Volume Harga satuan (Rp.) Pajak (%) Pajak (Rp.) Total (Rp.) Keterangan
2.96 204,500.00 10.00 60,532.00 665,852.00
32.81 1,164,100.00 10.00 3,819,412.10 42,013,533.10
34.43 1,164,100.00 10.00 4,007,996.30 44,087,959.30
364.50 18,400.00 10.00 670,680.00 7,377,480.00
78.40 121,300.00 10.00 950,992.00 10,460,912.00
11.88 122,200.00 10.00 145,173.60 1,596,909.60
23.76 90,800.00 10.00 215,740.80 2,373,148.80
23.76 57,400.00 10.00 136,382.40 1,500,206.40
83.17 90,800.00 10.00 755,183.60 8,307,019.60
83.17 57,400.00 10.00 477,395.80 5,251,353.80
19.20 90,800.00 10.00 174,336.00 1,917,696.00
19.20 57,400.00 10.00 110,208.00 1,212,288.00
32.51 90,800.00 10.00 295,190.80 3,247,098.80
32.51 57,400.00 10.00 186,607.40 2,052,681.40
126.13 28,500.00 10.00 359,470.50 3,954,175.50
18.23 220,900.00 10.00 402,700.70 4,429,707.70
364.50 263,900.00 10.00 9,619,155.00 105,810,705.00
20.10 188,500.00 10.00 378,885.00 4,167,735.00
5.17 1,112,300.00 10.00 575,059.10 6,325,650.10
1.99 174,200.00 10.00 34,665.80 381,323.80
3.00 192,100.00 10.00 57,630.00 633,930.00
9.00 56,100.00 10.00 50,490.00 555,390.00
3.00 287,200.00 10.00 86,160.00 947,760.00
55.00 188,500.00 10.00 1,036,750.00 11,404,250.00
18.94 1,112,300.00 10.00 2,106,696.20 23,173,658.20
11.00 155,500.00 10.00 171,050.00 1,881,550.00
33.00 56,100.00 10.00 185,130.00 2,036,430.00
54.18 188,500.00 10.00 1,021,293.00 11,234,223.00
6.49 174,200.00 10.00 113,055.80 1,243,613.80
77.20 188,500.00 10.00 1,455,220.00 16,007,420.00
13.78 1,283,800.00 10.00 1,769,076.40 19,459,840.40
20.70 174,200.00 10.00 360,594.00 3,966,534.00
4.00 1,134,700.00 10.00 453,880.00 4,992,680.00
8.00 1,337,500.00 10.00 1,070,000.00 11,770,000.00
8.00 1,134,700.00 10.00 907,760.00 9,985,360.00
8.00 1,134,700.00 10.00 907,760.00 9,985,360.00
8.00 379,400.00 10.00 303,520.00 3,338,720.00
10.46 188,500.00 10.00 197,171.00 2,168,881.00
1.72 1,112,300.00 10.00 191,315.60 2,104,471.60
1.30 174,200.00 10.00 22,646.00 249,106.00
1.00 192,100.00 10.00 19,210.00 211,310.00
3.00 56,100.00 10.00 16,830.00 185,130.00
1.00 287,200.00 10.00 28,720.00 315,920.00
72.70 188,500.00 10.00 1,370,395.00 15,074,345.00
3.44 824,900.00 10.00 283,765.60 3,121,421.60
26.99 174,200.00 10.00 470,165.80 5,171,823.80
2.00 192,100.00 10.00 38,420.00 422,620.00
6.00 56,100.00 10.00 33,660.00 370,260.00
2.00 287,200.00 10.00 57,440.00 631,840.00
214.72 188,500.00 10.00 4,047,472.00 44,522,192.00
60.52 174,200.00 10.00 1,054,258.40 11,596,842.40
6.16 188,500.00 10.00 116,116.00 1,277,276.00
1.51 174,200.00 10.00 26,304.20 289,346.20
