Download as pdf or txt
Download as pdf or txt
You are on page 1of 160

VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

80
LIST OF APPROVED ON-WING MAINTENANCE TASKS
DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Engine Vibration Barry Controls ATR72/ 11 SEP HCM CAAV
94796-XXX CSE/2019/29 CMM 71-20-22 Inspection, maintenance, repair.
Isolation System Aerospace PW124/127 2019 BMC SSCA
Repair # 03 Inspection, Removal Limits & 11 SEP
CSE-2020-60
Rework Forward Frame 2020
Repair #30: replacement of the Fwd lower
CSE-2020-16 seal equipped reverser half- door task 78-32-
36-300-829
Repair #31: replacement of the FWD LWR
22 JUL
CSE-2020-17 box seal equipped reverser half-door
2020
Fan Thrust Task 78-32-36-300-830
642-3801 Goodrich A320/CFM5 HAN CAAV
Reverser Door CMM 78-32-36 Repair #48: replacement of teflon strip on
642-3802 Aerostructures 6-5B BMC FAA
CSE-2020-18 Assemply forward frame and latch
Task 78-32-36-300-847
Repair 27- replacement of the turbine scoop
03 AUG
CSE-2020-22 seal right
2020
Repair 22- replacement of the upr strut seals
CSE-2020- 17 AUG
equipped
052 2020
reverser half-door, Task 78-32-36-300-821
Fan Thrust Repair 64- replacement of thermal blankets
642-3801 CSE-2020- Goodrich A320/CFM5 17 AUG HAN CAAV
Reverser Door CMM 78-32-36 on lh & rh halves config 1; task 78-32-36-
642-3802 054 Aerostructures 6-5B 2020 BMC FAA
Assemply 300-863
WD038ADABAAA; DISASSEMBLY & ASSEMBLE RAM AIR
WD038ADACAAA; INLET PANEL 193CL AND 194ER
WD038AEABAAA 1. CMM 21-52-15 ALL TASK 21-52-15-000
WD038AFABAAA; 2. CMM 21 -52-15 ALL TASK 21-52-15-400
DISASSEMBLY &
WD038AGABAAA; INSPECTION/CHECK RAM AIR INLET
ASSEMBLE RAM A350/RR 11 JUL HAN
WD038AHABAAA; CSE-2020-15 AIRBUS CMM 21-52-15 PANEL 193CL AND 194ER CAAV
AIR INLET PANEL XWB 2020 BMC
WD038AHACAAA; 3. CMM 21-52-15 ALL TASK 21-52-15-200
193CL AND 194ER
WD038AHADAAA; FITS AND CLEARANCES RAM AIR INLET
WD038AJABAAA PANEL 193CL AND 194ER
WD038AKACAAA; 4. CMM 21 -52-15 TASK TASK 21-52-15-
WD038ALACAAA ; 820-803-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 1


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WD039ABABAAA; CLEANING RAM AIR INLET PANEL 193CL
WD039ABACAAA; AND 194ER
WD039ACABAAA; 5. CMM 21-52-15 TASK TASK 21-52-15-
WD039ADABAAA; 100-801-A01
WD039AEABAAA; 6. CMM 21 -52-15 TASK TASK 21-52-1 5-
WD039AFABAAA 100-802-A01
WD039AFACAAA;
WD039AGABAAA;
WD039AHACAAA;
WD039AJACAAA

Replacement of the Section Profile as per


A320/A321 13 JUL HCM
D2557215XXXXXX CSE/2020/014 MATS-BALL AIRBUS CMM 25-59-63 CMM 25-59-63/ Repair 25-59-63-350-808- CAAV
series 2020 BMC
A01

CLEANING: IAW CMM 25-36-29: TASK 25-


36-29-100-801-A01.
INSPECTION/CHECK: IAW CMM 25-36-29:
CSE-2020- A321/V253 17 JUL
601368-XXX GALLEY G5 ZODIAC CMM 25-36-29 TASK 25-36-29-210-801-A01. CIMC CAAV
CI05 3-A5 2020
REPAIR: IAW CMM 25-36-29: TASK 25-36-
29-300-801-A01, TASK 25-36-29-300-806-
A01, TASK 25-36-29-300-807-A01.
29 JUL HAN
CSE-2020-20 Inspection Thrust Link Attach Pins Ref Task
2020 BMC
71-21-12-200-001 step 1.B.11 item 150
CSE-2022-
27 JUN
740-2010; 025 Forward Engine Goodrich Inspection CROSS BEAM ATIACH PIN Ref A320/A321-
CMM 71-21-12 Task 71-21-12-200-001step 1.B.11 (d) 2022 CAAV
745-2010 Mount Aerostructures V2500 HCM
- Removethe Cross Beam (460) Ref TASK
BMC
CSE-2022- 71-21-12-000-001 STEP 1, B (5) 04 JUL
028 - Install The Cross Beam (460) Ref Task 2022
71-21-12-400-001 STEP 1, B (1)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 2


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CMM 49-16-45 disassembly (removal of the
diffuser assy from the elbow assy - subtask
49-16-45-000-008-A01).
CMM 49-16-45 assembly (installation of the
diffuser assy on the elbow assy - subtask 49-
16-45-400-008-a01).
CMM 49-16-45 disassembly (disassembly of
the elbow - task 49-16-45-000-808-a01).
CAAV
CMM 49-16-45 assembly (assembly of the
03 AUG HAN FAA
D4918501415600 CSE-2020-21 Air Intake Duct Airbus CMM 49-16-45 elbow - task 49-16-45-400-801-a01). A320/A321
2020 BMC THAI
CMM 49-16-45 repair (remove/install the
CAAT
frame - task 49-16-45-300-802-a01 step 1 to
3a(1) and step 3.a(2).(d) to step 3.a(2).(q) ).
CMM 49-16-45 disassembly (disassembly of
the seal - task 49-16-45-000-805-a01, task
49-16-45-000-805-b01).
CMM 49-16-45 assembly (assembly of the
seal - task 49-16-45-400-804-a01, task 49-
16-45-400-804-b01).
- Task 55-21-15-300-803-a01 repainting of
the elevator
- Task 55-21-15-300-803-801 repainting of
elevator
- Task 55-21-15-200-801-A01 check of the
elevator weight A320/A321 06 AUG HCM CAAV
D5528000XXX CSE/2020/015 Elevator Assy Airbus CMM 55-21-15
- Task 55-21-15-300-802-A01 record the Series 2020 BMC SSCA
elevator weight
-Task 55-2 1-15-300-806-A01 replacement
of the cover
- Task 55-21-15-300-801-A01 protective
treatment
- Disassembly-task 36-11-45-000-801 -A01;
CAAV
Zodiac - Cleaning - task 36-11-45-100-801- A01; 06 AUG HCM
ATD50N CSE/2020/017 Discharge Piping CMM 36-11-45 ATR42/72 SSCA
Aerospace - Inspection/Check - task 36-11-45-200-801 2020 BMC
CAAP
- A01 ;

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 3


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly - task task 36-11-45-400-801-
A01 (except marking of the discharge piping
- subtask 36-11 -45-420-004-A01)
601368-1; 1. TASK 25-36-29-000-801-A01
CAAV
601368-101; Zodiac Disassembly of galley G5. A321/V250 10 AUG HCM
CSE/2020/29 Galley G5 CMM 25-36-29 FAA
601368-201; Aerospace 2. TASK 25-36-29-400-801-A01 Assembly 0 2020 BMC
SSCA
601368-301 of galley G5.
Remove check valve IPL Figure 1 Item 30
(35) (35A) l.A.W CMM 78-36-51 Subtask 78-
3282982-1; 36-51-000-003-A01
C-Duct Linear 10 AUG HAN CAAV
3282982-2; CSE-2020-30 Honeywell CMM 78-36-51 Install check valve IPL Figure 1 Item 30 (35) A320/A321
Hydraulic Actuator 2020 BMC FAA
3282982-3 (35A) l.A.W CMM 78-36-51 CMM 78-36-51
Subtask 78-36-51-400-
006-A01 Step 5, 6, 7
CMM 57-52-23 DISASSEMBLY (Removal of
the Rod Protection at RIB 3 - TASK 57-52-
Inboard Flap 23-000-814-A01) 10 AUG HAN CAAV
D575730500XXX CSE-2020-34 Airbus CMM 57-52-23 A320/A321
Structure CMM 57-52-23 ASSEMBLY (Installation of 2020 BMC FAA
the Rod Protection at Rib 3 - TASK 57-52-
23-400-819-A01)
CMM 21-53-54: Remove Clevis
(DISASSEMBLY-Task 21-53-54-000-801-
CSE-2020- Ram Air Inlet A01Step1.D.(2) (a) and (b)). 10 AUG HAN CAAV
1809A0000-01 Liebherr CMM 21-53-54 A320/A321
035 Actuator - CMM 21-53-54: Install Clevis (ASSEMBLY- 2020 BMC FAA
Task 21-53-54-400-801-A01Steo1.D.(13Hcl
and (15)(b)).
753A0000-03; CMM 21-52-11 LIEBHERR: Cleaning
753A0000-04, (Standard Cleaning Procedure - SUBTASK:
CMM 21-52-11;
753B0000-02; Primary Heat 20-00-02-100-003-A01) 12 AUG HAN
CSE-2020-09 Liebherr CMM 20-00-02 A320/A321 CAAV
753B0000-03; Exchanger CMM 20-00-02 LIEBHERR: Cleaning 2020 BMC
753C0000-01; (External Cleaning - SUBTASK: 20-00-02-
753C0000-02 100-003-A01 )

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 4


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CMM 20-00-02 LIEBHERR: Cleaning
(Internal Cleaning, Manual Flushing-
SUBTASK 20-00-02-100-008-A01)

CMM 21-52-12 LIEBHERR: Cleaning


(Standard Cleaning Procedure - SUBTASK:
21-52-12-100-801-A01)
CMM 21-54-14 LIEBHERR: Cleaning
754A0000-03; (Standard Cleaning Procedure - SUBTASK:
CMM 21-54-14,
754B0000-02; Heat Exchanger- 21-54-14-100-801-A01) 12 AUG HAN
CSE-2020-10 Liebherr CMM 21-52-12, A320/A321 CAAV
754C0000-01; Main CMM 20-00-02 LIEBHERR: Cleaning 2020 BMC
CMM 20-00-02
754D0000-01 (External Cleaning - SUBTASK: 20-00-02-
100-003-A01)
CMM 20-00-02 LIEBHERR: Cleaning
(Internal Cleaning, Manual Flushing-
SUBTASK 20-00-02-100-008-A01)

CAAV
S57412016XXX; Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
CSE/2020/018 Leading Edge Assy
S57412006XXX Aerospace CMM 57-42-11 icer Boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
S57412114XXX; Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
CSE/2020/019 Leading Edge Assy
S57412117XXX Aerospace CMM 57-43-11 icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
S57412080XXX; Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
CSE/2020/020 Leading Edge Assy
S57412170XXX Aerospace CMM 57-43-12; icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
S57412090XXX CSE/2020/021 Leading Edge Assy
Aerospace CMM 57-43-12; icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 5


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CAAV
Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
S57412121XXX CSE/2020/022 Leading Edge Assy
Aerospace CMM 57-43-12 icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
S57412125XXX CSE/2020/023 Leading Edge Assy
Aerospace CMM 57-43-12 icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
S55172000XXX CSE/2020/024 Leading Edge Assy
Aerospace CMM 55-12-00 icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
Zodiac CMM 30-21-65; Duct Assy - Replace The New The Radiator ATR72/PW 13 AUG HCM CAAP
S54112670XXX CSE/2020/025 Duct Assy
Aerospace CMM 71-62-62 upper conduit de-icer as Rer CMM 30-21-65 127 2020 BMC CAAB
SSCA
CAAV
Duct Assy- Replace The New Gaspath And
S54115619XXX; Zodiac CMM 30-21-65; ATR72/PW 13 AUG HCM CAAP
CSE/2020/026 Duct Assy Lower Gaspath De-icer Boot As Per CMM
S54112656XXX Aerospace CMM 71-62-62 127 2020 BMC CAAB
30-21-65
SSCA
CAAV
Leading Edge Zodiac CMM 30-21-65; Leading Edge Assy - Replace The New Air ATR72/PW 13 AUG HCM CAAP
S54112759XXX CSE/2020/027
Assy-Air Intake Aerospace CMM 71-61-61 Intake De-icer Boot As Per CMM 30-21-65 127 2020 BMC CAAB
SSCA
285-14000-XXX; FOLLOWING TASK ON CMM 252300
285-17000-XXX; Cleaning And (2817N)
Facc Ag CMM 25-23-00
285-18000-XXX; Visual Inspection, 1. Cleanning door linning: Task 25-23-00-
(2817n), Airbus (2817N);
285-19000-XXX; Replacement 940-801-A00, 25-23-00-94A-801 A00, 25- A350/ RR 14 AUG HAN
CSE-2020-02 Helicopters CAAV
285-22000-XXX; Component Of The 23-00-100-801-A00 XWB 2020 BMC
Deutschland CMM 25-23-00
285-23000-XXX; Pax Door 2. Visual inspection of the door lining: Task
Gmbh (C0417) (C0417)
285-24000-XXX; Lining A350 Fleet 25-23-00-210-801-A00
285-28000-XXX; 3. R/I and disassembly/assembly of the slide

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 6


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
285-29000-XXX; raft cover: Task 25-23-00-000-801-A00, 25-
285-33000-XXX; 23-00-400-801-A00
285-38000-XXX; 4. Repair 5: Replacement of the slide-raft
285-39000-XXX; cover glass: Task 25-23-00-300-802-A00
285-42000-XXX; 5. Repair 6: Replacement of the seals, foams
285-43000-XXX; and tapes: Task 25-23-00-300-804-A00
285-44000-XXX; FOLLOWING TASK ON CMM 252300
285-48000-XXX; (C0417)
285-49000-XXX; 1. Cleanning door linn ing: Task 25-23-00-
285-59000-XXX; 940-801 -A00, 25-23-00-94A-801-A00, 25-
285-69000-XXX 23-00-100-801-A00
2. Visual inspection of the door lin ing: Task
25-23-00-210-801-A00
3. R/I and disassembly/assembly of the slide
raft cover: Task 25-23-00-000-801-A00,
TASK 25-23-00-400-801-A00
4. Repair 5: Replacement of the slide-raft
cover glass: Task 25-23-00-300-802-A00
5. Repair 6: Replacement of the seals, foams
and tapes: Task 25-23-00-300-804-A00
FOLLOWING TASK ON CMP 383197
9.1 Disconnect, remove and disassemble
procedures D1227WTA6953-A-38-31-97-
01001-500A-C
WTA6953-05;
Remove/Install Para 2: Remove Waste Separator Outlet
WTA6953-06;
Separator Outlet, Para 3: Remove and Disassemble Revision
WTA6953-15;
Revision Cover, Cover Assembly
WTA6953-16; A350/ RR 14 AUG HAN
CSE-2020-03 Waste Inlet Diehl Aviation CMP 38-31-97 Para 9: Remove and Disassemble Waste CAAV
WTA6953-20; XWB 2020 BMC
Assembly Of Waste Inlet Assembly
WTA6953-21;
Tank Assy Fleet 9.2 Assemble, install, and connect
WTA6953-50
A350 procedures D1227WTA6953-A-38-31-97-
01001-700A-C
Para 10: Install Waste Separator Outlet
Para 9: Assemble and Install Revision Cover
9.3 Clean and apply surface protection

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 7


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
D1227WTA6953-A-38-31-97-01001-250A-
C
Para 2: Clean Disassembled Mechanical
Parts of Tank Assembly
VL500 XXX FOLLOWING TASK ON CMM 352161, CMM
E2C15R5 XXX; 352162; CMM 352163; CMM 352164; CMM
E3C15R5 XXX; 252201; CMM 252202; CMM 252208
E4C15R5 XXX 1. TASK 35-21-61-000-801-A01
E2C22R5 XXX DISASSEMBLY, STEP 2. D (5) AND 3. C (6)
E3C22R5 XXX 2. TASK 35-21-61-400-801-A01
E4C22R5 XXX ASSEMBLY, STEP 2. A (1) AND 3. A (2)
E2C15L5 XXX; 3. TASK 35-21-62-000-801-A01
E3C15L5 XXX; DISASSEMBLY, STEP 2. D (5) AND 3. D (4)
E4C15L5 XXX; AND 4. D (4)
E2C22L5 XXX; 4. TASK 35-21 -62-400-801-A01
E3C22L5 XXX; ASSEMBLY, STEP 2. A (3) AND 3. A (2)
Replacement
E4C22L5 XXX; CMM 35-21-61; AND 4. A (1)
Locking System
F2C150 XXX; CMM 35-21-62; 5. TASK 35-21 -63-000-801 -A01
Assy Of Passenger
F3C150 XXX; Airbus; CMM 35-21-63; DISASSEMBLY, STEP 2. D (4) AND 3. D (4)
Service Unit (Psu) A350/ RR 14 AUG HAN
F4C150 XXX; CSE-2020-45 Diehl; CMM 35-21-64, AND 4. D (4) CAAV
And XWB 2020 BMC
F5C150 XXX; Be Aerospace CMM 25-22-01; 6. TASK 35-21-63-400-801 -A01
Chemical Oxygen
F6C150 XXX; CMM 25-22-02; ASSEMBLY, STEP 2. A (2) AND STEP 3. A
Container
F2C220 XXX; CMM 25-22-08 (2) AND STEP 4. A (1)
Assembly
F3C220 XXX; 7. TASK 35-21-64-000-801 -A01
F4C220 XXX; DISASSEMBLY, STEP 2. D (5) AND 3. C (6)
F5C220 XXX; 8. TASK 35-21-64-400-801-A01 ASS
F6C220 XXX; EMBLY, STEP 2. A (1) AND 3. A (2) (a)
M3C220 XXX; 9. TASK A350-A-25-22-01-01001-530A-C
M4C220 XXX; DISASSEMBLY STEP 1.1.2
M5C220 XXX; 10. TASK A350-A-25-22-01-01001-710A-C
M6C220 XXX; ASSEMBLY STEP 1.1.12
G2C150 XXX; 11. TASK A350-A-25-22-02-01001-530A-C
G3C150 XXX; DISASSEMBLY STEP 1.1.2
G4C150 XXX; 12. TASK A350-A-25-22-02-01001-710A-C
G2C220 XXX; ASSEMBLY STEP 1.2.7

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 8


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
G3C220 XXX; 13. TASK A350-A-25-22-08-01001-530A-C
G4C220 XXX; DISASSEMBLY STEP 1.1.2
N3C220 XXX; 14. TASK A350-A-25-22-08-01001-710A-C
K2C15R XXX; ASSEMBLY STEP 1.1.12
K3C 5R XXX; 15. SERVICE INFORMATION date
K2C22R XXX; 16.04.2019 - B/E Aerospace Systems GmbH
K3C22R XXX;
K2C15L XXX;
K3C15L XXX;
K2C22L XXX;
K3C22L XXX

9.1 CMM GRAA350RR-51563-N0001 -01


(78-30-00) Issue No. 011 ;
Thrust Reverser LH - Disassemble
CMM
procedure: 2.62 Removal of the Translating
GRAA350RR-
Cowl
51563-N0001-
351-3001-XXX; Thrust Reverser LH -Assemble procedure:
Replace Translating 01(78-30-00);
351-3002-XXX; Utc Aerospace 2.20 Installation of the Translating Cowl A350/ RR 14 AUG HAN
CSE -2020-46 Sleeve Of Cowl CAAV
351-3003-XXX; Systems 9.2 CMM GRAA350RR-51563-N0002-01 XWB 2020 BMC
Thrust Reverser CMM
351-3004-XXX (78-30-00) Issue No. 011 ;
GRAA350RR-
Thrust Reverser RH - Disassemble
51563-N0002-01
procedure: 2.64 Removal of the Translating
(78-30-00)
Cowl
Thrust Reverser RH - Assemble procedure:
2.23 Installation of the Translating Cowl

WQ220ADAAAAA; 9.1: Replace top cover shell of number 2 UH


WQ220AGAAAAA; and R/H moveable fairing IAW CMM 57-57-
CMM 57-57-41;
WQ220AHAAAAA; 41 :
Replace Top Cover
WQ220AJAAAAA; TASK 57-57-41-000-801-A01(801 ,C01 A350/ RR 14 AUG HAN
CSE-2020-47 Shell Of Moveable Airbus Sas CMM 57-57-43; CAAV
WQ220AKAAAAA; ,D01 ,E01 ,F01 ,G01 ,H01 ,J01 ,K01) Para XWB 2020 BMC
Fairring
WQ220AMAAAAA; 3.C
CMM 57-57-45
WQ220ANAAAAA; TASK 57-57-41-400-801-A01
WR220ADAAAAA; (B01,C01,C?01, E01 ,F01 ,G01 ,H01 ,J01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 9


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WR220AEAAAAA; ,K01 ) Para 3.J
WR220AFAAAAA; 9.2: Replace top cover shell of number 3 UH
WR220AGAAAAA; and R/H moveable fairing IAW CMM 57-57-
WR220AHAAAAA; 43:
WR220AKAAAAA; TASK 57-57-43-000-801-A01 (B01 ,C01
WR220ALAAAAA; ,001 ,J01 ,K01 ,L01 ,M01 ,N01 ,P01) Para
WQ218ADAAAAA; 3.C
WQ218AEAAAAA; TASK 57-57-43-000-801-E01(F01,G01 ,H01
WQ218AF AAAAA; ) Para 3.D
WQ218AGAAAAA; TASK 57-57-43-400-801-A01 (B01
WQ218AHAAAAA; ,C01,D01 ,E01 ,F01 ,G01 ,H01 ,J01 ,K01
WQ218AJAAAAA; ,L01 ,M01 ,N01 ,P01 ) Para 3.H
WQ218AKAAAAA; 9.3: Replace top cover shell of number 4 UH
WQ218ALAAAAA; and R/H moveable fairing IAW CMM 57-57-
WQ218ANAAAAA; 45:
WQ218APAAAAA; TASK 57-57-45-000-801-A01(B01 ,C01
WR218ADAAAAA; ,D01 ,E01 ,F01 ,G01 ,H01 ,J01 ,K01 ) Para
WR218AEAAAAA; 3.C
WR218AF AAAAA; TASK 57-57-45-400-801-A01 (B01 ,C01
WR218AGAAAAA; ,D01 ,E01 ,F01 ,G01 ,H01,J01 ,K01) Para
WR218AHAAAAA;; 3.H
WR218AJAAAAA;
WR218AKAAAAA;
WR218ALAAAAA;
WR218ANAAAAA;
WR218AP AAAAA;
WQ216ADAAAAA;
WQ216AEAAAAA;
WQ216AF AAAAA;
WQ216AGAAAAA;
WQ216AHAAAAA;
WQ216AKAAAAA;
WQ216ALAAAAA;
WR216ADAAAAA;
WR216AEAAAAA;

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 10


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WR216AF AAAAA;
WR216AGAAAAA;
WR216AHAAAAA;
WR216AKAAAAA;
WR216ALAAAA;
2LH, 2RH, 3LH, 3RH Pax Door : CMM 52-
12-30, REPLACE BEARING AND BEARING
ASSY OF FITTINGSTOP
SUBTASK 52-12-30-000-113-A01 STEP
B(3}, B(4}, B(11), B(12) FOR REMOVE
BEARING AND BEARING ASSY
SUBTASK 52-12-30-000-117-A01 STEP
B(3), B(4), B(11), B(12) FOR REMOVE
BEARING AND BEARING ASSY
SUBTASK 52-12-30-000-154-A01 STEP
B(3}, B(4}, B(11}, B(12) FOR REMOVE
WF100 XXX; BEARING AND BEARING ASSY
WF101 XXX; SUBTASK 52-12-30-000-156-A01 STEP
Replace Bearing CMM 52-12-30;
WG100 XXX; B(3}, B(4), B(11), B(12) FOR REMOVE
(X-Roller) And
WG101 XXX; BEARING AND BEARING ASSY A350/ RR 14 AUG HAN
CSE-2020-48 Bearing Assy Of Airbus Sas CMM 52-11-30; CAAV
WD100 XXX; SUBTASK 52-12-30-000-201 -A01 STEP XWB 2020 BMC
Fitiing-Stop Of Pax
WD101 XXX; B(3), B(4), B(11 ), B(12) FOR REMOVE
Door CMM 52-13-30
WH100 XXX; BEARING AND BEARING ASSY
WH101 XXX SUBTASK 52-12-30-000-203-A01 STEP
B(3), B(4), B(11 ), B(12) FOR REMOVE
BEARING AND BEARING ASSY
SUBTASK 52-12-30-000-206-
A01STEP8(3), B(4), B(11 ), B(12) FOR
REMOVE BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-018-A01 STEP
A(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-100-A01 STEP
A(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 11


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
SUBTASK 52-12-30-400-179-A01 STEP
A(3), A(4), A(1 1), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-181-A01 STEP
A(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-214-A01
STEPA(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-215-A01 STEP
A(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-227-A01 STEP
A(3), A(4), A(11}, A(12) FOR INSTALL
BEARING AND BEARING ASSY
- 1 LH, 1 RH Pax Door: CMM 52-11-30,
REPLACE BEARING OF FITTING-STOP
TASK 52-11 -30-000-820-A01 Step 4.8.(7),
4.B.( 8), 4.B.(17) and 4.B.(18) FOR
REMOVE BEARING AND ASSY
TASK 52-11-30-000-820-B01Step4.B.{7),
4.B.( 8), 4.B.(17) and 4.B.(18) FOR
REMOVE BEARING AND ASSY
TASK 52-11 -30-000-820-C01 Step 4.B.(7),
4.B.( 8), 4.B.(17) and 4.B.(18) FOR
REMOVE BEARING AND ASSY
TASK 52-11-30-000-820-E01 Step 4.B.(7),
4.B.( 8), 4.B.(17) and 4.B.(18) FOR
REMOVE BEARING AND ASSY
TASK 52-11-30-400-820-A01 Step 3.A.(3},
3.A.(4), 3.A.(13) and Step 3.A.(14) FOR
INSTALL BEARING AND ASSY
TASK 52-11 -30-400-820-B01 Step 3.A.(3),
3.A.(4), 3.A.(13) and Step 3.A.(14) FOR
INSTALL BEARING AND ASSY

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 12


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
TASK 52-11 -30-400-820-C01 Step 3.A.(3},
3.A.(4}, 3.A.(13) and Step 3.A.(14) FOR
INSTALL BEARING AND ASSY
TASK 52-11 -30-400-820-E01 Step 3.A.(3},
3.A.(4}, 3.A.(1 3) and Step 3.A.(14) FOR
INSTALL BEARING AND ASSY
4LH, 4RH Pax Door: CMM 52-13-30,
REPLACE BEARING OF FITTING-STOP
TASK 52-13-30-000-820-A01 Step 4.B.(3),
4.B.(4), 4.B. (11) Step 4.B.(12) FOR
REMOVE BEARING AND ASSY
TASK 52-13-30-000-820-B01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
REMOVE BEARING AND ASSY
TASK 52-13-30-000-820-D01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
REMOVE BEARING AND ASSY
TASK 52-13-30-000-820-E01Step4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
REMOVE BEARING AND ASSY
TASK 52-13-30-400-820-A01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
INSTALL BEARING AND ASSY
TASK 52-13-30-400-820-B01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
INSTALL BEARING AND ASSY
TASK 52-13-30-400-820-C01Step4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
INSTALL BEARING AND ASSY
TASK 52-13-30-400-820-E01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
INSTALL BEARING AND ASSY

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 13


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WF101AQATAAG; 9.1. Removal and Disassembly of the
WF100ARAVAAG; Indication Mechanism
WG101BAAVAAH; CMM 5211 30
WG100AXAUAAH; 52-11-30-000-809-A01 PARA 1,2,3
WD101AXAPAAF; 52-11-30-000-809-801 PARA 1,2,3
WD100AXAPAAF; 52-11-30-000-809-C01PARA1,2,3 .,
WH101BGAUAAF; 52-11-30-000-809-D01 PARA 1,2,3
WH100BFATAAF; 52-11-30-000-809-E01 PARA 1,2,3
WF101BBAXAAH; CMM 521230
WF100BCAXAAH; 52-12-30-000-811-A01 PARA 1,2,3
WG101BFAWAAB; 52-12-30-000-811-801 PARA 1,2,3
WG100BCAWAAB; 52-12-30-000-811-001PARA1,2,3
WD101BEARAAB; 52-12-30-000-811-E01PARA1 ,2,3
WD100BEARAAB; 52-12-30-000-811-F01 PARA 1,2,3
WH101BPAWAAB; 52-12-30-000-8 11 -G01PARA1,2,3
WH100BNAWAAB; CMM 52-12-30; CMM 521330
Remove/ Install
WF101BGBBAAH; 52-13-30-000-809-A01 PARA 1,2,3
Indicator A350/ RR 14 AUG HAN
WF100BHBBAAH; CSE-2020-49 Airbus CMM 52-11-30; 52-13-30-000-809-801 PARA 1,2,3 CAAV
Mechanism Of Pax XWB 2020 BMC
WG101BKAYAAB; 52-13-30-000-809-001 PARA 1,2,3
Door
WG100BJAYAAB; CMM 52-13-30 52-13-30-000-809-E01 PARA 1,2,3
WD101BFAUAAB; 9.2. Assembly and Installation of the
WD100BFAUAAB; Indication Mechanism
WH101BRAXAAB; CMM 521130
WH100BQAXAAB; 52-11-30-400-819-A01 PARA 4
WF101 BJBBAAH; 52-11-30-400-819-801 PARA 4
WF100BKBBAAH; 52-11 -30-400-819-C01 PARA4
WG101BNAYAAB; 52-11-30-400-819-001PARA4
WG100BKAYAAB; 52-11-30-400-819-E01 PARA4
WD101BMAUAAB; 52-11-30-400-819-F01 PARA 3.0
WD100BMAUAAB; 52-11-30-400-819-G01 PARA 3.0
WH101BWAXAAB; CMM 521230
WH100BVAXAAB; 52-12-30-400-822-A01 PARA 4
WF101BMBDAAJ; 52-12-30-400-822-801 PARA 4
WF100BNBDAAJ; 52-12-30-400-822-001 PARA 4
WG101BQAZAAJ; 52-12-30-400-822-E01 PARA 4

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 14


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WG100BMAZAAJ; 52-12-30-400-822-F01 PARA 4
WD101BRAVAAJ; CMM 521330
WD100BRAVAAJ; 52-13-30-400-819-A01 PARA 4
WH101CBAZAAJ; 52-13-30-400-819-801 PARA 4
WH100CAAZAAJ; 52-13-30-400-819-001 PARA 4
WF101 BMBEAAK; 52-13-30-400-819-E01 PARA 4
WF100BNBEAAK; 3. Testing of the Electrical Bonding
WG101 BQBAAAK; CMM 521130 52-11 -30-700-801-A01
WG100BMBAAAK; CMM 521230 52-12-30-700-801 -A01
WD101BRAWAAH; CMM 521330 52-13-30-700-801 -A01
WD100BRAWAAH;
WH101CBBAAAH;
WH100CABAAAH;
WF101 BSBEAAK;
WF1 OOBNBEAAK;
WG101 BUBAAAK;
WG100BRBAAAK;
WD101 BVAWAAH;
WD100BVAWAAH;
WH101CLBAAAH;
WH100CKBAAAH;
WF101BZBFAAK;
WF100CABFAAK;
WG101CBBBAAK;
WG100BYBBAAK;
WD101CCAYAAH;
WD100CCAYAAH;
WH101CUBCAAH;
WH100CUBCAAH

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 15


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval

FOLLOWING TASK ON CMM 322101


1. Removal stop assy of NLG shock strut
SUBTASK 32-21-01-030-008-A01 PARA
Remove/Install (29), (a) (b)
Stop Assy And 2. Install stop assy of NLG shock strut
A350/ RR 14 AUG HAN
4816A0000-06 CSE-2020-50 Reference Plate Airbus CMM 32-21-01 SUBTASK 32-21-01-430-105-A01 PARA CAAV
XWB 2020 BMC
P/N 5035-3201 Of (36), (e) (f) (g) (h) (i)
Nlg Shock Strut 3. Remove Reference Plate P/N 5035-3201
SUBTASK 32-21-01-010-055-A01
4. Install Reference Plate PIN 5035-3201
SUBTASK 32-21-01-410-012-A01

Removauinstallatio
9.1 Revoval:
n Of The Housing
Diehl Aerospace TASK 52-71 -50-000-801-A01 Step 1.C.(1) .. A350/ RR 14 AUG HAN
E01301E01020000 CSE-2020-51 Cover Of Door CMM 52-71-50 CAAV
Gmbh 9.2 Installation: XWB 2020 BMC
Indication Panel
TASK 52-71-50-400-801-A01Step1 .C.(5)
(Dip)
- CMM 78-11-11: REPAIR 002 COMMON
NOZZLE ASSEMBLY REPLACE THE
745-1101 XXX; Common Nozzle Goodrich OUTER DUCT SEALS (VRS2055) A320/A321- 18 AUG HAN CAAV
CSE-2020-57 CMM 78-11-11
740-1094 XXX Assembly Aerostructures - CMM 78-11-11: REPAIR 005 COMMON V2500 2020 BMC FAA
NOZZLE ASSEMBLY- REPLACE THE
LOWER SEAL (VRS2060)
REPAIR 72- THRUST REVERSER RIGHT
C-DUCT FIXED STRUCTURE A320/A321- 18 AUG CAAV
CSE-2020-55
- REPLACE THE PANDOWN V2500 2020 FAA
HEATSHIELD; TASK 78-30-00-300-072
740-0002; Thrust Reverser Goodrich HAN
CMM 78-30-00 - CMM SUBTASK 78-30-00-020-136:
745-0002 Assembly Aerostructures BMC
Remove the Seal Assemblies from the
CSE-2020- A320/A321- 18 AUG CAAV
ACAC Duct
058 V2500 2020 FAA
- CMM SUBTASK 78-30-00-420-126: Install
the Seal Assembly on the ACAC Duct

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 16


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
INSPECTION AND REPAIR# 162: THRUST
REVERSER FIXED DUCT ASSEMBLY - A321/V250 11 SEP
CSE-2020-61 CAAV
REPLACE THE ENGINE BUMPER 0 2020
PANDOWN, (VRS2302)
DISASSEMBLY (Disassembly of the hinge
assy - TASK 52-81-18-000-801-
Door - Main A01step3.A.1 and step 3.B.1) A321/V250 27 AUG HCM CAAV
D5288016500XXX CSE/2020/034 Airbus CMM 52-81-18
Landing Gear ASSEMBLY (Assembly of the hinge assy - 0 2020 BMC SSCA
TASK 52-81-18-400-809-A01 step 3.A.2 and
step 3.B .2)
Disassembly:
+Removal of the Ball Unit as per CMM TASK
25-59-63-010-801-A01
-Cleaning:
+Cleaning of the Painted Component Parts
as per CMM TASK 25-59-63-100-801-A01
+Cleaning of the Component Parts which are
not Painted as per TASK 25-59-63-100-802-
A01
-ChecU lnspection:
+ Check of the Metal and GFRP
Components of the Ball Mats as per CMM
27 AUG HCM CAAV
D255721XXX CSE/2020/035 Mats-Ball Airbus CMM 25-59-63 TASK 25-59-63-210-801-A01 A320/A321
2020 BMC SSCA
+ Check of the Sealing Tape as per CMM
TASK 25-59-63-210-803-A01.
+ Check of the lnsulation as per CMM TASK
25-59-63-210-804-A01
+ Check of the Captive Screw as per CMM
TASK 25-59-63-210-805-A01
-Repair:
+ Repair of the Paint on the Ball Mats as per
CMM TASK 25-59-63-300-803-A01
+ Removal of the Marks and the Corrosion
as per CMM TASK 25-59-63-300-801-A01
+ Repair of the Scratches on the Metal

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 17


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Components as per CMM TASK 25-59-63-
300-802-A01
+ Repair of the Non-Slip Coating as per
CMM TASK 25-59-63-350-802-A01
+ Replacement of the Captive Screws
(swaged) as per CMM TASK 25-59-63-350-
801-A01
+ Replacement of the Sealing Tape as per
CMM TASK 25-59-63-350-803-A01
+ Replacement of the Supporting Strip as per
CMM TASK 25-59-63-350-804-A01
+ Replacement of the Cover Sheet as per
CMM TASK 25-59-63-350-805-A01
+ Replacement of the Lower Sheet as per
CMM TASK 25-59-63-350-806-A01
+ Replacement of the Insulation as per CMM
TASK 25-59-63-350-807-A01
+ Replacement of the Section Profile as per
CMM TASK 25-59-63-350-808-A01
+ Repair of the GFRP on the Lower Sheet as
per CMM TASK 25-59-63-300-804-A01
+ Replacement of the Cover Plate as per
CMM TASK 25-59-63-300-805-A01
+ Replacement of the Nut Plate as per CMM
TASK 25-59-63-300-806-A01
+lnstallation of the Ball Unit as per TASK 25-
59-63-410-801-A01
CMM 21-54-12 LIEBHERR: Cleaning
(Standard Cleaning Procedure - SUBTASK:
CMM 21-54-12; TASK 21-54-12-100-801-A01)
Primary Heat 27 AUG HAN
753D0000-01 CSE-2020-66 Liebherr CMM 20-00-02 LIEBHERR: Cleaning A320/A321 CAAV
Exchanger 2020 BMC
CMM 20-00-02 (External Cleaning - SUBTASK: 20-00-02-
100-003-A01)
CMM 20-00-02 LIEBHERR: Cleaning

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 18


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
(Internal Cleaning, Manual Flushing-
SUBTASK 20-00-02-100-008-A01)

