Download as pdf or txt
Download as pdf or txt
You are on page 1of 2

1/23/23, 8:30 AM View Active Negotiations - Supplier Portal - Oracle Fusion Cloud Applications

Requirement: 1. Technical requirements (RFQ 23-RFQ-0 Done

Section 1. technical requirements


Evaluation
Technical
Stage
Requirement 1. Technical requirements

Requirement
Note :
Text
1. You will find all the Project documents from below link. If you are facing any issue with link please drop us email immediately.
https://maaden-my.sharepoint.com/personal/castillanol_maaden_com_sa/_layouts/15/onedrive.aspx?
id=%2Fpersonal%2Fcastillanol%5Fmaaden%5Fcom%5Fsa%2FDocuments%2FOneDrive%5F2023%2D01%2D11%2Ezip&parent=%2Fpersonal%2Fcastillanol%5

2. Attach the technical proposal with unpriced BOQ details here.


3. All other requirement documents as below bullet points MUST BE attach along with technical proposal in one File with less ca
General Organization/Past Experience
1. Overall Organization of the Bidder
2. Previous Project Experience of similar size and nature
3. Previous experience with Maaden in similar size and nature
4. Previous experience with MWSPC in similar size and nature
Project Organization
1. Project Organization Chart
2. Project Management and Engineering
3. Project Manager qualification and Experience
4. 1.8 CV's of Key Staff

Safety Compliance
1. Compliance to HSE Questionairies
2. Bidder's Project HSE Plan
3. Compliance to Maaden HSE Precedures
4. Understanding of Project Safety Risk and Mitigation Plan
Preliminary Engineering
1. Review & Evaluate available information (Including as built conditions
2. Identify required site specific additional
information
3. Site visits and field inspection

Basic Engineering Design and Analyses


1. Understanding to the scope and confirmation to the technical requirements
2. Preliminary Detailed Design Drawings
3. Mobilization Plan
4. Compliance to Project Milestones
5. Manpower details
6. Final Detailed Design Drawings
7. Demobilization Plan

Compliance to Engineering deliverables


1. Comprehensive report and detailed drawing
2. Technical memorandum

Saudi Arabian Content


1. Bidder to provide the Saudization Plan
2. Has bidder proposed Saudis at key position
3. Bidder to specify the local content plan

3. File size must be reduce otherwise system will not support. So after the attachment kindly double check whether the
properly.

Hint

Properties

Level Supplier Value Type Single line text


Attachments None
Response Required Allow comments from suppliers

Requirement Type Multiple choice with single selection

Acceptable Values

https://fa-epod-saasfaprod1.fa.ocs.oraclecloud.com/fscmUI/faces/FndOverview?fndGlobalItemNodeId=itemNode_supplier_portal_supplier_portal… 1/2
1/23/23, 8:30 AM View Active Negotiations - Supplier Portal - Oracle Fusion Cloud Applications

View Format Freeze Detach Wrap

Response Value

a. YES

b. NO

https://fa-epod-saasfaprod1.fa.ocs.oraclecloud.com/fscmUI/faces/FndOverview?fndGlobalItemNodeId=itemNode_supplier_portal_supplier_portal… 2/2

You might also like