Download as pdf or txt
Download as pdf or txt
You are on page 1of 1

GUMAP – Activity 012A – MLGDRD – Accra / 1st of July 2021

LTTA Traffic and Parking management -


Task 2 – Pilot studies 3/8 Task 8 – Institutional improvements
Mission 3 - Schedule

Duties of the groups by next mission


 Convert traffic counts into flow rates and identify peak flow rates for the 3
intersections
 Complete situational and functional survey of the 3 intersections, if needed.
For traffic lights, duration of phases shoud be measured ( see note on data
collection)
 Compute volume-to-capacity ratio (used capacity) for the 2 unsignalized
intersections and try to draw what are the problems

You can bring any specific traffic or parking question, even if not
related to pilot studies. It can be addressed under topic 6 – On the job
training and ad hoc support.
 Share questions/issues with Pascal (by email) or Mamaa prior to the
following mission
15 / 32
1.7.2021 TRANSITEC 0844_202-12a-ppt-pam-mission 3-wrapup.pptm

You might also like