Professional Documents
Culture Documents
On-Wing Caplist 11 JAN 2024
On-Wing Caplist 11 JAN 2024
80
LIST OF APPROVED ON-WING MAINTENANCE TASKS
DANH MỤC CÁC CÔNG VIỆC BẢO DƯỠNG ON-WING
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Engine Vibration Barry Controls ATR72/ 11 SEP HCM CAAV
94796-XXX CSE/2019/29 CMM 71-20-22 Inspection, maintenance, repair.
Isolation System Aerospace PW124/127 2019 BMC SSCA
Repair # 03 Inspection, Removal Limits & 11 SEP
CSE-2020-60
Rework Forward Frame 2020
Repair #30: replacement of the Fwd lower
CSE-2020-16 seal equipped reverser half- door task 78-32-
36-300-829
Repair #31: replacement of the FWD LWR
22 JUL
CSE-2020-17 box seal equipped reverser half-door
2020
Fan Thrust Task 78-32-36-300-830
642-3801 Goodrich A320/CFM5 HAN CAAV
Reverser Door CMM 78-32-36 Repair #48: replacement of teflon strip on
642-3802 Aerostructures 6-5B BMC FAA
CSE-2020-18 Assemply forward frame and latch
Task 78-32-36-300-847
Repair 27- replacement of the turbine scoop
03 AUG
CSE-2020-22 seal right
2020
Repair 22- replacement of the upr strut seals
CSE-2020- 17 AUG
equipped
052 2020
reverser half-door, Task 78-32-36-300-821
Fan Thrust Repair 64- replacement of thermal blankets
642-3801 CSE-2020- Goodrich A320/CFM5 17 AUG HAN CAAV
Reverser Door CMM 78-32-36 on lh & rh halves config 1; task 78-32-36-
642-3802 054 Aerostructures 6-5B 2020 BMC FAA
Assemply 300-863
WD038ADABAAA; DISASSEMBLY & ASSEMBLE RAM AIR
WD038ADACAAA; INLET PANEL 193CL AND 194ER
WD038AEABAAA 1. CMM 21-52-15 ALL TASK 21-52-15-000
WD038AFABAAA; 2. CMM 21 -52-15 ALL TASK 21-52-15-400
DISASSEMBLY &
WD038AGABAAA; INSPECTION/CHECK RAM AIR INLET
ASSEMBLE RAM A350/RR 11 JUL HAN
WD038AHABAAA; CSE-2020-15 AIRBUS CMM 21-52-15 PANEL 193CL AND 194ER CAAV
AIR INLET PANEL XWB 2020 BMC
WD038AHACAAA; 3. CMM 21-52-15 ALL TASK 21-52-15-200
193CL AND 194ER
WD038AHADAAA; FITS AND CLEARANCES RAM AIR INLET
WD038AJABAAA PANEL 193CL AND 194ER
WD038AKACAAA; 4. CMM 21 -52-15 TASK TASK 21-52-15-
WD038ALACAAA ; 820-803-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WD039ABABAAA; CLEANING RAM AIR INLET PANEL 193CL
WD039ABACAAA; AND 194ER
WD039ACABAAA; 5. CMM 21-52-15 TASK TASK 21-52-15-
WD039ADABAAA; 100-801-A01
WD039AEABAAA; 6. CMM 21 -52-15 TASK TASK 21-52-1 5-
WD039AFABAAA 100-802-A01
WD039AFACAAA;
WD039AGABAAA;
WD039AHACAAA;
WD039AJACAAA
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CMM 49-16-45 disassembly (removal of the
diffuser assy from the elbow assy - subtask
49-16-45-000-008-A01).
CMM 49-16-45 assembly (installation of the
diffuser assy on the elbow assy - subtask 49-
16-45-400-008-a01).
CMM 49-16-45 disassembly (disassembly of
the elbow - task 49-16-45-000-808-a01).
CAAV
CMM 49-16-45 assembly (assembly of the
03 AUG HAN FAA
D4918501415600 CSE-2020-21 Air Intake Duct Airbus CMM 49-16-45 elbow - task 49-16-45-400-801-a01). A320/A321
2020 BMC THAI
CMM 49-16-45 repair (remove/install the
CAAT
frame - task 49-16-45-300-802-a01 step 1 to
3a(1) and step 3.a(2).(d) to step 3.a(2).(q) ).
CMM 49-16-45 disassembly (disassembly of
the seal - task 49-16-45-000-805-a01, task
49-16-45-000-805-b01).
CMM 49-16-45 assembly (assembly of the
seal - task 49-16-45-400-804-a01, task 49-
16-45-400-804-b01).
- Task 55-21-15-300-803-a01 repainting of
the elevator
- Task 55-21-15-300-803-801 repainting of
elevator
- Task 55-21-15-200-801-A01 check of the
elevator weight A320/A321 06 AUG HCM CAAV
D5528000XXX CSE/2020/015 Elevator Assy Airbus CMM 55-21-15
- Task 55-21-15-300-802-A01 record the Series 2020 BMC SSCA
elevator weight
-Task 55-2 1-15-300-806-A01 replacement
of the cover
- Task 55-21-15-300-801-A01 protective
treatment
- Disassembly-task 36-11-45-000-801 -A01;
CAAV
Zodiac - Cleaning - task 36-11-45-100-801- A01; 06 AUG HCM
ATD50N CSE/2020/017 Discharge Piping CMM 36-11-45 ATR42/72 SSCA
Aerospace - Inspection/Check - task 36-11-45-200-801 2020 BMC
CAAP
- A01 ;
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly - task task 36-11-45-400-801-
A01 (except marking of the discharge piping
- subtask 36-11 -45-420-004-A01)
601368-1; 1. TASK 25-36-29-000-801-A01
CAAV
601368-101; Zodiac Disassembly of galley G5. A321/V250 10 AUG HCM
CSE/2020/29 Galley G5 CMM 25-36-29 FAA
601368-201; Aerospace 2. TASK 25-36-29-400-801-A01 Assembly 0 2020 BMC
SSCA
601368-301 of galley G5.
Remove check valve IPL Figure 1 Item 30
(35) (35A) l.A.W CMM 78-36-51 Subtask 78-
3282982-1; 36-51-000-003-A01
C-Duct Linear 10 AUG HAN CAAV
3282982-2; CSE-2020-30 Honeywell CMM 78-36-51 Install check valve IPL Figure 1 Item 30 (35) A320/A321
Hydraulic Actuator 2020 BMC FAA
3282982-3 (35A) l.A.W CMM 78-36-51 CMM 78-36-51
Subtask 78-36-51-400-
006-A01 Step 5, 6, 7
CMM 57-52-23 DISASSEMBLY (Removal of
the Rod Protection at RIB 3 - TASK 57-52-
Inboard Flap 23-000-814-A01) 10 AUG HAN CAAV
D575730500XXX CSE-2020-34 Airbus CMM 57-52-23 A320/A321
Structure CMM 57-52-23 ASSEMBLY (Installation of 2020 BMC FAA
the Rod Protection at Rib 3 - TASK 57-52-
23-400-819-A01)
CMM 21-53-54: Remove Clevis
(DISASSEMBLY-Task 21-53-54-000-801-
CSE-2020- Ram Air Inlet A01Step1.D.(2) (a) and (b)). 10 AUG HAN CAAV
1809A0000-01 Liebherr CMM 21-53-54 A320/A321
035 Actuator - CMM 21-53-54: Install Clevis (ASSEMBLY- 2020 BMC FAA
Task 21-53-54-400-801-A01Steo1.D.(13Hcl
and (15)(b)).
753A0000-03; CMM 21-52-11 LIEBHERR: Cleaning
753A0000-04, (Standard Cleaning Procedure - SUBTASK:
CMM 21-52-11;
753B0000-02; Primary Heat 20-00-02-100-003-A01) 12 AUG HAN
CSE-2020-09 Liebherr CMM 20-00-02 A320/A321 CAAV
753B0000-03; Exchanger CMM 20-00-02 LIEBHERR: Cleaning 2020 BMC
753C0000-01; (External Cleaning - SUBTASK: 20-00-02-
753C0000-02 100-003-A01 )
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CMM 20-00-02 LIEBHERR: Cleaning
(Internal Cleaning, Manual Flushing-
SUBTASK 20-00-02-100-008-A01)
CAAV
S57412016XXX; Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
CSE/2020/018 Leading Edge Assy
S57412006XXX Aerospace CMM 57-42-11 icer Boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
S57412114XXX; Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
CSE/2020/019 Leading Edge Assy
S57412117XXX Aerospace CMM 57-43-11 icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
S57412080XXX; Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
CSE/2020/020 Leading Edge Assy
S57412170XXX Aerospace CMM 57-43-12; icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
S57412090XXX CSE/2020/021 Leading Edge Assy
Aerospace CMM 57-43-12; icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CAAV
Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
S57412121XXX CSE/2020/022 Leading Edge Assy
Aerospace CMM 57-43-12 icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
S57412125XXX CSE/2020/023 Leading Edge Assy
Aerospace CMM 57-43-12 icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
Zodiac CMM 30-11-42; Leading Edge Assy - Replace The New De- ATR72/PW 13 AUG HCM CAAP
S55172000XXX CSE/2020/024 Leading Edge Assy
Aerospace CMM 55-12-00 icer boot As Per CMM 30-11-42 127 2020 BMC CAAB
SSCA
CAAV
Zodiac CMM 30-21-65; Duct Assy - Replace The New The Radiator ATR72/PW 13 AUG HCM CAAP
S54112670XXX CSE/2020/025 Duct Assy
Aerospace CMM 71-62-62 upper conduit de-icer as Rer CMM 30-21-65 127 2020 BMC CAAB
SSCA
CAAV
Duct Assy- Replace The New Gaspath And
S54115619XXX; Zodiac CMM 30-21-65; ATR72/PW 13 AUG HCM CAAP
CSE/2020/026 Duct Assy Lower Gaspath De-icer Boot As Per CMM
S54112656XXX Aerospace CMM 71-62-62 127 2020 BMC CAAB
30-21-65
SSCA
CAAV
Leading Edge Zodiac CMM 30-21-65; Leading Edge Assy - Replace The New Air ATR72/PW 13 AUG HCM CAAP
S54112759XXX CSE/2020/027
Assy-Air Intake Aerospace CMM 71-61-61 Intake De-icer Boot As Per CMM 30-21-65 127 2020 BMC CAAB
SSCA
285-14000-XXX; FOLLOWING TASK ON CMM 252300
285-17000-XXX; Cleaning And (2817N)
Facc Ag CMM 25-23-00
285-18000-XXX; Visual Inspection, 1. Cleanning door linning: Task 25-23-00-
(2817n), Airbus (2817N);
285-19000-XXX; Replacement 940-801-A00, 25-23-00-94A-801 A00, 25- A350/ RR 14 AUG HAN
CSE-2020-02 Helicopters CAAV
285-22000-XXX; Component Of The 23-00-100-801-A00 XWB 2020 BMC
Deutschland CMM 25-23-00
285-23000-XXX; Pax Door 2. Visual inspection of the door lining: Task
Gmbh (C0417) (C0417)
285-24000-XXX; Lining A350 Fleet 25-23-00-210-801-A00
285-28000-XXX; 3. R/I and disassembly/assembly of the slide
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
285-29000-XXX; raft cover: Task 25-23-00-000-801-A00, 25-
285-33000-XXX; 23-00-400-801-A00
285-38000-XXX; 4. Repair 5: Replacement of the slide-raft
285-39000-XXX; cover glass: Task 25-23-00-300-802-A00
285-42000-XXX; 5. Repair 6: Replacement of the seals, foams
285-43000-XXX; and tapes: Task 25-23-00-300-804-A00
285-44000-XXX; FOLLOWING TASK ON CMM 252300
285-48000-XXX; (C0417)
285-49000-XXX; 1. Cleanning door linn ing: Task 25-23-00-
285-59000-XXX; 940-801 -A00, 25-23-00-94A-801-A00, 25-
285-69000-XXX 23-00-100-801-A00
2. Visual inspection of the door lin ing: Task
25-23-00-210-801-A00
3. R/I and disassembly/assembly of the slide
raft cover: Task 25-23-00-000-801-A00,
TASK 25-23-00-400-801-A00
4. Repair 5: Replacement of the slide-raft
cover glass: Task 25-23-00-300-802-A00
5. Repair 6: Replacement of the seals, foams
and tapes: Task 25-23-00-300-804-A00
FOLLOWING TASK ON CMP 383197
9.1 Disconnect, remove and disassemble
procedures D1227WTA6953-A-38-31-97-
01001-500A-C
WTA6953-05;
Remove/Install Para 2: Remove Waste Separator Outlet
WTA6953-06;
Separator Outlet, Para 3: Remove and Disassemble Revision
WTA6953-15;
Revision Cover, Cover Assembly
WTA6953-16; A350/ RR 14 AUG HAN
CSE-2020-03 Waste Inlet Diehl Aviation CMP 38-31-97 Para 9: Remove and Disassemble Waste CAAV
WTA6953-20; XWB 2020 BMC
Assembly Of Waste Inlet Assembly
WTA6953-21;
Tank Assy Fleet 9.2 Assemble, install, and connect
WTA6953-50
A350 procedures D1227WTA6953-A-38-31-97-
01001-700A-C
Para 10: Install Waste Separator Outlet
Para 9: Assemble and Install Revision Cover
9.3 Clean and apply surface protection
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
D1227WTA6953-A-38-31-97-01001-250A-
C
Para 2: Clean Disassembled Mechanical
Parts of Tank Assembly
VL500 XXX FOLLOWING TASK ON CMM 352161, CMM
E2C15R5 XXX; 352162; CMM 352163; CMM 352164; CMM
E3C15R5 XXX; 252201; CMM 252202; CMM 252208
E4C15R5 XXX 1. TASK 35-21-61-000-801-A01
E2C22R5 XXX DISASSEMBLY, STEP 2. D (5) AND 3. C (6)
E3C22R5 XXX 2. TASK 35-21-61-400-801-A01
E4C22R5 XXX ASSEMBLY, STEP 2. A (1) AND 3. A (2)
E2C15L5 XXX; 3. TASK 35-21-62-000-801-A01
E3C15L5 XXX; DISASSEMBLY, STEP 2. D (5) AND 3. D (4)
E4C15L5 XXX; AND 4. D (4)
E2C22L5 XXX; 4. TASK 35-21 -62-400-801-A01
E3C22L5 XXX; ASSEMBLY, STEP 2. A (3) AND 3. A (2)
Replacement
E4C22L5 XXX; CMM 35-21-61; AND 4. A (1)
Locking System
F2C150 XXX; CMM 35-21-62; 5. TASK 35-21 -63-000-801 -A01
Assy Of Passenger
F3C150 XXX; Airbus; CMM 35-21-63; DISASSEMBLY, STEP 2. D (4) AND 3. D (4)
Service Unit (Psu) A350/ RR 14 AUG HAN
F4C150 XXX; CSE-2020-45 Diehl; CMM 35-21-64, AND 4. D (4) CAAV
And XWB 2020 BMC
F5C150 XXX; Be Aerospace CMM 25-22-01; 6. TASK 35-21-63-400-801 -A01
Chemical Oxygen
F6C150 XXX; CMM 25-22-02; ASSEMBLY, STEP 2. A (2) AND STEP 3. A
Container
F2C220 XXX; CMM 25-22-08 (2) AND STEP 4. A (1)
Assembly
F3C220 XXX; 7. TASK 35-21-64-000-801 -A01
F4C220 XXX; DISASSEMBLY, STEP 2. D (5) AND 3. C (6)
F5C220 XXX; 8. TASK 35-21-64-400-801-A01 ASS
F6C220 XXX; EMBLY, STEP 2. A (1) AND 3. A (2) (a)
M3C220 XXX; 9. TASK A350-A-25-22-01-01001-530A-C
M4C220 XXX; DISASSEMBLY STEP 1.1.2
M5C220 XXX; 10. TASK A350-A-25-22-01-01001-710A-C
M6C220 XXX; ASSEMBLY STEP 1.1.12
G2C150 XXX; 11. TASK A350-A-25-22-02-01001-530A-C
G3C150 XXX; DISASSEMBLY STEP 1.1.2
G4C150 XXX; 12. TASK A350-A-25-22-02-01001-710A-C
G2C220 XXX; ASSEMBLY STEP 1.2.7
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
G3C220 XXX; 13. TASK A350-A-25-22-08-01001-530A-C
G4C220 XXX; DISASSEMBLY STEP 1.1.2
N3C220 XXX; 14. TASK A350-A-25-22-08-01001-710A-C
K2C15R XXX; ASSEMBLY STEP 1.1.12
K3C 5R XXX; 15. SERVICE INFORMATION date
K2C22R XXX; 16.04.2019 - B/E Aerospace Systems GmbH
K3C22R XXX;
K2C15L XXX;
K3C15L XXX;
K2C22L XXX;
K3C22L XXX
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WR220AEAAAAA; ,K01 ) Para 3.J
WR220AFAAAAA; 9.2: Replace top cover shell of number 3 UH
WR220AGAAAAA; and R/H moveable fairing IAW CMM 57-57-
WR220AHAAAAA; 43:
WR220AKAAAAA; TASK 57-57-43-000-801-A01 (B01 ,C01
WR220ALAAAAA; ,001 ,J01 ,K01 ,L01 ,M01 ,N01 ,P01) Para
WQ218ADAAAAA; 3.C
WQ218AEAAAAA; TASK 57-57-43-000-801-E01(F01,G01 ,H01
WQ218AF AAAAA; ) Para 3.D
WQ218AGAAAAA; TASK 57-57-43-400-801-A01 (B01
WQ218AHAAAAA; ,C01,D01 ,E01 ,F01 ,G01 ,H01 ,J01 ,K01
WQ218AJAAAAA; ,L01 ,M01 ,N01 ,P01 ) Para 3.H
WQ218AKAAAAA; 9.3: Replace top cover shell of number 4 UH
WQ218ALAAAAA; and R/H moveable fairing IAW CMM 57-57-
WQ218ANAAAAA; 45:
WQ218APAAAAA; TASK 57-57-45-000-801-A01(B01 ,C01
WR218ADAAAAA; ,D01 ,E01 ,F01 ,G01 ,H01 ,J01 ,K01 ) Para
WR218AEAAAAA; 3.C
WR218AF AAAAA; TASK 57-57-45-400-801-A01 (B01 ,C01
WR218AGAAAAA; ,D01 ,E01 ,F01 ,G01 ,H01,J01 ,K01) Para
WR218AHAAAAA;; 3.H
WR218AJAAAAA;
WR218AKAAAAA;
WR218ALAAAAA;
WR218ANAAAAA;
WR218AP AAAAA;
WQ216ADAAAAA;
WQ216AEAAAAA;
WQ216AF AAAAA;
WQ216AGAAAAA;
WQ216AHAAAAA;
WQ216AKAAAAA;
WQ216ALAAAAA;
WR216ADAAAAA;
WR216AEAAAAA;
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WR216AF AAAAA;
WR216AGAAAAA;
WR216AHAAAAA;
WR216AKAAAAA;
WR216ALAAAA;
2LH, 2RH, 3LH, 3RH Pax Door : CMM 52-
12-30, REPLACE BEARING AND BEARING
ASSY OF FITTINGSTOP
SUBTASK 52-12-30-000-113-A01 STEP
B(3}, B(4}, B(11), B(12) FOR REMOVE
BEARING AND BEARING ASSY
SUBTASK 52-12-30-000-117-A01 STEP
B(3), B(4), B(11), B(12) FOR REMOVE
BEARING AND BEARING ASSY
SUBTASK 52-12-30-000-154-A01 STEP
B(3}, B(4}, B(11}, B(12) FOR REMOVE
WF100 XXX; BEARING AND BEARING ASSY
WF101 XXX; SUBTASK 52-12-30-000-156-A01 STEP
Replace Bearing CMM 52-12-30;
WG100 XXX; B(3}, B(4), B(11), B(12) FOR REMOVE
(X-Roller) And
WG101 XXX; BEARING AND BEARING ASSY A350/ RR 14 AUG HAN
CSE-2020-48 Bearing Assy Of Airbus Sas CMM 52-11-30; CAAV
WD100 XXX; SUBTASK 52-12-30-000-201 -A01 STEP XWB 2020 BMC
Fitiing-Stop Of Pax
WD101 XXX; B(3), B(4), B(11 ), B(12) FOR REMOVE
Door CMM 52-13-30
WH100 XXX; BEARING AND BEARING ASSY
WH101 XXX SUBTASK 52-12-30-000-203-A01 STEP
B(3), B(4), B(11 ), B(12) FOR REMOVE
BEARING AND BEARING ASSY
SUBTASK 52-12-30-000-206-
A01STEP8(3), B(4), B(11 ), B(12) FOR
REMOVE BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-018-A01 STEP
A(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-100-A01 STEP
A(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
SUBTASK 52-12-30-400-179-A01 STEP
A(3), A(4), A(1 1), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-181-A01 STEP
A(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-214-A01
STEPA(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-215-A01 STEP
A(3), A(4), A(11), A(12) FOR INSTALL
BEARING AND BEARING ASSY
SUBTASK 52-12-30-400-227-A01 STEP
A(3), A(4), A(11}, A(12) FOR INSTALL
BEARING AND BEARING ASSY
- 1 LH, 1 RH Pax Door: CMM 52-11-30,
REPLACE BEARING OF FITTING-STOP
TASK 52-11 -30-000-820-A01 Step 4.8.(7),
4.B.( 8), 4.B.(17) and 4.B.(18) FOR
REMOVE BEARING AND ASSY
TASK 52-11-30-000-820-B01Step4.B.{7),
4.B.( 8), 4.B.(17) and 4.B.(18) FOR
REMOVE BEARING AND ASSY
TASK 52-11 -30-000-820-C01 Step 4.B.(7),
4.B.( 8), 4.B.(17) and 4.B.(18) FOR
REMOVE BEARING AND ASSY
TASK 52-11-30-000-820-E01 Step 4.B.(7),
4.B.( 8), 4.B.(17) and 4.B.(18) FOR
REMOVE BEARING AND ASSY
TASK 52-11-30-400-820-A01 Step 3.A.(3},
3.A.(4), 3.A.(13) and Step 3.A.(14) FOR
INSTALL BEARING AND ASSY
TASK 52-11 -30-400-820-B01 Step 3.A.(3),
3.A.(4), 3.A.(13) and Step 3.A.(14) FOR
INSTALL BEARING AND ASSY
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
TASK 52-11 -30-400-820-C01 Step 3.A.(3},
3.A.(4}, 3.A.(13) and Step 3.A.(14) FOR
INSTALL BEARING AND ASSY
TASK 52-11 -30-400-820-E01 Step 3.A.(3},
3.A.(4}, 3.A.(1 3) and Step 3.A.(14) FOR
INSTALL BEARING AND ASSY
4LH, 4RH Pax Door: CMM 52-13-30,
REPLACE BEARING OF FITTING-STOP
TASK 52-13-30-000-820-A01 Step 4.B.(3),
4.B.(4), 4.B. (11) Step 4.B.(12) FOR
REMOVE BEARING AND ASSY
TASK 52-13-30-000-820-B01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
REMOVE BEARING AND ASSY
TASK 52-13-30-000-820-D01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
REMOVE BEARING AND ASSY
TASK 52-13-30-000-820-E01Step4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
REMOVE BEARING AND ASSY
TASK 52-13-30-400-820-A01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
INSTALL BEARING AND ASSY
TASK 52-13-30-400-820-B01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
INSTALL BEARING AND ASSY
TASK 52-13-30-400-820-C01Step4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
INSTALL BEARING AND ASSY
TASK 52-13-30-400-820-E01 Step 4.B.(3),
4.B.(4), 4.B.(11) Step 4.B.(12) FOR
INSTALL BEARING AND ASSY
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WF101AQATAAG; 9.1. Removal and Disassembly of the
WF100ARAVAAG; Indication Mechanism
WG101BAAVAAH; CMM 5211 30
WG100AXAUAAH; 52-11-30-000-809-A01 PARA 1,2,3
WD101AXAPAAF; 52-11-30-000-809-801 PARA 1,2,3
WD100AXAPAAF; 52-11-30-000-809-C01PARA1,2,3 .,
WH101BGAUAAF; 52-11-30-000-809-D01 PARA 1,2,3
WH100BFATAAF; 52-11-30-000-809-E01 PARA 1,2,3
WF101BBAXAAH; CMM 521230
WF100BCAXAAH; 52-12-30-000-811-A01 PARA 1,2,3
WG101BFAWAAB; 52-12-30-000-811-801 PARA 1,2,3
WG100BCAWAAB; 52-12-30-000-811-001PARA1,2,3
WD101BEARAAB; 52-12-30-000-811-E01PARA1 ,2,3
WD100BEARAAB; 52-12-30-000-811-F01 PARA 1,2,3
WH101BPAWAAB; 52-12-30-000-8 11 -G01PARA1,2,3
WH100BNAWAAB; CMM 52-12-30; CMM 521330
Remove/ Install
WF101BGBBAAH; 52-13-30-000-809-A01 PARA 1,2,3
Indicator A350/ RR 14 AUG HAN
WF100BHBBAAH; CSE-2020-49 Airbus CMM 52-11-30; 52-13-30-000-809-801 PARA 1,2,3 CAAV
Mechanism Of Pax XWB 2020 BMC
WG101BKAYAAB; 52-13-30-000-809-001 PARA 1,2,3
Door
WG100BJAYAAB; CMM 52-13-30 52-13-30-000-809-E01 PARA 1,2,3
WD101BFAUAAB; 9.2. Assembly and Installation of the
WD100BFAUAAB; Indication Mechanism
WH101BRAXAAB; CMM 521130
WH100BQAXAAB; 52-11-30-400-819-A01 PARA 4
WF101 BJBBAAH; 52-11-30-400-819-801 PARA 4
WF100BKBBAAH; 52-11 -30-400-819-C01 PARA4
WG101BNAYAAB; 52-11-30-400-819-001PARA4
WG100BKAYAAB; 52-11-30-400-819-E01 PARA4
WD101BMAUAAB; 52-11-30-400-819-F01 PARA 3.0
WD100BMAUAAB; 52-11-30-400-819-G01 PARA 3.0
WH101BWAXAAB; CMM 521230
WH100BVAXAAB; 52-12-30-400-822-A01 PARA 4
WF101BMBDAAJ; 52-12-30-400-822-801 PARA 4
WF100BNBDAAJ; 52-12-30-400-822-001 PARA 4
WG101BQAZAAJ; 52-12-30-400-822-E01 PARA 4
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WG100BMAZAAJ; 52-12-30-400-822-F01 PARA 4
WD101BRAVAAJ; CMM 521330
WD100BRAVAAJ; 52-13-30-400-819-A01 PARA 4
WH101CBAZAAJ; 52-13-30-400-819-801 PARA 4
WH100CAAZAAJ; 52-13-30-400-819-001 PARA 4
WF101 BMBEAAK; 52-13-30-400-819-E01 PARA 4
WF100BNBEAAK; 3. Testing of the Electrical Bonding
WG101 BQBAAAK; CMM 521130 52-11 -30-700-801-A01
WG100BMBAAAK; CMM 521230 52-12-30-700-801 -A01
WD101BRAWAAH; CMM 521330 52-13-30-700-801 -A01
WD100BRAWAAH;
WH101CBBAAAH;
WH100CABAAAH;
WF101 BSBEAAK;
WF1 OOBNBEAAK;
WG101 BUBAAAK;
WG100BRBAAAK;
WD101 BVAWAAH;
WD100BVAWAAH;
WH101CLBAAAH;
WH100CKBAAAH;
WF101BZBFAAK;
WF100CABFAAK;
WG101CBBBAAK;
WG100BYBBAAK;
WD101CCAYAAH;
WD100CCAYAAH;
WH101CUBCAAH;
WH100CUBCAAH
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Removauinstallatio
9.1 Revoval:
n Of The Housing
Diehl Aerospace TASK 52-71 -50-000-801-A01 Step 1.C.(1) .. A350/ RR 14 AUG HAN
E01301E01020000 CSE-2020-51 Cover Of Door CMM 52-71-50 CAAV
Gmbh 9.2 Installation: XWB 2020 BMC
Indication Panel
TASK 52-71-50-400-801-A01Step1 .C.(5)
(Dip)
- CMM 78-11-11: REPAIR 002 COMMON
NOZZLE ASSEMBLY REPLACE THE
745-1101 XXX; Common Nozzle Goodrich OUTER DUCT SEALS (VRS2055) A320/A321- 18 AUG HAN CAAV
CSE-2020-57 CMM 78-11-11
740-1094 XXX Assembly Aerostructures - CMM 78-11-11: REPAIR 005 COMMON V2500 2020 BMC FAA
NOZZLE ASSEMBLY- REPLACE THE
LOWER SEAL (VRS2060)
REPAIR 72- THRUST REVERSER RIGHT
C-DUCT FIXED STRUCTURE A320/A321- 18 AUG CAAV
CSE-2020-55
- REPLACE THE PANDOWN V2500 2020 FAA
HEATSHIELD; TASK 78-30-00-300-072
740-0002; Thrust Reverser Goodrich HAN
CMM 78-30-00 - CMM SUBTASK 78-30-00-020-136:
745-0002 Assembly Aerostructures BMC
Remove the Seal Assemblies from the
CSE-2020- A320/A321- 18 AUG CAAV
ACAC Duct
058 V2500 2020 FAA
- CMM SUBTASK 78-30-00-420-126: Install
the Seal Assembly on the ACAC Duct
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
INSPECTION AND REPAIR# 162: THRUST
REVERSER FIXED DUCT ASSEMBLY - A321/V250 11 SEP
CSE-2020-61 CAAV
REPLACE THE ENGINE BUMPER 0 2020
PANDOWN, (VRS2302)
DISASSEMBLY (Disassembly of the hinge
assy - TASK 52-81-18-000-801-
Door - Main A01step3.A.1 and step 3.B.1) A321/V250 27 AUG HCM CAAV
D5288016500XXX CSE/2020/034 Airbus CMM 52-81-18
Landing Gear ASSEMBLY (Assembly of the hinge assy - 0 2020 BMC SSCA
TASK 52-81-18-400-809-A01 step 3.A.2 and
step 3.B .2)
Disassembly:
+Removal of the Ball Unit as per CMM TASK
25-59-63-010-801-A01
-Cleaning:
+Cleaning of the Painted Component Parts
as per CMM TASK 25-59-63-100-801-A01
+Cleaning of the Component Parts which are
not Painted as per TASK 25-59-63-100-802-
A01
-ChecU lnspection:
+ Check of the Metal and GFRP
Components of the Ball Mats as per CMM
27 AUG HCM CAAV
D255721XXX CSE/2020/035 Mats-Ball Airbus CMM 25-59-63 TASK 25-59-63-210-801-A01 A320/A321
2020 BMC SSCA
+ Check of the Sealing Tape as per CMM
TASK 25-59-63-210-803-A01.
+ Check of the lnsulation as per CMM TASK
25-59-63-210-804-A01
+ Check of the Captive Screw as per CMM
TASK 25-59-63-210-805-A01
-Repair:
+ Repair of the Paint on the Ball Mats as per
CMM TASK 25-59-63-300-803-A01
+ Removal of the Marks and the Corrosion
as per CMM TASK 25-59-63-300-801-A01
+ Repair of the Scratches on the Metal
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Components as per CMM TASK 25-59-63-
300-802-A01
+ Repair of the Non-Slip Coating as per
CMM TASK 25-59-63-350-802-A01
+ Replacement of the Captive Screws
(swaged) as per CMM TASK 25-59-63-350-
801-A01
+ Replacement of the Sealing Tape as per
CMM TASK 25-59-63-350-803-A01
+ Replacement of the Supporting Strip as per
CMM TASK 25-59-63-350-804-A01
+ Replacement of the Cover Sheet as per
CMM TASK 25-59-63-350-805-A01
+ Replacement of the Lower Sheet as per
CMM TASK 25-59-63-350-806-A01
+ Replacement of the Insulation as per CMM
TASK 25-59-63-350-807-A01
+ Replacement of the Section Profile as per
CMM TASK 25-59-63-350-808-A01
+ Repair of the GFRP on the Lower Sheet as
per CMM TASK 25-59-63-300-804-A01
+ Replacement of the Cover Plate as per
CMM TASK 25-59-63-300-805-A01
+ Replacement of the Nut Plate as per CMM
TASK 25-59-63-300-806-A01
+lnstallation of the Ball Unit as per TASK 25-
59-63-410-801-A01
CMM 21-54-12 LIEBHERR: Cleaning
(Standard Cleaning Procedure - SUBTASK:
CMM 21-54-12; TASK 21-54-12-100-801-A01)
Primary Heat 27 AUG HAN
753D0000-01 CSE-2020-66 Liebherr CMM 20-00-02 LIEBHERR: Cleaning A320/A321 CAAV
Exchanger 2020 BMC
CMM 20-00-02 (External Cleaning - SUBTASK: 20-00-02-
100-003-A01)
CMM 20-00-02 LIEBHERR: Cleaning
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
(Internal Cleaning, Manual Flushing-
SUBTASK 20-00-02-100-008-A01)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
-Surface Damage Repair as per CMM 32-
12-21/SUBTASK 32-12-21-350-001-
Main Landing Gear A01/(1)/(a)/1. 31 AUG BMC
20158500X-XXX CSE/2020/011 Safran CMM 32-12-21 A320/A321 CAAV
LEG And Dressings -Protective Treatment as per CMM 32-12- 2020 HCM
21/SUBTASK 32-12-21-380-001-
A01/(2)/(a)/2& 3
- Remove the Atmospheric Vacuum Breaker
(AVB): IAW CMP 38-31-84 :
D1227TA69XX-A-38-31-84-01001-500A-
C.2a: Remove Atmospheric Vacuum
Breaker (AVB)
D1227TA69XX-A-38-31-84-01001-500A-
C.4a,b: Remove Water Valve Assembly.
- Assemble, install, and connect procedures:
IAW CMP 38-31-84:
CSE-2020- A350/TREN 1 SEP
TA69-XXX Toilet Assembly Diehl CMP 38-31-84 D1227T A69XX-A-38-31-84-01001 -700A- CIMC CAAV
CI06 XWB-84 2020
C.5a: Install Water Valve Assembly
01227T A69XX-A-38-31-84-01001-700A-
C.6b: Install Atmospheric Vacuum Breaker
(AVB)
D1227TA69XX-A-38-31-84-01001-700A-
C.7g,h,i: Install Spray Ring Assembly
D1227TA69XX-A-38-31-84-01001-700A-
C.8a: Connect the harness assembly to the
water valve assembly.