REPAIR 002 - REPLACE THE OUTER


CSE/2020/031 DUCT SEALS (VRS2055) - Task 78-11-11-
Common Nozzle 300-002 A321/V250 31 AUG HCM CAAV
740-1094; Goodrich CMM 78-11-11
Assembly REPAIR 024 - REPLACE THE INNER 0 2020 BMC SSCA
745-1101
CSE/2020/033 ANNULUS SEALS (VRS2305) - Task 78-11-
11-300-024
-Surface Damage Repair as per CMM 32-12-
13/SUBTASK32-12-13-350-001-
201660001-XXX; A01/(1)/(a)1 A320/A321 31 AUG HCM
CSE/2020/010 Side Stay Complete Safran CMM 32-12-13 CAAV
201660002-XXX -Protective Treatment as per CMM 32-12- series 2020 BMC
13/SUBTASK32-12-13-380-001-
401/(2)/(a)/2& 3
Replacement of the Cover and Seat Toilet
Unit IAW the following tasks:
- Removal and Disassembly of the Cover
CSE CIMC
Diehl Comfort and Seat Toilet Unit : TASK 25-41 -56-000- A320/A321/ 31 AUG CAAV
D2549026013000 BASEHAN - Lavatory A CMM 25-41-56 CIMC
Modules Gmbh 809-A01 CFM56 2020 FAA
2020-18
- Installation and Assembly of the Cover and
Seat Toilet Unit SUBTASK 25-41-56-400-
009-A01
Replacement of the Cover and Seat Toilet
Unit IAW the following tasks:
- Removal and Disassembly of the Cover
CSE CIMC
Diehl Comfort and Seat Toilet Unit : TASK 25-43-58-000- A320/A321/ 31 AUG CAAV
D2549022101200 BASEHAN - Lavatory D CMM 25-43-58 CIMC
Modules Gmbh 806-A01 CFM56 2020 FAA
2020-19
- Installation and Assembly of the Cover and
Seat Toilet Unit TASK 25-43-58-400-808-
A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 19


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
-Surface Damage Repair as per CMM 32-
12-21/SUBTASK 32-12-21-350-001-
Main Landing Gear A01/(1)/(a)/1. 31 AUG BMC
20158500X-XXX CSE/2020/011 Safran CMM 32-12-21 A320/A321 CAAV
LEG And Dressings -Protective Treatment as per CMM 32-12- 2020 HCM
21/SUBTASK 32-12-21-380-001-
A01/(2)/(a)/2& 3
- Remove the Atmospheric Vacuum Breaker
(AVB): IAW CMP 38-31-84 :
D1227TA69XX-A-38-31-84-01001-500A-
C.2a: Remove Atmospheric Vacuum
Breaker (AVB)
D1227TA69XX-A-38-31-84-01001-500A-
C.4a,b: Remove Water Valve Assembly.
- Assemble, install, and connect procedures:
IAW CMP 38-31-84:
CSE-2020- A350/TREN 1 SEP
TA69-XXX Toilet Assembly Diehl CMP 38-31-84 D1227T A69XX-A-38-31-84-01001 -700A- CIMC CAAV
CI06 XWB-84 2020
C.5a: Install Water Valve Assembly
01227T A69XX-A-38-31-84-01001-700A-
C.6b: Install Atmospheric Vacuum Breaker
(AVB)
D1227TA69XX-A-38-31-84-01001-700A-
C.7g,h,i: Install Spray Ring Assembly
D1227TA69XX-A-38-31-84-01001-700A-
C.8a: Connect the harness assembly to the
water valve assembly.
- Remove the Atmospheric Vacuum Breaker
(AVB): IAW CMP 38-31-84:
D1227TA69XX-A-38-31-84-01001-500A-
C.2a: Remove Atmospheric Vacuum
CSE-2020- Breaker (AVB) A350/TREN 1 SEP
TA69-XXX Toilet Assembly Diehl CMP 38-31-84 CIMC CAAV
CI06 D1227TA69XX-A-38-31-84-01001-500A- XWB-84 2020
C.4a,b: Remove Water Valve Assembly.
- Assemble, install, and connect procedures:
IAW CMP 38-31-84:
D1227T A69XX-A-38-31-84-01001 -700A-

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 20


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
C.5a: Install Water Valve Assembly
01227T A69XX-A-38-31-84-01001-700A-
C.6b: Install Atmospheric Vacuum Breaker
(AVB)
D1227TA69XX-A-38-31-84-01001-700A-
C.7g,h,i: Install Spray Ring Assembly
D1227TA69XX-A-38-31-84-01001-700A-
C.8a: Connect the harness assembly to the
water valve assembly.
WD038ADABAAA;
WD038ADACAAA;
WD038AEABAAA;
WD038AFABAAA;
WD038AGABAAA;
WD038AHABAAA;
WD038AHACAAA;
WD038AHADAAA;
WD038AJABAAA;
WD038AKACAAA;
CMM 21-52-15/TASK 21-52-1 5-300-813- 03 SEP HAN
WD038ALACAAA; CSE-2020-13 Ram Air Inlet Airbus CMM 21-52-15 A350 CAAV
A01, Permanent Repair of Worn Holes 2020 BMC
WD039ABABAAA;
WD039ABACAAA;
WD039ACABAAA;
WD039ADABAAA;
WD039AEABAAA;
WD039AFABAAA;
WD039AFACAAA;
WD039AGABAAA;
WD039AHACAAA;
WD039AJACAAA;
T-Piece Connection FOLLOWING TASK ON CMM 78-32-44
Assembly On Goodrich 1. DISASSEMBLY T-PIECE CONNECTION
A321/V250 4 SEP HAN CAAV
CH1543A0034 CSE-2020-68 Transmision Thrust Actuation CMM 78-32-44 ASSEMBLY SUBTASK 1. AND 2.C.
0 2020 BMC FAA
Rev Systems 2. ASSEMBLY T-PIECE CONNECTION
Control ASSEMBLY SUBTASK 1. AND 3.C.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 21


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
INSPECTION/CHECK LP BLEED AIR
CHECK VALVE IAW CMM 36-10-02 WITH
CAAV
Lp Bleed Air Check SUBTASKS:- 36-10-02-000-801-A01 ATR42,ATR 4 SEP HCM
CT60-3 CSE/2020/30 Safran CMM 36-10-02 SSCA
Valve DISASSEMBLY 72/PW127 2020 BMC
CAAP
- 36-10-02-200-802-A01 INSPECTION
- 36-10-02-400-801-A01 ASSEMBLY
CMM 71-1 1-00 Repair (Repair 011 Replace
740-3000;
the damaged rear bulkhead insulation 5 SEP HAN
745-3000; CSE-2020-69 Air Intake Cowl Goodrich CMM 71-11-00 A320/A321 CAAV
blankets of the air intake cowl- TASK 71-11- 2020 BMC
745-3400
00-300-011 Step 6.A, Step 6.J)
10-450101 XXX;
CMM 32-12-79; CAAV
10-450102 XXX; Main Landing Gear Paint finish repaired as per Subtask 32-12- 7 SEP HCM
CSE/2020/042 Safran A320-A321 FAA
10-450201 XXX; Complete 79-380-001 -A01 / (2) / (a)/3/a 2020 BMC
PCS-2500 SSCA
10-450202 XXX;

Cleaning, inspection and repair area A320/A321 11 SEP HAN CAAV


D255721XXX CSE-2020-59 Mats - Ball Airbus CMM 25-59-63
available series 2020 BMC FAA

D2157100000800;
D2157100001000;
D2157100001200;
D2157100001400;
D2157100001600,
D2157100001800;
CMM 21-52-12, TASK 21-52-1 2-300-801- 11 SEP HAN CAAV
D2157100002000; CSE-2020-62 Ram Air Outlet Airbus CMM 21-52-12 A320/A321
A01: Reworking Or Machining 2020 BMC FAA
D2157100103000,
D2157108001000;
D2157108001200;
D2157108001400,
D2157108001600;
D2157108001800;

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 22


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
D2157108002000;
D2157108002200;
D2157108002400;
D2157108103000;
D2157138800000;
D2157138900000

CMM TASK 53-15-11-300-818-A01:


Application of Paint
CMM TASK 53 -1 5-11-300-819-A01: Paint
touch-up
CMM TASK 53-1 5-11-300-802-A01: Repair
of a lightning arrester strip
D53132010000;
CMM TASK 53-15-11-300-807-A01:
D5311047700007;
Mechanical stripping of paint
D5311047700006;
CMM TASK 53-15-11-750-801-A01:
D5311047700005;
Electrical surface resistance and continuity 11 SEP HAN
D5311047700004, CSE-2020-63 Nose Radome Airbus CMM 53-15-11 A320/A321 CAAV
check(with anti-static paint tester) 2020 BMC
D5311047700003;
CMM TASK 53-15-11-750-801-A02:
D5311047700002;
Electrical surface resistance and continuity
D5311047700001;
check(with Megohmmeter)
D5311047700000
CMM TASK 53-15- 11-300-821-A01:
Appication of Airline Finish Paint
CMM TASK 53-15-11 -000-804-A01:
Removal of a lightning arrester strip
CMM TASK 53-15-11-400-804-A01:
Installation of a lightning arrester strip

INSPECTION/CHECK
REPAIR#1 (CMM TASK 53-15-12-300-801-
A01): Radome Repair
D53132210000; A320/A321 11 SEP HAN CAAV
CSE-2020-64 Nose Radome Airbus CMM 53-15-12 REPAIR#2 (CMM TASK 53-15-12-300-802-
D53132110000 series 2020 BMC FAA
A01): Resin Injection
REPAIR#3 (CMM TASK 53-15-12-300-803-
A01): Sandwich Zone -Through Repair by

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 23


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Inside on a One Phase
Process (Heat blanket or Autoclave)
REPAIR#4: CMM TASK 53-15-12-300-803-
A02: Sandwich Zone-Through Repair by
inside on a Two Phase
Process(Heat Blanket)
REPAIR#5: CMM TASK 53-15-12-300-810-
A01: Sandwich Zone-Through Repair by
Outside on a One Phase
Process (Heat blanket)
REPAIR#6: CMM TASK 53-15-12-300-804-
A01: Sandwich Zone -Through Repair by
Inside Nearthe
Monolithic Zone on a One-Phase Process
(Heat Blanket or Autoclave)
REPAIR#7: CMM TASK 53-15-12-300-804-
A02: Sandwich Zone -Through Repair by
Inside Nearthe
Monolithic Zone on a Two-Phase Process
(Heat blanket)
REPAIR#11: CMM TASK 53-15-12-360-
801-A01: Repair of the Lightning Plugs
REPAIR#12: CMM TASK 53-15-12-370-
801-A01 : Curing Process
REPAIR#13: CMM TASK 53-15-12-380-
801-A01 : Application of Paint
REPAIR#14: CMM TASK 53-15-12-380-
802-A01: Paint Touch-up
REPAIR#15: CMM TASK 53-15-12-380-
803-A01: Application of Sealing Varnish
Inside Radome
REPAIR#16: CMM TASK 53-15-12-380-
804-A01: Application of Airline Finish Paint
WD040ABACAAA; - TASK 21-59-11 -000-802-A01, 11SEP HAN
CSE-2020-71 Flap Assy Airbus CMM 21-59-11 A350/XWB CAAV
WD040ABADAAA; Disassembly of the Transmission Bar 2020 BMC

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 24


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WD040ACACAAA; - TASK 21-59-11-400-802-A01, Asembly of
WD040ADACAAA; the Transmission Bar
WD040ADADAAA; - TASK 21-59-11-000-801 -A01,
WD040AFADAAA, Disassembly of the Flap Rear-LWR Panel
WD040AGADAAA; - TASK 21-59-11 -400-801-A01, Assembly of
WD040AHADAAA; the Flap Rear-LWR Panel
WD041ACAEAAA, - Subtask 21 -59-11 -000-015-A01,
WD041ADAFAAA; Disassembly of the Flap Assy
WD041AEAEAAA; - Subtask 21-59-11 -400-023-A01, Assembly
WD041AEAFAAA, of the Flap Assy
WD041AFAEAAA;
WD041AGAEAAA;
WD041AHAEAAA
FOLLOWING TASK ON CMM 28-11 -39:
1 TASK 28-11-39-700-801 -A01 Structural
Container Leak Test
2 TASK 28-11-39-700-802-A01 Tube Leak
Test.
3. TASK 28-11-39-700-803-A01 Bladder
Tank Leak Test.
4. TASK 28-11-39-000-813-A01 Removal of
the Bladder Tank
5 TASK 28-11-39-400-802-A01 Installation
Additional Center A321/V250 15 SEP HCM CAAV
D282710750XXXX CSE/2020/28 Airbus CMM 28-11-39 of the Bladder Tank
Tank (Act) 0 2020 BMC FAA
6 TASK 28-11-39-100-801 -A01 Cleaning
7 TASK 28-1 1-39-210-801-A01
Examination of the Internal and External
ACT Structure
8. TASK 28-11-39-2 10-802-A01 Examine
the ACT internal component parts
9. TASK 28-11-39-210-803-A01 Electrical
System Parts
10. TASK 28-11-39-210-805-A01 Check of
the Identification Plate and Placards

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 25


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
11. TASK 28-11-39-210-804-A01 Examine
the Bladder Tank
12. TASK 28-1 1-39-300-801-A01
Reworking or Machining
13. TASK 28-11 -39-300-802-A01 Repair of
the Protective Treatment
14. TASK 28-11-39-300-803-A01
Replacement of Parts
15. TASK 28-11-39-500-801 -A01 Storage
after Assembly
16. TASK 28-11 -39-700-806-A01 Continuity
Test
17. TASK 28-11-39-000-809-A01 Removal
of the Vent System
18. TASK 28-11-39-000-810-A01 Removal
of the Fuel System
19. TASK 28-1 1-39-000-811-A01 Removal
of the Fuel Valve System
20. TASK 28-11-39-400-804-A01 Installation
of the Fuel Valve System
21.TASK 28-11-39-400-805-A01 Installation
of the Fuel System
22.TASK 28-11 -39-400-806-A01 Installation
of the Vent System
23. TASK 28-11-39-400-815-A01
Disassembly of the Tank Structure
Installation.
1. Blades repair 4-1 , 4-2, 4-4, 4-6, 4-10, 4-
Hamilton ATR4/ATR7
19, 4-20 15 SEP HCM CAAV
815500-X CSE/2020/038 Propeller Sundstrand CMM 61-13-12 2/PW124/P
2.Spinner repair 1-1 , 1-2, 1-3; 2020 BMC CAAP
W127
3. Hub repair 3-3

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 26


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of Divider Panel lAW CMM 25-
CSE-IN6- Trolley 31-222 reference: A320/A321/ 06 DEC CAAV
263522-41 Safran CMM 25-31-222 CIMC
2021-50 Compartment -Removal: Block 4.5 Divider Panel Removal CFM56 2021 CAAT
- Install: Block 4.5 Divider Panel Installation

Hamilton ATR42/ATR CAAP


Replacement of the blades protection strip 30 DEC HCM
815500-X CSE/2021/045 Propeller Sundstrand CMM 61-13-12 72/PW124/ SSCA
IAW CMM 61-13-12, repair 4-19, repair 4-20. 2021 BMC
PW127 CAAB

-Task 55-21-15-010-801 -A01 Removal of


the Pressed-in Bushes
- Task 55-21-15-410-801-A01 Installation of
the Pressed-in Bushes
- Referenced information:
+ SRM 51-72-12
+ PMS 01-05-58 Installation Method A
Assembly-Press fit
+Task 55-21-15-300-801-A01 Protective
Treatment
A320/A321
+Task 55-21-15-300-803-A01 Repainting of 17 SEP HCM CAAV
D5528000XXX CSE/2020/047 Elevator Assy Airbus CMM 55-21-15 V2500-
Elevator 2020 BMC SSCA
PW1100G
+ Task 55-21-15-300-803-801 Repainting of
Elevator
+Task 55-21-15-200-801-A01 Check of the
Elevator Weight
+ Task 55-21-15-300-802-A01 Record the
Elevator Weight
+ Task 55-21-15-300-806-A01 Replacement
of the Cover
+Task 55-21-15-820-807-A01 Fits and
Clearances

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 27


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval

CMM 71 -11 -19 REPAIR NO. 20


CSE-2020- Inlet Cowl Goodrich A320/A321- 18 SEP HAN CAAV
642-1000XXX CMM 71-11-19 REPLACEMENT OF INLET COWL LIP
070 Assembly Aerostructures CFM56 2020 BMC FAA
SEGMENT. TASK 71-11-19-300-820

CSE-2017- Cleaning and replacement the defective A350/TREN 23 SEP


X127003-0000011 Galley G25caf39 B/E Aerospace CMM 25-39-19 CIMC CAAV
CI54 parts (except electric parts) XWB-84 2020

CSE-2017- Cleaning and replacement the defective A350/TREN 23 SEP


X101002-0000011 Galley G22lar39 B/E Aerospace CMM 25-39-20 CIMC CAAV
Cl55 parts (except electric parts). XWB-84 2020

CSE-2017- Cleaning and replacement the defective A350/TREN 23 SEP


X094000-0000011 Galley G22ral39 B/E Aerospace CMM 25-39-21 CIMC CAAV
Cl56 parts (except electric parts). XWB-84 2020

CSE-2017- Galley G44cfa With Cleaning and replacement the defective A350/TREN 23 SEP
X409000-0000011 B/E Aerospace CMM 25-39-22 CIMC CAAV
Cl57 Ccrc parts (except electric parts) XWB-84 2020

CSE-2017- Cleaning and replacement the defective A350/TREN 23 SEP


X412005-0000011 Galley G4m B/E Aerospace CMM 25-39-23 CIMC CAAV
CI58 parts (except electric parts). XWB-84 2020

CSE-2017- Cleaning and replacement the defective A350/TREN 23 SEP


X414000-0000011 Galley G45lar B/E Aerospace CMM 25-39-24 CIMC CAAV
Cl59 parts (except electric parts). XWB-84 2020

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 28


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CMM 25-39-25,
CSE-2017- ISSUE DATE: 10 Cleaning and replacement the defective A350/TREN 23 SEP
X415000-0000011 Galley G45ral B/E Aerospace CIMC CAAV
CI60 AUG 2019 REV parts (except electric parts). XWB-84 2020
03

CSE-2017- Cleaning and replacement the defective A350/TREN 23 SEP


X413000-0000011 Galley G46caf B/E Aerospace CMM 25-39-26 CIMC CAAV
Cl61 parts (except electric parts). XWB-84 2020

-CMM 32-47-52: Removal of the Unions


(DISASSEMBLY - Subtask 32-47-52-010-
CAAV
C24837102; CSE-2020- Normal Brake Safran Messier- 003-A01). 24 SEP HAN
CMM 32-47-52 A320/A321 FAA
C24837102-2 074 Manifold Assembly Bugatti-Dowty -CMM 32-47-52: Installation of the Unions 2020 BMC
CAAT
(ASSEMBLY - Subtask 32-47-52-410-004-
A01).

201584 XXX; CMM 32-12-20;


Main Landing Gear Paint finish repaired as per Subtask 32-12- A320/A321 24 SEP HCM CAAV
201659 XXX CSE/2020/048 Safran 20-380-001-A01/ (2) / (a) / 3 / a V2500-
Complete 2020 BMC SSCA
PW1100G
PCS-2500
CMM (CMP) RADOME REPAIR- DMC
CSE-2020-56 RADOME AIRBUS CMM (CMP) 53- RADOME-A-53-10-11-01001-6648-C. A350/TREN 28 SEP HAN
CAAV
V53132010000 RADOME-SPECIAL REPAIR PROCEDURE XWB-84 2020 BMC
10-11
(PAINT TOUCH-UP)
SERVICING: IAW CMP 25-20-09: TASK
A350-A-25-20-09-01001-250A-C
EXAMINATION,TEST,CHECK: IAW CMP
CMP: 25-20-09; 25-20-09: TASK A350-A-25-20-09-01001-
CSE-2020- A350/TREN 28 SEP
VW30-XXX Partition Diehl 300A-C, A350-A-25-20-09-01001-310A-C, CIMC CAAV
CI07 SPM: 20-00-01 A350-A-25-20-09-01001-320A-C, A350-A- XWB-84 2020
25-20-09-01001-322A-C, A350-A-25-20-09-
01001-420A-C, A350-A-25-20-09-01001-
430A-C.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 29


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY: IAW CMP 25-20-09: TASK
A350-A-25-20-09-01001-530A-C, A350-A-
25-20-09-02001-530A-C,
A350-A-25-20-09-03001-530A-C, A350-A-
25-20-09-04001-530A-C, A350-A-25-20-09-
05001-530A-C, A350-A-25-20-09-06001-
530A-C.
ASSEMBLY: IAW CMP 25-20-09: TASK
A350-A-25-20-09-01001-710A-C, A350-A-
25-20-09-02001-710A-C,
A350-A-25-20-09-03001-71 OA-C, A350-A-
25-20-09-04001-71 OA-C, A350-A-25-20-
09-05001-71 OA-C, A350-A-25-20-
09-06001-710A-C.
REPAIR: IAW CMP 25-20-09: TASK A350-
A-25-20-09-01001-600A-C
SERVICING: IAW CMP 25-23-35: TASK
A350-A-25-23-35-01001-250A-C
EXAMINATION,TEST,CHECK: IAW CMP
25-23-35: TASK A350-A-25-23-35-01001-
300A-C, A350-A-25-23-35-
01001-310A-C, A350-A-25-23-35-01001-
320A-C
DISASSEMBLY: IAW CMP 25-23-35: TASK
A350-A-25-23-35-01001-530A-C, A350-A-
CSE-2020- A350/TREN 28 SEP
5011-XXX PARTITION DIEHL CMP 25-23-35 25-23-35-02001-530A-C, CIMC CAAV
CI08 XWB-84 2020
A350-A-25-23-35-03001-530A-C, A350-A-
25-23-35-04001-530A-C, A350-A-25-23-35-
05001-530A-C
ASSEMBLY: IAW CMP 25-23-35: TASK
A350-A-25-23-35-01001-710A-C, A350-A-
25-23-35-02001-710A-C,
A350-A-25-23-35-03001-710A-C, A350-A-
25-23-35-04001-71 OA-C , A350-A-25-23-
35-05001-710A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 30


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
REPAIR: IAW CMP 25-23-35: TASK A350-
A-25-23-35-01001-600A-C
REMOVAL OF THE BONDED
CONNECTOR BRACKETS : TASK 20-00-
CSE-2020- Standard Practices 01-300-829-A00 A350/TREN 28 SEP
C5678 Diehl SPM 20-00-01 CIMC CAAV
CI09 Manual REPLACEMENT OF THE BONDED XWB-84 2020
CONNECTOR BRACKETS :TASK 20-00-
01-300-865-A0
Sleeve-Nlg - Cleaning: Subtask 32-31-09-160-001-A01 29 SEP HAN CAAV
D3221407920000 CSE-2020-23 Messier-Dowty CMM 32-31-09 A320/A321
Actuating Cylinder - Inspection: Subtask 32-31-09-220-002-A01 2020 BMC FAA
Pin Assy-Nlg Cleaning: Subtask 32-31-07-100-801-A01 29 SEP HAN CAAV
D3221408000000 CSE-2020-24 Messier-Dowty CMM 32-31-07 A320/A321
Actuating Cylinder - Inspection: Subtask 32-31-07-200-801-A01 2020 BMC FAA
- Disassembly of the Side-Load Stay
Assembly - Flap Track 3. Ref TASK 57-55-
D57556232 XXX;
Fairing Assemby 16-040-805-A01 29 SEP HAN CAAV
D57556236 XXX; CSE-2020-26 Airbus CMM 57-55-16 A320/A321
Flap Track 3 - Assembly of the Side-Load Stay Assembly 2020 BMC FAA
D57556579 XXX
- Flap Track 3. Ref TASK 57-55-16-440-801-
A01
- Disassembly of the Side-Load Stay
Assembly - Flap Track 4. Ref TASK 57-55-
D57556242 XXX;
Fairing Assemby 17-000-805-A01 29 SEP HAN CAAV
D57556246 XXX; CSE-2020-27 Airbus CMM 57-55-17 A320/A321
Flap Track 4 - Assembly of the Side-Load Stay Assembly 2020 BMC FAA
D57556580 XXX
- Flap Track 4. Ref TASK 57-55-17-400-801-
A01
Check of the Trunnion Assembly and
Inboard Flap 29 SEP HAN CAAV
D575730500 XXX CSE-2020-28 Airbus CMM 57-52-23 Torsion Support Assembly Ref TASK 57-52- A320/A321
Structure Compl 2020 BMC FAA
23-210-803-A01
- Removal of the bearing (4-300) or (4A-300)
Ref SUBTASK 32-27-20-010-005-A01 Page
Messier-Bugatti- 3008 29 SEP HAN CAAV
D23590000 XXX CSE-2020-29 Leg-Structure CMM 32-27-20 A320/A321
Dowty - Installation of the bearing (4-300) or (4A- 2020 BMC FAA
300) Ref SUBTASK 32-27-20-440-001-A01
Step (I) Page 7010

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 31


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- REMOVAL BRAKE BLEED VLV (ITEM
330) Ref SUBTASK 32-41-05-040-002-A01
C20534050; Safran Messier- 29 SEP HAN CAAV
CSE-2020-37 Carbon Brake Assy CMM 32-41-05 - INSTALLATION BRAKE BLEED VLV A320/A321
C20534100 Bugatil-Dowty 2020 BMC FAA
(ITEM 330) Ref SUBTASK 32-41-05-440-
002-A01
Triumph
11412200X; Mlg Door Actuating- Actuation Measure the wear of the door actuating- 29 SEP HAN CAAV
CSE-2020-38 A320/A321
11412200XX Cylinder Systems - Uk, CMM 32-31-35 cylinder bearings. 2020 BMC FAA
Ltd
1141220X; Nlg Door Actuating- Measure the wear of the NLG door 29 SEP HAN CAAV
CSE-2020-39 Safran CMM 32-37-11 actuating-cylinder bearings A320/A321
1141220XX Cylinder 2020 BMC FAA
D23278000;
REMOVE & INSTALL PIN OF TOWING
D23281000;
Remove & Install FITTING AT NLG
D23278000-1; 29 SEP HAN CAAV
CSE-2020-40 Pin Of Towing Safran CMM 32-27-11 1. SUBTASK 32-27-11-000-001-A01 A320/A321
D23281100; 2020 BMC FAA
Fitting At Nlg 2. SUBTASK 32-27-11-010-001-A01
D23278100;
3. SUBTASK 32-27-11-440-001-A01
D23278200
CMM 21 -52-07; REPAIR 07- Removing of
cracks and nicks and smoothing of the
Housing,
SUBTASK 21 -52-07-380-002-A01
- CMM 21 -52-07; REPAIR 08- Repair of
749A0000-02;
Delamination,
2056A0000-02;
CSE-2020- SUBTASK 21-52-07-380-003-A01 29 SEP HAN CAAV
205680000-01; Plenum Liebherr CMM 21-52-07 - CMM 21-52-07; REPAIR 09- Tempering of A320/A321
041 2020 BMC FAA
2056C0000-01;
the Housing,
2056C0000-02
SUBTASK 21-52-07-370-001-A01
- CMM 21 -52-07; REPAIR 10- Painting of
the Inner Surface of the Housing (FOR
PAINT AKZO NOBEL),
SUBTASK 21-52-07-380-004-A01
CMM 55-21-15: Cleaning;
D552800030XXXX CSE-2020- TASK 55-21-15-100-801-A01 29 SEP HAN CAAV
Elevator Assy Airbus CMM 55-21-15 - CMM 55-21-15: Check of the Elevator A320/A321
043 2020 BMC FAA
Weight;

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 32


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
TASK 55-21-15-200-801-A01
- CMM 55-21-15: Protective Treatment;
TASK 55-21-15-300-801-A01
- CMM 55-21-15: Record the Elevator
Weight;
TASK 55-21-15-300-802-A01
- CMM 55-21-15: Repainting of the Elevator;
TASK 55-21-15-300-803-A01
- CMM 55-21-15: Repainting of elevator;
TASK 55-21-15-300-803-B01
- CMM 55-21-15: Replacement of the Cover;
TASK 55-21-15-300-806-A01
FOLLOWING TASK ON CMM 28-11-39:
1. TASK 28-11-39-700-801-A01 Structural
Container Leak Test
2. TASK 28-11-39-700-802-A01 Tube Leak
Test.
3. TASK 28-11-39-700-803-A01 Bladder
Tank Leak Test.
4. TASK 28-11-39-000-813-A01 Removal of
the Bladder Tank
5. TASK 28-11-39-400-802-A01 Installation
Additional Center
of the Bladder Tank
D2827107500XXX; Tank (Act), 29 SEP HAN CAAV
CSE-2020-44 Airbus CMM 28-11-39 6. TASK 28-11-39-100-801-A01 Cleaning A320/A321
D2827107501XXX Inspection And 2020 BMC FAA
7. TASK 28-11-39-210-801-A01
Replace Bladder
Examination of the Internal and External
ACT Structure
8. TASK 28-11-39-210-802-A01 Examine
the ACT internal component parts
9. TASK 28-11-39-210-803-A01 Electrical
System Parts
10. TASK 28-11-39-210-805-A01 Check of
the Identification Plate and Placards
11. TASK 28-11-39-210-804-A01 Examine
the Bladder Tank

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 33


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
12. TASK 28-11-39-300-801-A01 Reworking
or Machining
13. TASK 28-11-39-300-802-A01 Repair of
the Protective Treatment
14. TASK 28-11-39-300-803-A01
Replacement of Parts
15. TASK 28-11-39-500-801 -A01 Storage
after Assembly
16. TASK 28-11-39-700-806-A01 Continuity
Test
17. TASK 28-11-39-000-809-A01 Removal
of the Vent System
18. TASK 28-11-39-000-810-A01 Removal
of the Fuel System
19. TASK 28-11-39-000-811-A01 Removal
of the Fuel Valve System
20. TASK 28-11-39-400-804-A01 Installation
of the Fuel Valve System
21 .TASK 28-11-39-400-805-A01 Installation
of the Fuel System
22. TASK 28-11-39-400-806-A01 Installation
of the Vent System
Perform detailed visual inspection in A320/A321 01 OCT HAN
N/A CSE-2020-77 Landing gear SAFRAN PCS-4102 CAAV
accordance with PCS-4102 /A350 2020 BMC
Using Scotch brite by hand, smoothly
A320/A321 01 OCT HAN
N/A CSE-2020-78 Landing gear SAFRAN PCS-4103 blend/de-burr sharp edge in accordance with CAAV
/A350 2020 BMC
PCS-4103
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
1050620 XXX; CSE-Cl-TD- A321/ 02 OCT
Passenger seat B/E Aerospace CMM: 25-23-58 the seat listed in the block CLEANING CIMC CAAV
1050622 XXX 2020-01 V2500 2020
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 34


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
the seat listed in the block CLEANING
(except electrical components,
1014159 XXX; CSE-Cl-TD- A321/ 02 OCT
Passenger seat B/E Aerospace CMM 25-23-57 wiring and PCU) CIMC CAAV
1014161 XXX 2020-02 V2500 2020
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
the seat listed in the block CLEANING
(except electrical components,
CSE-Cl-TD- A321/ 02 OCT
88807XXX Passenger seat B/E Aerospace CMM 25-26-82 wiring and PCU) CIMC CAAV
2020-03 V2500 2020
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
2128-71CE00EAE;
CLEANING: Cleaning of all components of
2128-71LE00EAE;
the seat listed in the block CLEANING
2128-75CE00AAE1; CSE-Cl-TD- Cabin attendant A321/ 02 OCT
Goodrich CMM: 25-29-38 INSPECTION/CHECK: Inspection of all CIMC CAAV
2128-75CE00EAE1; 2020-04 seat V2500 2020
components of the seat listed in the block
2128-75LE00AAE1;
INSPECTION/CHECK
2128-75LE00EAE1
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 35


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
2130-11CH00FAE; the seat listed in the block CLEANING
CSE-Cl-TD- Cabin attendant A321/ 02 OCT
2130-15CH00AAE1; Goodrich CMM: 25-29-39 INSPECTION/CHECK: Inspection of all CIMC CAAV
2020-05 seat V2500 2020
2130-15CH00FAE1 components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: All tasks in the block
DISASSEMBLY
2131-71NK00GAE; CLEANING: All tasks in the block
CSE-Cl-TD- Cabin attendant A321/ 02 OCT
2131-75NK00AAE1; Goodrich CMM: 25-29-40 CLEANING CIMC CAAV
2020-06 seat V2500 2020
2131-75NK00GAE1 CHECK: All tasks in the block CHECK
ASSEMBLY: All tasks in the block
ASSEMBLY
DISASSEMBLY: All tasks in the block
DISASSEMBLY
2127-25EN02AAE1;
CLEANING: All tasks in the block
2127-15AD00AAE1; CSE-Cl-TD- Cabin attendant A321/ 02 OCT
Goodrich CMM: 25-29-41 CLEANING CIMC CAAV
2127-15AD00EAE1; 2020-07 seat V2500 2020
CHECK: All tasks in the block CHECK
2127-21EB02EAE
ASSEMBLY: All tasks in the block
ASSEMBLY
CLEANING: IAW CMM 25-11-97: All
Subtasks in the TASK 25-11-97-100-801-
A01
CHECK: IAW CMM 25-11-97: All Subtasks
in the TASK 25-11-97-200-801-A01
CSE-Cl-TD- Cabin attendant A321/ 02 OCT
FA-XXX Safran CMM: 25-11-97 ASSEMBLY: IAW CMM 25-11-97: All CIMC CAAV
2020-53 seat V2500 2020
Subtasks in the TASK 25-11-97-400-801-
A01
DISASSEMBLY: IAW CMM 25-11-97: All
Subtasks in the TASK 25-11-97-000-801-
A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 36


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY: IAW CMM 25-75-32: All
tasks in the block DISASSEMBL Y,except:
CABLE-ASSY MASTER 3D8004-1: TASK
25-75-32-012-299-A01
CABLE-ASSY PHONE 3D8004-3: TASK 25-
75-32-012-300-A01
CABLE-ASSY STANDARD 3D8004-5:
B787/
TASK 25-75-32-012-301-A01
GENX-
CLEANING: IAW CMM 25-75-32: All tasks in
Track Mounted 1B74/75/P2
CSE-Cl-TD- Utc Aerospace the block CLEANING 02 OCT
Model 2787 Cabin Attendant CMM: 25-75-32 CHECK: IAW CMM 25-75-32: All tasks in the G01 & CIMC CAAV
2020-54 Systems 2020
Seat GENX-
block CHECK
1B67/P2G0
ASSEMBLY: CMM 25-75-32: All tasks in the
1
block DISASSEMBL Y,except:
CABLE-ASSY STANDARD 308004-5: TASK
25-75-32-412-298-A01
CABLE-ASSY PHONE 3D8004-3: TASK 25-
75-32-412-299-A01
CABLE-ASSY MASTER 3D8004-1: TASK
25-75-32-412-298-A01
DISASSEMBLY: IAW CMM 25-11-44: All
Subtasks in the TASK 25-11-44-000-801-
A01
CLEANING: IAW CMM 25-11-44: All
Cabin crew Subtasks in the TASK 25-11-44-100-801-
CSE-Cl-TD- ATR72/307 02 OCT
138-XXX member seatcabin ZODIAC CMM: 25-11-44 A01 CIMC CAAV
2020-55 3453-01 2020
crew member seat CHECK: IAW CMM 25-11-44: All Subtasks
in the TASK 25-11-44-200-801-A01
ASSEMBLY: IAW CMM 25-11-44: All
Subtasks in the TASK 25-11-44-400-801-
A01
DISASSEMBLY: IAW CMM 25-37-67:
CSE-Cl-TD- General TASK 25-37-67-99F-806 B787I 02 OCT
B870-XXX Galley assembly JAMCO CMM: 25-37-67 Disassembly Procedures All subtasks in the CIMC CAAV
2020-56 GENX-1B 2020
TASK25-37-67-000-801 , except:

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 37


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Removal Procedure for Proximity Light
SUBTASK 25-37-67-040-032
Removal Procedure for Light Assy (Work
Light) SUBTASK 25-37-67-040-033
Removal Procedure for Electrical Control
Unit SUBTASK 25-37-67-040-034
CLEANING: IAW CMM 25-37-67:
General: TASK 25-37-67-99F-807
Materials: TASK 25-37-67-94A-801
Cleaning Procedure: TASK 25-37-67-100-
801
CHECK: IAW CMM 25-37-67:
General TASK 25-37-67-99F-808
Detail Check Procedure TASK 25-37-67-
200-801
ASSEMBLY: IAW CMM 25-37-67:
General TASK 25-37-67-99F-811
Materials TASK 25-37-67-94A-803
Assembly Procedures: All subtasks in the
TASK 25-37-67-400-801 , except:
Installation Procedure for Proximity Light:
SUBTASK 25-37-67-440-032
Installation Procedure for Light Assy (Work
Light): SUBTASK 25-37-67-440-033
Installation Procedure for Electrical Control
Unit: SUBTASK 25-37-67-440-034
DISASSEMBLY: IAW CMM 25-49-59: All
subtasks in the task 25-49-59-000-801 ,
except:
Disassembly Procedures for LDF lnstl:
CSE-Cl-TD- B787I 02 OCT
B800-XXX Lavatory assy JAMCO CMM: 25-49-59 SUBTASK 25-49-59-040-012 CIMC CAAV
2020-57 GENX-1B 2020
Disassembly Procedures for LDF Actuator
Assy: SUBTASK 25-49-59-040-013
Disassembly Procedures for LDF IR Switch
Assy: SUBTASK 25-49-59-040-015

