Professional Documents
Culture Documents
R250 Avr
R250 Avr
R250 Avr
23
78
KNEE
3 OFF
65Hz 7
456
LAM OFF 4 13%
KNEE 6
5 25%
57Hz 60Hz LAM
LAM OFF
R250
AVR
Installation and maintenance
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
This manual concerns the alternator AVR which you have just purchased.
We wish to draw your attention to the contents of this maintenance manual.
SAFETY MEASURES
2
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
CONTENTS
1 - POWER SUPPLY................................................................................................................ 4
1.1 - SHUNT excitation system.............................................................................................4
2 - R250 AVR............................................................................................................................5
2.1 - Characteristics.............................................................................................................. 5
2.2 - U/F function and LAM....................................................................................................5
2.3 - AVR options................................................................................................................... 6
2.4 - LAM Characteristics .....................................................................................................6
2.5 - Typical effects of the LAM..............................................................................................7
3 - INSTALLATION - COMMISIONING....................................................................................8
3.1 - Electrical checks on the AVR.........................................................................................8
3.2 - Settings.........................................................................................................................8
3.3 - Electrical faults.............................................................................................................. 9
4 - SPARE PARTS.................................................................................................................. 10
4.1 - Designation................................................................................................................. 10
4.2 - Technical support service............................................................................................10
The R250 is an IP00 product. It must be installed inside a unit so that this unit’s cover can
provide IP20 minimum total protection (it must only be installed on our alternators in the
appropriate location so that when viewed externally, it has a higher degree of protection than
IP20).
3
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
Varistor
Induced
5+ 6-
T4 T10 T5 T11 T6 T12
Field
75 mm
110 0V E+ E- R250
4 x holes Ø 5.8 x
140 mm
50 x 115 mm
Slow fuse
F1 250V 8 A
FREQ. & L.A.M. CONFIG.
P1 Voltage
STAB VOLT
47.5Hz
KNEE
50Hz LAM
LAM OFF 9
o OFF
1 13%
SPECIAL
8 901 2 25%
Frequency selector 50 Hz
23
78
KNEE
3 OFF
P2
65Hz 7
456
ST4 Option
External potentiometrer
for voltage adjusting
4
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
KNEE
3 OFF gradient ; a special programme is possible
65Hz 7
456
13%
on request. This programme must be
LAM OFF 4 specified before ordering, during the project
KNEE 6
5 25% study.
57Hz 60Hz LAM
LAM OFF
9: threshold at 47.5 Hz without LAM for
speed variations at a steady state > 2 Hz.
5
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
2.3 - AVR options It is advised to use the “LAM” at 25% for load
Potentiometer for remote voltage impacts > at 70% of the genset rated power.
adjustment, 1000 Ω / 0.5 W min: adjustment
Voltage
range ± 5%.
- Remove the ST4 jumper. UN
Voltage
U/f
0,85 UN LAM
6
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
2.5.1 - Voltage
Transient voltage drop
UN
0,9
(U/f)
with without LAM
0,8
LAM
Time
0 1s 2s 3s
2.5.2 - Frequency
Max speed drop with
fN LAM
0,9
without
LAM
0,8 Time
0 1s 2s 3s
2.5.3 - Power
LAM
shaft (kW)
Load variation
Load on
Time
0 1s 2s 3s
7
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
3 - INSTALLATION - 3.2.2 - Special type of use
COMMISSIONING
3.1 - Electrical checks on the AVR WARNING
- Check that all connections have been
made properly as shown in the attached Excitation circuit E+, E- must not be left
open when the machine is running: AVR
wiring diagram.
damage will occur.
- Check that the position of the jumper
corresponds to the operating frequency. 3.2.2.1 - R250 field weakening (SHUNT)
- Check whether the ST4 jumper or the
remote adjustment potentiometer have
been connected.
3.2 - Settings
E+
0V
110
E-
The exciter is switched off by disconnecting
The different settings made during the the AVR power supply (1 wire - 0 or 110V).
trial are to be done by qualified personnel. Contact rating: 16A - 250V AC.
Respecting the load speed specified on
the nameplate is vital in order to start a Do not reclose the power supply until the
settings procedure. After operational voltage has reached a value ≤15% of the
testing, replace all access panels or rated voltage (approximately 5 seconds
covers. after opening).
The only possible settings on the
machine are to be done with the AVR. 3.2.2.2 - R250 field forcing
(400V - 10A) Diode
E+
0V
E-
the middle.
Operate the alternator at its rated speed: if
the voltage does not rise it is necessary to
re-magnatise the magnetic circuit.
- slowly adjust the voltage potentiometer of
the AVR P1 until the output voltage reaches
its rated value.
- Stability setting with P2. Battery must be isolated from the earth.
8
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
9
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
4 - SPARE PARTS
4.1 - Designation
Description Type Code
AVR R250 AEM 110 RE 019
10
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
Disposal and recycling instructions All materials listed above need special
We are committed to limiting the treatment to separate waste from
environmental impact of our activity. We reclaimable materials and should be
continuously monitor our production entrusted to specialist recycling companies.
processes, material sourcing and product
design to improve recyclability and minimise
our environmental footprint.
These instructions are for information
purposes only. It is the user’s responsibility
to comply with local legislation regarding
product disposal and recycling.
11
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
12
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
13
Electric Power Generation Installation and maintenance 4067 en - 2024.02 / j
R250
AVR
14
Service & Support
Life Extension
•Reconditioning Start-up
•System upgrade
•Commissioning
•Training
Optimisation
•Monitoring Operation
•System audit •Genuine spare parts
•Repair services
Contact us:
Americas: +1 (507) 625 4011
EMEA: +33 238 609 908
Asia Pacific: +65 6250 8488
China: +86 591 8837 3010
India: +91 806 726 4867
Scan the code or go to:
service.epg@leroy-somer.com www.lrsm.co/support
www.leroy-somer.com/epg
4067 en - 2024.02 / j