- Remove the Atmospheric Vacuum Breaker
(AVB): IAW CMP 38-31-84:
D1227TA69XX-A-38-31-84-01001-500A-
C.2a: Remove Atmospheric Vacuum
CSE-2020- Breaker (AVB) A350/TREN 1 SEP
TA69-XXX Toilet Assembly Diehl CMP 38-31-84 CIMC CAAV
CI06 D1227TA69XX-A-38-31-84-01001-500A- XWB-84 2020
C.4a,b: Remove Water Valve Assembly.
- Assemble, install, and connect procedures:
IAW CMP 38-31-84:
D1227T A69XX-A-38-31-84-01001 -700A-
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
C.5a: Install Water Valve Assembly
01227T A69XX-A-38-31-84-01001-700A-
C.6b: Install Atmospheric Vacuum Breaker
(AVB)
D1227TA69XX-A-38-31-84-01001-700A-
C.7g,h,i: Install Spray Ring Assembly
D1227TA69XX-A-38-31-84-01001-700A-
C.8a: Connect the harness assembly to the
water valve assembly.
WD038ADABAAA;
WD038ADACAAA;
WD038AEABAAA;
WD038AFABAAA;
WD038AGABAAA;
WD038AHABAAA;
WD038AHACAAA;
WD038AHADAAA;
WD038AJABAAA;
WD038AKACAAA;
CMM 21-52-15/TASK 21-52-1 5-300-813- 03 SEP HAN
WD038ALACAAA; CSE-2020-13 Ram Air Inlet Airbus CMM 21-52-15 A350 CAAV
A01, Permanent Repair of Worn Holes 2020 BMC
WD039ABABAAA;
WD039ABACAAA;
WD039ACABAAA;
WD039ADABAAA;
WD039AEABAAA;
WD039AFABAAA;
WD039AFACAAA;
WD039AGABAAA;
WD039AHACAAA;
WD039AJACAAA;
T-Piece Connection FOLLOWING TASK ON CMM 78-32-44
Assembly On Goodrich 1. DISASSEMBLY T-PIECE CONNECTION
A321/V250 4 SEP HAN CAAV
CH1543A0034 CSE-2020-68 Transmision Thrust Actuation CMM 78-32-44 ASSEMBLY SUBTASK 1. AND 2.C.
0 2020 BMC FAA
Rev Systems 2. ASSEMBLY T-PIECE CONNECTION
Control ASSEMBLY SUBTASK 1. AND 3.C.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
INSPECTION/CHECK LP BLEED AIR
CHECK VALVE IAW CMM 36-10-02 WITH
CAAV
Lp Bleed Air Check SUBTASKS:- 36-10-02-000-801-A01 ATR42,ATR 4 SEP HCM
CT60-3 CSE/2020/30 Safran CMM 36-10-02 SSCA
Valve DISASSEMBLY 72/PW127 2020 BMC
CAAP
- 36-10-02-200-802-A01 INSPECTION
- 36-10-02-400-801-A01 ASSEMBLY
CMM 71-1 1-00 Repair (Repair 011 Replace
740-3000;
the damaged rear bulkhead insulation 5 SEP HAN
745-3000; CSE-2020-69 Air Intake Cowl Goodrich CMM 71-11-00 A320/A321 CAAV
blankets of the air intake cowl- TASK 71-11- 2020 BMC
745-3400
00-300-011 Step 6.A, Step 6.J)
10-450101 XXX;
CMM 32-12-79; CAAV
10-450102 XXX; Main Landing Gear Paint finish repaired as per Subtask 32-12- 7 SEP HCM
CSE/2020/042 Safran A320-A321 FAA
10-450201 XXX; Complete 79-380-001 -A01 / (2) / (a)/3/a 2020 BMC
PCS-2500 SSCA
10-450202 XXX;
D2157100000800;
D2157100001000;
D2157100001200;
D2157100001400;
D2157100001600,
D2157100001800;
CMM 21-52-12, TASK 21-52-1 2-300-801- 11 SEP HAN CAAV
D2157100002000; CSE-2020-62 Ram Air Outlet Airbus CMM 21-52-12 A320/A321
A01: Reworking Or Machining 2020 BMC FAA
D2157100103000,
D2157108001000;
D2157108001200;
D2157108001400,
D2157108001600;
D2157108001800;
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
D2157108002000;
D2157108002200;
D2157108002400;
D2157108103000;
D2157138800000;
D2157138900000
INSPECTION/CHECK
REPAIR#1 (CMM TASK 53-15-12-300-801-
A01): Radome Repair
D53132210000; A320/A321 11 SEP HAN CAAV
CSE-2020-64 Nose Radome Airbus CMM 53-15-12 REPAIR#2 (CMM TASK 53-15-12-300-802-
D53132110000 series 2020 BMC FAA
A01): Resin Injection
REPAIR#3 (CMM TASK 53-15-12-300-803-
A01): Sandwich Zone -Through Repair by
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Inside on a One Phase
Process (Heat blanket or Autoclave)
REPAIR#4: CMM TASK 53-15-12-300-803-
A02: Sandwich Zone-Through Repair by
inside on a Two Phase
Process(Heat Blanket)
REPAIR#5: CMM TASK 53-15-12-300-810-
A01: Sandwich Zone-Through Repair by
Outside on a One Phase
Process (Heat blanket)
REPAIR#6: CMM TASK 53-15-12-300-804-
A01: Sandwich Zone -Through Repair by
Inside Nearthe
Monolithic Zone on a One-Phase Process
(Heat Blanket or Autoclave)
REPAIR#7: CMM TASK 53-15-12-300-804-
A02: Sandwich Zone -Through Repair by
Inside Nearthe
Monolithic Zone on a Two-Phase Process
(Heat blanket)
REPAIR#11: CMM TASK 53-15-12-360-
801-A01: Repair of the Lightning Plugs
REPAIR#12: CMM TASK 53-15-12-370-
801-A01 : Curing Process
REPAIR#13: CMM TASK 53-15-12-380-
801-A01 : Application of Paint
REPAIR#14: CMM TASK 53-15-12-380-
802-A01: Paint Touch-up
REPAIR#15: CMM TASK 53-15-12-380-
803-A01: Application of Sealing Varnish
Inside Radome
REPAIR#16: CMM TASK 53-15-12-380-
804-A01: Application of Airline Finish Paint
WD040ABACAAA; - TASK 21-59-11 -000-802-A01, 11SEP HAN
CSE-2020-71 Flap Assy Airbus CMM 21-59-11 A350/XWB CAAV
WD040ABADAAA; Disassembly of the Transmission Bar 2020 BMC
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
WD040ACACAAA; - TASK 21-59-11-400-802-A01, Asembly of
WD040ADACAAA; the Transmission Bar
WD040ADADAAA; - TASK 21-59-11-000-801 -A01,
WD040AFADAAA, Disassembly of the Flap Rear-LWR Panel
WD040AGADAAA; - TASK 21-59-11 -400-801-A01, Assembly of
WD040AHADAAA; the Flap Rear-LWR Panel
WD041ACAEAAA, - Subtask 21 -59-11 -000-015-A01,
WD041ADAFAAA; Disassembly of the Flap Assy
WD041AEAEAAA; - Subtask 21-59-11 -400-023-A01, Assembly
WD041AEAFAAA, of the Flap Assy
WD041AFAEAAA;
WD041AGAEAAA;
WD041AHAEAAA
FOLLOWING TASK ON CMM 28-11 -39:
1 TASK 28-11-39-700-801 -A01 Structural
Container Leak Test
2 TASK 28-11-39-700-802-A01 Tube Leak
Test.
3. TASK 28-11-39-700-803-A01 Bladder
Tank Leak Test.
4. TASK 28-11-39-000-813-A01 Removal of
the Bladder Tank
5 TASK 28-11-39-400-802-A01 Installation
Additional Center A321/V250 15 SEP HCM CAAV
D282710750XXXX CSE/2020/28 Airbus CMM 28-11-39 of the Bladder Tank
Tank (Act) 0 2020 BMC FAA
6 TASK 28-11-39-100-801 -A01 Cleaning
7 TASK 28-1 1-39-210-801-A01
Examination of the Internal and External
ACT Structure
8. TASK 28-11-39-2 10-802-A01 Examine
the ACT internal component parts
9. TASK 28-11-39-210-803-A01 Electrical
System Parts
10. TASK 28-11-39-210-805-A01 Check of
the Identification Plate and Placards
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
11. TASK 28-11-39-210-804-A01 Examine
the Bladder Tank
12. TASK 28-1 1-39-300-801-A01
Reworking or Machining
13. TASK 28-11 -39-300-802-A01 Repair of
the Protective Treatment
14. TASK 28-11-39-300-803-A01
Replacement of Parts
15. TASK 28-11-39-500-801 -A01 Storage
after Assembly
16. TASK 28-11 -39-700-806-A01 Continuity
Test
17. TASK 28-11-39-000-809-A01 Removal
of the Vent System
18. TASK 28-11-39-000-810-A01 Removal
of the Fuel System
19. TASK 28-1 1-39-000-811-A01 Removal
of the Fuel Valve System
20. TASK 28-11-39-400-804-A01 Installation
of the Fuel Valve System
21.TASK 28-11-39-400-805-A01 Installation
of the Fuel System
22.TASK 28-11 -39-400-806-A01 Installation
of the Vent System
23. TASK 28-11-39-400-815-A01
Disassembly of the Tank Structure
Installation.
1. Blades repair 4-1 , 4-2, 4-4, 4-6, 4-10, 4-
Hamilton ATR4/ATR7
19, 4-20 15 SEP HCM CAAV
815500-X CSE/2020/038 Propeller Sundstrand CMM 61-13-12 2/PW124/P
2.Spinner repair 1-1 , 1-2, 1-3; 2020 BMC CAAP
W127
3. Hub repair 3-3
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of Divider Panel lAW CMM 25-
CSE-IN6- Trolley 31-222 reference: A320/A321/ 06 DEC CAAV
263522-41 Safran CMM 25-31-222 CIMC
2021-50 Compartment -Removal: Block 4.5 Divider Panel Removal CFM56 2021 CAAT
- Install: Block 4.5 Divider Panel Installation
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CSE-2017- Galley G44cfa With Cleaning and replacement the defective A350/TREN 23 SEP
X409000-0000011 B/E Aerospace CMM 25-39-22 CIMC CAAV
Cl57 Ccrc parts (except electric parts) XWB-84 2020
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CMM 25-39-25,
CSE-2017- ISSUE DATE: 10 Cleaning and replacement the defective A350/TREN 23 SEP
X415000-0000011 Galley G45ral B/E Aerospace CIMC CAAV
CI60 AUG 2019 REV parts (except electric parts). XWB-84 2020
03
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY: IAW CMP 25-20-09: TASK
A350-A-25-20-09-01001-530A-C, A350-A-
25-20-09-02001-530A-C,
A350-A-25-20-09-03001-530A-C, A350-A-
25-20-09-04001-530A-C, A350-A-25-20-09-
05001-530A-C, A350-A-25-20-09-06001-
530A-C.
ASSEMBLY: IAW CMP 25-20-09: TASK
A350-A-25-20-09-01001-710A-C, A350-A-
25-20-09-02001-710A-C,
A350-A-25-20-09-03001-71 OA-C, A350-A-
25-20-09-04001-71 OA-C, A350-A-25-20-
09-05001-71 OA-C, A350-A-25-20-
09-06001-710A-C.
REPAIR: IAW CMP 25-20-09: TASK A350-
A-25-20-09-01001-600A-C
SERVICING: IAW CMP 25-23-35: TASK
A350-A-25-23-35-01001-250A-C
EXAMINATION,TEST,CHECK: IAW CMP
25-23-35: TASK A350-A-25-23-35-01001-
300A-C, A350-A-25-23-35-
01001-310A-C, A350-A-25-23-35-01001-
320A-C
DISASSEMBLY: IAW CMP 25-23-35: TASK
A350-A-25-23-35-01001-530A-C, A350-A-
CSE-2020- A350/TREN 28 SEP
5011-XXX PARTITION DIEHL CMP 25-23-35 25-23-35-02001-530A-C, CIMC CAAV
CI08 XWB-84 2020
A350-A-25-23-35-03001-530A-C, A350-A-
25-23-35-04001-530A-C, A350-A-25-23-35-
05001-530A-C
ASSEMBLY: IAW CMP 25-23-35: TASK
A350-A-25-23-35-01001-710A-C, A350-A-
25-23-35-02001-710A-C,
A350-A-25-23-35-03001-710A-C, A350-A-
25-23-35-04001-71 OA-C , A350-A-25-23-
35-05001-710A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
REPAIR: IAW CMP 25-23-35: TASK A350-
A-25-23-35-01001-600A-C
REMOVAL OF THE BONDED
CONNECTOR BRACKETS : TASK 20-00-
CSE-2020- Standard Practices 01-300-829-A00 A350/TREN 28 SEP
C5678 Diehl SPM 20-00-01 CIMC CAAV
CI09 Manual REPLACEMENT OF THE BONDED XWB-84 2020
CONNECTOR BRACKETS :TASK 20-00-
01-300-865-A0
Sleeve-Nlg - Cleaning: Subtask 32-31-09-160-001-A01 29 SEP HAN CAAV
D3221407920000 CSE-2020-23 Messier-Dowty CMM 32-31-09 A320/A321
Actuating Cylinder - Inspection: Subtask 32-31-09-220-002-A01 2020 BMC FAA
Pin Assy-Nlg Cleaning: Subtask 32-31-07-100-801-A01 29 SEP HAN CAAV
D3221408000000 CSE-2020-24 Messier-Dowty CMM 32-31-07 A320/A321
Actuating Cylinder - Inspection: Subtask 32-31-07-200-801-A01 2020 BMC FAA
- Disassembly of the Side-Load Stay
Assembly - Flap Track 3. Ref TASK 57-55-
D57556232 XXX;
Fairing Assemby 16-040-805-A01 29 SEP HAN CAAV
D57556236 XXX; CSE-2020-26 Airbus CMM 57-55-16 A320/A321
Flap Track 3 - Assembly of the Side-Load Stay Assembly 2020 BMC FAA
D57556579 XXX
- Flap Track 3. Ref TASK 57-55-16-440-801-
A01
- Disassembly of the Side-Load Stay
Assembly - Flap Track 4. Ref TASK 57-55-
D57556242 XXX;
Fairing Assemby 17-000-805-A01 29 SEP HAN CAAV
D57556246 XXX; CSE-2020-27 Airbus CMM 57-55-17 A320/A321
Flap Track 4 - Assembly of the Side-Load Stay Assembly 2020 BMC FAA
D57556580 XXX
- Flap Track 4. Ref TASK 57-55-17-400-801-
A01
Check of the Trunnion Assembly and
Inboard Flap 29 SEP HAN CAAV
D575730500 XXX CSE-2020-28 Airbus CMM 57-52-23 Torsion Support Assembly Ref TASK 57-52- A320/A321
Structure Compl 2020 BMC FAA
23-210-803-A01
- Removal of the bearing (4-300) or (4A-300)
Ref SUBTASK 32-27-20-010-005-A01 Page
Messier-Bugatti- 3008 29 SEP HAN CAAV
D23590000 XXX CSE-2020-29 Leg-Structure CMM 32-27-20 A320/A321
Dowty - Installation of the bearing (4-300) or (4A- 2020 BMC FAA
300) Ref SUBTASK 32-27-20-440-001-A01
Step (I) Page 7010
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- REMOVAL BRAKE BLEED VLV (ITEM
330) Ref SUBTASK 32-41-05-040-002-A01
C20534050; Safran Messier- 29 SEP HAN CAAV
CSE-2020-37 Carbon Brake Assy CMM 32-41-05 - INSTALLATION BRAKE BLEED VLV A320/A321
C20534100 Bugatil-Dowty 2020 BMC FAA
(ITEM 330) Ref SUBTASK 32-41-05-440-
002-A01
Triumph
11412200X; Mlg Door Actuating- Actuation Measure the wear of the door actuating- 29 SEP HAN CAAV
CSE-2020-38 A320/A321
11412200XX Cylinder Systems - Uk, CMM 32-31-35 cylinder bearings. 2020 BMC FAA
Ltd
1141220X; Nlg Door Actuating- Measure the wear of the NLG door 29 SEP HAN CAAV
CSE-2020-39 Safran CMM 32-37-11 actuating-cylinder bearings A320/A321
1141220XX Cylinder 2020 BMC FAA
D23278000;
REMOVE & INSTALL PIN OF TOWING
D23281000;
Remove & Install FITTING AT NLG
D23278000-1; 29 SEP HAN CAAV
CSE-2020-40 Pin Of Towing Safran CMM 32-27-11 1. SUBTASK 32-27-11-000-001-A01 A320/A321
D23281100; 2020 BMC FAA
Fitting At Nlg 2. SUBTASK 32-27-11-010-001-A01
D23278100;
3. SUBTASK 32-27-11-440-001-A01
D23278200
CMM 21 -52-07; REPAIR 07- Removing of
cracks and nicks and smoothing of the
Housing,
SUBTASK 21 -52-07-380-002-A01
- CMM 21 -52-07; REPAIR 08- Repair of
749A0000-02;
Delamination,
2056A0000-02;
CSE-2020- SUBTASK 21-52-07-380-003-A01 29 SEP HAN CAAV
205680000-01; Plenum Liebherr CMM 21-52-07 - CMM 21-52-07; REPAIR 09- Tempering of A320/A321
041 2020 BMC FAA
2056C0000-01;
the Housing,
2056C0000-02
SUBTASK 21-52-07-370-001-A01
- CMM 21 -52-07; REPAIR 10- Painting of
the Inner Surface of the Housing (FOR
PAINT AKZO NOBEL),
SUBTASK 21-52-07-380-004-A01
CMM 55-21-15: Cleaning;
D552800030XXXX CSE-2020- TASK 55-21-15-100-801-A01 29 SEP HAN CAAV
Elevator Assy Airbus CMM 55-21-15 - CMM 55-21-15: Check of the Elevator A320/A321
043 2020 BMC FAA
Weight;
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
TASK 55-21-15-200-801-A01
- CMM 55-21-15: Protective Treatment;
TASK 55-21-15-300-801-A01
- CMM 55-21-15: Record the Elevator
Weight;
TASK 55-21-15-300-802-A01
- CMM 55-21-15: Repainting of the Elevator;
TASK 55-21-15-300-803-A01
- CMM 55-21-15: Repainting of elevator;
TASK 55-21-15-300-803-B01
- CMM 55-21-15: Replacement of the Cover;
TASK 55-21-15-300-806-A01
FOLLOWING TASK ON CMM 28-11-39:
1. TASK 28-11-39-700-801-A01 Structural
Container Leak Test
2. TASK 28-11-39-700-802-A01 Tube Leak
Test.
3. TASK 28-11-39-700-803-A01 Bladder
Tank Leak Test.
4. TASK 28-11-39-000-813-A01 Removal of
the Bladder Tank
5. TASK 28-11-39-400-802-A01 Installation
Additional Center
of the Bladder Tank
D2827107500XXX; Tank (Act), 29 SEP HAN CAAV
CSE-2020-44 Airbus CMM 28-11-39 6. TASK 28-11-39-100-801-A01 Cleaning A320/A321
D2827107501XXX Inspection And 2020 BMC FAA
7. TASK 28-11-39-210-801-A01
Replace Bladder
Examination of the Internal and External
ACT Structure
8. TASK 28-11-39-210-802-A01 Examine
the ACT internal component parts
9. TASK 28-11-39-210-803-A01 Electrical
System Parts
10. TASK 28-11-39-210-805-A01 Check of
the Identification Plate and Placards
11. TASK 28-11-39-210-804-A01 Examine
the Bladder Tank
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
12. TASK 28-11-39-300-801-A01 Reworking
or Machining
13. TASK 28-11-39-300-802-A01 Repair of
the Protective Treatment
14. TASK 28-11-39-300-803-A01
Replacement of Parts
15. TASK 28-11-39-500-801 -A01 Storage
after Assembly
16. TASK 28-11-39-700-806-A01 Continuity
Test
17. TASK 28-11-39-000-809-A01 Removal
of the Vent System
18. TASK 28-11-39-000-810-A01 Removal
of the Fuel System
19. TASK 28-11-39-000-811-A01 Removal
of the Fuel Valve System
20. TASK 28-11-39-400-804-A01 Installation
of the Fuel Valve System
21 .TASK 28-11-39-400-805-A01 Installation
of the Fuel System
22. TASK 28-11-39-400-806-A01 Installation
of the Vent System
Perform detailed visual inspection in A320/A321 01 OCT HAN
N/A CSE-2020-77 Landing gear SAFRAN PCS-4102 CAAV
accordance with PCS-4102 /A350 2020 BMC
Using Scotch brite by hand, smoothly
A320/A321 01 OCT HAN
N/A CSE-2020-78 Landing gear SAFRAN PCS-4103 blend/de-burr sharp edge in accordance with CAAV
/A350 2020 BMC
PCS-4103
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
1050620 XXX; CSE-Cl-TD- A321/ 02 OCT
Passenger seat B/E Aerospace CMM: 25-23-58 the seat listed in the block CLEANING CIMC CAAV
1050622 XXX 2020-01 V2500 2020
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
the seat listed in the block CLEANING
(except electrical components,
1014159 XXX; CSE-Cl-TD- A321/ 02 OCT
Passenger seat B/E Aerospace CMM 25-23-57 wiring and PCU) CIMC CAAV
1014161 XXX 2020-02 V2500 2020
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
the seat listed in the block CLEANING
(except electrical components,
CSE-Cl-TD- A321/ 02 OCT
88807XXX Passenger seat B/E Aerospace CMM 25-26-82 wiring and PCU) CIMC CAAV
2020-03 V2500 2020
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
2128-71CE00EAE;
CLEANING: Cleaning of all components of
2128-71LE00EAE;
the seat listed in the block CLEANING
2128-75CE00AAE1; CSE-Cl-TD- Cabin attendant A321/ 02 OCT
Goodrich CMM: 25-29-38 INSPECTION/CHECK: Inspection of all CIMC CAAV
2128-75CE00EAE1; 2020-04 seat V2500 2020
components of the seat listed in the block
2128-75LE00AAE1;
INSPECTION/CHECK
2128-75LE00EAE1
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
2130-11CH00FAE; the seat listed in the block CLEANING
CSE-Cl-TD- Cabin attendant A321/ 02 OCT
2130-15CH00AAE1; Goodrich CMM: 25-29-39 INSPECTION/CHECK: Inspection of all CIMC CAAV
2020-05 seat V2500 2020
2130-15CH00FAE1 components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: All tasks in the block
DISASSEMBLY
2131-71NK00GAE; CLEANING: All tasks in the block
CSE-Cl-TD- Cabin attendant A321/ 02 OCT
2131-75NK00AAE1; Goodrich CMM: 25-29-40 CLEANING CIMC CAAV
2020-06 seat V2500 2020
2131-75NK00GAE1 CHECK: All tasks in the block CHECK
ASSEMBLY: All tasks in the block
ASSEMBLY
DISASSEMBLY: All tasks in the block
DISASSEMBLY
2127-25EN02AAE1;
CLEANING: All tasks in the block
2127-15AD00AAE1; CSE-Cl-TD- Cabin attendant A321/ 02 OCT
Goodrich CMM: 25-29-41 CLEANING CIMC CAAV
2127-15AD00EAE1; 2020-07 seat V2500 2020
CHECK: All tasks in the block CHECK
2127-21EB02EAE
ASSEMBLY: All tasks in the block
ASSEMBLY
CLEANING: IAW CMM 25-11-97: All
Subtasks in the TASK 25-11-97-100-801-
A01
CHECK: IAW CMM 25-11-97: All Subtasks
in the TASK 25-11-97-200-801-A01
CSE-Cl-TD- Cabin attendant A321/ 02 OCT
FA-XXX Safran CMM: 25-11-97 ASSEMBLY: IAW CMM 25-11-97: All CIMC CAAV
2020-53 seat V2500 2020
Subtasks in the TASK 25-11-97-400-801-
A01
DISASSEMBLY: IAW CMM 25-11-97: All
Subtasks in the TASK 25-11-97-000-801-
A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY: IAW CMM 25-75-32: All
tasks in the block DISASSEMBL Y,except:
CABLE-ASSY MASTER 3D8004-1: TASK
25-75-32-012-299-A01
CABLE-ASSY PHONE 3D8004-3: TASK 25-
75-32-012-300-A01
CABLE-ASSY STANDARD 3D8004-5:
B787/
TASK 25-75-32-012-301-A01
GENX-
CLEANING: IAW CMM 25-75-32: All tasks in
Track Mounted 1B74/75/P2
CSE-Cl-TD- Utc Aerospace the block CLEANING 02 OCT
Model 2787 Cabin Attendant CMM: 25-75-32 CHECK: IAW CMM 25-75-32: All tasks in the G01 & CIMC CAAV
2020-54 Systems 2020
Seat GENX-
block CHECK
1B67/P2G0
ASSEMBLY: CMM 25-75-32: All tasks in the
1
block DISASSEMBL Y,except:
CABLE-ASSY STANDARD 308004-5: TASK
25-75-32-412-298-A01
CABLE-ASSY PHONE 3D8004-3: TASK 25-
75-32-412-299-A01
CABLE-ASSY MASTER 3D8004-1: TASK
25-75-32-412-298-A01
DISASSEMBLY: IAW CMM 25-11-44: All
Subtasks in the TASK 25-11-44-000-801-
A01
CLEANING: IAW CMM 25-11-44: All
Cabin crew Subtasks in the TASK 25-11-44-100-801-
CSE-Cl-TD- ATR72/307 02 OCT
138-XXX member seatcabin ZODIAC CMM: 25-11-44 A01 CIMC CAAV
2020-55 3453-01 2020
crew member seat CHECK: IAW CMM 25-11-44: All Subtasks
in the TASK 25-11-44-200-801-A01
ASSEMBLY: IAW CMM 25-11-44: All
Subtasks in the TASK 25-11-44-400-801-
A01
DISASSEMBLY: IAW CMM 25-37-67:
CSE-Cl-TD- General TASK 25-37-67-99F-806 B787I 02 OCT
B870-XXX Galley assembly JAMCO CMM: 25-37-67 Disassembly Procedures All subtasks in the CIMC CAAV
2020-56 GENX-1B 2020
TASK25-37-67-000-801 , except:
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Removal Procedure for Proximity Light
SUBTASK 25-37-67-040-032
Removal Procedure for Light Assy (Work
Light) SUBTASK 25-37-67-040-033
Removal Procedure for Electrical Control
Unit SUBTASK 25-37-67-040-034
CLEANING: IAW CMM 25-37-67:
General: TASK 25-37-67-99F-807
Materials: TASK 25-37-67-94A-801
Cleaning Procedure: TASK 25-37-67-100-
801
CHECK: IAW CMM 25-37-67:
General TASK 25-37-67-99F-808
Detail Check Procedure TASK 25-37-67-
200-801
ASSEMBLY: IAW CMM 25-37-67:
General TASK 25-37-67-99F-811
Materials TASK 25-37-67-94A-803
Assembly Procedures: All subtasks in the
TASK 25-37-67-400-801 , except:
Installation Procedure for Proximity Light:
SUBTASK 25-37-67-440-032
Installation Procedure for Light Assy (Work
Light): SUBTASK 25-37-67-440-033
Installation Procedure for Electrical Control
Unit: SUBTASK 25-37-67-440-034
DISASSEMBLY: IAW CMM 25-49-59: All
subtasks in the task 25-49-59-000-801 ,
except:
Disassembly Procedures for LDF lnstl:
CSE-Cl-TD- B787I 02 OCT
B800-XXX Lavatory assy JAMCO CMM: 25-49-59 SUBTASK 25-49-59-040-012 CIMC CAAV
2020-57 GENX-1B 2020
Disassembly Procedures for LDF Actuator
Assy: SUBTASK 25-49-59-040-013
Disassembly Procedures for LDF IR Switch
Assy: SUBTASK 25-49-59-040-015
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Disassembly Procedures for Translucent
Window Inst!: SUBTASK 25-49-59-040-016
Disassembly Procedures for Electrical Mirror
Light lnstl: SUBTASK 25-49-59-040-023
Disassembly Procedures for PSU lnstl:
SUBTASK 25-49-59-040-037
Disassembly Procedures for PSU Assy:
SUBTASK 25-49-59-040-038
Disassembly Procedures for Electrical
System Inst!: SUBTASK 25-49-59-040-049
Disassembly Procedures for Call Reset
Switch Assy: SUBTASK 25-49-59-040-050
Disassembly Procedures for Sky Light Assy:
SUBTASK 25-49-59-040-052
Disassembly Procedures for Flush Control
Assy: SUBTASK 25-49-59-040-054
CLEANING: IAW CMM 25-49-59
General: TASK 25-49-59-99F-805
Materials :TASK 25-49-59-94A-801
Cleaning Procedure :All subtasks in the
TASK 25-49-59-100-801
CHECK: IAW CMM 25-49-59:
General TASK 25-49-59-99F-806
Materials TASK 25-49-59-94A-805
Detailed Check Procedure All subtasks in
the TASK 25-49-59-200-801
ASSEMBLY : : IAW CMM 25-49-59: All
subtasks in the task 25-49-59-400-801,
except:
Assembly Procedures for LDF lnstl:
SUBTASK 25-49-59-440-012
Assembly Procedures for LDF Actuator
Assy: SUBTASK 25-49-59-440-013
Assembly Procedures for LDF IR Switch
Assy: SUBTASK 25-49-59-440-015
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Assembly Procedures for Translucent
Window lnstl: SUBTASK 25-49-59-440-016
Assembly Procedures for Electrical Mirror
Light lnstl: SUBTASK 25-49-59-440-023
Assembly Procedures for PSU lnstl:
SUBTASK 25-49-59-440-037
Assembly Procedures for PSU Assy:
SUBTASK 25-49-59-440-038
Assembly Procedures for Electrical System
lnstl: SUBTASK 25-49-59-440-049
Assembly Procedures for Call Reset Switch
Assy: SUBTASK 25-49-59-440-050
Assembly Procedures for Sky Light Assy:
SUBTASK 25-49-59-440-052
Assembly Procedures for Flush Control
Assy: SUBTASK 25-49-59-440-054
DISASSEMBLY: IAW CMM 25-03-08: All
subtasks in the TASK 25-03-08-000-801-
A01
CLEANING: IAW CMM 25-03-08: All
subtasks in the TASK 25-03-08-100-801-
CSE-Cl-TD- Business class seat B787I 02 OCT
2C06-XXX ZODIAC CMM 25-03-08 A01 CIMC CAAV
2020-58 asemblies GENX-1B 2020
CHECK: IAW CMM 25-03-08: All subtasks in
the TASK 25-03-08-200-801-A01
ASSEMBLY: IAW CMM 25-03-08: All
subtasks in the TASK 25-03-08-400-801-
A01
DISASSEMBLY: IAW CMM 25-03-09: All
subtasks in the TASK 25-03-09-000-801-
A01
2C06-XXX; CSE-Cl-TD- CLEANING: IAW CMM 25-03-09: All B787/ 02 OCT
Shell assembly Safran Seats CMM: 25-03-09 subtasks in the TASK 25-03-09-100-801- CIMC CAAV
2C14-XXX 2020-59 GENX 2020
A01
CHECK: IAW CMM 25-03-09: All subtasks in
the TASK 25-03-09-200-801-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
REPAIR: IAW CMM 25-03-09:
Placard Replacement SUBTASK 25-03-10-
350-013-A01
Replace or Install Bonded Components
SUBTASK25-03-10-350-014-A01
ASSEMBLY: IAW CMM 25-03-09: All
subtasks in the TASK 25-03-09-400-801 -
A01
DISASSEMBLY: IAW CMM 25-03-10: All
subtasks in the TASK 25-03-10-000-802-
A01
CLEANING: IAW CMM 25-03-10: All
subtasks in the TASK 25-03-10-100-801-
A01
CHECK: IAW CMM 25-03-10: All subtasks in
2C06-XXX; CSE-Cl-TD- the TASK 25-03-10-200-802-A01 B787/ 02 OCT
Monument Zodiac CMM 25-03-10 REPAIR: IAW CMM 25-03-10: CIMC CAAV
2C14-XXX 2020-60 GENX-1B 2020
Placard Replacement SUBTASK 25-03-10-
350-013-A01
Replace or Install Bonded Components
SUBTASK 25-03-10-350-014-A01
ASSEMBLY: IAW CMM 25-03-10: All
subtasks in the TASK 25-03-10-400-802-
A01
DISASSEMBLY: IAW CMM 25-22-54: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-22-54: All tasks in
1032063-XXX; CSE-Cl-TD- Economy class seat the block CLEANING B787/ 02 OCT
B/E Aerospace CMM: 25-22-54 CIMC CAAV
1032064-XXX 2020-61 asemblies INSPECTION/CHECK: IAW CMM 25-22-54: GENX-1B 2020
All tasks in the block CHECK
ASSEMBLY: IAW CMM 25-22-54: All tasks
in the block ASSEMBLY
CSE-Cl-TD- Economy class seat DISASSEMBLY: IAW CMM 25-21-95: B787I 02 OCT
MODE L3050 Haeco CMM: 25-21-95 General: TASK 25-21-95-000-801 CIMC CAAV
2020-62 asemblies GENX-1B 2020
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Equipment and Materials Required: TASK
25-21-95-000-802
Procedure : All subtasks in the TASK 25-21-
95-000-801-A01
CLEANING: IAW CMM 25-21-95:
General TASK 25-21-95-100-801
Equipment and Materials Required TASK
25-21-95-100-802
Procedure: All subtasks in the TASK 25-21-
95-100-801-A01
CHECK: IAW CMM 25-21-95:
General: TASK 25-21-95-210-801
Detailed Checklist: All subtasks in the TASK
25-21-95-200-801-A01
REPAIR: IAW CMM 25-21-95: Repair of
Bonded Components TASK 25-21-95-300-
804
ASSEMBLY: IAW CMM 25-21-95: All tasks
in the block ASSEMBLY
DISASSEMBLY: IAW CMM 25-22-54: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-22-54: All tasks in
1032063-XXX; CSE-Cl-TD- Economy class seat the block CLEANING B787/ 02 OCT
B/E Aerospace CMM: 25-22-54 CIMC CAAV
1032064-XXX 2020-61 asemblies INSPECTION/CHECK: IAW CMM 25-22-54: GENX-1B 2020
All tasks in the block CHECK
ASSEMBLY: IAW CMM 25-22-54: All tasks
in the block ASSEMBLY
Following steps of CMM 49-11-09
- Disassembly, step 39. B: Discard terminal
Replacement Of
(1045) if required.
