736

1535
250

250
Additional Beam require for Entrance Step Down

148
L R L R L R L R L R
L R
TB TB 6000 TB TB TB
PB1
7050
PB2
L R 6300 7050
7050
7050 6300

1048

5151
4554

5348

8886
R
R.C.C. PARDI
7350

7202

R
R

R
1002

1002

1251
1248

1248

268
248

249
L
PB5 shifted as per architect DWG

4950
2950
PB3 PB4 PB6 PB7 PB8 PB9 PB10 PB11 PB12

R
L R
L R L R PB5 L R L R L R L R L R L R L R

R.C.C. PARDI

PB81
PB74
PB62

PB67
3900 3900 2950
R

R
2048
R

R
1802

1802
2950
2002

TB3
1469

1470
TB3
1319

L
PB13 PB14 PB15 PB16 PB19 PB20 PB21 PB22 PB23
L

L
L R L R L R L R L R L
2500 R L R L R L R L R L R L R
PB17 PB18 PB1

PB71
PB60

PB82
1400

1400
48000

PB24 PB25 PB26 PB27 PB28 1800 PB29 PB31 1800 PB35
PB30 PB32 PB33 PB34
L R L R L R L R L R L R L R L L R L R L R L R

PB79
R

R
R
R

R
721
1850
852

1600

R.C.C. PARDI

1321
1319

1300

L
TB3

TB3
PB36
1851

1851

PB73
PB68

1852

1853
PB70
OPENING OPENING
2051

PB63

2049

2050
55

L R
L R
IN SHEAR WALL IN SHEAR WALL PB11
PB61

1500
L

L
1500 3900

PB78
800

L
L

3900
13253250

PB80
PB40 1200 5250 850 PB47 PB48
L

L
1400 1200

L
2950 3900 1399
PB65

1300 PB46

2331
4226

L
L R L R L R L R L L R L R L R

2610
L R L R L R PB41 PB42 PB43 PB44 L R
PB64

PB39 PB45 2950


PB37 PB38 UPWARD LUMP

1198
2800 3900

1479
6299
998

1279
UPWARD
ST1
2013

AST1 LUMP
L

L
7150

L
PB69

PB72
1500

7750
L R
PB49

OP.
L

L
4352
L
L

8842
4799

4799
L R

PB11
PB50

2140
PB51
L R PB52
L R
L R 1000
PB53
3044

1690
L R
1439

7050 PB55 PB54 7050

OP.
L R
TB

PB75
1402
TB 2900
TB TB2 TB2 TB
750

L R L R L R L R L R L R
499

PB56 870 PB57

L
L R L R
250

1790

1790
1691

1691
R
PB66

PB76
R

PB77
R
770

770
700
200

Bracket Details required Additional Beam require for Entrance Step Down
900
1194

L
L

L R L R
PB58 PB59
1800

199
Duct as Per Required INDEX PLAN FOR R.C.C. PLINTH BEAM/ TIE BEAM
Duct as Per Required
DELETED COLUMN = C10, C29, C41, C42

R.C.C PARDI UPTO PLINTH


FOR LIFT PIT