ANGLE GRINDER No : ______________________________ Date : ______________________________________
Project Name: :________________________ Checklist No:____________________________ HOT WORK No : _____________________ If any item is damaged or not working properly, take a copy of this checklist and give it to your supervisor. Make notes, (ON THE COPY), in the comments section below. NOTE: If the powered industrial truck is not used, all inspection items must be marked not applicable (N/A). Mark “🗸” if the condition is good and “×” if action is needed. NR Location of Power / Equipment MON TUE WED THU FRI SAT SUN PRE - CHECKLIST 1 Loose connections 2 Conditions earthings 3 Cable free from bad joints 4 Cracked or broken insulation 5 Safety flange inserted on 9' 6 Switches in good order 7 Plug in order 8 Guards in place Comments :