The Terminal Lug
Griffith - Repair, step 2.A: General Repair 05 OCT HAN
3888438 CSE-2020-80 On Wiring Harness A321 CAAV
Enterprises, Inc CMM 49-11-09 Procedures, apply to replace the start motor 2020 BMC
Ass Embly Pn
terminal lug PN 327732 Ref. Table 602
3888438
- Assembly, step 3(F): Perform pin-to-pin
conti nuity check from P1 to Start Motor
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Remove the rubber grommet and the
obturator IAW Subtask 32-48-28-000-001- A320-
RU1502U00; CSE-2020- A01 step (1).(e).1 and 2. A321/V250 07 OCT HCM CAAV
Universal Wheel Kit Technofan CMM 32-48-28
RU1502U01 050 - Install the rubber grommet and the 0- 2020 BMC SSCA
obturator IAW Subtask 32-48-28-410-001- PW1100G
A01 step (1).(c).7 and 8.
- CMM 32-12-20; REPAIR DAMAGE TO
20158400X; SMALL AREAS PAINT FINISH. REF.TO
20165900X; SUBTASK TASK 32-12-20-
10-450101XXX; 380-001 -01 A; (2)/(a)/3/a
10-450102XXX; CMM 32-12-20; - CMM 32-12-79; REPAIR DAMAGE TO A320/A321-
10-450201XXX; CSE-2020- Main Landing Gear SMALL AREAS PAINT FINISH. REF.TO V2500/CFM 09 OCT HAN CAAV
Safran CMM 32-12-79;
10-452901XXX; 079 Complete SUBTASK TASK 32-12-79- 56- 2020 BMC FAA
10-452902XXX; CMM 32-12-86 380-001-01 A; (2)/(a)/3/a 5B/PW1100
10-453001XXX; - CMM 32-12-86; REPAIR DAMAGE TO
10-453002XXX SMALL AREAS PAINT FINISH. REF.TO
SUBTASK TASK 32-12-86-
380-001-01 A; (2)/(a)/3/a
10-355503XXX;
10-355603XXX; CMM 32-13-01;
10-355703XXX; CMM 32-13-02;
10-355803XXX;
10-356103XXX; CMM 32-13-03;
10-356203XXX; CMM 32-13-04;
10-353203XXX;
10-356403XXX; CMM 32-13-05; Main Landing Gear: Application Of Primer 09 OCT HAN
CSE-2020-81 Main Landing Gear Safran A350/XWB CAAV
10-355903XXX; CMM 32-13-06; And Top Coat Paint Refer To Pcs-2530 2020 BMC
10-357303XXX;
10-357403XXX; CMM 32-13-13;
10-355504XXX; CMM 32-13-14;
10-355604XXX;
10-356104XXX; CMM 32-13-15;
10-356204XXX;
CMM 32-13-20
10-356304XXX;
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
10-356305XXX;
10-355505XXX;
10-355605XXX
Replacement of component IAW the
following tasks:
Stowage And - Removal of all components of the seat
CSE CIMC
ASAB1-XXXXXX-XX; BASEHAN - Privacy Area – Stelia CMM: 25-21-12 I.A.W. tasks listed in the block A350/TREN 10 OCT CIMC CAAV
FJSL4-XXXXXX-XX Business Class Aerospace XWB-84 2020
2020-22 DISASSEMBLE
Seat Assemblies
- Installation of all components of the seat
I.A.W. tasks listed in the block ASSEMBLE
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Lower
Attachment I.A.W. subtask 25-43-58-010-
022-A01
- Removal and Disassembly of the Pelmet
I.A.W. subtask 25-43-58-000-004-A01
- Removal and Disassembly of the Rear wall
I.A.W. subtask 25-43-58-000-005-B01
- Removal and Disassembly of the Housing
I.A.W. subtask 25-43-58-000-013-B01
- Removal and Disassembly of the Side wall
I.A.W. subtask 25-43-58-000-034-B01
- Removal and Disassembly of the Door
Installation I.A.W. subtask 25-43-58-000-
043-A01
- Disassembly of the Single Door Assembly
I.A.W. subtask 25-43-58-040-008-A01
- Removal and Disassembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-43-
58-000-018-A01
- Removal and Disassembly of the Floor Pan
I.A.W. subtask 25-43-58-000-017-D01
- Removal and Disassembly of the Door
Light I.A.W. subtask 25-43-58-000-035-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the
Washbasin Unit I.A.W. subtask 25-43-58-
000-046-C01
- Removal and Disassembly of the Wash
basin-Unit Door Assembly I.A.W. subtask
25-43-58-000-020-A01
- Removal and Disassembly of the Wash
basin-Unit Panel Assembly I.A.W. subtask
25-43-58-000-036-A01
- Removal and Disassembly of the
Washbasin Unit Console I.A.W. subtask 25-
43-58-000-016-A01
- Removal and Disassembly of the Service
Cabinet I.A.W. subtask 25-43-58-000-051-
A01
- Removal and Disassembly of the Nursing
Table I.A.W. subtask 25-43-58-000-037-
A01
- Removal and Disassembly of the
Ventilation Syste I.A.W. subtask 25-43-58-
000-038-A01
- Installation nstallation and Assembly of the
Upper Attachment I.A.W. subtask 25-43-58-
400-003-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the Lower
Attachment I.A.W. subtask 25-43-58-400-
006-A01
- Installation and Assembly of the Pelmet
I.A.W. subtask 25-43-58-400-008-A01
Installation and Assembly of the Rear Wall
I.A.W. subtask 25-43-58-400-009-B01
- Installation and Assembly of the Housing
I.A.W. subtask 25-43-58-400-017-B01
- Installation and Assembly of the Side Wall
I.A.W. subtask 25-43-58-400-033-B01
- Installation and Assembly of the Door
Installation I.A.W. subtask 25-43-58-400-
034-A01
- Assembly of the Door Assembly I.A.W.
subtask 25-43-58-440-006-A01
- Installation and Assembly of the Cover and
Seat Toilet Unit I.A.W. subtask 25-43-58-
400-037-A01
- Installation and Assembly of the Floor Pan
I.A.W. subtask 25-43-58-400-041-D01
- Installation and Assembly of the Door Light
I.A.W. subtask 25-43-58-400-042-A01
- Installation and Assembly of the Washbasin
Unit I.A.W. subtask 25-43-58-400-043-C01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the Wash
basin-Unit Door Assembly I.A.W. subtask
25-43-58-400-048-A01
- Installation and Assembly of the Wash
basin-Unit Panel Assembly I.A.W. subtask
25-43-58-400-049-A01
- Installation and Assembly of the Washbasin
Unit Console I.A.W. subtask 25-43-58-400-
019-A01
- Installation and Assembly of the Service
Cabinet I.A.W. subtask 25-43-58-400-050-
A01
- Installation and Assembly of the Nursing
Table I.A.W. subtask 25-43-58-400-051-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Upper
Attachment I.A.W. subtask 25-41-54-000-
006-A01
- Removal and Disassembly of the Lower
Attachment I.A.W. subtask 25-41-54-000-
008-A01
- Removal and Disassembly of the Pelmet
I.A.W. subtask 25-41-54-000-001-A01
- Removal and Disassembly of the Rear
wall I.A.W. subtask 25-41-54-000-002-
B01
- Removal and Disassembly of the
Housing I.A.W. subtask 25-41-54-000-
003-A01
- Removal and Disassembly of the Side
wall I.A.W. subtask 25-41-54-000-011-
C01
- Removal and Disassembly of the Single
Door Installation I.A.W. subtask 25-41-
54-000-041-A01
- Disassembly of the Single Door
Assembly I.A.W. subtask 25-41-54-040-
001-B01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-41-
54-000-012-A01
- Removal and Disassembly of the Floor
Pan I.A.W. subtask 25-41-54-000-014-
A01
- Removal and Disassembly of the Door
Light I.A.W. subtask 25-41-54-000-020-
A01
- Removal and Disassembly of the
Washbasin Unit I.A.W. subtask 25-41-54-
000-023-A01
- Removal and Disassembly of the Wash
basin-Unit Door Assembly I.A.W. subtask
25-41-54-000-045-A01
- Removal and Disassembly of the Wash
basin-Unit Panel Assembly I.A.W.
subtask 25-41-54-000-042-A01
- Removal and Disassembly of the
Washbasin Unit Console I.A.W. subtask
25-41-54-000-044-A01
- Removal and Disassembly of the Service
Cabinet I.A.W. subtask 25-41-54-000-
048-B01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Nursing
Table I.A.W. subtask 25-41-54-000-051-
A01
- Removal and Disassembly of the
Ventilation Syste I.A.W. subtask 25-41-
54-000-052-A01
- Installation nstallation and Assembly of
the Upper Attachment I.A.W. subtask 25-
41-54-400-006-A01
- Installation and Assembly of the Lower
Attachment I.A.W. subtask 25-41-54-400-
008-A01
- Installation and Assembly of the Pelmet
I.A.W. subtask 25-41-54-400-001-A01
- Installation and Assembly of the Rear
Wall I.A.W. subtask 25-41-54-400-002-
B01
- Installation and Assembly of the Housing
I.A.W. subtask 25-41-54-400-003-A01
- Installation and Assembly of the Side Wall
I.A.W. subtask 25-41-54-400-012-C01
- Installation and Assembly of the Single
Door Installation I.A.W. subtask 25-41-
54-400-042-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly of the Single Door Assembly
I.A.W. subtask 25-41-54-440-004-A01
- Installation and Assembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-41-
54-400-014-A01
- Installation and Assembly of the Floor
Pan I.A.W. subtask 25-41-54-400-016-
A01
- Installation and Assembly of the Door
Light I.A.W. subtask 25-41-54-400-021-
A01
- Installation and Assembly of the
Washbasin Unit I.A.W. subtask 25-41-54-
400-032-A01
- Installation and Assembly of the Wash
basin-Unit Door Assembly I.A.W. subtask
25-41-54-400-046-A01
- Installation and Assembly of the Wash
basin-Unit Panel Assembly I.A.W.
subtask 25-41-54-400-043-A01
- Installation and Assembly of the
Washbasin Unit Console I.A.W. subtask
25-41-54-400-045-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the Service
Cabinet I.A.W. subtask 25-41-54-400-
048-B01
- Installation and Assembly of the Nursing
Table I.A.W. subtask 25-41-54-400-051-
A01
- Installation and Assembly of the
Ventilation System I.A.W. subtask 25-41-
54-400-052-A01
SERVICING:
- Cleaning Procedures: Painted surfaces
cleaning, Metal surfaces cleaning,
Decorative laminates and trim cleaning,
2C10ZD0002R; Front Row Placards cleaning, Upholstery hand cleaning
CSE-CI-TD- CMP 25-20-11 process A350/ Trent 14 OCT
2C10ZD0007L; Monument Safran Seat CIMC CAAV
2020-10 XWB 2020
2C10ZD0005S Assembly - DISASSEMBLE: Removal of all
components of the seat listed in the block
DISASSEMBLE
- ASSEMBLE: Installation of all components
of the seat listed in the block ASSEMBLE
SERVICING:
- Cleaning Procedures: Painted surfaces
cleaning, Metal surfaces cleaning, Placards
cleaning, Upholstery hand cleaning process,
CSE-CI-TD- CMP 25-20-09 Actuators cleaning A350/ Trent 14 OCT
2C101X0-0XX Seat Assembly Safran Seat CIMC CAAV
2020-11 XWB 2020
DISASSEMBLE: Removal of all components
of the seat listed in the block DISASSEMBLE
ASSEMBLE: Installation of all components
of the seat listed in the block ASSEMBLE
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
SERVICING: Cleaning of all components of
the seat listed in the block Cleaning
Procedures(except washing)
CHECK: Inspection of all components of the
CSE-CI-TD- CMP 25-20-10 seat listed in the block CHECK A350/ Trent 14 OCT
2C10-XXX Shell Assembly Safran Seat CIMC CAAV
2020-12 XWB 2020
DISASSEMBLE: Removal of all components
of the seat listed in the block DISASSEMBLE
- ASSEMBLE: Installation of all components
of the seat listed in the block ASSEMBLE
Replacement of component IAW the
following tasks:
- Replacement of the Self-adhesive
Placards I.A.W. subtask 25-43-61-350-
034-A01
- Removal and Disassembly of the Upper
Attachment I.A.W. subtask 25-43-61-
000-002-A01
- Removal and Disassembly of the Lower
Attachment I.A.W. subtask 25-43-61-
CSE CIMC 000-006-A01
Diehl Comfort A320/A321/ 15 OCT
D2549013808200 BASEHAN - Lavatory E CMM 25-43-61 - Removal and Disassembly of the CIMC CAAV
Modules Gmbh V2500 2020
2020-27 Pelmet I.A.W. subtask 25-43-61-000-
009-A01
- Removal and Disassembly of the Rear
wall I.A.W. subtask 25-43-61-000-014-
B01
- Removal and Disassembly of the
Housing I.A.W. subtask 25-43-61-000-
043-J01
- Removal and Disassembly of the Side
wall I.A.W. subtask 25-43-61-000-050-
D01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the Single
Door Installation I.A.W. subtask 2 5-43-
61-000-011-P01
- Removal and Disassembly of the
Folding Door Installation I.A.W. subtask
25-43-61-000-038-A01
- Disassembly of the Single Door
Assembly I.A.W. subtask 25-43-61-040-
020-B01
- Removal and Disassembly of the
Folding Door Assembly I.A.W. subtask
25-43-61-040-007-B01
- Removal and Disassembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-
43-61-000-015-A01
- Removal and Disassembly of the Floor
Pan I.A.W. subtask 25-43-61-000-032-
A01
- Removal and Disassembly of the Door
Light I.A.W. subtask 25-43-61-000-017-
A01
- Removal and Disassembly of the
Washbasin Unit I.A.W. subtask 25-43-
61-000-023-G01
- Removal and Disassembly of the Wash
basin-Unit Door Assembly I.A.W.
subtask 25-43-61-000-025-A01
- Removal and Disassembly of the Wash
basin-Unit Panel Assembly I.A.W.
subtask 25-43-61-000-026-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal and Disassembly of the
Washbasin Unit Console I.A.W. subtask
25-43-61-000-028-A01
- Removal and Disassembly of the
Service Cabinet I.A.W. subtask 25-43-
61-000-029-B01
- Removal and Disassembly of the
Nursing Table I.A.W. subtask 25-43-61-
000-030-A01
- Removal and Disassembly of the
Ventilation Syste I.A.W. subtask 25-43-
61-000-033-A01
- Installation and Assembly of the Upper
Attachment I.A.W. subtask 25-43-61-
400-002-A01
- Installation and Assembly of the Lower
Attachment I.A.W. subtask 25-43-61-
400-007-A01
- Installation and Assembly of the Pelmet
I.A.W. subtask 25-43-61-400-011-A01
- Installation and Assembly of the Rear
Wall I.A.W. subtask 25-43-61-400-006-
B01
- Installation and Assembly of the Housing
I.A.W. subtask 25-43-61-400-018-K01
- Installation and Assembly of the Side
Wall I.A.W. subtask 25-43-61-400-034-
D01
- Installation and Assembly of the Single
Door Installation I.A.W. subtask 25-43-
61-400-013-P01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the
foldingDoor Installation I.A.W. subtask
25-43-61-400-048-A01
- Assembly of the Single Door Assembly
I.A.W. subtask 25-43-61-440-020-B01
- Installation and Assembly of the
foldingDoor Assembly I.A.W. subtask
25-43-61-440-007-A01
- Installation and Assembly of the Cover
and Seat Toilet Unit I.A.W. subtask 25-
43-61-400-022-A01
- Installation and Assembly of the Floor
Pan I.A.W. subtask 25-43-61-400-025-
A01
- Installation and Assembly of the Door
Light I.A.W. subtask 25-43-61-400-026-
A01
- Installation and Assembly of the
Washbasin Unit I.A.W. subtask 25-43-
61-400-035-H01
- Installation and Assembly of the Wash
basin-Unit Door Assembly I.A.W.
subtask 25-43-61-400-037-A01
- Installation and Assembly of the Wash
basin-Unit Panel Assembly I.A.W.
subtask 25-43-61-400-038-A01
- Installation and Assembly of the
Washbasin Unit Console I.A.W. subtask
25-43-61-400-040-A01
- Installation and Assembly of the Service
Cabinet I.A.W. subtask 25-43-61-400-
041-B01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation and Assembly of the Nursing
Table I.A.W. subtask 25-43-61-400-
042-A01
- Installation and Assembly of the
Ventilation System I.A.W. subtask 25-
43-61-400-045-A01
SERVICING: IAW CMM 25-70-35: Task
DMC-A350BEGALMON-A-25-70-35-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-35 : Task DMC-
A350BEGALMON-A-25-70-35-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-35 : Task DMC-
A350BEGALMON-A-25-70-35-00001-300A-
C
CSE-CI-TD- CMP 25-70-35 DISCONNECT, REMOVE AND
A350/TREN 16 OCT
X00200-0-025-00 Galley G15RFA B/E Aerospace DISASSEMBLY PROCEDURES: IAW CMM CIMC CAAV
2020-13 T XWB-84 2020
25-70-35: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except
electrical and water system components
ASSEMBLE, INSTALL AND
CONNECT PROCEDURES: IAW
CMM 25-70-35: All tasks in the block
ASSEMBLE, INSTALL AND
CONNECT PROCEDURES, except
electrical and water system
components
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
SERVICING: IAW CMM 25-70-36: Task
DMC-A350BEGALMON-A-25-70-36-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-36 : Task DMC-
A350BEGALMON-A-25-70-36-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-36 : Task DMC-
A350BEGALMON-A-25-70-36-00001-300A-
CSE-CI-TD- CMP 25-70-36 C A350/TREN 16 OCT
X01106-0-025-00 GALLEY G14CAF B/E Aerospace CIMC CAAV
2020-14 DISCONNECT, REMOVE AND T XWB-84 2020
DISASSEMBLY PROCEDURES: IAW CMM
25-70-36: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except
electrical and water system components
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-36: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except
electrical and water system components
SERVICING: IAW CMM 25-70-37: Task
DMC-A350BEGALMON-A-25-70-37-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CSE-CI-TD- CMP 25-70-37 CMM 25-70-37 : Task DMC-
A350/TREN 16 OCT
X05001-0-025-00 X05001-0-025-00 B/E Aerospace A350BEGALMON-A-25-70-37-00001-251A- CIMC CAAV
2020-15 T XWB-84 2020
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-37 : Task DMC-
A350BEGALMON-A-25-70-37-00001-300A-
C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-37: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except
electrical and water system components
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-37: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except
electrical and water system components
SERVICING: IAW CMM 25-70-38: Task
DMC-A350BEGALMON-A-25-70-38-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-38 : Task DMC-
A350BEGALMON-A-25-70-38-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-38 : Task DMC-
A350BEGALMON-A-25-70-38-00001-300A-
CSE-CI-TD- CMP 25-70-38 C A350/TREN 16 OCT
X08802-0-025-00 Galley G24cfa B/E Aerospace CIMC CAAV
2020-16 DISCONNECT, REMOVE AND T XWB-84 2020
DISASSEMBLY PROCEDURES: IAW CMM
25-70-38: All tasks in the block
DISCONNECT, REMOVE AND ----
Disassembly Procedures, Except Electrical
And Water System Components
- Assemble, Install And Connect Procedures:
IAW CMM 25-70-38: All tasks in the block
Assemble, Install And Connect Procedures,
except electrical and water system
components
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Servicing: IAW CMM 25-70-39: Task DMC-
A350BEGALMON-A-25-70-39-00001-200A-
C
Clean With Chemical Agent: IAW CMM 25-
70-39 : Task DMC-A350BEGALMON-A-25-
70-39-00001-251A-C
Examination, Test And Checks: IAW CMM
25-70-39 : Task DMC-A350BEGALMON-A-
CMP 25-70-39 25-70-39-00001-300A-C A350/TREN 16 OCT
X12703-0-025-00 CSE-CI-TD- Galley G25caf B/E Aerospace Disconnect, Remove And Disassembly T XWB-84 CIMC CAAV
2020
2020-17 Procedures: IAW CMM 25-70-39: All tasks in
the block Disconnect, Remove And
Disassembly Procedures, except electrical
and water system components
Assemble, Install And Connect Procedures:
IAW CMM 25-70-39: All tasks in the block
Assemble, Install And Connect Procedures,
except electrical and water system
components
SERVICING: IAW CMM 25-70-40: Task
DMC-A350BEGALMON-A-25-70-40-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-40 : Task DMC-
A350BEGALMON-A-25-70-40-00001-251A-
CSE-CI-TD- A350/TREN 16 OCT
X40900-0-025-00 Galley G44cfa B/E Aerospace C CIMC CAAV
2020-18 CMP 25-70-40 T XWB-84 2020
Examination, Test And Checks: IAW CMM
25-70-40 : Task DMC-A350BEGALMON-A-
25-70-40-00001-300A-C
Disconnect, Remove And Disassembly
Procedures: IAW CMM 25-70-40: All tasks in
the Block DISCONNECT, REMOVE AND
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY PROCEDURES, Except
Electrical And Water System Components
Assemble, Install And Connect Procedures:
IAW CMM 25-70-40: All tasks in the block
Assemble, Install And Connect Procedures,
Except Electrical And Water System
Components
SERVICING: IAW CMM 25-70-41 : Task
DMC-A350BEGALMON-A-25-70-41-00001-
200A-C
CLEAN WITH CHEMICAL AGENT: IAW
CMM 25-70-41 : Task DMC-
A350BEGALMON-A-25-70-41-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-41 : Task DMC-
CSE-CI-TD- CMM 25-70-41 A350BEGALMON-A-25-70-41-00001-300A- A350/TREN 16 OCT
X41205-0-025-00 Galley Tc44av13 B/E Aerospace CIMC CAAV
2020-63 C T XWB-84 2020
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-41: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES.
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-41 : All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES
SERVICING: IAW CMM 25-70-42: Task
DMC-A350BEGALMON-A-25-70-42-00001- A321NEO/
CSE-CI-TD- CMM 25-70-42 200A-C 16 OCT
X41300-0-025-00 GALLEY G46CAF B/E Aerospace PW1130G- CIMC CAAV
2020-64 2020
CLEAN WITH CHEMICAL AGENT: IAW JM
CMM 25-70-42 : Task DMC-
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-42-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-42 : Task DMC-
A350BEGALMON-A-25-70-42-00001-300A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-42: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except:
- G46CAF: Task DMC-A350BEGALMON-
A-25-70-42-01000-500A-C
- UPPER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-42-12000-
500A-C
- UPPER AIR VENTILATION
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-16000-
500A-C
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-20000-
500A-C
- REAR BULKHEAD EXTERNAL DUCT -
LH: Task DMC-A350BEGALMON-A-25-
70-42-21000-500A-C
- REAR BULKHEAD EXTERNAL DUCT -
RH: Task DMC-A350BEGALMON-A-25-
70-42-22000-500A-C
- UPPER ELECTRICAL INSTALLATION
ASSEMBLY:Task DMC-
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-42-23000-
500A-C
- WORKLIGHT ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-24000-
500A-C,
- Task DMC-A350BEGALMON-A-25-70-
42-25000-500A-C
- 12M HA G45RAL SPLIT- GAINS &
SPLIT ASSY: Task DMC-
A350BEGALMON-A-25-70-42-26000-
500A-C
- 11M HA G45LAR SPLIT- GAINS ASSY:
Task DMC-A350BEGALMON-A-25-70-
42-27000-500A-C
- 12-M HA, SPLIT CON-ACU INST
ASSEMBLY DMC-A350BEGALMON-A-
25-70-42-37000-500A-C
- LOWER ELECTRICAL HARNESS
DMC-A350BEGALMON-A-25-70-42-
38000-500A-C
- MONUMENT - LOOSE ITEM KIT: Task
DMC-A350BEGALMON-A-25-70-42-
53000-500A-C
- ELECTRICAL STACKUP: Task DMC-
A350BEGALMON-A-25-70-42-55000-
500A-C
- PANEL ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-62000-
500A-C
- ACU BOX ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-63000-
500A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-42: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except:
- G46CAF : Task DMC-
A350BEGALMON-A-25-70-42-01000-
700A-C
- UPPER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-42-12000-
700A-C
- UPPER AIR VENTILATION
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-16000-
700A-C
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-20000-
700A-C
- REAR BULKHEAD EXTERNAL DUCT -
LH: Task DMC-A350BEGALMON-A-25-
70-42-21000-700A-C
- REAR BULKHEAD EXTERNAL DUCT -
RH: Task DMC-A350BEGALMON-A-25-
70-42-22000-700A-C
- UPPER ELECTRICAL
INSTALLATIONASSEMBLY:TaskDMC-
A350BEGALMON-A-25-70-42-23000-
700A-C
- WORKLIGHT ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-24000-
700A-C and Task DMC-
A350BEGALMON-A-25-70-42-25000-
700A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- 12M HA G45RAL SPLIT- GAINS &
SPLIT ASSY: Task DMC-
A350BEGALMON-A-25-70-42-26000-
700A-C
- 11M HA G45LAR SPLIT- GAINS ASSY:
Task DMC-A350BEGALMON-A-25-70-
42-27000-700A-C
- 12-M HA, SPLIT CON-ACU INST
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-37000-
700A-C
- LOWER ELECTRICAL HARNESS: Task
DMC-A350BEGALMON-A-25-70-42-
38000-700A-C
- MONUMENT - LOOSE ITEM KIT: Task
DMC-A350BEGALMON-A-25-70-42-
53000-700A-C
- ELECTRICAL STACKUP: Task DMC-
A350BEGALMON-A-25-70-42-55000-
700A-C
ACU BOX ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-42-63000-700A-
C
SERVICING: IAW CMM 25-70-43: Task
DMC-A350BEGALMON-A-25-70-43-00001-
200A-C
CSE-CI-TD- CMM 25-70-43 CLEAN WITH CHEMICAL AGENT: IAW A350/TREN 16 OCT
X41404-0-025-00 Galley G45lar B/E Aerospace CMM 25-70-43 : Task DMC- T XWB-84 CIMC CAAV
2020-65 2020
A350BEGALMON-A-25-70-43-00001-251A-
C
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-43 : Task DMC-
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-43-00001-300A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-43: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except:
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-13000-
500A-C
- UPPER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-14000-
500A-C
- UPPER GALLEY HARNESS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-27000-
500A-C
- I/O CONTROLLER ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-43-
28000-500A-C
- [11P] I/P, I/F - CONT - C/B MODULE
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-29000-
500A-C
- [11M] I/O CONTROLLER TO SWITCH
PANEL HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-43-
30000-500A-C
- [1MD] I/F, I/P - FAP AND CAS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-31000-
500A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- [11M] C/B MODULE - GAINS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-32000-
500A-C
- MODULAR X4 CONNECTOR: Task
DMC-A350BEGALMON-A-25-70-43-
33000-500A-C
- CONNECTOR BRACKET ASSEMBLY:
Task DMC-A350BEGALMON-A-25-70-
43-35000-500A-C
- ECP: Task DMC-A350BEGALMON-A-
25-70-43-36000-500A-C
- CONTACTOR ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-41000-
500A-C
- [1MD] I/F, I/P - FAP AND CAS
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-82000-
500A-C
- [1MD] SPLITLINE - CAS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-83000-
500A-C
- [11M] SPLITLINE - ACU AND CAS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-84000-
500A-C
- MONUMENT INSTALLATION KIT: Task
DMC-A350BEGALMON-A-25-70-43-
87000-500A-C
- [11M] SPLITLINE - ACU AND CAS
HARNESS INSTALLATION: Task DMC-
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-43-D3000-
500A-C
- [1MD] SPLITLINE - CAS HARNESS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-D4000-
500A-C
- [11M] I/O CONTROLLER TO SWITCH
PANEL HARNESS INSTALLATION:
Task DMC-A350BEGALMON-A-25-70-
43-D9000-500A-C
- [11P] I/P, I/F - CONT - C/B MODULE
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-E1000-
500A-C
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: : IAW CMM 25-70-43: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except:
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-13000-
700A-C
- UPPER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-14000-
700A-C
- UPPER GALLEY HARNESS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-27000-
700A-C
- I/O CONTROLLER ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-43-
28000-700A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- [11P] I/P, I/F - CONT - C/B MODULE
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-29000-
700A-C
- [11M] I/O CONTROLLER TO SWITCH
PANEL HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-43-
30000-700A-C
- [1MD] I/F, I/P - FAP AND CAS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-31000-
700A-C
- [11M] C/B MODULE - GAINS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-32000-
700A-C
- MODULAR X4 CONNECTOR: Task
DMC-A350BEGALMON-A-25-70-43-
33000-700A-C
- CONNECTOR BRACKET ASSEMBLY:
Task DMC-A350BEGALMON-A-25-70-
43-35000-700A-C
- ECP: Task DMC-A350BEGALMON-A-
25-70-43-36000-700A-C
- CONTACTOR ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-41000-
700A-C
- [1MD] I/F, I/P - FAP AND CAS
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-82000-
700A-C
- [1MD] SPLITLINE - CAS HARNESS
ASSEMBLY: Task DMC-
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-43-83000-
700A-C
- [11M] SPLITLINE - ACU AND CAS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-43-84000-
700A-C
- [11M] SPLITLINE - ACU AND CAS
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-D3000-
700A-C
- [1MD] SPLITLINE - CAS HARNESS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-D4000-
700A-C
- [11M] I/O CONTROLLER TO SWITCH
PANEL HARNESS INSTALLATION:
- Task DMC-A350BEGALMON-A-25-70-
43-D9000-700A-C
[11P] I/P, I/F - CONT - C/B MODULE
HARNESS INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-43-E1000-
700A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350BEGALMON-A-25-70-44-00001-300A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-44: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except:
ECP ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-25000-500A-
C
- TERMINAL BLOCK ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
28000-500A-C
- I/O CONTROLLER ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
29000-500A-C
- 12-P I/P I/F - C/B MODULE HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-32000-
500A-C
- 12-M GB, SWT PNL HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-33000-
500A-C
- 2-MD ESS A/C I/F - CAS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-34000-
500A-C
- 12-M C/B MODULE TO GAINS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-35000-
500A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- MODULAR X4 CONNECTOR: Task
DMC-A350BEGALMON-A-25-70-44-
36000-500A-C
- BULKHEAD ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-37000-
500A-C
- LOWER ELECTRICAL AND BONDING
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-42000-
500A-C
- 12M HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
43000-500A-C
- 2MD HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
44000-500A-C
- LOWER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-44-45000-
500A-C
- MONUMENT - LOOSE ITEMS KIT :
Task DMC-A350BEGALMON-A-25-70-
44-87000-500A-C
- REAR GALLEY WATER SUPPLY
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-D7000-
500A-C
- LOWER GALLEY WASTE WATER
SYSTEM: Task DMC-
A350BEGALMON-A-25-70-44-D8000-
500A-C
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMM 25-70-44: All
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except:
- ECP ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-25000-
700A-C
- TERMINAL BLOCK ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
28000-700A-C
- I/O CONTROLLER ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
29000-700A-C
- CONTACTOR ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-30000-
700A-C
- 12-P I/P I/F - C/B MODULE HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-32000-
700A-C
- 12-M GB, SWT PNL HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-33000-
700A-C
- 2-MD ESS A/C I/F - CAS HARNESS
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-34000-
700A-C
- 12-M C/B MODULE TO GAINS
HARNESS ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-35000-
700A-C
- MODULAR X4 CONNECTOR: Task
DMC-A350BEGALMON-A-25-70-44-
36000-700A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- LOWER ELECTRICAL AND BONDING
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-42000-
700A-C
- 12M HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
43000-700A-C
- 2MD HARNESS ASSEMBLY: Task
DMC-A350BEGALMON-A-25-70-44-
44000-700A-C
- LOWER WATER SYSTEMS
INSTALLATION: Task DMC-
A350BEGALMON-A-25-70-44-45000-
700A-C
- MONUMENT - LOOSE ITEMS KIT:
Task DMC-A350BEGALMON-A-25-70-
44-87000-700A-C
- REAR GALLEY WATER SUPPLY
ASSEMBLY: Task DMC-
A350BEGALMON-A-25-70-44-D7000-
700A-C
LOWER GALLEY WASTE WATER
SYSTEM: Task DMC-A350BEGALMON-A-
25-70-44-D8000-700A-C
SERVICING: IAW CMM 25-70-45: Task
DMC-A350BEGALMON-A-25-70-45-00001-
200A-C
CSE-CI-TD- CMM 25-70-45 CLEAN WITH CHEMICAL AGENT: IAW A350/TREN 16 OCT
X901000-0000025 Galley Tc12lar29 B/E Aerospace CIMC CAAV
2020-67 T XWB-84 2020
CMM 25-70-45 : Task DMC-
A350BEGALMON-A-25-70-45-00001-251A-
C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
EXAMINATION, TEST AND CHECKS: IAW
CMM 25-70-45 : Task DMC-
A350BEGALMON-A-25-70-45-00001-300A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMM
25-70-45: All tasks in the block
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES, except:
- 11-M HA, I/P I/F - WL'S & CAS ASSY:
Task DMC-A350BEGALMON-A-25-70-
45-16000-500A-C
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES IAW CMM 25-70-45: All
tasks in the block ASSEMBLE, INSTALL
AND CONNECT PROCEDURES, except:
11-M HA, I/P I/F - WL'S & CAS ASSY: Task
DMC-A350BEGALMON-A-25-70-45-16000-
700A-C
DISASSEMBLY: IAW CMM 25-20-85: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-20-85: All tasks in
the block CLEANING
INSPECTION/CHECK: IAW CMM 25-20-85: A321NEO/
CSE-CI-TD- C Class Passenger 16 OCT
1075265-XXX B/E Aerospace CMM 25-20-85 All tasks in the block INSPECTION/CHECK PW1130G- CIMC CAAV
2020-68 Seats 2020
REPAIR: IAW CMM 25-20-85: JM
F. Seat Belt Repair
G. Seat Bottom Cushion Repair
ASSEMBLY: IAW CMM 25-20-85: All tasks
in the block ASSEMBLY
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly of the Elbow(DISASSEMBLY
CMM Task 49-16-45-000-808-A01 ).
