ROLLING MILL FIX COMPENSATION INFLUENCE ON THE NETWORK


Date:
02/11/21

Prepared by: Sebastian Molina

Notes

The PFM300 ANALYZER is installed at the PCC (230kV Line) of Las Lomas Substation in order to register
and analyze the behavior of the EAF and LF furnaces.

The Monitor tool of the PFM300 ANALYZER has a recording rate of every 1 second. All instantaneous
peaks value obtained in a sample time of 1 second.

Point of measurement high voltage side:

On October 26, 2021 Furnace stop operation at 10:45 am due to some problems. Rolling Mill in the
other side operated until 17:52 pm.

• After De-Energized the STATCOM, it can be appreciated a rise of the voltage.


o The maximum peak voltage on the HV side identified is 137.338 kV (103.42% Un)
phase B.
o The maximum peak voltage on the MV side identified is 6.489 kV (102.19% Un) phase
A.
• The U THD rise after rolling mill operation and even after the 5th and 7th filter are de-energized.

Measurement Date: October 26, 2021


Code: REV: 0 Page: 2 of 5

ROLLING MILL FIX COMPENSATION INFLUENCE ON THE NETWORK


Date:
02/11/21

POWER MV SIDE

Figure 1

U THD HV SIDE

Figure 2

Measurement Date: October 26, 2021


Code: REV: 0 Page: 3 of 5

ROLLING MILL FIX COMPENSATION INFLUENCE ON THE NETWORK


Date:
02/11/21

VOLTAGE HV SIDE

Figure 3

VOLTAGE MV SIDE

Figure 4

Measurement Date: October 26, 2021


Code: REV: 0 Page: 4 of 5

ROLLING MILL FIX COMPENSATION INFLUENCE ON THE NETWORK


Date:
02/11/21

After Operation

U THD

Figure 5

VOLTAGE

Figure 6

Measurement Date: October 26, 2021


Code: REV: 0 Page: 5 of 5

ROLLING MILL FIX COMPENSATION INFLUENCE ON THE NETWORK


Date:
02/11/21

FLICKER

Figure 7

Measurement Date: October 26, 2021