Estimate of Quantities of a T beam Decking

Item No Description of items No L B H Quantity Units


1 RCC Work 1:2:4 excluding steel and its bending
3
a T beam ribs 3 6.9 0.35 0.75 5.434 m
3
b Fillets 6 6.9 0.5x0.15x0.15 0.466 m
3
c Deck slab 1 6.9 7.7 0.2 10.626 m
3
d Railing Post 2x6 0.15 0.15 1.2 0.324 m
3
e Kerbs 2 6.9 0.35 0.2 0.966 m
3
Total 17.816 m
2 RCC work in Wearing Coat
3
1 6.9 7 0.1 4.83 m
3 40 mm dia GI pipe in railing
8 6.9 55.2 rm
4 Steel reinforcement bars including bending
a Beams@2.5% 3 6.9 0.35 0.95 13.5 Quintal
b Slab @ 1% 1 6.9 77 0.2 8.34 Quintal
Railing post @1% 12 0.15 0.15 1.2 0.26 Quintal
Total 22.1 Quintal
beam Decking
Remarks
and its bending

No=6.9/1.36 +1=6

13.5=(3*6.9*0.35*0.95*2.5*78.5)/100