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 38


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Disassembly Procedures for Translucent
Window Inst!: SUBTASK 25-49-59-040-016
Disassembly Procedures for Electrical Mirror
Light lnstl: SUBTASK 25-49-59-040-023
Disassembly Procedures for PSU lnstl:
SUBTASK 25-49-59-040-037
Disassembly Procedures for PSU Assy:
SUBTASK 25-49-59-040-038
Disassembly Procedures for Electrical
System Inst!: SUBTASK 25-49-59-040-049
Disassembly Procedures for Call Reset
Switch Assy: SUBTASK 25-49-59-040-050
Disassembly Procedures for Sky Light Assy:
SUBTASK 25-49-59-040-052
Disassembly Procedures for Flush Control
Assy: SUBTASK 25-49-59-040-054
CLEANING: IAW CMM 25-49-59
General: TASK 25-49-59-99F-805
Materials :TASK 25-49-59-94A-801
Cleaning Procedure :All subtasks in the
TASK 25-49-59-100-801
CHECK: IAW CMM 25-49-59:
General TASK 25-49-59-99F-806
Materials TASK 25-49-59-94A-805
Detailed Check Procedure All subtasks in
the TASK 25-49-59-200-801
ASSEMBLY : : IAW CMM 25-49-59: All
subtasks in the task 25-49-59-400-801,
except:
Assembly Procedures for LDF lnstl:
SUBTASK 25-49-59-440-012
Assembly Procedures for LDF Actuator
Assy: SUBTASK 25-49-59-440-013
Assembly Procedures for LDF IR Switch
Assy: SUBTASK 25-49-59-440-015

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 39


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Assembly Procedures for Translucent
Window lnstl: SUBTASK 25-49-59-440-016
Assembly Procedures for Electrical Mirror
Light lnstl: SUBTASK 25-49-59-440-023
Assembly Procedures for PSU lnstl:
SUBTASK 25-49-59-440-037
Assembly Procedures for PSU Assy:
SUBTASK 25-49-59-440-038
Assembly Procedures for Electrical System
lnstl: SUBTASK 25-49-59-440-049
Assembly Procedures for Call Reset Switch
Assy: SUBTASK 25-49-59-440-050
Assembly Procedures for Sky Light Assy:
SUBTASK 25-49-59-440-052
Assembly Procedures for Flush Control
Assy: SUBTASK 25-49-59-440-054
DISASSEMBLY: IAW CMM 25-03-08: All
subtasks in the TASK 25-03-08-000-801-
A01
CLEANING: IAW CMM 25-03-08: All
subtasks in the TASK 25-03-08-100-801-
CSE-Cl-TD- Business class seat B787I 02 OCT
2C06-XXX ZODIAC CMM 25-03-08 A01 CIMC CAAV
2020-58 asemblies GENX-1B 2020
CHECK: IAW CMM 25-03-08: All subtasks in
the TASK 25-03-08-200-801-A01
ASSEMBLY: IAW CMM 25-03-08: All
subtasks in the TASK 25-03-08-400-801-
A01
DISASSEMBLY: IAW CMM 25-03-09: All
subtasks in the TASK 25-03-09-000-801-
A01
2C06-XXX; CSE-Cl-TD- CLEANING: IAW CMM 25-03-09: All B787/ 02 OCT
Shell assembly Safran Seats CMM: 25-03-09 subtasks in the TASK 25-03-09-100-801- CIMC CAAV
2C14-XXX 2020-59 GENX 2020
A01
CHECK: IAW CMM 25-03-09: All subtasks in
the TASK 25-03-09-200-801-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 40


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
REPAIR: IAW CMM 25-03-09:
Placard Replacement SUBTASK 25-03-10-
350-013-A01
Replace or Install Bonded Components
SUBTASK25-03-10-350-014-A01
ASSEMBLY: IAW CMM 25-03-09: All
subtasks in the TASK 25-03-09-400-801 -
A01
DISASSEMBLY: IAW CMM 25-03-10: All
subtasks in the TASK 25-03-10-000-802-
A01
CLEANING: IAW CMM 25-03-10: All
subtasks in the TASK 25-03-10-100-801-
A01
CHECK: IAW CMM 25-03-10: All subtasks in
2C06-XXX; CSE-Cl-TD- the TASK 25-03-10-200-802-A01 B787/ 02 OCT
Monument Zodiac CMM 25-03-10 REPAIR: IAW CMM 25-03-10: CIMC CAAV
2C14-XXX 2020-60 GENX-1B 2020
Placard Replacement SUBTASK 25-03-10-
350-013-A01
Replace or Install Bonded Components
SUBTASK 25-03-10-350-014-A01
ASSEMBLY: IAW CMM 25-03-10: All
subtasks in the TASK 25-03-10-400-802-
A01
DISASSEMBLY: IAW CMM 25-22-54: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-22-54: All tasks in
1032063-XXX; CSE-Cl-TD- Economy class seat the block CLEANING B787/ 02 OCT
B/E Aerospace CMM: 25-22-54 CIMC CAAV
1032064-XXX 2020-61 asemblies INSPECTION/CHECK: IAW CMM 25-22-54: GENX-1B 2020
All tasks in the block CHECK
ASSEMBLY: IAW CMM 25-22-54: All tasks
in the block ASSEMBLY
CSE-Cl-TD- Economy class seat DISASSEMBLY: IAW CMM 25-21-95: B787I 02 OCT
MODE L3050 Haeco CMM: 25-21-95 General: TASK 25-21-95-000-801 CIMC CAAV
2020-62 asemblies GENX-1B 2020

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 41


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Equipment and Materials Required: TASK
25-21-95-000-802
Procedure : All subtasks in the TASK 25-21-
95-000-801-A01
CLEANING: IAW CMM 25-21-95:
General TASK 25-21-95-100-801
Equipment and Materials Required TASK
25-21-95-100-802
Procedure: All subtasks in the TASK 25-21-
95-100-801-A01
CHECK: IAW CMM 25-21-95:
General: TASK 25-21-95-210-801
Detailed Checklist: All subtasks in the TASK
25-21-95-200-801-A01
REPAIR: IAW CMM 25-21-95: Repair of
Bonded Components TASK 25-21-95-300-
804
ASSEMBLY: IAW CMM 25-21-95: All tasks
in the block ASSEMBLY
DISASSEMBLY: IAW CMM 25-22-54: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-22-54: All tasks in
1032063-XXX; CSE-Cl-TD- Economy class seat the block CLEANING B787/ 02 OCT
B/E Aerospace CMM: 25-22-54 CIMC CAAV
1032064-XXX 2020-61 asemblies INSPECTION/CHECK: IAW CMM 25-22-54: GENX-1B 2020
All tasks in the block CHECK
ASSEMBLY: IAW CMM 25-22-54: All tasks
in the block ASSEMBLY
Following steps of CMM 49-11-09
- Disassembly, step 39. B: Discard terminal
Replacement Of
(1045) if required.
The Terminal Lug
Griffith - Repair, step 2.A: General Repair 05 OCT HAN
3888438 CSE-2020-80 On Wiring Harness A321 CAAV
Enterprises, Inc CMM 49-11-09 Procedures, apply to replace the start motor 2020 BMC
Ass Embly Pn
terminal lug PN 327732 Ref. Table 602
3888438
- Assembly, step 3(F): Perform pin-to-pin
conti nuity check from P1 to Start Motor

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 42


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Remove the rubber grommet and the
obturator IAW Subtask 32-48-28-000-001- A320-
RU1502U00; CSE-2020- A01 step (1).(e).1 and 2. A321/V250 07 OCT HCM CAAV
Universal Wheel Kit Technofan CMM 32-48-28
RU1502U01 050 - Install the rubber grommet and the 0- 2020 BMC SSCA
obturator IAW Subtask 32-48-28-410-001- PW1100G
A01 step (1).(c).7 and 8.
- CMM 32-12-20; REPAIR DAMAGE TO
20158400X; SMALL AREAS PAINT FINISH. REF.TO
20165900X; SUBTASK TASK 32-12-20-
10-450101XXX; 380-001 -01 A; (2)/(a)/3/a
10-450102XXX; CMM 32-12-20; - CMM 32-12-79; REPAIR DAMAGE TO A320/A321-
10-450201XXX; CSE-2020- Main Landing Gear SMALL AREAS PAINT FINISH. REF.TO V2500/CFM 09 OCT HAN CAAV
Safran CMM 32-12-79;
10-452901XXX; 079 Complete SUBTASK TASK 32-12-79- 56- 2020 BMC FAA
10-452902XXX; CMM 32-12-86 380-001-01 A; (2)/(a)/3/a 5B/PW1100
10-453001XXX; - CMM 32-12-86; REPAIR DAMAGE TO
10-453002XXX SMALL AREAS PAINT FINISH. REF.TO
SUBTASK TASK 32-12-86-
380-001-01 A; (2)/(a)/3/a
10-355503XXX;
10-355603XXX; CMM 32-13-01;
10-355703XXX; CMM 32-13-02;
10-355803XXX;
10-356103XXX; CMM 32-13-03;
10-356203XXX; CMM 32-13-04;
10-353203XXX;
10-356403XXX; CMM 32-13-05; Main Landing Gear: Application Of Primer 09 OCT HAN
CSE-2020-81 Main Landing Gear Safran A350/XWB CAAV
10-355903XXX; CMM 32-13-06; And Top Coat Paint Refer To Pcs-2530 2020 BMC
10-357303XXX;
10-357403XXX; CMM 32-13-13;
10-355504XXX; CMM 32-13-14;
10-355604XXX;
10-356104XXX; CMM 32-13-15;
10-356204XXX;
CMM 32-13-20
10-356304XXX;

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 43


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
10-356305XXX;
10-355505XXX;
10-355605XXX
Replacement of component IAW the
following tasks:
Stowage And - Removal of all components of the seat
CSE CIMC
ASAB1-XXXXXX-XX; BASEHAN - Privacy Area – Stelia CMM: 25-21-12 I.A.W. tasks listed in the block A350/TREN 10 OCT CIMC CAAV
FJSL4-XXXXXX-XX Business Class Aerospace XWB-84 2020
2020-22 DISASSEMBLE
Seat Assemblies
- Installation of all components of the seat
I.A.W. tasks listed in the block ASSEMBLE

Replacement of component IAW the


following tasks:
- Removal of all components of the seat
CSE CIMC CMM 25-23-52
1023567-XX BASEHAN - Passenger Seats B/E Aerospace I.A.W. tasks listed in the block A350/TREN 10 OCT CIMC CAAV
XWB-84 2020
2020-23 DISASSEMBLE

- Installation of all components of the seat


I.A.W. tasks listed in the block ASSEMBLE
Replacement of component IAW the
following tasks:
- Replacement of the Self-adhesive Placards
D2549011805000; I.A.W. subtask 25-43-58-350-044-A01
CSE CIMC
Diehl Comfort CMM 25-43-58 - Replacement of the Self-Adhesive Parts A321/V250 12 OCT
D2549011803000; BASEHAN - Lavatory D CIMC CAAV
Modules Gmbh 2020
2020-26 I.A.W. subtask 25-43-58-360-010-A1
D2549011803200
- Removal and Disassembly of the Upper
Attachment I.A.W. subtask 25-43-58-000-
003-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 44


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Lower
Attachment I.A.W. subtask 25-43-58-010-
022-A01
- Removal and Disassembly of the Pelmet
I.A.W. subtask 25-43-58-000-004-A01
- Removal and Disassembly of the Rear wall
I.A.W. subtask 25-43-58-000-005-B01
- Removal and Disassembly of the Housing
I.A.W. subtask 25-43-58-000-013-B01
- Removal and Disassembly of the Side wall
I.A.W. subtask 25-43-58-000-034-B01
- Removal and Disassembly of the Door
Installation I.A.W. subtask 25-43-58-000-
043-A01
- Disassembly of the Single Door Assembly
I.A.W. subtask 25-43-58-040-008-A01
- Removal and Disassembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-43-
58-000-018-A01
- Removal and Disassembly of the Floor Pan
I.A.W. subtask 25-43-58-000-017-D01
- Removal and Disassembly of the Door
Light I.A.W. subtask 25-43-58-000-035-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 45


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the
Washbasin Unit I.A.W. subtask 25-43-58-
000-046-C01
- Removal and Disassembly of the Wash
basin-Unit Door Assembly I.A.W. subtask
25-43-58-000-020-A01
- Removal and Disassembly of the Wash
basin-Unit Panel Assembly I.A.W. subtask
25-43-58-000-036-A01
- Removal and Disassembly of the
Washbasin Unit Console I.A.W. subtask 25-
43-58-000-016-A01
- Removal and Disassembly of the Service
Cabinet I.A.W. subtask 25-43-58-000-051-
A01
- Removal and Disassembly of the Nursing
Table I.A.W. subtask 25-43-58-000-037-
A01
- Removal and Disassembly of the
Ventilation Syste I.A.W. subtask 25-43-58-
000-038-A01
- Installation nstallation and Assembly of the
Upper Attachment I.A.W. subtask 25-43-58-
400-003-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 46


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the Lower
Attachment I.A.W. subtask 25-43-58-400-
006-A01
- Installation and Assembly of the Pelmet
I.A.W. subtask 25-43-58-400-008-A01
Installation and Assembly of the Rear Wall
I.A.W. subtask 25-43-58-400-009-B01
- Installation and Assembly of the Housing
I.A.W. subtask 25-43-58-400-017-B01
- Installation and Assembly of the Side Wall
I.A.W. subtask 25-43-58-400-033-B01
- Installation and Assembly of the Door
Installation I.A.W. subtask 25-43-58-400-
034-A01
- Assembly of the Door Assembly I.A.W.
subtask 25-43-58-440-006-A01
- Installation and Assembly of the Cover and
Seat Toilet Unit I.A.W. subtask 25-43-58-
400-037-A01
- Installation and Assembly of the Floor Pan
I.A.W. subtask 25-43-58-400-041-D01
- Installation and Assembly of the Door Light
I.A.W. subtask 25-43-58-400-042-A01
- Installation and Assembly of the Washbasin
Unit I.A.W. subtask 25-43-58-400-043-C01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 47


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the Wash
basin-Unit Door Assembly I.A.W. subtask
25-43-58-400-048-A01
- Installation and Assembly of the Wash
basin-Unit Panel Assembly I.A.W. subtask
25-43-58-400-049-A01
- Installation and Assembly of the Washbasin
Unit Console I.A.W. subtask 25-43-58-400-
019-A01
- Installation and Assembly of the Service
Cabinet I.A.W. subtask 25-43-58-400-050-
A01
- Installation and Assembly of the Nursing
Table I.A.W. subtask 25-43-58-400-051-A01

- Installation and Assembly of the Ventilation


System I.A.W. subtask 25-43-58-400-052-
A01
Replacement of component IAW the
following tasks:
D2549010304400; - Replacement of the Self-adhesive
CSE CIMC
Diehl Aviation CMM 25-41-54 Placards I.A.W. subtask 25-41-54-350- A321/V250 13 OCT
D2549010304600; BASEHAN - Lavatory A CIMC CAAV
Hamburg Gmbh 0 2020
2020-25 016-A01
D2549010306600
- Replacement of the Self-Adhesive Parts
I.A.W. subtask 25-41-54-360-010-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 48


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Upper
Attachment I.A.W. subtask 25-41-54-000-
006-A01
- Removal and Disassembly of the Lower
Attachment I.A.W. subtask 25-41-54-000-
008-A01
- Removal and Disassembly of the Pelmet
I.A.W. subtask 25-41-54-000-001-A01
- Removal and Disassembly of the Rear
wall I.A.W. subtask 25-41-54-000-002-
B01
- Removal and Disassembly of the
Housing I.A.W. subtask 25-41-54-000-
003-A01
- Removal and Disassembly of the Side
wall I.A.W. subtask 25-41-54-000-011-
C01
- Removal and Disassembly of the Single
Door Installation I.A.W. subtask 25-41-
54-000-041-A01
- Disassembly of the Single Door
Assembly I.A.W. subtask 25-41-54-040-
001-B01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 49


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-41-
54-000-012-A01
- Removal and Disassembly of the Floor
Pan I.A.W. subtask 25-41-54-000-014-
A01
- Removal and Disassembly of the Door
Light I.A.W. subtask 25-41-54-000-020-
A01
- Removal and Disassembly of the
Washbasin Unit I.A.W. subtask 25-41-54-
000-023-A01
- Removal and Disassembly of the Wash
basin-Unit Door Assembly I.A.W. subtask
25-41-54-000-045-A01
- Removal and Disassembly of the Wash
basin-Unit Panel Assembly I.A.W.
subtask 25-41-54-000-042-A01
- Removal and Disassembly of the
Washbasin Unit Console I.A.W. subtask
25-41-54-000-044-A01
- Removal and Disassembly of the Service
Cabinet I.A.W. subtask 25-41-54-000-
048-B01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 50


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Nursing
Table I.A.W. subtask 25-41-54-000-051-
A01
- Removal and Disassembly of the
Ventilation Syste I.A.W. subtask 25-41-
54-000-052-A01
- Installation nstallation and Assembly of
the Upper Attachment I.A.W. subtask 25-
41-54-400-006-A01
- Installation and Assembly of the Lower
Attachment I.A.W. subtask 25-41-54-400-
008-A01
- Installation and Assembly of the Pelmet
I.A.W. subtask 25-41-54-400-001-A01
- Installation and Assembly of the Rear
Wall I.A.W. subtask 25-41-54-400-002-
B01
- Installation and Assembly of the Housing
I.A.W. subtask 25-41-54-400-003-A01
- Installation and Assembly of the Side Wall
I.A.W. subtask 25-41-54-400-012-C01
- Installation and Assembly of the Single
Door Installation I.A.W. subtask 25-41-
54-400-042-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 51


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly of the Single Door Assembly
I.A.W. subtask 25-41-54-440-004-A01
- Installation and Assembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-41-
54-400-014-A01
- Installation and Assembly of the Floor
Pan I.A.W. subtask 25-41-54-400-016-
A01
- Installation and Assembly of the Door
Light I.A.W. subtask 25-41-54-400-021-
A01
- Installation and Assembly of the
Washbasin Unit I.A.W. subtask 25-41-54-
400-032-A01
- Installation and Assembly of the Wash
basin-Unit Door Assembly I.A.W. subtask
25-41-54-400-046-A01
- Installation and Assembly of the Wash
basin-Unit Panel Assembly I.A.W.
subtask 25-41-54-400-043-A01
- Installation and Assembly of the
Washbasin Unit Console I.A.W. subtask
25-41-54-400-045-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 52


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the Service
Cabinet I.A.W. subtask 25-41-54-400-
048-B01
- Installation and Assembly of the Nursing
Table I.A.W. subtask 25-41-54-400-051-
A01
- Installation and Assembly of the
Ventilation System I.A.W. subtask 25-41-
54-400-052-A01
SERVICING:
- Cleaning Procedures: Painted surfaces
cleaning, Metal surfaces cleaning,
Decorative laminates and trim cleaning,
2C10ZD0002R; Front Row Placards cleaning, Upholstery hand cleaning
CSE-CI-TD- CMP 25-20-11 process A350/ Trent 14 OCT
2C10ZD0007L; Monument Safran Seat CIMC CAAV
2020-10 XWB 2020
2C10ZD0005S Assembly - DISASSEMBLE: Removal of all
components of the seat listed in the block
DISASSEMBLE
- ASSEMBLE: Installation of all components
of the seat listed in the block ASSEMBLE
SERVICING:
- Cleaning Procedures: Painted surfaces
cleaning, Metal surfaces cleaning, Placards
cleaning, Upholstery hand cleaning process,
CSE-CI-TD- CMP 25-20-09 Actuators cleaning A350/ Trent 14 OCT
2C101X0-0XX Seat Assembly Safran Seat CIMC CAAV
2020-11 XWB 2020
DISASSEMBLE: Removal of all components
of the seat listed in the block DISASSEMBLE
ASSEMBLE: Installation of all components
of the seat listed in the block ASSEMBLE

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 53


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
SERVICING: Cleaning of all components of
the seat listed in the block Cleaning
Procedures(except washing)
CHECK: Inspection of all components of the
CSE-CI-TD- CMP 25-20-10 seat listed in the block CHECK A350/ Trent 14 OCT
2C10-XXX Shell Assembly Safran Seat CIMC CAAV
2020-12 XWB 2020
DISASSEMBLE: Removal of all components
of the seat listed in the block DISASSEMBLE
- ASSEMBLE: Installation of all components
of the seat listed in the block ASSEMBLE
Replacement of component IAW the
following tasks:
- Replacement of the Self-adhesive
Placards I.A.W. subtask 25-43-61-350-
034-A01
- Removal and Disassembly of the Upper
Attachment I.A.W. subtask 25-43-61-
000-002-A01
- Removal and Disassembly of the Lower
Attachment I.A.W. subtask 25-43-61-
CSE CIMC 000-006-A01
Diehl Comfort A320/A321/ 15 OCT
D2549013808200 BASEHAN - Lavatory E CMM 25-43-61 - Removal and Disassembly of the CIMC CAAV
Modules Gmbh V2500 2020
2020-27 Pelmet I.A.W. subtask 25-43-61-000-
009-A01
- Removal and Disassembly of the Rear
wall I.A.W. subtask 25-43-61-000-014-
B01
- Removal and Disassembly of the
Housing I.A.W. subtask 25-43-61-000-
043-J01
- Removal and Disassembly of the Side
wall I.A.W. subtask 25-43-61-000-050-
D01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 54


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Single
Door Installation I.A.W. subtask 2 5-43-
61-000-011-P01
- Removal and Disassembly of the
Folding Door Installation I.A.W. subtask
25-43-61-000-038-A01
- Disassembly of the Single Door
Assembly I.A.W. subtask 25-43-61-040-
020-B01
- Removal and Disassembly of the
Folding Door Assembly I.A.W. subtask
25-43-61-040-007-B01
- Removal and Disassembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-
43-61-000-015-A01
- Removal and Disassembly of the Floor
Pan I.A.W. subtask 25-43-61-000-032-
A01
- Removal and Disassembly of the Door
Light I.A.W. subtask 25-43-61-000-017-
A01
- Removal and Disassembly of the
Washbasin Unit I.A.W. subtask 25-43-
61-000-023-G01
- Removal and Disassembly of the Wash
basin-Unit Door Assembly I.A.W.
subtask 25-43-61-000-025-A01
- Removal and Disassembly of the Wash
basin-Unit Panel Assembly I.A.W.
subtask 25-43-61-000-026-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 55


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the
Washbasin Unit Console I.A.W. subtask
25-43-61-000-028-A01
- Removal and Disassembly of the
Service Cabinet I.A.W. subtask 25-43-
61-000-029-B01
- Removal and Disassembly of the
Nursing Table I.A.W. subtask 25-43-61-
000-030-A01
- Removal and Disassembly of the
Ventilation Syste I.A.W. subtask 25-43-
61-000-033-A01
- Installation and Assembly of the Upper
Attachment I.A.W. subtask 25-43-61-
400-002-A01
- Installation and Assembly of the Lower
Attachment I.A.W. subtask 25-43-61-
400-007-A01
- Installation and Assembly of the Pelmet
I.A.W. subtask 25-43-61-400-011-A01
- Installation and Assembly of the Rear
Wall I.A.W. subtask 25-43-61-400-006-
B01
- Installation and Assembly of the Housing
I.A.W. subtask 25-43-61-400-018-K01
- Installation and Assembly of the Side
Wall I.A.W. subtask 25-43-61-400-034-
D01
- Installation and Assembly of the Single
Door Installation I.A.W. subtask 25-43-
61-400-013-P01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 56


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the
foldingDoor Installation I.A.W. subtask
25-43-61-400-048-A01
- Assembly of the Single Door Assembly
I.A.W. subtask 25-43-61-440-020-B01
- Installation and Assembly of the
foldingDoor Assembly I.A.W. subtask
25-43-61-440-007-A01
- Installation and Assembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-
43-61-400-022-A01
- Installation and Assembly of the Floor
Pan I.A.W. subtask 25-43-61-400-025-
A01
- Installation and Assembly of the Door
Light I.A.W. subtask 25-43-61-400-026-
A01
- Installation and Assembly of the
Washbasin Unit I.A.W. subtask 25-43-
61-400-035-H01
- Installation and Assembly of the Wash
basin-Unit Door Assembly I.A.W.
subtask 25-43-61-400-037-A01
- Installation and Assembly of the Wash
basin-Unit Panel Assembly I.A.W.
subtask 25-43-61-400-038-A01
- Installation and Assembly of the
Washbasin Unit Console I.A.W. subtask
25-43-61-400-040-A01
- Installation and Assembly of the Service
Cabinet I.A.W. subtask 25-43-61-400-
041-B01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 57


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the Nursing
Table I.A.W. subtask 25-43-61-400-
042-A01
- Installation and Assembly of the
Ventilation System I.A.W. subtask 25-
43-61-400-045-A01
SERVICING: IAW CMM 25-70-35: Task
DMC-A350BEGALMON-A-25-70-35-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-35 : Task DMC-
A350BEGALMON-A-25-70-35-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-35 : Task DMC-
A350BEGALMON-A-25-70-35-00001-300A-
C
CSE-CI-TD- CMP 25-70-35 DISCONNECT, REMOVE AND
A350/TREN 16 OCT
X00200-0-025-00 Galley G15RFA B/E Aerospace DISASSEMBLY PROCEDURES: IAW CMM CIMC CAAV
2020-13 T XWB-84 2020
25-70-35: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except
electrical and water system components
ASSEMBLE, INSTALL AND
CONNECT PROCEDURES: IAW
CMM 25-70-35: All tasks in the block
ASSEMBLE, INSTALL AND
CONNECT PROCEDURES, except
electrical and water system
components

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 58


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
SERVICING: IAW CMM 25-70-36: Task
DMC-A350BEGALMON-A-25-70-36-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-36 : Task DMC-
A350BEGALMON-A-25-70-36-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-36 : Task DMC-
A350BEGALMON-A-25-70-36-00001-300A-
CSE-CI-TD- CMP 25-70-36 C A350/TREN 16 OCT
X01106-0-025-00 GALLEY G14CAF B/E Aerospace CIMC CAAV
2020-14 DISCONNECT, REMOVE AND T XWB-84 2020
DISASSEMBLY PROCEDURES: IAW CMM
25-70-36: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except
electrical and water system components
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-36: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except
electrical and water system components
SERVICING: IAW CMM 25-70-37: Task
DMC-A350BEGALMON-A-25-70-37-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CSE-CI-TD- CMP 25-70-37 CMM 25-70-37 : Task DMC-
A350/TREN 16 OCT
X05001-0-025-00 X05001-0-025-00 B/E Aerospace A350BEGALMON-A-25-70-37-00001-251A- CIMC CAAV
2020-15 T XWB-84 2020
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-37 : Task DMC-
A350BEGALMON-A-25-70-37-00001-300A-
C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 59


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-37: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except
electrical and water system components
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-37: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except
electrical and water system components
SERVICING: IAW CMM 25-70-38: Task
DMC-A350BEGALMON-A-25-70-38-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-38 : Task DMC-
A350BEGALMON-A-25-70-38-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-38 : Task DMC-
A350BEGALMON-A-25-70-38-00001-300A-
CSE-CI-TD- CMP 25-70-38 C A350/TREN 16 OCT
X08802-0-025-00 Galley G24cfa B/E Aerospace CIMC CAAV
2020-16 DISCONNECT, REMOVE AND T XWB-84 2020
DISASSEMBLY PROCEDURES: IAW CMM
25-70-38: All tasks in the block
DISCONNECT, REMOVE AND ----
Disassembly Procedures, Except Electrical
And Water System Components
- Assemble, Install And Connect Procedures:
IAW CMM 25-70-38: All tasks in the block
Assemble, Install And Connect Procedures,
except electrical and water system
components

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 60


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Servicing: IAW CMM 25-70-39: Task DMC-
A350BEGALMON-A-25-70-39-00001-200A-
C
Clean With Chemical Agent: IAW CMM 25-
70-39 : Task DMC-A350BEGALMON-A-25-
70-39-00001-251A-C
Examination, Test And Checks: IAW CMM
25-70-39 : Task DMC-A350BEGALMON-A-
CMP 25-70-39 25-70-39-00001-300A-C A350/TREN 16 OCT
X12703-0-025-00 CSE-CI-TD- Galley G25caf B/E Aerospace Disconnect, Remove And Disassembly T XWB-84 CIMC CAAV
2020
2020-17 Procedures: IAW CMM 25-70-39: All tasks in
the block Disconnect, Remove And
Disassembly Procedures, except electrical
and water system components
Assemble, Install And Connect Procedures:
IAW CMM 25-70-39: All tasks in the block
Assemble, Install And Connect Procedures,
except electrical and water system
components
SERVICING: IAW CMM 25-70-40: Task
DMC-A350BEGALMON-A-25-70-40-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-40 : Task DMC-
A350BEGALMON-A-25-70-40-00001-251A-
CSE-CI-TD- A350/TREN 16 OCT
X40900-0-025-00 Galley G44cfa B/E Aerospace C CIMC CAAV
2020-18 CMP 25-70-40 T XWB-84 2020
Examination, Test And Checks: IAW CMM
25-70-40 : Task DMC-A350BEGALMON-A-
25-70-40-00001-300A-C
Disconnect, Remove And Disassembly
Procedures: IAW CMM 25-70-40: All tasks in
the Block DISCONNECT, REMOVE AND

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 61


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY PROCEDURES, Except
Electrical And Water System Components
Assemble, Install And Connect Procedures:
IAW CMM 25-70-40: All tasks in the block
Assemble, Install And Connect Procedures,
Except Electrical And Water System
Components
SERVICING: IAW CMM 25-70-41 : Task
DMC-A350BEGALMON-A-25-70-41-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-41 : Task DMC-
A350BEGALMON-A-25-70-41-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-41 : Task DMC-
CSE-CI-TD- CMM 25-70-41 A350BEGALMON-A-25-70-41-00001-300A- A350/TREN 16 OCT
X41205-0-025-00 Galley Tc44av13 B/E Aerospace CIMC CAAV
2020-63 C T XWB-84 2020
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-41: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES.
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-41 : All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES
SERVICING: IAW CMM 25-70-42: Task
DMC-A350BEGALMON-A-25-70-42-00001- A321NEO/
CSE-CI-TD- CMM 25-70-42 200A-C 16 OCT
X41300-0-025-00 GALLEY G46CAF B/E Aerospace PW1130G- CIMC CAAV
2020-64 2020
CLEAN WITH CHEMICAL AGENT: IAW JM
CMM 25-70-42 : Task DMC-

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 62


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-42-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-42 : Task DMC-
A350BEGALMON-A-25-70-42-00001-300A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-42: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except:
- G46CAF: Task DMC-A350BEGALMON-
A-25-70-42-01000-500A-C
- UPPER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-42-12000-
500A-C
- UPPER AIR VENTILATION
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-16000-
500A-C
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-20000-
500A-C
- REAR BULKHEAD EXTERNAL DUCT -
LH: Task DMC-A350BEGALMON-A-25-
70-42-21000-500A-C
- REAR BULKHEAD EXTERNAL DUCT -
RH: Task DMC-A350BEGALMON-A-25-
70-42-22000-500A-C
- UPPER ELECTRICAL INSTALLATION
ASSEMBLY:Task DMC-

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 63


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-42-23000-
500A-C
- WORKLIGHT ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-24000-
500A-C,
- Task DMC-A350BEGALMON-A-25-70-
42-25000-500A-C
- 12M HA G45RAL SPLIT- GAINS &
SPLIT ASSY: Task DMC-
A350BEGALMON-A-25-70-42-26000-
500A-C
- 11M HA G45LAR SPLIT- GAINS ASSY:
Task DMC-A350BEGALMON-A-25-70-
42-27000-500A-C
- 12-M HA, SPLIT CON-ACU INST
ASSEMBLY DMC-A350BEGALMON-A-
25-70-42-37000-500A-C
- LOWER ELECTRICAL HARNESS
DMC-A350BEGALMON-A-25-70-42-
38000-500A-C
- MONUMENT - LOOSE ITEM KIT: Task
DMC-A350BEGALMON-A-25-70-42-
53000-500A-C
- ELECTRICAL STACKUP: Task DMC-
A350BEGALMON-A-25-70-42-55000-
500A-C
- PANEL ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-62000-
500A-C
- ACU BOX ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-63000-
500A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 64


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-42: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except:
- G46CAF : Task DMC-
A350BEGALMON-A-25-70-42-01000-
700A-C
- UPPER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-42-12000-
700A-C
- UPPER AIR VENTILATION
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-16000-
700A-C
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-20000-
700A-C
- REAR BULKHEAD EXTERNAL DUCT -
LH: Task DMC-A350BEGALMON-A-25-
70-42-21000-700A-C
- REAR BULKHEAD EXTERNAL DUCT -
RH: Task DMC-A350BEGALMON-A-25-
70-42-22000-700A-C
- UPPER ELECTRICAL
INSTALLATIONASSEMBLY:TaskDMC-
A350BEGALMON-A-25-70-42-23000-
700A-C
- WORKLIGHT ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-24000-
700A-C and Task DMC-
A350BEGALMON-A-25-70-42-25000-
700A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 65


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- 12M HA G45RAL SPLIT- GAINS &
SPLIT ASSY: Task DMC-
A350BEGALMON-A-25-70-42-26000-
700A-C
- 11M HA G45LAR SPLIT- GAINS ASSY:
Task DMC-A350BEGALMON-A-25-70-
42-27000-700A-C
- 12-M HA, SPLIT CON-ACU INST
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-37000-
700A-C
- LOWER ELECTRICAL HARNESS: Task
DMC-A350BEGALMON-A-25-70-42-
38000-700A-C
- MONUMENT - LOOSE ITEM KIT: Task
DMC-A350BEGALMON-A-25-70-42-
53000-700A-C
- ELECTRICAL STACKUP: Task DMC-
A350BEGALMON-A-25-70-42-55000-
700A-C
ACU BOX ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-63000-700A-
C
SERVICING: IAW CMM 25-70-43: Task
DMC-A350BEGALMON-A-25-70-43-00001-
200A-C
CSE-CI-TD- CMM 25-70-43 CLEAN WITH CHEMICAL AGENT: IAW A350/TREN 16 OCT
X41404-0-025-00 Galley G45lar B/E Aerospace CMM 25-70-43 : Task DMC- T XWB-84 CIMC CAAV
2020-65 2020
A350BEGALMON-A-25-70-43-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-43 : Task DMC-

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 66


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-43-00001-300A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-43: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except:
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-13000-
500A-C
- UPPER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-14000-
500A-C
- UPPER GALLEY HARNESS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-27000-
500A-C
- I/O CONTROLLER ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-43-
28000-500A-C
- [11P] I/P, I/F - CONT - C/B MODULE
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-29000-
500A-C
- [11M] I/O CONTROLLER TO SWITCH
PANEL HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-43-
30000-500A-C
- [1MD] I/F, I/P - FAP AND CAS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-31000-
500A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 67


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- [11M] C/B MODULE - GAINS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-32000-
500A-C
- MODULAR X4 CONNECTOR: Task
DMC-A350BEGALMON-A-25-70-43-
33000-500A-C
- CONNECTOR BRACKET ASSEMBLY:
Task DMC-A350BEGALMON-A-25-70-
43-35000-500A-C
- ECP: Task DMC-A350BEGALMON-A-
25-70-43-36000-500A-C
- CONTACTOR ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-41000-
500A-C
- [1MD] I/F, I/P - FAP AND CAS
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-82000-
500A-C
- [1MD] SPLITLINE - CAS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-83000-
500A-C
- [11M] SPLITLINE - ACU AND CAS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-84000-
500A-C
- MONUMENT INSTALLATION KIT: Task
DMC-A350BEGALMON-A-25-70-43-
87000-500A-C
- [11M] SPLITLINE - ACU AND CAS
HARNESS INSTALLATION: Task DMC-

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 68


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-43-D3000-
500A-C
- [1MD] SPLITLINE - CAS HARNESS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-D4000-
500A-C
- [11M] I/O CONTROLLER TO SWITCH
PANEL HARNESS INSTALLATION:
Task DMC-A350BEGALMON-A-25-70-
43-D9000-500A-C
- [11P] I/P, I/F - CONT - C/B MODULE
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-E1000-
500A-C
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: : IAW CMM 25-70-43: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except:
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-13000-
700A-C
- UPPER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-14000-
700A-C
- UPPER GALLEY HARNESS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-27000-
700A-C
- I/O CONTROLLER ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-43-
28000-700A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 69


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- [11P] I/P, I/F - CONT - C/B MODULE
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-29000-
700A-C
- [11M] I/O CONTROLLER TO SWITCH
PANEL HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-43-
30000-700A-C
- [1MD] I/F, I/P - FAP AND CAS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-31000-
700A-C
- [11M] C/B MODULE - GAINS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-32000-
700A-C
- MODULAR X4 CONNECTOR: Task
DMC-A350BEGALMON-A-25-70-43-
33000-700A-C
- CONNECTOR BRACKET ASSEMBLY:
Task DMC-A350BEGALMON-A-25-70-
43-35000-700A-C
- ECP: Task DMC-A350BEGALMON-A-
25-70-43-36000-700A-C
- CONTACTOR ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-41000-
700A-C
- [1MD] I/F, I/P - FAP AND CAS
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-82000-
700A-C
- [1MD] SPLITLINE - CAS HARNESS
ASSEMBLY: Task DMC-

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 70


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-43-83000-
700A-C
- [11M] SPLITLINE - ACU AND CAS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-84000-
700A-C
- [11M] SPLITLINE - ACU AND CAS
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-D3000-
700A-C
- [1MD] SPLITLINE - CAS HARNESS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-D4000-
700A-C
- [11M] I/O CONTROLLER TO SWITCH
PANEL HARNESS INSTALLATION:
- Task DMC-A350BEGALMON-A-25-70-
43-D9000-700A-C
[11P] I/P, I/F - CONT - C/B MODULE
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-E1000-
700A-C

SERVICING: IAW CMM 25-70-44: Task


DMC-A350BEGALMON-A-25-70-44-00001-
200A-C
CSE-CI-TD- CLEAN WITH CHEMICAL AGENT: IAW A350/TREN 16 OCT
X41509-0-025-00 Galley G45ral B/E Aerospace CMM 25-70-44 CMM 25-70-44 : Task DMC- T XWB-84 CIMC CAAV
2020-66 2020
A350BEGALMON-A-25-70-44-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-44 : Task DMC-

