180057-211-30.01.21 Plinth Beam-Model
180057-211-30.01.21 Plinth Beam-Model
1535
250
250
Additional Beam require for Entrance Step Down
148
L R L R L R L R L R
L R
TB TB 6000 TB TB TB
PB1
7050
PB2
L R 6300 7050
7050
7050 6300
1048
5151
4554
5348
8886
R
R.C.C. PARDI
7350
7202
R
R
R
1002
1002
1251
1248
1248
268
248
249
L
PB5 shifted as per architect DWG
4950
2950
PB3 PB4 PB6 PB7 PB8 PB9 PB10 PB11 PB12
R
L R
L R L R PB5 L R L R L R L R L R L R L R
R.C.C. PARDI
PB81
PB74
PB62
PB67
3900 3900 2950
R
R
2048
R
R
1802
1802
2950
2002
TB3
1469
1470
TB3
1319
L
PB13 PB14 PB15 PB16 PB19 PB20 PB21 PB22 PB23
L
L
L R L R L R L R L R L
2500 R L R L R L R L R L R L R
PB17 PB18 PB1
PB71
PB60
PB82
1400
1400
48000
PB24 PB25 PB26 PB27 PB28 1800 PB29 PB31 1800 PB35
PB30 PB32 PB33 PB34
L R L R L R L R L R L R L R L L R L R L R L R
PB79
R
R
R
R
R
721
1850
852
1600
R.C.C. PARDI
1321
1319
1300
L
TB3
TB3
PB36
1851
1851
PB73
PB68
1852
1853
PB70
OPENING OPENING
2051
PB63
2049
2050
55
L R
L R
IN SHEAR WALL IN SHEAR WALL PB11
PB61
1500
L
L
1500 3900
PB78
800
L
L
3900
13253250
PB80
PB40 1200 5250 850 PB47 PB48
L
L
1400 1200
L
2950 3900 1399
PB65
1300 PB46
2331
4226
L
L R L R L R L R L L R L R L R
2610
L R L R L R PB41 PB42 PB43 PB44 L R
PB64
1198
2800 3900
1479
6299
998
1279
UPWARD
ST1
2013
AST1 LUMP
L
L
7150
L
PB69
PB72
1500
7750
L R
PB49
OP.
L
L
4352
L
L
8842
4799
4799
L R
PB11
PB50
2140
PB51
L R PB52
L R
L R 1000
PB53
3044
1690
L R
1439
OP.
L R
TB
PB75
1402
TB 2900
TB TB2 TB2 TB
750
L R L R L R L R L R L R
499
L
L R L R
250
1790
1790
1691
1691
R
PB66
PB76
R
PB77
R
770
770
700
200
Bracket Details required Additional Beam require for Entrance Step Down
900
1194
L
L
L R L R
PB58 PB59
1800
199
Duct as Per Required INDEX PLAN FOR R.C.C. PLINTH BEAM/ TIE BEAM
Duct as Per Required
DELETED COLUMN = C10, C29, C41, C42