4-Doors (2.5'x7') 2.00 2.00 0.38 7.00 10.50
i D1-Doors (4'x7') 1.00 4.00 0.38 7.00 10.50
ii D2-Doors (3'x7') 4.00 3.00 0.38 7.00 31.50
iii D3-Doors (3.5'x7') 1.00 3.50 0.38 7.00 9.19
iv D5-Doors (2'x7') 1.00 2.00 0.38 7.00 5.25
iv W1-Windows (4'x4') 4.00 4.00 0.38 4.00 24.00
v W2-Window (2'x2') 1.00 2.00 0.38 2.00 1.50
vi W3-Window (3'x4') 3.00 3.00 0.38 4.00 13.50
vii V1-Ventilators (1.5X1.5) 3.00 1.50 0.38 1.50 2.53
108.47 Cft
Sub Total 2384.97 Cft
5 Plaster work (Exterior side)
Cement plaster 1/2'' thick, ratio 1:4
i Complete exteriors walls of Dispansary -Long Side 2.00 42.50 13.00 1105.00
ii Complete exteriors walls of Dispansary - Short Side 2.00 25.75 13.00 669.50
iii Main Entrance Stair Case with P.W.D Ramp 2.00 8.00 3.00 48.00
iv Main Entrance Stair Case with P.W.D Ramp Stop area 1.00 6.00 2.00 12.00
Total 1834.50 Sft
Deductions
i D1-Doors (4'x7') -Door (4'-0" wide) 1.00 4.00 7.00 28.00
ii W1-Windows (4'x4')-Windows (4'-0" wide) 1.00 4.00 4.00 16.00
iii W3-Window (3'x4') 3.00 3.00 4.00 36.00
iv V1-Ventilators (1.5X1.5) 3.00 1.50 1.50 6.75
86.75 Sft
Sub Total 1747.75 Sft
6 Plaster work (Interior side)
Cement plaster 1/2'' thick, ratio 1:4
i ER Room 1.00 48.00 10.00 480.00
ii Dr. Room 1.00 44.00 10.00 440.00
iii LHV Room 1.00 48.75 10.00 487.50
iv Pharmacy 1.00 47.00 10.00 470.00
v Passage 1.00 24.34 10.00 243.40
vi Hall Area 1.00 8.333 10.00 83.33
vii Waiting Area 1.00 25.00 10.00 250.00
viii Recieption counter 2.00 5.00 5.00 50.00
ix Toilet for staff 1.00 22.00 10.00 220.00
x Hand washing area for staff toilet 1.00 20.00 10.00 200.00
xi Toilet for Patients 1.00 33.18 10.00 331.80
xi Partition wall 2.00 17.00 10.00 340.00
Total 3596.03
Deductions
i D1-Doors (4'x7') -Door (4'-0" wide) 1.00 4.00 7.00 28.00
ii D2-Doors (3'x7')-Door (3'-0" wide) 4.00 3.00 7.00 84.00
iii D3-Doors (3.5'x7')-Door (3'-6" wide) 1.00 3.50 7.00 24.50
iv D4-Doors (2.5'x7')-Door (2'-6" wide) 2.00 2.50 7.00 35.00
v W1-Windows (4'x4')-Window (4'-0" wide) 4.00 4.00 4.00 64.00
vi W2-Window (2'x2')-Window (2'-0" wide) 1.00 2.00 2.00 4.00
vii W3-Window (3'x4')-Window (3'-0" wide) 3.00 3.00 4.00 36.00
viii V1-Ventilators (1.5X1.5)-Ventolators 3.00 1.50 1.50 6.75
282.25 Sft
Sub Total 3313.78 Sft
7 Tile Borders
Provision and application of 4 inch high Tile Border as per
standard requirements of Dispensary ( complete in all
respect.)
i Varanda 1.00 43.00 43.00
ii ER Room 1.00 48.00 48.00
iii Dr. Room 1.00 44.00 44.00
iv LHV Room 1.00 48.75 48.75
v Pharmacy 1.00 47.00 47.00
vi Passage 1.00 24.34 24.34
vii Waiting Area 1.00 25.00 25.00
viii Recieption Area 1.00 25.00 25.00
Total 305.09 Rft
Deductions
ix D1-Doors (4'x7') -Door (4'-0" wide) 1.00 4.00 1.00 4.00
x D2-Doors (3'x7')-Door (3'-0" wide) 4.00 3.00 1.00 12.00
xi D4-Doors (2.5'x7')-Door (2'-6" wide) 2.00 2.50 0.50 2.50
18.50
Sub Total 286.59 Rft
8 Tile Work
Provision and fixing ceramic tiles for toilets floor and walls
with adhesive materials including formation of cement
sand base, joint filling with sealant, complete in all respect.

Floor tile for Patients -Toilet (P.W.D Toilet) 1.00 9.00 7.59 68.31
Floor Tile for Staff Toilet 1.00 9.00 6.00 54.00
Wall Tile for Patients Toilet-(P.W.D Toilet) 1.00 33.18 7.00 232.26
Wall Tile for Staff Toilet 1.00 30.00 7.00 210.00
LHV room -Floor Tile 1.00 12.00 8.25 99.00
Doctor room (8'x10') -Floor Tile 1.00 10.00 8.00 80.00
Waiting room Partition wall-Floor Tile 1.00 9.00 8.50 76.50
E.R Room Short- Floor Tile 1.00 8.00 12.00 96.00
Corridor-Hall- Floor Tile 1.00 8.25 8.33 68.75
Corridor-Hall -Floor Tile 1.00 10.59 9.00 95.31
Passage -Floor Tile 1.00 17.59 6.75 118.73
Pharmecy room -Floor Tile 1.00 7.00 13.00 91.00
Recieption counter 1.00 5.00 5.00 25.00
Total 1314.86
Deductions
i D3-Doors (3.5'x7')-Door (3'-6" wide) 1.00 3.50 7.00 24.50
ii D2-Doors (3'x7')-Door (3'-0" wide) 1.00 3.00 7.00 21.00
iii D4-Doors (2.5'x7')-Door (2'-6" wide) 1.00 2.50 7.00 17.50
63.00
Sub Total 1251.86 Sft
10 Installation of GI Chokhat for Door,

Providing and fixing G.I frames /Choukhats of size


mentioned 18 gauge G.I sheet I/c welded hinges and fixing
at site with necessary hold fasts, filling with cement sand
slurry of ratio 1:4 and repairing the jambs. The cost also i/c
all carriage , tools and plants used in making and fixing.

i For Door size (3'-6"x7') 1.00 21.00 21.00


iii For Door size (2'-6"x7') 2.00 19.00 38.00
Sub Total 59.00 Rft
11 Installation of Wooden Doors
i For Door size (3'-6"x7') 1.00 3.50 7.00 24.50
iii For Door size (2'-6"x7') 2.00 2.50 7.00 35.00
Sub Total 59.50 Sft
12 Installation of Alumium/Glass and iron Doors
Provision and Fixation of Glass and Aluminium Sliding door
including metalic channels and strips from the internal side
i of Dispensary (complete in all respect ). (12mm Glass, Delur 1.00 4.00 7.00 28.00
Aluminum 1.4mm)

Provision and Fixation of Iron Grill sliding door from the


ii external side of Dispensary (complete in all respect ) 1.00 4.00 7.00 28.00

Provision and Fixation of Glass and Aluminium door


including metalic channels and strips from the internal side
iii of Dispensary (complete in all respect ). (12mm Glass, Delur 4.00 3.00 7.00 84.00
Aluminum 1.4mm)

Provision and Fixation of Glass and Aluminium door


including metalic channels and strips from the internal side
vi of Dispensary (complete in all respect ). (12mm Glass, Delur 1.00 2.00 7.00 14.00
Aluminum 1.4mm)
Sub Total 154.00 Sft