- Disassembly of the Seal (DISASSEMBLY,
CMM Task 49-16-45-000-805-B01 ).
CSE-2020- CMM 49-16-45 - Replacement of the Frame (REPAIR, CMM A320/A321 16 OCT HAN CAAV
D4918529700451 AIR DUCT ASSY AIRBUS S.A.S
086 Task 49-16-45-300-802-A01 ). 2020 BMC FAA
- Assembly of the Elbow (ASS EMBLY -
CMM Task 49-16-45-400-801-A01 ).
- Assembly of the Seal (ASSEMBLY, CMM
Task 49-16-45-400-804-B01).
Replacement of component IAW the
16800-01-00; following tasks:
16800-01-02; CSE CIMC CMM 25-11-96 - Removal of the BACKREST EQUIPPED A320/A321/ 16 OCT
Third Occupant
16800-01-01; BASEHAN - Safran CIMC CAAV
Seats I.A.W subtask 25-11-96-040-007-A01 V2500 2020
16800-00-00; 2020-30
16800-01-03 - Assembly of the BACKREST ASSEMBLY
I.A.W subtask 25-11-96-440-003-A1
WD040ABACAAA,
WD040ABADAAA;
WD040ACACAAA;
WD040ADACAAA, I. Disassembly of the Bushings - TASK 21 -
WD040ADADAAA; 59-11-000-806-A01
WD040AFADAAA; II. Disassembly of the Bearings - TASK 21 -
WD040AGADAAA; Supplemental 59-11-000-807-A01
WD040AHADAAA; CSE-2020-87 Cooling System Airbus CMM 21-59-11 Ill. Assembly of the Bushings - TASK 21 -59- A350/XWB 16 OCT HAN
CAAV
2020 BMC
WD041ACAEAAA; (Scs) Ram Air Inlet 11-400-806-A01
WD041ADAFAAA;
IV. Assembly of the Bearings - TASK 21 -59-
WD041AEAEAAA,
11-400-807 -A01
WD041AEAFAAA;
WD041AFAEAAA;
WD041AGAEAAA;
WD041AHAEAAA
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
3136312-001
3136313-19M;
3136303-064;
3136302-002; Inspection and Replacement of component
31 36303-020; IAW the following tasks:
3136302-016; - Test of component I.AW Task 25-03-04-
3136312-11L; 700-801-A01
CSE CIMC
3136313-159 CMM 25-03-04 - Check of component I.AW Task 25-03-04- A321/V250 16 OCT
BASEHAN - Seat Assembly Zodiac CIMC CAAV
3 136312-015 200-801-A01 0 2020
2020-28
3136302-02A; - Disassembly of component I.AW Task 25-
3136210-143; 03-04-000-801 -A01
3136300-08A; -Assembly of component I.AW Task 25-03-
3136312-111; 04-400-801-A01
3136200-144;
3136302-02B;
3136203-056
Disassembly:
- Removal of the Door Assembly: Subtask
25-35-12-010-005-A01
-Removal of the Door Seal: Subtask 25-35-
12-010-031-A01 ; step A
Assembly:
CSE-Cl-TD- 3000/3075 Oven CMM 25-35-12 - Installation of the Door Seal: Subtask 25- A321/V253 22 OCT
4323100-01-6622 B/E Aerospace CIMC CAAV
2020-70 Series 3-A5 2020
35-12-440-008-A01 ; step L
- Installation of the Door Assembly: Subtask
25-35-12-410-018-A01
Repair:
- Door Repaint Instructions : Subtask 25-35-
12-380-001-A01
Disassembly:
- Removal of the Door Assembly: Subtask
B787-
CSE-Cl-TD- Steam Oven CMM 25-35-14 25-35-14-000-001-A01 ; step 4 22 OCT
4323200-91-6600 B/E Aerospace 9/GENX-1 CIMC CAAV
2020-71 DS3000 ARINC - Removal of the Door Seal: Subtask 25-35- 2020
B
14-000-004-A01; step 1
Assembly:
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation of the Door Seal: Subtask 25-
35-14-400-003-A01 ; step 10
- Installation of the Door Assembly: Subtask
25-35-14-400-001-A01 : Step 27
Repair:
- Door Repaint Instructions: Task 25-35-14-
500-801-A01
Disassembly:
- Removal of the Door Assembly: Subtask
25-35-14-000-001-A01 ; step 4
- Removal of the Door Seal: Subtask 25-35-
14-000-004-A01; step 1
Assembly: B787-
CSE-Cl-TD- Steam Oven CMM 25-35-14 22 OCT
4323200-91-6600 B/E Aerospace - Installation of the Door Seal: Subtask 25- 9/GENX-1 CIMC CAAV
2020-71 DS3000 ARINC 2020
35-14-400-003-A01 ; step 10 B
- Installation of the Door Assembly: Subtask
25-35-14-400-001-A01 : Step 27
Repair:
- Door Repaint Instructions: Task 25-35-14-
500-801-A01
CMM 54-10-71(GRAA350RR-51563-
N0010-01) ISSUE 7
351-1500; CSE-2020- Utc Aerospace CMM 54-10-71 REPAIR TASK 54-10-71-300-806-A-01. 23 OCT HAN
Air Intake Cowl A350/XWB CAAV
352-1500 088 Systems TASK: 54-10-71-300-808-A-01 ; TASK: 54- 2020 BMC
10-71-400-815-A-01 ; TASK: 54-10-71-000-
816-A-01
CMM 78-30-00; Repair 111-Thrust Reverser
740-0002; CSE-2020- Thrust Reverser Goodrich CMM 78-30-00 A320/A321- 05 NOV HAN
Translating Sleeve - Replace The Blocker CAAV
745-0002 090 Assembly Aerostructures V2500 2020 BMC
Door Hinge; Task 78-30-00-300-111
FOLLOWING TASK ON CMM 528232
1. TASK 52-82-32-000-801-B01
Replace Fwd and
CMM 52-82-32 Disassembly of the Forward Hinge-Fitting 13 NOV HAN
D52810138XXX CSE-2020-91 Aft Hinge Fitiing of Airbus A320/A321 CAAV
Assemblies 2020 BMC
NLG Aft Door
2. TASK 52-82-32-000-803-C01 Para 3A. (1)
Disassembly of the Aft Hinge Fittings
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
3. TASK 52-82-32-400-802-C01 Para 3A. (2)
Assembly of the Aft Hinge Fittings
4. TASK 52-82-32-400-805-B01 Assembly
of the Forward Hinge-Fitting Assemblies
5. TASK 52-82-32-100-801-A01 Cleaning of
the Painted Components
6. TASK 52-82-32-100-803-A01 Cleaning of
the Components Which Are Not Painted
10.
- DISASSEMBLY (Removal of Slider- CMM
Task 25-13-15-000-805-A01 Step 4.T.(1)
CSE-2020- Foot Rest And CMM 25-13-15 and (2)). 13 NOV HAN CAAV
D2511411800000 Airbus A320/A321
092 Sliding Table -ASSEMBLY (Installation of Slider-CMM 2020 BMC FAA
Task 25-13-15-400-801-A01 Step 3.A.(6) to
(8)).
Disassembly:
- Removal of the Door Assembly: Subtask
25-35-12-010-005-A01
-Removal of the Door Seal: Subtask 25-35-
12-010-031-A01 ; step A
Assembly:
CSE-Cl-TD- 3000/3075 Oven CMM 25-35-12 - Installation of the Door Seal: Subtask 25- A321/V253 22 OCT
4323100-01-6622 B/E Aerospace CIMC CAAV
2020-70 Series 3-A5 2020
35-12-440-008-A01 ; step L
- Installation of the Door Assembly: Subtask
25-35-12-410-018-A01
Repair:
- Door Repaint Instructions : Subtask 25-35-
12-380-001-A01
SERVICING: IAW CMP 25-11-51 , All task in
the block SERVICING (except subtask:
F4643COCKPIT-A-25-11-51-01001-722A-
TAAl8-04PE-XXX; CSE-Cl-TD- Stelia CMP 25-11-51 C) A350/TREN 24 NOV
Pilot & Copilot Seat CIMC CAAV
TAAl8-04CE-XXX 2020-19 Aerospace T XWB-84 2020
EXAMINATION, TEST AND CHECKS: IAW
CMP 25-11-51 , subtask F4643COCKPIT-A-
25-11-51-01001-311A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLE: IAW CMP 25-11-51 , All
task in the block DISASSEMBLE
ASSEMBLE: IAW CMP 25-11-51 , All task
in the block ASSEMBLE
SERVICING: IAW CMP 25-11-52, All task in
the block SERVICING (except subtask:
F4643COCKPIT-A-25-11-52-01001-722A-
C)
EXAMINATION, TEST AND CHECKS: IAW
TAAl8-031M05-01; CSE-Cl-TD- Stelia CMP 25-11-52 CMP 25-11-52, subtask F4643COCKPIT-A- A350/TREN 24 NOV
Obsever Seat CIMC CAAV
TAAl8-031M06-01 2020-20 Aerospace T XWB-84 2020
25-11-52-01001-311A-C
DISASSEMBLE: IAW CMP 25-11-52, All
task in the block DISASSEMBLE
ASSEMBLE: IAW CMP 25-11 -52, All task in
the block ASSEMBLE
CLEAN WITH CHEMICAL AGENT: IAW
CMP 25-39-17, TASK DMC-
A350BEGALMON-A-25-39-17-00001-251A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMP
25-39-17: All tasks in the block
CSE-Cl-TD- B/E CMP 25-39-17 DISCONNECT, REMOVE AND A350/TREN 24 NOV
X011004-0000011 GALLEY G14CAF CIMC CAAV
2020-22 AEROSPACE DISASSEMBLY PROCEDURES, except T XWB-84 2020
electrical and water system components
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMP 25-39-17: All
tasks in the block ASSEMBLE,
INSTALL AND CONNECT PROCEDURES,
except electrical and water system
components
1012790-XXX;
CSE-Cl-TD- CMM 25-22-53 DISASSEMBLY: Removal of all components A321/ 24 NOV
1012792-102; Passenger Seat B/E Aerospace CIMC CAAV
2020-24 of the seat listed in the block DISASSEMBLY V2500 2020
1012794-002
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CLEANING: Cleaning of all components of
the seat listed in the block CLEANING
(except electrical components,
wiring and PCU)
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: Removal of all components
of the seat listed in the block DISASSEMBLY
CLEANING: Cleaning of all components of
the seat listed in the block CLEANING
1015239-XXX; (except electrical components, wiring and
CSE-Cl-TD- A321/ 24 NOV
1015241-002; Passenger Seat B/E Aerospace CMM 25-22-50 PCU) CIMC CAAV
2020-25 V2500 2020
1015241-104 INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat listed in the block ASSEMBLY
DISASSEMBLY: All task and subtask listed
in the block DISASSEMBLY
CLEANING: All task and subtask listed in the
CSE-Cl-TD- ATR72/307 24 NOV
134-XXX Attendant Seat SAFRAN SEAT CMM 25-11-23 block CLEANING CIMC CAAV
2020-27 3453-01 2020
CHECK: SUBTASK 25-11-23-220-001-A01
ASSEMBLY: All task and subtask listed in
the block ASSEMBLY
CLEANING: Cleaning of all components
listed in the block CLEANING
1088709-XXX; CSE-ClꞏTD- Y Class Passenger B/E CMM 25-21-59 DISASSEMBLY: Removal of all components B787 / 24 NOV
CIMC CAAV
1088710-XXX 2020-28 Seats AEROSPACE listed in the block DISASSEMBLY GENX 2020
ASSEMBLY: Installation of all components
listed in the block ASSEMBLY
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
REPAIR: Repairing of all components
(Except: D. Removal of Nealiaible Surface
Corrosion, E. Uoholstery- Fabric)
DISASSEMBLY: IAW CMM 25-11-75: All
tasks in the block DISASSEMBLY, except:
- SUBTASK 25-11-75-040-009-A01:
REMOVE THE SPRING OF SEAT.
CLEANING: IAW CMM 25-11-75: All tasks in
CSE-Cl-TD- Cabin Attendant CMM 25-11-75 the block CLEANING. A321/ 24 NOV
WA-XXX Safran Seats CIMC CAAV
2020-73 Seats CHECK: IAW CMM 25-11-75: All tasks in the V2533-A5 2020
block CHECK.
ASSEMBLY: IAW CMM 25-11-75: All tasks
in the block ASSEMBLY, except:
- Subtask 25-11-75-440-010-A01: INSTALL
THE SPRING OF SEAT.
DISASSEMBLY: IAW CMM 25-11 -78: All
tasks In the block DISASSEMBLY
CLEANING: IAW CMM 25-11-78: All tasks in
CSE-Cl-TD- Cabin Attendant CMM 25-11-78 the block CLEANING. A321/ 24 NOV
DN-XXX Zodiac Seats CIMC CAAV
2020-74 Seats CHECK IAW CMM 25-11-78: All tasks in the V2533-A5 2020
block CHECK.
ASSEMBLY: IAW CMM 25-11-78: All tasks
in the block ASSEMBLY
DISASSEMBLY: IAW CMM 25-11-79: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-11-79: All tasks in
CSE-Cl-TD- Cabin Attendant CMM: 25-11-79 the block CLEANING. A321/ 24 NOV
RL-XXX Zodiac Seats CIMC CAAV
2020-75 Seats CHECK: IAW CMM 25-11-79: All tasks in the V2533-A5 2020
block CHECK.
ASSEMBLY: IAW CMM 25-11-79: All tasks
in the block ASSEMBLY
DISASSEMBLY: IAW CMM 25-11-99: All
CSE-Cl-TD- Cabin Attendant CMM: 25-11-99 tasks in the block DISASSEMBLY. A321/ 24 NOV
RL-XXX Zodiac Seats CIMC CAAV
2020-75 Seats CLEANING: IAW CMM 25-11-99: All tasks in V2533-A5 2020
the block CLEANING.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CHECK: IAW CMM 25-11-99: All tasks in the
block CHECK.
ASSEMBLY: IAW CMM 25-11-99: All tasks
in the block ASSEMBLY.
DISASSEMBLY: IAW CMM 25-25-85: All
tasks in the block DISASSEMBLY.
CLEANING: IAW CMM 25-25-85: All tasks in
CSE-Cl-TD- the block CLEANING. A321/ 24 NOV
8880700-XXX Passenger Seats B/E Aerospace CMM: 25-25-85 CIMC CAAV
2020-77 INSPECTION/CHECK: IAW CMM 25-25-85: V2533-A5 2020
All tasks in the block INSPECTION/CHECK.
ASSEMBLY: IAW CMM 25-25-85: All tasks
in the block ASSEMBLY.
DISASSEMBLY: IAW CMM 25-26-88: All
tasks in the block DISASSEMBLY.
CLEANING: IAW CMM 25-26-88: All tasks in
CSE-Cl-TD- the block CLEANING. A321/ 24 NOV
8880720-XXX Passenger Seats B/E Aerospace CMM: 25-26-88 CIMC CAAV
2020-78 INSPECTION/CHECK: IAW CMM 25-26-88: V2533-A5 2020
All tasks in the block INSPECTION/CHECK.
ASSEMBLY: IAW CMM 25-26-88: All tasks
in the block ASS EMBLY
FOLLOWING TASK ON CMM 574321
1. TASK 57-43-21 -000-801-A01 Removal of
D5746092000000; the Seals and the Bonding Lead:
Replace Rubber
D5746092000200; CMM 57-43-21 Subtask 57-43-21-010-001-D01 Para D. (3) 26 NOV HAN CAAV
CSE-2020-93 Seal Under Slat Airbus A320/A321
D5746092000100; 2. TASK 57-43-21-400-802-A01 Installation 2020 BMC FAA
Assy #2
D5746092000300 of the Seals and the Bonding Lead
Subtask 57-43-21-410-002-D01 Para D. (5),
(6), (7)
Fan cowl door latch handles paint repair
A320- CAAV
740-4002; Goodrich CMM 71-13-00 (repair 028 VRS 2789) per TASK 71-13-00- 27 NOV HCM
CSE/2020/053 Fan Cowls A321/V250 FAA
745-4002 Aerostructures 300-028 (Without step 6.B Disassembly and 2020 BMC
0 SSCA
6.N Assembly)
Thrust reverser c-duct fixed structure A320- CAAV
740-0002; Thrust Reverser Goodrich CMM 78-30-00 27 NOV HCM
CSE/2020/054 ꞏreplace the rubstrlp (repair 032 VRS A321/V250 FAA
745-0002 Assembly Aerostructures 2020 BMC
2092/2093) task 78-30-00-300-032 0 SSCA
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Repair No 26 Replacement of The "V" Core
642-3801; CSE-2020- Thrust Reverser Goodrich CMM 78-32-36 Cowl Seal On The Equipped Half-Door: A320/A321- 27 NOV HAN CAAV
642-3802 095 Door Assy Aerostructures CFM56 2020 BMC FAA
TASK 78-32-36-300-825.
VM30S2060029000; - Repair of the cracks on the surface 1.A.W
Panel Assy-Decor
VM30S1070028000; CSE CIMC AIRBUS SPM 20-00-01 : task 20-00-01-300-827-A00
and Strip Assy- SPM 20-00-01 - Repair of the decorative paint on the A350/ RR 04 DEC
VM30S2060004000; BASEHAN - Operations CIMC CAAV
Cover (Door Frame XWB 2020
VM30S4080006000; 2020-39 Gmbh sandwich panels I.AW SPM 20-00-01 : task
Lining)
VM30S2080012000 20-00-01-300-803-A00
DISASSEMBLY: Removal of all components
listed in the block DISASSEMBLY (except
Electrical system)
CLEANING: Cleaning of all components
listed in the block CLEANING
CSE-Cl-TD- Zodiac Galley CMM 25-36-29 INSPECTION/CHECK: Inspection of all A321/V250 04 DEC
601368-201 Galley G5 CIMC CAAV
2020-29 Europe 0 2020
components listed in the block
INSPECTION/CHECK (except Electrical)
ASSEMBLY: Installation of all components
listed in the block ASSEMBLY (except
Electrical system)
D5237175000000;
D5237175000200;
D5237175000400;
D5237175000600; A320-
Replacement of sight glasses per TASK 52- CAAV
D5237175000800; Fwd Cargo CMM 52-31-14 A321/V250 10 DEC HCM
CSE/2020/062 Airbus 31-14-000-802-A01 and TASK 52-31-14- FAA
D5237175001000; Compartment Door 0- 2020 BMC
400-802-A01. SSCA
D5237175001200; PW1100G
D5237175001400;
D5237175001600;
D5237175001800
G1LXXX;
- DISASSEMBLY (STEP 2.B, 2.C, 2.G, 2.M); CAAV
G1LXXX; Emergency Oxygen 14 DEC HCM
CSE/2020/057 B/E Aerospace CMM 35-21-73 - ASS EMBLY (STEP 2.A.(1), 2.A.(2), A320/A321 FAA
W1LXXX; Container 2020 BMC
2.A.(9), 2.8). SSCA
W1RXXX
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
G2F212-XXX;
G2N122-XXX; Emergency Oxygen - DISASSEMBLY (STEP 2.8, 2.C, 2.G, 2.M); CAAV
14 DEC HCM
G2N212-XXX; CSE/2020/058 Container, B/E Aerospace CMM 35-21-74 - ASSEMBLY (STEP 2.A.(1), 2.A.(2), 2.A.(8), A320/A321 FAA
2020 BMC
G2N422-XXX; Type II 2.8). SSCA
G2N632-XXX
DG2F212-XXX;
DG2N122-XXX; Emergency Oxygen - DISASSEMBLY (STEP 2.B, 2.C, 2.G, 2.M); CAAV
14 DEC HCM
DG2N212-XXX; CSE/2020/060 Container, B/E Aerospace CMM 35-22-74 - ASSEMBLY (STEP 2.A.(1), 2.A.(2), 2.A.(9), A320/A321 FAA
2020 BMC
DG2N422-XXX; Type II 2.B). SSCA
DG2N632-XXX;
REPAIR: Foam filter replacement - Subtask
25-36-49-350-006-A01
DISASSEMBLY:
- Removal of air inlet cover assembly -
Subtask 25-36-49-040-002-A01
- Removal of blanking plate assembly -
Subtask 25-36-49-040-003-A01
688-6; CSE-Cl-TD- SCS Beverage - Removal of foam filter - Subtask 25-36-49- A350/TREN 17 DEC
B/E Aerospace CMM 25-36-49 040-004-A01 CIMC CAAV
688-6-00-100 2020-30 Chiller/Freezer T XWB 2020
ASSEMBLY:
- Installation of foam filter - Subtask 25-36-
49-440-003-A01
- Installation of blanking plate assembly -
Subtask 25-36-49-440-004-A01
- Installation of air inlet cover assembly -
Subtask 25-36-49-440-005-A01
745-1101-501; CMM 78-11-11 Repair No 06 - REPAIR 006
745-1101-503; - REPLACE THE PRESSURE SEAL: TASK
745-1101-505; 78-11-11-300-006
745-1101-507; CMM 78-11-11_ Repair No 08 - REPLACE
CSE-2020- Common Nozzle Goodrich A320/A321- 17 DEC HAN CAAV
740-1094-501, CMM 78-11-11 THE UPPER PAN SEALS AND FIRE
096 Assembly Aerostructures V2500 2020 BMC FAA
740-1094-503; SEALS: TASK 78-11-11-300-008
740-1094-505; CMM 78-11-11 _Repair No 27 - SPRING
740-1094-507; SEAL REPLACEMENT REPAIR: TASK 78-
740-1094-509; 11-11-300-027
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
740-1094-513;
740-1094-515;
740-1094-517;
740-1094-519
1. TASK 52-33-50-000-809-A01 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
2. TASK 52-33-50-000-809-801 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
3. TASK 52-33-50-000-809-D01 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
4. TASK 52-33-50-000-809-E01 Removal
WG102AKAAAAF;
and Disassembly of the Miscellaneous
WG102ALAAAAF;
Equipment: Para 4.A. (6), (7)
WG102ARAAAAF;
5. TASK 52-33-50-400-802-A01 Assembly
WG102ARAAAAH;
and Installation of the Miscellaneous
WG102AV AAAAK;
Replace glass Equipment: Para 3.A. (5), (6)
WG102AXAAAAK; 17 DEC HAN
CSE-2020- 98 Window of Cargo Airbus CMM 52-33-50 6. TASK 52-33-50-400-802-801 Assembly A350/XWB CAAV
WH102ALAAAAC; 2020 BMC
Door and Installation of the Miscellaneous
WH102AMAAAAC;
Equipment: Para 3.A. (5), (6)
WH102ASAAAAC;
7. TASK 52-33-50-400-802-D01 Assembly
WH102ASAAAAF;
and Installation of the Miscellaneous
WH102AVAAAAH;
Equipment: Para 3.A. (5), (6)
WH102AXAAAAH
8. TASK 52-33-50-400-802-E01 Assembly
and Installation of the Miscellaneous
Equipment: Para 3.A. (5), (6)
FOLLOWING TASK ON CMM 523351
1. TASK 52-33-51-000-807-A01 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
2. TASK 52-33-51-000-807-801 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
3. TASK 52-33-51 -000-807-D01 Removal
and Disassembly of the Miscellaneous
Equipment: Para 4.A. (6), (7)
4. TASK 52-33-51-400-802-A01 Assembly
and Installation of the Miscellaneous
Equipment: Para 3.A. (5), (6)
5. TASK 52-33-51-400-802-801 Assembly
and Installation of the Miscellaneous
Equipment: Para 3.A. (5), (6)
6. TASK 52-33-51-400-802-D01 Assembly
and Installation of the Miscellaneous
Equipment: Para 3.A. (5), (6)
- REPAIR NO 01 : THRUST REVERSER
FORWARD CROSSOVER BEAM -
REPLACE THE SEALS (VRS2064): TASK
78-30-00-300-001
- REPAIR NO 25: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
745-0002-513; THE HEATSHIELD VELCRO STRIPS
745-0002-515; CSE-2020- Thrust Reverser Goodrich (VRS2056/2061 ): Task 78-30-00-300-025 A320/A321- 23 DEC HAN CAAV
CMM 78-30-00
745-0002-517; 099 Assembly Aerostructures - REPAIR NO 33: THRUST REVERSER C- V2500 2020 BMC FAA
745-0002-519 DUCT FIXED STRUCTURE - REPLACE
THE LARGE FORWARD HEATSHIELD
(VRS2099/2100) : Task 78-30-00-300-033
- REPAIR NO 36: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
THE LARGE AFT HEATSHIELD
(VRS2097/2098) : Task 78-30-00-300-036
REPAIR 020: COMMON NOZZLE
ASSEMBLY - REPLACE THE INNER
ANNULUS SUPPORT ASSEMBLY
745-1101-5XX; CSE-2020- Common Nozzle Goodrich A320/A321- 28 DEC HAN CAAV
CMM 78-11-11 NUTPLATE(VRS2160):TASK 78-11-11-
740-1094-5XX; 101 Assembly Aerostructures V2500 2020 BMC FAA
300-020
REPAIR 029: COMMON NOZZLE
ASSEMBLY - REPLACE THE CNA
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ATTACHMENT FLANGE NUTPLATE
RIVETS (VRS2355): TASK 78-11-11-300-
029
DISASSEMBLY: All tasks in the block
DISASSEMBLY (except Removal of the
intercom handset- SUBTASK 25-11-98-040-
005-AO 1 )
CLEANING: Polycarbonate/ABS fairing
(SUBTASK 25-11-98-160-001-A01); Metal
parts (SUBTASK 25-11-98-160-003-A01);
DN01TYU3YS00096;
CSE-Cl-TD- Cabin Attendant Fabric-backed vinyl (SUBTASK 25-11-98- A321/V250 28 DEC
DN01TYU3YS00054; Safran Seats ACMM 25-11-98 CIMC CAAV
2020-40 Seats 160-004-A01); Leathers (SUBTASK 25-11- 0 2020
DN01TYT3YS00054
98-160-005-A01).
CHECK: All tasks in the block CHECK.
ASSEMBLY: All tasks in the block
ASSEMBLY (except Installation of the
intercom handset - SUBTASK 25-11-98-440-
004-A01 and Installation of the headrest
cable - SUBTASK 25-11-98-440-005-A01).
REPAIR NO 002: THRUST REVERSER
FORWARD CROSSOVER BEAM -
REPLACE THE SEAL RETAINER
(VRS2136): TASK 78-30-00-300-002
REPAIR NO 003: THRUST REVERSER
745-0002-513; FORWARD CROSSOVER BEAM -
745-0002-515; CSE-2020- Thrust Reverser Goodrich CMM 78-30-00 REPLACE THE FIRE SHIELDS A320/A321- 28 DEC HAN CAAV
745-0002-517; 100 Assembly Aerostructures (VRS2137): TASK 78-30-00-300-003 V2500 2020 BMC FAA
745-0002-519
REPAIR 026 THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
LOWER BIFURCATION HEATSHIELD
(VRS2101/2102): TASK 78-30-00-300-026
REPAIR NO 040: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
THE LOWER TRACK RUBSTRIP
(VRS2199): Task 78-30-00-300-040
REPAIR NO 041: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
THE LOWER TRACK SEAL
(VRS2191/2192): TASK 78-30-00-300-041
REPAIR NO 043: THRUST REVERSER C-
DUCT FIXED STRUCTURE - REPLACE
THE LOWER TRACK ALUMINUM
RUBSTRIP (VRS2201/2202): Task 78-30-
00-300-043
REPAIR NO 162: THRUST REVERSER
FIXED DUCT ASSEMBLY - REPLACE THE
ENGINE BUMPER ANDOWN,
(VRS2302): TASK 78-30-00-300-162
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DISASSEMBLY: l.A.W CMM 25-78-47: All
tasks in the block DISASSEMBLY
CLEANING: l.A.W CMM 25-78-47: All tasks
Wall-Mounted A321N/
CSE-Cl-TD- in the block CLEANING 29 DEC
2431-81NH00F0DQ Bench Cabin Goodrich Corp ACMM 25-78-47 PW1130G- CIMC CAAV
2020-43 CHECK: I.AW CMM 25-78-47: All tasks in 2020
Attendant Seat JM
the block CHECK
ASSEMBLY: I.AW CMM 25-78-47: All tasks
in the block ASSEMBLY
DISASSEMBLY: 1.A.W CMM 25-78-48: All
tasks in the block DISASSEMBLY
CLEANING: 1.A.W CMM 25-78-48: All tasks
Floor-Mounted A321N/
2427-71AD00F0DQ; CSE-Cl-TD- in the block CLEANING 29 DEC
Cabin Attendant Goodrich Corp ACMM 25-78-48 PW1130G- CIMC CAAV
2427-91BB02F0DQ 2020-44 CHECK: l.A.W CMM 25-78-48: All tasks in 2020
Seat JM
the block CHECK
ASSEMBLY: l.A.W CMM 25-78-48: All tasks
in the block ASSEMBLY
DISASSEMBLY: All tasks in the block
DISASSEMBLY
CLEANING: All tasks in the block
CLEANING (except 12. Wool and Synthetic
1012702-XXX; CSE-Cl-TD- A321/V250 11 JAN
Passenger Seats B/E Aerospace CMM 25-23-53 Fabric Cleaning) CIMC CAAV
1012705-XXX 2021-01 0 2021
INSPECTION/CHECK: All tasks in the block
INSPECTION/CHECK
ASSEMBLY: All tasks in the block
ASSEMBLY
Following Task on CMM 32-21-01:
1. Remove of the identification label and
A350 XWB -
scale, subtask 32-21 -01-010-050-A01 :step
Replace Steering 12 JAN HAN
4816A0000-06 CSE-2021-08 Liebherr CMM 32-21-01 (73) (a), (b), (e) A350/XWB CAAV
Scale and ID Label 2021 BMC
2. Installation of the identification label and
At NLG
scale, subtask 32-21-01-410-007-A01 : step
(67) (a), (d), (e)
901500-1; Telair
CSE-2021- - Repair 5: removal of surface damage; Task 13 JAN HAN CAAV
901501-1; Ball Mat Assy International CMM 50-23-20 50-23-20-300-803-A01 A350/XWB
001 2021 BMC FAA
901502-1; GmbH
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
901503-1; - Repair 7: Inspection and removal of
901504-1; damage; Task 50-23-20-300-807-A01
901505-1; Note: Except for the following damage types:
901506-1; punctures, cracks, crease
901507-1; - Repair 9: Removal of nicks,scratches and
901508-1; gouge; Task 50-23-20-300-805-A01
901509-1; - Repair 10: inspection and repair of dents:
901510-1; Task50-23-20-300-806-A01
901511-1
745-0002-513;
REPAIR NO 36: thrust reverser c-duct fixed
745-0002-515; Thrust Reverser Goodrick A320-A321/ 14 JAN HCM CAAV
CSE/2021/001 CMM 78-30-00 structure - replace the large aft heatshield
745-0002-517; Assembly Aerostructures V2500 2021 BMC FAA
(vrs2097/2098) : task 78-30-00-300-036
745-0002-519
A350FS5UAA21ZA;
A351WS58AA14ZA;
A351WS5MAA31Z; Inspection, cleaning and replacement of
A350FS5VAA21ZA; component l.A.W the following tasks:
A351WS5JAA53ZA; - Inspection of component of the seat 1.A.W
A351WS5UAA28ZA; task list in the block INSPECTION/CHECK.
