(FAT)
1
TABLE OF CONTENTS
FAT DATE..................................................................................................................................................3
Document Approval...............................................................................................................................4
1 Introduction......................................................................................................................................5
2 Participants......................................................................................................................................5
3 User Feedback/Comment.............................................................................................................6
Script Attachment.................................................................................................................................16
2
FAT DATE
All Modules
3
Document Approval
We hereby confirm that this report complies with the Final Acceptance Test
Report (FAT) as held by SE Infinity Sdn Bhd with CyberSecurity Malaysia,
MySEF.
Final Acceptance
1.0 Test (FAT) .....................................................
Report
I hereby confirm that all the system requirements specifications stated in this
document have fully followed/do not follow * the items as requested by us.
REVIEWED BY:
.................................................... ...................................................
Name: Name:
Position: Position:
APPROVED BY:
.....................................................
Name:
4
Position:
1 Introduction
2 Participants
Participants that has been selected to monitor, manage the project from MySEF
department together with the system users. This is the list of participants that
participate in Final Acceptance Test (FAT) MyQuest:
5
3 User Feedback/Comment
This is the list of result feedback/comment from Final Acceptance Test (FAT):
Table 1
Re-Reviewed
Reviewer not upload doc,
system capture latest
document author upload
6
7
3.2 Module User Information
This is the compiled comment from user and result after based on comment for Module Project Management
at table 2.
Table 2
8
3.3 Module Quality Monitoring
This is the compiled comment from user and result after based on comment for Module Project Management at table
3.
Table 3
9
BIL FAT COMMENT RESULT AFTER BASED ON COMMENT
2 Consistency Delete button > QM
Assign User (CPA/NCR)
10
BIL FAT COMMENT RESULT AFTER BASED ON COMMENT
11
3.4 Module Project Management
This is the compiled comment from user and result after based on comment for Module Project Management at table 4.
Table 4
12
3.5 All Modules
This is the compiled comment from user and result after based on comment for Module Project Management at table 5.
Table 5
13
BIL FAT COMMENT RESULT
3 Searching
Quality Monitoring > Training
Planning Management >
Completed Training
Bila searching nama
Azatulsheera dia keluar nama
employee lain juak
14
BIL FAT COMMENT RESULT
15
Script Attachment
16