Providing & fixing & Installation of steel chrome iron Hand


raill at main entrance stair Case with P.W.D Ramp
12(a) area.stainless steel railing of 2.5" main pipe welded with 2.00 2.00 8.00 32.00 Rft
5/8"x5/8" MS bars 2'-9" high, fixed in each step (complete
in all respect and standard required ) Approved By Engineer

Internal Color work (Mat Finish)Internal Side of


13 Dispansary
Providing & Apply Mat Finisg with 3 coat, Scraping and
preparing flate surface with fillings on internal sides of all
Dispensary walls , White distemper wth 3 coats ,( complete
in all respect)
i ER Room 1.00 40.00 10.00 400.00
ii Dr. Room 1.00 40.00 10.00 400.00
iii LHV Room 1.00 40.50 10.00 405.00
iv Pharmacy 1.00 40.00 10.00 400.00
v Passage 1.00 63.76 10.00 637.63
vi Waiting Area 1.00 27.00 10.00 270.00
vii Recieption counter 1.00 5.00 5.00 25.00
viii Toilet for staff 1.00 22.00 3.00 66.00
ix Hand washing area for staff toilet 1.00 18.00 3.00 54.00
x Toilet for Patients -Toilet (P.W.D Toilet) 1.00 33.18 3.00 99.54
Total 2757.17 Sft
Deductions
i D1-Doors (4'x7') -Door (4'-0" wide) 1.00 4.00 7.00 28.00
ii D2-Doors (3'x7')-Door (3'-0" wide) 4.00 3.00 7.00 84.00
iii D3-Doors (3.5'x7')-Door (3'-6" wide) 1.00 3.50 7.00 24.50
iv D4-Doors (2.5'x7')-Door (2'-6" wide) 2.00 2.50 7.00 35.00
v W1-Windows (4'x4')-Window (4'-0" wide) 4.00 4.00 4.00 64.00
vi W2-Window (2'x2')-Window (2'-0" wide) 1.00 2.00 2.00 4.00
viii W3-Window (3'x4')-Window (3'-0" wide) 3.00 3.00 4.00 36.00
viii V1-Ventilators (1.5X1.5)-Ventolators 3.00 1.50 1.50 6.75
282.25 Sft
Sub Total 2474.92 Sft
14 Oil Paint

Preparing surface and painting with oil paint door and


window as per detail complete with in all respect.

i Door (4'-0" wide) Iron Railing Door 1.00 4.00 7.00 28.00
iii Door (3'-6" wide) 1.00 3.50 7.00 24.50
iv Door (2'-6" wide) 3.00 2.50 7.00 52.50
Sub Total 105.00 Sft
15 Weather Shield Color (External side of Dispensary)
Providing & Apply weather Shield with 3 coat, Scraping and
preparing flate surface with fillings on External sides of all
Dispensary walls , White distemper wth 3 coats ,( complete
in all respect)
i Complete exterios walls of Dispansary 2.00 66.75 11.00 1468.50
Total 1468.50 Sft
Deductions
i D1-Doors (4'x7') -Door (4'-0" wide) 1.00 4.00 7.00 28.00
ii W3-Window (3'x4')-Window (3'-0" wide) 3.00 3.00 4.00 36.00
ii V1-Ventilators (1.5X1.5)-Ventolators 3.00 1.50 1.50 6.75
iv W1-Windows (4'x4')-Window (4'-0" wide) 1.00 4.00 4.00 16.00
86.75 Sft
Sub Total 1381.75 Sft
16 Installation of Aluminum Windows and Ventilators
Provision and Fixation of Glass and Aluminium Windows
and Metallic Grill from the external side of Dispansary
(complete in all respect )
i For Windows (4'-0" wide) 1.00 4.00 4.00 16.00
ii For Windows (2'-0" wide) 1.00 2.00 2.00 4.00
iii For Ventilators 3.00 1.50 1.50 6.75
iv W3-Window (3'x4')-Window (3'-0" wide) 3.00 3.00 4.00 36.00
Sub Total 62.75 Sft
18 False ceiling
Provision and Fixation of false ceiling including Pannels, T
channels, main channels and hanging wires (complete in all
respect )
i Internal Dispensary Area 1.00 24.25 31.25 757.81
ii Toilet Area 1.00 9.00 14.25 128.25
Sub Total 886.06 Sft
19 P/L 25 mm (1") thick Ziarat White Marble Top
i Bottom of Windows (4'-0" wide) 4.00 4.00 1.00 16.00
ii Bottom of Windows (2'-0" wide) 1.00 2.00 1.00 2.00
iii Bottom of Windows (3'-0" wide) 3.00 2.00 1.00 6.00
iv Bottom of Ventilator 3.00 1.50 1.00 4.50
Sub Total 28.50 Sft

20 Plumbing Work Details -(complete in all respect )


a Overhead to Toilet Water Connection
PPRC 40 mm (over head to toilet ) Rft 130.00 130.00
Tee 40 mm No 10.00 10.00
Elbow 40 mm No 12.00 12.00
Bush 40 mm x1/2'' No 2.00 2.00
Pvc Gray Handle valve 40 mm No 2.00 2.00
b Toilet Internal Conceal Fitting
PPRC Pipe 25 mm' No 40.00 40.00
Tee 25 mm No 8.00 8.00
Elbow 25 mm No 8.00 8.00
socket 25 mm No 5.00 5.00
Brass Elbow 1/2'' No 6.00 6.00
E.z solution 250 gram No 3.00 3.00
c Internal Underground Pipe Line Fitting
P. trap 4'' No 2.00 2.00
Elbow 4'' 90 angle No 2.00 2.00
Elbow 4'' 45 angle No 2.00 2.00
T 4'' No 2.00 2.00
pipe 4'' Rft 20.00 20.00
d Drainage Line
PVC 4'' PAK ARAB Pipe Chamber to chamber Rft 15.00 15.00
Exhaustic Air pipe Cape 4'' for drainage line Rft 10.00 10.00
PVC 6'' PAK ARAB PIPE chamber to main line Rft 40.00 40.00
PVC 6'' socked No 3.00 3.00
e Sanitary Items (complete in all respect )
Provision flash commode white color ( 18'' height Porta )
with P-trap, stopper for water outlet including all fixers
i complete set No 2.0 2.0
Provision and fixation of W.C white color connected with
ii Flush Tank for complete in all respect . No 2.0 2.0
Providing & fixing master white color 6 liters flush tank
including t.coack etc complete in all respect as directed by
iii Engineer In charge No 2.0 2.0

Provision of ceramic Wash Basin with pedestal for toilet


white color (porta HD 19) Fixing with back to wall including
drain pipe,stell waste drain, sink mixer faisal sanitary,
shutoff valve, flexible supply tube, complete fitting with in
iv all respect (Connecting to existing drainage system) No 2.0 2.0

Providing and installation of (filp up grab bar) with Steel


Handle (Made of stainless steel of 1.25" dia pipe, having
size should not be more than 2-ft with angles including
v fixation with nuts and bolts, complete in all respect) No 2.0 2.0

Providing and installation of (Grab bar) with Steel Handle


(Made of stainless steel of 1.25" dia pipe, having size
should not be more than 2-ft with angles including fixation
vi with nuts and bolts, complete in all respect) No 2.0 2.0
Providing & fixing long Bib cock steel ( Master) economy
type or equivalent etc complete in all respect as directed by
vii Engineer In charge No 2.0 2.0
Providing & fixing Muslim shower Master economy type
or equivalent etc complete in all respect as directed by
viii Engineer Incharge No 2.0 2.0
ix Provision and fixation of drainer No 2.0 2.0
Carpentary work