CSE-IN6- Cabin Attendant A350/TREN 15 JAN
A351WS58AA13ZA; Goodrich ACMM 25-75-58 - Cleaning of component of the seat 1.A.W XWB-84 CIMC CAAV
2021-06 Seat 2021
A351WS5KAA54ZA; tasks listed in the block CLEANING
A351WS5VAA21ZA; - Replacement of component of the seat
A351WS5WAA31ZA; l.A.W tasks listed in the block
A351WS5LAA31ZA; DISASSEMBLY and block ASSEMBLY
A351WS5VAA28ZA;
A351WS5VAA54ZA
E441001A-XXX; CSE-IN6- Inspection, cleaning and replacement the A350/TREN 19 JAN
Lavatory Assembly Safran CIMC CAAV
E451001A-XXX 2021-09 CMM 25-40-06 defective part (except electric parts). XWB-84 2021
FOLLOWING TASK ON CMM 52-31-14:
Replace Sign Glass
D523717500XXX; CMM 52-31-14; 1. Removal and Disassembly of the Access A320/A321-
CSE-2021- at Panel Indicator of 19 JAN HAN CAAV
D523719801XXX; Airbus Panel : V2500/PW1
009 Fwd & Aft Cargo CMM 52-32-15 TASK 52-31-14-000-802-A01 Para 3.A.(4) 2021 BMC FAA
D523719800XXX 100G
Door
Remove the sight glasses
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
2. Assembly and Installation of the Access
Panel
TASK 52-31-14-400-802-A01 Para 3.A.(1)
Install the sight glasses
FOLLOWING TASK ON CMM 52-32-15:
1. Removal and Disassembly of the Access
Panel:
TASK 52-32-15-000-803-A01 Para 3.A.(4)
Remove the sight glasses
2. Assembly and Installation of the Access
Panel
TASK 52-32-15-400-803-A01 Para 3.A.(1)
Install the sight glasses
CSE-IN6- L11 Lavatory Inspection, cleaning and replacement the A350/TREN 19 JAN
E201001A-XXX Zodiac CMM 25-40-03 CIMC CAAV
2021-07 Assembly defective part (except electric parts). XWB-84 2021
E261001A-XXX; CSE-IN6- Inspection, cleaning and replacement the A350/TREN 19 JAN
Lavatory Assembly Safran CMM 25-40-11 CIMC CAAV
E271001A-XXX 2021-08 defective part (except electric parts). XWB-84 2021
E471001A-XXX; CSE-IN6- L73/L74 Lavatory Inspection, cleaning and replacement the A350/TREN 19 JAN
Safran CMM 25-40-07 CIMC CAAV
E481001A-XXX 2021-10 Assembly defective part (except electric parts). XWB-84 2021
Replacement of component I.AW the
following tasks:
- Disassembly of component of lavatory
I.AW CMM 25-43-21 : block
D2549310004200; DISASSEMBLY OF THE WASHBASIN
A321
D2549320004000; CSE-IN6- PANEL ASSY reference TASK 25-43-21- 19 JAN
Lavatory D, E Diehl Aviation CMM 25-43-21 NEO/PW11 CIMC CAAV
R225404693-002; 2021-11 000-813-A00 2021
30G-JM
R225405693-002 - Assembly of component of lavatory I.AW
CMM 25-43-21 : block ASSEMBLY OF THE
WASHBASIN PANEL
ASSY reference TASK 25-43-21-400-807-
A00
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of the Roller Assembly at ribs
CAAV
D5758550XXXXXX; 1 and 19 per TASK 57-53-23-000-811-A01 03 FEB HCM
CSE/2021/002 Outboard Flap Assy Airbus S.A.S CMM 57-53-23 A320/A321 FAA
D5758670XXXXXX and TASK 57-53-23400-805-A01 in CMM 2021 BMC
SSCA
57-53-23
A321
CSE-IN6- Safran Cabin Repair Faying Surface Sealing of Procedure- 04 FEB
601969-000001 Stowage S1 CMM 25-20-263 NEO/PW11 CIMC CAAV
2021-12 CZ S.R.O Sealing Procedure l.A.W CMM 25-20-263 2021
30G-JM
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Thrust Reverser Precooler Duct- Replace
14 DEC HAN
CSE-2022-033 The Rub Strip As Rer CMM 78-30-00-300-
2022 BMC
167
- Removal of the bearing (4-300) Ref
Replacement Lower SUBTASK 32-27-92-010-005-A01
10-375002-000; 11 FEB HAN CAAV
CSE-2021-15 Bearing of NLG Safran CMM 32-27-92 - Installation of the bearing (4-300) Ref A320/A321
10-375002-001 2021 BMC FAA
Leg-Structure SUBTASK 32-27-92-440-001-A01 Step (11 )
(I)
- CMM 25-60-10: Testing And Fault
Isolation/D. Identification of ADT 406 Beacon
Update of the CMM 25-60-10; A350
01N65900; - CMM 25-60-11: Testing And Fault lsolation/ 16 FEB HAN
CSE-2021-16 ELT/CS ELTA TRENT- CAAV
01N65920 Task 25-60-11-750-805-A01 "Cospas- 2021 BMC
Identification CMM 25-60-11 XWB
Sarsat Ident ification of the
ADT 406 S ELT"
- Removal of hose rest support and fender
lower slave link at MLG,
SUB TASK 32-13-06-040-019-A01/ Step Q
Replace Hose Rest (1), (2), (3), (7)
A350
10-357303 XXX; Support and Fender - Installation of hose rest support and fender 19 FEB HAN
CSE-2021-17 Safran CMM 32-13-06 TRENT- CAAV
10-357403 XXX Lower Slave Link at lower slave link aT MLG, 2021 BMC
XWB
MLG SUB TASK 32-13-06-440-026-A01 / Step V
(1) To (6)
SUB TASK 32-13-06-440-027-A01/ Step W
(1) To (9)
201581001;
201581002;
201581003;
CMM 32-12-23; CAAV
201581004; Main Landing Gear Paint finish repaired as per CMM 32-12- 24 MAR HCM
CSE/2021/006 Safran A320-A321 FAA
201581005; Complete 23/REPAIR.PARA/3/A/(3)/(a) 2021 BMC
PCS-2500 SSCA
201581006;
201581007;
201581008
Goodrich CAAV
- Disassembly T-piece connection assembly 26 MAR HCM
CH1543A0034 CSE/2021/007 Deploy T Connector Actuation CMM 78-32-44 A320-A321 FAA
IAW subject disassembly item 1 and 2.C 2021 BMC
Systems SSCA
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly T-piece connection assembly
IAW subject assembly item 1 and 3.C
Thrust Reverser C- CMM 78-30-00 Repair 114 thrust reverser
CSE-2021- Goodrich 31 MAR HAN
745-0002XXX Duct Fixed CMM 78-30-00 translating sleeve - replace the pin stowage A320/A321 CAAV
018 Aerostructures 2021 BMC
Structure bracket
CSE-IN6- Zodiac Galleys - Installation of Placard in the block ANNEX 05 APR
601858-023601 GALLEY G5 CMM 25-36-089 A321 CIMC CAAV
2021-16 Europe C : Placard installaion I.AW CMM 25-36-089 2021
D5746091000000; - Removal of the lnboard End Seals and
CAAV
D5746091000100; Bonding Strap IAW 57-42-21-000-801-A01. 09 APR HCM
CSE/2021/009 SLAT 1 Airbus S.A.S CMM 57-42-21 A320-A321 FAA
D5746091000200; - lnstallation of the lnboard End Seals and 2021 BMC
SSCA
D5746091000300 Bonding Strap IAW 57-42-21-400-804-A01.
D5746092000000; - Removalof the Seals and the Bonding
CAAV
D5746092000100; Lead IAW TASK 57-43-21-000-801-A01. 09 APR HCM
CSE/2021/010 SLAT 2 Airbus S.A.S CMM 57-43-21 A320-A321 FAA
D5746092000200; - lnstallation of the Seals and the Bonding 2021 BMC
SSCA
D5746092000300 Lead IAW TASK 57-43-21-400-802-A01.
E281001A-XXX;
E291001A-XXX; CSE-IN6- Inspection, cleaning and replacement the 14 APR
Lavatory Assembly Safran CMM 25-40-05 A350 CIMC CAAV
E321001A-XXX; 2021-18 defective part (except electricꞏ parts). 2021
E521001A-XXX
-Disassemble slat to remove wire harness
as per Para 301 Disassembly of CMM 57-
43-23
- Install wire bundle harness as per C(15)
Para 701. Heater Blanket Wiring Installation
Slat Assembly No.4 22 APR HCM CAAV
144Z0201-50X-X CSE/2021/015 Boeing CMM 57-43-23 of CMM 57-43-23 B787-9
And 9 2021 BMC FAA
- Assemble slat as per Para 701 Assembly
of CMM 57-43-23
- Wing Anti-Ice Detail Test as per Step 3,
Para 101, Testing And Fault Isolation of
CMM 57-43-23
CAAV
174095XXX; Passenger Oxygen Inspection/check of passenger oxygen 22 APR HCM SSCA
CSE/2021/016 Aerospace CMM 35-24-04 ATR72
174097XXX Mask Assembly masks for condition IAW CMM 35-24-04 2021 BMC CAAB
CAAP
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of structure I .AW the following
tasks:
- Disassembly of structure I.AW CMM 25-35-
CSE-IN6- 23 APR
3212VNRHGA00 RH Stowage AIM CMM 25-35-99 99 reference block the Structure A321 CIMC CAAV
2021-20 2021
disassembly
- Assembly of structure I.AW CMM 25-35-
99 reference block Structure assembly
Replacement of structure I.AW the following
tasks:
- Disassembly of structure l.A.W CMM 25-
35-96 reference block the Structure
CSE-IN6-20- disassembly except disassemble the lower, 23 APR
21-21 centre and upper structure assy 2021
- Assembly of structure I.AW CMM 25-35-96
reference block Structure assembly except
assemble the lower, centre and upper
structure assy
3212VN05GA00;
GALLEY 5 AIM CMM 25-35-96 Replacement of faucet, placards I.AW the A321 CIMC CAAV
3212VN05GB00
following tasks:
- Disassembly of faucet I.AW CMM 25-35-
96 reference block Removal of the
Plumbing Assembly
CSE-IN6- 26 APR
- Assembly of faucet I.AW CMM 25-35-96
2021-22 2021
reference block Installation of the Water
System
- Assembly of placard I.AW CMM 25-35-96
reference block Illustrated Parts List-
Installation of Placards
DISASSEMBLY: .Removal of all
components of the seat I.AW tasks listed in
CSE-IN6- the block DISASSEMBLY 27 APR
2351WS5XXXXXXX Attendant Seat Goodrich CMM 25-73-92 A350 CIMC CAAV
2021-24 CLEANING: 2021
- List of Materials: TASK 25-73-92-160-801
-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Cleaning Procedures: TASK 25-73-92-
160-802-A01
CHECK:
- General: TASK 25-73-92-210-801-A01
- Restraint: TASK 25-73-92-210-802-A01
- Seat Assembly: TASK 25-73-92-210-803-
A01
ASS EMBLY: Installation of all components
of the seat I.AW tasks listed in the
block.ASSEMBLY
HAN
BMC;
HCM
Emergency Locator - Update of the ELT C/S Identification l.A.W 16 APR BMC; CAAV
01N65920 CSE/2021/013 Elta CMM 25-60-11 B787
Transmitter CMM 25-60-11 task 25-60-11-750-807-A01. 2021 HAN FAA
LMC;
HCM
LMC
- Update of the ELT C/S identification l.A.W HAN
CMM 25-60-10 task ATR-A-25-65-20-00001 LMC; CAAV
CMM 25-60-10; ATR72/42-
01N65900; Emergency Locator -752A-A. 16 APR HCM EASA
CSE/2021/014 Elta PW1
01N65920 Transmitter - Update of the ELT C/S identification l.A.W 2021 LMC; SSCA
CMM 25-60-11 24/127
CMM 25-60-11 task ATR-A-25-65-20- HCM CAAP
01002-752A-A. BMC
HAN
CMM 25-60-10: Testing And Fault Isolation/ BMC;
CSE-2021-19; D. Identification of ADT 406 Beacon. HCM
CMM 25-60-10;
01N65900; HAN/2021/A3 Emergency Locator CMM 25-60-11: Testing And Fault Isolation/ A321 26 APR BMC; CAAV
Elta
01N65920 21.A350ELT - Transmitter Task 25-60-11-750-805-A01, Task 25-60- A350 2021 HAN FAA
CMM 25-60-11
02 11-750-806-A01 and Task 25-60-11-750- LMC;
807-A01. HCM
LMC
CSE-IN6-2021 Replacement of faucet, placards I.AW the 26 APR
3212VN01GA00 GALLEY 1 AIM CMM 25-35-95 A321 CIMC CAAV
-23 following tasks: 2021
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly of faucet I.AW CMM 25-35-
95 reference block Removal of the
Plumbing Assembly
- Assembly of faucet I.AW CMM 25-35-95
reference block Installation of the Water
System
- Assembly of placard I.AW CMM 25-35-95
reference block Illustrated Parts List-
Installation of Placards
REPAIR 3: Replacement of the riveted part
285-29000-00XX; TASK 25-23-00-300-801-A00
285-39000-00XX; CSE-2021- *REPAIR 4: Reworking or machining; 04 MAY HAN CAAV
Door Lining Airbus CMM 25-23-00 A350
285-49000-00XX; 012 TASK 25-00-30-803-A00 2021 BMC FAA
285-59000-00XX * REPAIR 8: repair of damaged paint;
TASK 25-23-00-300-806-A00
Repair I.AW CMM 25-40-06 the follow tasks:
- Repair Fiberglass Composite Pane refer
task 25-40-06-300-806-A01
E441001A-XXX: CSE-IN6- 15 MAY
Lavatory Safran CMM 25-40-06 - Paint and Prime the Composite Panel refer A350 CIMC CAAV
E451001A-XXX 2021-28 2021
task 25-40-06-300-809-A01
- Repair Cracked Shroud refer task 25-40-
06-300-816-A01
DISASSEMBLY: Removal of all
components of the seat listed in the block
DISASSEMBLY (except Video, IFE/PC
Power component
CLEANING: Cleaning procedures: Non-
876499-XXX; CSE-IN6- upholstered Parts, Upholstery, Metal 15 MAY
Passenger Seat Safran CMM 25-20-17 A350 CIMC CAAV
876529-XXX 2021-26 parts,Fabric-Backed Vinyls and Plastic 2021
INSPECTION/CHECK: Inspection of all
components of the seat listed in the block
INSPECTION/CHECK
ASSEMBLY: Installation of all components
of the seat I.A.W tasks listed in the block
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ASSEMBLY (except Video, IFE/PC Power
components)
Repair l.A.W CMM 25-40-03 the follow tasks:
-Repair Fiberglass Composite Pane refer
task 25-40-03-300-807-A01
CSE-IN6- 15 MAY
E201001A-XXX L11 Lavatory Safran CMM 25-40-03 - Paint and Prime the Composite Panel refer A350 CIMC CAAV
2021-30 2021
task 25-40-03-300-810-A01
- Repair Cracked Shroud refer task 25-40-
03-300-817-A01
285-12000-00XX;
285-13000-00XX;
285-14000-00XX;
285-17000-00XX;
285-18000-00XX; REPAIR 3: REPLACEMENT OF THE
285-22000-00XX; RIVETED PARTS; TASK 25-23-00-300-801-
285-23000-00XX; A00
CSE-2021- 21 MAY HAN CAAV
285-24000-00XX; Door Lining Airbus CMM 25-23-00 *REPAIR 4: REWORKING OR MACHINING; A350
021 2021 BMC FAA
285-28000-00XX; TASK 25-23-00-300-803-A00
285-33000-00XX; *REPAIR 8: REPAIR OF DAMAGED PAINT;
285-38000-00XX; TASK 25-23-00-300-806-A00
285-42000-00XX;
285-43000-00XX;
285-44000-00XX;
285-48000-00XX
DISASSEMBLY: IAW CMM 25-22-51: All
tasks in the block DISASSEMBLY
CLEANING: IAW CMM 25-22-51: All tasks in
the block CLEANING
1075402-XXX; CSE-IN6- Y Class Passenger 22 MAY
B/E Aerospace CMM 25-22-51 INSPECTION/CHECK: IAW CMM 25-22-51: A321 CIMC CAAV
1075403-XXX 2021-31 Seats 2021
All tasks in the block INSPECTION/CHECK
REPAIR: IAW CMM 25-22-51:
F. Seat Belt Repair
G. Seat Bottom Cushion Repair
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ASSEMBLY: IAW CMM 25-22-51: All tasks
in the block ASSEMBLY
Replacement of the fixed bushes of the
CAAV
Structure Complete center hinge as per subtask 57-72-21-010- 28 MAY HCM
D5775001900XXXX CSE/2021/020 Airbus CMM 57-72-21 A320-A321 FAA
- Spoiler 2 004-A01/A/(6) and subtask 57-72-21-410- 2021 BMC
SSCA
001-A01/A/(10)
Replacement of the fixed bushes of the
CAAV
Structure Complete center hinge as per subtask 57-74-21-010- 28 MAY HCM
D5775002100XXXX CSE/2021/021 Airbus CMM 57-74-21 A320-A321 FAA
- Spoiler 4 004-A01/A/(7) and subtask 57-74-21-400- 2021 BMC
SSCA
001-A01/A/(10)
- Visual inspection the axel for sign of heat
damage after serious hot brake event per
SOPM 20-10-02 step 11.F
- Apply local Low Hydrogen Embrittlement
SOPM 20-10-02; HCM
Inspection main (LHE) stylus cadmium plate to the reworked
SOPM 20-42-10; 04 JUN BMC;
515Z2002-501 CSE/2021/001 landing gear axel Boeing surfaced per SOPM 20-42-10 B787 CAAV
SOPM 20-10-01; 2021 HAN
for heat damage - Machining and Grinding per SOPM 20-10-
CMM 32-10-35 BMC
01
- Re-apply Primer per CMM 32-10-35 step
Repair 3-1 SUBTASK 32-10-35-300-009-
A01
HCM
Inspection main Visual inspection the axel for sign of heat
04 JUN LMC;
515Z2002-501 CSE/2021/005 landing gear axel Boeing SOPM 20-10-02 damage after serious hot brake event l.A.W B787 CAAV
2021 HAN
for heat damage SOPM 20-10-02 step 11.F
LMC
- Removal of the defective parts I.AW CMM
25-23-34 reference Task A350-A-25-23-34-
513035A; 01001-530A-C
513036A; CSE-IN6- Diehl Aircabin - Repair of the defective parts I.AW CMM 25- 17 JUN
Doghouse CMM 25-23-34 A350 CIMC CAAV
513093; 2021-36 GmbH 23-34 reference : 2021
513094 Task A350-A-25-23-34-01001-600A-C (the
repair of the surface finish, the edge profiles
and the edge fillers )
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation of the defective parts I.AW
CMM 25-23-34 reference Task A350-A-25-
23-34-01001-710A-C
- Remove primer
and paint on main
landing gear truck
beam assembly - ON CMM 32-13-05: AXLE ASSEMBLY -
- Apply local low REPAIR 3-1, Para. 6: Axle Assembly
hydrogen Refinish Procedure;
CMM 32-13-05;
embrittlement (lhe) - On SOPM 20-10-01 : Step 2.D: Polishing
515Z1110-501; SOPM 20-10-01; B787- 18 JUN HAN
CSE-2021-22 stylus cadmium Boeing - On SOPM 20-10-02: Step 4.E: Cleaning CAAV
515Z1110-502 SOPM 20-10-02; GENX-1B 2021 BMC
plate on main and Storing of Parts
SOPM 20-42-10
landing gear truck - On SOPM 20-42-10: Low hydrogen
beam assembly embrittlement stylus cadmium plating using
- Apply primer and DALIC CADMIUM solution.
paint on main
landing gear truck
beam assembly
Removal door of Steam Oven Assembly
I.AW CMM 25-35-21 reference Subtask 25-
35-2 1-010-001-A01/step 3
Cleaning door of Steam Oven Assembly
I.AW CMM 25-35-21 reference Subtask 25-
X200100; 35-21-1 40-001-A0l /step 1-step 2- step 3-
CSE-IN6- A350/TREN 21 JUN
X200200; Steam Oven Zodiac Services CMM 25-35-21 step 4 CIMC CAAV
2021-33 XWB-84 2021
X201100 Repair door of oven assembly I.AW CMM
25-35-21 reference block Paint - Minor
Repair I Touch-Up
Installation door of Steam Oven Assembly
I.AW CMM 25-35-21 reference Subtask 25-
35-2 1-420-001-A01/step 17
Removal of the Door Assembly l.A.W CMM
4323500-XX-XXXX; CSE-IN6- A350/TREN 21 JUN
Steam Oven B/E Aerospace CMM 25-35-52 25-35-52 reference Subtask 25-35-52-010- CIMC CAAV
4323501-XX-XXXX 2021-34 XWB-84 2021
005-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Repair door of oven assembly I.AW CMM
25-35-52 reference block Touch Up Paint -
Task 25-35-52-350-801 - A01
Installation of the Door Assembly 1.A.W
CMM 25-35-52 reference Subtask 25-35-52-
410-050-A01
FOLLOWING TASK ON CMM 352160:
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-21-
60-000-001-A01
Installation Of The Warning Flag: Subtask
H2CXXXXXXXXX50 35-21-60-000-002-A01 Step
1; (5).(b),(c),(d),(e)
EXCXXXXXXXXX50 Remove The Pax Mask Assembly: Subtask
1; 35-21-60-000-002-A01 Step (6),(7),(8),(12)
EXCXXXXXXXXX50 2. Installation Of The Pax Oxygen-Mask
CMM 35-21-60;
2; Assembly
CMM 35-21-61;
FXCXXXXXXXXX50 Install New Pax Mask Assembly: Subtask
CMM 35-21-62;
1;FXCXXXXXXXXX5 PAX Oxygen-Mask B/E Aerospace 35-21-60-410-001-A01 Step (2), (5), (6), (7), 28 JUN BMC
CSE-2021-24 CMM 35-21-63; A350/XWB CAAV
02; Assembly Systems GmbH (16) 2021 HAN
CMM 35-21-64;
GXCXXXXXXXXX50; Fold The Oxygen Masks: Subtask 35-21 -60-
CMM 35-20-50;
KXCXXXXXXXXX50 410-001-A01 Step (8)
CMM 35-21-51
1; Close The Door Assembly Subtask 35-21-
KXCXXXXXXXXX50 60-700-001-A01 Step (5)
2; FOLLOWING TASK ON CMM 352161
H2GXXXXXXXXX50 1. Remove Of The Pax Oxygen-Mask Ass
1; Embly
Open The Door Assembly: Subtask 35-21-
61-000-001-A01
Installation Of The Warning Flag: Subtask
35-21 -61-010-001-A01 Step (3).(b)(c)
Remove the pax mask assembly: Subtask
35-21-61-010-001-A01 Step 4),(5),(6),(12)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
2. Installation Of The Pax Oxygen-Mask
Assembly
Install New Pax Mask Assembly: Subtask
35-21-61-410-001-A01 Step (2),(5),(6) ,(14)
Close The Door Assembly Subtask Task 35-
21 -61-700-801-A01 Step 1.E.(5)
FOLLOWING TASK ON CMM 352162
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-21-
62-000-001-A01
Installation Of The Warning Flag: Subtask
35-21-62-000-002-A01 Step
(1),(4).(a),(c),(d)
Remove The Pax Mask Assembly: Subtask
35-21 -62-000-002-A01 Step (5),(6),(7),(10)
Open The Door Assembly: Subtask 35-21-
62-000-005-A01
Installation Of The Warning Flag: Subtask
35-21-62-000-006-A01 Step (1
),(4),(5);(6),(8).(C),(D)
Remove The Pax Mask Assembly: Subtask
35-21 -62-000-006-A01 Step (10)
2. Installation Of The Pax Oxygen-Mask
Assembly
Install New Pax Mask Assembly: Subtask
35-21-62-400-003-A01 Step (13)
Fold The Oxygen Masks: Subtask 35-21-62-
400-003-A01 Step (2),(5),(7)
Close The Door Assembly Subtask 35-21-
62-200-801-A01 Step F
Install New Pax Mask Assembly: Subtask
35-21-62-400-006-A01 Step (13)
Fold The Oxygen Masks: Subtask 35-21-62-
400-006-A01 Step (2),(5),(7)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Following Task On Cmm 352163
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-21-
63-000-001-A01
Installation Of The Warning Flag: Subtask
35-21 -63-000-002-A01 Step
(4).(B),(C);(D),(E)
Remove The Pax Mask Assembly: Subtask
35-21 -63-000-002-A01 Step (6),(7),(8),(12)
Open The Door Assembly: Subtask 35-21-
63-000-003-A01
Installation Of The Warning Flag: Subtask
35-21-63-000-004-A01
(5),(6),(7),(9).(B),(C),(D),(E)
Remove The Pax Mask Assembly: Subtask
35-21 -63-000-004-A01 Step (11)
2. Installation Of The Pax Oxygen-Mask
Assembly:
Install New Pax Mask Assembly: Subtask
35-21-63-410-001-A01 Step
(2),(5),(6),(7),(14)
Close The Door Assembly Subtask 35-21-
63-200-801 -A01 Step E
Install New Pax Mask Assembly: Subtask
35-21-63-410-002-A01 Step
(2),(5),(6),(7),(14)
Following Task On Cmm 352164
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-21-
64-000-005-A01
Installation Of The Warning Flag: Subtask
35-21-64-000-006-A01 Step (3).(C)(D)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Remove The Pax Mask Assembly: Subtask
35-21-64-000-006-A01 Step (5),(6),(7),(12)
Open The Door Assembly: Subtask 35-21-
64-000-007-A01
Installation Of The Warning Flag: Subtask
35-21 -64-000-004-A01 Step
(5).(C)(D),(6),(7),(8)
Remove The Pax Mask Assembly: Subtask
35-21-64-030-003-A01 Step (1)
2. Installation Of The Pax Oxygen-Mask
Assembly
Install New Pax Mask Assembly: Subtask
35-21-64-410-001-A01 Step (2),(5),(6),(14)
Close The Door Assembly Subtask Task 35-
21-64-200-801-A01 Step E
Install New Pax Mask Assembly: Subtask
35-21 -64-400-006-A01 Step (2),(8),(9), And
Subtask 35-21-
64-400-007-A01
Following Task On Cmm 352250
1. Remove Of The Pax Oxygen-Mask
Assembly
Open The Door Assembly: Subtask 35-22-
50-000-001-A01 Step (1),(3),(4)
Installation Of The Warning Flag: Subtask
35-22-50-000-002-A01 Step
(1),(3),(4),(5)(A),(6),(7)
Remove The Pax Mask Assembly: Subtask
35 35-22-50-000-003-A01 Step (1)
2. Installation Of The Pax Oxygen-Mask
Assembly
Install New Pax Mask Assembly: Subtask
35-22-50-400-001-A01 Step (4),(5)
Close The Door Assembly Subtask Task 35-
22-50-700-003-A01 Step 1.A.(5)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
10.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
2.Backrest recline test I.AW CMM 25-26-14
reference subtask 25-26-14-700-004-A01
3.Removal of the defective parts I.AW CMM
25-26-14 in block DISASSEMBLY reference
follow task:
- Disassembly of the Backrest Assembly
refence task 25-26-14-000-004-A01
- Disassembly of the Armrest Assembly
refence subtask 25-26-14-020-007-A01
- Disassembly of the IAT Armrest Assembly
refence task 25-26-14-000-007-A01
- Disassembly of the Foodtray Assembly
refence task 25-26-14-000-008-A01 except
remove item 70
- Disassembly of the Kinematics Assy
refence task 25-26-14-000-014-A01
- Disassembly of the SEB Shroud refence
task 25-26-14-000-015-A01
- Disassembly of the Seatleg Assembly
refence task 25-26-14-000-010-A01
4. Install of the parts I.AW CMM 25-26-14 in
block ASSEMBLY reference follow task :
- Assembly of the Backrest Assembly
refence task 25-26-14-400-008-A01
- Assembly of the Armrest Assembly refence
subtask 25-26-14-420-008-A01
- Assembly of the IAT Armrest Assembly
refence task 25-26-14-400-005-A01
- Assembly of the Foodtray Assembly
refence task 25-26-14-400-004-A01 except
install item 70
- Assembly of the Kinematics Assy refence
task 25-26-14-420-012-A01
- Assembly of the SEB Shroud refence task
25-26-14-400-012-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
-Assembly of the Seatleg Assembly refence
task 25-26-14-400-002-A01.
5. Replacement of the Actuator refence task
25-26-14-000-016-A0 1
CLEANING: IAW CMM 25-12-14: All
Subtasks in the TASK 25-12-14-100-801-
A01
CHECK IAW CMM 25-12-14: All Subtasks in
the TASK 25-12-14-200-801-A01
CSE-IN6-TD- Cabin attendant A321/ 26 JUL CAAV
FA-XXX SAFRAN CMM 25-12-14 ASSEMBLY: IAW CMM 25-12-14: All CIMC
2021-41 seat V2500 2021 CAAT
Subtasks in the TASK 25-12-14-400-801-
A01
DISASSEMBLY: IAW CMM 25-12-14: All
Subtasks in the TASK 25-12-14-000-801-
A01
CLEANING: IAW CMM 25-12-12: All
Subtasks in the TASK 25-12-12-100-801-
A01
CHECK: IAW CMM 25-12-12: All Subtasks
in the TASK 25-12-12-200-801-A01
CSE-IN6-TD- Cabin attendant ZODIAC A321/ 26 JUL CAAV
DN-XXX CMM 25-12-12 ASSEMBLY: IAW CMM 25-12-12: All CIMC
2021-42 seat AEROSPACE V2500 2021 CAAT
Subtasks in the TASK 25-12-12-400-801-
A01
DISASSEMBLY: IAW CMM 25-12-12: All
Subtasks in the TASK 25-12-12-000-801-
A01
Disassembly of the Side-Load Stay
Assembly - Flap Track 2. Ref Task 57-55-15-
D57556222 XXX; FAIRING CAAV
000-805-A01 28 JUL HAN
D57556226 XXX; CSE-2020-25 ASSEMBY FLAP Airbus CMM 57-55-15 A320/A321 FAA
- Assembly of the Side-Load Stay Assembly 2021 BMC
D57556578 XXX TRACK 2 CAAT
- Flap Track 2. Ref Task 57-55-15-400-801-
A01
- Remove Rubber Grommet CAAV
RU1502U00; CSE-2020- Technofan 28 JUL HAN
Universal Wheel Kit CMM 32-48-28 (DISASSEMBLY - Task 32-48-28-000-801- A320/A321 FAA
RU1502U01 036 Snecma Group 2021 BMC
A01 Step 1.E.(1)(e).2). CAAT
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CMM 32-48-28: Install Rubber Grommet
(ASSEMBLY - Task 32-48-28-400-801-A01
Step1.E.(1)(c).7).
1. TASK 57-42-21-000-802-A01 Removal of
the Outboard End Seals and the Support
Assembly: Para 1,2,3,4 (B)
D5746091000000; 2. TASK 57-42-21-400-803-A01 Installation
CAAV
D5746091000100; Outb Rubber Seal of the Outboard End Seals and the Support 28 JUL HAN
CSE-2020-97 Airbus CMM 57-42-21 A320/A321 FAA
D5746091000200; Under Slat Assy #1 Assembly Para 1,2,3 (8) 2021 BMC
CAAT
D5746091000300 3. TASK 57-42-21 -100-801-A01 Cleaning of
the Component Parts
4. TASK 57-42-21 -200-801-A01 Check of
the Component Parts
FOLLOWING TASK ON CMM 57-55-15
1. Disassembly of the Movable Fairing
Assembly - Flap Track 2
TASK 57-55-15-000-803-A01 Para 3.B.(10)
Bearing and to Para 3.B.(13) Remove bracket assemblies
Bracket Assemblies and Bearing CAAV
CSE-2021- 28 JUL HAN
D57556578XXX at Fwd Fitting of Airbus CMM 57-55-15 2. Assemble the Flap Movable-Fairing A320/A321 FAA
010 2021 BMC
Moveable Fairring Assembly - Flap Track 2 CAAT
#2 TASK 57-55-15-400-802-A01 Para 3.8.(2) to
Para 3.B.(18) Install bracket assemblies and
bearing
3. Non-Standard Torque Value
TASK 57-55-15-820-806-A01
Thrust Reverser C-
CSE-2021- Goodrich Repair 24 - C-Duct fixed structure-replace A320/A321- 28 JUL HAN
745-0002-XXX Duct Fixed CMM 78-30-00 CAAV
034 Aerostructures the pressure seal: Task 78-30-00-300-024 V2500 2021 BMC
Structure
DISASSEMBLY: IAW CMM 25-21-92, All
tasks in the block DI SASS EMBLY.
CSE-Cl-TD- Cabin Attendant CHECK: IAW CMM 25-21-92, All tasks in B787/Genx 02 AUG
278733AAAXXX Goodrich CMM 25-21-92 CIMC CAAV
2021-02 Seat the block CHECK. -1B 2021
ASSEMBLY: IAW CMM 25-21-92, All tasks
in the block ASSEMBLY.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- CMM 52-81-18, TASK 52-81-18-000-801-
A01 Disassembly of the FWD Fitting Assy.
Door - Main landing A320/A321-
D5288016500XXX; CSE-2021- Step 3A1 and 3B1 06 AUG HAN CAAV
Gear, Common Airbus CMM 52-81-18 V2500/CFM
D5288025000XXX 036 - CMM 52-81-18, TASK 52-81-18-400-809- 2021 BMC FAA
Ramp 56-5B
A01 Assembly of the Forward Fitting
Assembly. Step 3A2 and 3B2
- Disassembly the seal and retainer I.A.W
subject disassembly (page block 301).
Slat Assembly No.6 B787/GEnx 09 AUG HCM CAAV
146Z0201-50X-X CSE/2021/025 Boeing CMM 57-43-26 - Assembly seal and retainer I.A.W subject
and No.7 -1B 2021 BMC FAA
assembly (page block 701, 702) item
2.b.1.(c).
- Removal of the bearings and the bushings
of center hingle i actuator bracket:
Refer to task 57-71-21-000-805-A01, except
paragraph 3.A.(1) to 3.A.(6) and refer to task
57-71-21-000-807-A01, except paragraph
D5774500000XXX; 3.A.(1) to 3.A.(4).
D5774500000XXXX; Note: Except removal of the center hingle I
HAN CAAV
D5775000100XXXX; CSE-2021- Structure Complete actuator bracket-assembly. 10 AUG
Airbus CMM 57-71-21 A320/A321 BMC FAA
D5775001600XXXX; 002 - Spoiler 1 - Installation of the bearings and the 2021
D5775001700XXXX; bushings of center hingle i actuator bracket: CAAT
D5775610100XXXX; Refer to task 57-71-21-400-801-A01 , except
paragraph 3.A.(13) to 3.A.(16) and
refer to task 57-71-21-400-802-A01 , except
paragraph 3.A.(14) to 3.A.(16)
Note: Except installation of the center hingle
I actuator bracket-assembly.
- Removal of the bearings and the bushings
D5774501100XXX;
of center hingle bracket:
D5774501100XXXX;
Refer to task 57-72-21-010-803-A01, except
D5774501101XXXX; HAN CAAV
CSE-2021- Structure Complete paragraph 3.A.(1) to 3.A.(4) and 3.A.(8), and 10 AUG
D5775000200XXXX; Airbus CMM 57-72-21 A320/A321 BMC FAA
003 – Spoiler 2 except paragraph 3.B.(1) to 3.B.(4) and 2021
D5775001800XXXX; CAAT
3.B.(8).
D5775001900XXXX;
Note: Except removal of the center hingle
D5775612200XXXX;
bracket.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation of the bearings and the
bushings of center hingle bracket:
Refer to task 57-72-21-400-801-A01, except
paragraph 3.A.(1) and 3.A.(11) to 3.A.(16),
and except paragraph 3.B.(1 ) and 3.B.(11)
to 3.B.(16)
Note: Except installation of the center hingle
bracket.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
D5774503401XXXX; - Refer to task 57-75-21-000-804-A01, CAAT
D5775000500XXXX; except paragraph 3.a.(1) to 3.a.(6) and
D5775002200XXXX 3.a.(11) and refer to task 57-75-21-000-805-
A01, except paragraph 3.a.(1) to 3.a.(6) and
3.a.(11)
Note: except removal of the center hingle i
actuator bracket-assembly.
- Installation of the bearings and the
bushings of center hingle bracket:
+ Refer to task 57-75-21-400-801-A01,
except paragraph 3.a.(6) to 3.a.(10)
+ Refer to task 57-75-21-400-802-A01,
except paragraph 3.a.(1) and 3.a.(10) to
3.a.(15)
+ Refer to task 57-75-21-400-803-A01,
except paragraph 3.a.(4) to 3.a.(5)
+ Refer to task 57-75-21-400-804-A01,
except paragraph 3.a.(1) and 3.a.(10) to
3.a.(18)
Note: except installation of the center hingle
/ actuator bracket-assembly.