30.08 188,500.00 10.00 567,008.00 6,237,088.00
5.20 174,200.00 10.00 90,584.00 996,424.00
4.69 188,500.00 10.00 88,406.50 972,471.50
0.73 174,200.00 10.00 12,716.60 139,882.60
3.68 188,500.00 10.00 69,368.00 763,048.00
0.68 824,900.00 10.00 56,093.20 617,025.20
1.00 155,500.00 10.00 15,550.00 171,050.00
2.00 56,100.00 10.00 11,220.00 123,420.00
74.80 92,000.00 10.00 688,160.00 7,569,760.00
24.00 121,300.00 10.00 291,120.00 3,202,320.00
68.10 122,200.00 10.00 832,182.00 9,154,002.00
6.48 220,900.00 10.00 143,143.20 1,574,575.20
75.60 263,900.00 10.00 1,995,084.00 21,945,924.00
151.20 313,700.00 10.00 4,743,144.00 52,174,584.00
72.00 199,900.00 10.00 1,439,280.00 15,832,080.00
72.00 56,200.00 10.00 404,640.00 4,451,040.00
77.76 199,900.00 10.00 1,554,422.40 17,098,646.40
77.76 249,700.00 10.00 1,941,667.20 21,358,339.20
72.00 28,500.00 10.00 205,200.00 2,257,200.00
10.00 2,828,200.00 10.00 2,828,200.00 31,110,200.00
6.00 1,162,400.00 10.00 697,440.00 7,671,840.00
3.00 3,172,000.00 10.00 951,600.00 10,467,600.00
11.00 128,500.00 10.00 141,350.00 1,554,850.00
14.00 110,100.00 10.00 154,140.00 1,695,540.00
10.00 223,000.00 10.00 223,000.00 2,453,000.00
3.00 276,100.00 10.00 82,830.00 911,130.00
55.00 30,100.00 10.00 165,550.00 1,821,050.00
70.00 38,200.00 10.00 267,400.00 2,941,400.00
50.00 99,800.00 10.00 499,000.00 5,489,000.00
50.00 107,100.00 10.00 535,500.00 5,890,500.00
17.00 271,000.00 10.00 460,700.00 5,067,700.00
17.00 123,700.00 10.00 210,290.00 2,313,190.00
1.00 33,188,000.00 10.00 3,318,800.00 36,506,800.00
APENDO 759,995,621.00
HPS 759,995,621.00
-
REKAPITULASI
PEKERJAAN REHABILITASI GEDUNG B KANTOR PUSBANGKOM JPW
LOKASI : Jalan Abdul Hamid Cicaheum Kota Bandung - Bandung (Kota)
TAHUN ANGGARAN : 2021
A PEKERJAAN LANTAI 2
I. PEKERJAAN BONGKARAN
1 Pekerjaan Bongkaran dan Pembersihan Kusen Pintu dan Jendela koridor m3 2.96 204,500.00 605,320.00 143,150.00 423,724.00
2 Pekerjaan Bongkaran pembersihan dan buangan keluar site bata koridor m3 32.81 1,164,100.00 38,194,121.00 814,870.00 26,735,884.70
3 Pekerjaan Bongkaran pembersihan dan buangan keluar site bata kamar + km/wc m3 34.43 1,164,100.00 40,079,963.00 814,870.00 28,055,974.10
4 Pekerjaan Bongkaran dan pembersihan Lantai Keramik m2 364.50 18,400.00 6,706,800.00 12,880.00 4,694,760.00
TOTAL PEKERJAAN BONGKARAN 85,586,204.00 59,910,342.80
II PEKERJAAN PASANGAN
1 Pek. Ring Balk 10/15 K 175 ovening jendela m1 78.40 121,300.00 9,509,920.00 84,910.00 6,656,944.00
2 Pekerjaan Pasangan bata adukan 14 penutup ex pintu m2 11.88 122,200.00 1,451,736.00 85,540.00 1,016,215.20