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 71


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-44-00001-300A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-44: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except:
ECP ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-25000-500A-
C
- TERMINAL BLOCK ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
28000-500A-C
- I/O CONTROLLER ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
29000-500A-C
- 12-P I/P I/F - C/B MODULE HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-32000-
500A-C
- 12-M GB, SWT PNL HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-33000-
500A-C
- 2-MD ESS A/C I/F - CAS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-34000-
500A-C
- 12-M C/B MODULE TO GAINS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-35000-
500A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 72


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- MODULAR X4 CONNECTOR: Task
DMC-A350BEGALMON-A-25-70-44-
36000-500A-C
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-37000-
500A-C
- LOWER ELECTRICAL AND BONDING
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-42000-
500A-C
- 12M HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
43000-500A-C
- 2MD HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
44000-500A-C
- LOWER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-44-45000-
500A-C
- MONUMENT - LOOSE ITEMS KIT :
Task DMC-A350BEGALMON-A-25-70-
44-87000-500A-C
- REAR GALLEY WATER SUPPLY
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-D7000-
500A-C
- LOWER GALLEY WASTE WATER
SYSTEM: Task DMC-
A350BEGALMON-A-25-70-44-D8000-
500A-C
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-44: All

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 73


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except:
- ECP ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-25000-
700A-C
- TERMINAL BLOCK ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
28000-700A-C
- I/O CONTROLLER ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
29000-700A-C
- CONTACTOR ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-30000-
700A-C
- 12-P I/P I/F - C/B MODULE HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-32000-
700A-C
- 12-M GB, SWT PNL HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-33000-
700A-C
- 2-MD ESS A/C I/F - CAS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-34000-
700A-C
- 12-M C/B MODULE TO GAINS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-35000-
700A-C
- MODULAR X4 CONNECTOR: Task
DMC-A350BEGALMON-A-25-70-44-
36000-700A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 74


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- LOWER ELECTRICAL AND BONDING
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-42000-
700A-C
- 12M HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
43000-700A-C
- 2MD HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
44000-700A-C
- LOWER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-44-45000-
700A-C
- MONUMENT - LOOSE ITEMS KIT:
Task DMC-A350BEGALMON-A-25-70-
44-87000-700A-C
- REAR GALLEY WATER SUPPLY
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-D7000-
700A-C
LOWER GALLEY WASTE WATER
SYSTEM: Task DMC-A350BEGALMON-A-
25-70-44-D8000-700A-C
SERVICING: IAW CMM 25-70-45: Task
DMC-A350BEGALMON-A-25-70-45-00001-
200A-C
CSE-CI-TD- CMM 25-70-45 CLEAN WITH CHEMICAL AGENT: IAW A350/TREN 16 OCT
X901000-0000025 Galley Tc12lar29 B/E Aerospace CIMC CAAV
2020-67 T XWB-84 2020
CMM 25-70-45 : Task DMC-
A350BEGALMON-A-25-70-45-00001-251A-
C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 75


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-45 : Task DMC-
A350BEGALMON-A-25-70-45-00001-300A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-45: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except:
- 11-M HA, I/P I/F - WL'S & CAS ASSY:
Task DMC-A350BEGALMON-A-25-70-
45-16000-500A-C
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES IAW CMM 25-70-45: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except:
11-M HA, I/P I/F - WL'S & CAS ASSY: Task
DMC-A350BEGALMON-A-25-70-45-16000-
700A-C
DISASSEMBLY: IAW CMM 25-20-85: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-20-85: All tasks in
the block CLEANING
INSPECTION/CHECK: IAW CMM 25-20-85: A321NEO/
CSE-CI-TD- C Class Passenger 16 OCT
1075265-XXX B/E Aerospace CMM 25-20-85 All tasks in the block INSPECTION/CHECK PW1130G- CIMC CAAV
2020-68 Seats 2020
REPAIR: IAW CMM 25-20-85: JM
F. Seat Belt Repair
G. Seat Bottom Cushion Repair
ASSEMBLY: IAW CMM 25-20-85: All tasks
in the block ASSEMBLY

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 76


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly of the Elbow(DISASSEMBLY
CMM Task 49-16-45-000-808-A01 ).
- Disassembly of the Seal (DISASSEMBLY,
CMM Task 49-16-45-000-805-B01 ).
CSE-2020- CMM 49-16-45 - Replacement of the Frame (REPAIR, CMM A320/A321 16 OCT HAN CAAV
D4918529700451 AIR DUCT ASSY AIRBUS S.A.S
086 Task 49-16-45-300-802-A01 ). 2020 BMC FAA
- Assembly of the Elbow (ASS EMBLY -
CMM Task 49-16-45-400-801-A01 ).
- Assembly of the Seal (ASSEMBLY, CMM
Task 49-16-45-400-804-B01).
Replacement of component IAW the
16800-01-00; following tasks:
16800-01-02; CSE CIMC CMM 25-11-96 - Removal of the BACKREST EQUIPPED A320/A321/ 16 OCT
Third Occupant
16800-01-01; BASEHAN - Safran CIMC CAAV
Seats I.A.W subtask 25-11-96-040-007-A01 V2500 2020
16800-00-00; 2020-30
16800-01-03 - Assembly of the BACKREST ASSEMBLY
I.A.W subtask 25-11-96-440-003-A1
WD040ABACAAA,
WD040ABADAAA;
WD040ACACAAA;
WD040ADACAAA, I. Disassembly of the Bushings - TASK 21 -
WD040ADADAAA; 59-11-000-806-A01
WD040AFADAAA; II. Disassembly of the Bearings - TASK 21 -
WD040AGADAAA; Supplemental 59-11-000-807-A01
WD040AHADAAA; CSE-2020-87 Cooling System Airbus CMM 21-59-11 Ill. Assembly of the Bushings - TASK 21 -59- A350/XWB 16 OCT HAN
CAAV
2020 BMC
WD041ACAEAAA; (Scs) Ram Air Inlet 11-400-806-A01
WD041ADAFAAA;
IV. Assembly of the Bearings - TASK 21 -59-
WD041AEAEAAA,
11-400-807 -A01
WD041AEAFAAA;
WD041AFAEAAA;
WD041AGAEAAA;
WD041AHAEAAA

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 77


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
3136312-001
3136313-19M;
3136303-064;
3136302-002; Inspection and Replacement of component
31 36303-020; IAW the following tasks:
3136302-016; - Test of component I.AW Task 25-03-04-
3136312-11L; 700-801-A01
CSE CIMC
3136313-159 CMM 25-03-04 - Check of component I.AW Task 25-03-04- A321/V250 16 OCT
BASEHAN - Seat Assembly Zodiac CIMC CAAV
3 136312-015 200-801-A01 0 2020
2020-28
3136302-02A; - Disassembly of component I.AW Task 25-
3136210-143; 03-04-000-801 -A01
3136300-08A; -Assembly of component I.AW Task 25-03-
3136312-111; 04-400-801-A01
3136200-144;
3136302-02B;
3136203-056
Disassembly:
- Removal of the Door Assembly: Subtask
25-35-12-010-005-A01
-Removal of the Door Seal: Subtask 25-35-
12-010-031-A01 ; step A
Assembly:
CSE-Cl-TD- 3000/3075 Oven CMM 25-35-12 - Installation of the Door Seal: Subtask 25- A321/V253 22 OCT
4323100-01-6622 B/E Aerospace CIMC CAAV
2020-70 Series 3-A5 2020
35-12-440-008-A01 ; step L
- Installation of the Door Assembly: Subtask
25-35-12-410-018-A01
Repair:
- Door Repaint Instructions : Subtask 25-35-
12-380-001-A01
Disassembly:
- Removal of the Door Assembly: Subtask
B787-
CSE-Cl-TD- Steam Oven CMM 25-35-14 25-35-14-000-001-A01 ; step 4 22 OCT
4323200-91-6600 B/E Aerospace 9/GENX-1 CIMC CAAV
2020-71 DS3000 ARINC - Removal of the Door Seal: Subtask 25-35- 2020
B
14-000-004-A01; step 1
Assembly:

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 78


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation of the Door Seal: Subtask 25-
35-14-400-003-A01 ; step 10
- Installation of the Door Assembly: Subtask
25-35-14-400-001-A01 : Step 27
Repair:
- Door Repaint Instructions: Task 25-35-14-
500-801-A01
Disassembly:
- Removal of the Door Assembly: Subtask
25-35-14-000-001-A01 ; step 4
- Removal of the Door Seal: Subtask 25-35-
14-000-004-A01; step 1
Assembly: B787-
CSE-Cl-TD- Steam Oven CMM 25-35-14 22 OCT
4323200-91-6600 B/E Aerospace - Installation of the Door Seal: Subtask 25- 9/GENX-1 CIMC CAAV
2020-71 DS3000 ARINC 2020
35-14-400-003-A01 ; step 10 B
- Installation of the Door Assembly: Subtask
25-35-14-400-001-A01 : Step 27
Repair:
- Door Repaint Instructions: Task 25-35-14-
500-801-A01
CMM 54-10-71(GRAA350RR-51563-
N0010-01) ISSUE 7
351-1500; CSE-2020- Utc Aerospace CMM 54-10-71 REPAIR TASK 54-10-71-300-806-A-01. 23 OCT HAN
Air Intake Cowl A350/XWB CAAV
352-1500 088 Systems TASK: 54-10-71-300-808-A-01 ; TASK: 54- 2020 BMC
10-71-400-815-A-01 ; TASK: 54-10-71-000-
816-A-01
CMM 78-30-00; Repair 111-Thrust Reverser
740-0002; CSE-2020- Thrust Reverser Goodrich CMM 78-30-00 A320/A321- 05 NOV HAN
Translating Sleeve - Replace The Blocker CAAV
745-0002 090 Assembly Aerostructures V2500 2020 BMC
Door Hinge; Task 78-30-00-300-111
FOLLOWING TASK ON CMM 528232
1. TASK 52-82-32-000-801-B01
Replace Fwd and
CMM 52-82-32 Disassembly of the Forward Hinge-Fitting 13 NOV HAN
D52810138XXX CSE-2020-91 Aft Hinge Fitiing of Airbus A320/A321 CAAV
Assemblies 2020 BMC
NLG Aft Door
2. TASK 52-82-32-000-803-C01 Para 3A. (1)
Disassembly of the Aft Hinge Fittings

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 79


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
3. TASK 52-82-32-400-802-C01 Para 3A. (2)
Assembly of the Aft Hinge Fittings
4. TASK 52-82-32-400-805-B01 Assembly
of the Forward Hinge-Fitting Assemblies
5. TASK 52-82-32-100-801-A01 Cleaning of
the Painted Components
6. TASK 52-82-32-100-803-A01 Cleaning of
the Components Which Are Not Painted
10.
- DISASSEMBLY (Removal of Slider- CMM
Task 25-13-15-000-805-A01 Step 4.T.(1)
CSE-2020- Foot Rest And CMM 25-13-15 and (2)). 13 NOV HAN CAAV
D2511411800000 Airbus A320/A321
092 Sliding Table -ASSEMBLY (Installation of Slider-CMM 2020 BMC FAA
Task 25-13-15-400-801-A01 Step 3.A.(6) to
(8)).
Disassembly:
- Removal of the Door Assembly: Subtask
25-35-12-010-005-A01
-Removal of the Door Seal: Subtask 25-35-
12-010-031-A01 ; step A
Assembly:
CSE-Cl-TD- 3000/3075 Oven CMM 25-35-12 - Installation of the Door Seal: Subtask 25- A321/V253 22 OCT
4323100-01-6622 B/E Aerospace CIMC CAAV
2020-70 Series 3-A5 2020
35-12-440-008-A01 ; step L
- Installation of the Door Assembly: Subtask
25-35-12-410-018-A01
Repair:
- Door Repaint Instructions : Subtask 25-35-
12-380-001-A01
SERVICING: IAW CMP 25-11-51 , All task in
the block SERVICING (except subtask:
F4643COCKPIT-A-25-11-51-01001-722A-
TAAl8-04PE-XXX; CSE-Cl-TD- Stelia CMP 25-11-51 C) A350/TREN 24 NOV
Pilot & Copilot Seat CIMC CAAV
TAAl8-04CE-XXX 2020-19 Aerospace T XWB-84 2020
EXAMINATION, TEST AND CHECKS: IAW
CMP 25-11-51 , subtask F4643COCKPIT-A-
25-11-51-01001-311A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 80


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLE: IAW CMP 25-11-51 , All
task in the block DISASSEMBLE
ASSEMBLE: IAW CMP 25-11-51 , All task
in the block ASSEMBLE
SERVICING: IAW CMP 25-11-52, All task in
the block SERVICING (except subtask:
F4643COCKPIT-A-25-11-52-01001-722A-
C)
EXAMINATION, TEST AND CHECKS: IAW
TAAl8-031M05-01; CSE-Cl-TD- Stelia CMP 25-11-52 CMP 25-11-52, subtask F4643COCKPIT-A- A350/TREN 24 NOV
Obsever Seat CIMC CAAV
TAAl8-031M06-01 2020-20 Aerospace T XWB-84 2020
25-11-52-01001-311A-C
DISASSEMBLE: IAW CMP 25-11-52, All
task in the block DISASSEMBLE
ASSEMBLE: IAW CMP 25-11 -52, All task in
the block ASSEMBLE
CLEAN WITH CHEMICAL AGENT: IAW
CMP 25-39-17, TASK DMC-
A350BEGALMON-A-25-39-17-00001-251A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMP
25-39-17: All tasks in the block
CSE-Cl-TD- B/E CMP 25-39-17 DISCONNECT, REMOVE AND A350/TREN 24 NOV
X011004-0000011 GALLEY G14CAF CIMC CAAV
2020-22 AEROSPACE DISASSEMBLY PROCEDURES, except T XWB-84 2020
electrical and water system components
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMP 25-39-17: All
tasks in the block ASSEMBLE,
INSTALL AND CONNECT PROCEDURES,
except electrical and water system
components
1012790-XXX;
CSE-Cl-TD- CMM 25-22-53 DISASSEMBLY: Removal of all components A321/ 24 NOV
1012792-102; Passenger Seat B/E Aerospace CIMC CAAV
2020-24 of the seat listed in the block DISASSEMBLY V2500 2020
1012794-002

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 81


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CLEANING: Cleaning of all components of
the seat listed in the block CLEANING
(except electrical components,
wiring and PCU)
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
the seat listed in the block CLEANING
1015239-XXX; (except electrical components, wiring and
CSE-Cl-TD- A321/ 24 NOV
1015241-002; Passenger Seat B/E Aerospace CMM 25-22-50 PCU) CIMC CAAV
2020-25 V2500 2020
1015241-104 INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: All task and subtask listed
in the block DISASSEMBLY
CLEANING: All task and subtask listed in the
CSE-Cl-TD- ATR72/307 24 NOV
134-XXX Attendant Seat SAFRAN SEAT CMM 25-11-23 block CLEANING CIMC CAAV
2020-27 3453-01 2020
CHECK: SUBTASK 25-11-23-220-001-A01
ASSEMBLY: All task and subtask listed in
the block ASSEMBLY
CLEANING: Cleaning of all components
listed in the block CLEANING
1088709-XXX; CSE-ClꞏTD- Y Class Passenger B/E CMM 25-21-59 DISASSEMBLY: Removal of all components B787 / 24 NOV
CIMC CAAV
1088710-XXX 2020-28 Seats AEROSPACE listed in the block DISASSEMBLY GENX 2020
ASSEMBLY: Installation of all components
listed in the block ASSEMBLY

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 82


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
REPAIR: Repairing of all components
(Except: D. Removal of Nealiaible Surface
Corrosion, E. Uoholstery- Fabric)
DISASSEMBLY: IAW CMM 25-11-75: All
tasks in the block DISASSEMBLY, except:
- SUBTASK 25-11-75-040-009-A01:
REMOVE THE SPRING OF SEAT.
CLEANING: IAW CMM 25-11-75: All tasks in
CSE-Cl-TD- Cabin Attendant CMM 25-11-75 the block CLEANING. A321/ 24 NOV
WA-XXX Safran Seats CIMC CAAV
2020-73 Seats CHECK: IAW CMM 25-11-75: All tasks in the V2533-A5 2020
block CHECK.
ASSEMBLY: IAW CMM 25-11-75: All tasks
in the block ASSEMBLY, except:
- Subtask 25-11-75-440-010-A01: INSTALL
THE SPRING OF SEAT.
DISASSEMBLY: IAW CMM 25-11 -78: All
tasks In the block DISASSEMBLY
CLEANING: IAW CMM 25-11-78: All tasks in
CSE-Cl-TD- Cabin Attendant CMM 25-11-78 the block CLEANING. A321/ 24 NOV
DN-XXX Zodiac Seats CIMC CAAV
2020-74 Seats CHECK IAW CMM 25-11-78: All tasks in the V2533-A5 2020
block CHECK.
ASSEMBLY: IAW CMM 25-11-78: All tasks
in the block ASSEMBLY
DISASSEMBLY: IAW CMM 25-11-79: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-11-79: All tasks in
CSE-Cl-TD- Cabin Attendant CMM: 25-11-79 the block CLEANING. A321/ 24 NOV
RL-XXX Zodiac Seats CIMC CAAV
2020-75 Seats CHECK: IAW CMM 25-11-79: All tasks in the V2533-A5 2020
block CHECK.
ASSEMBLY: IAW CMM 25-11-79: All tasks
in the block ASSEMBLY
DISASSEMBLY: IAW CMM 25-11-99: All
CSE-Cl-TD- Cabin Attendant CMM: 25-11-99 tasks in the block DISASSEMBLY. A321/ 24 NOV
RL-XXX Zodiac Seats CIMC CAAV
2020-75 Seats CLEANING: IAW CMM 25-11-99: All tasks in V2533-A5 2020
the block CLEANING.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 83


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CHECK: IAW CMM 25-11-99: All tasks in the
block CHECK.
ASSEMBLY: IAW CMM 25-11-99: All tasks
in the block ASSEMBLY.
DISASSEMBLY: IAW CMM 25-25-85: All
tasks in the block DISASSEMBLY.
CLEANING: IAW CMM 25-25-85: All tasks in
CSE-Cl-TD- the block CLEANING. A321/ 24 NOV
8880700-XXX Passenger Seats B/E Aerospace CMM: 25-25-85 CIMC CAAV
2020-77 INSPECTION/CHECK: IAW CMM 25-25-85: V2533-A5 2020
All tasks in the block INSPECTION/CHECK.
ASSEMBLY: IAW CMM 25-25-85: All tasks
in the block ASSEMBLY.
DISASSEMBLY: IAW CMM 25-26-88: All
tasks in the block DISASSEMBLY.
CLEANING: IAW CMM 25-26-88: All tasks in
CSE-Cl-TD- the block CLEANING. A321/ 24 NOV
8880720-XXX Passenger Seats B/E Aerospace CMM: 25-26-88 CIMC CAAV
2020-78 INSPECTION/CHECK: IAW CMM 25-26-88: V2533-A5 2020
All tasks in the block INSPECTION/CHECK.
ASSEMBLY: IAW CMM 25-26-88: All tasks
in the block ASS EMBLY
FOLLOWING TASK ON CMM 574321
1. TASK 57-43-21 -000-801-A01 Removal of
D5746092000000; the Seals and the Bonding Lead:
Replace Rubber
D5746092000200; CMM 57-43-21 Subtask 57-43-21-010-001-D01 Para D. (3) 26 NOV HAN CAAV
CSE-2020-93 Seal Under Slat Airbus A320/A321
D5746092000100; 2. TASK 57-43-21-400-802-A01 Installation 2020 BMC FAA
Assy #2
D5746092000300 of the Seals and the Bonding Lead
Subtask 57-43-21-410-002-D01 Para D. (5),
(6), (7)
Fan cowl door latch handles paint repair
A320- CAAV
740-4002; Goodrich CMM 71-13-00 (repair 028 VRS 2789) per TASK 71-13-00- 27 NOV HCM
CSE/2020/053 Fan Cowls A321/V250 FAA
745-4002 Aerostructures 300-028 (Without step 6.B Disassembly and 2020 BMC
0 SSCA
6.N Assembly)
Thrust reverser c-duct fixed structure A320- CAAV
740-0002; Thrust Reverser Goodrich CMM 78-30-00 27 NOV HCM
CSE/2020/054 ꞏreplace the rubstrlp (repair 032 VRS A321/V250 FAA
745-0002 Assembly Aerostructures 2020 BMC
2092/2093) task 78-30-00-300-032 0 SSCA

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 84


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Repair No 26 Replacement of The "V" Core
642-3801; CSE-2020- Thrust Reverser Goodrich CMM 78-32-36 Cowl Seal On The Equipped Half-Door: A320/A321- 27 NOV HAN CAAV
642-3802 095 Door Assy Aerostructures CFM56 2020 BMC FAA
TASK 78-32-36-300-825.
VM30S2060029000; - Repair of the cracks on the surface 1.A.W
Panel Assy-Decor
VM30S1070028000; CSE CIMC AIRBUS SPM 20-00-01 : task 20-00-01-300-827-A00
and Strip Assy- SPM 20-00-01 - Repair of the decorative paint on the A350/ RR 04 DEC
VM30S2060004000; BASEHAN - Operations CIMC CAAV
Cover (Door Frame XWB 2020
VM30S4080006000; 2020-39 Gmbh sandwich panels I.AW SPM 20-00-01 : task
Lining)
VM30S2080012000 20-00-01-300-803-A00
DISASSEMBLY: Removal of all components
listed in the block DISASSEMBLY (except
Electrical system)
CLEANING: Cleaning of all components
listed in the block CLEANING
CSE-Cl-TD- Zodiac Galley CMM 25-36-29 INSPECTION/CHECK: Inspection of all A321/V250 04 DEC
601368-201 Galley G5 CIMC CAAV
2020-29 Europe 0 2020
components listed in the block
INSPECTION/CHECK (except Electrical)
ASSEMBLY: Installation of all components
listed in the block ASSEMBLY (except
Electrical system)
D5237175000000;
D5237175000200;
D5237175000400;
D5237175000600; A320-
Replacement of sight glasses per TASK 52- CAAV
D5237175000800; Fwd Cargo CMM 52-31-14 A321/V250 10 DEC HCM
CSE/2020/062 Airbus 31-14-000-802-A01 and TASK 52-31-14- FAA
D5237175001000; Compartment Door 0- 2020 BMC
400-802-A01. SSCA
D5237175001200; PW1100G
D5237175001400;
D5237175001600;
D5237175001800
G1LXXX;
- DISASSEMBLY (STEP 2.B, 2.C, 2.G, 2.M); CAAV
G1LXXX; Emergency Oxygen 14 DEC HCM
CSE/2020/057 B/E Aerospace CMM 35-21-73 - ASS EMBLY (STEP 2.A.(1), 2.A.(2), A320/A321 FAA
W1LXXX; Container 2020 BMC
2.A.(9), 2.8). SSCA
W1RXXX

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 85


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
G2F212-XXX;
G2N122-XXX; Emergency Oxygen - DISASSEMBLY (STEP 2.8, 2.C, 2.G, 2.M); CAAV
14 DEC HCM
G2N212-XXX; CSE/2020/058 Container, B/E Aerospace CMM 35-21-74 - ASSEMBLY (STEP 2.A.(1), 2.A.(2), 2.A.(8), A320/A321 FAA
2020 BMC
G2N422-XXX; Type II 2.8). SSCA
G2N632-XXX
DG2F212-XXX;
DG2N122-XXX; Emergency Oxygen - DISASSEMBLY (STEP 2.B, 2.C, 2.G, 2.M); CAAV
14 DEC HCM
DG2N212-XXX; CSE/2020/060 Container, B/E Aerospace CMM 35-22-74 - ASSEMBLY (STEP 2.A.(1), 2.A.(2), 2.A.(9), A320/A321 FAA
2020 BMC
DG2N422-XXX; Type II 2.B). SSCA
DG2N632-XXX;
REPAIR: Foam filter replacement - Subtask
25-36-49-350-006-A01
DISASSEMBLY:
- Removal of air inlet cover assembly -
Subtask 25-36-49-040-002-A01
- Removal of blanking plate assembly -
Subtask 25-36-49-040-003-A01
688-6; CSE-Cl-TD- SCS Beverage - Removal of foam filter - Subtask 25-36-49- A350/TREN 17 DEC
B/E Aerospace CMM 25-36-49 040-004-A01 CIMC CAAV
688-6-00-100 2020-30 Chiller/Freezer T XWB 2020
ASSEMBLY:
- Installation of foam filter - Subtask 25-36-
49-440-003-A01
- Installation of blanking plate assembly -
Subtask 25-36-49-440-004-A01
- Installation of air inlet cover assembly -
Subtask 25-36-49-440-005-A01
745-1101-501; CMM 78-11-11 Repair No 06 - REPAIR 006
745-1101-503; - REPLACE THE PRESSURE SEAL: TASK
745-1101-505; 78-11-11-300-006
745-1101-507; CMM 78-11-11_ Repair No 08 - REPLACE
CSE-2020- Common Nozzle Goodrich A320/A321- 17 DEC HAN CAAV
740-1094-501, CMM 78-11-11 THE UPPER PAN SEALS AND FIRE
096 Assembly Aerostructures V2500 2020 BMC FAA
740-1094-503; SEALS: TASK 78-11-11-300-008
740-1094-505; CMM 78-11-11 _Repair No 27 - SPRING
740-1094-507; SEAL REPLACEMENT REPAIR: TASK 78-
740-1094-509; 11-11-300-027

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 86


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
740-1094-513;
740-1094-515;
740-1094-517;
740-1094-519
1. TASK 52-33-50-000-809-A01 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
2. TASK 52-33-50-000-809-801 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
3. TASK 52-33-50-000-809-D01 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
4. TASK 52-33-50-000-809-E01 Removal
WG102AKAAAAF;
and Disassembly of the Miscellaneous
WG102ALAAAAF;
Equipment: Para 4.A. (6), (7)
WG102ARAAAAF;
5. TASK 52-33-50-400-802-A01 Assembly
WG102ARAAAAH;
and Installation of the Miscellaneous
WG102AV AAAAK;
Replace glass Equipment: Para 3.A. (5), (6)
WG102AXAAAAK; 17 DEC HAN
CSE-2020- 98 Window of Cargo Airbus CMM 52-33-50 6. TASK 52-33-50-400-802-801 Assembly A350/XWB CAAV
WH102ALAAAAC; 2020 BMC
Door and Installation of the Miscellaneous
WH102AMAAAAC;
Equipment: Para 3.A. (5), (6)
WH102ASAAAAC;
7. TASK 52-33-50-400-802-D01 Assembly
WH102ASAAAAF;
and Installation of the Miscellaneous
WH102AVAAAAH;
Equipment: Para 3.A. (5), (6)
WH102AXAAAAH
8. TASK 52-33-50-400-802-E01 Assembly
and Installation of the Miscellaneous
Equipment: Para 3.A. (5), (6)
FOLLOWING TASK ON CMM 523351
1. TASK 52-33-51-000-807-A01 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
2. TASK 52-33-51-000-807-801 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 87


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
3. TASK 52-33-51 -000-807-D01 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
4. TASK 52-33-51-400-802-A01 Assembly
and Installation of the Miscellaneous
Equipment: Para 3.A. (5), (6)
5. TASK 52-33-51-400-802-801 Assembly
and Installation of the Miscellaneous
Equipment: Para 3.A. (5), (6)
6. TASK 52-33-51-400-802-D01 Assembly
and Installation of the Miscellaneous
Equipment: Para 3.A. (5), (6)
- REPAIR NO 01 : THRUST REVERSER
FORWARD CROSSOVER BEAM -
REPLACE THE SEALS (VRS2064): TASK
78-30-00-300-001
- REPAIR NO 25: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
745-0002-513; THE HEATSHIELD VELCRO STRIPS
745-0002-515; CSE-2020- Thrust Reverser Goodrich (VRS2056/2061 ): Task 78-30-00-300-025 A320/A321- 23 DEC HAN CAAV
CMM 78-30-00
745-0002-517; 099 Assembly Aerostructures - REPAIR NO 33: THRUST REVERSER C- V2500 2020 BMC FAA
745-0002-519 DUCT FIXED STRUCTURE - REPLACE
THE LARGE FORWARD HEATSHIELD
(VRS2099/2100) : Task 78-30-00-300-033
- REPAIR NO 36: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
THE LARGE AFT HEATSHIELD
(VRS2097/2098) : Task 78-30-00-300-036
REPAIR 020: COMMON NOZZLE
ASSEMBLY - REPLACE THE INNER
ANNULUS SUPPORT ASSEMBLY
745-1101-5XX; CSE-2020- Common Nozzle Goodrich A320/A321- 28 DEC HAN CAAV
CMM 78-11-11 NUTPLATE(VRS2160):TASK 78-11-11-
740-1094-5XX; 101 Assembly Aerostructures V2500 2020 BMC FAA
300-020
REPAIR 029: COMMON NOZZLE
ASSEMBLY - REPLACE THE CNA

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 88


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ATTACHMENT FLANGE NUTPLATE
RIVETS (VRS2355): TASK 78-11-11-300-
029
DISASSEMBLY: All tasks in the block
DISASSEMBLY (except Removal of the
intercom handset- SUBTASK 25-11-98-040-
005-AO 1 )
CLEANING: Polycarbonate/ABS fairing
(SUBTASK 25-11-98-160-001-A01); Metal
parts (SUBTASK 25-11-98-160-003-A01);
DN01TYU3YS00096;
CSE-Cl-TD- Cabin Attendant Fabric-backed vinyl (SUBTASK 25-11-98- A321/V250 28 DEC
DN01TYU3YS00054; Safran Seats ACMM 25-11-98 CIMC CAAV
2020-40 Seats 160-004-A01); Leathers (SUBTASK 25-11- 0 2020
DN01TYT3YS00054
98-160-005-A01).
CHECK: All tasks in the block CHECK.
ASSEMBLY: All tasks in the block
ASSEMBLY (except Installation of the
intercom handset - SUBTASK 25-11-98-440-
004-A01 and Installation of the headrest
cable - SUBTASK 25-11-98-440-005-A01).
REPAIR NO 002: THRUST REVERSER
FORWARD CROSSOVER BEAM -
REPLACE THE SEAL RETAINER
(VRS2136): TASK 78-30-00-300-002
REPAIR NO 003: THRUST REVERSER
745-0002-513; FORWARD CROSSOVER BEAM -
745-0002-515; CSE-2020- Thrust Reverser Goodrich CMM 78-30-00 REPLACE THE FIRE SHIELDS A320/A321- 28 DEC HAN CAAV
745-0002-517; 100 Assembly Aerostructures (VRS2137): TASK 78-30-00-300-003 V2500 2020 BMC FAA
745-0002-519
REPAIR 026 THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
LOWER BIFURCATION HEATSHIELD
(VRS2101/2102): TASK 78-30-00-300-026
REPAIR NO 040: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 89


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
THE LOWER TRACK RUBSTRIP
(VRS2199): Task 78-30-00-300-040
REPAIR NO 041: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
THE LOWER TRACK SEAL
(VRS2191/2192): TASK 78-30-00-300-041
REPAIR NO 043: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
THE LOWER TRACK ALUMINUM
RUBSTRIP (VRS2201/2202): Task 78-30-
00-300-043
REPAIR NO 162: THRUST REVERSER
FIXED DUCT ASSEMBLY - REPLACE THE
ENGINE BUMPER ANDOWN,
(VRS2302): TASK 78-30-00-300-162

DISASSEMBLY: 1.A.W CMM 25-78-45: All


tasks in the block DISASSEMBLY
CLEANING: l.A.W CMM 25-78-45: All tasks
2428-81BE03F0DQ; in the block CLEANING A321N/
CSE-Cl-TD- Wall-mounted cabin 29 DEC
2428-81LE03F0DQ; Goodrich Corp ACMM 25-78-45 CHECK: I.AW CMM 25-78-45: All tasks in PW1130G- CIMC CAAV
2020-41 attendant seat 2020
2428-81AE03F0DQ the block CHECK JM
ASSEMBLY: I.AW CMM 25-78-45: All tasks
in the block ASSEMBLY
DISASSEMBLY: l.A.W CMM 25-78-46: All
tasks in the block DISASSEMBLY
CLEANING: l.A.W CMM 25-78-46: All tasks
Floor Mounted A321N/
CSE-Cl-TD- in the block CLEANING 29 DEC
2430-11BK00F0DQ Rotating Cabin Goodrich Corp ACMM 25-78-46 PW1130G- CIMC CAAV
2020-42 CHECK: l.A.W CMM 25-78-46: All tasks in 2020
Attendant Seat JM
the block CHECK
ASSEMBLY: l.A.W CMM 25-78-46: All tasks
in the block ASSEMBLY

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 90


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY: l.A.W CMM 25-78-47: All
tasks in the block DISASSEMBLY
CLEANING: l.A.W CMM 25-78-47: All tasks
Wall-Mounted A321N/
CSE-Cl-TD- in the block CLEANING 29 DEC
2431-81NH00F0DQ Bench Cabin Goodrich Corp ACMM 25-78-47 PW1130G- CIMC CAAV
2020-43 CHECK: I.AW CMM 25-78-47: All tasks in 2020
Attendant Seat JM
the block CHECK
ASSEMBLY: I.AW CMM 25-78-47: All tasks
in the block ASSEMBLY
DISASSEMBLY: 1.A.W CMM 25-78-48: All
tasks in the block DISASSEMBLY
CLEANING: 1.A.W CMM 25-78-48: All tasks
Floor-Mounted A321N/
2427-71AD00F0DQ; CSE-Cl-TD- in the block CLEANING 29 DEC
Cabin Attendant Goodrich Corp ACMM 25-78-48 PW1130G- CIMC CAAV
2427-91BB02F0DQ 2020-44 CHECK: l.A.W CMM 25-78-48: All tasks in 2020
Seat JM
the block CHECK
ASSEMBLY: l.A.W CMM 25-78-48: All tasks
in the block ASSEMBLY
DISASSEMBLY: All tasks in the block
DISASSEMBLY
CLEANING: All tasks in the block
CLEANING (except 12. Wool and Synthetic
1012702-XXX; CSE-Cl-TD- A321/V250 11 JAN
Passenger Seats B/E Aerospace CMM 25-23-53 Fabric Cleaning) CIMC CAAV
1012705-XXX 2021-01 0 2021
INSPECTION/CHECK: All tasks in the block
INSPECTION/CHECK
ASSEMBLY: All tasks in the block
ASSEMBLY
Following Task on CMM 32-21-01:
1. Remove of the identification label and
A350 XWB -
scale, subtask 32-21 -01-010-050-A01 :step
Replace Steering 12 JAN HAN
4816A0000-06 CSE-2021-08 Liebherr CMM 32-21-01 (73) (a), (b), (e) A350/XWB CAAV
Scale and ID Label 2021 BMC
2. Installation of the identification label and
At NLG
scale, subtask 32-21-01-410-007-A01 : step
(67) (a), (d), (e)
901500-1; Telair
CSE-2021- - Repair 5: removal of surface damage; Task 13 JAN HAN CAAV
901501-1; Ball Mat Assy International CMM 50-23-20 50-23-20-300-803-A01 A350/XWB
001 2021 BMC FAA
901502-1; GmbH

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 91


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
901503-1; - Repair 7: Inspection and removal of
901504-1; damage; Task 50-23-20-300-807-A01
901505-1; Note: Except for the following damage types:
901506-1; punctures, cracks, crease
901507-1; - Repair 9: Removal of nicks,scratches and
901508-1; gouge; Task 50-23-20-300-805-A01
901509-1; - Repair 10: inspection and repair of dents:
901510-1; Task50-23-20-300-806-A01
901511-1
745-0002-513;
REPAIR NO 36: thrust reverser c-duct fixed
745-0002-515; Thrust Reverser Goodrick A320-A321/ 14 JAN HCM CAAV
CSE/2021/001 CMM 78-30-00 structure - replace the large aft heatshield
745-0002-517; Assembly Aerostructures V2500 2021 BMC FAA
(vrs2097/2098) : task 78-30-00-300-036
745-0002-519
A350FS5UAA21ZA;
A351WS58AA14ZA;
A351WS5MAA31Z; Inspection, cleaning and replacement of
A350FS5VAA21ZA; component l.A.W the following tasks:
A351WS5JAA53ZA; - Inspection of component of the seat 1.A.W
A351WS5UAA28ZA; task list in the block INSPECTION/CHECK.
CSE-IN6- Cabin Attendant A350/TREN 15 JAN
A351WS58AA13ZA; Goodrich ACMM 25-75-58 - Cleaning of component of the seat 1.A.W XWB-84 CIMC CAAV
2021-06 Seat 2021
A351WS5KAA54ZA; tasks listed in the block CLEANING
A351WS5VAA21ZA; - Replacement of component of the seat
A351WS5WAA31ZA; l.A.W tasks listed in the block
A351WS5LAA31ZA; DISASSEMBLY and block ASSEMBLY
A351WS5VAA28ZA;
A351WS5VAA54ZA
E441001A-XXX; CSE-IN6- Inspection, cleaning and replacement the A350/TREN 19 JAN
Lavatory Assembly Safran CIMC CAAV
E451001A-XXX 2021-09 CMM 25-40-06 defective part (except electric parts). XWB-84 2021
FOLLOWING TASK ON CMM 52-31-14:
Replace Sign Glass
D523717500XXX; CMM 52-31-14; 1. Removal and Disassembly of the Access A320/A321-
CSE-2021- at Panel Indicator of 19 JAN HAN CAAV
D523719801XXX; Airbus Panel : V2500/PW1
009 Fwd & Aft Cargo CMM 52-32-15 TASK 52-31-14-000-802-A01 Para 3.A.(4) 2021 BMC FAA
D523719800XXX 100G
Door
Remove the sight glasses