Disassembly of the Diffuser Assy ref CMM
TASK 49-16-45-000-807-B01
- Assembly of the Diffuser Assy ref CMM
TASK 49-16-45-400-802-B01
- Disassembly of the Handle ref CMM TASK
D4918501415XXX; CSE-2021- 13 AUG HAN CAAV
Air int ake duct Airbus CMM 49-16-45 49-16-45-000-804-A01 A320/A321
D4918529700XXX 037 2021 BMC FAA
- Assembly of the Handle ref CMM TASK 49-
16-45-400-805-A01
- Disassembly of the Plate Formed or the
Frame Diffuser Assy ref CMM TASK 49-16-
45-000-803-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly of the Plate Formed or the Frame
Diffuser Assy ref CMM TASK 49-16-45-400-
806-A01
- Cleaning of the Painted Components ref
CMM TASK 49-16-45-100-801-A01
- Cleaning of the Components Which Are Not
Painted ref CMM TASK 49-16-45-100-802-
A01
- Replacement of the Drain Section ref CMM
TASK 49-16-45-300-805-A01
- Disassembly of the step assemblies ref
CMM task 52-81-18-000-805-A01 except
CSE-2021- Door - Main paragraph 3.a; 3.b; 3.c; 3e; 3f. 16 AUG HAN CAAV
D5288016500600 Airbus CMM 52-81-18 A320/A321
038 Landing Gear - Assembly of the step assemblies ref CMM 2021 BMC FAA
task 52-81-18-400-805-A01 except
paragraph 3.a; 3.b; 3.c; 3e; 3f.
intake-naca vent: replace door assy as per
CMM 28-12-47: CAAV
D2815700100500; - Subtask 28-12-47-010-002-C01 A320/A321- 17 AUG HCM
CSE/2021/035 Intake-Naca Vent Airbus CMM 28-12-47 FAA
D2815700100400 (Disassembly) V2500 2021 BMC
- Subtask 28-12-47-410-001-C01 SSCA
(Assembly)
Repair No 01: thrust reverser forward CAAV
Thrust reverser Goodrich A320/A321- 17 AUG HCM
745-0002-51X CSE/2021/036 CMM 78-30-00 crossover beam - replace the seals FAA
assembly Aerostructures V2500 2021 BMC
(VRS2064): Task 78-30-00-300-001 SSCA
Disassembly IAW CMM 25-26-96:
-Subtask 25-26-96-010-002-A00: Removal
of the cover seat divider and the finger
CSE-Cl-TD- protection 26 AUG
3530AY89-XXX Passenger Seats Recaro CMM 25-26-96 A320 CIMC SSCA
2021-03 -Subtask 25-26-96-020-002-A01: Removal 2021
of the cushions with the dress covers
- Subtask 25-26-96-020-015-A01: Removal
of the life vest pouch
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Subtask 25-26-96-020-023-A01: Removal
of the IAT armrest
-Subtask 25-26-96-020-024-A00:
Disassembly of the STD armrest
-Subtask 25-26-96-030-001-A01:
Disassembly of the table arms
-Subtask 25-26-96-040-003-A00:
disassembly of the bridge assy check IAW
cmm 25-26-96:
-Subtask 25-26-96-220-001-A01: check of
the seat assembly
Assembly IAW CMM 25-26-96:
-Subtask 25-26-96-410-001-A00: Installation
of the cover seat divider and the finger
protection
-Subtask 25-26-96-420-008-A01: Installation
of the life vest pouch
-Subtask 25-26-96-420-021-A01: Installation
of the cushions with the dress covers
- Subtask 25-26-96-420-023-A00: Assembly
of the IAT armrest
- Subtask 25-26-96-420-024-A00: Assembly
of the STD armrest
-Subtask 25-26-96-420-026-A01: Installation
of the STD armrest
- Subtask 25-26-96-430-002-A01: Assembly
of the table arms
- Subtask 25-26-96-440-001-A00: Assembly
of the bridge assy
- Subtask 25-26-96-420-024-A00: Assembly
of the STD armrest
-Subtask 25-26-96-420-026-A0: Installation
of the STD armrest
- Subtask 25-26-96-430-002-A01: Assembly
of the table arms
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Subtask 25-26-96-440-001-A00: Assembly
of the bridge assy
CMM Task 57-51-41-000-801-A01 Removal
of the Aft Spigot Pin.
CSE-2021- Flap track beam- - CMM Task 57-51-41-400-802-A01 08 SEP HAN
D5755656601000 Airbus CMM 57-51-41 A320/A321 CAAV
040 No.2 Installation of the Aft Spigot Pin on the 2021 BMC
Beam-Assembly Flap Tracks 2, 3 and 4
paragraph 1, 2 and 3C
S57412016XXX; Leading edge assy - repair the de-icer boot CAAV
S57412006XXX; Atr/Zodiac CMM 30-11-42; as per CMM 30-11-42, Rev16 - oct 13/17: ATR42/72- 09 SEP HCM SSCA
CSE/2021/029 Leading Edge Assy
S57415036XXX; Aerospace CMM 57-42-11 Task 30-11- 42-300-801-A01/Task 30-11- PW124/127 2021 BMC CAAP
S57415046XXX 42-700-801-A01 CAAB
S57412114XXX; CAAV
Leading edge assy - repair the de-icer boot
S57412117XXX; Atr/Zodiac CMM 30-11-42; ATR42/72- 09 SEP HCM SSCA
CSE/2021/030 Leading Edge Assy as per CMM 30-11-42: Task 30-11-42-300-
S57415038XXX; Aerospace CMM 57-43-11 PW124/127 2021 BMC CAAP
801-A01/Task 30-11-42-700-801-A01.
S57415048XXX CAAB
S57412080XXX;
S57412090XXX: CAAV
Leading edge assy - repair the de-icer boot
S57412170XXX; Atr/Zodiac CMM 30-11-42; ATR42/72- 09 SEP HCM SSCA
CSE/2021/031 Leading Edge Assy as per CMM 30-11-42: TASK 30-11-42-300-
S57412121XXX; Aerospace CMM 57-43-12 PW124/127 2021 BMC CAAP
S57412125XXX; 801-A01/TASK 30-11-42-700-801-A01.
S57410042XXX
CAAB
CAAV
Leading edge assy - repair the de-icer boot
Atr/Zodiac CMM 30-11-42; ATR42/72- 09 SEP HCM SSCA
S55172000XXX CSE/2021/032 Leading Edge Assy as per CMM 30-11-42: TASK 30-11-42-300-
Aerospace CMM 55-12-00 PW124/127 2021 BMC CAAP
801-A01/TASK 30-11-42-700-801-A01
CAAB
CAAV
S54112670XXX; Duct assy - repair the de-icer boot as per
Atr/Zodiac CMM 30-21-65; ATR42/72- 09 SEP HCM SSCA
S54115619XXX; CSE/2021/033 Duct Assy CMM 30-21-65: TASK 30-21-65-300-801-
Aerospace CMM 71-62-62 PW124/127 2021 BMC CAAP
S54112656XXX A01/TASK 30-21-65-700-801-A01
CAAB
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CAAV
Duct assy - repair the de-icer boot as per
Leading edge assy Atr/Zodiac CMM 30-21-65; ATR42/72- 09 SEP HCM SSCA
S54112759XXX CSE/2021/034 CMM 30-21-65: TASK 30-21-65-300-801-
– air intake Aerospace CMM 71-61-61 PW124/127 2021 BMC CAAP
A01/TASK 30-21-65-700-801-A01
CAAB
CAAV
Removal and installation passenger/crew SSCA
Passenger/Crew door stair assy I.A.W CMM 52-11-00: ATR72/42 - 10 SEP HCM
S521760010XXX CSE/2021/037 FB429 CMM 52-11-00 EASA
Door Disassembly step 1, 2, 3, 3A and Assembly PW124/127 2021 BMC
step 13, 15, 15A CAAP
CAAB
Following task on CMM 32-22-01
- Disassembly of the Stop Assembly and
6406A0000-01; Bracket IAW Subtask: 32-22-01-030-008-
Stop of Torque Link 16 SEP HAN
6406A0000-02 CSE-2021-41 Liebherr CMM 32-22-01 A01 Step (c),(d),(e) A350/XWB CAAV
at NLG 2021 BMC
- Assembly of the Stop Assembly and
Bracket JAW Subtask: 32-22-01-430-105-
A01 Step (a),(b) ,(c),(d)
CMM 78-11-05: Repair No 2 Replacement CAAV
238-0451-5XX; CSE-2021- Nozzle and Center Goodrich 20 SEP HAN
CMM 78-11-05 of Damaged Pylon Seal Assembly; A320/A321 FAA
642-4001-5XX 047 body Aerostructures 2021 BMC
TASK 78-11-05-300-803 CAAT
- Removal of the Inboard End Seals and
Bonding Strap ref CMM task 57-42-21-000-
801-A01
- Removal of the Outboard End Seals and
the Support Assembly ref CMM task 57-42- CAAV
CSE-2021- 21 SEP HAN
D5746091000XXX Slat #01 Airbus CMM 57-42-21 21-000-802 –A01 A320/A321 FAA
042 2021 BMC
- Cleaning of the Component Pmts ref CMM CAAT
task 57-42-21-100-801-A0l
- Check of the attached Parts ref CMN1 task
57-42-21-200-803-A01 and ta5k 57-42-21-
200-804-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Installation of the Inboard End Seals and
Bonding Strap ref CMM task 57-42-21-400-
804 -A01.
- Installation of the Outbomꞏd End Seals and
the Support Assembly ref CMM task 57-42-
21-400-803-A01
- Removal of the Seals and Bonding Lead ref
CMM task 57-43-21-000-801-A01.
- Cleaning of the Component Parts ref CMM CAAV
CSE-2021- task 57-43-21-100-801-A01 21 SEP HAN
D574609200XXX Slat #02 Airbus CMM 57-43-21 A320/A321 FAA
043 - Check of the attached Parts ref CMM task 2021 BMC
57-43-21-200-803-A01. CAAT
- Installation of the Seals and Bonding Lead
ref CMM task 57-43-21-400-802-A01.
- Removal of the Seals and Bonding Straps
ref CMM task 57-44-21-000-801-A01.
- Cleaning of the Component Parts ref CMM CAAV
CSE-2021- task 57-44-21-100-801-A01 21 SEP HAN
D5746093000XXX Slat #03 Airbus CMM 57-44-21 A320/A321 FAA
044 - Check of the attached Parts ref CMM task 2021 BMC
57-44-21-200-803-A01. CAAT
- Installation of the Seals and Bonding Straps
ref CMM task 57-44-21-400-804-A01
Removal of the Seals and Bonding Tag ref
CMM task 57-45-21-000-801-A01
- Cleaning of the Component Parts ref CMM CAAV
CSE-2021- task 57-45-21-100-801-A01 21 SEP HAN
D5746094000XXX Slat #04 Airbus CMM 57-45-21 A320/A321 FAA
045 - Check of the attached Parts ref CMM task 2021 BMC
57-45-21-200-803-A01 CAAT
- Installation of the Seals ref CMM task 57-
45-21-400-804-A01
- Removal of the Seals and Bonding Straps CAAV
CSE-2021- ref CMM task 57-46-21-000-801-A01. 21 SEP HAN
D5746095000 Slat #05 Airbus CMM 57-46-21 A320/A321 FAA
046 - Cleaning of the Component Parts ref CMM 2021 BMC
task 57-46-21-100-801-A01 CAAT
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Check of the attached Parts ref CMM task
57-46-21-210-802-A01
- Installation of the Seals and Bonding Staps
rcfCMM task 57-46-21-400-803-A01
DME Replacement of battery pack of flashlight 01 OCT HAN
P2-07-0001-214 CSE-2021-26 Flashlight CMM 25-60-02 A321 CAAV
Corporation l.A.W step 3.0 in the block repair 2021 LMC
CSE-2021- Inboard flap CMM 57-52-23, Subtask 57-52-23-210-045- 01 OCT HAN CAAV
D57573050XXXXX Airbus CMM 57-52-23 A320/A321
048 structure compl A01 Check of the Torsion Support Assembly 2021 BMC FAA
D5528000300XXX; CMM 55-21-15: Removal of the Pressed-in
D5528000301XXX; Bushes; TASK 55-21-15-010-801-A01 CAAV
D5528000302XXX; CSE-2021- - CMM 55-21-15: Installation of the Pressed- 01 OCT HAN
Elevator Assy Airbus CMM 55-21-15 A320/A321 FAA
D5528000303XXX; 056 in Bushes; TASK 55-21-15-410-801-A01 2021 BMC
D5528000304XXX; - CMM 55-21 -15: Fits and Clearances; CAAT
D5528000200XXX TASK 55-21-15-820-807-A01
CMM 27-54-42, TASK 27-54-42-000-801-
A01 Removal of the Bolt Assemblies the
Bearings and the Pendulum Assembly. Step
D2754460099932; CSE-2021- Carriage Instl- 04 OCT HAN CAAV
Airbus CMM 27-54-42 4A A320/A321
D5755600900000 049 Flaptrack 1 2021 BMC FAA
- CMM 27-54-42, TASK 27-54-42-400-803-
A01 Installation of the Component Parts -
Carriage Assembly. Step 3A
Disassembly: IAW ACMM 25-01-29: All
Subtasks in the Task 25-01-29-000-801-A0l
MOD KIT COMPT -AssemblY: IAW ACMM 25-01-29: All
CSE IN6- Driessen 10 OCT
262110-151 110 - 113- Galley ACMM 25-01-29 Subtasks in the Task 25-01-29-400-801-A0l A321 CIMC CAAV
2021-47 Aerospace CZ 2021
G1 -Fits and clearances: IAW ACMM 25-01-29:
All Subtasks in the TASK 25-01-29-800-802-
A01
Disassembly: IAW CMM 25-20-67: TASK
25-20-67-000-833-A00 in the block
CSE-Cl-TD- disassembly. 18 OCT
1250-36 Folding table Innovint CMM 25-20-67 A321 CIMC CAAV
2021-05 CleaninG: IAW CMM 25-20-67: All tasks in 2021
the block cleaning task 25-20-67-100-841-
A00.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
ChecK: IAW CMM 25-20-67: All tasks in the
block check task 25-20-67-210-851-A00.
Assembly: IAW CMM 25-20-67: task 25-20-
67-400-872-A00 in the block assembly.
CAAV
D3215303200XXX; Pin - Pintle Rear Disassembly: TASK 32-11-07-000-801-A01 21 OCT HCM
CSE/2021/038 Airbus CMM 32-11-07 A320/A321 FAA
D3215600400XXX MLG Assembly: TASK 32-11-07-400-801-A01 2021 BMC
SSCA
- Remove the Pin (Disassembly - Task 32-
12-15-000-801-A01 (Except paragraph
1.D.(2) to 1.D.(5))).
- Cleaning (Cleaning - Task 32-12-15-100-
801-A01 (Except paragraph 1.D.(1).(d) and
Safran Landing
CSE-2021- 1.D.(2)) . 25 OCT HAN
201531001 Lock Stay Systems UK CMM 32-12-15 A320/A321 CAAV
055 - Install the Pin (Assembly - Task 32-12-15- 2021 BMC
LTD.
400-801-A01 (Except paragraph 1.D.(1) to
1.D(6); 1.D.(8) and 1.D.(9))).
- Check the Tolerance (Fits and Clearances
– Task 32-12-940-801-A01 Apply only for
Section W-W)
CHECK - 4: Balancing of the Aileron CAAV
S57615300-XXX; Assembly on Aileron Balancing Tool PIN
S57615012-XXX; ATR72/42 - 08 NOV HCM SSCA
CSE/2021/040 Aileron FB429 CMM 57-61-12 98S57605002000,
S57613156-XXX; PW124/127 2021 BMC CAAP
S57612012-XXX - CHECK - 5: Check of Aileron Assembly
Weight, CAAB
D2-01-101-4VJ; Inspection, Repair and Replacement of
D2-01-102-4VJ; component IAW the following tasks:
D2-01-103-4VJ; - Inspection of the Seat Assembly l.A.W
D2-01-104-4VJ; CMM 25-22-66: block TESTING AND CAAV
CSE-IN6- Aircraft Passenger A320/A321/ 01 NOV FAA
D2-01-105-5VJ; GEVEN CMM 25-22-66 FAULT ISOLATION, block CIMC
2021-49 Seat CFM56 2021
D2-01-106-5VJ; INSPECTION/CHECK. CAAT
D2-01-135-5VJ; - Repair of the Seat Assembly l.A.W CMM
D2-02-009-5VJ; 25-22-66: Task 25-22-66-300-803-A01
D2-02-010-5VJ; (Placard Replacement)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
D2-01-137-5VJ; - Replacement of the Seat Assembly 1.A.W
D2-01-138-5VJ; CMM 25-22-66: block DISASSEMBLY and
D2-02-011-5VJ; ASSEMBLY
D2-02-012-5VJ;
D2-01-139-5VJ;
D2-01-113-5VJ;
D2-01-114-5VJ;
D2-01-115-5VJ;
D2-01-116-5VJ;
D2-01-142-5VJ;
D2-01-140-5VJ;
D2-01-136-5VJ
Removal of the bearings refer to CMM 57-
51-33, Subtask 57-51-33-010-001-A01,
Para 4.A.(21)
Note: Except remove the bush figure-item:
D5755600000XXX; CSE-2021- CMM 57-51-33; 09 NOV HAN CAAV
Mounting Supports Airbus 20-400 A320/A321
D5755600001XXX 058 PMS 01-05-26 2021 BMC FAA
B. Installation of the bearings refer to CMM
57-51-33, Subtask 57-51-33-41 0-003-A01 ,
Para 3.A.(1)(c) to Para 3.A.(1)(f)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of END RUBSTRIP with PIN:
247516-135, lAW ACMM 25-31-091;
FIGURE 2, ITEM 50.
Remove/ Install Cmm 71-11-19 Illustrated CAAV
642-1000-501; Inlet Cowl A320/A321- 19 NOV HAN
CSE-2021-62 Goodrich CMM 71-11-19 Parts List Figure 1, Item 682, 686, 676, 677, FAA
642-1000-505 Assembly CFM56 2021 BMC
680. I.A.W Srm 51-42-11 CAAT
Removal of the bearings refer to CMM 57-
51-33, Subtask 57-51-33-010-001-A01,
CAAV
Para 4.A.(21). 24 NOV HCM
D57556000002XXX CSE/2021/041 Mounting Supports Airbus CMM 57-51-33 A320/A321 FAA
Installation of the bearings refer to CMM 57- 2021 BMC
SSCA
51-33, Subtask 57-51-33-410-003-A01,
Para 3.A.(1)(c) to Para 3.A.(1 )(f)
- Removal of the bearings refer to CMM 27-
D2755611500XXX; 54-55, Subtask 27-54-55-000-001-A01,
D2755612200XXX; CMM 27-54-55; Para 3.A.(3) CAAV
Lever Assy - Flap 24 NOV HCM
D2755611600XXX; CSE/2021/042 Airbus PMS 01-05-26; Note: Bearing item: 01B-030C, 02B-030C A320/A321 FAA
Actuator 2021 BMC
D2755612300XXX; PMS 01-05-27 - Installation of the bearings refer to CMM 27- SSCA
D2755620800XXX 54-55, Subtask 27-54-55-440-001-A01,
Para 3.A.(1) to Para 3.A.(5)
- Replacement of the bearings refer to CMM
CAAV
D57573050-XXX; Inboard Flap 57-52-23, Subtask 57-52-23-300-303-A01 24 NOV HCM
CSE/2021/043 Airbus CMM 57-52-23 A320/A321 FAA
D57573900-XXX Structure Compl Note: Bearing item: 25-330, 25A-330, 25B- 2021 BMC
SSCA
330, 26-250A, 26A-350
- Repair 025: Thrust Reverser C-Duct Fixed
Structure - Replace The Heatshield Velcro
Strips (VRS2056/2061)
745-0002-513;
- Repair 026: Thrust Reverser C-Duct Fixed CAAV
745-0002-515; Thrust Reverser Goodrich 22 NOV HCM
CSE/2021/044 CMM 78-30-00 Structure - Replace Lojer Bifurcation A320/A321 FAA
745-0002-517; Assembly Aerostructures 2021 BMC
Heatshield (VRS2101/2102) SSCA
745-0002-519
- Repair 033: Thrust Reverser C-Duct Fixed
Structure - Replace The Large Forward
Heatshield (VRS2099/2100)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Repair 037: Thrust Reverser C-Duct Fixed
Structure - Replace Upper Bifurcation
Heatshield (VRS2111/2112)
Fan Thrust Repair No. 24 Replacement Of The Inner CAAV
642-3801; CSE-2021- Goodrich A320/A321- 25 NOV HAN
Reverser Door CMM 78-32-36 Flange Seal Equipped Reverser Half-Door FAA
642-3802 063 Aerostructures CFM56-5B 2021 BMC
Assembly Task 78-32-36-300-823 CAAT
- Removal of the Fixed Bushes and
Spherical Bearing of the Inboard Hinge
Assembly (Disassembly - Task
57-71-21-000-S01-A01 (Except paragraph
3.A.(11) to 3.A.(12))).
- Removal of the Fixed Bushes and
Spherical Bearing of the Outboard Hinge
Assembly (Disassembly -Task 57-71-21-
000-S02-A01 (Except paragraph 3.A.(11) to
3.A.(12))).
- Cleaning (Cleaning - Task 57-71-21-100-
801-A01)
- Examine the Component (Inspection
D5775001700438; CSE-2021- Structure Complete /Check - Task 57-71-21-210-S02-A01) 29 NOV HAN CAAV
Airbus S.A.S CMM 57-71-21 A320/A321
D5775001700538 064 - Spoiler 1 - Check the Tolerance (Fits and Clearances 2021 BMC FAA
- Task 57-71-21-S20-S05-A01Apply only for
Item 1E-1S0, 1E-190, 1E-200, 1E-210, 1E-
300, 1E-310, 1E-320 and 1E-330).
- Installation of the Fixed Bushes and
Spherical Bearing of the Outboard Hinge
Assembly (Assembly- Task 57-71-21-400-
805-A01 (Except paragraph 3.A.(9) to
3.A.(18) and Except paragraph 3.B and
3.C)).
- Installation of the Fixed Bushes and
Spherical Bearing of the Inboard Hinge
Assembly (Assembly –Task 57-71-21-400-
S06-A01 (Except paragraph 3.A.(9) to
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
3.A.(18) and Except paragraph 3.B and
3.C)).
D5758550000XXX;
D5758550001XXX;
D5758550010XXX;
D5758550011XXX;
D5758550100XXX;
Replace of the roller assembly at ribs 1 and CAAV
D5758550101XXX; Outboard Flap 30 NOV HAN
CSE-2021-65 Airbus CMM 57-53-23 19 ref Subtask 57-53-23-000-811-A01 and A320/A321 FAA
D5758550102XXX; Structure Compl 2021 BMC
ref subtask 57-53-23-400-805-A01 CAAT
D5758550110XXX;
D5758550111XXX;
D5758670000XXX;
D5758670001XXX;
D5758670005XXX
CAAV
ATR42/ATR
S2738115190210 Replacement of the hand grips IAW CMM 30 DEC HCM CAAP
CSE/2021/046 Control Column ATR CMM 27-31-11 72/PW124/
S2738115190310 27-31-11/ Repair 2, paragraph D 2021 BMC SSCA
PW127
CAAB
S57510005XXXXX; CAAV
ATR42/ATR
S57512005XXXXX; Paint application on the rubbing strips as per 30 DEC HCM CAAP
CSE/2021/047 Flap Assy-Inboard ATR CMM 57-52-11 72/PW124/
S57512331XXXXX; CMM 57-52-111 Repair 3 pI,aragraphC 2021 BMC SSCA
PW127
S57515221XXXXX CAAB
S57510080XXXXX; CAAV
ATR42/ATR
S57512080XXXXX; Paint application on the rubbing strips as per 30 DEC HCM CAAP
CSE/2021/048 Flap Assy-Outboard ATR CMM57-53-11 72/PW124/
S57512332XXXXX; CMM 57-53-11/ Repair 3 paragraph C 2021 BMC SSCA
PW127
S57515228XXXXX CAAB
Replacement of the rubber seals under slat
#1 lAW following procedures:
- Removal of the Outboard End Seals and A320/A321
CAAV
the Support Assembly lAW CMM 57-42-21, /V2500/PW 30 DEC HCM
D5746091000XXX CSE/2021/049 Slat 1 Airbus S.AS CMM 57-42-21 FAA
task 57-42-21-000-802-A01, subtask 57-42- 1100G/CF 2021 BMC
SSCA
21-010-003-B01 step B.(1), (2), (3) and (4) M56
- Installation of the Outboard End Seals and
the Support Assembly lAW CMM 57-42-21,
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
task 57-42-21-400-803-A01, subtask 57-42-
21-410-007-B01 step B.(2), (3), (4) and (5)
10-452901XXX; A320/A321
CMM 32-12-86; Paint finish repaired as per Subtask 32-12- V2500/PW1 30 DEC CAAV
10-452902XXX; Main Landing Gear HCM
CSE/2021/050 Safran FAA
10-453001XXX; Complete PCS-2500 86-380-001-A01/(2(/(a)/3/a 100G/CFM 2021 BMC
SSCA
10-453002XXX 56
TASK 57-73-21-000-802-A01: Removal of
D5774503000XXX;
the Edge-Seals A320/A321-
D5775000300XXX; CSE-2022- CMM 57-73-21 - TASK 57-73-21-400-802-A01: Installation CFM56/V25 06 JAN HAN CAAV
Spoiler Assy No.3 Airbus
D5775002000XXX 001 2022 BMC FAA
of the Edge-Seals 00
- TASK 57-73-21-100-801-A01: Cleaning
TASK 57-74-21-000-803-A01: Removal of
D5774503200XXXX; the Seals and the Rubbing-Strip A320/A321-
CSE-2022- CMM 57-74-21 - TASK 57-74-21-400-802-A01: Installation CFM56/V25 06 JAN HAN CAAV
D5775000400XXXX: Spoiler Assy No.4 Airbus
002 2022 BMC FAA
D5775002100XXXX of the Seals and the Rubbing-Strip 00
- TASK 57-74-21-100-801-A01: Cleaning
Thrust Reverser C-
740-0002; CSE-2022- Goodrich CMM 78-30-00 Repair 24 - C Duct Fixed Structure-Replace A320/A321- 14 JAN HCM CAAV
Duct Fixed
745-0002 001 Aerostructures The Pressure Seal - Task 78-30-00-300-024 V2500 2022 BMC FAA
Structure
CAAV
642-1000-501; Inlet Cowl Goodrich CMM 71-11-19 Cleaning: TASK 71−11−19−100−801 A320/321- 18 JAN HCM
CSE/2022/002 FAA
642-1000-505 Assembly Aerostructures CFM56 2022 BMC
SSCA
Removal Of The Seal Iaw CMM 71-62-62
S54115619XXX CSE/2022/003 Duct Assembly ATR CMM 71-62-62 Disassembly Step A. ATR72/PW 27 JAN HCM CAAV
- Installation Of The Seal Iaw CMM 71-62-62 127 2022 BMC SSCA
Assembly Step D.
DISASSEMBLY:
- Disassemble the Leg harness 2M RH:
Subtask 32-12-77-040-004-A01. A230/A321-
CSE-2022- RH MLG Leg CMM 32-12-77 ASSEMBLY: 28 JAN HAN CAAV
201400201 Sfran CFM56/V25
007 Harness 2m 2022 BMC FAA
- Assemble the Leg harness 2M RH: Subtask 00
32-12-77-440-004-A01 (exept REPAIR
items that the subtask refers to).
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Test the leg harnesses 1M LH, 2M LH, 1M
RH and 2M RH: Subtask 32-12-77-440-005-
A01 (paragraphs applicable to Leg Harness
2M RH only).
- Final assembly of the leg harness:Subtask
32-12-77-440-006-A01
TESTINGAND FAULT ISOLATION:
- Testing and Fault Isolation: Task 32-12-77-
700-801-A01 (paragraphs applicable to Leg
Harness 2M RH only).
Disassembly:
- Removal of the door assembly:
Disassembly step 3.A
- Removal of the door seal: Disassembly
Step 4.B
CSE-CI-TD- CMM 25-36-84 Assembly: A321/V250 11 FEB
8202-10-0000-00 Sell CIMC CAAV
2022-01 OVEN - Installation of the door seal: Assembly Step 0 2022
2.D
- Installation of the door assembly:Assembly
step 3.E
Repair:
- Repaint of oven door: Repair step 2.B
Inspection and Replacement of the curtain
systems lAW the following tasks:
- Inspection of the curtain systems lAW CMM
25-23-16: block Examination, test, checks
and fault isolation
Diehl Aircabin CMM 25-23-16 reference task: A350/ Trent 15 FEB
CSE-CAB-2022-01 VW90-XXX Curtain systems CIMC CAAV
GmbH A350-A-25-23-16-01001-300A-C (2016-06- XWB 2022
29) : Examination, tests and checks
A350-A-25-23-16-01001-31OA-C(2016-06-
29) : Visual examination
A350-A-25-23-16-01001-320A-C (2016-06-
29) : Operation test
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
A350-A-25-23-16-01001-322A-C (2016-06-
29): Test and inspection
A350-A-25-23-16-01001-420A-C (2016-06-
29) : General fault isolation procedure
- Replacement of the curtain systems lAW
CMM 25-23-16: block DISASSEMBLY and
ASSEMBLY reference
task:
A350-A-25-23-16-01001-530A-C (2016-06-
29): Disassemble procedure - Comfort
curtain header
A350-A-25-23-16-02001-530A-C (2016-06-
29) : Disassemble procedure - Curtain textile
A350-A-25-23-16-03001-530A-C (2016-06-
29) : Disassemble procedure - Curtain rail
A350-A-25-23-16-01001-710A-C (2016-06-
29): Assemble procedure - Comfort curtain
header
A350-A-25-23-16-02001-710A-C (2016-06-
29): Assemble procedure - Curtain textile
A350-A-25-23-16-03001-710A-C (2016-06-
29) : Assemble procedure - Curtain rail
- Disassemble cable assy: Step
A320/A321-
CSE-2022- Flush Cover And CMM 28-25-41 3C/Disassembly section CMM 28-25-41 28 FEB HAN CAAV
0727540 Eaton CFM56/V25
010 Cable Assembly - Assemble cable assy : Step 3B/Assembly 2022 BMC FAA
00
section CMM 28-25-41
- Remove the ACAC duct seal assemblies
CAAV
Thrust Reverser Goodrich CMM 78-30-00 I.A.W CMIVI subtask 78-30-00-020-136 A320/A321- 03 MAR HCM
745-0002-XXX CSE/2022/006 FAA
Assembly Aerostructures - Install the ACAC duct seal assemblies V2500 2022 BMC
SSCA
I.A.WCMM subtask 78-30-00-420-126
A. RADOME P/N: V53132010000
V53132010000; CMM 53-10-11 1. DMC: RADOME-A-53-10-11-02001- A350/TREN 18 MAR HAN
CSE-2022-11 Radome Airbus CMM 53-10-12 CAAV
V53132110000 664B-C: Special repair procedure (Sandwich TXWB-84 2022 BMC
Zone- Resin Injection)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
2. DMC: RADOME-A-53-1 0-11-09001-
664B-C: Special repair procedure
(Application of Paint)
3. DMC: RADOME-A-53-10-11-10001-
664B-C: Special repair procedure (Paint
Touch-up)
4. DMCꞏ RADOME-A-53-1 0-11-11 001-
664B-C: Special repair procedure
(Application of sealing varnish inside
Radome )
5. DMC: RADOME-A-53-10-11-12001 -
664B-C: Special repair procedure
(Application of Airline Finish-Paint)
6. DMC RADOME-A-53-10-11-02001-366B-
C: Resistance Check (with Megohmmeter)
7. DMC: RADOME-A-53-10-11 -02001-
365B-C: Continuity Check (with
Megohmmeter)
B. RADOME PIN : V53132110000
1 DMC RADOME-A-53-1 0-12-02001-664A-
C: Special repair procedure (Sandwich zone
- Resin Injection)
2. DMC: RADOME-A-53-10-12-11001-
664A-C: Special repair procedure (Paint
Touch-up)
3. DMC: RADOME-A-53-1 0-12-12001-
664A-C: Special repair procedure
(Application of sealing varnish inside
Radome)
4. DMC RADOME-A-53-1 0-12-1 300 1-
664A-C: Special repair procedure
(Application of paint)
5. DMC RADOM E-A-53-1 0-12-14001-
664A-C : Special repair procedure
(Application of Airline Finish-Paint)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
6. DMC: RADOME-A-53-1 0-12-01 001-
3668-C: Resistance Check (with
Megohmmeter)
7. DMC. RADOME-A-53 -10-12-01001-
3658-C: Continuity Check (with
Megohmmeter)
A320-
642-3801; Thrust Reverser Goodrich CMM 78-32-36 Replacement of the lower strut seal (repair A321/CFM5 28 MAR HCM
CSE/2022/009 CAAV
642-3802 Door Assy Aerostructures No.28) lAW Task 78-32-36-300-827 2022 BMC
6
Replacement of the engine bumper
Thrust Reverser Goodrich CMM 78-30-00 pandown (Repair 162) lAW Task 78-30-00- A320-A321/ 28 MAR HCM
745-0002 CSE/2022/010 CAAV
Assembly Aerostructures V2500 2022 BMC
300-162
CSE-CI-TD- SPM 20-00-01 Replace the Seal PIN: ABS0306B04-17 lAW A350/TREN 05 APR
VR1124230046000 Panel Diehl CIMC CAAV
2022-05 TASK 20-00-01-300-836-A00 TXWB-84 2022
Removal and installation of CMM 71-11-19 A320-
642-1000-501; Inlet Cowl Goodrich CMM 71-11-19 IPL Figure 1Item 682, 686, 676, 677, 680 A321/CFM5 08 APR HCM
CSE/2022/011 CAAV
642-1000-505 Assembly Aerostructures 2022 BMC
l.A.W SRM 51-42-11 6
V2500 C-Duct Examine for excessive dents of the cooling A320-
3282982-X; CMM 78-36-51 shroud assembly (Figure 5001 item 70) A321/V250 09 APR HCM
CSE/2022/012 Linear Hydraulic Honeywell CAAV
7408007-X 2022 BMC
Actuator I.A.W Subtask 78-36-51-210-006-A01 0
Right C duct fixed structure- Replace the CAAV
Thrust Reverser Goodrich CMM 78-30-00 pandown heatshield (Repair 072) lAW Task A320-A321/ 10 APR HCM
745-0002 CSE/2022/013 FAA
Assembly Aerostructures V2500 2022 BMC
78-30-00-300-072 SSCA
- DMC: 26330930341-A-25-31-684X-01001-
CSE-CAB- Completion Kit Safran Cabin ACMM 25-31- 520A-C for block 4.4.1 - kick Strip removal A321/CFM5 15 APR CAAV
263309-30341 684 CIMC
2022-03 Galley CZ s.r.o - DMC: 6330930341-A-25-31-684X-01001- 6 2022 FAA
720A-C for block 4.4.1 - kick Strip installation
Replacement of the Captive Nut Bands (1- A320-A321/
Primary Heat CMM 21-54-12 50) and (1-70) I.A.WTask 21-54-12-350-801- CFM56- 21 APR HCM CAAV
7530XXX CSE/2022/014 Liebherr
Exchanger 2022 BMC FAA
A01 V2500
Fan Thrust Repair #31: Replacementof The Fwd Lwr
642-3801 CSE-2022- Goodrichaero CMM 78-32-36 Box Seal Equipped Reverser Half-Door A320-A321/ 22 APR HCM CAAV
Reverser door
642-3802 016 structures CFM56-5B 2022 BMC FAA
Assembly Task 78-32-36-300-830
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Refinish surface per CMM 32-21-18 repair 9-
1 step 4 (except C.7 and C.8)
CMM 32-21-18 - Clean per SOPM 20-30-03 ( Step 4, Step
522Z2001-501; SOPM 20-30-03;
Inner Cylinder Assy 5) B787-9- 26 APR HCM
522Z2001-502 CSE/2022/015 Boeing SOPM 20-30-02; CAAV
(NLG) - Removewotective finish as necessary per GenX 2022 BMC
SOPM 20-50-10; SOPM20-30-02 (Step 4E except 4E.2)
- Put identification number per SOPM 20-50-
10 (Step 3A.6)
- Remove Obturator and Rubber Grommet
I.A.W Task 32-48-28-000-801A01 Step
A320/A321-
RU1502U00; CSE-2022- Technofan CMM 32-48-28 1.E(1)(e).1 and 2. 26 APR HAN CAAV
Universal Wheel Kit CFM56/V25
RU1502U01 016 Snecma Group - Install Obturator and Rubber Grommet 2022 BMC FAA
00
I.A.W Task 32-48-28-400-801-A01 Step
1.E(1)(c).7 and 8.
