DESIGN APPROACH A
Very loose to Very loose to loose
Units Soft Clay Hard Silt
loose Sand Fill-1 Sand Fill-2
(above GWT) (below GWT)
Moderately conservative parameters
Angle of Internal Friction degree 35 35 23 30
Drained Cohesion kPa 0 0 2 4
Undrained Cohesion kPa 0 0 30 300
Density
DESIGN APPROACH B
Very loose to Very loose to loose
Units Soft Clay Hard Silt
loose Sand Fill-1 Sand Fill-2
(above GWT) (below GWT)
Worst credible parameters
Angle of Internal Friction degree 30 30 23 30
Drained Cohesion kPa 0 0 2 4
Undrained Cohesion kPa 0 0 15 200
Density
DESIGN APPROACH B IS CONSIDERED MORE ONEROUS OF THE ABOVE TWO CASES; ACCORDINGLY, DESIGN
APPROACH B IS ADOPTED
Estimation of Design Soil Parameters as per CIRIAC580 for Serviceability Limit State Analysis
DESIGN APPROACH A
Very loose to Very loose to loose
Units Soft Clay Hard Silt
loose Sand Fill-1 Sand Fill-2
(above GWT) (below GWT)
Moderately conservative parameters
Angle of Internal Friction degree 35 35 23 30
Drained Cohesion kPa 0 0 2 4
Undrained Cohesion kPa 0 0 30 300
Density
DESIGN APPROACH A
Very loose to Very loose to loose
Units Soft Clay Hard Silt
loose Sand Fill-1 Sand Fill-2
(above GWT) (below GWT)
Moderately conservative parameters
Angle of Internal Friction degree 35 35 23 30
Drained Cohesion kPa 0 0 2 4
Undrained Cohesion kPa 0 0 30 300
Density
S. No GT/ ST HALL
Sheet Pile
T1 T2 BM SF Penetration Toe deflection Top deflection
Length
(kN/m) (kN/m) (kN-m/m) (kN/m) (m) (mm) (mm)
1 ULS values 108 356 262 211 12 95 182
7 Load effects (max of 1, 3 and 6 for struts) 164 440 270 211
and max of 1, 3 and 4 for walls)
(as per CIRIA C580)
Adopted Load Effects 180 450 280 230 12m long sheet pile
Sheet Pile
T1 T2 BM SF Penetration Toe deflection Top deflection
Length
(kN/m) (kN/m) (kN-m/m) (kN/m) (m) (mm) (mm)
1 ULS values 84 161 191 126 12 32 105
5 Load effects (max of 1, 3 and 6 for struts) 128 170 191 126
and max of 1, 3 and 4 for walls)
(as per CIRIA C580)
Adopted Load Effects 140 180 210 140 12m long sheet pile
Sheet Pile
Elev. Of Max.
Strut Forces Max BM## & its Max SF## & Its
Sheet Pile data (Top and Toe Level) Max Def. Max Def at toe Def at top Excavation
(kN per m run)## Elevation Elevation
Def. Level
##
Ultimate Forces and Moments (Factored Values); the strut forces are acting perpendicular to the plane of sheet pile. RL (-)5.8m
Notes: GWT RL (-)6.3m
1. The sheet piles shall be in good condition; damaged or distorted sheet piles shall not be used.
2. No over_excavation shall be permitted 12m Long, Grade 275, Interlocked, FSP III A Sheet Pile
3. Stockpiling of excavated material on retained side shall be avoided as far as possible
4. Movement of machineries up to 20m behind the sheet pile shall be kept to minimum possible
5. In any case, total surcharge due to item 3 and 4 above shall not exceed 10 kPa of surcharge
6. Removal of Strut T2:
The gap between the structure (concrete wall/ slab inside cofferdam) and the inside of cofferdam shall be filled with incompressible fill material such as compacted hardcore,
sand or gravel up to underside of strut T2 before removing the the same.
The gap between the structure (concrete wall/ slab inside cofferdam) and the inside of cofferdam shall be filled with incompressible fill material such as compacted hardcore,
sand or gravel up to underside of strut T1 before removing the the same.
Sheet Pile
Elev. Of Max.
Strut Forces Max BM## & its Max SF## & Its
Sheet Pile data (Top and Toe Level) Max Def. Max Def at toe Def at top Excavation
(kN per m run)## Elevation Elevation
Def. Level
##
Ultimate Forces and Moments (Factored Values); the strut forces are acting perpendicular to the plane of sheet pile. RL (-)4.6m
Notes: GWT RL (-)5.1m
1. The sheet piles shall be in good condition; damaged or distorted sheet piles shall not be used.
2. No over_excavation shall be permitted 12m Long, Interlocked, FSP III A Sheet Pile
3. Stockpiling of excavated material on retained side shall be avoided as far as possible
4. Movement of machineries up to 20m behind the sheet pile shall be kept to minimum possible
5. In any case, total surcharge due to item 3 and 4 above shall not exceed 10 kPa of surcharge
6. Removal of Strut T2:
The gap between the structure (concrete wall/ slab inside cofferdam) and the inside of cofferdam shall be filled with incompressible fill material such as compacted hardcore,
sand or gravel up to underside of strut T2 before removing the the same.
The gap between the structure (concrete wall/ slab inside cofferdam) and the inside of cofferdam shall be filled with incompressible fill material such as compacted hardcore,
sand or gravel up to underside of strut T1 before removing the the same.