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 92


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
2. Assembly and Installation of the Access
Panel
TASK 52-31-14-400-802-A01 Para 3.A.(1)
Install the sight glasses
FOLLOWING TASK ON CMM 52-32-15:
1. Removal and Disassembly of the Access
Panel:
TASK 52-32-15-000-803-A01 Para 3.A.(4)
Remove the sight glasses
2. Assembly and Installation of the Access
Panel
TASK 52-32-15-400-803-A01 Para 3.A.(1)
Install the sight glasses
CSE-IN6- L11 Lavatory Inspection, cleaning and replacement the A350/TREN 19 JAN
E201001A-XXX Zodiac CMM 25-40-03 CIMC CAAV
2021-07 Assembly defective part (except electric parts). XWB-84 2021
E261001A-XXX; CSE-IN6- Inspection, cleaning and replacement the A350/TREN 19 JAN
Lavatory Assembly Safran CMM 25-40-11 CIMC CAAV
E271001A-XXX 2021-08 defective part (except electric parts). XWB-84 2021
E471001A-XXX; CSE-IN6- L73/L74 Lavatory Inspection, cleaning and replacement the A350/TREN 19 JAN
Safran CMM 25-40-07 CIMC CAAV
E481001A-XXX 2021-10 Assembly defective part (except electric parts). XWB-84 2021
Replacement of component I.AW the
following tasks:
- Disassembly of component of lavatory
I.AW CMM 25-43-21 : block
D2549310004200; DISASSEMBLY OF THE WASHBASIN
A321
D2549320004000; CSE-IN6- PANEL ASSY reference TASK 25-43-21- 19 JAN
Lavatory D, E Diehl Aviation CMM 25-43-21 NEO/PW11 CIMC CAAV
R225404693-002; 2021-11 000-813-A00 2021
30G-JM
R225405693-002 - Assembly of component of lavatory I.AW
CMM 25-43-21 : block ASSEMBLY OF THE
WASHBASIN PANEL
ASSY reference TASK 25-43-21-400-807-
A00

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 93


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of the Roller Assembly at ribs
CAAV
D5758550XXXXXX; 1 and 19 per TASK 57-53-23-000-811-A01 03 FEB HCM
CSE/2021/002 Outboard Flap Assy Airbus S.A.S CMM 57-53-23 A320/A321 FAA
D5758670XXXXXX and TASK 57-53-23400-805-A01 in CMM 2021 BMC
SSCA
57-53-23

A321
CSE-IN6- Safran Cabin Repair Faying Surface Sealing of Procedure- 04 FEB
601969-000001 Stowage S1 CMM 25-20-263 NEO/PW11 CIMC CAAV
2021-12 CZ S.R.O Sealing Procedure l.A.W CMM 25-20-263 2021
30G-JM

Replace cover assy ,emergency hatch I.AW


CMM 25-25-02:
CSE-IN6- Cover Assy, Diehl Aircabin - Disassemble procedure - Xaisle panel A350/TREN 26 FEB
VN3 XXX GMM 25-25-02 CIMC CAAV
2021-13 Emergency Hatch Gmbh reference A350-A-25-25-02-01001-530A-C XWB-84 2021
- Assemble procedure - Xaisle panel
reference A350-A-25-25-02-01001-710A-C
- DISASSEMBLY OF THE WASHBASIN
PANEL ASSY I.AW CMM 25-43-20/ TASK
A321
D2549340001400; CSE-IN6- Diehl Aviation 25-43-20-000-812-A00 02 MAR
Lavatory H CMM 25-43-20 NEO/PW11 CIMC CAAV
R225408693-000 2021-14 Hamburg GmbH - ASSEMBLY OF THE WASHBASIN PANEL 2021
30G-JM
ASSY I.AW CMM 25-43-20/ TASK 25-43-20-
400-806-A00
- Remove the rubber grommet and the
obturator IAW CMM Subtask 32-48-28-000- A320-
RU1502U00; 001-A01 step (1). (e).1 and 2. A321/V250 02 MAR DAD
CSE-2021/01 Universal Wheel Kit Technofan CMM 32-48-28 CAAV
RU1502U01 - Install the rubber grommet and the 0- 2021 Branch
obturator IAW CMM Subtask 32-48-28-410- PW1100G
001-A01 step (1).(c).7 and 8
LH/RH Main ATR72/
D23189000-XXX; Replace Main landing gear shock absorber 02 MAR HCM CAAV
CSE/2020/037 Landing Gear Leg Safran CMM 32-18-33 PW124/PW
D23190000-XXX IAW CMM 32-18-33 2021 BMC SSCA
Assembly 127
Replace the Rub Strips on the Aft Door
Goodrich A320/A321- 02 MAR HCM CAAV
745-3400XXX CSE/2021/003 Air Intake Cowl CMM 71-11-00 Landing as per CMM TASK 71-11-00-300-
Aerostructures V2500 2021 BMC FAA
015
740-0002 XXX; Goodrich A320/A321- 08 MAR HCM CAAV
CSE/2021/004 Thrust Reverser CMM 78-30-00
745-0002 XXX Aerostructures V2500 2021 BMC FAA

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 94


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Thrust Reverser Precooler Duct- Replace
14 DEC HAN
CSE-2022-033 The Rub Strip As Rer CMM 78-30-00-300-
2022 BMC
167
- Removal of the bearing (4-300) Ref
Replacement Lower SUBTASK 32-27-92-010-005-A01
10-375002-000; 11 FEB HAN CAAV
CSE-2021-15 Bearing of NLG Safran CMM 32-27-92 - Installation of the bearing (4-300) Ref A320/A321
10-375002-001 2021 BMC FAA
Leg-Structure SUBTASK 32-27-92-440-001-A01 Step (11 )
(I)
- CMM 25-60-10: Testing And Fault
Isolation/D. Identification of ADT 406 Beacon
Update of the CMM 25-60-10; A350
01N65900; - CMM 25-60-11: Testing And Fault lsolation/ 16 FEB HAN
CSE-2021-16 ELT/CS ELTA TRENT- CAAV
01N65920 Task 25-60-11-750-805-A01 "Cospas- 2021 BMC
Identification CMM 25-60-11 XWB
Sarsat Ident ification of the
ADT 406 S ELT"
- Removal of hose rest support and fender
lower slave link at MLG,
SUB TASK 32-13-06-040-019-A01/ Step Q
Replace Hose Rest (1), (2), (3), (7)
A350
10-357303 XXX; Support and Fender - Installation of hose rest support and fender 19 FEB HAN
CSE-2021-17 Safran CMM 32-13-06 TRENT- CAAV
10-357403 XXX Lower Slave Link at lower slave link aT MLG, 2021 BMC
XWB
MLG SUB TASK 32-13-06-440-026-A01 / Step V
(1) To (6)
SUB TASK 32-13-06-440-027-A01/ Step W
(1) To (9)
201581001;
201581002;
201581003;
CMM 32-12-23; CAAV
201581004; Main Landing Gear Paint finish repaired as per CMM 32-12- 24 MAR HCM
CSE/2021/006 Safran A320-A321 FAA
201581005; Complete 23/REPAIR.PARA/3/A/(3)/(a) 2021 BMC
PCS-2500 SSCA
201581006;
201581007;
201581008
Goodrich CAAV
- Disassembly T-piece connection assembly 26 MAR HCM
CH1543A0034 CSE/2021/007 Deploy T Connector Actuation CMM 78-32-44 A320-A321 FAA
IAW subject disassembly item 1 and 2.C 2021 BMC
Systems SSCA

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 95


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly T-piece connection assembly
IAW subject assembly item 1 and 3.C
Thrust Reverser C- CMM 78-30-00 Repair 114 thrust reverser
CSE-2021- Goodrich 31 MAR HAN
745-0002XXX Duct Fixed CMM 78-30-00 translating sleeve - replace the pin stowage A320/A321 CAAV
018 Aerostructures 2021 BMC
Structure bracket
CSE-IN6- Zodiac Galleys - Installation of Placard in the block ANNEX 05 APR
601858-023601 GALLEY G5 CMM 25-36-089 A321 CIMC CAAV
2021-16 Europe C : Placard installaion I.AW CMM 25-36-089 2021
D5746091000000; - Removal of the lnboard End Seals and
CAAV
D5746091000100; Bonding Strap IAW 57-42-21-000-801-A01. 09 APR HCM
CSE/2021/009 SLAT 1 Airbus S.A.S CMM 57-42-21 A320-A321 FAA
D5746091000200; - lnstallation of the lnboard End Seals and 2021 BMC
SSCA
D5746091000300 Bonding Strap IAW 57-42-21-400-804-A01.
D5746092000000; - Removalof the Seals and the Bonding
CAAV
D5746092000100; Lead IAW TASK 57-43-21-000-801-A01. 09 APR HCM
CSE/2021/010 SLAT 2 Airbus S.A.S CMM 57-43-21 A320-A321 FAA
D5746092000200; - lnstallation of the Seals and the Bonding 2021 BMC
SSCA
D5746092000300 Lead IAW TASK 57-43-21-400-802-A01.
E281001A-XXX;
E291001A-XXX; CSE-IN6- Inspection, cleaning and replacement the 14 APR
Lavatory Assembly Safran CMM 25-40-05 A350 CIMC CAAV
E321001A-XXX; 2021-18 defective part (except electricꞏ parts). 2021
E521001A-XXX
-Disassemble slat to remove wire harness
as per Para 301 Disassembly of CMM 57-
43-23
- Install wire bundle harness as per C(15)
Para 701. Heater Blanket Wiring Installation
Slat Assembly No.4 22 APR HCM CAAV
144Z0201-50X-X CSE/2021/015 Boeing CMM 57-43-23 of CMM 57-43-23 B787-9
And 9 2021 BMC FAA
- Assemble slat as per Para 701 Assembly
of CMM 57-43-23
- Wing Anti-Ice Detail Test as per Step 3,
Para 101, Testing And Fault Isolation of
CMM 57-43-23
CAAV
174095XXX; Passenger Oxygen Inspection/check of passenger oxygen 22 APR HCM SSCA
CSE/2021/016 Aerospace CMM 35-24-04 ATR72
174097XXX Mask Assembly masks for condition IAW CMM 35-24-04 2021 BMC CAAB
CAAP

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 96


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of structure I .AW the following
tasks:
- Disassembly of structure I.AW CMM 25-35-
CSE-IN6- 23 APR
3212VNRHGA00 RH Stowage AIM CMM 25-35-99 99 reference block the Structure A321 CIMC CAAV
2021-20 2021
disassembly
- Assembly of structure I.AW CMM 25-35-
99 reference block Structure assembly
Replacement of structure I.AW the following
tasks:
- Disassembly of structure l.A.W CMM 25-
35-96 reference block the Structure
CSE-IN6-20- disassembly except disassemble the lower, 23 APR
21-21 centre and upper structure assy 2021
- Assembly of structure I.AW CMM 25-35-96
reference block Structure assembly except
assemble the lower, centre and upper
structure assy
3212VN05GA00;
GALLEY 5 AIM CMM 25-35-96 Replacement of faucet, placards I.AW the A321 CIMC CAAV
3212VN05GB00
following tasks:
- Disassembly of faucet I.AW CMM 25-35-
96 reference block Removal of the
Plumbing Assembly
CSE-IN6- 26 APR
- Assembly of faucet I.AW CMM 25-35-96
2021-22 2021
reference block Installation of the Water
System
- Assembly of placard I.AW CMM 25-35-96
reference block Illustrated Parts List-
Installation of Placards
DISASSEMBLY: .Removal of all
components of the seat I.AW tasks listed in
CSE-IN6- the block DISASSEMBLY 27 APR
2351WS5XXXXXXX Attendant Seat Goodrich CMM 25-73-92 A350 CIMC CAAV
2021-24 CLEANING: 2021
- List of Materials: TASK 25-73-92-160-801
-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 97


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Cleaning Procedures: TASK 25-73-92-
160-802-A01
CHECK:
- General: TASK 25-73-92-210-801-A01
- Restraint: TASK 25-73-92-210-802-A01
- Seat Assembly: TASK 25-73-92-210-803-
A01
ASS EMBLY: Installation of all components
of the seat I.AW tasks listed in the
block.ASSEMBLY
HAN
BMC;
HCM
Emergency Locator - Update of the ELT C/S Identification l.A.W 16 APR BMC; CAAV
01N65920 CSE/2021/013 Elta CMM 25-60-11 B787
Transmitter CMM 25-60-11 task 25-60-11-750-807-A01. 2021 HAN FAA
LMC;
HCM
LMC
- Update of the ELT C/S identification l.A.W HAN
CMM 25-60-10 task ATR-A-25-65-20-00001 LMC; CAAV
CMM 25-60-10; ATR72/42-
01N65900; Emergency Locator -752A-A. 16 APR HCM EASA
CSE/2021/014 Elta PW1
01N65920 Transmitter - Update of the ELT C/S identification l.A.W 2021 LMC; SSCA
CMM 25-60-11 24/127
CMM 25-60-11 task ATR-A-25-65-20- HCM CAAP
01002-752A-A. BMC
HAN
CMM 25-60-10: Testing And Fault Isolation/ BMC;
CSE-2021-19; D. Identification of ADT 406 Beacon. HCM
CMM 25-60-10;
01N65900; HAN/2021/A3 Emergency Locator CMM 25-60-11: Testing And Fault Isolation/ A321 26 APR BMC; CAAV
Elta
01N65920 21.A350ELT - Transmitter Task 25-60-11-750-805-A01, Task 25-60- A350 2021 HAN FAA
CMM 25-60-11
02 11-750-806-A01 and Task 25-60-11-750- LMC;
807-A01. HCM
LMC
CSE-IN6-2021 Replacement of faucet, placards I.AW the 26 APR
3212VN01GA00 GALLEY 1 AIM CMM 25-35-95 A321 CIMC CAAV
-23 following tasks: 2021

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 98


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly of faucet I.AW CMM 25-35-
95 reference block Removal of the
Plumbing Assembly
- Assembly of faucet I.AW CMM 25-35-95
reference block Installation of the Water
System
- Assembly of placard I.AW CMM 25-35-95
reference block Illustrated Parts List-
Installation of Placards
REPAIR 3: Replacement of the riveted part
285-29000-00XX; TASK 25-23-00-300-801-A00
285-39000-00XX; CSE-2021- *REPAIR 4: Reworking or machining; 04 MAY HAN CAAV
Door Lining Airbus CMM 25-23-00 A350
285-49000-00XX; 012 TASK 25-00-30-803-A00 2021 BMC FAA
285-59000-00XX * REPAIR 8: repair of damaged paint;
TASK 25-23-00-300-806-A00
Repair I.AW CMM 25-40-06 the follow tasks:
- Repair Fiberglass Composite Pane refer
task 25-40-06-300-806-A01
E441001A-XXX: CSE-IN6- 15 MAY
Lavatory Safran CMM 25-40-06 - Paint and Prime the Composite Panel refer A350 CIMC CAAV
E451001A-XXX 2021-28 2021
task 25-40-06-300-809-A01
- Repair Cracked Shroud refer task 25-40-
06-300-816-A01
DISASSEMBLY: Removal of all
components of the seat listed in the block
DISASSEMBLY (except Video, IFE/PC
Power component
CLEANING: Cleaning procedures: Non-
876499-XXX; CSE-IN6- upholstered Parts, Upholstery, Metal 15 MAY
Passenger Seat Safran CMM 25-20-17 A350 CIMC CAAV
876529-XXX 2021-26 parts,Fabric-Backed Vinyls and Plastic 2021
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat I.A.W tasks listed in the block

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 99


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ASSEMBLY (except Video, IFE/PC Power
components)
Repair l.A.W CMM 25-40-03 the follow tasks:
-Repair Fiberglass Composite Pane refer
task 25-40-03-300-807-A01
CSE-IN6- 15 MAY
E201001A-XXX L11 Lavatory Safran CMM 25-40-03 - Paint and Prime the Composite Panel refer A350 CIMC CAAV
2021-30 2021
task 25-40-03-300-810-A01
- Repair Cracked Shroud refer task 25-40-
03-300-817-A01
285-12000-00XX;
285-13000-00XX;
285-14000-00XX;
285-17000-00XX;
285-18000-00XX; REPAIR 3: REPLACEMENT OF THE
285-22000-00XX; RIVETED PARTS; TASK 25-23-00-300-801-
285-23000-00XX; A00
CSE-2021- 21 MAY HAN CAAV
285-24000-00XX; Door Lining Airbus CMM 25-23-00 *REPAIR 4: REWORKING OR MACHINING; A350
021 2021 BMC FAA
285-28000-00XX; TASK 25-23-00-300-803-A00
285-33000-00XX; *REPAIR 8: REPAIR OF DAMAGED PAINT;
285-38000-00XX; TASK 25-23-00-300-806-A00
285-42000-00XX;
285-43000-00XX;
285-44000-00XX;
285-48000-00XX
DISASSEMBLY: IAW CMM 25-22-51: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-22-51: All tasks in
the block CLEANING
1075402-XXX; CSE-IN6- Y Class Passenger 22 MAY
B/E Aerospace CMM 25-22-51 INSPECTION/CHECK: IAW CMM 25-22-51: A321 CIMC CAAV
1075403-XXX 2021-31 Seats 2021
All tasks in the block INSPECTION/CHECK
REPAIR: IAW CMM 25-22-51:
F. Seat Belt Repair
G. Seat Bottom Cushion Repair

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 100


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ASSEMBLY: IAW CMM 25-22-51: All tasks
in the block ASSEMBLY
Replacement of the fixed bushes of the
CAAV
Structure Complete center hinge as per subtask 57-72-21-010- 28 MAY HCM
D5775001900XXXX CSE/2021/020 Airbus CMM 57-72-21 A320-A321 FAA
- Spoiler 2 004-A01/A/(6) and subtask 57-72-21-410- 2021 BMC
SSCA
001-A01/A/(10)
Replacement of the fixed bushes of the
CAAV
Structure Complete center hinge as per subtask 57-74-21-010- 28 MAY HCM
D5775002100XXXX CSE/2021/021 Airbus CMM 57-74-21 A320-A321 FAA
- Spoiler 4 004-A01/A/(7) and subtask 57-74-21-400- 2021 BMC
SSCA
001-A01/A/(10)
- Visual inspection the axel for sign of heat
damage after serious hot brake event per
SOPM 20-10-02 step 11.F
- Apply local Low Hydrogen Embrittlement
SOPM 20-10-02; HCM
Inspection main (LHE) stylus cadmium plate to the reworked
SOPM 20-42-10; 04 JUN BMC;
515Z2002-501 CSE/2021/001 landing gear axel Boeing surfaced per SOPM 20-42-10 B787 CAAV
SOPM 20-10-01; 2021 HAN
for heat damage - Machining and Grinding per SOPM 20-10-
CMM 32-10-35 BMC
01
- Re-apply Primer per CMM 32-10-35 step
Repair 3-1 SUBTASK 32-10-35-300-009-
A01
HCM
Inspection main Visual inspection the axel for sign of heat
04 JUN LMC;
515Z2002-501 CSE/2021/005 landing gear axel Boeing SOPM 20-10-02 damage after serious hot brake event l.A.W B787 CAAV
2021 HAN
for heat damage SOPM 20-10-02 step 11.F
LMC
- Removal of the defective parts I.AW CMM
25-23-34 reference Task A350-A-25-23-34-
513035A; 01001-530A-C
513036A; CSE-IN6- Diehl Aircabin - Repair of the defective parts I.AW CMM 25- 17 JUN
Doghouse CMM 25-23-34 A350 CIMC CAAV
513093; 2021-36 GmbH 23-34 reference : 2021
513094 Task A350-A-25-23-34-01001-600A-C (the
repair of the surface finish, the edge profiles
and the edge fillers )

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 101


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation of the defective parts I.AW
CMM 25-23-34 reference Task A350-A-25-
23-34-01001-710A-C
- Remove primer
and paint on main
landing gear truck
beam assembly - ON CMM 32-13-05: AXLE ASSEMBLY -
- Apply local low REPAIR 3-1, Para. 6: Axle Assembly
hydrogen Refinish Procedure;
CMM 32-13-05;
embrittlement (lhe) - On SOPM 20-10-01 : Step 2.D: Polishing
515Z1110-501; SOPM 20-10-01; B787- 18 JUN HAN
CSE-2021-22 stylus cadmium Boeing - On SOPM 20-10-02: Step 4.E: Cleaning CAAV
515Z1110-502 SOPM 20-10-02; GENX-1B 2021 BMC
plate on main and Storing of Parts
SOPM 20-42-10
landing gear truck - On SOPM 20-42-10: Low hydrogen
beam assembly embrittlement stylus cadmium plating using
- Apply primer and DALIC CADMIUM solution.
paint on main
landing gear truck
beam assembly
Removal door of Steam Oven Assembly
I.AW CMM 25-35-21 reference Subtask 25-
35-2 1-010-001-A01/step 3
Cleaning door of Steam Oven Assembly
I.AW CMM 25-35-21 reference Subtask 25-
X200100; 35-21-1 40-001-A0l /step 1-step 2- step 3-
CSE-IN6- A350/TREN 21 JUN
X200200; Steam Oven Zodiac Services CMM 25-35-21 step 4 CIMC CAAV
2021-33 XWB-84 2021
X201100 Repair door of oven assembly I.AW CMM
25-35-21 reference block Paint - Minor
Repair I Touch-Up
Installation door of Steam Oven Assembly
I.AW CMM 25-35-21 reference Subtask 25-
35-2 1-420-001-A01/step 17
Removal of the Door Assembly l.A.W CMM
4323500-XX-XXXX; CSE-IN6- A350/TREN 21 JUN
Steam Oven B/E Aerospace CMM 25-35-52 25-35-52 reference Subtask 25-35-52-010- CIMC CAAV
4323501-XX-XXXX 2021-34 XWB-84 2021
005-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 102


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Repair door of oven assembly I.AW CMM
25-35-52 reference block Touch Up Paint -
Task 25-35-52-350-801 - A01
Installation of the Door Assembly 1.A.W
CMM 25-35-52 reference Subtask 25-35-52-
410-050-A01
FOLLOWING TASK ON CMM 352160:
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-21-
60-000-001-A01
Installation Of The Warning Flag: Subtask
H2CXXXXXXXXX50 35-21-60-000-002-A01 Step
1; (5).(b),(c),(d),(e)
EXCXXXXXXXXX50 Remove The Pax Mask Assembly: Subtask
1; 35-21-60-000-002-A01 Step (6),(7),(8),(12)
EXCXXXXXXXXX50 2. Installation Of The Pax Oxygen-Mask
CMM 35-21-60;
2; Assembly
CMM 35-21-61;
FXCXXXXXXXXX50 Install New Pax Mask Assembly: Subtask
CMM 35-21-62;
1;FXCXXXXXXXXX5 PAX Oxygen-Mask B/E Aerospace 35-21-60-410-001-A01 Step (2), (5), (6), (7), 28 JUN BMC
CSE-2021-24 CMM 35-21-63; A350/XWB CAAV
02; Assembly Systems GmbH (16) 2021 HAN
CMM 35-21-64;
GXCXXXXXXXXX50; Fold The Oxygen Masks: Subtask 35-21 -60-
CMM 35-20-50;
KXCXXXXXXXXX50 410-001-A01 Step (8)
CMM 35-21-51
1; Close The Door Assembly Subtask 35-21-
KXCXXXXXXXXX50 60-700-001-A01 Step (5)
2; FOLLOWING TASK ON CMM 352161
H2GXXXXXXXXX50 1. Remove Of The Pax Oxygen-Mask Ass
1; Embly
Open The Door Assembly: Subtask 35-21-
61-000-001-A01
Installation Of The Warning Flag: Subtask
35-21 -61-010-001-A01 Step (3).(b)(c)
Remove the pax mask assembly: Subtask
35-21-61-010-001-A01 Step 4),(5),(6),(12)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 103


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
2. Installation Of The Pax Oxygen-Mask
Assembly
Install New Pax Mask Assembly: Subtask
35-21-61-410-001-A01 Step (2),(5),(6) ,(14)
Close The Door Assembly Subtask Task 35-
21 -61-700-801-A01 Step 1.E.(5)
FOLLOWING TASK ON CMM 352162
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-21-
62-000-001-A01
Installation Of The Warning Flag: Subtask
35-21-62-000-002-A01 Step
(1),(4).(a),(c),(d)
Remove The Pax Mask Assembly: Subtask
35-21 -62-000-002-A01 Step (5),(6),(7),(10)
Open The Door Assembly: Subtask 35-21-
62-000-005-A01
Installation Of The Warning Flag: Subtask
35-21-62-000-006-A01 Step (1
),(4),(5);(6),(8).(C),(D)
Remove The Pax Mask Assembly: Subtask
35-21 -62-000-006-A01 Step (10)
2. Installation Of The Pax Oxygen-Mask
Assembly
Install New Pax Mask Assembly: Subtask
35-21-62-400-003-A01 Step (13)
Fold The Oxygen Masks: Subtask 35-21-62-
400-003-A01 Step (2),(5),(7)
Close The Door Assembly Subtask 35-21-
62-200-801-A01 Step F
Install New Pax Mask Assembly: Subtask
35-21-62-400-006-A01 Step (13)
Fold The Oxygen Masks: Subtask 35-21-62-
400-006-A01 Step (2),(5),(7)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 104


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Following Task On Cmm 352163
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-21-
63-000-001-A01
Installation Of The Warning Flag: Subtask
35-21 -63-000-002-A01 Step
(4).(B),(C);(D),(E)
Remove The Pax Mask Assembly: Subtask
35-21 -63-000-002-A01 Step (6),(7),(8),(12)
Open The Door Assembly: Subtask 35-21-
63-000-003-A01
Installation Of The Warning Flag: Subtask
35-21-63-000-004-A01
(5),(6),(7),(9).(B),(C),(D),(E)
Remove The Pax Mask Assembly: Subtask
35-21 -63-000-004-A01 Step (11)
2. Installation Of The Pax Oxygen-Mask
Assembly:
Install New Pax Mask Assembly: Subtask
35-21-63-410-001-A01 Step
(2),(5),(6),(7),(14)
Close The Door Assembly Subtask 35-21-
63-200-801 -A01 Step E
Install New Pax Mask Assembly: Subtask
35-21-63-410-002-A01 Step
(2),(5),(6),(7),(14)
Following Task On Cmm 352164
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-21-
64-000-005-A01
Installation Of The Warning Flag: Subtask
35-21-64-000-006-A01 Step (3).(C)(D)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 105


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Remove The Pax Mask Assembly: Subtask
35-21-64-000-006-A01 Step (5),(6),(7),(12)
Open The Door Assembly: Subtask 35-21-
64-000-007-A01
Installation Of The Warning Flag: Subtask
35-21 -64-000-004-A01 Step
(5).(C)(D),(6),(7),(8)
Remove The Pax Mask Assembly: Subtask
35-21-64-030-003-A01 Step (1)
2. Installation Of The Pax Oxygen-Mask
Assembly
Install New Pax Mask Assembly: Subtask
35-21-64-410-001-A01 Step (2),(5),(6),(14)
Close The Door Assembly Subtask Task 35-
21-64-200-801-A01 Step E
Install New Pax Mask Assembly: Subtask
35-21 -64-400-006-A01 Step (2),(8),(9), And
Subtask 35-21-
64-400-007-A01
Following Task On Cmm 352250
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-22-
50-000-001-A01 Step (1),(3),(4)
Installation Of The Warning Flag: Subtask
35-22-50-000-002-A01 Step
(1),(3),(4),(5)(A),(6),(7)
Remove The Pax Mask Assembly: Subtask
35 35-22-50-000-003-A01 Step (1)
2. Installation Of The Pax Oxygen-Mask
Assembly
Install New Pax Mask Assembly: Subtask
35-22-50-400-001-A01 Step (4),(5)
Close The Door Assembly Subtask Task 35-
22-50-700-003-A01 Step 1.A.(5)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 106


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
10.

Replacement cardan assembly as per CMM


Main Landing Gear 32-12-22 /Disassembly: 2.E step (1),(2),(4) 28 JUN BMC CAAV
20158700X CSE/2021/023 Safran CMM 32-12-22 A320-A321
LEG and Assembly: 2.AD step (13),(1 4),(1 2021 HCM FAA
5),(16)
1.Removal of the defective parts l.A.W CMM
25-12-15 in block DISASSEMBLY reference
follow task :
-Removal of the upholstery refence subtask
25-12-15-040-001 -A01
-Removal of the backrest assy refence
subtask 25-12-15-040-003-A01
-Removal of the intercom handset refence
subtask 25-1 2-15-040-006-A01
-Removal of the stowage door assembly
refence subtask 25-12-15-040-007-A01
-Removal of the restraint system assembly
CSE-IN6- refence subtask 25-12-15-040-008-A01 21 JUL
WA-XXX Seat Assembly Safran seats CMM 25-12-15 A320/A321 CIMC CAAV
2021-39 2. Install of the parts l.A.W CMM 25-12-15 in 2021
block ASSEMBLY reference follow task :
- Installation of the upholstery refence
subtask 25-12-15-440-001 -A01
- Installation of the backrest assy refence
subtask 25-12-15-440-003-A01
- Installation of the intercom handset refence
subtask 25-12-15-440-006-A01
-Installation of the stowage door assembly
refence subtask 25-12-15-440-007-A01
- Installation of the restraint system
assembly refence task 25-12-15-440-008-
A01.
3520D(Type 950)- Recaro Aircraft 1.General visual inspection I.AW CMM 25-
CSE-IN6- 21JUL
XXX; 3520E(Type Passenger Seats Seating GmbH CMM 25-26-14 26-14 reference subtask 25-26-14-210-001- A320/A321 CIMC CAAV
2021-38 2021
950)-XXX & Co. KG A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 107


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
2.Backrest recline test I.AW CMM 25-26-14
reference subtask 25-26-14-700-004-A01
3.Removal of the defective parts I.AW CMM
25-26-14 in block DISASSEMBLY reference
follow task:
- Disassembly of the Backrest Assembly
refence task 25-26-14-000-004-A01
- Disassembly of the Armrest Assembly
refence subtask 25-26-14-020-007-A01
- Disassembly of the IAT Armrest Assembly
refence task 25-26-14-000-007-A01
- Disassembly of the Foodtray Assembly
refence task 25-26-14-000-008-A01 except
remove item 70
- Disassembly of the Kinematics Assy
refence task 25-26-14-000-014-A01
- Disassembly of the SEB Shroud refence
task 25-26-14-000-015-A01
- Disassembly of the Seatleg Assembly
refence task 25-26-14-000-010-A01
4. Install of the parts I.AW CMM 25-26-14 in
block ASSEMBLY reference follow task :
- Assembly of the Backrest Assembly
refence task 25-26-14-400-008-A01
- Assembly of the Armrest Assembly refence
subtask 25-26-14-420-008-A01
- Assembly of the IAT Armrest Assembly
refence task 25-26-14-400-005-A01
- Assembly of the Foodtray Assembly
refence task 25-26-14-400-004-A01 except
install item 70
- Assembly of the Kinematics Assy refence
task 25-26-14-420-012-A01
- Assembly of the SEB Shroud refence task
25-26-14-400-012-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 108


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
-Assembly of the Seatleg Assembly refence
task 25-26-14-400-002-A01.
5. Replacement of the Actuator refence task
25-26-14-000-016-A0 1
CLEANING: IAW CMM 25-12-14: All
Subtasks in the TASK 25-12-14-100-801-
A01
CHECK IAW CMM 25-12-14: All Subtasks in
the TASK 25-12-14-200-801-A01
CSE-IN6-TD- Cabin attendant A321/ 26 JUL CAAV
FA-XXX SAFRAN CMM 25-12-14 ASSEMBLY: IAW CMM 25-12-14: All CIMC
2021-41 seat V2500 2021 CAAT
Subtasks in the TASK 25-12-14-400-801-
A01
DISASSEMBLY: IAW CMM 25-12-14: All
Subtasks in the TASK 25-12-14-000-801-
A01
CLEANING: IAW CMM 25-12-12: All
Subtasks in the TASK 25-12-12-100-801-
A01
CHECK: IAW CMM 25-12-12: All Subtasks
in the TASK 25-12-12-200-801-A01
CSE-IN6-TD- Cabin attendant ZODIAC A321/ 26 JUL CAAV
DN-XXX CMM 25-12-12 ASSEMBLY: IAW CMM 25-12-12: All CIMC
2021-42 seat AEROSPACE V2500 2021 CAAT
Subtasks in the TASK 25-12-12-400-801-
A01
DISASSEMBLY: IAW CMM 25-12-12: All
Subtasks in the TASK 25-12-12-000-801-
A01
Disassembly of the Side-Load Stay
Assembly - Flap Track 2. Ref Task 57-55-15-
D57556222 XXX; FAIRING CAAV
000-805-A01 28 JUL HAN
D57556226 XXX; CSE-2020-25 ASSEMBY FLAP Airbus CMM 57-55-15 A320/A321 FAA
- Assembly of the Side-Load Stay Assembly 2021 BMC
D57556578 XXX TRACK 2 CAAT
- Flap Track 2. Ref Task 57-55-15-400-801-
A01
- Remove Rubber Grommet CAAV
RU1502U00; CSE-2020- Technofan 28 JUL HAN
Universal Wheel Kit CMM 32-48-28 (DISASSEMBLY - Task 32-48-28-000-801- A320/A321 FAA
RU1502U01 036 Snecma Group 2021 BMC
A01 Step 1.E.(1)(e).2). CAAT

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 109


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CMM 32-48-28: Install Rubber Grommet
(ASSEMBLY - Task 32-48-28-400-801-A01
Step1.E.(1)(c).7).
1. TASK 57-42-21-000-802-A01 Removal of
the Outboard End Seals and the Support
Assembly: Para 1,2,3,4 (B)
D5746091000000; 2. TASK 57-42-21-400-803-A01 Installation
CAAV
D5746091000100; Outb Rubber Seal of the Outboard End Seals and the Support 28 JUL HAN
CSE-2020-97 Airbus CMM 57-42-21 A320/A321 FAA
D5746091000200; Under Slat Assy #1 Assembly Para 1,2,3 (8) 2021 BMC
CAAT
D5746091000300 3. TASK 57-42-21 -100-801-A01 Cleaning of
the Component Parts
4. TASK 57-42-21 -200-801-A01 Check of
the Component Parts
FOLLOWING TASK ON CMM 57-55-15
1. Disassembly of the Movable Fairing
Assembly - Flap Track 2
TASK 57-55-15-000-803-A01 Para 3.B.(10)
Bearing and to Para 3.B.(13) Remove bracket assemblies
Bracket Assemblies and Bearing CAAV
CSE-2021- 28 JUL HAN
D57556578XXX at Fwd Fitting of Airbus CMM 57-55-15 2. Assemble the Flap Movable-Fairing A320/A321 FAA
010 2021 BMC
Moveable Fairring Assembly - Flap Track 2 CAAT
#2 TASK 57-55-15-400-802-A01 Para 3.8.(2) to
Para 3.B.(18) Install bracket assemblies and
bearing
3. Non-Standard Torque Value
TASK 57-55-15-820-806-A01
Thrust Reverser C-
CSE-2021- Goodrich Repair 24 - C-Duct fixed structure-replace A320/A321- 28 JUL HAN
745-0002-XXX Duct Fixed CMM 78-30-00 CAAV
034 Aerostructures the pressure seal: Task 78-30-00-300-024 V2500 2021 BMC
Structure
DISASSEMBLY: IAW CMM 25-21-92, All
tasks in the block DI SASS EMBLY.
CSE-Cl-TD- Cabin Attendant CHECK: IAW CMM 25-21-92, All tasks in B787/Genx 02 AUG
278733AAAXXX Goodrich CMM 25-21-92 CIMC CAAV
2021-02 Seat the block CHECK. -1B 2021
ASSEMBLY: IAW CMM 25-21-92, All tasks
in the block ASSEMBLY.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 110


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- CMM 52-81-18, TASK 52-81-18-000-801-
A01 Disassembly of the FWD Fitting Assy.
Door - Main landing A320/A321-
D5288016500XXX; CSE-2021- Step 3A1 and 3B1 06 AUG HAN CAAV
Gear, Common Airbus CMM 52-81-18 V2500/CFM
D5288025000XXX 036 - CMM 52-81-18, TASK 52-81-18-400-809- 2021 BMC FAA
Ramp 56-5B
A01 Assembly of the Forward Fitting
Assembly. Step 3A2 and 3B2
- Disassembly the seal and retainer I.A.W
subject disassembly (page block 301).
Slat Assembly No.6 B787/GEnx 09 AUG HCM CAAV
146Z0201-50X-X CSE/2021/025 Boeing CMM 57-43-26 - Assembly seal and retainer I.A.W subject
and No.7 -1B 2021 BMC FAA
assembly (page block 701, 702) item
2.b.1.(c).
- Removal of the bearings and the bushings
of center hingle i actuator bracket:
Refer to task 57-71-21-000-805-A01, except
paragraph 3.A.(1) to 3.A.(6) and refer to task
57-71-21-000-807-A01, except paragraph
D5774500000XXX; 3.A.(1) to 3.A.(4).
D5774500000XXXX; Note: Except removal of the center hingle I
HAN CAAV
D5775000100XXXX; CSE-2021- Structure Complete actuator bracket-assembly. 10 AUG
Airbus CMM 57-71-21 A320/A321 BMC FAA
D5775001600XXXX; 002 - Spoiler 1 - Installation of the bearings and the 2021
D5775001700XXXX; bushings of center hingle i actuator bracket: CAAT
D5775610100XXXX; Refer to task 57-71-21-400-801-A01 , except
paragraph 3.A.(13) to 3.A.(16) and
refer to task 57-71-21-400-802-A01 , except
paragraph 3.A.(14) to 3.A.(16)
Note: Except installation of the center hingle
I actuator bracket-assembly.
- Removal of the bearings and the bushings
D5774501100XXX;
of center hingle bracket:
D5774501100XXXX;
Refer to task 57-72-21-010-803-A01, except
D5774501101XXXX; HAN CAAV
CSE-2021- Structure Complete paragraph 3.A.(1) to 3.A.(4) and 3.A.(8), and 10 AUG
D5775000200XXXX; Airbus CMM 57-72-21 A320/A321 BMC FAA
003 – Spoiler 2 except paragraph 3.B.(1) to 3.B.(4) and 2021
D5775001800XXXX; CAAT
3.B.(8).
D5775001900XXXX;
Note: Except removal of the center hingle
D5775612200XXXX;
bracket.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 111


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation of the bearings and the
bushings of center hingle bracket:
Refer to task 57-72-21-400-801-A01, except
paragraph 3.A.(1) and 3.A.(11) to 3.A.(16),
and except paragraph 3.B.(1 ) and 3.B.(11)
to 3.B.(16)
Note: Except installation of the center hingle
bracket.