Replace kick Strip & Door lAW ACMM 25-22-
12 reference:
- DMC: A350-A-25-22-12-01 001-530A-C for
CSE-CAB- Diehl Aircabin CMM 25-22-12 A350/TREN 29 APR
VW60D XXX Doghouse block 1.2 Disassembly of the typical lower CIMC CAAV
2022-04 GmbH XWB-84 2022
frame
- DMC: A350-A-25-22-12-01001-710A-C for
block 1.2 - Assembly of the lower frame
- CMM 21-52-11: Cleaning - Task 21-52-11-
100-801-A01,
- CMM 21-54-12: Cleaning - Task 21-54-12-
753A0000-0X; CMM 21-52-11; 100-801-A01,
753B0000-0X; Heat Exchanger- CMM 21-54-12, 29 APR HCM CAAV
CSE/2022/007 Liebherr - CMM 20-00-02 Liebherr: Cleaning A320/A321
753C0000-0X; Primary CMM 20-00-02 2022 BMC SSCA
Procedure For Exchanger (External
753D0000-0X
Cleaning – Subtask 20-00-02-100-003-A01;
Internal Cleaning - Manual Flushing -
Subtask 20-00-02-100-008-A01).
754A0000-03; CMM 21-52-12; - CMM 21-52-12: Cleaning - Task 21-52-12-
754B0000-02; Heat Exchanger- CMM 21-54-14; 100-801-A01, 29 APR HCM CAAV
CSE/2022/008 Liebherr A320/A321
754C0000-01, Main CMM 20-00-02 - CMM 21-54-14: Cleaning - Task 21-54-14- 2022 BMC SSCA
754D0000-01 100-801-A01,
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- CMM 20-00-02 Liebherr: Cleaning
Procedure For Exchanger (External
Cleaning – Sub Task 20-00-02-100-003-
A01; Internal Cleaning - Manual Flushing -
Subtask 20-00-02-100-008-A01)
Clean the Thrust Reverser lAW CMM Task
CAAV
Thrust Reverser Goodrich CMM 78-30-00 78-30-00-100-001 18 MAY HCM
745-0002-XXX CSE/2022/017 A320-A32 FAA
Assembly Aerostructures - Check Upper Track Beam On The C-DUCT 2022 BMC
SSCA
lAW CMM Task 78-30-00-200-035
Disassembly: 1.A.W CMM 25-22-54, All
tasks in the block Disassembly.
Cleaning: l.A.W CMM 25-22-54, All tasks in
the block Cleaning except: 12. Wool and
CSE-Cl-TD- CMM 25-22-54 Synthetic Fabric 24-May-
1012796-XXX Passenger Seats Aerospace A320-A321 CIMC CAAV
2022-14 Cleaning. 2022
Inspection/Check: 1.A.W CMM 25-22-54, All
tasks in the block Inspection/Check.
Assembly: l.A.W CMM 25-22-54, All tasks in
the Block Assembly
Disassembly: 1.A.W CMM 25-22-54, All
tasks in the block Disassembly.
Cleaning: l.A.W CMM 25-22-54, All tasks in
the block Cleaning except: 12. Wool and
CSE-Cl-TD- CMM 25-22-54 Synthetic Fabric 24-May-
1012796-XXX Passenger Seats Aerospace A320-A321 CIMC CAAV
2022-14 Cleaning. 2022
Inspection/Check: 1.A.W CMM 25-22-54, All
tasks in the block Inspection/Check.
Assembly: l.A.W CMM 25-22-54, All tasks in
the Block Assembly
Disassembly: I.A.W CMM 25-31-65, All
Tasks In The Block Disassembly.
Albert
106266; CSE-Cl-TD- CMM 25-31-65 Cleaning: I.A.W CMM 25-31-65, All Tasks In 24-May-
Galley G1 Muhlenberg A320-A321 CIMC CAAV
106266A 2022-15 The Block Cleaning. 2022
Apparatebu
Check: I.A.W CMM 25-31-65, All Tasks In
The Block Check.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Assembly: I.A.W CMM 25-31-65, All Tasks
In The Block Assembly.
DISASSEMBLY: I.A.W CMM 25-31-66, All
Tasks In The Block Disassembly.
Cleaning: I.A.W CMM 25-31-66, All Tasks In
Albert
106267; CSE-Cl-TD- CMM 25-31-66 The Block CLEANING. 24-May-
Galley G5 Muhlenberg A320-A321 CIMC CAAV
106267 A 2022-16 Check: I.AW CMM 25-31-66, All Tasks In 2022
Apparatebu
The Block CHECK.
Assembly: 1.A.W CMM 25-31-66, All Tasks
In The Block Assembly.
DISASSEMBLY: 1.A.W CMM 25-31-65, All
tasks in the block DISASSEMBLY.
CLEANING: l.A.W CMM 25-31-65, All tasks
Albert
106268; CSE-Cl-TD- CMM 25-31-67 in the block CLEANING. 25-May-
Galley G2 Muhlenberg A321 CIMC CAAV
106268A 2022-17 CHECK: l.A.W CMM 25-31-65, All tasks in 2022
App.Aratebu
the block CHECK.
ASSEMBLY: I .A.W CMM 25-31-65, All tasks
in the block ASSEMBLY
DISASSEMBLY: l.A.W CMM 25-49-77, All
tasks in the block DISASSEMBLY, except:
- SUBTASK 25-49-77-040-046: AT.
Disassembly Procedures for Water Supply
System lnstl.
- SUBTASK 25-49-77-040-049: AW.
Disassembly Procedures for Electrical
CSE-Cl-TD- Jamco CMM 25-49-77 System lnstl. 25 MAY
B80014A1011 Lavatory Assy B787 CIMC CAAV
2022-18 Corporation - SUBTASK 25-49-77-040-027: AA. 2022
Disassembly Procedures for Sink Cabinet
lnstl.
- SUBTASK 25-49-77-040-047: AU.
Disassembly Procedures for Drain System
lnstl.
ASSEMBLY: l.A.W CMM 25-49-77, All tasks
in the block ASSEMBLY, except:
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- SUBTASK 25-49-77-440-046: AT.
Assembly Procedures for Water Supply
System lnstl.
- SUBTASK 25-49-77-440-049: AW.
Assembly Procedures for Electrical System
lnstl.
- SUBTASK 25-49-77-440-027: AA.
Assembly Procedures for Sink Cabinet lnstl.
- SUBTASK 25-49-77-440-047: AU.
Assembly Procedures for Drain System lnstl.
- Disassemble procedure - Door assylitem
180 I.A.W task A350-A-25-22-11-0S001-
CSE-CAB- Diehl Aircabin CMM 25-22-11 530A-C Step 1.1.8 01 JUN
VW00XXX Stowage A350 CIMC CAAV
2022-08 Gmbh - Assemble procedur - Door assylitem 180 2022
I.A.W task A350-A-25-22-11-0S001-710A-C
Step 1.1.4
CSE-CAB- Zodiac Galleys CMM 25-36-28 Replace the latch of door assembly 03 JUN
601367-1 Galley G2A A320/A321 CIMC CAAV
2022-09 Europe reference IPL FIG 11/ltem 10 2022
MCMM 25-35- Replace placard PN 268500-3-33 and
CSE-CAB- Zodiac Galleys 516 268516-3-27 I.A.W Reprair procedure- 04 JUN
601852-009701 Galley G1 A320/A321 CIMC CAAV
2022-10 Europe CMM 25-30-074 placard replacement in CMM 25- 2022
30-074
MCMM 25-35- Replace placard PN 268500-3-33 and
CSE-CAB- Zodiac Galleys 516 268516-3-27 I.A.W Reprair procedure- 04 JUN
601852-009701 Galley G1 A320/A321 CIMC CAAV
2022-10 Europe CMM 25-30-074 placard replacement in CMM 25- 2022
30-074
Replace Rubstrip reference completion Kit -
CSE-CAB- Completion Kit Zodiac Galleys CMM 25-32-859 04 JUN
263413-40191 Figure 2 - Rubstrip Installation/item A320/A321 CIMC CAAV
2022-11 Galley Europe 2022
100/110/120/130
Disassemble the Lavatory lAW Task 25-46-
01-000-801-A01
CSE-CI-TD- CMM 25-46-01; - Clean the Lavatory lAW Task 25-00-01- 08 JUN
D2549010206600 Lavatory A Diehl SPM 25-00-01 A321 CIMC CAAV
2022-24 99F-806-A00 2022
- Inspection/Check lAW Task 25-00-01-99F-
807-A00
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Repair the door jamb lAW Task 25-00-01-
99F-841-A00
- Assemble the Lavatory lAW Task 25-46-01-
400-801-A01
- Replacement of the inner flange seal
equipped reverser half door (Repair No.24)
642-3801 Thrust Reverser Goodrich CMM 78-32-36 LA.W Task 78-32-36-300-823 16 JUN HCM CAAV
CSE/2022/024 A320/A321
642-3802 Door Assy Aerostructures - Replacement of the forward lower seal 2022 BMC FAA
equipped reverser half door (Repair No.30)
I.A.W Task 78-32-36-300-829
- Check the Restraint lAW TASK 25-75-13-
Wall - Mounted
CSE-CI-TD- CMM 25-75-13 210-802-A01 17 JUN CAAV
2131 -XXX Double Cabin Goodrich Corp A320 CIMC
2022-47 - Check the seat assembly I.A.W TASK 25- 2022 FAA
Attendant Seat
75-1ꞏ3-210-803-A01
- Check the Restraint I.AW TASK 25-75-12-
210-802-A01
- Check the seat assembly I.AW TASK 25-
Floor Mounted
CSE-Cl-TD- CMM 25-75-12 75-12-210-803-A01 17 JUN CAAV
2130 -XXX Pivoting Cabin Goodrich Corp A320 CIMC
2022-46 - Remove the spring anchorꞏ I.AW Task 25- 2022 FAA
Attendant Seat
75-12-010-803-A01 Step R
- Install the spring anchor I.AW Task 25-75-
12-410-814-A01 Step Q
- Check the Restraint lAW TASK 25-75-11-
Wall - Mounted Utcaerospace
CSE-CI-TD- CMM 25-75-11 210-802-A01 17 JUN CAAV
2128 -XXX Cabin Attendant Systems A320 CIMC
2022-45 - Check the seat assembly lAW TASK 25-75- 2022 FAA
Seat Company
11-210-803-A01
- Check the restraint lAW TASK 25-75-10-21
Floor Mounted
CSE-CI-TD- CMM 25-75-10 0-802-A01 17 JUN CAAV
2127-XXX Cabin Attendant Goodrich Corp A320 CIMC
2022-44 - Check the seat assembly I.A.W TASK 25- 2022 FAA
Seat
75-1 0-210-803-A01
TAAI1-03PE XXX CSE-CI-TD- Captain Seats And CMM 25-11-31 CLEANING: Step 3. B "Seat cover with 17 JUN
Stelia A321 CIMC CAAV
TAAI1-03CE XXX 2022-28 First Officer Seats sheep-skin" 2022
Powered Captain
TAAI2-33PE XXX CSE-CI- TD- CMM 25-11-37 CLEANING: step 3. B "Seat cover with 17 JUN
Seats And Powered Stelia A321 CIMC CAAV
TAAI2-33CE XXX 2022-29 sheep-skin" 2022
First Officer Seats
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CSE-CI-TD- CMM 25-11-25 CLEANING: Step3. A "Seat cover with 17 JUN
2510154-XXX Air Crew Seats Stelia A321 CIMC CAAV
2022-33 sheep-skin" 2022
TAAI8-04CE XXX CSE-CI-TD- Pilot And Copilot CMM 25-11-51 Clean the seat cover lAW SERVICING Task 17 JUN
Stelia A350 CIMC CAAV
TAAI8-04PE XXX 2022-34 Seat F4643COCKPIT-A-25-11-51-02001-254A-C 2022
CSE-CI-TD- CMM 25-11-52 Clean the seat cover lAW SERVICING Task 17 JUN
TAAI8-03IM XXX Observer Seat Stelia A350 CIMC CAAV
2022-35 F4643COCKPIT-A-25-11-52-02001-254A-C 2022
Clean the upholstery with vacuum cleaner
3A380-0007 -01-7 CSE-CI-TD- Pilot And Co-Pilot CMM 25-11-69 lAW SUBTASK 25-11-69-100-001-A01 step 17 JUN
Ipeco B787 CIMC CAAV
3A380-0008-0 1-7 2022-37 Crew Seats 2022
A.2
First Observer Clean the upholstery with vacuum cleaner
CSE-CI-TD- CMM 25-11-70 lAW SUBTASK 25-11-70-100-001-A01step 17 JUN
3A383-0007-01-5 Crew Seat Ipeco B787 CIMC CAAV
2022-38 2022
Publication A.2
Clean the upholstery with vacuum cleaner
CSE-CI-TD- 2nd Observer Crew CMM 25-11-71 lAW SUBTASK 25-11-71-100-001-A01 step 17 JUN
3A384-0007-01-2 Ipeco B787 CIMC CAAV
2022-39 Seat Publication 2022
A.2
3A063-0079-03-4 CSE-CI-TD- Crew Seat CMM 25-11-21 Clean the seat cover with a vacuum cleaner 17 JUN
Ipeco ATR72 CIMC CAAV
3A063-0080-03-4 2022-40 Assembly I.W.A CLEANING step A.1.b 2022
CSE-CI-TD- Pacific Scientific CMM 25-11-58 CHECK: lAW CMM 25-11-58, All tasks in the 17 JUN
2000013-XXX Restraint System A320 CIMC CAAV
2022-43 Company block CHECK 2022
- Check the restraint lAW TASK 25-75-10-21
Floor Mounted
CSE-CI-TD- 0-802-A01 17 JUN CAAV
2127-XXX Cabin Attendant Goodrich Corp CMM 25-75-10 A320 CIMC
2022-44 - Check the seat assembly I.A.W TASK 25- 2022 FAA
Seat
75-1 0-210-803-A01
- Check the Restraint lAW TASK 25-75-11-
Wall - Mounted Utcaerospace
CSE-CI-TD- CMM 25-75-11 210-802-A01 17 JUN CAAV
2128 -XXX Cabin Attendant Systems A320 CIMC
2022-45 - Check the seat assembly lAW TASK 25-75- 2022 FAA
Seat Company
11-210-803-A01
- Check the Restraint I.AW TASK 25-75-12-
210-802-A01
Floor Mounted
CSE-Cl-TD- - Check the seat assembly I.AW TASK 25- 17 JUN CAAV
2130 -XXX Pivoting Cabin Goodrich Corp CMM 25-75-12 A320 CIMC
2022-46 75-12-210-803-A01 2022 FAA
Attendant Seat
- Remove the spring anchorꞏ I.AW Task 25-
75-12-010-803-A01 Step R
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Install the spring anchor I.AW Task 25-75-
12-410-814-A01 Step Q
- Check the Restraint lAW TASK 25-75-13-
Wall - Mounted
CSE-CI-TD- CMM 25-75-13 210-802-A01 17 JUN CAAV
2131 -XXX Double Cabin Goodrich Corp A320 CIMC
2022-47 - Check the seat assembly I.A.W TASK 25- 2022 FAA
Attendant Seat
75-1ꞏ3-210-803-A01
- Remove the Kickstrip (item 105) and Tape
Albert (item 110) Ref. IPL, Fig.1 lAW Section
CSE-CI-TD- 17 JUN
105187A Stowage Mohlenbergapp CMM 25-29-79 Disassembly A321 CIMC CAAV
2022-48 2022
aratebau - Install the Kickstrip (item 105) and Tape
(item 110) lAW Section Assembly Step 6. (g)
Remove the Stay, Flap (item 125) Ref. IPL,
Fig. 3 lAW Section Disassembly
- Remove the Bumper (item 65) Ref. IPL, Fig.
Albert
CSE-CI-TD- 2 lAW Section- Disassembly 17 JUN
105188B Stowage Mohlenbergapp CMM 25-29-80 A321 CIMC CAAV
2022-49 - Install the Stay, Flap (item 125) lAW 2022
aratebau
Section Assembly Step 2.(j)
- Install the Bumper (item 65) lAW Section
Assembly Step 3. (d)
Inspection, replace all defective part I.A.W:
- Testing of the seat assembly ref task 25-
CSE-CAB- Aircraft Passenger CMM 25-21-63 22 JUN CAAV
Geven 21-63-700-801-A01 and Fault Isolation ref A320/A321 CIMC
2022-12 Seat 2022 FAA
Task 25-21-63-750-801-A01
- Inspection/check ref Task 25-21-63-200-
801-A01
- Disassemby of seat assy ref Task 25-21-
C7-07/08 XXX 63-030-801-A01
- Assembly of seat assy ref Task 25-21-63-
440-801-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Removal of the gas cylinder I.A.W
disassembly of the lower part reference task CAAV
CSE-CAB- 25-11-46-000-831-A01
2022-13 - Install the gas cylinder I.A.W assembly of
the lower part reference task 25-11-46-400-
TAAI3-03PE XXX Captain and First Stelia 803-A01. 23 JUN
CMM 25-11-46 A320/A321 CIMC
TAAI3-03CE XXX CSE-CI-TD- Officer Seat Aerospace CLEANING: step 3.B: Seat cover with 2022
2022-30 sheep-skin
- Disassembly of the backrest ref TASK 25-
CSE-CAB- 11-46-000-819-A01
2022-16 - Assembly of the backrest ref TASK 25-11- CAAV
46-400-814-A01 FAAA
Replace cover at doghouse ref:
CSE-CAB- Diehl Aviation CMM 25-21-49 - Disassembly of the doghouse/step 8-item 23 JUN
113415K XXX Doghouse A320/A321 CIMC CAAV
2022-14 Hamburg Gmbh 55 2022
- Assembly of the doghouse/step 6-item 55
-Replace latch of galley ref IPL Fig 9/item
450-460
CSE-CAB- CMM 25-39-11 -Replace spring of waste flapper door ref IPL 23 JUN
320PAL05GB00 Aim Aviation Aim Aviation A320/A321 CIMC CAAV
2022-15 Fig 10/item 430 2022
-Replace slide extractor ref IPL Fig 9/ item
670
- Removal ofthe headrest equipped ref
CSE-CAB- CMM 25-12-01 subtask 25-12-01-040-004-A01 23 JUN CAAV
WA-XXX Seat Assembly Safran seats A320/A321 CIMC
2022-17 - installation of the headrest equipped ref 2022 FAA
subtask 25-12-01-440-004-A01
238-0451-XXX Replacement of damaged pylon seal
Nozzle And Goodrich CMM 78-11-05 27 JUN HCM CAAV
642-4001-501 CSE/2022/026 assembly (Repair No.2) lAW Task 78-11-05- A320/A321
Centerbody Aerostructures 2022 BMC FAA
642-4612-501 300-803
Replacement of the RCC Master pushbutton
Panasonic CAAV
Remote Control CMM 44-27-25 switch I.A.W Subtask 44-27-25-000-001- 04 JUL HCM
RD-AA902723-XX CSE/2022/027 Avionics A320/A321 FAA
Center A01 step (3).10 and 11, Subtask 44-27-25- 2022 BMC
Corporation SSCA
400-003-A01 step (6).(a).7 and 8
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly: I.A.W CMM 25-20-02, All
tasks in the block DISASSEMBLY
- Cleaning: lAW CMM 25-20-02, All tasks in
the block Cleaning
866Z301-0101X CSE-CI-TD- CMM 25-20-02 - Repair: lAW CMM 25-20-02, All tasks in the 06 JUL
Literatue Pocket Vaupell B787 CIMC CAAV
2022-42 block Repair 2022
- Check: lAW CMM 25-20-02, All tasks in the
block Check
- Assembly: lAW CMM 25-20-02, All tasks in
the block Assembly
- Disassemble The Flap From Rear Wall
I.A.W SubtasK 25-41-20-000-011-A00 Step
CSE-CAB- Diehl Aviation CMM 25-41-20 22 JUL
D2549300100200 Lavatory A 6 A320/A321 CIMC CAAV
2022-18 Hamburg GmbH 2022
- Assemble The Flap Into Rear Wall I.A.W
Subtask 25-41-20-400-015-A00 Step 27
CSE-CAB- Completion Kit Zodiac Galleys ACMM 25-32- Replace the latch of door assy (item 80 - 29 JUL
26320691 273 A320/A321 CIMC CAAV
2022-19 Galley Europe s.r.o Fig 1) 2022
CAAV
- Removal of the bobbins I.A.W Disassembly
SSCA
D22699500XXX CSE/2022/030 Leg Structure Safran CMM 32-28-16 block - Step 2. C. (5). (c) ATR42/72
05 AUG HCM
CAAB
- Installation of the bobbins I.A.W Assembly 2022 BMC
DMCA
block - Step 2. A. (6). (c)
CAAP
- Remove the protective plugs item 070 and
080 of Figue (36 or 36A or 36B) I.A.W
(Subtask 52-32-15-000-005-A01or Subtask
52-32-15-000-021-A01or Subtask 52-32-15-
CSE-2022- Aft Cargo Comp CMM 52-32-15 000-037-A01) step A.(2) 09 AUG HCM CAAV
D52371980XXXX Airbus A320-A321
031 Door - Install the protective plugs item 070 and 2022 BMC FAA
080 of Figue (36 or 36A or 36B) I.A.W
(Subtask 52-32-15-400-004-A01 or Subtask
52-32-15-400-027-A01 or Subtask 52-32-
15-400-048-A01) step A.(2).
D22698500XXX, CMM 32-28-15 Apply the full paint scheme to Nose Landing 19 AUG HCM
CAAV
CSE/2022/032 Leg assembly Safran PCS-2S00 Leg I.A.W CMM 32-28-16, Repair section, ATR42/72 SSCA
D22699500XXX 2022 BMC
Step 3.B CAAB
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
DMCA
CAAP
- Check the attendant seat LA.W TASK 25-
12-01-200-801- A01
CSE-CI-TD- Cabin Attendant Safran Seats CMM 25-12-01 - Removal of the upholstery LA.W Subtask 26 AUG CAAV
WA-XXX A320/A321 CIMC
2022-53 Seats France 25-12-01-040-001-A01 2022 FAA
- Installation of the upholstery assembly
LA.W Subtask 25-12-01-440-001-A01
D575510530XXXXX - Disassembly of the Side-load Stay
Except: Assembly-Flap Track 2I.A.W Task 57-55-
D5755105301600A; Flap Track Fairing CMM 57-55-12 12-000-810-A01 26 AUG HCM CAAV
CSE/2022/033 Airbus A320/A321
D5755105301700A; No.2 - Assembly of the Side-load Stay Assembly- 2022 BMC FAA
D5755105302000; Flap Track 2 lAW Task 57-55-12-400-801-
D5755105302100 A01
- Removal of the Diffuser Assy from the
Elbow Assy I.A.W Subtask 49-16-45-000-
008-A01
- Installation of the Diffuser Assy on the
D4918501415600;
CMM 49-16-45 Elbow Assy LA.W Subtask 49-16-45-400- 26 AUG HCM CAAV
D4918529700000; CSE/2022/034 Air Intake Duct Airbus A320/A321
011-A01 2022 BMC FAA
D4918529700400
- Disassembly of the seal LA.W Task 49-16-
45-000-805-B01
- Assembly of the sealLA.W Task 49-16-45-
400-804-B01
- Disassembly: All task in block Disassembly
- Cleaning: All Task In Block Cleaning
CSE-CI-TD- CMM 25-32-20 - Inspection/Check: All Task In Block 06 SEP
GN100X20X Galley Type K10 Simair ATR 72 CIMC CAAV
2022-54 Inspection/Check 2022
- Repair: All Task In Block Repair
- Assembly: All Task In Block Assembly
CSE-CI-TD- - Disassembly:All tasks in block Disassembly
Galley Type A0210 06 SEP 653049X
653049XXX 2022-55 Simair CMM 25-33-90 ATR 72 CIMC
NL BP - Cleaning: All tasks in block Cleaning 2022 XX
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Inspection/Check: All tasks in block
Inspection/ Check
- Repair: All tasks in block repair
- Assembly: All tasks in block Assembly
CSE-CAB- Completion Kit Zodiac Galleys ACMM 25-31- Replace filler of divider Pivoting Assy I.A.W 08 SEP
26341210021 646 A320/A321 CIMC CAAV
2022-20 Galley Europe S.R.O IPL item 50 FIG 1 2022
- Remove and install inner cylinder bushing
CMM 32-13-06 Rev 17 Repair 15-1 (B787-9)
CMM 32-13-06; step 2 (except step 2.C(5), 2.C(8), 2.C(9))
Replacebushing Of SOPM 20-30-03; - Clean per SOPM20-30-03 ( Step 4, Step 5) 09 SEP HCM
510Z1111-50X CSE/2022/018 Inner Cylinder Boeing SOPM 20-44-02; - Preservation procedure per SOPM 20-44- B787 CAAV
2022 BMC
Assembly (MLG) SOPM2 0-50-03 02
- Shrink - fit method per SOPM20-50-03 step
7B, 6B.
- Disassembly: All tasks in block
87836321; DISASSEMBLY
87836324; CSE-CI-TD- CMM 25-29-76 - Cleaning: All tasks in block CLEANING 12 SEP
Passenger Seat B/E Aerospace A321 CIMC CAAV
87836351; 2022-52 - Inspection/ Check: All tasks in block 2022
87836354 INSPECTION/ CHECK
- Assembly: All tasks in block ASSEMBLY
Replacement of outer panel of left and right
upper blocker door (Repair No.55) lAW
642-3801; Thrust Reverser Goodrich CMM 78-32-36 Task 78-32-36-300-854. 14 SEP HCM CAAV
CSE/2022/037 A320/A321
642-3802 Door Assy Aerostructures Applicable PINs are 321-310-011-0 and up 2022 BMC FAA
for LH upper blocker door, 321-310-061-0
and up for RH upper blocker door.
- Removal of the Chart Holder 35LE (46LE)
CAAV
I.A.WCMM27-31-11, Disassembly section,
SSCA
CMM 27-31-11 Step 4. 14 SEP HCM
S2738115XXX CSE/2022/038 Control Column FB429 ATR42172 CAAB
- Removal of the Hand Wheel from the 2022 BMC
DMCA
ColumnI.A.WCMM27-31-11,Disassembly
CAAP
section, Step 5, 5A
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Disassembly of the Control Hand
Wheell.A.W CMM27-31-11, Disassembly
section, Step Disassembly of the Control
Hand Wheel 1,2,3.
Assembly of the Control Hand Wheel l.A.W
CMM27-31-11, Assembly section, Step
1,2,3,3A,4,4A,5,6,6A,7.
- Removal of the Left/Right Seals refer to
D53132210000; CSE-2022- CMM 53-15-12 CMM task 53-15-12-000-803-A01 29 SEP HAN CAAV
Nose Raoome Airbus A320/A321
D53132110000 024 - Installation of the Left/Right Seals refer to 2022 BMC FAA
CMM task 53-15-12-400-806-A01
- Remove the bonding straps refer to CMM
TASK 71-11-00-000-001 - Step 2,E,4.
(Config 1,Config 2)
- Remove the bonding straps refer to CMM
TASK 71-11-00-000-001 - Step 3,E,2.
(Config 3)
- Remove the bonding straps refer to CMM
740-3000; TASK 71-11-00-000-001 - Step 4,E,2.
CSE-2022- Goodrich CMM 71-11-00 (Config 4) 03 OCT HAN CAAV
745-3000; 025
Air Intake Cowl
Aerostructures - Install the bonding straps refer to CMM
A320/A321
2022 BMC FAA
745-3400 TASK 71-11-00-400-001- Step 2,E,3.
(Config 1, Config 2)
- Install the bonding straps refer to CMM
TASK 71-11-00-400-001 - Step 3,E,3.
(Config 3)
- Install the bonding straps refer to CMM
TASK 71-11-00-400-001 - Step 4,D,3.
(Config 4)
Remove and Install rubstrip I.A.W
Completion Kit Figure 7 - Rubstrip
CSE-CAB- Completion Kit Zodiac Galleys CMM 25-32-364 Installation ltem 110 05 OCT
263109-1471 A320/A321 CIMC CAAV
2022-21 Galley Europe s.r.o - Remove and Install knob of divider pivoting 2022
I.A.W Completion Kit - Figure 10 - Divider
Pivoting Assy/ltem 10
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
CLEAN WITH CHEMICAL AGENT: IAW
CMP 25-39-18, TASK DMC-
A350BEGALMON-A-25-39-18-00001-251A-
C
DISCONNECT, REMOVE AND
DISASSEMBLY PROCEDURES: IAW CMP
25-39-18: All tasks in the block
CSE-Cl-TD- GALLEY B/E CMP 25-39-18 DISCONNECT, REMOVE AND A350/TREN 24 NOV
X089001-0000011 CIMC CAAV
2020-23 G25CFA39 AEROSPACE DISASSEMBLY PROCEDURES, except T XWB-84 2020
electrical and water system components
ASSEMBLE, INSTALL AND CONNECT
PROCEDURES: IAW CMP 25-39-18: All
tasks in the block ASSEMBLE,
INSTALL AND CONNECT PROCEDURES,
except electrical and water system
components
CLEAN WITH CHEMICAL AGENT: IAW
CMP 25-39-16, TASK DMC-
A350BEGALMON-A-25-39-16-00001-251A-
C
Disconnect, Remove And Disassembly
Procedures: IAW CMP 25-39-16: All tasks in
CSE-Cl-TD- the block Disconnect, Remove And A350/TREN 24 NOV
X002000-0000011 Galley G15rfa B/E Aerospace CMP 25-39-16 CIMC CAAV
2020-21 Disassembly Procedures, Except Electrical T XWB-84 2020
And Water System Components
Assemble, Install And Connect Procedures:
IAW CMP 25-39-16: All Tasks In The Block
Assemble, Install And Connect Procedures,
Except Electrical And Water System
Components
Remove and Install knob of divider pivoting
CSE-CAB- 05 OCT
I.A.W Completion Kit - Figure 9 - Divider
2022-22 Completion Kit Zodiac Galleys CMM 25-32-513 Pivoting Assy 2022
A320/A321 CIMC CAAV
263518-10411 Galley Europe s.r.o
CSE-CI-TD- Install rubstrip lAW Completion Kit Figure 7 - 28 NOV
2022-61 Rubstrip Installation Item 140 2022
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Servicing: Task A350-A-25-29-01-01001-
250A-C (2016-02-19): Clean and apply
surface protection.
- Examination, test, check and fault Isolation:
I.AW CMM 25-29-01, all task in block
examination, test, checks and fault Isolation.
- Disassembly: I.AW CMM 25-29-01, ALL
Task in block Disassembly.
CSE-CI-TD- Overhead Stowage CMM 25-29-01 - Assembly: I.AW CMM 25-29-01, ALL Task 16 OCT
VL4-XXX Diehl SPM 20-00-01 A350 CIMC CAAV
2022-57 Compartment in block Assembly. 2022
- Repair : Repair of component of the
Overhead stowage compartment I.AW SPM
20-00-01 (Code C5678) in the block
REPAIR:
+ Repair of the paint on the metal parts
(repair 9) I.AW SPM 20-00-01.
+ Repair of the decor foil (repair 10) I.AW
CMM 25-29-01 I.AW SPM 20-00-01.