Provision and Fixation of top cabinates and racks for the


pharmacy room with the specification of wodden chip
board including frame work with glass and metallic channel
embeded in it , Bottom cabinet doors including lassani
board along with all hardwares required there. (complete
in all respect as required ) Sft 280.0 280.0
Construction of Wetland/ Waste Water Garden
Bill Of Quantities
21
Sr. No. Description No. B D/H Quantity Unit Remarks
ft ft cft
A Excavation
i For Septic Tank 1.00 5.00 4.00 20.00
ii For Wetland 1.00 5.00 3.00 15.00
iii For Control Box 1.00 3.00 3.00 9.00
iv For Drainage Pipe 1.00 1.00 2.50 2.50
v For Mainholes 1.00 2.00 3.00 6.00
Sub Total 52.50 Cft
B Backfilling
i For Septic Tank Sides 1.00 1.00 4.00 4.00
ii For Wetland Sides 1.00 1.00 3.00 3.00
iii For Control Box Sides 1.00 1.00 3.00 3.00
iv For Mainhole Sides 1.00 1.00 2.50 2.50
v For Seapage Pipe Line 1.00 1.00 2.00 2.00
Sub Total 14.50 Cft
C PCC 1:4:8
i For Septic Tank 1.00 5.00 0.50 2.50
ii For Wetland 1.00 5.00 0.50 2.50
iii For Control Box 1.00 3.00 0.50 1.50
iv For Mainholes 1.00 2.00 0.50 1.00
Sub Total 7.50 Cft
D PCC 1:2:4
i For Septic Tank 1.00 5.00 0.33 1.65
ii For Wetland 1.00 5.00 0.33 1.65
iii For Control Box 1.00 3.00 0.33 0.99
iv For Mainholes 1.00 2.00 0.33 0.66
Sub Total 4.95 Cft
E Brick Masonry with 1:4 C/Sand Mortars
i For Septic Tank Long Wall 2.00 0.75 3.50 5.25
ii For Septic Tank Short Wall 2.00 0.75 3.50 5.25
iii For Wetland Long Wall 2.00 0.75 3.00 4.50
iv For Wetland Short Wall 2.00 0.75 3.00 4.50
v For Control Box All Walls 3.00 0.75 3.00 6.75
vi For Mainhole Long Wall 1.00 0.75 2.00 1.50
vii For Mainhole Short Wall 2.00 0.75 2.00 3.00
Sub Total 30.75 Cft
F 1" Thick Plaster with 1:4 C/Sand
i For Septic Tank Floor 1.00 5.00 5.00
ii For Septic Tank Internal Long Walls 2.00 3.50 7.00
iii For Septic Tank Internal Short Walls 2.00 3.50 7.00
iv For Septic Tank External Long Walls 2.00 1.00 2.00
v For Septic Tank External Short Walls 2.00 1.00 2.00
vi For Septic Tank Long Wall's Top 2.00 0.75 1.50
vii For Septic Tank Short Wall's Top 2.00 0.75 1.50
viii For Wetland Floor 1.00 4.00 4.00
ix For Wetland Internal Long Walls 2.00 3.00 6.00
x For Wetland Internal Short Walls 2.00 3.00 6.00
xix For Wetland External Long Walls 2.00 1.00 2.00
xii For Wetland External Short Walls 2.00 1.00 2.00
xiii For Wetland Long Wall's Top 2.00 0.50 1.00
xiv For Wetland Short Wall's Top 2.00 0.50 1.00
xv For Control Box Floor 1.00 2.00 2.00
xvi For Control Box Internal Walls 3.00 3.00 9.00
xvii For Control Box External Walls 3.00 1.50 4.50
xviii For Control Box Wall's Top 3.00 0.50 1.50
xix For Mainhole Floor 1.00 1.50 1.50
xx For Mainhole Internal Long Walls 1.00 1.50 1.50
xxi For Mainhole Internal Short Walls 2.00 1.50 3.00
xxii For Mainhole External Long Walls 1.00 1.00 1.00
xxiii For Mainhole External Short Walls 2.00 1.00 2.00
xxiv For Mainhole Long Wall's Top 1.00 0.50 0.50
xxv For Mainhole Short Wall's Top 2.00 0.50 1.00
Sub Total 75.50 sft
g PCV Dubai Pipes (4" Dia)
i From Male Restrooms Mainhole to Septic Tank 4.00 4.00
ii PVC Pipe Filter (3" Dia) 2.00 2.00
iii From Septic Tank to Wetland 3.00 3.00
iv PVC Pipe (Half Filter from Bottom & Top) in Wetland 4.00 4.00
v From Wetland to Control Box 2.00 2.00
vi From Control Box to Field (Half Filter from Bottom) 30.00 30.00
vii Vent Pipe for Mainholes and Septic Tank 8.00 8.00
Sub Total 45.00 rft
H Round Gravels
i For Wetland 1.00 4.00 2.00 8.00
ii For Field 1.00 0.67 0.42 0.28
Sub Total 8.28 CFT
I PVC Pipe Net Covers (4" Dia) 9.00 9.00 Nos.
J PVC Elbows for 4" Dia Pipes 7.00 7.00 Nos.
K PVC Tee Joints for 4" Dia Pipes 4.00 4.00 Nos.
L Glue and Other Requirments 1.00 1.00 Job
Abstract Sheet
Construction New Dispensry
PSO Project Shikarpure Sindh
UNIT
SNO. DESCRIPTION QTY UNIT AMOUNT
RATE
Excavation of earth for foundation trench (Manual) as
per provided layout of toilets and dimensions by site
engineer including cutting of existing floor including
proper compaction of base and sides of excavated
1 portion complete in all respect as per instruction of site 1424.00 Cft
engineer.

Earth filling as in Ordinary or Hard Soil, filling in


foundation, pipe trenches, shafts,independent holes,
under floors or around plinths Beam etc . with soil
obtained from excavation in trenches/over
areas .watering and compaction 95% in 150 mm layer
2 and dressing to required shape. Note : back filling with 3590.09 Cft
suitable material with out any boulders)(Complete in all
respect)

Provision/supply, laying and compaction of Stone


3 Ballast 1"-1/2" size, Complete in all respect. 698.91 Cft

Providing and laying CC 1:4:8 (using S.R cement) of


specified strength using approved quality 3/4" max.
size graded crushed aggregate and fine aggregate
including approved form work and its removal as per
4 drawing,levelling, compaction, rodding, vibrating, 698.91 Cft
finishing and curing etc. excluding cost of
reinforcement.

Providing and laying Reinforced cement concrete using


graded screened bajri 3/8" and down gauge as fine
aggregate, OPC and crushed stone 3/4" down gauge as
coarse aggregate with 1:2:4 Concrete mix by machine
5 at site including the cost of fixing form work and 1817.77 Cft
scaffolding and its removal, vibrating using mechanical
vibrator, curing and Cylinder testing etc. having min.
cubicall strength of 4000 psi after 28 days curing but
excluding the cost of reinforcement bars complete as
per drawing. For the curing All structural items must
be covered with Jute bags cloth.The contractor is
bound to sumbit the Sieve analysis reports and results
of cube test, cylinder tests on UTM machine after the
stregnth of 14 days and the result should not be less
than 90% of the specified strength.top slab with four
side 1.5 ft External Chajja.
Providing, straightening, cutting, bending, fabrication,
hoisting and placing in position high yield strength
Steel Reinforcement 60,000 psi Amreeli Steeli
conforming to ASTM A-615 (Deformed bar), tying with
6 binding wire 18 gauge together with its cost in all kinds
of reinforced concrete sections in any position or
elevation or at any height, providing and fixing steel
chairs or approved plastic chairs, or precast concrete 11.40 Tons
chairs of mix richer than the concrete mix in section,
tying with binding wire, pins, spacer bars etc. as per
drawings, specifications and instructions of the
Architect/Engineer.
7
Providing & laying first class brick 9inch masonry
(approved make) in cement mortar of specified
thickness set in 1:4 cement sand mortar. The job
2384.97 Cft
includes required scaffolding, racking out & cleaning
and provision of expansion joints & 15 days of water
curing