- Removal of the bearings and the bushings


of center hingle bracket: HAN CAAV
CSE-2021- Refer to task 57-73-21-000-803-A01, except 10 AUG
BMC FAA
004 paragraph 3.A.(1) to 3.A.(4) and 3.A.(8) 2021
CAAT
D5774503000XXX; Note: Except removal of the center hingle
Structure Complete
D5775000300XXX; Airbus CMM 57-73-21 bracket. A320/A321
– Spoiler 3
D5775002000XXX - Installation of the bearings and the
bushings of center hingle bracket:
Refer to task 57-73-21-400-801-A01, except 07 NOV HCM CAAV
CSE/2023/029 paragraph 3.A.(1) and 3.A.(12) to 3.A.(17) 2023 BMC FAA
Note: Except installation of the center hingle
bracket.
- Removal of the bearings and the bushings
of center hingle bracket:
CSE-2021- Refer to task 57-74-21-000-804-A01, except HAN CAAV
005 paragraph 3.A.(1) to 3.A.(5) and 3.A.(9) 10 AUG
BMC FAA
Note: Except removal of the center hingle 2021
D5774503200XXX; CAAT
Structure Complete bracket.
D5775000400XXX; Airbus CMM 57-74-21 A320/A321
– Spoiler 4 - Installation of the bearings and the
D5775002100XXX
bushings of center hingle bracket:
Refer to task 57-74-21-400-801-A01, except
CSE/2023/030 paragraph 3.a.(1) and 3.a.(11) to 3.a.(17) 07 NOV HCM CAAV
Note: Except installation of the center hingle 2023 BMC FAA
bracket.
D5774503400XXX; Structure Complete - Removal of the bearings and the bushings 10 AUG HAN CAAV
Airbus CMM 57-75-21 A320/A321
D5774503400XXXX: – Spoiler 5 of center hingle i actuator bracket: 2021 BMC FAA

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 112


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
D5774503401XXXX; - Refer to task 57-75-21-000-804-A01, CAAT
D5775000500XXXX; except paragraph 3.a.(1) to 3.a.(6) and
D5775002200XXXX 3.a.(11) and refer to task 57-75-21-000-805-
A01, except paragraph 3.a.(1) to 3.a.(6) and
3.a.(11)
Note: except removal of the center hingle i
actuator bracket-assembly.
- Installation of the bearings and the
bushings of center hingle bracket:
+ Refer to task 57-75-21-400-801-A01,
except paragraph 3.a.(6) to 3.a.(10)
+ Refer to task 57-75-21-400-802-A01,
except paragraph 3.a.(1) and 3.a.(10) to
3.a.(15)
+ Refer to task 57-75-21-400-803-A01,
except paragraph 3.a.(4) to 3.a.(5)
+ Refer to task 57-75-21-400-804-A01,
except paragraph 3.a.(1) and 3.a.(10) to
3.a.(18)
Note: except installation of the center hingle
/ actuator bracket-assembly.
Disassembly of the Diffuser Assy ref CMM
TASK 49-16-45-000-807-B01
- Assembly of the Diffuser Assy ref CMM
TASK 49-16-45-400-802-B01
- Disassembly of the Handle ref CMM TASK
D4918501415XXX; CSE-2021- 13 AUG HAN CAAV
Air int ake duct Airbus CMM 49-16-45 49-16-45-000-804-A01 A320/A321
D4918529700XXX 037 2021 BMC FAA
- Assembly of the Handle ref CMM TASK 49-
16-45-400-805-A01
- Disassembly of the Plate Formed or the
Frame Diffuser Assy ref CMM TASK 49-16-
45-000-803-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 113


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly of the Plate Formed or the Frame
Diffuser Assy ref CMM TASK 49-16-45-400-
806-A01
- Cleaning of the Painted Components ref
CMM TASK 49-16-45-100-801-A01
- Cleaning of the Components Which Are Not
Painted ref CMM TASK 49-16-45-100-802-
A01
- Replacement of the Drain Section ref CMM
TASK 49-16-45-300-805-A01
- Disassembly of the step assemblies ref
CMM task 52-81-18-000-805-A01 except
CSE-2021- Door - Main paragraph 3.a; 3.b; 3.c; 3e; 3f. 16 AUG HAN CAAV
D5288016500600 Airbus CMM 52-81-18 A320/A321
038 Landing Gear - Assembly of the step assemblies ref CMM 2021 BMC FAA
task 52-81-18-400-805-A01 except
paragraph 3.a; 3.b; 3.c; 3e; 3f.
intake-naca vent: replace door assy as per
CMM 28-12-47: CAAV
D2815700100500; - Subtask 28-12-47-010-002-C01 A320/A321- 17 AUG HCM
CSE/2021/035 Intake-Naca Vent Airbus CMM 28-12-47 FAA
D2815700100400 (Disassembly) V2500 2021 BMC
- Subtask 28-12-47-410-001-C01 SSCA
(Assembly)
Repair No 01: thrust reverser forward CAAV
Thrust reverser Goodrich A320/A321- 17 AUG HCM
745-0002-51X CSE/2021/036 CMM 78-30-00 crossover beam - replace the seals FAA
assembly Aerostructures V2500 2021 BMC
(VRS2064): Task 78-30-00-300-001 SSCA
Disassembly IAW CMM 25-26-96:
-Subtask 25-26-96-010-002-A00: Removal
of the cover seat divider and the finger
CSE-Cl-TD- protection 26 AUG
3530AY89-XXX Passenger Seats Recaro CMM 25-26-96 A320 CIMC SSCA
2021-03 -Subtask 25-26-96-020-002-A01: Removal 2021
of the cushions with the dress covers
- Subtask 25-26-96-020-015-A01: Removal
of the life vest pouch

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 114


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Subtask 25-26-96-020-023-A01: Removal
of the IAT armrest
-Subtask 25-26-96-020-024-A00:
Disassembly of the STD armrest
-Subtask 25-26-96-030-001-A01:
Disassembly of the table arms
-Subtask 25-26-96-040-003-A00:
disassembly of the bridge assy check IAW
cmm 25-26-96:
-Subtask 25-26-96-220-001-A01: check of
the seat assembly
Assembly IAW CMM 25-26-96:
-Subtask 25-26-96-410-001-A00: Installation
of the cover seat divider and the finger
protection
-Subtask 25-26-96-420-008-A01: Installation
of the life vest pouch
-Subtask 25-26-96-420-021-A01: Installation
of the cushions with the dress covers
- Subtask 25-26-96-420-023-A00: Assembly
of the IAT armrest
- Subtask 25-26-96-420-024-A00: Assembly
of the STD armrest
-Subtask 25-26-96-420-026-A01: Installation
of the STD armrest
- Subtask 25-26-96-430-002-A01: Assembly
of the table arms
- Subtask 25-26-96-440-001-A00: Assembly
of the bridge assy
- Subtask 25-26-96-420-024-A00: Assembly
of the STD armrest
-Subtask 25-26-96-420-026-A0: Installation
of the STD armrest
- Subtask 25-26-96-430-002-A01: Assembly
of the table arms

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 115


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Subtask 25-26-96-440-001-A00: Assembly
of the bridge assy
CMM Task 57-51-41-000-801-A01 Removal
of the Aft Spigot Pin.
CSE-2021- Flap track beam- - CMM Task 57-51-41-400-802-A01 08 SEP HAN
D5755656601000 Airbus CMM 57-51-41 A320/A321 CAAV
040 No.2 Installation of the Aft Spigot Pin on the 2021 BMC
Beam-Assembly Flap Tracks 2, 3 and 4
paragraph 1, 2 and 3C
S57412016XXX; Leading edge assy - repair the de-icer boot CAAV
S57412006XXX; Atr/Zodiac CMM 30-11-42; as per CMM 30-11-42, Rev16 - oct 13/17: ATR42/72- 09 SEP HCM SSCA
CSE/2021/029 Leading Edge Assy
S57415036XXX; Aerospace CMM 57-42-11 Task 30-11- 42-300-801-A01/Task 30-11- PW124/127 2021 BMC CAAP
S57415046XXX 42-700-801-A01 CAAB
S57412114XXX; CAAV
Leading edge assy - repair the de-icer boot
S57412117XXX; Atr/Zodiac CMM 30-11-42; ATR42/72- 09 SEP HCM SSCA
CSE/2021/030 Leading Edge Assy as per CMM 30-11-42: Task 30-11-42-300-
S57415038XXX; Aerospace CMM 57-43-11 PW124/127 2021 BMC CAAP
801-A01/Task 30-11-42-700-801-A01.
S57415048XXX CAAB
S57412080XXX;
S57412090XXX: CAAV
Leading edge assy - repair the de-icer boot
S57412170XXX; Atr/Zodiac CMM 30-11-42; ATR42/72- 09 SEP HCM SSCA
CSE/2021/031 Leading Edge Assy as per CMM 30-11-42: TASK 30-11-42-300-
S57412121XXX; Aerospace CMM 57-43-12 PW124/127 2021 BMC CAAP
S57412125XXX; 801-A01/TASK 30-11-42-700-801-A01.
S57410042XXX
CAAB
CAAV
Leading edge assy - repair the de-icer boot
Atr/Zodiac CMM 30-11-42; ATR42/72- 09 SEP HCM SSCA
S55172000XXX CSE/2021/032 Leading Edge Assy as per CMM 30-11-42: TASK 30-11-42-300-
Aerospace CMM 55-12-00 PW124/127 2021 BMC CAAP
801-A01/TASK 30-11-42-700-801-A01
CAAB
CAAV
S54112670XXX; Duct assy - repair the de-icer boot as per
Atr/Zodiac CMM 30-21-65; ATR42/72- 09 SEP HCM SSCA
S54115619XXX; CSE/2021/033 Duct Assy CMM 30-21-65: TASK 30-21-65-300-801-
Aerospace CMM 71-62-62 PW124/127 2021 BMC CAAP
S54112656XXX A01/TASK 30-21-65-700-801-A01
CAAB

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 116


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CAAV
Duct assy - repair the de-icer boot as per
Leading edge assy Atr/Zodiac CMM 30-21-65; ATR42/72- 09 SEP HCM SSCA
S54112759XXX CSE/2021/034 CMM 30-21-65: TASK 30-21-65-300-801-
– air intake Aerospace CMM 71-61-61 PW124/127 2021 BMC CAAP
A01/TASK 30-21-65-700-801-A01
CAAB
CAAV
Removal and installation passenger/crew SSCA
Passenger/Crew door stair assy I.A.W CMM 52-11-00: ATR72/42 - 10 SEP HCM
S521760010XXX CSE/2021/037 FB429 CMM 52-11-00 EASA
Door Disassembly step 1, 2, 3, 3A and Assembly PW124/127 2021 BMC
step 13, 15, 15A CAAP
CAAB
Following task on CMM 32-22-01
- Disassembly of the Stop Assembly and
6406A0000-01; Bracket IAW Subtask: 32-22-01-030-008-
Stop of Torque Link 16 SEP HAN
6406A0000-02 CSE-2021-41 Liebherr CMM 32-22-01 A01 Step (c),(d),(e) A350/XWB CAAV
at NLG 2021 BMC
- Assembly of the Stop Assembly and
Bracket JAW Subtask: 32-22-01-430-105-
A01 Step (a),(b) ,(c),(d)
CMM 78-11-05: Repair No 2 Replacement CAAV
238-0451-5XX; CSE-2021- Nozzle and Center Goodrich 20 SEP HAN
CMM 78-11-05 of Damaged Pylon Seal Assembly; A320/A321 FAA
642-4001-5XX 047 body Aerostructures 2021 BMC
TASK 78-11-05-300-803 CAAT
- Removal of the Inboard End Seals and
Bonding Strap ref CMM task 57-42-21-000-
801-A01
- Removal of the Outboard End Seals and
the Support Assembly ref CMM task 57-42- CAAV
CSE-2021- 21 SEP HAN
D5746091000XXX Slat #01 Airbus CMM 57-42-21 21-000-802 –A01 A320/A321 FAA
042 2021 BMC
- Cleaning of the Component Pmts ref CMM CAAT
task 57-42-21-100-801-A0l
- Check of the attached Parts ref CMN1 task
57-42-21-200-803-A01 and ta5k 57-42-21-
200-804-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 117


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation of the Inboard End Seals and
Bonding Strap ref CMM task 57-42-21-400-
804 -A01.
- Installation of the Outbomꞏd End Seals and
the Support Assembly ref CMM task 57-42-
21-400-803-A01
- Removal of the Seals and Bonding Lead ref
CMM task 57-43-21-000-801-A01.
- Cleaning of the Component Parts ref CMM CAAV
CSE-2021- task 57-43-21-100-801-A01 21 SEP HAN
D574609200XXX Slat #02 Airbus CMM 57-43-21 A320/A321 FAA
043 - Check of the attached Parts ref CMM task 2021 BMC
57-43-21-200-803-A01. CAAT
- Installation of the Seals and Bonding Lead
ref CMM task 57-43-21-400-802-A01.
- Removal of the Seals and Bonding Straps
ref CMM task 57-44-21-000-801-A01.
- Cleaning of the Component Parts ref CMM CAAV
CSE-2021- task 57-44-21-100-801-A01 21 SEP HAN
D5746093000XXX Slat #03 Airbus CMM 57-44-21 A320/A321 FAA
044 - Check of the attached Parts ref CMM task 2021 BMC
57-44-21-200-803-A01. CAAT
- Installation of the Seals and Bonding Straps
ref CMM task 57-44-21-400-804-A01
Removal of the Seals and Bonding Tag ref
CMM task 57-45-21-000-801-A01
- Cleaning of the Component Parts ref CMM CAAV
CSE-2021- task 57-45-21-100-801-A01 21 SEP HAN
D5746094000XXX Slat #04 Airbus CMM 57-45-21 A320/A321 FAA
045 - Check of the attached Parts ref CMM task 2021 BMC
57-45-21-200-803-A01 CAAT
- Installation of the Seals ref CMM task 57-
45-21-400-804-A01
- Removal of the Seals and Bonding Straps CAAV
CSE-2021- ref CMM task 57-46-21-000-801-A01. 21 SEP HAN
D5746095000 Slat #05 Airbus CMM 57-46-21 A320/A321 FAA
046 - Cleaning of the Component Parts ref CMM 2021 BMC
task 57-46-21-100-801-A01 CAAT

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 118


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Check of the attached Parts ref CMM task
57-46-21-210-802-A01
- Installation of the Seals and Bonding Staps
rcfCMM task 57-46-21-400-803-A01
DME Replacement of battery pack of flashlight 01 OCT HAN
P2-07-0001-214 CSE-2021-26 Flashlight CMM 25-60-02 A321 CAAV
Corporation l.A.W step 3.0 in the block repair 2021 LMC
CSE-2021- Inboard flap CMM 57-52-23, Subtask 57-52-23-210-045- 01 OCT HAN CAAV
D57573050XXXXX Airbus CMM 57-52-23 A320/A321
048 structure compl A01 Check of the Torsion Support Assembly 2021 BMC FAA
D5528000300XXX; CMM 55-21-15: Removal of the Pressed-in
D5528000301XXX; Bushes; TASK 55-21-15-010-801-A01 CAAV
D5528000302XXX; CSE-2021- - CMM 55-21-15: Installation of the Pressed- 01 OCT HAN
Elevator Assy Airbus CMM 55-21-15 A320/A321 FAA
D5528000303XXX; 056 in Bushes; TASK 55-21-15-410-801-A01 2021 BMC
D5528000304XXX; - CMM 55-21 -15: Fits and Clearances; CAAT
D5528000200XXX TASK 55-21-15-820-807-A01
CMM 27-54-42, TASK 27-54-42-000-801-
A01 Removal of the Bolt Assemblies the
Bearings and the Pendulum Assembly. Step
D2754460099932; CSE-2021- Carriage Instl- 04 OCT HAN CAAV
Airbus CMM 27-54-42 4A A320/A321
D5755600900000 049 Flaptrack 1 2021 BMC FAA
- CMM 27-54-42, TASK 27-54-42-400-803-
A01 Installation of the Component Parts -
Carriage Assembly. Step 3A
Disassembly: IAW ACMM 25-01-29: All
Subtasks in the Task 25-01-29-000-801-A0l
MOD KIT COMPT -AssemblY: IAW ACMM 25-01-29: All
CSE IN6- Driessen 10 OCT
262110-151 110 - 113- Galley ACMM 25-01-29 Subtasks in the Task 25-01-29-400-801-A0l A321 CIMC CAAV
2021-47 Aerospace CZ 2021
G1 -Fits and clearances: IAW ACMM 25-01-29:
All Subtasks in the TASK 25-01-29-800-802-
A01
Disassembly: IAW CMM 25-20-67: TASK
25-20-67-000-833-A00 in the block
CSE-Cl-TD- disassembly. 18 OCT
1250-36 Folding table Innovint CMM 25-20-67 A321 CIMC CAAV
2021-05 CleaninG: IAW CMM 25-20-67: All tasks in 2021
the block cleaning task 25-20-67-100-841-
A00.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 119


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ChecK: IAW CMM 25-20-67: All tasks in the
block check task 25-20-67-210-851-A00.
Assembly: IAW CMM 25-20-67: task 25-20-
67-400-872-A00 in the block assembly.
CAAV
D3215303200XXX; Pin - Pintle Rear Disassembly: TASK 32-11-07-000-801-A01 21 OCT HCM
CSE/2021/038 Airbus CMM 32-11-07 A320/A321 FAA
D3215600400XXX MLG Assembly: TASK 32-11-07-400-801-A01 2021 BMC
SSCA
- Remove the Pin (Disassembly - Task 32-
12-15-000-801-A01 (Except paragraph
1.D.(2) to 1.D.(5))).
- Cleaning (Cleaning - Task 32-12-15-100-
801-A01 (Except paragraph 1.D.(1).(d) and
Safran Landing
CSE-2021- 1.D.(2)) . 25 OCT HAN
201531001 Lock Stay Systems UK CMM 32-12-15 A320/A321 CAAV
055 - Install the Pin (Assembly - Task 32-12-15- 2021 BMC
LTD.
400-801-A01 (Except paragraph 1.D.(1) to
1.D(6); 1.D.(8) and 1.D.(9))).
- Check the Tolerance (Fits and Clearances
– Task 32-12-940-801-A01 Apply only for
Section W-W)
CHECK - 4: Balancing of the Aileron CAAV
S57615300-XXX; Assembly on Aileron Balancing Tool PIN
S57615012-XXX; ATR72/42 - 08 NOV HCM SSCA
CSE/2021/040 Aileron FB429 CMM 57-61-12 98S57605002000,
S57613156-XXX; PW124/127 2021 BMC CAAP
S57612012-XXX - CHECK - 5: Check of Aileron Assembly
Weight, CAAB
D2-01-101-4VJ; Inspection, Repair and Replacement of
D2-01-102-4VJ; component IAW the following tasks:
D2-01-103-4VJ; - Inspection of the Seat Assembly l.A.W
D2-01-104-4VJ; CMM 25-22-66: block TESTING AND CAAV
CSE-IN6- Aircraft Passenger A320/A321/ 01 NOV FAA
D2-01-105-5VJ; GEVEN CMM 25-22-66 FAULT ISOLATION, block CIMC
2021-49 Seat CFM56 2021
D2-01-106-5VJ; INSPECTION/CHECK. CAAT
D2-01-135-5VJ; - Repair of the Seat Assembly l.A.W CMM
D2-02-009-5VJ; 25-22-66: Task 25-22-66-300-803-A01
D2-02-010-5VJ; (Placard Replacement)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 120


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
D2-01-137-5VJ; - Replacement of the Seat Assembly 1.A.W
D2-01-138-5VJ; CMM 25-22-66: block DISASSEMBLY and
D2-02-011-5VJ; ASSEMBLY
D2-02-012-5VJ;
D2-01-139-5VJ;
D2-01-113-5VJ;
D2-01-114-5VJ;
D2-01-115-5VJ;
D2-01-116-5VJ;
D2-01-142-5VJ;
D2-01-140-5VJ;
D2-01-136-5VJ
Removal of the bearings refer to CMM 57-
51-33, Subtask 57-51-33-010-001-A01,
Para 4.A.(21)
Note: Except remove the bush figure-item:
D5755600000XXX; CSE-2021- CMM 57-51-33; 09 NOV HAN CAAV
Mounting Supports Airbus 20-400 A320/A321
D5755600001XXX 058 PMS 01-05-26 2021 BMC FAA
B. Installation of the bearings refer to CMM
57-51-33, Subtask 57-51-33-41 0-003-A01 ,
Para 3.A.(1)(c) to Para 3.A.(1)(f)

A Removal of the bearings item 01B-030C,


item 02B-030C, refer to CMM 27-54-55,
D2755611500XXX; CMM 27-54-55; Subtask 27-54-55-000-001-A01, Para
CSE-2021- Lever Assy - Flap 09 NOV HAN CAAV
D2755612200XXX; Airbus PMS 01-05-26; 3.A.(3) A320/A321
059 Actuator 2021 BMC FAA
D2755612200XXX PMS 01-05-27 B. Installation of the bearings refer to CMM
27-54-55, Subtask 27-54-55-440-001-A01,
Para 3.A.(1) to Para 3.A.(5)
Replacement of the bearings item 25-330,
D57573050-XXX; CSE-2021- Inboard flap CMM 57-52-23; item 25A-330, item 25B-330, refer to TASK 09 NOV HAN CAAV
Airbus A320/A321
D57573900-XXX 060 Structure Compl PMS 01-05-26 CMM 57-52-23, 2021 BMC FAA
TASK 57-52-23-300-803-A01
Replacement of RUBSTRIP with PIN:
CSE-CI-TD- Galley G5 Zodiac ACMM 25-31- A320/CFM5 11 NOV
263515-11 247513-1-657, lAW ACMM 25-31-091; CIMC CAAV
2021-06 Completion Kit Aerospace 091 6 2021
FIGURE 1, ITEM 230.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 121


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of END RUBSTRIP with PIN:
247516-135, lAW ACMM 25-31-091;
FIGURE 2, ITEM 50.
Remove/ Install Cmm 71-11-19 Illustrated CAAV
642-1000-501; Inlet Cowl A320/A321- 19 NOV HAN
CSE-2021-62 Goodrich CMM 71-11-19 Parts List Figure 1, Item 682, 686, 676, 677, FAA
642-1000-505 Assembly CFM56 2021 BMC
680. I.A.W Srm 51-42-11 CAAT
Removal of the bearings refer to CMM 57-
51-33, Subtask 57-51-33-010-001-A01,
CAAV
Para 4.A.(21). 24 NOV HCM
D57556000002XXX CSE/2021/041 Mounting Supports Airbus CMM 57-51-33 A320/A321 FAA
Installation of the bearings refer to CMM 57- 2021 BMC
SSCA
51-33, Subtask 57-51-33-410-003-A01,
Para 3.A.(1)(c) to Para 3.A.(1 )(f)
- Removal of the bearings refer to CMM 27-
D2755611500XXX; 54-55, Subtask 27-54-55-000-001-A01,
D2755612200XXX; CMM 27-54-55; Para 3.A.(3) CAAV
Lever Assy - Flap 24 NOV HCM
D2755611600XXX; CSE/2021/042 Airbus PMS 01-05-26; Note: Bearing item: 01B-030C, 02B-030C A320/A321 FAA
Actuator 2021 BMC
D2755612300XXX; PMS 01-05-27 - Installation of the bearings refer to CMM 27- SSCA
D2755620800XXX 54-55, Subtask 27-54-55-440-001-A01,
Para 3.A.(1) to Para 3.A.(5)
- Replacement of the bearings refer to CMM
CAAV
D57573050-XXX; Inboard Flap 57-52-23, Subtask 57-52-23-300-303-A01 24 NOV HCM
CSE/2021/043 Airbus CMM 57-52-23 A320/A321 FAA
D57573900-XXX Structure Compl Note: Bearing item: 25-330, 25A-330, 25B- 2021 BMC
SSCA
330, 26-250A, 26A-350
- Repair 025: Thrust Reverser C-Duct Fixed
Structure - Replace The Heatshield Velcro
Strips (VRS2056/2061)
745-0002-513;
- Repair 026: Thrust Reverser C-Duct Fixed CAAV
745-0002-515; Thrust Reverser Goodrich 22 NOV HCM
CSE/2021/044 CMM 78-30-00 Structure - Replace Lojer Bifurcation A320/A321 FAA
745-0002-517; Assembly Aerostructures 2021 BMC
Heatshield (VRS2101/2102) SSCA
745-0002-519
- Repair 033: Thrust Reverser C-Duct Fixed
Structure - Replace The Large Forward
Heatshield (VRS2099/2100)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 122


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Repair 037: Thrust Reverser C-Duct Fixed
Structure - Replace Upper Bifurcation
Heatshield (VRS2111/2112)
Fan Thrust Repair No. 24 Replacement Of The Inner CAAV
642-3801; CSE-2021- Goodrich A320/A321- 25 NOV HAN
Reverser Door CMM 78-32-36 Flange Seal Equipped Reverser Half-Door FAA
642-3802 063 Aerostructures CFM56-5B 2021 BMC
Assembly Task 78-32-36-300-823 CAAT
- Removal of the Fixed Bushes and
Spherical Bearing of the Inboard Hinge
Assembly (Disassembly - Task
57-71-21-000-S01-A01 (Except paragraph
3.A.(11) to 3.A.(12))).
- Removal of the Fixed Bushes and
Spherical Bearing of the Outboard Hinge
Assembly (Disassembly -Task 57-71-21-
000-S02-A01 (Except paragraph 3.A.(11) to
3.A.(12))).
- Cleaning (Cleaning - Task 57-71-21-100-
801-A01)
- Examine the Component (Inspection
D5775001700438; CSE-2021- Structure Complete /Check - Task 57-71-21-210-S02-A01) 29 NOV HAN CAAV
Airbus S.A.S CMM 57-71-21 A320/A321
D5775001700538 064 - Spoiler 1 - Check the Tolerance (Fits and Clearances 2021 BMC FAA
- Task 57-71-21-S20-S05-A01Apply only for
Item 1E-1S0, 1E-190, 1E-200, 1E-210, 1E-
300, 1E-310, 1E-320 and 1E-330).
- Installation of the Fixed Bushes and
Spherical Bearing of the Outboard Hinge
Assembly (Assembly- Task 57-71-21-400-
805-A01 (Except paragraph 3.A.(9) to
3.A.(18) and Except paragraph 3.B and
3.C)).
- Installation of the Fixed Bushes and
Spherical Bearing of the Inboard Hinge
Assembly (Assembly –Task 57-71-21-400-
S06-A01 (Except paragraph 3.A.(9) to

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 123


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
3.A.(18) and Except paragraph 3.B and
3.C)).
D5758550000XXX;
D5758550001XXX;
D5758550010XXX;
D5758550011XXX;
D5758550100XXX;
Replace of the roller assembly at ribs 1 and CAAV
D5758550101XXX; Outboard Flap 30 NOV HAN
CSE-2021-65 Airbus CMM 57-53-23 19 ref Subtask 57-53-23-000-811-A01 and A320/A321 FAA
D5758550102XXX; Structure Compl 2021 BMC
ref subtask 57-53-23-400-805-A01 CAAT
D5758550110XXX;
D5758550111XXX;
D5758670000XXX;
D5758670001XXX;
D5758670005XXX
CAAV
ATR42/ATR
S2738115190210 Replacement of the hand grips IAW CMM 30 DEC HCM CAAP
CSE/2021/046 Control Column ATR CMM 27-31-11 72/PW124/
S2738115190310 27-31-11/ Repair 2, paragraph D 2021 BMC SSCA
PW127
CAAB
S57510005XXXXX; CAAV
ATR42/ATR
S57512005XXXXX; Paint application on the rubbing strips as per 30 DEC HCM CAAP
CSE/2021/047 Flap Assy-Inboard ATR CMM 57-52-11 72/PW124/
S57512331XXXXX; CMM 57-52-111 Repair 3 pI,aragraphC 2021 BMC SSCA
PW127
S57515221XXXXX CAAB
S57510080XXXXX; CAAV
ATR42/ATR
S57512080XXXXX; Paint application on the rubbing strips as per 30 DEC HCM CAAP
CSE/2021/048 Flap Assy-Outboard ATR CMM57-53-11 72/PW124/
S57512332XXXXX; CMM 57-53-11/ Repair 3 paragraph C 2021 BMC SSCA
PW127
S57515228XXXXX CAAB
Replacement of the rubber seals under slat
#1 lAW following procedures:
- Removal of the Outboard End Seals and A320/A321
CAAV
the Support Assembly lAW CMM 57-42-21, /V2500/PW 30 DEC HCM
D5746091000XXX CSE/2021/049 Slat 1 Airbus S.AS CMM 57-42-21 FAA
task 57-42-21-000-802-A01, subtask 57-42- 1100G/CF 2021 BMC
SSCA
21-010-003-B01 step B.(1), (2), (3) and (4) M56
- Installation of the Outboard End Seals and
the Support Assembly lAW CMM 57-42-21,

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 124


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
task 57-42-21-400-803-A01, subtask 57-42-
21-410-007-B01 step B.(2), (3), (4) and (5)
10-452901XXX; A320/A321
CMM 32-12-86; Paint finish repaired as per Subtask 32-12- V2500/PW1 30 DEC CAAV
10-452902XXX; Main Landing Gear HCM
CSE/2021/050 Safran FAA
10-453001XXX; Complete PCS-2500 86-380-001-A01/(2(/(a)/3/a 100G/CFM 2021 BMC
SSCA
10-453002XXX 56
TASK 57-73-21-000-802-A01: Removal of
D5774503000XXX;
the Edge-Seals A320/A321-
D5775000300XXX; CSE-2022- CMM 57-73-21 - TASK 57-73-21-400-802-A01: Installation CFM56/V25 06 JAN HAN CAAV
Spoiler Assy No.3 Airbus
D5775002000XXX 001 2022 BMC FAA
of the Edge-Seals 00
- TASK 57-73-21-100-801-A01: Cleaning
TASK 57-74-21-000-803-A01: Removal of
D5774503200XXXX; the Seals and the Rubbing-Strip A320/A321-
CSE-2022- CMM 57-74-21 - TASK 57-74-21-400-802-A01: Installation CFM56/V25 06 JAN HAN CAAV
D5775000400XXXX: Spoiler Assy No.4 Airbus
002 2022 BMC FAA
D5775002100XXXX of the Seals and the Rubbing-Strip 00
- TASK 57-74-21-100-801-A01: Cleaning
Thrust Reverser C-
740-0002; CSE-2022- Goodrich CMM 78-30-00 Repair 24 - C Duct Fixed Structure-Replace A320/A321- 14 JAN HCM CAAV
Duct Fixed
745-0002 001 Aerostructures The Pressure Seal - Task 78-30-00-300-024 V2500 2022 BMC FAA
Structure
CAAV
642-1000-501; Inlet Cowl Goodrich CMM 71-11-19 Cleaning: TASK 71−11−19−100−801 A320/321- 18 JAN HCM
CSE/2022/002 FAA
642-1000-505 Assembly Aerostructures CFM56 2022 BMC
SSCA
Removal Of The Seal Iaw CMM 71-62-62
S54115619XXX CSE/2022/003 Duct Assembly ATR CMM 71-62-62 Disassembly Step A. ATR72/PW 27 JAN HCM CAAV
- Installation Of The Seal Iaw CMM 71-62-62 127 2022 BMC SSCA
Assembly Step D.
DISASSEMBLY:
- Disassemble the Leg harness 2M RH:
Subtask 32-12-77-040-004-A01. A230/A321-
CSE-2022- RH MLG Leg CMM 32-12-77 ASSEMBLY: 28 JAN HAN CAAV
201400201 Sfran CFM56/V25
007 Harness 2m 2022 BMC FAA
- Assemble the Leg harness 2M RH: Subtask 00
32-12-77-440-004-A01 (exept REPAIR
items that the subtask refers to).