3 Pekerjaan Plesteran adukan 14 penutup ex pintu m2 23.76 90,800.00 2,157,408.00 63,560.00 1,510,185.60
4 Pekerjaan Acian penutup ex pintu m2 23.76 57,400.00 1,363,824.00 40,180.00 954,676.80
5 Pekerjaan Plesteran adukan 14 Ovening Jendela koridor m2 83.17 90,800.00 7,551,836.00 63,560.00 5,286,285.20
6 Pekerjaan Acian Ovening Jendela koridor m2 83.17 57,400.00 4,773,958.00 40,180.00 3,341,770.60
7 Pekerjaan Plesteran adukan 14 bekas bongkaran bata m2 19.20 90,800.00 1,743,360.00 63,560.00 1,220,352.00
8 Pekerjaan Acian bekas bongkatan bata m2 19.20 57,400.00 1,102,080.00 40,180.00 771,456.00
9 Pekerjaan Plesteran adukan 14 Ovening Jendela dan Bouwvenligh luar m2 32.51 90,800.00 2,951,908.00 63,560.00 2,066,335.60
10 Pekerjaan Acian Ovening Jendela dan Bouwvenligh luar m2 32.51 57,400.00 1,866,074.00 40,180.00 1,306,251.80
11 Pekerjaan Pengecatan dinding dan Ovening Jendela bekas bidang bongkaran m2 126.13 28,500.00 3,594,705.00 19,950.00 2,516,293.50
12 Pekerjaan pas. Pasir urug bawah Lantai m3 18.23 220,900.00 4,027,007.00 154,630.00 2,818,904.90
13 Pekerjaan pas. Keramik lantai bekas bongkaran m2 364.50 263,900.00 96,191,550.00 197,925.00 72,143,662.50
TOTAL PEKERJAAN DINDING 138,285,366.00 101,609,333.70
V PEKERJAAN MEKANIKAL
1 Pek. Pas. Kloset duduk bh 10.00 2,828,200.00 28,282,000.00 2,121,150.00 21,211,500.00
2 Pek. Pas. Wastafel bh 6.00 1,162,400.00 6,974,400.00 871,800.00 5,230,800.00
3 Pek. Pas. Urinoar bh 3.00 3,172,000.00 9,516,000.00 2,379,000.00 7,137,000.00
4 Pek. Pas. Kran air bh 11.00 128,500.00 1,413,500.00 96,375.00 1,060,125.00
5 Pek. Pas. Floordrain bh 14.00 110,100.00 1,541,400.00 82,575.00 1,156,050.00
6 Pek. Pas. Zet washer bh 10.00 223,000.00 2,230,000.00 167,250.00 1,672,500.00
7 Pek. Pas. Showe Sprey bh 3.00 276,100.00 828,300.00 207,075.00 621,225.00
1 Pek. Instalasi Air Bersih PVC dia 1/2 m1 55.00 30,100.00 1,655,500.00 22,575.00 1,241,625.00
2 Pek. Instalasi Air Bersih PVC dia 1 m1 70.00 38,200.00 2,674,000.00 28,650.00 2,005,500.00
3 Pek. Instalasi Air Kotor PVC dia 3 m1 50.00 99,800.00 4,990,000.00 74,850.00 3,742,500.00
4 Pek. Instalasi Air Kotor PVC dia 4 m1 50.00 107,100.00 5,355,000.00 80,325.00 4,016,250.00
TOTAL PEKERJAAN MEKANIKAL 65,460,100.00 49,095,075.00
VI PEKERJAAN ELEKTRIKAL
5 Pek. Intalasi Titik lampu ttk 17.00 271,000.00 4,607,000.00 203,250.00 3,455,250.00
6 Pek. Lampu LED 11 watt bh 17.00 123,700.00 2,102,900.00 92,775.00 1,577,175.00
TOTAL PEKERJAAN MEKANIKAL DAN ELEKTRIKAL 6,709,900.00 5,032,425.00