8 Provision and application of 3/4'' thick cement plaster 5061.53 sq-ft


with 1:4 cement sand mix as per available detail sheet
including proper curing and finishing as per
instructions of site engineer complete in all respect
(Exterior side & Interior side)

9 Providing and Installation of Tile Borders, Brand 286.59 15.00


Shabeer Tile, Size 4" high and Black in color, complete
in all respect.
Providing and fixing of Shabeer ceramic tiles prime 1251.86 Sft
quality first copy size 9''x16'' or equavalent with motar
10 as per approved design laying and fixing with cement
slurry, filling gaps making smooth and proper level
including 3 mm spacer, cost of white imported filling
Providing and fixing G.I frames /Choukhats of size 59.00 RFT
mentioned 18 gauge G.I sheet I/c welded hinges and
fixing at site with necessary hold fasts, filling with
cement sand slurry of ratio 1:4 and repairing the
11 jambs. The cost also i/c all carriage , tools and plants
used in making and fixing.(complete in all respects)

Providing and fixing solid wooden doors made of


TAALI wood (including all door hardwares like door
12 stopper, hinges Hand lock and Aluminium sheet 3' 59.50 Sft
high)

Providing & fixing & Installation of steel chrome iron


Hand raill at main entrance stair Case with P.W.D
13 Ramp area.stainless steel railing of 2.5" main pipe 32.00 Rft
welded with 5/8"x5/8" MS bars 2'-9" high, fixed in
each step (complete in all respect and standard
Provision and Fixation of Glass and Aluminium &
Aluminium Sliding door including metalic channels
and strips from the internal side of Dispensary
14 (complete in all respect ). (12mm Glass, lucky box ser 154.00 Sft
Aluminum 1.4mm thick with 2.5"x3" channel size )
(complete in all respects as per DWG & as per
instruction of site engineer)

28.00 sft
Provision and Fixation of Iron Grill sliding door
15 including from the external side of Dispensary
(complete in all respects as per DWG )
Providing and applying 3 coats of plastic emulsion or
matt enamel paint (oil Based) to internal wall surface
of ICI/BERGER paints of required color and shade
including preparation of the base by rubbing- the
surface with carborandum stone, applying premier coat
16 of "Plastron Premier Sealer" from ICI/Berger paints 2474.92 Sft
on the entire surface, filling depressions with putty,
cutting the surface and rubbing smooth finally with
sand paper complete as per specification and as per
instruct- tins of PSO Engineer. (complete in all respects
)

Providing and applying 3 coats of Enamel weather


shield Paint ICI/BERGER of required color and shade
17 1381.75 Sft
complete as per specification and as per instructions of
PSO Engineer.
Proving and applying Corona Oil Pint (Gobiz 060
Peach & Final Touch Red 1228) after preparation of
surface & filling of putty. economy premier two coats
18 of ICI/Gobiz inner side of walls and roof adding 105.00 Sft
sufficient standard volume of liquid complete in all
aspects and up to satisfaction of site Engineer and
management.

Providing ,Fabricating and Fixing of aluminum


windows/ventilators at any floor, of any shade Deluxe
Section 4" wide 1.4mm thick of Pakistan Cables,
Alcop, Krudson, Prime with imported colored glass of
5mm fitted with PVC gasket i/c all hard wares
19 62.75 Sft
chaulking all joints with approved silicone sealant,
imported Japan make with handles and locking partly
fix and partly hung single leaf system. It also includes
fly proof (imported) panel. Complete in all respects as
per instructions of site Incharge.

Providing and fixing new dampa false ceiling & hanged


20 frame ceiling along with 3 to 4 inch tapered borders 886.06 Sft
complete in all respect as per instruction of site
engineer
Providing and laying 25 mm (1") thick Ziarat Grey and
White Marble Top set with cement mortar with
matching color pigment over 1/2" thick base of (1:3)
21 cement sand mortar including jointing, curing, rubbing 28.50 Sft
and polishing complete in all respect's as per drawings
and instructions of engineer Incharge.

Provision and Fixation of top cabinates and racks for


the pharmacy room with the specification of wodden
22 chip board including frame work with glass and 280.00 Sft
metallic channel embeded in it , Bottom cabinet doors
including lassani board along with all hardwares
required there. (complete in all respects as per attached
DWG )
Civil Work Total -
Plumbing Work and drainage
a Overhead to Toilet Water Connection
Provision and fixation of PPRC 40 mm (over head to
100.00 Rft
toilet ) (National)
Tee 40 mm 10.00 No
Elbow 40 mm 12.00 No
Bush 40 mm x1/2'' 2.00 No
Pvc Gray Handle valve 40 mm 2.00 No
b Toilet Internal Conceal Fitting
PPRC Pipe 25 mm' 40.00 No
Tee 25 mm 8.00 No
Elbow 25 mm 8.00 No
socket 25 mm 5.00 No
Brass Elbow 1/2'' 6.00 No
E.z solution 250 gram 3.00 No
c Internal Underground Pipe Line Fitting
P. trap 4'' 2.00 No
Elbow 4'' 90 angle 2.00 No
Elbow 4'' 45 angle 2.00 No
T 4'' 2.00 No
pipe 4'' 20.00 Rft
d Drainage Line
PVC 4'' PAK ARAB Pipe Chamber to chamber 15.00 Rft
Exhaustic Air pipe Cape 4'' for drainage line 10.00 Rft
PVC 6'' PAK ARAB PIPE chamber to main line 40.00 Rft
PVC 6'' socked 3.00 No
23 Provision and fixation of ceramic Wash Basin with 3 No
pedestal for toilet white color (Durr) Fixing with back
to wall including drain pipe, sink mixer faisal sanitary,
shutoff valve, flexible supply tube, complete fitting
24 Provision and fixation of flash commode white color 2 No
( 18'' height Durr ) with P-trap, stopper for water
outlet including all fixers complete set
25 Provision of WC Medium size (Durr ) white color +P- 2 set
trap with in all respect.
26 Providing & fixing master white color 6 liters flush 2 No
tank including t. coack etc complete in all respect as
directed by Engineer In charge
27 Providing & fixing long Bib cock steel ( faisal) economy 2 No
type or equivalent etc complete in all respect as
directed by Engineer In charge
28 Providing & fixing of T. cock steel (faisal) economy 4 No
type or equivalent etc complete in all respect as
directed by Engineer In charge
29 Providing & fixing of floor drainer (jali) steel ( faisal 3 No
sanitary ) economy type or equivalent etc complete in
all respect as directed by Engineer In charge

Plumbing and Drainage Total -


Electric Work
Conduting work for electrict points for lights, fans, 82 points
power socket, switches and DBs using good quality pipe
of different dia as per requirement complate in all
aspects
30 Wiring for light and fan with 7/29 & 3/29 cable single 18.0 No
core, PVC insulated wire 300/500 volt grade copper
conductor wire in 3/4" dia PVC conduit Galco with
recessed in the wall or column, roof etc., including as
ECC, pull/junction boxes etc. complete in all respect as
required by the Engineer Incharge Site.(with
30 Wiring for Power plug and room main circuit from 7.0 No
switch board to switch board with 7/29 wire PVC
insulated 300/500V grade single core cables in heavy
gauge PVC conduit Shyvl, Beta or Galco make (of
minimum size 3/4 inch or bigger as required) concealed
(or run on surface) in walls, columns, ceiling etc.
including all PVC conduit. wiring accessories, 4x4
boxes etc. PVC insulated copper wire as ECC all along
conduit complete in all respect and as required by
Engineer Incharge.