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 125


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Test the leg harnesses 1M LH, 2M LH, 1M
RH and 2M RH: Subtask 32-12-77-440-005-
A01 (paragraphs applicable to Leg Harness
2M RH only).
- Final assembly of the leg harness:Subtask
32-12-77-440-006-A01
TESTINGAND FAULT ISOLATION:
- Testing and Fault Isolation: Task 32-12-77-
700-801-A01 (paragraphs applicable to Leg
Harness 2M RH only).
Disassembly:
- Removal of the door assembly:
Disassembly step 3.A
- Removal of the door seal: Disassembly
Step 4.B
CSE-CI-TD- CMM 25-36-84 Assembly: A321/V250 11 FEB
8202-10-0000-00 Sell CIMC CAAV
2022-01 OVEN - Installation of the door seal: Assembly Step 0 2022
2.D
- Installation of the door assembly:Assembly
step 3.E
Repair:
- Repaint of oven door: Repair step 2.B
Inspection and Replacement of the curtain
systems lAW the following tasks:
- Inspection of the curtain systems lAW CMM
25-23-16: block Examination, test, checks
and fault isolation
Diehl Aircabin CMM 25-23-16 reference task: A350/ Trent 15 FEB
CSE-CAB-2022-01 VW90-XXX Curtain systems CIMC CAAV
GmbH A350-A-25-23-16-01001-300A-C (2016-06- XWB 2022
29) : Examination, tests and checks
A350-A-25-23-16-01001-31OA-C(2016-06-
29) : Visual examination
A350-A-25-23-16-01001-320A-C (2016-06-
29) : Operation test

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 126


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350-A-25-23-16-01001-322A-C (2016-06-
29): Test and inspection
A350-A-25-23-16-01001-420A-C (2016-06-
29) : General fault isolation procedure
- Replacement of the curtain systems lAW
CMM 25-23-16: block DISASSEMBLY and
ASSEMBLY reference
task:
A350-A-25-23-16-01001-530A-C (2016-06-
29): Disassemble procedure - Comfort
curtain header
A350-A-25-23-16-02001-530A-C (2016-06-
29) : Disassemble procedure - Curtain textile
A350-A-25-23-16-03001-530A-C (2016-06-
29) : Disassemble procedure - Curtain rail
A350-A-25-23-16-01001-710A-C (2016-06-
29): Assemble procedure - Comfort curtain
header
A350-A-25-23-16-02001-710A-C (2016-06-
29): Assemble procedure - Curtain textile
A350-A-25-23-16-03001-710A-C (2016-06-
29) : Assemble procedure - Curtain rail
- Disassemble cable assy: Step
A320/A321-
CSE-2022- Flush Cover And CMM 28-25-41 3C/Disassembly section CMM 28-25-41 28 FEB HAN CAAV
0727540 Eaton CFM56/V25
010 Cable Assembly - Assemble cable assy : Step 3B/Assembly 2022 BMC FAA
00
section CMM 28-25-41
- Remove the ACAC duct seal assemblies
CAAV
Thrust Reverser Goodrich CMM 78-30-00 I.A.W CMIVI subtask 78-30-00-020-136 A320/A321- 03 MAR HCM
745-0002-XXX CSE/2022/006 FAA
Assembly Aerostructures - Install the ACAC duct seal assemblies V2500 2022 BMC
SSCA
I.A.WCMM subtask 78-30-00-420-126
A. RADOME P/N: V53132010000
V53132010000; CMM 53-10-11 1. DMC: RADOME-A-53-10-11-02001- A350/TREN 18 MAR HAN
CSE-2022-11 Radome Airbus CMM 53-10-12 CAAV
V53132110000 664B-C: Special repair procedure (Sandwich TXWB-84 2022 BMC
Zone- Resin Injection)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 127


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
2. DMC: RADOME-A-53-1 0-11-09001-
664B-C: Special repair procedure
(Application of Paint)
3. DMC: RADOME-A-53-10-11-10001-
664B-C: Special repair procedure (Paint
Touch-up)
4. DMCꞏ RADOME-A-53-1 0-11-11 001-
664B-C: Special repair procedure
(Application of sealing varnish inside
Radome )
5. DMC: RADOME-A-53-10-11-12001 -
664B-C: Special repair procedure
(Application of Airline Finish-Paint)
6. DMC RADOME-A-53-10-11-02001-366B-
C: Resistance Check (with Megohmmeter)
7. DMC: RADOME-A-53-10-11 -02001-
365B-C: Continuity Check (with
Megohmmeter)
B. RADOME PIN : V53132110000
1 DMC RADOME-A-53-1 0-12-02001-664A-
C: Special repair procedure (Sandwich zone
- Resin Injection)
2. DMC: RADOME-A-53-10-12-11001-
664A-C: Special repair procedure (Paint
Touch-up)
3. DMC: RADOME-A-53-1 0-12-12001-
664A-C: Special repair procedure
(Application of sealing varnish inside
Radome)
4. DMC RADOME-A-53-1 0-12-1 300 1-
664A-C: Special repair procedure
(Application of paint)
5. DMC RADOM E-A-53-1 0-12-14001-
664A-C : Special repair procedure
(Application of Airline Finish-Paint)

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 128


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
6. DMC: RADOME-A-53-1 0-12-01 001-
3668-C: Resistance Check (with
Megohmmeter)
7. DMC. RADOME-A-53 -10-12-01001-
3658-C: Continuity Check (with
Megohmmeter)
A320-
642-3801; Thrust Reverser Goodrich CMM 78-32-36 Replacement of the lower strut seal (repair A321/CFM5 28 MAR HCM
CSE/2022/009 CAAV
642-3802 Door Assy Aerostructures No.28) lAW Task 78-32-36-300-827 2022 BMC
6
Replacement of the engine bumper
Thrust Reverser Goodrich CMM 78-30-00 pandown (Repair 162) lAW Task 78-30-00- A320-A321/ 28 MAR HCM
745-0002 CSE/2022/010 CAAV
Assembly Aerostructures V2500 2022 BMC
300-162
CSE-CI-TD- SPM 20-00-01 Replace the Seal PIN: ABS0306B04-17 lAW A350/TREN 05 APR
VR1124230046000 Panel Diehl CIMC CAAV
2022-05 TASK 20-00-01-300-836-A00 TXWB-84 2022
Removal and installation of CMM 71-11-19 A320-
642-1000-501; Inlet Cowl Goodrich CMM 71-11-19 IPL Figure 1Item 682, 686, 676, 677, 680 A321/CFM5 08 APR HCM
CSE/2022/011 CAAV
642-1000-505 Assembly Aerostructures 2022 BMC
l.A.W SRM 51-42-11 6
V2500 C-Duct Examine for excessive dents of the cooling A320-
3282982-X; CMM 78-36-51 shroud assembly (Figure 5001 item 70) A321/V250 09 APR HCM
CSE/2022/012 Linear Hydraulic Honeywell CAAV
7408007-X 2022 BMC
Actuator I.A.W Subtask 78-36-51-210-006-A01 0
Right C duct fixed structure- Replace the CAAV
Thrust Reverser Goodrich CMM 78-30-00 pandown heatshield (Repair 072) lAW Task A320-A321/ 10 APR HCM
745-0002 CSE/2022/013 FAA
Assembly Aerostructures V2500 2022 BMC
78-30-00-300-072 SSCA
- DMC: 26330930341-A-25-31-684X-01001-
CSE-CAB- Completion Kit Safran Cabin ACMM 25-31- 520A-C for block 4.4.1 - kick Strip removal A321/CFM5 15 APR CAAV
263309-30341 684 CIMC
2022-03 Galley CZ s.r.o - DMC: 6330930341-A-25-31-684X-01001- 6 2022 FAA
720A-C for block 4.4.1 - kick Strip installation
Replacement of the Captive Nut Bands (1- A320-A321/
Primary Heat CMM 21-54-12 50) and (1-70) I.A.WTask 21-54-12-350-801- CFM56- 21 APR HCM CAAV
7530XXX CSE/2022/014 Liebherr
Exchanger 2022 BMC FAA
A01 V2500
Fan Thrust Repair #31: Replacementof The Fwd Lwr
642-3801 CSE-2022- Goodrichaero CMM 78-32-36 Box Seal Equipped Reverser Half-Door A320-A321/ 22 APR HCM CAAV
Reverser door
642-3802 016 structures CFM56-5B 2022 BMC FAA
Assembly Task 78-32-36-300-830

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 129


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Refinish surface per CMM 32-21-18 repair 9-
1 step 4 (except C.7 and C.8)
CMM 32-21-18 - Clean per SOPM 20-30-03 ( Step 4, Step
522Z2001-501; SOPM 20-30-03;
Inner Cylinder Assy 5) B787-9- 26 APR HCM
522Z2001-502 CSE/2022/015 Boeing SOPM 20-30-02; CAAV
(NLG) - Removewotective finish as necessary per GenX 2022 BMC
SOPM 20-50-10; SOPM20-30-02 (Step 4E except 4E.2)
- Put identification number per SOPM 20-50-
10 (Step 3A.6)
- Remove Obturator and Rubber Grommet
I.A.W Task 32-48-28-000-801A01 Step
A320/A321-
RU1502U00; CSE-2022- Technofan CMM 32-48-28 1.E(1)(e).1 and 2. 26 APR HAN CAAV
Universal Wheel Kit CFM56/V25
RU1502U01 016 Snecma Group - Install Obturator and Rubber Grommet 2022 BMC FAA
00
I.A.W Task 32-48-28-400-801-A01 Step
1.E(1)(c).7 and 8.
Replace kick Strip & Door lAW ACMM 25-22-
12 reference:
- DMC: A350-A-25-22-12-01 001-530A-C for
CSE-CAB- Diehl Aircabin CMM 25-22-12 A350/TREN 29 APR
VW60D XXX Doghouse block 1.2 Disassembly of the typical lower CIMC CAAV
2022-04 GmbH XWB-84 2022
frame
- DMC: A350-A-25-22-12-01001-710A-C for
block 1.2 - Assembly of the lower frame
- CMM 21-52-11: Cleaning - Task 21-52-11-
100-801-A01,
- CMM 21-54-12: Cleaning - Task 21-54-12-
753A0000-0X; CMM 21-52-11; 100-801-A01,
753B0000-0X; Heat Exchanger- CMM 21-54-12, 29 APR HCM CAAV
CSE/2022/007 Liebherr - CMM 20-00-02 Liebherr: Cleaning A320/A321
753C0000-0X; Primary CMM 20-00-02 2022 BMC SSCA
Procedure For Exchanger (External
753D0000-0X
Cleaning – Subtask 20-00-02-100-003-A01;
Internal Cleaning - Manual Flushing -
Subtask 20-00-02-100-008-A01).
754A0000-03; CMM 21-52-12; - CMM 21-52-12: Cleaning - Task 21-52-12-
754B0000-02; Heat Exchanger- CMM 21-54-14; 100-801-A01, 29 APR HCM CAAV
CSE/2022/008 Liebherr A320/A321
754C0000-01, Main CMM 20-00-02 - CMM 21-54-14: Cleaning - Task 21-54-14- 2022 BMC SSCA
754D0000-01 100-801-A01,

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 130


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- CMM 20-00-02 Liebherr: Cleaning
Procedure For Exchanger (External
Cleaning – Sub Task 20-00-02-100-003-
A01; Internal Cleaning - Manual Flushing -
Subtask 20-00-02-100-008-A01)
Clean the Thrust Reverser lAW CMM Task
CAAV
Thrust Reverser Goodrich CMM 78-30-00 78-30-00-100-001 18 MAY HCM
745-0002-XXX CSE/2022/017 A320-A32 FAA
Assembly Aerostructures - Check Upper Track Beam On The C-DUCT 2022 BMC
SSCA
lAW CMM Task 78-30-00-200-035
Disassembly: 1.A.W CMM 25-22-54, All
tasks in the block Disassembly.
Cleaning: l.A.W CMM 25-22-54, All tasks in
the block Cleaning except: 12. Wool and
CSE-Cl-TD- CMM 25-22-54 Synthetic Fabric 24-May-
1012796-XXX Passenger Seats Aerospace A320-A321 CIMC CAAV
2022-14 Cleaning. 2022
Inspection/Check: 1.A.W CMM 25-22-54, All
tasks in the block Inspection/Check.
Assembly: l.A.W CMM 25-22-54, All tasks in
the Block Assembly
Disassembly: 1.A.W CMM 25-22-54, All
tasks in the block Disassembly.
Cleaning: l.A.W CMM 25-22-54, All tasks in
the block Cleaning except: 12. Wool and
CSE-Cl-TD- CMM 25-22-54 Synthetic Fabric 24-May-
1012796-XXX Passenger Seats Aerospace A320-A321 CIMC CAAV
2022-14 Cleaning. 2022
Inspection/Check: 1.A.W CMM 25-22-54, All
tasks in the block Inspection/Check.
Assembly: l.A.W CMM 25-22-54, All tasks in
the Block Assembly
Disassembly: I.A.W CMM 25-31-65, All
Tasks In The Block Disassembly.
Albert
106266; CSE-Cl-TD- CMM 25-31-65 Cleaning: I.A.W CMM 25-31-65, All Tasks In 24-May-
Galley G1 Muhlenberg A320-A321 CIMC CAAV
106266A 2022-15 The Block Cleaning. 2022
Apparatebu
Check: I.A.W CMM 25-31-65, All Tasks In
The Block Check.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 131


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Assembly: I.A.W CMM 25-31-65, All Tasks
In The Block Assembly.
DISASSEMBLY: I.A.W CMM 25-31-66, All
Tasks In The Block Disassembly.
Cleaning: I.A.W CMM 25-31-66, All Tasks In
Albert
106267; CSE-Cl-TD- CMM 25-31-66 The Block CLEANING. 24-May-
Galley G5 Muhlenberg A320-A321 CIMC CAAV
106267 A 2022-16 Check: I.AW CMM 25-31-66, All Tasks In 2022
Apparatebu
The Block CHECK.
Assembly: 1.A.W CMM 25-31-66, All Tasks
In The Block Assembly.
DISASSEMBLY: 1.A.W CMM 25-31-65, All
tasks in the block DISASSEMBLY.
CLEANING: l.A.W CMM 25-31-65, All tasks
Albert
106268; CSE-Cl-TD- CMM 25-31-67 in the block CLEANING. 25-May-
Galley G2 Muhlenberg A321 CIMC CAAV
106268A 2022-17 CHECK: l.A.W CMM 25-31-65, All tasks in 2022
App.Aratebu
the block CHECK.
ASSEMBLY: I .A.W CMM 25-31-65, All tasks
in the block ASSEMBLY
DISASSEMBLY: l.A.W CMM 25-49-77, All
tasks in the block DISASSEMBLY, except:
- SUBTASK 25-49-77-040-046: AT.
Disassembly Procedures for Water Supply
System lnstl.
- SUBTASK 25-49-77-040-049: AW.
Disassembly Procedures for Electrical
CSE-Cl-TD- Jamco CMM 25-49-77 System lnstl. 25 MAY
B80014A1011 Lavatory Assy B787 CIMC CAAV
2022-18 Corporation - SUBTASK 25-49-77-040-027: AA. 2022
Disassembly Procedures for Sink Cabinet
lnstl.
- SUBTASK 25-49-77-040-047: AU.
Disassembly Procedures for Drain System
lnstl.
ASSEMBLY: l.A.W CMM 25-49-77, All tasks
in the block ASSEMBLY, except:

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 132


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- SUBTASK 25-49-77-440-046: AT.
Assembly Procedures for Water Supply
System lnstl.
- SUBTASK 25-49-77-440-049: AW.
Assembly Procedures for Electrical System
lnstl.
- SUBTASK 25-49-77-440-027: AA.
Assembly Procedures for Sink Cabinet lnstl.
- SUBTASK 25-49-77-440-047: AU.
Assembly Procedures for Drain System lnstl.
- Disassemble procedure - Door assylitem
180 I.A.W task A350-A-25-22-11-0S001-
CSE-CAB- Diehl Aircabin CMM 25-22-11 530A-C Step 1.1.8 01 JUN
VW00XXX Stowage A350 CIMC CAAV
2022-08 Gmbh - Assemble procedur - Door assylitem 180 2022
I.A.W task A350-A-25-22-11-0S001-710A-C
Step 1.1.4
CSE-CAB- Zodiac Galleys CMM 25-36-28 Replace the latch of door assembly 03 JUN
601367-1 Galley G2A A320/A321 CIMC CAAV
2022-09 Europe reference IPL FIG 11/ltem 10 2022
MCMM 25-35- Replace placard PN 268500-3-33 and
CSE-CAB- Zodiac Galleys 516 268516-3-27 I.A.W Reprair procedure- 04 JUN
601852-009701 Galley G1 A320/A321 CIMC CAAV
2022-10 Europe CMM 25-30-074 placard replacement in CMM 25- 2022
30-074
MCMM 25-35- Replace placard PN 268500-3-33 and
CSE-CAB- Zodiac Galleys 516 268516-3-27 I.A.W Reprair procedure- 04 JUN
601852-009701 Galley G1 A320/A321 CIMC CAAV
2022-10 Europe CMM 25-30-074 placard replacement in CMM 25- 2022
30-074
Replace Rubstrip reference completion Kit -
CSE-CAB- Completion Kit Zodiac Galleys CMM 25-32-859 04 JUN
263413-40191 Figure 2 - Rubstrip Installation/item A320/A321 CIMC CAAV
2022-11 Galley Europe 2022
100/110/120/130
Disassemble the Lavatory lAW Task 25-46-
01-000-801-A01
CSE-CI-TD- CMM 25-46-01; - Clean the Lavatory lAW Task 25-00-01- 08 JUN
D2549010206600 Lavatory A Diehl SPM 25-00-01 A321 CIMC CAAV
2022-24 99F-806-A00 2022
- Inspection/Check lAW Task 25-00-01-99F-
807-A00

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 133


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Repair the door jamb lAW Task 25-00-01-
99F-841-A00
- Assemble the Lavatory lAW Task 25-46-01-
400-801-A01
- Replacement of the inner flange seal
equipped reverser half door (Repair No.24)
642-3801 Thrust Reverser Goodrich CMM 78-32-36 LA.W Task 78-32-36-300-823 16 JUN HCM CAAV
CSE/2022/024 A320/A321
642-3802 Door Assy Aerostructures - Replacement of the forward lower seal 2022 BMC FAA
equipped reverser half door (Repair No.30)
I.A.W Task 78-32-36-300-829
- Check the Restraint lAW TASK 25-75-13-
Wall - Mounted
CSE-CI-TD- CMM 25-75-13 210-802-A01 17 JUN CAAV
2131 -XXX Double Cabin Goodrich Corp A320 CIMC
2022-47 - Check the seat assembly I.A.W TASK 25- 2022 FAA
Attendant Seat
75-1ꞏ3-210-803-A01
- Check the Restraint I.AW TASK 25-75-12-
210-802-A01
- Check the seat assembly I.AW TASK 25-
Floor Mounted
CSE-Cl-TD- CMM 25-75-12 75-12-210-803-A01 17 JUN CAAV
2130 -XXX Pivoting Cabin Goodrich Corp A320 CIMC
2022-46 - Remove the spring anchorꞏ I.AW Task 25- 2022 FAA
Attendant Seat
75-12-010-803-A01 Step R
- Install the spring anchor I.AW Task 25-75-
12-410-814-A01 Step Q
- Check the Restraint lAW TASK 25-75-11-
Wall - Mounted Utcaerospace
CSE-CI-TD- CMM 25-75-11 210-802-A01 17 JUN CAAV
2128 -XXX Cabin Attendant Systems A320 CIMC
2022-45 - Check the seat assembly lAW TASK 25-75- 2022 FAA
Seat Company
11-210-803-A01
- Check the restraint lAW TASK 25-75-10-21
Floor Mounted
CSE-CI-TD- CMM 25-75-10 0-802-A01 17 JUN CAAV
2127-XXX Cabin Attendant Goodrich Corp A320 CIMC
2022-44 - Check the seat assembly I.A.W TASK 25- 2022 FAA
Seat
75-1 0-210-803-A01
TAAI1-03PE XXX CSE-CI-TD- Captain Seats And CMM 25-11-31 CLEANING: Step 3. B "Seat cover with 17 JUN
Stelia A321 CIMC CAAV
TAAI1-03CE XXX 2022-28 First Officer Seats sheep-skin" 2022
Powered Captain
TAAI2-33PE XXX CSE-CI- TD- CMM 25-11-37 CLEANING: step 3. B "Seat cover with 17 JUN
Seats And Powered Stelia A321 CIMC CAAV
TAAI2-33CE XXX 2022-29 sheep-skin" 2022
First Officer Seats

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 134


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CSE-CI-TD- CMM 25-11-25 CLEANING: Step3. A "Seat cover with 17 JUN
2510154-XXX Air Crew Seats Stelia A321 CIMC CAAV
2022-33 sheep-skin" 2022
TAAI8-04CE XXX CSE-CI-TD- Pilot And Copilot CMM 25-11-51 Clean the seat cover lAW SERVICING Task 17 JUN
Stelia A350 CIMC CAAV
TAAI8-04PE XXX 2022-34 Seat F4643COCKPIT-A-25-11-51-02001-254A-C 2022
CSE-CI-TD- CMM 25-11-52 Clean the seat cover lAW SERVICING Task 17 JUN
TAAI8-03IM XXX Observer Seat Stelia A350 CIMC CAAV
2022-35 F4643COCKPIT-A-25-11-52-02001-254A-C 2022
Clean the upholstery with vacuum cleaner
3A380-0007 -01-7 CSE-CI-TD- Pilot And Co-Pilot CMM 25-11-69 lAW SUBTASK 25-11-69-100-001-A01 step 17 JUN
Ipeco B787 CIMC CAAV
3A380-0008-0 1-7 2022-37 Crew Seats 2022
A.2
First Observer Clean the upholstery with vacuum cleaner
CSE-CI-TD- CMM 25-11-70 lAW SUBTASK 25-11-70-100-001-A01step 17 JUN
3A383-0007-01-5 Crew Seat Ipeco B787 CIMC CAAV
2022-38 2022
Publication A.2
Clean the upholstery with vacuum cleaner
CSE-CI-TD- 2nd Observer Crew CMM 25-11-71 lAW SUBTASK 25-11-71-100-001-A01 step 17 JUN
3A384-0007-01-2 Ipeco B787 CIMC CAAV
2022-39 Seat Publication 2022
A.2
3A063-0079-03-4 CSE-CI-TD- Crew Seat CMM 25-11-21 Clean the seat cover with a vacuum cleaner 17 JUN
Ipeco ATR72 CIMC CAAV
3A063-0080-03-4 2022-40 Assembly I.W.A CLEANING step A.1.b 2022
CSE-CI-TD- Pacific Scientific CMM 25-11-58 CHECK: lAW CMM 25-11-58, All tasks in the 17 JUN
2000013-XXX Restraint System A320 CIMC CAAV
2022-43 Company block CHECK 2022
- Check the restraint lAW TASK 25-75-10-21
Floor Mounted
CSE-CI-TD- 0-802-A01 17 JUN CAAV
2127-XXX Cabin Attendant Goodrich Corp CMM 25-75-10 A320 CIMC
2022-44 - Check the seat assembly I.A.W TASK 25- 2022 FAA
Seat
75-1 0-210-803-A01
- Check the Restraint lAW TASK 25-75-11-
Wall - Mounted Utcaerospace
CSE-CI-TD- CMM 25-75-11 210-802-A01 17 JUN CAAV
2128 -XXX Cabin Attendant Systems A320 CIMC
2022-45 - Check the seat assembly lAW TASK 25-75- 2022 FAA
Seat Company
11-210-803-A01
- Check the Restraint I.AW TASK 25-75-12-
210-802-A01
Floor Mounted
CSE-Cl-TD- - Check the seat assembly I.AW TASK 25- 17 JUN CAAV
2130 -XXX Pivoting Cabin Goodrich Corp CMM 25-75-12 A320 CIMC
2022-46 75-12-210-803-A01 2022 FAA
Attendant Seat
- Remove the spring anchorꞏ I.AW Task 25-
75-12-010-803-A01 Step R

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 135


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Install the spring anchor I.AW Task 25-75-
12-410-814-A01 Step Q
- Check the Restraint lAW TASK 25-75-13-
Wall - Mounted
CSE-CI-TD- CMM 25-75-13 210-802-A01 17 JUN CAAV
2131 -XXX Double Cabin Goodrich Corp A320 CIMC
2022-47 - Check the seat assembly I.A.W TASK 25- 2022 FAA
Attendant Seat
75-1ꞏ3-210-803-A01
- Remove the Kickstrip (item 105) and Tape
Albert (item 110) Ref. IPL, Fig.1 lAW Section
CSE-CI-TD- 17 JUN
105187A Stowage Mohlenbergapp CMM 25-29-79 Disassembly A321 CIMC CAAV
2022-48 2022
aratebau - Install the Kickstrip (item 105) and Tape
(item 110) lAW Section Assembly Step 6. (g)
Remove the Stay, Flap (item 125) Ref. IPL,
Fig. 3 lAW Section Disassembly
- Remove the Bumper (item 65) Ref. IPL, Fig.
Albert
CSE-CI-TD- 2 lAW Section- Disassembly 17 JUN
105188B Stowage Mohlenbergapp CMM 25-29-80 A321 CIMC CAAV
2022-49 - Install the Stay, Flap (item 125) lAW 2022
aratebau
Section Assembly Step 2.(j)
- Install the Bumper (item 65) lAW Section
Assembly Step 3. (d)
Inspection, replace all defective part I.A.W:
- Testing of the seat assembly ref task 25-
CSE-CAB- Aircraft Passenger CMM 25-21-63 22 JUN CAAV
Geven 21-63-700-801-A01 and Fault Isolation ref A320/A321 CIMC
2022-12 Seat 2022 FAA
Task 25-21-63-750-801-A01
- Inspection/check ref Task 25-21-63-200-
801-A01
- Disassemby of seat assy ref Task 25-21-
C7-07/08 XXX 63-030-801-A01
- Assembly of seat assy ref Task 25-21-63-
440-801-A01

Seat Assy Removall.A.W Removal section


26 AUG
CSE-CI-TD- Seat Assembly Installation I.A.W Installation
2022
2022-51 section

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 136


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal of the gas cylinder I.A.W
disassembly of the lower part reference task CAAV
CSE-CAB- 25-11-46-000-831-A01
2022-13 - Install the gas cylinder I.A.W assembly of
the lower part reference task 25-11-46-400-
TAAI3-03PE XXX Captain and First Stelia 803-A01. 23 JUN
CMM 25-11-46 A320/A321 CIMC
TAAI3-03CE XXX CSE-CI-TD- Officer Seat Aerospace CLEANING: step 3.B: Seat cover with 2022
2022-30 sheep-skin
- Disassembly of the backrest ref TASK 25-
CSE-CAB- 11-46-000-819-A01
2022-16 - Assembly of the backrest ref TASK 25-11- CAAV
46-400-814-A01 FAAA
Replace cover at doghouse ref:
CSE-CAB- Diehl Aviation CMM 25-21-49 - Disassembly of the doghouse/step 8-item 23 JUN
113415K XXX Doghouse A320/A321 CIMC CAAV
2022-14 Hamburg Gmbh 55 2022
- Assembly of the doghouse/step 6-item 55
-Replace latch of galley ref IPL Fig 9/item
450-460
CSE-CAB- CMM 25-39-11 -Replace spring of waste flapper door ref IPL 23 JUN
320PAL05GB00 Aim Aviation Aim Aviation A320/A321 CIMC CAAV
2022-15 Fig 10/item 430 2022
-Replace slide extractor ref IPL Fig 9/ item
670
- Removal ofthe headrest equipped ref
CSE-CAB- CMM 25-12-01 subtask 25-12-01-040-004-A01 23 JUN CAAV
WA-XXX Seat Assembly Safran seats A320/A321 CIMC
2022-17 - installation of the headrest equipped ref 2022 FAA
subtask 25-12-01-440-004-A01
238-0451-XXX Replacement of damaged pylon seal
Nozzle And Goodrich CMM 78-11-05 27 JUN HCM CAAV
642-4001-501 CSE/2022/026 assembly (Repair No.2) lAW Task 78-11-05- A320/A321
Centerbody Aerostructures 2022 BMC FAA
642-4612-501 300-803
Replacement of the RCC Master pushbutton
Panasonic CAAV
Remote Control CMM 44-27-25 switch I.A.W Subtask 44-27-25-000-001- 04 JUL HCM
RD-AA902723-XX CSE/2022/027 Avionics A320/A321 FAA
Center A01 step (3).10 and 11, Subtask 44-27-25- 2022 BMC
Corporation SSCA
400-003-A01 step (6).(a).7 and 8

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 137


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly: I.A.W CMM 25-20-02, All
tasks in the block DISASSEMBLY
- Cleaning: lAW CMM 25-20-02, All tasks in
the block Cleaning
866Z301-0101X CSE-CI-TD- CMM 25-20-02 - Repair: lAW CMM 25-20-02, All tasks in the 06 JUL
Literatue Pocket Vaupell B787 CIMC CAAV
2022-42 block Repair 2022
- Check: lAW CMM 25-20-02, All tasks in the
block Check
- Assembly: lAW CMM 25-20-02, All tasks in
the block Assembly
- Disassemble The Flap From Rear Wall
I.A.W SubtasK 25-41-20-000-011-A00 Step
CSE-CAB- Diehl Aviation CMM 25-41-20 22 JUL
D2549300100200 Lavatory A 6 A320/A321 CIMC CAAV
2022-18 Hamburg GmbH 2022
- Assemble The Flap Into Rear Wall I.A.W
Subtask 25-41-20-400-015-A00 Step 27
CSE-CAB- Completion Kit Zodiac Galleys ACMM 25-32- Replace the latch of door assy (item 80 - 29 JUL
26320691 273 A320/A321 CIMC CAAV
2022-19 Galley Europe s.r.o Fig 1) 2022
CAAV
- Removal of the bobbins I.A.W Disassembly
SSCA
D22699500XXX CSE/2022/030 Leg Structure Safran CMM 32-28-16 block - Step 2. C. (5). (c) ATR42/72
05 AUG HCM
CAAB
- Installation of the bobbins I.A.W Assembly 2022 BMC
DMCA
block - Step 2. A. (6). (c)
CAAP
- Remove the protective plugs item 070 and
080 of Figue (36 or 36A or 36B) I.A.W
(Subtask 52-32-15-000-005-A01or Subtask
52-32-15-000-021-A01or Subtask 52-32-15-
CSE-2022- Aft Cargo Comp CMM 52-32-15 000-037-A01) step A.(2) 09 AUG HCM CAAV
D52371980XXXX Airbus A320-A321
031 Door - Install the protective plugs item 070 and 2022 BMC FAA
080 of Figue (36 or 36A or 36B) I.A.W
(Subtask 52-32-15-400-004-A01 or Subtask
52-32-15-400-027-A01 or Subtask 52-32-
15-400-048-A01) step A.(2).
D22698500XXX, CMM 32-28-15 Apply the full paint scheme to Nose Landing 19 AUG HCM
CAAV
CSE/2022/032 Leg assembly Safran PCS-2S00 Leg I.A.W CMM 32-28-16, Repair section, ATR42/72 SSCA
D22699500XXX 2022 BMC
Step 3.B CAAB

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 138


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DMCA
CAAP
- Check the attendant seat LA.W TASK 25-
12-01-200-801- A01
CSE-CI-TD- Cabin Attendant Safran Seats CMM 25-12-01 - Removal of the upholstery LA.W Subtask 26 AUG CAAV
WA-XXX A320/A321 CIMC
2022-53 Seats France 25-12-01-040-001-A01 2022 FAA
- Installation of the upholstery assembly
LA.W Subtask 25-12-01-440-001-A01
D575510530XXXXX - Disassembly of the Side-load Stay
Except: Assembly-Flap Track 2I.A.W Task 57-55-
D5755105301600A; Flap Track Fairing CMM 57-55-12 12-000-810-A01 26 AUG HCM CAAV
CSE/2022/033 Airbus A320/A321
D5755105301700A; No.2 - Assembly of the Side-load Stay Assembly- 2022 BMC FAA
D5755105302000; Flap Track 2 lAW Task 57-55-12-400-801-
D5755105302100 A01
- Removal of the Diffuser Assy from the
Elbow Assy I.A.W Subtask 49-16-45-000-
008-A01
- Installation of the Diffuser Assy on the
D4918501415600;
CMM 49-16-45 Elbow Assy LA.W Subtask 49-16-45-400- 26 AUG HCM CAAV
D4918529700000; CSE/2022/034 Air Intake Duct Airbus A320/A321
011-A01 2022 BMC FAA
D4918529700400
- Disassembly of the seal LA.W Task 49-16-
45-000-805-B01
- Assembly of the sealLA.W Task 49-16-45-
400-804-B01
- Disassembly: All task in block Disassembly
- Cleaning: All Task In Block Cleaning
CSE-CI-TD- CMM 25-32-20 - Inspection/Check: All Task In Block 06 SEP
GN100X20X Galley Type K10 Simair ATR 72 CIMC CAAV
2022-54 Inspection/Check 2022
- Repair: All Task In Block Repair
- Assembly: All Task In Block Assembly
CSE-CI-TD- - Disassembly:All tasks in block Disassembly
Galley Type A0210 06 SEP 653049X
653049XXX 2022-55 Simair CMM 25-33-90 ATR 72 CIMC
NL BP - Cleaning: All tasks in block Cleaning 2022 XX

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 139


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Inspection/Check: All tasks in block
Inspection/ Check
- Repair: All tasks in block repair
- Assembly: All tasks in block Assembly
CSE-CAB- Completion Kit Zodiac Galleys ACMM 25-31- Replace filler of divider Pivoting Assy I.A.W 08 SEP
26341210021 646 A320/A321 CIMC CAAV
2022-20 Galley Europe S.R.O IPL item 50 FIG 1 2022
- Remove and install inner cylinder bushing
CMM 32-13-06 Rev 17 Repair 15-1 (B787-9)
CMM 32-13-06; step 2 (except step 2.C(5), 2.C(8), 2.C(9))
Replacebushing Of SOPM 20-30-03; - Clean per SOPM20-30-03 ( Step 4, Step 5) 09 SEP HCM
510Z1111-50X CSE/2022/018 Inner Cylinder Boeing SOPM 20-44-02; - Preservation procedure per SOPM 20-44- B787 CAAV
2022 BMC
Assembly (MLG) SOPM2 0-50-03 02
- Shrink - fit method per SOPM20-50-03 step
7B, 6B.
- Disassembly: All tasks in block
87836321; DISASSEMBLY
87836324; CSE-CI-TD- CMM 25-29-76 - Cleaning: All tasks in block CLEANING 12 SEP
Passenger Seat B/E Aerospace A321 CIMC CAAV
87836351; 2022-52 - Inspection/ Check: All tasks in block 2022
87836354 INSPECTION/ CHECK
- Assembly: All tasks in block ASSEMBLY
Replacement of outer panel of left and right
upper blocker door (Repair No.55) lAW
642-3801; Thrust Reverser Goodrich CMM 78-32-36 Task 78-32-36-300-854. 14 SEP HCM CAAV
CSE/2022/037 A320/A321
642-3802 Door Assy Aerostructures Applicable PINs are 321-310-011-0 and up 2022 BMC FAA
for LH upper blocker door, 321-310-061-0
and up for RH upper blocker door.
- Removal of the Chart Holder 35LE (46LE)
CAAV
I.A.WCMM27-31-11, Disassembly section,
SSCA
CMM 27-31-11 Step 4. 14 SEP HCM
S2738115XXX CSE/2022/038 Control Column FB429 ATR42172 CAAB
- Removal of the Hand Wheel from the 2022 BMC
DMCA
ColumnI.A.WCMM27-31-11,Disassembly
CAAP
section, Step 5, 5A

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 140


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Disassembly of the Control Hand
Wheell.A.W CMM27-31-11, Disassembly
section, Step Disassembly of the Control
Hand Wheel 1,2,3.
Assembly of the Control Hand Wheel l.A.W
CMM27-31-11, Assembly section, Step
1,2,3,3A,4,4A,5,6,6A,7.
- Removal of the Left/Right Seals refer to
D53132210000; CSE-2022- CMM 53-15-12 CMM task 53-15-12-000-803-A01 29 SEP HAN CAAV
Nose Raoome Airbus A320/A321
D53132110000 024 - Installation of the Left/Right Seals refer to 2022 BMC FAA
CMM task 53-15-12-400-806-A01
- Remove the bonding straps refer to CMM
TASK 71-11-00-000-001 - Step 2,E,4.
(Config 1,Config 2)
- Remove the bonding straps refer to CMM
TASK 71-11-00-000-001 - Step 3,E,2.
(Config 3)
- Remove the bonding straps refer to CMM
740-3000; TASK 71-11-00-000-001 - Step 4,E,2.
CSE-2022- Goodrich CMM 71-11-00 (Config 4) 03 OCT HAN CAAV
745-3000; 025
Air Intake Cowl
Aerostructures - Install the bonding straps refer to CMM
A320/A321
2022 BMC FAA
745-3400 TASK 71-11-00-400-001- Step 2,E,3.
(Config 1, Config 2)
- Install the bonding straps refer to CMM
TASK 71-11-00-400-001 - Step 3,E,3.
(Config 3)
- Install the bonding straps refer to CMM
TASK 71-11-00-400-001 - Step 4,D,3.
(Config 4)
Remove and Install rubstrip I.A.W
Completion Kit Figure 7 - Rubstrip
CSE-CAB- Completion Kit Zodiac Galleys CMM 25-32-364 Installation ltem 110 05 OCT
263109-1471 A320/A321 CIMC CAAV
2022-21 Galley Europe s.r.o - Remove and Install knob of divider pivoting 2022
I.A.W Completion Kit - Figure 10 - Divider
Pivoting Assy/ltem 10

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 141


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CLEAN WITH CHEMICAL AGENT: IAW
CMP 25-39-18, TASK DMC-
A350BEGALMON-A-25-39-18-00001-251A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMP
25-39-18: All tasks in the block
CSE-Cl-TD- GALLEY B/E CMP 25-39-18 DISCONNECT, REMOVE AND A350/TREN 24 NOV
X089001-0000011 CIMC CAAV
2020-23 G25CFA39 AEROSPACE DISASSEMBLY PROCEDURES, except T XWB-84 2020
electrical and water system components
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMP 25-39-18: All
tasks in the block ASSEMBLE,
INSTALL AND CONNECT PROCEDURES,
except electrical and water system
components
CLEAN WITH CHEMICAL AGENT: IAW
CMP 25-39-16, TASK DMC-
A350BEGALMON-A-25-39-16-00001-251A-
C
Disconnect, Remove And Disassembly
Procedures: IAW CMP 25-39-16: All tasks in
CSE-Cl-TD- the block Disconnect, Remove And A350/TREN 24 NOV
X002000-0000011 Galley G15rfa B/E Aerospace CMP 25-39-16 CIMC CAAV
2020-21 Disassembly Procedures, Except Electrical T XWB-84 2020
And Water System Components
Assemble, Install And Connect Procedures:
IAW CMP 25-39-16: All Tasks In The Block
Assemble, Install And Connect Procedures,
Except Electrical And Water System
Components
Remove and Install knob of divider pivoting
CSE-CAB- 05 OCT
I.A.W Completion Kit - Figure 9 - Divider
2022-22 Completion Kit Zodiac Galleys CMM 25-32-513 Pivoting Assy 2022
A320/A321 CIMC CAAV
263518-10411 Galley Europe s.r.o
CSE-CI-TD- Install rubstrip lAW Completion Kit Figure 7 - 28 NOV
2022-61 Rubstrip Installation Item 140 2022

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 142


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Servicing: Task A350-A-25-29-01-01001-
250A-C (2016-02-19): Clean and apply
surface protection.
- Examination, test, check and fault Isolation:
I.AW CMM 25-29-01, all task in block
examination, test, checks and fault Isolation.
- Disassembly: I.AW CMM 25-29-01, ALL
Task in block Disassembly.
CSE-CI-TD- Overhead Stowage CMM 25-29-01 - Assembly: I.AW CMM 25-29-01, ALL Task 16 OCT
VL4-XXX Diehl SPM 20-00-01 A350 CIMC CAAV
2022-57 Compartment in block Assembly. 2022
- Repair : Repair of component of the
Overhead stowage compartment I.AW SPM
20-00-01 (Code C5678) in the block
REPAIR:
+ Repair of the paint on the metal parts
(repair 9) I.AW SPM 20-00-01.
+ Repair of the decor foil (repair 10) I.AW
CMM 25-29-01 I.AW SPM 20-00-01.
CMM 25-29-01 Repair Of The Decorative Paint On The
CSE-CI-TD- Overhead Stowage 22 NOV
VL4 - Series Diehl SPM 20-00-01 Sandwich Panels (Repair 8): lAW SPM 20- A350 CIMC CAAV
2023-23 Compartment 2023
00-01
ASAB1-XXX; CSE-CI-TD- CMM 25-21-12 REPAIR: ITEM 2.1.2.1: Surface preparation 16 OCT
C-Class Seats Stelia A350 CIMC CAAV
FJSL4-XXX 2022-58 IAW CMM 25-21-12 2022
Replace The Corner Plates On The Fan
745-4001; CSE-2022- CMM 71-13-00 24 OCT HAN
Fan Cowls Goodrich Cowl Doors Ref To CMM Task 71-13-00- A320/A321 CAAV
745-4002 028 2022 BMC
300-024 (Repair 024)
Completion Kit
CSE-CAB- Safran Cabin 01 NOV
263109-3721 Galley - Trolley CMM 25-32-576 Replace filler of T-Divider/FIG 1 item 250A A320/A321 CIMC CAAV
2022-23 CZ 2022
Compartment

CSE-2022- Adjust The 'Open' And 'Close' Positons On 10 NOV HAN


WF019AJAAAAA Hatch Door Airbus CMM 52-21-74 The Internal Handle I.A.W Subtask: 52-21- A350 CAAV
030 2022 BMC
74-820-001-A01: Step 3.B

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 143


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of placards (PIN: 236501-C1-
CSE-CAB- CMM 25-23-13 1 and 236554-3) I.A.W Subtask 25-23-13- 11 NOV
601369-1 Stowage Driessen A320/A321 CIMC CAAV
2022-25 2022
350-005-A01
Replacement of placards (P/N: 236501-C3-
CSE-CAB- CMM 25-23-14 1A; 236501-C3-1B; 236501-C3-2A; 11 NOV
601370-1 Stowage Driessen A320/A321 CIMC CAAV
2022-26 236501-C3-2B) l.A.W Subtask 25-23-14- 2022
350-005-A01
- Disassembly of the Nozzle Assy I.A.W
Subtask 49-81-41-010-001-A01 step A.(2)
and Assembly of the Nozzle Assy I.A.W
D4988500000XXX CSE/2022/042 Muffler-Exhaust Airbus S.A.S CMM 49-81-41 Subtask 49-81-41-410-002-A01 step A.(1). A320/A321 11 NOV HCM CAAV
2022 BMC FAA
- Check of the Exhaust Duct Assembly I.A.W
Task 49-81-41-200-801-A01 and Task 49-
81-41-200-801-B01
CSE-CAB- Trolley ACMM 25-31- Replace the filler (PIN 247516-313) of T- 23 NOV
263518-41 Safran 315 A320 CIMC CAAV
2022-27 Compartment divider assy, reference FIG 1/item 365 2022
28 NOV HCM
CSE/2022/044
D30664-XXX; Slide and Slide/Raft 2022 BMC
Safran CMM 25-61-20 Gage viewing port replacement as per CMM A320/A321 CAAV
D30665-XXX CSE-2023- Assembly Task 25-61-20 repair 22 28 NOV HAN FAA
029 2023 BMC
351-3001; Repair Latch Beam Rub Strip Bond I.A.W
CSE-2022- Utc Aerospace CMM 78-30-00 CMM 09 DEC HAN
351-3003; Thrust Reverser GRAA350RR-A-78-30-00-00001- A350 CAAV
032 Systems 2022 BMC
351M3010 621A-C
Removal of the Jet Pipe Assy I.A.W Subtask
CAAV
740-1094; Common Nozzle Goodrich CMM 78-11-11 78-11-11-020-068 09 JAN HCM
CSE/2023/001 A320/A321 FAA
745-1101 Assembly Aerostructures -Installation of the Jet Pipe Asay I.A.W 2023 BMC
SSCA
Subtask 78-11-11-420-082
CMM 32-41-31; CAAV
13 FEB HCM
304-266 CSE/2023/003 Hub Cap Kit Goodrich CMM 32ꞏ41-13 Paint the hub cap I.A.W Paragraph 6.D A320/A321 FAA
2023 BMC
SSCA
CMM 25-36-089; Remove And Install Divider Pivoting Assy
CSE-CI-TD- Zodiac ACMM 25-32- Pin: 259501-1352 I.A.W ACMM 25- 15 FEB
601858-023601 Galley G5 A320/A321 CIMC CAAV
2023-01 Aerospace 513 32-513 (Item 325 - Figure 1) LAW VSB 2023
259501-25-001 (DWG No: 680800-411,

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 144


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Sheet 1; Assembly Instruction Steps 5.1 -
5.5)
HAN
BMC;
HAN
CSE-2023- Airborne Auxiliary VSB HGT1700- Perform the VSB HGT1700-49-8354 27 FEB LMC;
70720041-00 Honeywell 49-8354 "Airborne Auxiliary Power-Remove and A350 CAAV
1001 Power 2023 HCM
Replace left and Right Buffer air tubes".
BMC;
HCM
LMC
601400-1; CSE -CAB- CMM 25-36-15 - Replace the placards lAW Subtask 25-36- 28 FEB
Galley G1 Driessen A320/A321 CIMC CAAV
601410-1 2023-06 15-350-005-A01 2023
- Removal and Disassembly of the Nursing
CSE -CAB- Table lAW Subtask 25-46-02-040-00S-A01. 28 FEB
D254-XXXXXXXX Lavatory D Diehl Aviation CMM 25-46-02 CIMC CAAV
2023-08 - Assembly and Installation of the Nursing A320/A321 2023
Table lAW Subtask 25-46-02-440-045-A01.
- Remove the screws of the Folding Door
(Ref: Fig 3-item 40-50-60-100-140) lAW
CSE -CAB- CMM 25-46-03 Subtask 25-46-03-040-002-A01 28 FEB
D254- XXXXXXXX Lavatory E Diehl Aviation CIMC CAAV
2023-09 -Install the screws of the Folding Door (Ref: A320/A321 2023
Fig 3- item 40-50-60-100-140) lAW Subtask
25-46-03-440-041-A01
Repair and replace a damaged labels (with
AC40-XXX; CSE-CI-TD- Underfloor Hold Net part number LB30-0213108 or LB30- 09 MAR
Amsafe Bridport CMM 25-52-28 A321 CIMC CAAV
HA70-XXX 2023-02 Set 0213109) lAW Subtask 25-52-28-350-020- 2023
A01
TASK 32-12-20-300-834-A01 Drag Brace
510Z1210-504 To CSE-2023- CMM 32-12-20 Spindle Assembly Refinish Procedure 20 MAR HCM CAAV
Buildup Assy Safran B787-9
510Z1210-514 006 2023 BMC FAA
paragraph 4.
- Removal air outlet exchange assy lAW
CMM 33-23-04, Disassembly section, Step
Goodrich CAAV
Passenger Service CMM33-23-04 D.(from 1 to 4). 23 MAR HCM
2LA456267-XXX CSE/2023/007 Lighting ATR 42/72 SSCA
Unit - Installation Air outlet exchange assy lAW 2023 BMC
Systems CAAP
CMM 33-23-04 Assembly section, Step
A.(from 11to 14).