CMM 25-29-01 Repair Of The Decorative Paint On The
CSE-CI-TD- Overhead Stowage 22 NOV
VL4 - Series Diehl SPM 20-00-01 Sandwich Panels (Repair 8): lAW SPM 20- A350 CIMC CAAV
2023-23 Compartment 2023
00-01
ASAB1-XXX; CSE-CI-TD- CMM 25-21-12 REPAIR: ITEM 2.1.2.1: Surface preparation 16 OCT
C-Class Seats Stelia A350 CIMC CAAV
FJSL4-XXX 2022-58 IAW CMM 25-21-12 2022
Replace The Corner Plates On The Fan
745-4001; CSE-2022- CMM 71-13-00 24 OCT HAN
Fan Cowls Goodrich Cowl Doors Ref To CMM Task 71-13-00- A320/A321 CAAV
745-4002 028 2022 BMC
300-024 (Repair 024)
Completion Kit
CSE-CAB- Safran Cabin 01 NOV
263109-3721 Galley - Trolley CMM 25-32-576 Replace filler of T-Divider/FIG 1 item 250A A320/A321 CIMC CAAV
2022-23 CZ 2022
Compartment
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Replacement of placards (PIN: 236501-C1-
CSE-CAB- CMM 25-23-13 1 and 236554-3) I.A.W Subtask 25-23-13- 11 NOV
601369-1 Stowage Driessen A320/A321 CIMC CAAV
2022-25 2022
350-005-A01
Replacement of placards (P/N: 236501-C3-
CSE-CAB- CMM 25-23-14 1A; 236501-C3-1B; 236501-C3-2A; 11 NOV
601370-1 Stowage Driessen A320/A321 CIMC CAAV
2022-26 236501-C3-2B) l.A.W Subtask 25-23-14- 2022
350-005-A01
- Disassembly of the Nozzle Assy I.A.W
Subtask 49-81-41-010-001-A01 step A.(2)
and Assembly of the Nozzle Assy I.A.W
D4988500000XXX CSE/2022/042 Muffler-Exhaust Airbus S.A.S CMM 49-81-41 Subtask 49-81-41-410-002-A01 step A.(1). A320/A321 11 NOV HCM CAAV
2022 BMC FAA
- Check of the Exhaust Duct Assembly I.A.W
Task 49-81-41-200-801-A01 and Task 49-
81-41-200-801-B01
CSE-CAB- Trolley ACMM 25-31- Replace the filler (PIN 247516-313) of T- 23 NOV
263518-41 Safran 315 A320 CIMC CAAV
2022-27 Compartment divider assy, reference FIG 1/item 365 2022
28 NOV HCM
CSE/2022/044
D30664-XXX; Slide and Slide/Raft 2022 BMC
Safran CMM 25-61-20 Gage viewing port replacement as per CMM A320/A321 CAAV
D30665-XXX CSE-2023- Assembly Task 25-61-20 repair 22 28 NOV HAN FAA
029 2023 BMC
351-3001; Repair Latch Beam Rub Strip Bond I.A.W
CSE-2022- Utc Aerospace CMM 78-30-00 CMM 09 DEC HAN
351-3003; Thrust Reverser GRAA350RR-A-78-30-00-00001- A350 CAAV
032 Systems 2022 BMC
351M3010 621A-C
Removal of the Jet Pipe Assy I.A.W Subtask
CAAV
740-1094; Common Nozzle Goodrich CMM 78-11-11 78-11-11-020-068 09 JAN HCM
CSE/2023/001 A320/A321 FAA
745-1101 Assembly Aerostructures -Installation of the Jet Pipe Asay I.A.W 2023 BMC
SSCA
Subtask 78-11-11-420-082
CMM 32-41-31; CAAV
13 FEB HCM
304-266 CSE/2023/003 Hub Cap Kit Goodrich CMM 32ꞏ41-13 Paint the hub cap I.A.W Paragraph 6.D A320/A321 FAA
2023 BMC
SSCA
CMM 25-36-089; Remove And Install Divider Pivoting Assy
CSE-CI-TD- Zodiac ACMM 25-32- Pin: 259501-1352 I.A.W ACMM 25- 15 FEB
601858-023601 Galley G5 A320/A321 CIMC CAAV
2023-01 Aerospace 513 32-513 (Item 325 - Figure 1) LAW VSB 2023
259501-25-001 (DWG No: 680800-411,
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Sheet 1; Assembly Instruction Steps 5.1 -
5.5)
HAN
BMC;
HAN
CSE-2023- Airborne Auxiliary VSB HGT1700- Perform the VSB HGT1700-49-8354 27 FEB LMC;
70720041-00 Honeywell 49-8354 "Airborne Auxiliary Power-Remove and A350 CAAV
1001 Power 2023 HCM
Replace left and Right Buffer air tubes".
BMC;
HCM
LMC
601400-1; CSE -CAB- CMM 25-36-15 - Replace the placards lAW Subtask 25-36- 28 FEB
Galley G1 Driessen A320/A321 CIMC CAAV
601410-1 2023-06 15-350-005-A01 2023
- Removal and Disassembly of the Nursing
CSE -CAB- Table lAW Subtask 25-46-02-040-00S-A01. 28 FEB
D254-XXXXXXXX Lavatory D Diehl Aviation CMM 25-46-02 CIMC CAAV
2023-08 - Assembly and Installation of the Nursing A320/A321 2023
Table lAW Subtask 25-46-02-440-045-A01.
- Remove the screws of the Folding Door
(Ref: Fig 3-item 40-50-60-100-140) lAW
CSE -CAB- CMM 25-46-03 Subtask 25-46-03-040-002-A01 28 FEB
D254- XXXXXXXX Lavatory E Diehl Aviation CIMC CAAV
2023-09 -Install the screws of the Folding Door (Ref: A320/A321 2023
Fig 3- item 40-50-60-100-140) lAW Subtask
25-46-03-440-041-A01
Repair and replace a damaged labels (with
AC40-XXX; CSE-CI-TD- Underfloor Hold Net part number LB30-0213108 or LB30- 09 MAR
Amsafe Bridport CMM 25-52-28 A321 CIMC CAAV
HA70-XXX 2023-02 Set 0213109) lAW Subtask 25-52-28-350-020- 2023
A01
TASK 32-12-20-300-834-A01 Drag Brace
510Z1210-504 To CSE-2023- CMM 32-12-20 Spindle Assembly Refinish Procedure 20 MAR HCM CAAV
Buildup Assy Safran B787-9
510Z1210-514 006 2023 BMC FAA
paragraph 4.
- Removal air outlet exchange assy lAW
CMM 33-23-04, Disassembly section, Step
Goodrich CAAV
Passenger Service CMM33-23-04 D.(from 1 to 4). 23 MAR HCM
2LA456267-XXX CSE/2023/007 Lighting ATR 42/72 SSCA
Unit - Installation Air outlet exchange assy lAW 2023 BMC
Systems CAAP
CMM 33-23-04 Assembly section, Step
A.(from 11to 14).
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
740-400X; CSE-2023- Goodrich CMM 71-13-00 Fan cowl door latch handles paint repair A320-A321 07 APR HAN CAAV
Fan Cowls
745-400X 009 Aerostructures I.A.W TASK 71-13-00-300-028 2023 BMC FAA
CSE-2023- Sumitomo 10 APR HAN
010 Starter Control Precision 2023 BMC
PS400-1/790424-4 CMM 80-13-51 Install a new identification plate P/N: A320/A321 CAAV
Valve Products Co., 797671-1 I.A.W assembly section, step 4.A 02 NOV HCM FAA
CSE/2023/028 Ltd 2023 BMC
Perform the testing and fault isolation of
CSE-CI-TD- Zodiac CMM 25-40-14 lavatory doors lAW Task 25-40-14-700-802- 10 APR
G901001XXX Lavatory Assembly A320 CIMC CAAV
2023-04 Aerospace 2023
A01, step B
D2511018000100
D2511113XXXXXX;
D2511168500000;
Replace the Bonding Part of Table Assy CAAV
D2511225800000 Foot Restand CMM25-13-15 I.A.W Subtask 25-13-15-360-001-A01Para. A320/A321 10 APR HCM
CSE/2023/011 Airbus FAA
D2511411800000; Slidingtable Assy 2023 BMC
U. SSCA
F2511211600000;
F2511223200000;
F2511223200200
Driessen CMM 25-31-034; Replace slide rail (P/N: 212509-10) lAW
CSE-CAB- Completion Kit 25 APR
263107-31 Aerospace CZ SPM 25-00-01 SPM 25-00-01, TASK 20-00-01-300-819- A320/A321 CIMC CAAV
2023-12 Galley G1 2023
s.r.o A00
Driessen CMM 25-31-580; Replace slide rail (PIN: 212509-10) lAW
CSE-CAB- Completion Kit 25 APR
263307-10031 Aerospace CZ SPM 25-00-01 SPM 25-00-01, TASK 20-00-01-300-819- A320/A321 CIMC CAAV
2023-13 Galley G1 2023
s.r.o A00
-Removal of the Link Assemblies, the Rod-
End Assemblies and Attached Parts, Task
52-81-13-000-801-A01, step (3), (10).
CSE-2023- CMM 52-81-13 -Installation of the Link Assemblies, the Rod- A320/A321 25 APR HAN CAAV
D528560100XXXX Fairing - Fixed Leg Airbus
013 2023 BMC FAA
End Assemblies, the Edge Angles and
Attached Parts, TASK 52-81-13-400-801-
A01, step (3), (5), (7).
- Repair Fiberglass Composite Panel refer
CSE-CAB- task 25-40-05-300-807-A01 27 APR
EXX1001 Lavatory Assembly Safran CMM 25-40-05 A350 CIMC CAAV
2023-14 - Paint and Prime the Composite Panel refer 2023
task 25-40-05-300-810-A01
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Repair Cracked Shroud refer task 25-40-
05-300-817-A01
- Repair Fiberglass Composite Panel refer
task 25-40-06-300-807-A01
E441001 XXX; CSE-CAB- CMM 25-40-06 - Paint and Prime the Composite Panel refer 27 APR
Lavatory Assembly Safran A350 CIMC CAAV
E451001 XXX 2023-15 task 25-40-06-300-810-A01 2023
- Repair Cracked Shroud refer task 25-40-
06-300-817-A01
- Repair Fiberglass Composite Panel refer
task 25-40-07-300-807-A01
E471001 XXX; CSE-CAB- CMM 25-40-06 - Paint and Prime the Composite Panel refer 27 APR
Lavatory Assembly Safran A350 CIMC CAAV
E481001 XXX 2023-15 task 25-40-07-300-810-A01 2023
- Repair Cracked Shroud refer task 25-40-
07-300-817-A01
- TASK 50-11-05-300-809-A01Fill and Fair
CSE-2023- Sidewall Panel out Procedure for Panel. 28 APR HCM CAAV
C41XXXX Safran CMM 50-11-05 B787-9
010 Assembly - TASK 50-11-05-300-810-A01Paint and 2023 BMC FAA
Prime the Composite Panels
ACMM 32-41-30; Paint the hub cap lAW CMM 32-41-30 CAAV
08 MAY HCM
304-265 CSE/2023/014 Hub Cap Kit Goodrich CMM 3241-13, Paragraph 6.0 A320/A321 FAA
2023 BMC
SSCA
- Subtask 32-27-73-040-004-A01:
Disassembly of the cylinder;
HAN
- Subtask 32-27-73-440-001-A: Assembly of
BMC
10-375201-000; CSE-2023- NLG Shock CMM 32-27-73 the cylinder; 08 MAY
Safran A320/A321 CAAV
10-375201-001 2006 Absorber - Subtask 32-27-73-41 0-001-A01: 2023
HCM
Installation of the restrictor;
BMC
- Subtask 32-27-73-410-002-A01:
Installation of the lower cam.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Perform Footwall shroud spring clip repair of
CSE-CI-TD- CMM 25-03-09 B787 Seat shell l.A.W CMM Subtask 25-03- 18 MAY
2C06/2C14-XXX Shell Assembly Safran B787 CIMC CAAV
2023-05 2023
09-350-032-A01
Perform Footwell shroud spring clip repair of
CSE-CI-TD- CMM 25-20-10 A350 Seat shell lAW CMM 25-20-10-01003- 18 MAY
2C10-XXX Shell Assembly Safran A350 CIMC CAAV
2023-06 2023
664A-C
D5746050000XXX;
Repair the contour of the Slat when an Insert
D5746057700XXX; CMM 57-46-21 Cover-Cap is missing lAW TASK 57-46-21- A320/A321 23 MAY HCM
CSE/2023/017 Slat Assy 05 Airbus CAAV
D574605980XXXX; 2023 BMC
300-803-A01.
D5746095000XXX
Instructions For
Nexgen Amsafe Continued
CSE-CAB- 24 MAY
7236 Seatbelt Airbag Amsafe Airworthiness - Testing And Fault Isolation A350 CIMC CAAV
2023-18 2023
System E513252
- Remove the Lubrication Shaft subassembly
ref CMM 32-12-89-000-801-A01. Subtask:
10-453101XXX;
32-12-89-040-002-A01, item 16, step (I),
10-453201XXX;
(m), and (n).
10-453301XXX; CSE-2023- Main Landing Gear Safran Landing CMM 32-12-89 26 MAY HAN CAAV
- Install the Lubrication Shaft subassembly A320/A321
10-453302XXX; 015 Leg And Dressings Systems UK Ltd 2023 BMC FAA
ref CMM 32-12-89-400-001-A01. Subtask:
10-453401XXX;
32-12-89-440-010-A01" item 11, step (f).
10-453402XXX
- Torque data: Ref CMM : 32-12-89-940-802-
A01
HAN-2023- - Disassembly The Cable Assembly PN HAN
A321-08 0727628 l.A.W Disassembly Section, Step
0727510; Flush Cover And CMM 28-25-41 3.C 30 MAY LMC
0727540 Cable Assembly
Eaton A320/A321 CAAV
DAD/2023/A321 2023 DAD
- Assembly The Cable Assembly PN
-01 Branch
0727628 l.A.W Assembly Section, Step 3.B
- Disassembly of cable assembly l.A.W Step
CAAV
Flush Cover and CMM 28-25-41 3C/Disassembly Section 31 MAY HCM
0727540 CSE/2023/018 Eaton A320/A321 FAA
Cable Assembly - Assembly of cable assembly l.A.W Step 2023 BMC
SSCA
3B/Assembly Section
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Subtask 32-57-17-110-001-A01: Cleaning
HAN
- Subtask 32-57-17-380-003-A01: Painting
CSE-2023- CMM 32-57-17 - Subtask 32-57-17-380-004-A01: Stamping A320/A321 31 MAY BMC;
D231197XXX Electric Box Safran CAAV
2007 2023 HCM
with step (a).3 and (d).1 refer TI-2023-2002
BMC
(corresponded step 12.C.a.3 and 12.C.d.1)
Disassembly The Cable Assembly PN
0727628 l.A.W Disassembly Section, Step
0727510; HCM/2023/A3 Flush Cover And CMM 28-25-41 02 JUN HCM
Eaton 3.C A320/A321 CAAV
0727540 21-01 Cable Assembly 2023 LMC
- Assembly The Cable Assembly PN
0727628 l.A.W Assembly Section, Step 3.B
- Disassemble of Stanchions (P/N: HA70-
021400X, AC40-0268155) I.A.W. TASK 25-
AC40-02XXXXX; CAAV
Under floor hold net Amsafe CMM 25-52-28 52-28-040-801-A01. 05 JUN HCM
AC40-0311XXX; CSE/2023/019 A320/A321 FAA
Set Bridport/ K2429 - Assemble of Stanchions (P/N: 2023 BMC
HA70-02140XX SSCA
HA70ꞏ021400X, AC40-0268155) I.A.W
TASK 25-52-28-440-801-A01.
CMM 25-36-089; Instal Slide Extractor PIN: 225512-3 I.A.W
CSE-CI-TD- Zodiac ACMM 25-31- 05 JUN
601858-023601 Galley G5 ACMM 25-31-864 "Completion Kit- A320/A321 CIMC CAAV
2023-10 Aerospace 864 2023
Installation Section" step 4.1
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Remove the bonding straps refer figure 16
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-000-001 step 2.E(4).
- Remove the bonding straps refer figure 36
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-000- l001 step 3.E(2).
- Remove the bonding straps refer figure 41
(PIN: 745-3237-501, FEB5051, FEB5049)
740-3000; CAAV
Goodrich CMM 71-11-00 I.A.W Task 71-11-00-000-001 step 4.E.(2) A320/A321 06 JUN HCM
745-3000; CSE/2023/013 Air Intake Cowl FAA
Aerostructures - Install the bonding straps refer figure 16 2023 BMC
745-3400 SSCA
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-400-001 step 2.E.(3)
-Install the bonding straps refer figure 36
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-400-001 step 3.E.(3).
- Install the bonding straps refer figure 41
(PIN: 745-3237-501, FEB5051, FEB5049)
I.A.W Task 71-11-00-400-001 step 4.0.(3)
- Removal of Spring P/N: A2577118920200
(item 01-460 or 01A-460) I.A.W Task 25-52-
44-000-801-A01, Subtask 25-52-44-040-
001-A01 Step A.(10-12) or Subtask:25-52-
A257711030XXXX; 44-040-001-B01 Step B.(10-12) CAAV
07 JUN HCM
D255723100XXXX; CSE/2023/020 Door Sill Latch Airbus S.A.S CMM 25-52-44 A320/A321 FAA
- Installation of Spring P/N: 2023 BMC
D255723980XXXX SSCA
A2577118920200 (item 01-460 or 01A-460)
I.A.W Subtask 25-52-44-440-002-A01 Step
A.(25-31) or Subtask 25-52-44-440-002-B01
Step B.(24-30)
-Disassembly of the Flap Movable Fairing-
Assembly - Flap Track 3, TASK 57-55-16-
CSE-2023- Fairing Assembly, CMM 57-55-16 040-803-A01, step 3, (B),(10), (11), (12). 08 JUN HAN CAAV
D5755657900XXXA Airbus A320/A321
016 Flap Track 3 2023 BMC FAA
-Assembly of the Flap Movable Fairing
Assembly - Flap Track 3, TASK 57-55-16-
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
440-803-A01, step 3, (B), (2),(11),(12), (13),
(14).
-Disassembly of the Movable Fairing
Assembly - Flap Track 4, Task 57-55-17-
000-803-A01, Step 3, (B), (8),(11).
CSE-2023- Fairing Assembly, CMM 57-55-17 08 JUN HAN CAAV
D5755658000XXXA Airbus -Assembly of the Flap Movable Fairing- A320/A321
017 Flap Track 4 2023 BMC FAA
Assembly - Flap Track 4, Task 57-55-17-
400-803-A01, step 3, (B), (2),(3), (12), (13),
(14).
CSE-2023- CMM 25-21-41 Replace or Install Bonded Components 21 JUN HCM CAAV
C33X00X Sidewall Assy Safran B787-9
021 Subtask 25-21-41-300-801-A01 2023 BMC FAA
- Disassemble the aft right hand isolator Fig
DIS-1 [100] I.A.W Task HON70210-01-49-
CSE-2023- Apu Suspension CMM 49-12-01 12-01-00A-530A-A, Step 6. 26 JUN HAN
9619117-00 Honey Well A350 XWB CAAV
016 System -Assemble the aft right hand isolator Fig 2023 BMC
ASSY-1 [100] I.A.W Task HON70210-01-49-
12-01-01A-710A-D, Step 4.
- Disassembly of the swivel selector valve,
CSE-2023- Swivel Selector CMM 32-57-15 Ref CMM 32ꞏ57ꞏ15 Step 2. A. (1). (2). 26 JUN HAN CAAV
C24998000 Sarfran A320/A321
019 Valve - Assembly of the swivel selector valve, Ref 2023 BMC FAA
CMM 32ꞏ57ꞏ15 Step 1. A. (1). (2), E. (1).
- Remove The Thermal Valve PIN: 243548-
17 I.A.W Green Galley G1- Removal
CSE-CI-TD- Zodiac CMM 25-30-074 Section, Step 4.12.4. 30 JUN
601852-001011 Galley G1 A320/A321 CIMC CAAV
2023-12 Aerospace -Instal The Thermal Valve PIN: 243548-17 2023
I.A.W Green Galley G1- Installation Section,
Step 4.9.4.
CAAV
Elevator and Trim CMM 55-20-00 Testing and Trouble Shooting 05 JUL HCM
D55270000XXX CSE/2023/022 ATR ATR72 CAAP
Tab 2023 BMC
SSCA
CAAV
CMM 55-40-00 Testing and Trouble Shooting 05 JUL HCM
S55470000XXX CSE/2023/023 Rudder Assy ATR ATR72 CAAP
2023 BMC
SSCA
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly of snap hook ref Task 35-24-
CSE-2023- Passenger Oxygen CMM 35-24-02 02-000-801-A01, step 2, D. 10 JUL HAN
174085-96 Aerospace A320/A321 CAAV
020 Mask Assembly - Assembly of snap hook ref Task 35-24-02- 2023 BMC
400-801-A01 , step 2, F
Removal of the Seal PIN: D5451887520000
I.A.W Subtask 54-55-11-000-003-L01.
CSE-2023- Fairing Assembly, CMM 54-55-11 - Install of the Seal PIN: 05451887520000 11 JUL HAN
D0001039000XXX Airbus A320/A321 CAAV
021 Movable 2023 BMC
I.A.W Subtask 54-55-11-400-015-A01, step
(1), (2), (3).
- Remove the clamp PIN: 4305901110
I.A.W Subtask 32-49-12-010-001-A01, Step
4133801030; CSE-2023- Wheel Pressure CMM 32-49-12 (1).(a).1 - Installation of the clamp PIN: 25 JUL HAN
Safran A320/A321 CAAV
1338-1450 022 Transducer 2023 BMC
430590111 I.A.W Subtask 32-49-12-410-
004-A01, Step (4).(c) and (4).( )
- Testing and Fault Isolation I.A.W Section
1000;
HT7000;
CSE-CI-TD- Tourist Class S&S Numerical CMM: 25-25-23; - Disassembly I.A.W Section 3000; 7 AUG
HL7000; CMM 25-22-54 - Inspection/ Check I.A.W Section 5000; B787-9 CIMC CAAV
2023-03 Deployment Arm Control 2023
HP7000 XXX
- Assembly I.A.W Section 7000;
- Fits and Clearances I.A.W Section 8000.
- Disassembly I.A.W CMM Task 25-11-69-
000-817-A01 Crew Seat General Assembly
Removal.
- Disassembly I.A.W CMM Task 25-11-69-
000-821-A01Inboard/Outboard Tilt
Assembly Removal.
3A380-0007-01-7; CSE-2023- CMM 25-11-69 - Disassembly I.A.W CMM Task 25-11-69- 21 AUG
Pilot Seat Ipeco B787-9/10 CIMC CAAV
3A380-0007-01-8 3001 2023
000-824-A01 Recline Unit Assembly
Removal.
- Assembly I.A.W CMM Task 25-11-69-400-
809-A01 Recline Unit Assembly.
- Assembly I.A.W CMM Task 25-11-69-400-
813-A01 Inboard/Outboard Tilt Assembly.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assembly I.A.W CMM Task 25-11-69-400-
830-A01 General Assembly. Crew Seat
Assembly.
- Test for Pilot Seat I.A.W CMM Task 2S-11-
69-700-801-A01
CMM 25-23-36 Repair of the decorative paint on the
5030-XXX; CSE-CI-TD- 23 AUG
Stowage Dieh SPM 20-00-01 sandwich panels l.A.W SPM 20-00-01- Task A350 CIMC CAAV
5031-XXX 2023-15 2023
20-00-01-94D-808-A00
Visual Inspection Inlet Door Assembly
70720055-0X;
CSE-2023- CMP 49-16-01 according to CMP 49-16-01, Examination, 29 AUG HAM
70720055-0X AMDT Inlet Assembly Honeywell A350 CAAV
023 test, checks and fault isolation, chapter 5, 2023 BMC
A
paragraphs 5.4, 5.6, 5.7
- Remove the Spring PIN: 235001-7 I.A.W
CSE-CI-TD- Miscellaneous ACMM 25-00-06 Subtask 25-00-06-040-001-A01 08 SEP
262107-11 Driessen A321 CIMC CAAV
2023-17 Stowage Mod Kit - Install the Spring PIN: 235001-7 I.A.W 2023
Subtask 25-00-06-410-001-A01
- Removal of the Rubber Grommet of the
Main Wheel Shroud (IPL Item 30): Subtask
DR1402C0; CSE-2023- CMM 32-48-25 32-48-25-020-001-A01 -Step (1}(a). 12 SEP HAM CAAV
Wheel Adapter Kit Safran A320/A321
DR1402C00 AMDT A 024 - Installation of the Rubber Grommet of the 2023 BMC FAA
Main Wheel Shroud (IPL Item 30): Subtask
32-48-25-420-001-A01 - Step (1).(i).
- Repair 2: Decor FoiI I.A.W SPM 25-00-01
TASK 25-00-01-99F-813-A00
- Repair 5: Structure Sandwich Panels I.A.W
CSE-CI-TD- SPM 25-00-01 13 SEP
VW00F0041000000 Stowage Diehl SPM 25-00-01 TASK 25-00-01-99F-819- A350 CIMC CAAV
2023-16 2023
A00 Step 21. Mixing of Epoxy Resin
- Repair 8: Laminated Parts I.A.W SPM 25-
00-01 TASK 25-00-01-99F-822-A00
- Disassembly of the Footrest Assembly
D2511411800000; CSE-2023- Foot Rest and CMM 25-13-15 I.A.W. Subtask 25-13-15-040-001-B01. 02 OCT HAN
Airbus A320/A321 CAAV
D2511225800000 025 Sliding Table - Assembly of the Footrest Assembly I.A.W. 2023 BMC
Subtask 25-13-15-400-005-B01.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Disassembly of Switch guard (150) and
Pushbutton switch (155) REF CMM 44-27-
09 Chapter DISASSEMBLY Step 5.E.(13).
Panasonic
Video System CMM 44-27-09 and S.E.(14). 04 OCT HCM CAAV
RDAA902657-01 CSE/2023/026 Avionics A320/A321
Control Unit - Assembly of Switch guard (150) and 2023 BMC FAA
Corporation
Pushbutton switch (155) REF CMM 44-27-
09 Chapter ASSEMBLY Step 3.H.(6) and
3.H.(7).
- Remove the Seal P/N D5284025220000 or
D5284025220100 of Fairing-Fixed Leg P/N:
D5285601000000X or D5285601000100X
l.A.W Subtask 52-81-13-010-001-A01 Step
A.(10).
- Remove the Seal PIN D5284025220000 or
D5284025220100 of Fairing-Fixed Leg PIN:
D5285601000000X; D5285601000[2-11100A l.A.W Subtask 52-
CAAV
D5285601000100X; CMM 52-81-13 81-13-000-001-A01 Step A.(10) 06 OCT HCM
CSE/2023/027 Fairing-Fixed Leg Airbus S.A.S A320/A321 FAA
D5285601000[2- - Install the Seal P/N D5284025220000 or 2023 BMC
SSCA
11]00A D5284025220100 of Fairing-Fixed Leg P/N:
D5285601000000X or D5285601000100X
l.A.W Subtask 52-81-13-410-001-A01 Step
A.(7).
- Install the Seal P/N 05284025220000 or
D5284025220100 of Fairing-Fixed Leg P/N:
D5285601000[2-11]00A l.A.W Subtask 52-
81-13-410-002-A01 Step A.(3) and (4).
CSE-CI-TD- CMM 25-31-652 - Cleaning lAW CMM 25-31-652 12 OCT
TV603020 Foldable Trolley Safran A350 CIMC CAAV
2023-18 - Check lAW CMM 25-31-652 2023
CSE-CI-TD- Diethelm Keller CMM 25-35-59 - Cleaning lAW CMM 25-35-59 18 OCT
TC01-101A1VN Foldable Trolley B787 CIMC CAAV
2023-19 Aviation - Check lAW CMM 25-35-59 2023
D23119751; - Remove Clamping Spring IAW Subtask 32-
D23119750; HAN/2023/A3 18 OCT HAN
Electrical Box Safran CMM 32-57-17 57-17-010-002-A01- Step (e). A320/A321 CAAV
D23119750-1; 21-21 - Install Clamping Spring IAW Subtask 32- 2023 LMC
D23119751-1 57-17-410-003-A01.
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Repair of the decor foil (Repair 10)
CSE-CI-TD- 25 OCT
VL30S-XXX Sidewall Assy Diehl SPM 20-00-01 - Replacement of the decor foil on metal and A350 CIMC CAAV
2023-20 2023
GFRP surfaces (Repair 11)
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
Remove Wiper Arm Bumper (PIN: 4293748
Safran or 4280966) lAW Subtask 30-45-52-020-
4279881; 4342555; 002-A01 Step (2).(b) and (2).(c). CAAV
Electronics & 15 NOV HCM
4357626; 4279874; CSE/2023/033 Wiper Arm ACMM 30-45-52 A320/A321 FAA
Defense Cockpit - Install Wiper Arm Bumper (PIN: 4293748 or 2023 BMC
4342562; 4357619 SSCA
Solutions 4280966) lAW Subtask 30-45-52-430-001-
A01 Step (1).(d) and (2).(e).
-Disassembly of Stanchions, TASK 25-52-
CSE-2023- Underfloor Hold Net 28-040-801-A01,step 3, (A), (1), (2). 27 NOV HAN CAAV
AC40-0217300 Amsafe Bridport CMM 25-52-28 A320/A321
028 Set -Assembly of Stanchions, TASK 25-52-28- 2023 BMC FAA
440-801-A01,step 2, (A), (1), (2).
1. Remove screw (Item 350, IPL Figure 1)
P/N: MS24693~273 lAW Subtask 49-41-20-
CSE-2023- Direct Current CMM 49-41-20 300-017-A01 step (2) and (3) 01 DEC HAN
2704506-X Honeywell A320/A321 CAAV
031 Motor 2. Install Screw (Item 350, IPL Fi9ure 1) 2023 BMC
P/N: MS24693S273 lAW Subtask 49-41-20-
300-017-A01 step (8) and (9)
740-1094; CSE-2023- Common Nozzle 78-11-11 Remove and Replace The Aft Ring (Non- 06 DEC HAN
Goodrich A320/A321 CAAV
745-1101 026 Assembly Vectored) IAW Repair#31 2023 BMC
- Disassemble the panel assy and the
universal joint assembly lAW Task 32-27-77-
000-801-A01 step 1.D.3.(b).
- Cleaning part lAW Task 32-27-77-100-801 HAN
10-375701-000;
CSE-2023- CMM 32-27-77 -A01. 11 DEC BMC CAAV
10-375701-001; Forestay Safran A320/A321
2008 - Assemble the panel assy and the universal 2023 HCM SSCA
10-375701-002
joint assy lAW Task 32-27-77 -400-801-A01 BMC
step 1.D.2.(b).
- Protective sealing lAW Task 32-27-77-400-
801-A01 Step 1.D.2.(d).
A320neo Hinge - Disassemble the "Hinge Access Panel
636-3053-XXX; HAN/2023/A3 UTC Aerospace CMM 78-30-06 13 DEC HAN
Access Panel Assembly" I.A.W GRAA320NEO-A-78-30- A320/A321 CAAV
636-3054-XXX 21-28 Systems 2023 LMC
Assemblies 06-00001-530A-C
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Assemble the "Hinge Access Panel
Assembly" I.A.W GRAA320NEO-A-78-30-
06-00001-710A-C
Disassembly SUBTASK 38-11-08-040-002:
C. Disassemble Faucet Control Module Assy
lAW CMM 38-11-08: Step 2,4,8,10,11.
CSE-CI-TD- Electronic Faucet CMM 38-11-08 - Assembly: subtask 38-11-08-440-002: C. 13 DEC
AFUT000-XXX Jamco B787 CIMC CAAV
2023-22 And Control Module Assemble Faucet Control Module Assy lAW 2023
CMM 38-11-08: Step 2,3,5,9,11.
- Fits And Clearances: TASK 38-11-08-820-
801: 1.A Torque values.
B87001A0040;
- Detail Check lAW Task 25-37-73-200-801.
B87008B0017;
- Replacement of defective parts lAW:
B87005B000;
CSE-CI-TD- CMM 25-37-73 + Disassembly and Removal Procedure For 15 DEC HCM CAAV
B87006C0009; Galley Assy Jamco B787-9
2023-30 Door Assy lAW Subtask 25-37-73-040-002. 2023 BMC FAA
B87037A0031;
+ Assembly and Installation Procedure For
B87037A0032;
Door Assy lAW Subtask 25-37-73-440-002 B
B87050A0053
- Disassembly of the Bearings IAW Task 52-
81-18-000-810-A01
D5288016500XXX;
- Assembly of the Bearings IAW Task 52-81-
D5288025000XXX;
Door - Main 18-400-810-A01
DH602AIAAAAA; CMM 52-81-18 18 DEC HCM CAAV
CSE/2023/034 Landing Gear, Airbus - Check of the Fittings, Uplock Assembly and A320/A321
DH602A1AAAAB; 2023 BMC FAA
Common Ramp Ramp Assembly IAW Task 52-81-18-210-
DH603AIAAAAA;
802-A01 STEP 3A(2)
DH603AIAAAAB
- Fits and Clearances IAW Task 52-81-18-
820-806-A01
CSE-CI-TD- CMM 25-36-15 -Inspection/Check lAW Task 25-36-15-200- 18 DEC
601410-1 Galley G1 Safran A321 CIMC CAAV
2023-25 801-A01 2023
CSE-CI-TD- CMM 25-36-28 Inspection/Check lAW Task 25-36-28-210- 18 DEC
601367-1 Galley G2 Safran A321 CIMC CAAV
2023-26 801-A01 2023
- Cleaning lAW Task 25-00-01-100-801-A00
CSE-CI-TD- SPM 25-00-01 18 DEC
D2549015911600 Lavatory H Assy Diel - Inspection/Check: lAW Task 25-00-01-200- A321 CIMC CAAV
2023-27 2023
801-A00
8. 10.
5. Maintenace 9.
1. P/N/ Model 2. Reference 3. Description 4. Manufacture 6. Limitation 7. Aircraft Aprroval Under
data Center
date approval
- Cleaning lAW Task 25-00-01-100-801-A00
CSE-CI-TD- SPM 25-00-01 - Inspection/Check lAW Task 25-00-01-200- 18 DEC
D2549011903600 Lavatory D Assy Diel A321 CIMC CAAV
2023-28 2023
801-A00
- Cleaning lAW Task 25-00-01-100-801-A00
CSE-CI-TD- SPM 25-00-01 - Inspection/Check lAW Task 25-00-01-200- 18 DEC
D2549013907000 Lavatory E Assy Diel A321 CIMC CAAV
2023-29 2023
801-A00