31 Supply and installation of gang one Switches Clopal 2.0 No


Brand No 1 China white color for toilet complete job
including labor transportation at satisfaction level of
site engineer and management.
32 Supply and installation of gang four Switches Clipsal 8.0 No
Brand No 1 China white color complete job including
labor transportation at satisfaction level of site engineer
and management.
33 Supply and installation of gang two+ one Dimmers 8.0 No
Clipsal Brand No 1 China white color complete job
including labor transportation at satisfaction level of
site engineer and management.
34 Supply and installation of 1x1 D.B including labour, 1.0 No
transportation at satisfaction level of site engineer and
management.

35 Provision and fixing L.E.D Lights 07 watts (Philips) 15.00 No

36 Provision and Installation of Royal Fans copper 56'' 8.00 No


size with in all respect

Electrict Work Total -


Total Amount of Building Construction -
Estimation
Construction New Wetland
PSO Project Shikarpure Sindh
Excavation of earth for foundation trench
(Manual) as per provided layout of toilets and
dimensions by site engineer including cutting of
existing floor including proper compaction of
1 base and sides of excavated portion complete in 80.50 cft
all respect as per instruction of site engineer.

Filling of approved earth (sweet) obtained from


outside source and filling the same in
foundation, plinth, under floors, embankments,
open areas etc i/c breaking clods, dressing,
2 watering ,as per drawings , specification and 14.50 Cft
instructions of PSO Engineer.

Providing and laying Ballast stone (using S.R


cement) of specified strength using approved
quality 3/4" - 1.5 inch max. s including
15.00 cft
approved form work and its removal as per
drawing levelling, compaction, as per
instruction of site engineer.

Providing and laying CC 1:4:8 (using S.R


cement) of specified strength using approved
quality 3/4" max. size graded crushed aggregate
3 and fine aggregate including approved form 7.50 Cft
work and its removal as per drawing levelling,
compaction, rodding, vibrating, finishing and
curing etc. excluding cost of reinforcement
Providing and laying CC 1:2:4 (using S.R
cement) of specified strength using approved
quality 3/4" max. size graded crushed aggregate
4 and fine aggregate including approved form 4.95 Cft
work and its removal as per drawing levelling,
compaction, rodding, vibrating, finishing and
curing etc. excluding cost of reinforcement

Providing & laying first class brick 9inch


masonry (approved make) in cement mortar of
specified thickness set in 1:4 cement sand
5 30.75 Cft
mortar. The job includes required scaffolding,
racking out & cleaning and provision of
expansion joints & 15 days of water curing

Provision and application of 3/4'' thick cement


plaster with 1:4 cement sand mix as per
available detail sheet including proper curing
6 and finishing as per instructions of site engineer 75.50 Sft
complete in all respect

PCV Dubai Pipes (4" Dia) 45.00 Rft


7

Round Gravel special from river shore, no


8.28 Cft
edges as per instruction of site engineer
8
9 PVC Pipe Net Covers (4" Dia) 9.00 No
10 PVC Elbows for 4" Dia Pipes 7.00 No
11 PVC Tee Joints for 4" Dia Pipes 4.00 No
Glue and Other Requirments 1.00 Job
12
13 End cap with solution 3"dia 3.00 No
Coarse aggregate 0.75"-1" for wetland filtration
process, Round Gravel special from river
95.00 Cft
shore, no edges as per instruction of site
14 engineer
Total Construction of New Wetland system
Wet Land System
-
Estimation sheet Solar Power System 3kw
New Dispensry
PSO Project Shikarpure Sindh
S.No Description Quantity unit unit cost Amount
Supply and installation of Solar Panel Tier 1 JA
Jinko Trina 540 watt MonoCrystallin, wiring as per
1 3500 watt
requirement and ensure execution as per
requirement

Supply and installation of Dry batteries batteries


2 brand(Narada) with 200aH 12V specifications, 4 No
With at least 1 year warrenty documents.

3 Supply and installation of Solar Inverter INVEREX 1 No


VERON 3.2 kw with online Monitoring system with
inverter perallel and ensure working as per
requirement at satisfactory level of site engineer.
Supply and installation of Mounting strcuture steel
4 brackets 16G properly fixed at as per requirement. 4 no

Casting of 1x1x1 ft Foundation with 1:2:4 civil


work under mounting racks with shutering
smooth wooden or iron after proper drilling and
5 16 cft
fixing of mountings in surface using proper filling
of holes if any chisiling of surface for proper
bonding as per instruction of site engineer

Breakers for DC controling 16 amper 1000 volts


Two Pole schneider Brannd With B.Box Iron
6 1 no
Material 16 Gauge as per requirement at
satisfactory level of site engineer

Breakers for Battery power control 250 Amper TP


schneider Brannd with D.Box Iron Material 16
7 1 no
Gauge as per requirement at satisfactory level of
site engineer

Breakers for AC controling 20 Amper Four pole


Schneider brannd with D.Box Iron Material 16
8 1 No
Gauge as per requirement at satisfactory level of
site engineer

9 AC cables from inverter to DB box 10mm dual core 30 rft

10 Battery racks 16G for four batteries 1 NO


Supply and provision of DC 30mm battery cable
11 from inverter to battery and battery series cables 20 rft
properly installed

Supply and provision of DC imported Cable 4.mm


12 1000 Volt dule core Cable Double Insulataion 150 rft
100% copper ( open Cost )
Distribution Box size 15x18 sqinch,16 Gauge color
13 1 No
quoted
Transportation from near by city
14 1 No
Sukkur/Shikarpure to village site
Total Amount
Summary of Cost
Construction of New Dispensry
PSO Project Shikarpure Sindh
S.No Item Cost
1 Civil Work Cost -
2 Plumbing Work Cost -
3 Electrict Work Cost -
4 Wet Land Cost -
5 Solar System Cost -
6 Ro Plant
Total Cost -
BILL OF QUANTITIES
Construction Of New Dispencery -(Additional work)-Rev-00
PSO Project Shikarpure Sindh
S.No Description Per Unit L (ft) B (ft) D (ft) Quantity Unit
No
1 Dismantling work

Dismantling work : Dismantling /Demolition of Existing


security tower room in existing construction site,
including removal and transport of debris to the site of
landfill. Complete Job in all respect.
Security tower Room Size (5'-9"
i X5'-6") and Column Size (10"X10") and Beam Size (12" 2 11 11 242.00 Sq-ft
X10")and Top slab(11'X11'X6"). windows and doors
should safely remove and install in new construction of
security tower room.(Complete Job as per instruction
of Engineer)
Note: Contractor shall be visit at site before Quote.

Hospital Main Gate Door Size (5'X7')-Dismantling


/Demolition of Existing wall only for Door area and
ii repair and Color same as existing wall. 1 7 7 49.00 Sq-ft
(Demolition Size opening 7'X7')

RO Plant Main Jali with Door (14'X9.5')-Dismantling


iii /Demolition of Existing wall only for wall area and 1 14 9.5 133.00 Sq-ft
repair and Color same as existing wall.
(Demolition Size opening (14'X9.5')

Total Dismantling work 424.00 Sq-ft

2 New Construct work Security tower-RCC work


New Construct work Security Tower-RCC work :
Security tower Room Size (5'-9" X5'-6") and Column
Size (10"X10") and Beam Size (12" X10")and Top
slab(11'X11') at top of RO Plant Room (same as existing
security tower room follow the same design or as per 1 1 Job-lump
PSO requird) (RCC work- sum
Complete Job in all respect)
Note: Contractor shall be visit at
site before Quote.