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 145


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
740-400X; CSE-2023- Goodrich CMM 71-13-00 Fan cowl door latch handles paint repair A320-A321 07 APR HAN CAAV
Fan Cowls
745-400X 009 Aerostructures I.A.W TASK 71-13-00-300-028 2023 BMC FAA
CSE-2023- Sumitomo 10 APR HAN
010 Starter Control Precision 2023 BMC
PS400-1/790424-4 CMM 80-13-51 Install a new identification plate P/N: A320/A321 CAAV
Valve Products Co., 797671-1 I.A.W assembly section, step 4.A 02 NOV HCM FAA
CSE/2023/028 Ltd 2023 BMC
Perform the testing and fault isolation of
CSE-CI-TD- Zodiac CMM 25-40-14 lavatory doors lAW Task 25-40-14-700-802- 10 APR
G901001XXX Lavatory Assembly A320 CIMC CAAV
2023-04 Aerospace 2023
A01, step B
D2511018000100
D2511113XXXXXX;
D2511168500000;
Replace the Bonding Part of Table Assy CAAV
D2511225800000 Foot Restand CMM25-13-15 I.A.W Subtask 25-13-15-360-001-A01Para. A320/A321 10 APR HCM
CSE/2023/011 Airbus FAA
D2511411800000; Slidingtable Assy 2023 BMC
U. SSCA
F2511211600000;
F2511223200000;
F2511223200200
Driessen CMM 25-31-034; Replace slide rail (P/N: 212509-10) lAW
CSE-CAB- Completion Kit 25 APR
263107-31 Aerospace CZ SPM 25-00-01 SPM 25-00-01, TASK 20-00-01-300-819- A320/A321 CIMC CAAV
2023-12 Galley G1 2023
s.r.o A00
Driessen CMM 25-31-580; Replace slide rail (PIN: 212509-10) lAW
CSE-CAB- Completion Kit 25 APR
263307-10031 Aerospace CZ SPM 25-00-01 SPM 25-00-01, TASK 20-00-01-300-819- A320/A321 CIMC CAAV
2023-13 Galley G1 2023
s.r.o A00
-Removal of the Link Assemblies, the Rod-
End Assemblies and Attached Parts, Task
52-81-13-000-801-A01, step (3), (10).
CSE-2023- CMM 52-81-13 -Installation of the Link Assemblies, the Rod- A320/A321 25 APR HAN CAAV
D528560100XXXX Fairing - Fixed Leg Airbus
013 2023 BMC FAA
End Assemblies, the Edge Angles and
Attached Parts, TASK 52-81-13-400-801-
A01, step (3), (5), (7).
- Repair Fiberglass Composite Panel refer
CSE-CAB- task 25-40-05-300-807-A01 27 APR
EXX1001 Lavatory Assembly Safran CMM 25-40-05 A350 CIMC CAAV
2023-14 - Paint and Prime the Composite Panel refer 2023
task 25-40-05-300-810-A01

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 146


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Repair Cracked Shroud refer task 25-40-
05-300-817-A01
- Repair Fiberglass Composite Panel refer
task 25-40-06-300-807-A01
E441001 XXX; CSE-CAB- CMM 25-40-06 - Paint and Prime the Composite Panel refer 27 APR
Lavatory Assembly Safran A350 CIMC CAAV
E451001 XXX 2023-15 task 25-40-06-300-810-A01 2023
- Repair Cracked Shroud refer task 25-40-
06-300-817-A01
- Repair Fiberglass Composite Panel refer
task 25-40-07-300-807-A01
E471001 XXX; CSE-CAB- CMM 25-40-06 - Paint and Prime the Composite Panel refer 27 APR
Lavatory Assembly Safran A350 CIMC CAAV
E481001 XXX 2023-15 task 25-40-07-300-810-A01 2023
- Repair Cracked Shroud refer task 25-40-
07-300-817-A01
- TASK 50-11-05-300-809-A01Fill and Fair
CSE-2023- Sidewall Panel out Procedure for Panel. 28 APR HCM CAAV
C41XXXX Safran CMM 50-11-05 B787-9
010 Assembly - TASK 50-11-05-300-810-A01Paint and 2023 BMC FAA
Prime the Composite Panels

ACMM 32-41-30; Paint the hub cap lAW CMM 32-41-30 CAAV
08 MAY HCM
304-265 CSE/2023/014 Hub Cap Kit Goodrich CMM 3241-13, Paragraph 6.0 A320/A321 FAA
2023 BMC
SSCA
- Subtask 32-27-73-040-004-A01:
Disassembly of the cylinder;
HAN
- Subtask 32-27-73-440-001-A: Assembly of
BMC
10-375201-000; CSE-2023- NLG Shock CMM 32-27-73 the cylinder; 08 MAY
Safran A320/A321 CAAV
10-375201-001 2006 Absorber - Subtask 32-27-73-41 0-001-A01: 2023
HCM
Installation of the restrictor;
BMC
- Subtask 32-27-73-410-002-A01:
Installation of the lower cam.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 147


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval

Disassembly per CMM 35-22-29, task 35-


22-29-000-801-A01 with discard procedure
of initiator assembly subtask 35-22-29-910-
002-A01.
Oxygen Cylinder Collin CMM 35-22-29 - Assembly per CMM 35-22-29, task 35-22- 09 MAY HCM
4441787-XXX CSE/2023/015 B787-9/10 CAAV
Assembly Aerospace 2023 BMC
29-940-804-A01 with cleaning procedure
task 35-22-29-100-801-A0
- Resistance verification test per CMM 35-
22-29, task 35-22-29-700-801-A01

- Disassembly per CMM 35-22-06, task 35-


22-06-000-801-A01 with discard procedure
of initiator assembly subtask 35-22-06-910-
003-A01;
4441129-023, Oxygen Cylinder Collin CMM 35-22-06 - Assembly per CMM 35-22-06, task 35-22- B787-9/10 09 MAY HCM
CSE/2023/016 CAAV
4441129-032 Assembly Aerospace 2023 BMC
06-940-804-A01 with cleaning procedure
task 35-22-06-100-801-A01;
- Resistance verification test per CMM 35-
22-06,, task 35-22-06-700-801-A01
LPB663 Rod
CSE-CI-TD- SIL 2C-099 Perform Removal/Installation of Rod Support 16 MAY
2CXXXXX Safran Support A350 CIMC CAAV
2023-07 Securisation lAW SIL 2C-099 2023
Securisation
CSE-CI-TD- LPB663 Rod
SIL 2C-099 Perform Removal/Installation of Rod Support 16 MAY
2CXXXXX 2023-08 Safran Support B787 CIMC CAAV
Securisation lAW SIL 2C-099 2023
Securisation
CSE-CI-TD- Perform Seat Calibration Procedure of B787
2023-09 Seat lAW CMM 25-03-08, TASK 25-03-08-
820-802-A01, except:
CMM 25-03-08 - E. (3) Seat calibration through 16 MAY
2C06-XXX Safran Seat Assembly B787 CIMC CAAV
2023
Maintenance Harness HAR066 (Optional)
- E. (4) Seat calibration through ECU
(seldom used

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 148


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Perform Footwall shroud spring clip repair of
CSE-CI-TD- CMM 25-03-09 B787 Seat shell l.A.W CMM Subtask 25-03- 18 MAY
2C06/2C14-XXX Shell Assembly Safran B787 CIMC CAAV
2023-05 2023
09-350-032-A01
Perform Footwell shroud spring clip repair of
CSE-CI-TD- CMM 25-20-10 A350 Seat shell lAW CMM 25-20-10-01003- 18 MAY
2C10-XXX Shell Assembly Safran A350 CIMC CAAV
2023-06 2023
664A-C
D5746050000XXX;
Repair the contour of the Slat when an Insert
D5746057700XXX; CMM 57-46-21 Cover-Cap is missing lAW TASK 57-46-21- A320/A321 23 MAY HCM
CSE/2023/017 Slat Assy 05 Airbus CAAV
D574605980XXXX; 2023 BMC
300-803-A01.
D5746095000XXX
Instructions For
Nexgen Amsafe Continued
CSE-CAB- 24 MAY
7236 Seatbelt Airbag Amsafe Airworthiness - Testing And Fault Isolation A350 CIMC CAAV
2023-18 2023
System E513252
- Remove the Lubrication Shaft subassembly
ref CMM 32-12-89-000-801-A01. Subtask:
10-453101XXX;
32-12-89-040-002-A01, item 16, step (I),
10-453201XXX;
(m), and (n).
10-453301XXX; CSE-2023- Main Landing Gear Safran Landing CMM 32-12-89 26 MAY HAN CAAV
- Install the Lubrication Shaft subassembly A320/A321
10-453302XXX; 015 Leg And Dressings Systems UK Ltd 2023 BMC FAA
ref CMM 32-12-89-400-001-A01. Subtask:
10-453401XXX;
32-12-89-440-010-A01" item 11, step (f).
10-453402XXX
- Torque data: Ref CMM : 32-12-89-940-802-
A01
HAN-2023- - Disassembly The Cable Assembly PN HAN
A321-08 0727628 l.A.W Disassembly Section, Step
0727510; Flush Cover And CMM 28-25-41 3.C 30 MAY LMC
0727540 Cable Assembly
Eaton A320/A321 CAAV
DAD/2023/A321 2023 DAD
- Assembly The Cable Assembly PN
-01 Branch
0727628 l.A.W Assembly Section, Step 3.B
- Disassembly of cable assembly l.A.W Step
CAAV
Flush Cover and CMM 28-25-41 3C/Disassembly Section 31 MAY HCM
0727540 CSE/2023/018 Eaton A320/A321 FAA
Cable Assembly - Assembly of cable assembly l.A.W Step 2023 BMC
SSCA
3B/Assembly Section

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 149


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Subtask 32-57-17-110-001-A01: Cleaning
HAN
- Subtask 32-57-17-380-003-A01: Painting
CSE-2023- CMM 32-57-17 - Subtask 32-57-17-380-004-A01: Stamping A320/A321 31 MAY BMC;
D231197XXX Electric Box Safran CAAV
2007 2023 HCM
with step (a).3 and (d).1 refer TI-2023-2002
BMC
(corresponded step 12.C.a.3 and 12.C.d.1)
Disassembly The Cable Assembly PN
0727628 l.A.W Disassembly Section, Step
0727510; HCM/2023/A3 Flush Cover And CMM 28-25-41 02 JUN HCM
Eaton 3.C A320/A321 CAAV
0727540 21-01 Cable Assembly 2023 LMC
- Assembly The Cable Assembly PN
0727628 l.A.W Assembly Section, Step 3.B
- Disassemble of Stanchions (P/N: HA70-
021400X, AC40-0268155) I.A.W. TASK 25-
AC40-02XXXXX; CAAV
Under floor hold net Amsafe CMM 25-52-28 52-28-040-801-A01. 05 JUN HCM
AC40-0311XXX; CSE/2023/019 A320/A321 FAA
Set Bridport/ K2429 - Assemble of Stanchions (P/N: 2023 BMC
HA70-02140XX SSCA
HA70ꞏ021400X, AC40-0268155) I.A.W
TASK 25-52-28-440-801-A01.
CMM 25-36-089; Instal Slide Extractor PIN: 225512-3 I.A.W
CSE-CI-TD- Zodiac ACMM 25-31- 05 JUN
601858-023601 Galley G5 ACMM 25-31-864 "Completion Kit- A320/A321 CIMC CAAV
2023-10 Aerospace 864 2023
Installation Section" step 4.1

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 150


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Remove the bonding straps refer figure 16
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-000-001 step 2.E(4).
- Remove the bonding straps refer figure 36
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-000- l001 step 3.E(2).
- Remove the bonding straps refer figure 41
(PIN: 745-3237-501, FEB5051, FEB5049)
740-3000; CAAV
Goodrich CMM 71-11-00 I.A.W Task 71-11-00-000-001 step 4.E.(2) A320/A321 06 JUN HCM
745-3000; CSE/2023/013 Air Intake Cowl FAA
Aerostructures - Install the bonding straps refer figure 16 2023 BMC
745-3400 SSCA
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-400-001 step 2.E.(3)
-Install the bonding straps refer figure 36
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-400-001 step 3.E.(3).
- Install the bonding straps refer figure 41
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-400-001 step 4.0.(3)
- Removal of Spring P/N: A2577118920200
(item 01-460 or 01A-460) I.A.W Task 25-52-
44-000-801-A01, Subtask 25-52-44-040-
001-A01 Step A.(10-12) or Subtask:25-52-
A257711030XXXX; 44-040-001-B01 Step B.(10-12) CAAV
07 JUN HCM
D255723100XXXX; CSE/2023/020 Door Sill Latch Airbus S.A.S CMM 25-52-44 A320/A321 FAA
- Installation of Spring P/N: 2023 BMC
D255723980XXXX SSCA
A2577118920200 (item 01-460 or 01A-460)
I.A.W Subtask 25-52-44-440-002-A01 Step
A.(25-31) or Subtask 25-52-44-440-002-B01
Step B.(24-30)
-Disassembly of the Flap Movable Fairing-
Assembly - Flap Track 3, TASK 57-55-16-
CSE-2023- Fairing Assembly, CMM 57-55-16 040-803-A01, step 3, (B),(10), (11), (12). 08 JUN HAN CAAV
D5755657900XXXA Airbus A320/A321
016 Flap Track 3 2023 BMC FAA
-Assembly of the Flap Movable Fairing
Assembly - Flap Track 3, TASK 57-55-16-

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 151


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
440-803-A01, step 3, (B), (2),(11),(12), (13),
(14).
-Disassembly of the Movable Fairing
Assembly - Flap Track 4, Task 57-55-17-
000-803-A01, Step 3, (B), (8),(11).
CSE-2023- Fairing Assembly, CMM 57-55-17 08 JUN HAN CAAV
D5755658000XXXA Airbus -Assembly of the Flap Movable Fairing- A320/A321
017 Flap Track 4 2023 BMC FAA
Assembly - Flap Track 4, Task 57-55-17-
400-803-A01, step 3, (B), (2),(3), (12), (13),
(14).
CSE-2023- CMM 25-21-41 Replace or Install Bonded Components 21 JUN HCM CAAV
C33X00X Sidewall Assy Safran B787-9
021 Subtask 25-21-41-300-801-A01 2023 BMC FAA
- Disassemble the aft right hand isolator Fig
DIS-1 [100] I.A.W Task HON70210-01-49-
CSE-2023- Apu Suspension CMM 49-12-01 12-01-00A-530A-A, Step 6. 26 JUN HAN
9619117-00 Honey Well A350 XWB CAAV
016 System -Assemble the aft right hand isolator Fig 2023 BMC
ASSY-1 [100] I.A.W Task HON70210-01-49-
12-01-01A-710A-D, Step 4.
- Disassembly of the swivel selector valve,
CSE-2023- Swivel Selector CMM 32-57-15 Ref CMM 32ꞏ57ꞏ15 Step 2. A. (1). (2). 26 JUN HAN CAAV
C24998000 Sarfran A320/A321
019 Valve - Assembly of the swivel selector valve, Ref 2023 BMC FAA
CMM 32ꞏ57ꞏ15 Step 1. A. (1). (2), E. (1).
- Remove The Thermal Valve PIN: 243548-
17 I.A.W Green Galley G1- Removal
CSE-CI-TD- Zodiac CMM 25-30-074 Section, Step 4.12.4. 30 JUN
601852-001011 Galley G1 A320/A321 CIMC CAAV
2023-12 Aerospace -Instal The Thermal Valve PIN: 243548-17 2023
I.A.W Green Galley G1- Installation Section,
Step 4.9.4.
CAAV
Elevator and Trim CMM 55-20-00 Testing and Trouble Shooting 05 JUL HCM
D55270000XXX CSE/2023/022 ATR ATR72 CAAP
Tab 2023 BMC
SSCA
CAAV
CMM 55-40-00 Testing and Trouble Shooting 05 JUL HCM
S55470000XXX CSE/2023/023 Rudder Assy ATR ATR72 CAAP
2023 BMC
SSCA

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 152


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly of snap hook ref Task 35-24-
CSE-2023- Passenger Oxygen CMM 35-24-02 02-000-801-A01, step 2, D. 10 JUL HAN
174085-96 Aerospace A320/A321 CAAV
020 Mask Assembly - Assembly of snap hook ref Task 35-24-02- 2023 BMC
400-801-A01 , step 2, F
Removal of the Seal PIN: D5451887520000
I.A.W Subtask 54-55-11-000-003-L01.
CSE-2023- Fairing Assembly, CMM 54-55-11 - Install of the Seal PIN: 05451887520000 11 JUL HAN
D0001039000XXX Airbus A320/A321 CAAV
021 Movable 2023 BMC
I.A.W Subtask 54-55-11-400-015-A01, step
(1), (2), (3).
- Remove the clamp PIN: 4305901110
I.A.W Subtask 32-49-12-010-001-A01, Step
4133801030; CSE-2023- Wheel Pressure CMM 32-49-12 (1).(a).1 - Installation of the clamp PIN: 25 JUL HAN
Safran A320/A321 CAAV
1338-1450 022 Transducer 2023 BMC
430590111 I.A.W Subtask 32-49-12-410-
004-A01, Step (4).(c) and (4).( )
- Testing and Fault Isolation I.A.W Section
1000;
HT7000;
CSE-CI-TD- Tourist Class S&S Numerical CMM: 25-25-23; - Disassembly I.A.W Section 3000; 7 AUG
HL7000; CMM 25-22-54 - Inspection/ Check I.A.W Section 5000; B787-9 CIMC CAAV
2023-03 Deployment Arm Control 2023
HP7000 XXX
- Assembly I.A.W Section 7000;
- Fits and Clearances I.A.W Section 8000.
- Disassembly I.A.W CMM Task 25-11-69-
000-817-A01 Crew Seat General Assembly
Removal.
- Disassembly I.A.W CMM Task 25-11-69-
000-821-A01Inboard/Outboard Tilt
Assembly Removal.
3A380-0007-01-7; CSE-2023- CMM 25-11-69 - Disassembly I.A.W CMM Task 25-11-69- 21 AUG
Pilot Seat Ipeco B787-9/10 CIMC CAAV
3A380-0007-01-8 3001 2023
000-824-A01 Recline Unit Assembly
Removal.
- Assembly I.A.W CMM Task 25-11-69-400-
809-A01 Recline Unit Assembly.
- Assembly I.A.W CMM Task 25-11-69-400-
813-A01 Inboard/Outboard Tilt Assembly.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 153


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly I.A.W CMM Task 25-11-69-400-
830-A01 General Assembly. Crew Seat
Assembly.
- Test for Pilot Seat I.A.W CMM Task 2S-11-
69-700-801-A01
CMM 25-23-36 Repair of the decorative paint on the
5030-XXX; CSE-CI-TD- 23 AUG
Stowage Dieh SPM 20-00-01 sandwich panels l.A.W SPM 20-00-01- Task A350 CIMC CAAV
5031-XXX 2023-15 2023
20-00-01-94D-808-A00
Visual Inspection Inlet Door Assembly
70720055-0X;
CSE-2023- CMP 49-16-01 according to CMP 49-16-01, Examination, 29 AUG HAM
70720055-0X AMDT Inlet Assembly Honeywell A350 CAAV
023 test, checks and fault isolation, chapter 5, 2023 BMC
A
paragraphs 5.4, 5.6, 5.7
- Remove the Spring PIN: 235001-7 I.A.W
CSE-CI-TD- Miscellaneous ACMM 25-00-06 Subtask 25-00-06-040-001-A01 08 SEP
262107-11 Driessen A321 CIMC CAAV
2023-17 Stowage Mod Kit - Install the Spring PIN: 235001-7 I.A.W 2023
Subtask 25-00-06-410-001-A01
- Removal of the Rubber Grommet of the
Main Wheel Shroud (IPL Item 30): Subtask
DR1402C0; CSE-2023- CMM 32-48-25 32-48-25-020-001-A01 -Step (1}(a). 12 SEP HAM CAAV
Wheel Adapter Kit Safran A320/A321
DR1402C00 AMDT A 024 - Installation of the Rubber Grommet of the 2023 BMC FAA
Main Wheel Shroud (IPL Item 30): Subtask
32-48-25-420-001-A01 - Step (1).(i).
- Repair 2: Decor FoiI I.A.W SPM 25-00-01
TASK 25-00-01-99F-813-A00
- Repair 5: Structure Sandwich Panels I.A.W
CSE-CI-TD- SPM 25-00-01 13 SEP
VW00F0041000000 Stowage Diehl SPM 25-00-01 TASK 25-00-01-99F-819- A350 CIMC CAAV
2023-16 2023
A00 Step 21. Mixing of Epoxy Resin
- Repair 8: Laminated Parts I.A.W SPM 25-
00-01 TASK 25-00-01-99F-822-A00
- Disassembly of the Footrest Assembly
D2511411800000; CSE-2023- Foot Rest and CMM 25-13-15 I.A.W. Subtask 25-13-15-040-001-B01. 02 OCT HAN
Airbus A320/A321 CAAV
D2511225800000 025 Sliding Table - Assembly of the Footrest Assembly I.A.W. 2023 BMC
Subtask 25-13-15-400-005-B01.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 154


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly of Switch guard (150) and
Pushbutton switch (155) REF CMM 44-27-
09 Chapter DISASSEMBLY Step 5.E.(13).
Panasonic
Video System CMM 44-27-09 and S.E.(14). 04 OCT HCM CAAV
RDAA902657-01 CSE/2023/026 Avionics A320/A321
Control Unit - Assembly of Switch guard (150) and 2023 BMC FAA
Corporation
Pushbutton switch (155) REF CMM 44-27-
09 Chapter ASSEMBLY Step 3.H.(6) and
3.H.(7).
- Remove the Seal P/N D5284025220000 or
D5284025220100 of Fairing-Fixed Leg P/N:
D5285601000000X or D5285601000100X
l.A.W Subtask 52-81-13-010-001-A01 Step
A.(10).
- Remove the Seal PIN D5284025220000 or
D5284025220100 of Fairing-Fixed Leg PIN:
D5285601000000X; D5285601000[2-11100A l.A.W Subtask 52-
CAAV
D5285601000100X; CMM 52-81-13 81-13-000-001-A01 Step A.(10) 06 OCT HCM
CSE/2023/027 Fairing-Fixed Leg Airbus S.A.S A320/A321 FAA
D5285601000[2- - Install the Seal P/N D5284025220000 or 2023 BMC
SSCA
11]00A D5284025220100 of Fairing-Fixed Leg P/N:
D5285601000000X or D5285601000100X
l.A.W Subtask 52-81-13-410-001-A01 Step
A.(7).
- Install the Seal P/N 05284025220000 or
D5284025220100 of Fairing-Fixed Leg P/N:
D5285601000[2-11]00A l.A.W Subtask 52-
81-13-410-002-A01 Step A.(3) and (4).
CSE-CI-TD- CMM 25-31-652 - Cleaning lAW CMM 25-31-652 12 OCT
TV603020 Foldable Trolley Safran A350 CIMC CAAV
2023-18 - Check lAW CMM 25-31-652 2023
CSE-CI-TD- Diethelm Keller CMM 25-35-59 - Cleaning lAW CMM 25-35-59 18 OCT
TC01-101A1VN Foldable Trolley B787 CIMC CAAV
2023-19 Aviation - Check lAW CMM 25-35-59 2023
D23119751; - Remove Clamping Spring IAW Subtask 32-
D23119750; HAN/2023/A3 18 OCT HAN
Electrical Box Safran CMM 32-57-17 57-17-010-002-A01- Step (e). A320/A321 CAAV
D23119750-1; 21-21 - Install Clamping Spring IAW Subtask 32- 2023 LMC
D23119751-1 57-17-410-003-A01.

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 155


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Repair of the decor foil (Repair 10)
CSE-CI-TD- 25 OCT
VL30S-XXX Sidewall Assy Diehl SPM 20-00-01 - Replacement of the decor foil on metal and A350 CIMC CAAV
2023-20 2023
GFRP surfaces (Repair 11)

- Remove the vacuum break valve PIN:


5905700 and o-ring AS3208-08 lAW
Subtask 24-11-89-040-032-A00 Step B.(3).
- Install the vacuum break valve PIN: CAAV
Integrated Drive Hamilton 10 NOV HCM
772292 CSE/2023/032 CMM 24-11-89 5905700 and o-ring AS3208-08 lAW A320/A321 FAA
Generator Sundstrand 2023 BMC
Subtask 24-11-89-440-073-A00 Step C.(25). SSCA
- Ref AMM 24-21-51-400-010-B Subtask 24-
21-51-720-060-A STEP 5.(1) To 5.(8). leak
check vacuum break valve for oil leak.

601368-1; - Disconnection of the Galley Splitline lAW


601368-101; CSE-CAB- Zodiac Galleys TASK 25-36-29-000-801-A01 10 NOV
601368-201;
Galley G5 CMM 25-36-29 A320/A321 CIMC CAAV
2023-20 Europe - Connection of the Galley Splitlines lAW 2023
601368-301
TASK 25-36-29-400-801-A01

- Remove and install inner cylinder bushing


CMM 32-10-37 Rev 11 Repair 15-1 (B787 -
10) step 2 (except step 2.B(5), 2.B(7),
2.B(8))
CMM 32-10-37;
Main Landing Gear
SOPM 20-30-03; - Clean per SOPM 20-30-03 ( Step 4, Step B787-10 14 NOV HCM
510Z1111-70X CSE/2023/031 Shock Strut Boeing CAAV
SOPM 20-44-02; 5) 2023 BMC
Assembly
SOPM 20-50-03 - Preservation procedure per SOPM 20-44-
02
- Shrink - fit method per SOPM 20-50-03 step
7B, 6B

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 156


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Remove Wiper Arm Bumper (PIN: 4293748
Safran or 4280966) lAW Subtask 30-45-52-020-
4279881; 4342555; 002-A01 Step (2).(b) and (2).(c). CAAV
Electronics & 15 NOV HCM
4357626; 4279874; CSE/2023/033 Wiper Arm ACMM 30-45-52 A320/A321 FAA
Defense Cockpit - Install Wiper Arm Bumper (PIN: 4293748 or 2023 BMC
4342562; 4357619 SSCA
Solutions 4280966) lAW Subtask 30-45-52-430-001-
A01 Step (1).(d) and (2).(e).
-Disassembly of Stanchions, TASK 25-52-
CSE-2023- Underfloor Hold Net 28-040-801-A01,step 3, (A), (1), (2). 27 NOV HAN CAAV
AC40-0217300 Amsafe Bridport CMM 25-52-28 A320/A321
028 Set -Assembly of Stanchions, TASK 25-52-28- 2023 BMC FAA
440-801-A01,step 2, (A), (1), (2).
1. Remove screw (Item 350, IPL Figure 1)
P/N: MS24693~273 lAW Subtask 49-41-20-
CSE-2023- Direct Current CMM 49-41-20 300-017-A01 step (2) and (3) 01 DEC HAN
2704506-X Honeywell A320/A321 CAAV
031 Motor 2. Install Screw (Item 350, IPL Fi9ure 1) 2023 BMC
P/N: MS24693S273 lAW Subtask 49-41-20-
300-017-A01 step (8) and (9)
740-1094; CSE-2023- Common Nozzle 78-11-11 Remove and Replace The Aft Ring (Non- 06 DEC HAN
Goodrich A320/A321 CAAV
745-1101 026 Assembly Vectored) IAW Repair#31 2023 BMC
- Disassemble the panel assy and the
universal joint assembly lAW Task 32-27-77-
000-801-A01 step 1.D.3.(b).
- Cleaning part lAW Task 32-27-77-100-801 HAN
10-375701-000;
CSE-2023- CMM 32-27-77 -A01. 11 DEC BMC CAAV
10-375701-001; Forestay Safran A320/A321
2008 - Assemble the panel assy and the universal 2023 HCM SSCA
10-375701-002
joint assy lAW Task 32-27-77 -400-801-A01 BMC
step 1.D.2.(b).
- Protective sealing lAW Task 32-27-77-400-
801-A01 Step 1.D.2.(d).
A320neo Hinge - Disassemble the "Hinge Access Panel
636-3053-XXX; HAN/2023/A3 UTC Aerospace CMM 78-30-06 13 DEC HAN
Access Panel Assembly" I.A.W GRAA320NEO-A-78-30- A320/A321 CAAV
636-3054-XXX 21-28 Systems 2023 LMC
Assemblies 06-00001-530A-C

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 157


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assemble the "Hinge Access Panel
Assembly" I.A.W GRAA320NEO-A-78-30-
06-00001-710A-C
Disassembly SUBTASK 38-11-08-040-002:
C. Disassemble Faucet Control Module Assy
lAW CMM 38-11-08: Step 2,4,8,10,11.
CSE-CI-TD- Electronic Faucet CMM 38-11-08 - Assembly: subtask 38-11-08-440-002: C. 13 DEC
AFUT000-XXX Jamco B787 CIMC CAAV
2023-22 And Control Module Assemble Faucet Control Module Assy lAW 2023
CMM 38-11-08: Step 2,3,5,9,11.
- Fits And Clearances: TASK 38-11-08-820-
801: 1.A Torque values.
B87001A0040;
- Detail Check lAW Task 25-37-73-200-801.
B87008B0017;
- Replacement of defective parts lAW:
B87005B000;
CSE-CI-TD- CMM 25-37-73 + Disassembly and Removal Procedure For 15 DEC HCM CAAV
B87006C0009; Galley Assy Jamco B787-9
2023-30 Door Assy lAW Subtask 25-37-73-040-002. 2023 BMC FAA
B87037A0031;
+ Assembly and Installation Procedure For
B87037A0032;
Door Assy lAW Subtask 25-37-73-440-002 B
B87050A0053
- Disassembly of the Bearings IAW Task 52-
81-18-000-810-A01
D5288016500XXX;
- Assembly of the Bearings IAW Task 52-81-
D5288025000XXX;
Door - Main 18-400-810-A01
DH602AIAAAAA; CMM 52-81-18 18 DEC HCM CAAV
CSE/2023/034 Landing Gear, Airbus - Check of the Fittings, Uplock Assembly and A320/A321
DH602A1AAAAB; 2023 BMC FAA
Common Ramp Ramp Assembly IAW Task 52-81-18-210-
DH603AIAAAAA;
802-A01 STEP 3A(2)
DH603AIAAAAB
- Fits and Clearances IAW Task 52-81-18-
820-806-A01
CSE-CI-TD- CMM 25-36-15 -Inspection/Check lAW Task 25-36-15-200- 18 DEC
601410-1 Galley G1 Safran A321 CIMC CAAV
2023-25 801-A01 2023
CSE-CI-TD- CMM 25-36-28 Inspection/Check lAW Task 25-36-28-210- 18 DEC
601367-1 Galley G2 Safran A321 CIMC CAAV
2023-26 801-A01 2023
- Cleaning lAW Task 25-00-01-100-801-A00
CSE-CI-TD- SPM 25-00-01 18 DEC
D2549015911600 Lavatory H Assy Diel - Inspection/Check: lAW Task 25-00-01-200- A321 CIMC CAAV
2023-27 2023
801-A00

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 158


VIETNAM AIRLINES ENGINEERING COMPANY FORM 2074

LIST OF APPROVED ON-WING MAINTENANCE TASKS


DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING

8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Cleaning lAW Task 25-00-01-100-801-A00
CSE-CI-TD- SPM 25-00-01 - Inspection/Check lAW Task 25-00-01-200- 18 DEC
D2549011903600 Lavatory D Assy Diel A321 CIMC CAAV
2023-28 2023
801-A00
- Cleaning lAW Task 25-00-01-100-801-A00
CSE-CI-TD- SPM 25-00-01 - Inspection/Check lAW Task 25-00-01-200- 18 DEC
D2549013907000 Lavatory E Assy Diel A321 CIMC CAAV
2023-29 2023
801-A00

- Removal of Harness PIN F1000457-00


(item 7-430A) I.A.W Task 25-46-03-000-802-
A01, Subtask 25-46-03-040-006-A01 Step
D2549XXXXXXXXX; CMM 25-46-03 (6)(d) to (6)(g). 26 DEC HCM CAAV
CSE/2023/035 Lavatory E Diehl Aviation A320/A321
R2254XXXXXXXXX -Installation of Harness PIN F1000457-00 2023 BMC FAA
(item 7-430A) I.A.W Task 25-46-03-400-802-
A01, Subtask 25-46-03-440-037-A01 Step
(40)(c) to (40)(f)

-Removal of Absorber Assy P/N


D5237201000000 (item 53-180A) and
Rubber Plate P/N D5237220720000 (item
53-210A) I.A.W Task 52-33-11-000-803-
B01, Subtask 52-33-11-000-006-A01 Step
A.(2) and A.(3).
CAAV
Bulk Cargo Compt CMM 52-33-11 -Installation of Absorber Assy P/N A320/A321 09 JAN HCM
D52372000XXXXX CSE/2024/001 Airbus S.A.S FAA
Door D5237201000000 (item 53-180A) and 2024 BMC
SSCA
Rubber Plate P/N D5237220720000 (item
53-210A) I.A. W Task 52-33-11-400-803-
B01, Subtask 52-33-11-400-006-A01 Step
A.(2) and A.(3) or Subtask 52-33-11-400-
006-B01 Step B.(2) and B.(3) or Subtask 52-
33-11-400-006-C01 Step C.(2) and C.(3).

ISS. 01; Rev. 01 – DATE: 15 JUL 2020 Page 159

You might also like