3 Main Gate Hospital -M.S Gate

Main Gate Hospital -M.S Gate : Providing and fixing or


Installation of 16 gauge M.S folded sheet welded with
angle box frame.2"x 2"x1/4" .M.S angle box frame with
coats of red oxide and two coats of enamel paint
including tower bolts, pull handle lock using approved
brass section fittings, iron lugs, including cutting, Job-lump
welding proper design and logo design of PSO should 1 1 sum
be imposed on door. Complete in all respects as per
drawings, technical provisions and as directed by the
Engineer Incharge (Complete Job in all respect)
Hospital
Main Gate Door Size (5'X7')

4 Security Barrication on the top of wall


Security Barrication on the top of wall : Providing and
Fixing barbed wire Security Barrication /fencing using
2"x2"x1/4" angle iron posts 2.5' long, 6' apart with 4
horizontal rows & 4 vertical of barbed wire in each 1 60 60 R-ft
part including 1' inside,PCC (1:2:4) in beam, painting
etc (Same As Existing in PSO Shikarpur oil depot)
(Complete Job)

5 Street Pavement : Concrete Pavers work

Street Pavement : Concrete Pavers work-Providing and


laying pigmented/Grey pavers Envicrete/banu mukht
or Equivalent over base 9" thick compacted sand upto
98% compaction according to A.A.S.H.T.O. in
required line, levels, shape and design, sand grouting,
complete in all respect as per drawing, specifications
and as directed by Architect (including side support
kerb stone and all Kerb Stone oil Painted ) for Street
toward hospital Main gate and out side and Ro Plant.
(City paver thick: 50 mm)

Stree-01 1 10 12 120.00 Sq-ft


Stree-02 1 10 10 100.00 Sq-ft
Stree-03 1 10 8 80.00 Sq-ft
Total-Street Concrete Pavers work 300.00 Sq-ft

6 Waterproofing work for Sub Structure (Level +00)

WATER PROOFING Provide and laying 2 coat (4mm


thick)
Cold or hot bituminous coating /cementious coating or
waterproofing treatment by brush/Roller/spray
application or approved equivalent method on
Footing and Plinth beam,short columns and Situ brick
wall of Sub-structure up to FFL Level etc complete in
all respects. Brand or approved quality by
site architect/Engineer (Complete Job in all respect)

i Footings
Footing-F1
Longer-Direction 6.00 6.00 1.50 54.00 S-ft
Shorter-Direction 6.00 6.00 1.50 54.00 S-ft
Base 6.00 3.00 3.00 54.00 S-ft
Footing-F2
Longer-Direction 13.00 8.00 1.50 156.00 S-ft
Shorter-Direction 13.00 8.00 1.50 156.00 S-ft
Base 13.00 4.00 4.00 208.00 S-ft
Sub-Total 682.00 S-ft

ii Short Columns-C1

Longer-Direction 19.00 3.00 4.50 256.50 S-ft

Shorter-Direction 19.00 1.50 4.50 128.25 S-ft


Sub-Total 384.75 S-ft
iii Plinth Beam
Vertical direction-Beam
PB1 (9''X18'') on Grid 01,02,04 B/W Grid A to D
Longer-Direction 3.00 51.50 1.50 231.75 S-ft
Shorter-Direction 3.00 51.50 0.75 115.88 S-ft
PB1 (9''X18'') on Grid 03 B/W Grid A to D
Longer-Direction 1.00 19.34 1.50 29.01 S-ft
Shorter-Direction 1.00 19.34 0.75 14.50 S-ft
PB1 (9''X18'') on Grid 05 B/W Grid A to C
Longer-Direction 1.00 31.16 1.50 46.74 S-ft
Shorter-Direction 1.00 31.16 0.75 23.37 S-ft
Horizonal direction-Beam
PB1 (9''X18'') on Grid-A B/W Grid 01 to 05
Longer-Direction 1.00 79.00 1.50 118.50 S-ft
Shorter-Direction 1.00 79.00 0.75 59.25 S-ft
PB1 (9''X18'') on Grid-B B/W Grid 01 to 02
Longer-Direction 1.00 23.84 1.50 35.76 S-ft
Shorter-Direction 1.00 23.84 0.75 17.88 S-ft
PB1 (9''X18'') on Grid-B B/W Grid 04 to 05
Longer-Direction 1.00 18.00 1.50 27.00 S-ft
Shorter-Direction 1.00 18.00 0.75 13.50 S-ft
PB1 (9''X18'') on Grid-C B/W Grid 01 to 04
Longer-Direction 1.00 59.50 1.50 89.25 S-ft
Shorter-Direction 1.00 59.50 0.75 44.63 S-ft
PB1 (9''X18'') on Grid-C B/W Grid 04 to 05
Longer-Direction 1.00 59.50 1.50 89.25 S-ft
Shorter-Direction 1.00 59.50 0.75 44.63 S-ft
PB1 (9''X18'') on Grid-D B/W Grid 01 to 04
Longer-Direction 1.00 59.50 1.50 89.25 S-ft
Shorter-Direction 1.00 59.50 0.75 44.63 S-ft
Sub Total 1134.76 S-ft
Total -Waterproofing work for Sub Structure 2201.515 S-ft

7 Plastic Sheet below - Plinth Beam (1000 Gauge)


Plinth Beam
i Vertical direction-Beam
PB1 (9''X18'') on Grid 01,02,04 B/W Grid A to D 3.00 25.75 0.75 57.94 S-ft
PB1 (9''X18'') on Grid 03 B/W Grid A to D 1.00 9.67 0.75 7.25 S-ft
PB1 (9''X18'') on Grid 05 B/W Grid A to C 1.00 15.58 0.75 11.69 S-ft
ii Horizonal direction-Beam
PB1 (9''X18'') on Grid-A B/W Grid 01 to 05 1.00 39.50 0.75 29.63 S-ft
PB1 (9''X18'') on Grid-B B/W Grid 01 to 02 1.00 11.92 0.75 8.94 S-ft
PB1 (9''X18'') on Grid-B B/W Grid 04 to 05 1.00 9.00 0.75 6.75 S-ft
PB1 (9''X18'') on Grid-C B/W Grid 01 to 04 1.00 29.75 0.75 22.31 S-ft
PB1 (9''X18'') on Grid-C B/W Grid 04 to 05 1.00 9.00 0.75 6.75 S-ft
PB1 (9''X18'') on Grid-D B/W Grid 01 to 04 1.00 29.75 0.75 22.31 S-ft
Total -Plastic Sheet below - Plinth Beam 173.56 S-ft

8 Excavation work
Excavation in all type of main structure and soil/rock,
dressed to designed section, grades and profiles,
excavated material disposed where required. lift up to
1 ft
i Boundary Wall-Footing 5 4.5 4.5 2 202.5 C-ft

ii Excavation for Brick Masonry Below Plinth Beam


ii-a Plinth Beam-Stone Foundation
Vertical direction-Beam
PB1 (9''X18'') on Grid 01,02,04 B/W Grid A to D 3.00 25.75 1.50 1.00 115.88
PB1 (9''X18'') on Grid 03 B/W Grid A to D 1.00 9.67 1.50 1.00 14.50
PB1 (9''X18'') on Grid 05 B/W Grid A to C 1.00 15.58 1.50 1.00 23.37
Horizonal direction-Beam
PB1 (9''X18'') on Grid-A B/W Grid 01 to 05 1.00 39.50 1.50 1.00 59.25
PB1 (9''X18'') on Grid-B B/W Grid 01 to 02 1.00 11.92 1.50 1.00 17.88
PB1 (9''X18'') on Grid-B B/W Grid 04 to 05 1.00 9.00 1.50 1.00 13.50
PB1 (9''X18'') on Grid-C B/W Grid 01 to 04 1.00 29.75 1.50 1.00 44.63
PB1 (9''X18'') on Grid-C B/W Grid 04 to 05 1.00 9.00 1.50 1.00 13.50
PB1 (9''X18'') on Grid-D B/W Grid 01 to 04 1.00 29.75 1.50 1.00 44.63
Sub-Total 347.13 Cft
iii Footings
Footing-F1 6.00 4.00 4.00 (1.00) -96.00

Footing-F2 13.00 4.00 5.00 (1.00) -260.00


Sub Total -356.00 Cft

Total -Excavation work 193.63 Cft


9 Backfilling and Compaction work
i Boundary Wall (back side) 1 60 1.5 2 180 Cft
Backfilling and Compaction work for Dispencery New
ii Plot 1 60 48 4.5 12960 Cft
Dispencery area 1 42.5 25.75 1.5 1641.6 Cft
Ro Plant area 1 20.5 15 1.5 461.25 Cft

iii Street Concrete Pavers work


Stree-01 1 10 12 0.75 90 Cft
Stree-02 1 10 10 0.75 75 Cft
Stree-03 1 10 8 0.75 60 Cft
Sub Total 15467.813 Cft
Deduction old backfilling 3590 Cft

Deduction volumn Concrete 388.61 Cft

Total -Back filling 11489.1 Cft


Nos of Truck/Dumper-Size 400 Cft 28.72 Nos

Stone Mansonry with C/Sand 1:4 SRC Cement Sand


10 Providing & laying 1ft-1.5 ft size Pathar
Footings
Footing-F1
Long-wall 6.00 10.17 1.00 2.00 121.99 Cft
Short-wall 6.00 6.17 1.00 2.00 73.99 Cft
Base 6.00 3.08 3.08 1.00 57.03 Cft
Footing-F2
Long-wall 13.00 12.17 1.00 2.00 316.32 Cft
Short-wall 13.00 8.17 1.00 2.00 212.32 Cft
Base 13.00 4.08 4.08 1.00 216.72 Cft
Sub-Total 998.37 Cft
Stone Mansonry for Brick Masonry Below Plinth Beam
11 at Foundation Level

i Plinth Beam
Vertical direction-Beam
PB1 (9''X18'') on Grid 01,02,04 B/W Grid A to D 3.00 25.75 1.50 1.00 115.88
PB1 (9''X18'') on Grid 03 B/W Grid A to D 1.00 9.67 1.50 1.00 14.50
PB1 (9''X18'') on Grid 05 B/W Grid A to C 1.00 15.58 1.50 1.00 23.37
Horizonal direction-Beam
PB1 (9''X18'') on Grid-A B/W Grid 01 to 05 1.00 39.50 1.50 1.00 59.25
PB1 (9''X18'') on Grid-B B/W Grid 01 to 02 1.00 11.92 1.50 1.00 17.88
PB1 (9''X18'') on Grid-B B/W Grid 04 to 05 1.00 9.00 1.50 1.00 13.50
PB1 (9''X18'') on Grid-C B/W Grid 01 to 04 1.00 29.75 1.50 1.00 44.63
PB1 (9''X18'') on Grid-C B/W Grid 04 to 05 1.00 9.00 1.50 1.00 13.50
PB1 (9''X18'') on Grid-D B/W Grid 01 to 04 1.00 29.75 1.50 1.00 44.63
Sub-Total 347.13 Cft
Deduction Stone Soiling-Footing-F1 & F2 178.00
Total-Stone Mansonry 1167.49 Cft

11 Stone Soiling
Provision, laying and compaction of Stone 1"-1/2",
complete in all respect
Boundary Wall-Footing 5 4.5 4.5 0.33 33.75
Boundary Wall-below 1 60 1.5 0.50 45
Sub-Total 78.75
deduction 5 4.5 1.5 0.33 11.25
Total-Stone Soiling 67.50 Cft
12 PCC 1:4:8

Plain cement concrete with 1:4:8 includig placing


compacting, finishing and curing, complete (including
screening and washing at stone aggregate with/without
shuttering. Complete in all respect

Boundary Wall-Footing 5 4.5 4.5 0.33 33.75


Boundary Wall-below 1 60 1.5 0.50 45
Sub-Total 78.75
deduction 5 4.5 1.5 0.33 11.25
Total PCC 1:4:8 67.50 Cft
13 Reinforced Cement Concrete-RCC 1:2:4

Providing and laying Reinforced cement concrete using


graded screened bajri 3/8" and down gauge as fine
aggregate, OPC / SRC and crushed stone 3/4" down
gauge as coarse aggregate with 1:2:4 Concrete mix by
machine at site including the cost of fixing form work
and scaffolding and its removal, vibrating using
mechanical vibrator, curing and Cylinder testing etc.
having min. cubicall strength of 4000 psi after 28 days
curing but excluding the cost of reinforcement bars
complete as per drawing. For the curing All structural
items must be covered with Jute bags cloth.The
contractor is bound to sumbit the Sieve analysis
reports and results of cube test, cylinder tests on UTM
machine after the stregnth of 14 days and the result
should not be less than 90% of the specified strength.
(Complete in all respect)

Boundary Wall-Footing 5 4 4.0 2 160


Plinth Beam-Boundary Wall 1 60 1 1.50 90
Top Beam-Boundary Wall 1 60 1 1.00 60
Columns-Boundary Wall 5 1 1.5 7.53 56.475

Short Columns-C1 below Plinth Beam 19.00 1.50 0.75 4.50 96.19

Total Concrete 462.66 Cft

14 Steel Reinforcement :

Providing, straightening, cutting, bending, fabrication,


hoisting and placing in position high yield strength
Steel Reinforcement 60,000 psi Amreeli Steeli
conforming to ASTM A-615 (Deformed bar), tying with
binding wire 18 gauge together with its cost in all kinds
of reinforced concrete sections in any position or
elevation or at any height, providing and fixing steel
chairs or approved plastic chairs, or precast concrete
chairs of mix richer than the concrete mix in section,
tying with binding wire, pins, spacer bars etc. as per
drawings, specifications and instructions of the
Architect/Engineer.(Complete in all respect)

Total Steel for building already 7% wastage steel add


in this Qty 1.00 799 1,000.00 1.55 Tons

i Short Columns-C1 below Plinth Beam 19.00 799.00 kg 0.80 Tons


ii Plinth Beam-Boundary Wall 1.00 135.00 kg 0.14 Tons
iii Top Beam-Boundary Wall 1.00 104.00 kg 0.10 Tons
iv Footing-Boundary Wall 5.00 115.72 kg 0.12 Tons
v Columns-Boundary Wall 5.00 399.50 kg 0.40 Tons

15 Brick Masonry with 1:4 C/S Mortars

Provision and construction of Brick Masonry with 1:4


cement sand mortars including maintaining of
horizontal and vertical levels and proper curing after
construction work for desirable timing to have proper
strength (cement SRC), with complete job in all respect.

Boundary Wall-13.5" 1 55 1.083 4.50 268.125 Cft


Boundary Wall-12" 1 55 1.00 7.53 414.15 Cft
Brick Masonry with 1:4 C/S Mortars below Plinth
Beam
i Plinth Beam
Vertical direction-Beam
PB1 (9''X18'') on Grid 01,02,04 B/W Grid A to D 3.00 25.75 0.75 4.50 260.72
PB1 (9''X18'') on Grid 03 B/W Grid A to D 1.00 9.67 0.75 4.50 32.64
PB1 (9''X18'') on Grid 05 B/W Grid A to C 1.00 15.58 0.75 4.50 52.58
Horizonal direction-Beam
PB1 (9''X18'') on Grid-A B/W Grid 01 to 05 1.00 39.50 0.75 4.50 133.31
PB1 (9''X18'') on Grid-B B/W Grid 01 to 02 1.00 11.92 0.75 4.50 40.22
PB1 (9''X18'') on Grid-B B/W Grid 04 to 05 1.00 9.00 0.75 4.50 30.38
PB1 (9''X18'') on Grid-C B/W Grid 01 to 04 1.00 29.75 0.75 4.50 100.41
PB1 (9''X18'') on Grid-C B/W Grid 04 to 05 1.00 9.00 0.75 4.50 30.38
PB1 (9''X18'') on Grid-D B/W Grid 01 to 04 1.00 29.75 0.75 4.50 100.41
Add- PB1 (9''X18'') on Grid 01,02,04 B/W Grid A to D 2.00 25.75 0.75 4.50 173.81
Deduction -old Brick Masonry below PB-Beams 1.00 188.00 1.00 1.00 188.00
Sub-Total 1449.12
Total-Brick Masonry with 1:4 C/S Mortars 1449.12 Cft

16 Plaster work with 1:4 C/S Mortars

Footings (Interior side) Stone Masonary box


Footing-F1
Long-wall 6.00 6.33 3.00 113.98 S-ft
Short-wall 6.00 6.33 3.00 113.98 S-ft
Base 6.00 3.17 3.17 60.14 S-ft
Footing-F2
Long-wall 13.00 8.33 3.00 324.95 S-ft
Short-wall 13.00 8.33 3.00 324.95 S-ft
Base 13.00 4.17 4.17 225.62 S-ft

Sub-Total 1163.61 S-ft


Boundary Wall 2 55 8.53 938.3 S-ft

Total 2101.91 Sft


Abstract Sheet
Construction Of New Dispencery -(Additional work)-Rev-00
PSO Project Shikarpure Sindh
SNO. DESCRIPTION QTY UNIT UNIT RATE AMOUNT
Excavation of earth for foundation trench (Manual) as per provided
layout of site and dimensions by site engineer including cutting of
existing floor including proper compaction of base and sides of
1 excavated portion complete in all respect as per instruction of site 193.63 Cft 40 7,745
engineer.

Earth filling as in Ordinary or Hard Soil, filling in foundation, pipe


trenches, shafts,independent holes, under floors or around plinths
Beam etc . with soil obtained from excavation in trenches/over
areas .watering and compaction 95% in 150 mm layer and dressing to
2 required shape. Note : back filling with suitable material with out any 11489.11 Cft 30 344,673
boulders)(Complete in all respect)

Provision/supply, laying and compaction of Stone Ballast 1"-


3 1/2" size, Complete in all respect. 67.50 Cft 100 6,750
Providing & laying cutting 1ft-1.5 ft size Pathar (City rohri) Stone
block Masonry (approved make) in cement mortar of specified
thickness set in 1:4 cement sand mortar(SRC Cemnet). The job
4 includes required scaffolding, racking out & cleaning and provision of 1167.49 Cft 120 140,099
expansion joints & 15 days of water curing

Providing and laying CC 1:4:8 (using S.R cement) of specified


strength using approved quality 3/4" max. size graded crushed
aggregate and fine aggregate including approved form work and its
5 removal as per drawing,levelling, compaction, rodding, vibrating, 67.50 Cft 500 33,750
finishing and curing etc. excluding cost of reinforcement.

Providing and laying Reinforced cement concrete using graded


screened bajri 3/8" and down gauge as fine aggregate,SRC and
crushed stone 3/4" down gauge as coarse aggregate with 1:2:4
Concrete mix by machine at site including the cost of fixing form
work and scaffolding and its removal, vibrating using mechanical
vibrator, curing and Cylinder testing etc. having min. cubicall
strength of 4000 psi after 28 days curing but excluding the cost of
reinforcement bars complete as per drawing. For the curing All
6 structural items must be covered with Jute bags cloth.The contractor 462.66 Cft 500 231,331
is bound to sumbit the Sieve analysis reports and results of cube test,
cylinder tests on UTM machine after the stregnth of 14 days and the
result should not be less than 90% of the specified strength

Providing, straightening, cutting, bending, fabrication, hoisting and


placing in position high yield strength Steel Reinforcement 60,000 psi
Amreeli Steeli conforming to ASTM A-615 (Deformed bar), tying with
7 binding wire 18 gauge together with its cost in all kinds of reinforced 1.55 Tons 320,000 497,032
concrete sections in any position or elevation or at any height,
providing and fixing steel chairs or approved plastic chairs, or precast
concrete chairs of mix richer than the concrete mix in section, tying
with binding wire, pins, spacer bars etc. as per drawings,
specifications and instructions of the Architect/Engineer. (complete in
all respect)
Providing & laying first class brick 9inch masonry (approved make)
in cement mortar of specified thickness set in 1:4 cement sand
8 mortar(SRC Cement). The job includes required scaffolding, racking 1449.12 Cft 600.0 869,471
out & cleaning and provision of expansion joints & 15 days of water
curing
Plaster work with 1:4 C/S Mortars : Provision and application of 3/4''
thick cement plaster with 1:4 cement sand mix as per available detail
sheet including proper curing and finishing as per instructions of site
9 engineer complete in all respect (Exterior side & Interior side) 2101.91 sq-ft 80.0 168,153

Providing and fixing of Plastic Sheet 1000 Gauge below Plinth Beam
10 Prime quality as per approved design complete job with all respect 173.56 sq-ft 100.0 17,356

WATER PROOFING Provide and laying 2 coat (4mm thick)


Cold or hot bituminous coating /cementious coating or waterproofing
treatment by brush/Roller/spray application or approved equivalent
method on
11 Footing and Plinth beam,short columns and Situ brick wall of Sub- 2201.52 sq-ft 100 220,152
structure up to FFL Level etc complete in
all respects. Brand or approved quality by
site architect/Engineer (Complete Job in all respect)

Street Pavement : Concrete Pavers work-Providing and laying


pigmented/Grey pavers Envicrete/banu mukht or Equivalent over
base 9" thick compacted sand upto
98% compaction according to A.A.S.H.T.O. in
required line, levels, shape and design, sand grouting,
12 complete in all respect as per drawing, specifications 300.00 sq-ft 500 150,000
and as directed by Architect (including side support kerb stone and
all Kerb Stone oil Painted ) for Street toward hospital Main gate and
out side and Ro Plant. (City paver thick: 50 mm)

Main Gate Hospital -M.S Gate : Providing and fixing or Installation


of 16 gauge M.S folded sheet welded with angle box frame.2"x
2"x1/4" .M.S angle box frame with coats of red oxide and two coats
of enamel paint including tower bolts, pull handle lock using
approved brass section fittings, iron lugs, including cutting, welding
proper design and logo design of PSO should be imposed on door. Job-
13 Complete in all respects as per drawings, technical provisions and as 1.00 lump 200000 200,000
directed by the Engineer Incharge (Complete Job in all respect) sum
Hospital Main
Gate Door Size (5'X7')

New Construct work Security Tower-RCC work : Security tower


Room Size (5'-9" X5'-6") and Column Size (10"X10") and Beam
Size (12" X10")and Top slab(11'X11') at top of RO Plant Room (same
as existing security tower room follow the same design or as per PSO Job-
14 requird) (RCC work-Complete Job in all 1.00 lump 250000 250,000
respect) Note: sum
Contractor shall be visit at site before Quote.

Dismantling work : Dismantling /Demolition of Existing security


tower room in existing construction site, including removal and
transport of debris to the site of landfill. Complete Job in all respect.
Security tower Room Size
(5'-9" X5'-6") and Column Size (10"X10") and Beam Size (12"
15 X10")and Top slab(11'X11'X6"). windows and doors should safely 424.00 Sq-ft 200 84,800
remove and install in new construction of security tower room.
(Complete Job as per instruction of Engineer)
Note: Contractor shall be visit at site before
Quote.

Security Barrication on the top of wall : Providing and Fixing barbed


wire Security Barrication /fencing using 2"x2"x1/4" angle iron posts
2.5' long, 6' apart with 4 horizontal rows & 4 vertical of barbed wire
in each
16 part including 1' inside,PCC (1:2:4) in beam, painting etc (Same As 60.00 Rft 4500 270,000
Existing in PSO Shikarpur oil depot)
(Complete Job)
Weather Shield Color : Providing & Apply weather Shield with 3
coat, Scraping and preparing flate surface with fillings on internal
17 & External sides of all Dispensary walls , White distemper wth 3 coats 938.30 S-ft 500 469,150
, ( complete in all respect)

Total Amount of Building Construction 3,960,463